DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA

No. Uraian Jenis Satuan Harga (Rp)

A. UPAH
U01 Pekerja Org/ Hari 49,700.00
U02 Mandor Org/ Hari 82,300.00
U03 Tukang Org/ Hari 78,700.00
U04 Kepala Tukang Org/ Hari 94,500.00
U05 Operator Org/ Hari 122,300.00
U06 Pembantu Operator Org/ Hari 75,000.00
U07 Mekanik Org/ Hari 122,300.00
U08 Mekanik Pembantu Org/ Hari 75,000.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA

No. Uraian Jenis Satuan Harga (Rp)

B. BAHAN
M01 Air Bersih Pengecoran Liter 150.00
M02 Angker Bolt D22+Mur+Ring Bh 42,000.00
M03 Bar Pengaman Unit 1,200,000.00
M04 Baja profil Kg 28,300.00
M05 Bambu Btg 34,100.00
M06 Batu Bata Buah 600.00
M07 Batukali / Batu Belah (Sungai / Gunung) M3 202,800.00
M08 Batu pecah 3 - 5 cm M3 290,950.00
M09 Batu pecah 2 - 3 cm M3 647,600.00
M10 Baut dan Mur Steel 1 1/2" Bh 22,000.00
M11 Baut Picer Ø16 mm Bh 12,000.00
M12 Base Plat 16 mm Bh 170,000.00
M13 Besi beton polos Kg 16,200.00
M14 Besi beton ulir/strip Kg 24,800.00
M15 Cat Tembok Kg 25,900.00
M16 Cat Menie Besi Kg 22,200.00
M17 Filter Bh 400,000.00
M18 Formite/penjaga jarak bekisting/spacer Bh 4,000.00
M19 Ijuk Kg 13,600.00
M20 Kantor Lapangan (Type C) M2 2,220,000.00
M21 Kawat beton Kg 10,500.00
M22 Kawat Bronjong dia. 5 mm Kg 22,800.00
M23 Kawat las Kg 16,000.00
M24 Koral Beton M3 141,100.00
M25 Balok Kayu Klas II M3 3,926,100.00
M26 Kayu Klas III (Borneo) M3 3,553,900.00
M27 Kayu Klas IV (Sengon) untuk Papan Begesting M3 2,948,100.00
M28 Kayu Dolken Ø 8-10 cm (panjang 4 M) Btg 62,500.00
M29 Lempengan Rumput M2 28,100.00
M30 Minyak Bensin Ltr 8,100.00
M31 Minyak cat Ltr 21,700.00
M32 Minyak Solar Ltr 8,100.00
M33 Minyak Tanah Ltr 6,700.00
M34 Minyak Bekisting Ltr 3,800.00
M35 Paku Kayu Kg 11,600.00
M36 Pasir beton/Kerikil M3 141,100.00
M37 Pasir Pasang M3 129,600.00
M38 Pasir urug M3 112,500.00
M39 Paving blok M2 83,700.00
M40 Pelumas / Oli Ltr 36,200.00
M41 Plywood 9 mm Lbr 150,500.00
M42 Pipa PVC Ø 1 12" Btg 71,900.00
M43 Semen Portland (@ 40 Kg) Zak 50,300.00
M44 Tanah Timbun M3 51,700.00
M45 Tanah Timbun Pilihan M3 122,600.00
M46 Plat Baja, t = 5 mm m2 25,700.00
M47 Pintu Air Sorong (B = 0,7 H = 1,0) Lengkap+pemasangan Set 3,000,000.00
M48 Pintu Air Koklep (B = 0,7 H = 1,25) Lengkap+pemasangan Set 4,000,000.00
M49 Pipa GIP ¢ 75 mm M' 96,006.00
M50 Pipa GIP ¢ 100 mm M' 200,946.00
M51 Pipa GIP ¢ 150 mm M' 272,689.50
M52 Pipa GIP ¢ 200 mm M' 344,433.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
M53 Pipa GIP ¢ 250 mm M' 544,978.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA

M54 Air Realease CI Ø 50 mm Bh 1,854,412.00


M55 Air Realease CI Ø 75 mm Bh 1,954,412.00
M56 Air Realease CI Ø 100 mm Bh 3,384,171.00
M57 Air Realease CI Ø 150 mm Bh 4,813,930.00
M58 Air Realease CI Ø 200 mm Bh 7,220,895.00
M59 All Range Bend 45° Bh 459,900.00
M60 Bend CI 22.5° Ø 75 mm Bh 179,100.00
M61 Bend CI 45° Ø 75 mm Bh 199,477.00
M62 Bend CI 90° Ø 75 mm Bh 248,240.00
M63 Bend CI 45° Ø 100 mm Bh 258,373.00
M64 Bend CI 45° Ø 150 mm Bh 442,349.00
M65 Bend CI 90° Ø 100 mm Bh 316,185.00
M66 Bend CI 45° Ø 200 mm Bh 626,325.00
M67 Bend CI 90° Ø 200 mm Bh 708,768.00
M68 Bend CI 45° Ø 250 mm Bh 1,310,750.00
M69 Bend CI 90° Ø 250 mm Bh 1,337,500.00
M70 Blinde Flange Bh 326,500.00
M71 Clamp Ø 100 mm Set 52,034.00
M72 Clamp Ø 150 mm Set 89,276.00
M73 Clamp Ø 200 mm Set 208,098.00
M74 Clamp dia. 200 mm dan Angker Bolt+Mur+Ring Set 250,098.00
M75 Clamp dia. 150 mm dan Angker Bolt+Mur+Ring Set 131,276.00
M76 Clamp dia. 100 mm dan Angker Bolt+Mur+Ring Set 94,034.00
M77 Dop GIP Ø 100 mm Bh 268,796.00
M78 Dop GIP Ø 150 mm Bh 383,994.00
M79 Dop GIP Ø 200 mm Bh 499,192.00
M80 Flange GIP Ø 75 mm Bh 100,000.00
M81 Flange GIP Ø 100 mm Bh 130,000.00
M82 Flange GIP Ø 150 mm Bh 165,000.00
M83 Flange GIP Ø 200 mm Bh 200,000.00
M84 Flange Socket GIP dia. 200 mm Bh 590,392.00
M85 Flange Socket GIP dia. 150 mm Bh 419,400.00
M86 Flange Socket GIP dia. 100 mm Bh 248,408.00
M87 Los Flange GIP dia. 100 mm Bh 56,900.00
M88 Los Flange GIP dia. 150 mm Bh 110,700.00
M89 Los Flange GIP dia. 200 mm Bh 164,500.00
M90 Flexible Joint Ø 150 mm Bh 798,200.00
M91 Flexible Joint Ø 200 mm Bh 798,200.00
M92 Gate Valve CI Ø 100 mm Bh 855,754.00
M93 Gate Valve CI Ø 150 mm Bh 1,702,905.00
M94 Gate Valve CI Ø 200 mm Bh 2,822,393.00
M95 Perangkat Mur, Baut & Ring Flange Ø 100 mm Set 35,450.00
M96 Perangkat Mur, Baut & Ring Flange Ø 150 mm Set 127,600.00
M97 Perangkat Mur, Baut & Ring Flange Ø 200 mm Set 137,500.00
M98 Reducer GIP Ø 100-75 mm Bh 250,352.00
M99 Reducer GIP Ø 150-100 mm Bh 330,737.00
M100 Reducer GIP Ø 200-100 mm Bh 421,791.00
M101 Socket GIP Ø 100 mm Bh 162,822.00
M102 Socket GIP Ø 150 mm Bh 187,450.00
M103 Dop Flange GIP dia. 200 mm Bh 516,000.00
M104 Tee GIP Ø 150-150-150 mm Bh 972,162.00
M105 Tee GIP Ø 200-200-200 mm Bh 1,069,378.00
M106 Tee GIP Ø 200 - 100 - 200 mm Bh 1,069,378.00
M107 Tee GIP Ø 150 - 100 - 150 mm Bh 972,162.00
M108 Tee All Flange CI Ø 150-100-150 mm Bh 612,254.00
M109 Tee All Flange CI Ø 200-100-200 mm Bh 991,890.00
M110 Tee All Flange CI Ø 200-150-200 mm Bh 1,030,410.00
M111 Tee All Flange CI Ø 200-200-200 mm Bh 1,049,670.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA

M112 Wall Flange Ø 200 mm Bh 425,000.00


M113 Pipa PVC RRJ S 12.5 ¢ 75 mm M' 41,578.00
M114 Pipa PVC RRJ S 12.5 ¢ 100 mm M' 70,495.00
M115 Pipa PVC RRJ S 12.5 ¢ 150 mm M' 132,932.50
M116 Pipa PVC RRJ S 12.5 ¢ 200 mm M' 195,370.00
M117 Pipa PVC RRJ S 12.5 ¢ 250 mm M' 307,188.00
M118 Bend 11.25° PVC Ø 75 mm Bh 56,528.00
M119 Bend 45° PVC Ø 75 mm Bh 62,528.00
M120 Bend 90° PVC Ø 75 mm Bh 68,507.00
M121 Bend 11.25° PVC Ø 100 mm Bh 93,723.00
M122 Bend 22.5° PVC Ø 100 mm Bh 96,111.00
M123 Bend 45° PVC Ø 100 mm Bh 99,871.00
M124 Bend 90° PVC Ø 100 mm Bh 117,219.00
M125 Bend 11.25° PVC Ø 200 mm Bh 274,733.00
M126 Bend 22.5° PVC Ø 200 mm Bh 290,533.00
M127 Bend 45° PVC Ø 200 mm Bh 335,333.00
M128 Bend 90° PVC Ø 200 mm Bh 390,532.00
M129 Bend 11.25° PVC Ø 250 mm Bh 586,300.00
M130 Bend 22.5° PVC Ø 250 mm Bh 629,200.00
M131 Bend 45° PVC Ø 250 mm Bh 1,015,938.00
M132 Bend 90° PVC Ø 250 mm Bh 1,206,693.00
M133 Dop PVC Ø 75 mm Bh 27,214.00
M134 Dop PVC Ø 100 mm Bh 96,428.00
M135 Dop PVC Ø 150 mm Bh 199,675.00
M136 Dop PVC Ø 200 mm Bh 302,922.00
M137 Flange Socket PVC Ø 75 mm Bh 102,185.00
M138 Flange Socket PVC Ø 100 mm Bh 122,863.00
M139 Flange Socket PVC Ø 150 mm Bh 294,691.50
M140 Flange Socket PVC Ø 200 mm Bh 466,520.00
M141 Reducer PVC Ø 100-75 mm Bh 64,228.00
M142 Reducer PVC Ø 200-75 mm Bh 337,425.00
M143 Reducer PVC Ø 200-100 mm Bh 337,425.00
M144 Socket PVC Ø 75 mm Bh 60,324.00
M145 Socket PVC Ø 100 mm Bh 81,133.00
M146 Socket PVC Ø 200 mm Bh 275,088.00
M147 Tee PVC Ø 100-100-100 mm Bh 339,546.00
M148 Tee PVC Ø 200-100-200 mm Bh 1,800,000.00
M149 Tee PVC Ø 200-200-200 mm Bh 2,160,000.00
M150 Street Box Bh 225,000.00
M151 Water Meter Box Bh 5,000,000.00
M152 Meter Air Ø 300 mm Bh 28,269,400.00
M153 Meter Air Ø 150 mm Bh 15,471,000.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA

No. Uraian Jenis Satuan Harga (Rp)

C. SEWA ALAT
A01 Alat Pengetesan Pipa Hk 75,000.00
A02 Jack Hammer Hk 150,000.00
A03 Concrete Mixer dan Vibrator Hk 100,000.00
A04 Stamper Hk 150,000.00
A05 Excavator Jam 343,208.28
A06 Buldozer Jam 547,125.46
A07 Vibro roller Jam 267,913.36
A08 Mesin Las Hk 100,000.00
A09 Alat Bantu Perpipaan (tracker & katrol) Hk 50,000.00
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP A05
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp 0.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 770,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000 Jam Alat Baru
c. Harga Alat (*) B' 770,000,000 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 77,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 115,862.57 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 770.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 116,632.57 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 97,200.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 43,440.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 57,750.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 17,471.43 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 226,575.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 343,208.28 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 17,471.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,100.00 Liter
5. Bahan Bakar Solar Ms 8,100.00 Liter
6. Minyak Pelumas Mp 36,200.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. A07
2. Tenaga Pw 75.0 HP
3. Kapasitas Cp 7.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600.0 Jam
c. Harga Alat B 431,200,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,280 Jam Sewa Alat
c. Harga Alat (*) B' 287,466,667 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 43,120,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 73,740.98 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 449.17 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 74,190.15 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 91,125.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 40,725.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 33,687.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 17,471.43 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 193,723.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 267,913.36 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 17,471.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,100.00 Liter
5. Bahan Bakar Solar Ms 8,100.00 Liter
6. Minyak Pelumas Mp 36,200.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN PRODUKSI ALAT

1. BULDOZER

Kapasitas bucket = 4.40 m3


Beban = 4.4 x 1.65 = 7.26 ton
Koefisien traksi = 0.7
Reaksi kritis = 0.7 x 7.26 = 5.08 ton
Kecepatan maju = 4.7 km/jam = 78.33 m/menit
Kecepatan mundur = 5.5 km/jam = 91.67 m/menit
Jarak dorong rata-rata = 50.00 m
Waktu maju (Wp) = 0.64 menit
Waktu mundur (Wj) = 0.55 menit
Waktu buang/pindah, dll = 0.30 menit
Total waktu (Ws) = 1.48 menit
Trip perjam = 40.44 trip
Produksi maks. alat = 4.4 x 40.44 = 177.93 m3

Faktor koreksi (Fk)


Efisiensi kerja siang (a) = 0.75
Ketrampilan operator (b) = 0.75
Cuaca cerah (C) = 0.90
Cara kerja (d) = 0.90
Kekerasan tanah (e) = 0.75
Total Fk = axbxcxdxe = 0.34
Taksiran produksi = 177.93 x 0.34 = 60.80 m3/jam
Dibulatkan 61.00 m3/jam

1 m3 tanah diperlukan faktor alat (buldozer) = 0.0164 jam


1 m2 tanah diperlukan faktor alat (buldozer) = 0.0049 jam = 203.33 m2/jam
1 Ha tanah diperlukan faktor alat (buldozer) = 49.1803 jam
= 0.0203 Ha/jam

Sumber : Hasil Perhitungan

2. EXCAVATOR

Kapasitas bucket = 0.80 m3


Beban = 0.8 x 1.65 = 1.32 ton
Berat excavator = 18.50 ton
Berat total = 19.82 ton
Koefisien traksi = 0.55
Reaksi kritis = 0.55 x 19.82 = 10.90 ton
Kecepatan maju = - km/jam = - m/menit
Kecepatan mundur = - km/jam = - m/menit
Jarak dorong rata-rata = - m
Waktu maju (Wp) = - menit
Waktu mundur (Wj) = - menit
Waktu buang/pindah, dll = 0.62 menit
Total waktu (Ws) = 0.62 menit
Trip perjam = 96.77 trip
Produksi maks. alat = 0.8 x 96.77 = 77.42 m3

Faktor koreksi (Fk)


Efisiensi kerja siang (a) = 0.80
Ketrampilan operator (b) = 0.80
Cuaca cerah (C) = 0.90
Faktor muat (d) = 0.90
Kekerasan tanah (e) = -
Total Fk = axbxcxd = 0.52
Taksiran produksi = 77.42 x 0.52 = 40.13 m3/jam
Dibulatkan 40.00 m3/jam

1 m3 tanah diperlukan faktor alat (buldozer) = 0.0250 jam


1 m2 tanah diperlukan faktor alat (buldozer) = 0.0075 jam = 133.33 m2/jam
1 Ha tanah diperlukan faktor alat (buldozer) = 75.0000 jam
= 0.0133 Ha/jam
1 m3 tanah diperlukan faktor alat (excavator) = 0.0250 jam

Sumber : Hasil Perhitungan


PERHITUNGAN PRODUKSI ALAT

3. VIBRATOR ROLLER

Kecepatan alat (V) = 3.00 km/jam


Lebar efektif pemadatan (B) = 1.10 m
Effisiensi (E) = 0.80
Faktor kembang (Fk) = 1.20
Tebal hamparan (t) = 0.30 m
Jumlah lintasan (N) = 10.00

Produksi alat = (V x B x t x E) / (N x Fk) = 66.00 m3/jam

1 m3 tanah diperlukan faktor alat (Vibrator roller) = 0.0152 jam

Sumber : Hasil Perhitungan


PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYA
Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915

BIDANG PROGRAM DAN PELAPORAN


PERENCANAAN PENGEMBANGAN INFRASTRUKTUR

ENGINEER ESTIMATE (EE)


A. PEMBANGUNAN JARINGAN AIR
BERSIH MEURANDEH - LANGSA LAMA -
SMA 2 LANGSA

KONSULTAN PERENCANA
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYA
Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915

CV. ZIYAD IDOLA CONSULTANT


KONSULTAN PERENCANAAN UMUM DAN PENGAWASAN
Head Office : Jl. Prada Utama Lr. Delima No. 10 Banda Aceh
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYA
Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915

BIDANG PROGRAM DAN PELAPORAN


PERENCANAAN PENGEMBANGAN INFRASTRUKTUR

ENGINEER ESTIMATE (EE)

NOMOR KONTRAK : 07-AC/CTR/BPP.P-OTSUS/DBC/APBA/2010


TANGGAL : 20 MEI 2010
PEKERJAAN : Perencanaan Pengembangan Infrastruktur (KOTA LANGSA)
KODE PAKET : PR INFRA 13/2010
NILAI KONTRAK : Rp. 162.923.000,-
NILAI KONTRAK FISIK : Rp. 6.447.585.000,-
SUMBER DANA : OTSUS
DPA SKPA : TAHUN ANGGARAN 2010

KONSULTAN PERENCANA
CV. ZIYAD IDOLA CONSULTANT
KONSULTAN PERENCANAAN UMUM DAN PENGAWASAN
Head Office : Jl. Prada Utama Lr. Delima No. 10 Banda Aceh
REKAPITULASI TOTAL

KEGIATAN : PERENCANAAN PENGEMBANGAN INFRASTRUKTUR (KOTA LANGSA)


LOKASI : KOTA LANGSA
TAHUN ANGGARAN : 2010

NO. URAIAN TOTAL HARGA (Rp.)

A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA-SMA2

LANGSA Rp. 2,370,121,110.20

B. SISTEM DRAINASE KOMPLEK PERUMAHAN SUNGAI PAOH KECAMATAN

LANGSA BARAT Rp. 3,491,320,400.74

TOTAL Rp. 5,861,441,510.94

PPn 10% Rp. 586,144,151.09

JUMLAH SELURUHNYA Rp. 6,447,585,662.03

DIBULATKAN Rp. 6,447,585,000.00

Terbilang : Enam Milyar Empat Ratus Empat Puluh Tujuh Juta Lima Ratus Delapan Puluh Lima Ribu Rupiah,-

Disetujui Oleh : Banda Aceh, September 2010


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Perencana,
Perencanaan Pengembangan Infrastruktur CV. ZIYAD IDOLA CONSULTANT
Dinas Bina Marga dan Cipta Karya Aceh

Mawaddah Noer, ST Abdullah, ST


Nip. 197404142006042002 Direktur

Mengetahui ;
Kepala Bidang Program dan Pelaporan
Dinas Bina Marga dan Cipta Karya
Kuasa Pengguna Anggaran / Kuasa Pengguna Barang

Ir. Mohd. Sanusi, M.Si


Pembina Tk. I / Nip. 19560707 198703 1 002
DAFTAR KUANTITAS DAN HARGA

Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa Barat
Pekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh
Lokasi : Kecamatan Langsa Barat, Kota Langsa
Tahun Anggaran : 2010

HARGA JUMLAH
KODE
NO. URAIAN PEKERJAAN SAT KUANTITAS SATUAN HARGA
ANALISA
(Rp) (Rp)
1 2 3 4 6 7=4x6

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Ls 1.00 A.1 21,000,000.00 21,000,000.00
2 Pembersihan Lapangan Ls 1.00 Taksir 2,000,000.00 2,000,000.00
3 Dewatering Ls 1.00 Taksir 6,500,000.00 6,500,000.00
4 Sewa Direksi Keet Unit 1.00 Taksir 2,000,000.00 2,000,000.00
5 Papan Nama Proyek Unit 1.00 Taksir 750,000.00 750,000.00
6 Adm. / Gbr. Lap / Dok. / Pas. Profil Ls 1.00 Taksir 4,500,000.00 4,500,000.00
Jumlah Harga Pekerjaan I (dipindah ke lembar Rekapitulasi) 36,750,000.00

II. PEKERJAAN TANGGUL BANJIR


1 Timbunan Tanah Didatangkan dan
dipadatkan dengan Alat Berat M3 3,099.57 B.6 156,697.00 485,693,320.29
2 Pasangan Gebalan Rumput M 2
3,334.38 B.8 42,535.00 141,827,853.30

Jumlah Harga Pekerjaan II (dipindah ke lembar Rekapitulasi) 627,521,173.59

III. PEKERJAAN SALURAN DRAINASE


1 Galian Tanah Biasa M3 2,057.62 B.2 48,434.00 99,658,767.08
2 Timbunan Tanah Hasil Galian M3 685.87 1/3 x B.2 16,144.67 11,073,196.34
3 Urugan Pasir M 3
62.16 B.7 150,733.00 9,369,563.28
4 Pasangan Batu Kosong (aanstamping) M3 248.65 D.2 364,629.00 90,665,000.85
5 Beton Tumbuk Lantai Kerja K.100 M3 62.16 C.1 598,775.00 37,219,854.00
6 Beton Struktur K.225 M3 420.43 C.3 1,184,505.00 498,001,437.15
7 Pekerjaan Besi Kg 44,035.67 C.4 18,165.00 799,907,945.55
8 Bekisting M2 2,179.31 C.7 511,321.00 1,114,326,968.51
9 Pipa Drain Hole PVC dia. 1 1/2" Bh 457.00 D.5 22,501.00 10,282,957.00

Jumlah Harga Pekerjaan III (dipindah ke lembar Rekapitulasi) 2,670,505,689.76

IV. PEKERJAAN PINTU AIR (1 UNIT)


1 Galian Tanah Biasa M3 19.78 B.2 48,434.00 958,024.52
2 Timbunan Tanah Hasil Galian M 3
4.95 1/3 x B.2 16,144.67 79,835.38
3 Urugan Pasir M3 8.71 B.7 150,733.00 1,312,884.43
4 Pasangan Batu Kosong (aanstamping) M3 17.42 D.2 364,629.00 6,351,837.18
5 Beton Tumbuk Lantai Kerja K.100 M3 8.35 C.1 598,775.00 4,999,771.25
6 Beton Cor K.175 M 3
15.68 C.2 739,466.00 11,594,826.88
7 Beton Struktur K.225 M3 31.02 C.3 1,184,505.00 36,743,345.10
8 Pekerjaan Besi Kg 842.66 C.4 18,165.00 15,306,918.90
9 Bekisting M2 123.75 C.7 511,321.00 63,275,973.75
10 Pipa Sandaran Galvanis Ø3" M' 20.00 M49 96,006.00 1,920,120.00
11 Pintu Air Sorong (B = 0,7 H = 1,0) Set 2.00 M47 3,000,000.00 6,000,000.00
12 Pintu Air Koklep (B = 0,7 H = 1,25) Set 2.00 M48 4,000,000.00 8,000,000.00

Jumlah Harga Pekerjaan IV (dipindah ke lembar Rekapitulasi) 156,543,537.39


DAFTAR KUANTITAS DAN HARGA

Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa Barat
Pekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh
Lokasi : Kecamatan Langsa Barat, Kota Langsa
Tahun Anggaran : 2010

HARGA JUMLAH
KODE
NO. URAIAN PEKERJAAN SAT KUANTITAS SATUAN HARGA
ANALISA
(Rp) (Rp)
1 2 3 4 6 7=4x6

REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa Barat
Pekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh
Lokasi : Kecamatan Langsa Barat, Kota Langsa
Tahun Anggaran : 2010

JUMLAH
NO. URAIAN PEKERJAAN HARGA KET.
(Rp)
1 2 3 4

I. PEKERJAAN PERSIAPAN 36,750,000.00


II. PEKERJAAN TANGGUL BANJIR 627,521,173.59
III. PEKERJAAN SALURAN DRAINASE 2,670,505,689.76
IV. PEKERJAAN PINTU AIR (1 UNIT) 156,543,537.39

A. Jumlah Harga 3,491,320,400.74


B. Pajak Pertambahan Nilai (PPn) = 10 % (A) 349,132,040.07
C. Jumlah (A) + (B) 3,840,452,440.81
D. DIBULATKAN 3,840,452,000.00

Terbilang : Tiga Milyar Delapan Ratus Empat Puluh Juta Empat Ratus Lima Puluh Dua Ribu Rupiah,-
ENGINEER'S ESTIMATE

KEGIATAN : PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA
PEKERJAAN : INSTALASI JARINGAN PIPA TRANSMISI PDAM TIRTA KEUMUNENG - LANGSA
LOKASI : KOTA LANGSA
TAHUN ANGGARAN : 2010

HARGA JUMLAH
No URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA SATUAN HARGA
(Rp) (Rp)

1 2 3 4 5 6 7

A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH -


LANGSA LAMA - SMA 2 LANGSA
I. PEKERJAAN PERSIAPAN
1 Direksi keet (sewa) 1.000 Ls Ditaksir 3,000,000.00 3,000,000.00
2 Pembersihan Lokasi Pekerjaan 1.000 Ls Ditaksir 1,700,000.00 1,700,000.00
3 Pematokan/Pengukuran (setting out) 1.000 Ls Ditaksir 4,850,000.00 4,850,000.00
4 Mobilisasi dan Demobilisasi 1.000 Ls Ditaksir 5,000,000.00 5,000,000.00
5 Administrasi, Dokumentasi dan Pelaporan 1.000 Ls Ditaksir 2,500,000.00 2,500,000.00
6 Papan Nama Proyek 1.000 Ls Ditaksir 750,000.00 750,000.00
7 Gambar Pekerjaan Selesai (As Built Drawing) 1.000 Ls Ditaksir 3,000,000.00 3,000,000.00

Jumlah (I) 20,800,000.00

II. PENGADAAN PIPA


1 Pengadaan Pipa GIP Panjang efektif 6 m'/batang
- Pipa GIP dia. 150 mm 27.000 M' M51 272,689.50 7,362,616.50
- Pipa GIP dia. 200 mm 202.000 M' M52 344,433.00 69,575,466.00

2 Pipa PVC lengkap dengan Rubber Ring Joint


Panjang efektif 6 m'/batang (seri S-12,5)
- Pipa PVC dia. 200 mm 4,002.000 M' M116 195,370.00 781,870,740.00
- Pipa PVC dia. 150 mm 515.000 M' M115 132,932.50 68,460,237.50
- Pipa PVC dia. 100 mm 95.000 M' M114 70,495.00 6,697,025.00

Jumlah (II) 933,966,085.00

III. PENGADAAN ASESORIES


(Lengkap dengan Baut, Mur, Rubber Ring dan Gasket)
1 Tee RRJ GIP dia. 150 mm 1.00 Bh M104 972,162.00 972,162.00
2 Bend GIP dia. 200 mm x 90 1.00 Bh M67 708,768.00 708,768.00
3 Bend PVC dia. 200 mm x 90º 5.00 Bh M128 390,532.00 1,952,660.00
4 Bend PVC dia. 200 mm x 45º 8.00 Bh M127 335,333.00 2,682,664.00
5 Bend PVC dia. 200 mm x 22.5º 3.00 Bh M126 290,533.00 871,599.00
6 Gate Valve GIP dia. 200 mm 1.00 Bh M94 2,822,393.00 2,822,393.00
7 Gate Valve GIP dia. 150 mm 2.00 Bh M93 1,702,905.00 3,405,810.00
8 Flange Socket PVC dia. 200 mm 11.00 Bh M140 466,520.00 5,131,720.00
9 Flange Socket PVC dia. 150 mm 9.00 Bh M139 294,691.50 2,652,223.50
10 Flange Socket GIP dia. 200 mm 8.00 Bh M84 590,392.00 4,723,136.00
11 Flange Socket GIP dia. 150 mm 10.00 Bh M85 419,400.00 4,194,000.00
12 Loos Flange GIP dia. 200 mm 10.00 Bh M89 164,500.00 1,645,000.00
13 Loos Flange GIP dia. 150 mm 10.00 Bh M88 110,700.00 1,107,000.00
14 Dop PVC dia. 150 mm 1.000 Bh M135 199,675.00 199,675.00

Jumlah (III) 33,068,810.50

IV. PEMASANGAN PIPA


1 Pekerjaan Tanah
a. Galian Tanah 2,523.760 M³ B.3 52,334.00 132,078,455.84
b. Urugan Kembali 2,092.685 M³ 1/3 x B3 17,444.67 36,506,192.26
c. Urugan Pasir 258.180 M³ B.7 150,733.00 38,916,245.94

2 Pekerjaan Beton
- Beton Cor K175 (trust block) 2.400 M³ C.2 739,466.00 1,774,718.40

3 Pipa PVC lengkap dengan Rubber Ring Joint


Panjang efektif 6 m'/batang (seri S-12,5)
a - Pipa PVC dia. 200 mm 4,002.000 M' E.4 23,413.00 93,698,826.00
b - Pipa PVC dia. 150 mm 515.000 M' E.3 19,514.00 10,049,710.00

4 Pengetesan Aliran Pipa 4,517.000 Ls (E.12+E.13)/2 5,623.50 25,401,349.50


Jumlah (IV) 338,425,497.94
HARGA JUMLAH
No URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA SATUAN HARGA
(Rp) (Rp)

1 2 3 4 5 6 7

V. PERLINTASAN PIPA
1 Perlintasan Pipa dia. 200 mm (5 unit) ###
- Pipa GIP dia. 200 mm 32.000 M' M52 344,433.00 11,021,856.00
Asesories :
- Flange GIP dia. 200 mm 8.000 Bh M83 200,000.00 1,600,000.00
- Flange GIP dia. 150 mm 8.000 Bh M82 165,000.00 1,320,000.00
- Tee GIP dia. 150 x 150 x 150 mm 1.000 Bh M104 972,162.00 972,162.00
- Gate Valve CI dia. 200 mm x 90º 1.000 Bh M94 2,822,393.00 2,822,393.00
- Gate Valve CI dia. 150 mm x 90º 1.000 Bh M93 1,702,905.00 1,702,905.00
- Bend CI dia. 200 mm x 45º 8.000 Bh M66 626,325.00 5,010,600.00
- Los Flange GIP dia. 200 mm 12.000 Bh M89 164,500.00 1,974,000.00
- Flange Socket PVC RRJ dia. 200 mm 4.000 Bh M140 466,520.00 1,866,080.00
- Baut dan Mur Ring Flange dia. 200 mm 2.000 Set M97 137,500.00 275,000.00
- Trust Block 0.600 M³ C.2 739,466.00 443,679.60
- Clamp dia. 200 mm dan Angker Bolt+Mur+Ring 10.000 Set M74 250,098.00 2,500,980.00
- Pabrikasi dan Pemasangan Perlintasan Jalan Pipa 5.000 Unit Ditaksir 8,500,000.00 42,500,000.00
(termasuk galian dan urugan)

2 Perlintasan Pipa dia. 150 mm (4 unit) ###


- Pipa GIP dia. 150 mm 27.000 M' M51 272,689.50 7,362,616.50
Asesories :
- Bend CI dia. 150 mm x 45º 12.000 Bh M64 442,349.00 5,308,188.00
- Los Flange GIP dia. 150 mm 6.000 Bh M88 110,700.00 664,200.00
- Flange Socket PVC RRJ dia. 150 mm 2.000 Bh M139 294,691.50 589,383.00
- Baut dan Mur Ring Flange dia. 150 mm 1.000 Set M96 127,600.00 127,600.00
- Trust Block 0.480 M³ C.2 739,466.00 354,943.68
- Clamp dia. 150 mm dan Angker Bolt+Mur+Ring 8.000 Set M75 131,276.00 1,050,208.00
- Pabrikasi dan Pemasangan Perlintasan Jalan Pipa 4.000 Unit Ditaksir 7,000,000.00 28,000,000.00
(termasuk galian dan urugan)

Jumlah (V) 117,466,794.78


HARGA JUMLAH
No URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA SATUAN HARGA
(Rp) (Rp)

1 2 3 4 5 6 7

VI. PEMBUATAN JEMBATAN PIPA (3 UNIT) + PERLINTASAN (1 UNIT)


1 Pekerjaan Tanah
- Galian Tanah 50.655 M³ B.3 52,334.00 2,650,978.77
- Urugan Kembali 12.664 M³ 1/3 x B3 17,444.67 220,914.90
- Urugan Pasir 1.620 M³ B.7 150,733.00 244,187.46

2 Pekerjaan Pasangan/Beton
- Pasangan Batu Kosong 1.620 M³ D.2 364,629.00 590,698.98
- Beton Cor Lantai K100 0.810 M³ C.1 598,775.00 485,007.75
- Beton Bertulang K225 24.696 M³ C.3 1,184,505.00 29,252,535.48
- Pembesian 798.360 Kg C.4 18,165.00 14,502,209.40
- Bekisting Pondasi 31.740 M2 C.6 194,462.00 6,172,223.88

3 Pemasangan Pipa dan Asesories


A. Pemasangan Pipa Jembatan
- Pipa PVC dia. 100 mm 144.000 M' M114 70,495.00 10,151,280.00
- Pipa GIP dia. 200 mm 92.000 M' M52 344,433.00 31,687,836.00
- Pipa GIP dia. 150 mm 102.000 M' ###
B. Asesories
- Flange Socket GIP dia. 200 mm 3.000 Bh M84 590,392.00 1,771,176.00
- Flange Socket GIP dia. 150 mm 5.000 Bh M85 419,400.00 2,097,000.00
- Flange Socket GIP dia. 100 mm 4.000 Bh M86 248,408.00 993,632.00
- Gate Valve CI dia. 200 mm 2.000 Bh M94 2,822,393.00 5,644,786.00
- Gate Valve CI dia. 150 mm 3.000 Bh M93 1,702,905.00 5,108,715.00
- Gate Valve CI dia. 100 mm 4.000 Bh M92 855,754.00 3,423,016.00
- Street Block 4.000 Bh M150 225,000.00 900,000.00
- Tee GIP dia. 200 - 100 - 200 mm 2.000 Bh M106 1,069,378.00 2,138,756.00
- Tee GIP dia. 150 - 100 - 150 mm 3.000 Bh M107 972,162.00 2,916,486.00
- Angker Bolt D22+Mur+Ring 36.000 Bh M02 42,000.00 1,512,000.00
- Bar Pengaman 8.000 Set M03 1,200,000.00 9,600,000.00
- Bend CI dia. 200 mm x 45º 5.000 Bh M66 626,325.00 3,131,625.00
- Bend CI dia. 150 mm x 45º 9.000 Bh M64 442,349.00 3,981,141.00
- Bend CI dia. 100 mm x 45º 4.000 Bh M63 258,373.00 1,033,492.00
- Air Realease CI Ø 50 mm 2.000 Bh M54 1,854,412.00 3,708,824.00
- Air Realease CI Ø 100 mm 3.000 Bh M56 3,384,171.00 10,152,513.00
- Base Plat 16 mm 6.000 Bh M12 170,000.00 1,020,000.00
- Baja Profil H.70.30.1,3.2,4 15,540.000 Kg M04 28,300.00 439,782,000.00
- Baut dan Mur Steel 1 1/2" 42.000 Set M10 22,000.00 924,000.00
- Los Flange GIP dia. 200 mm 10.000 Bh M89 164,500.000 1,645,000.00
- Los Flange GIP dia. 150 mm 19.000 Bh M88 110,700.000 2,103,300.00
- Los Flange GIP dia. 100 mm 7.000 Bh M87 56,900.000 398,300.00
- Trust Block 0.960 M³ C.2 739,466.00 709,887.36
- Pabrikasi dan Pemasangan Perlintasan Pipa Jembatan 4.000 Unit Ditaksir 12,000,000.00 48,000,000.00

Jumlah (VI) 648,653,521.98

VII. PEKERJAAN LAIN-LAIN


1 Pengadaan dan Pemasangan Pompa Centrifugal (termasuk panel, Instalasi
dan Asesories) dengan spesifikasi :
a. Pompa kapasitas 60 ltr/det, Head = 40 meter/37,5 kw/2900-3000 rpm 1.000 Unit Ditaksir 78,000,000.00 78,000,000.00
b. Pompa kapasitas 50 ltr/det, Head = 40 meter/30 kw/2900-3000 rpm 1.000 Unit Ditaksir 64,000,000.00 64,000,000.00
c. Pompa kapasitas 20 ltr/det, Head = 40 meter/18,5 kw/2900-3000 rpm 2.000 Unit Ditaksir 46,000,000.00 92,000,000.00

2 Pengadaan dan Pemasangan Meter air :


a. Meter air Ø 300 mm 1.000 Unit M152 28,269,400.00 28,269,400.00
b. Meter air Ø 300 mm 1.000 Unit M153 15,471,000.00 15,471,000.00

Jumlah (VII) 277,740,400.00


REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA
PEKERJAAN : INSTALASI JARINGAN PIPA TRANSMISI PDAM TIRTA KEUMUNENG - LANGSA
LOKASI : KOTA LANGSA
TAHUN ANGGARAN : 2010

JUMLAH HARGA
NO. URAIAN PEKERJAAN KET
(Rp.)

1 2

A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH -


LANGSA LAMA - SMA 2 LANGSA
I. PEKERJAAN PERSIAPAN 20,800,000.00
II. PENGADAAN PIPA 933,966,085.00
III. PENGADAAN ASESORIES 33,068,810.50
IV. PEMASANGAN PIPA 338,425,497.94
V. PERLINTASAN PIPA 117,466,794.78
VI. PEMBUATAN JEMBATAN PIPA (3 UNIT) + PERLINTASAN (1 UNIT) 648,653,521.98
VII. PEKERJAAN LAIN-LAIN 277,740,400.00

A. Jumlah Harga 2,370,121,110.20


B. Pajak Pertambahan Nilai (PPn) = 10 % (A) 237,012,111.02
C. Jumlah (A) + (B) 2,607,133,221.22
D. DIBULATKAN 2,607,133,000.00

Terbilang : Dua Milyar Enam Ratus Tujuh Juta Seratus Tiga Puluh Tiga Ribu Rupiah,-
JENIS PEKERJAAN : MOBILISASI/DEMOBILISASI
SATUAN PEKERJAAN : LS
KODE ANALISA : A.1

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A MOBILISASI ALAT & PERSONIL


1 Excavator bh 1.000 3,500,000.00 3,500,000.00
2 Buldozer bh 1.000 3,500,000.00 3,500,000.00
3 Vibro roller bh 1.000 3,500,000.00 3,500,000.00
4
5

B DEMOBILISASI ALAT & PERSONIL


1 Excavator bh 1.000 3,500,000.00 3,500,000.00
2 Buldozer bh 1.000 3,500,000.00 3,500,000.00
3 Vibro roller bh 1.000 3,500,000.00 3,500,000.00
4
5

Jumlah (termasuk biaya umum dan keuntungan) 21,000,000.00


Harga pekerjaan (diluar PPN) 21,000,000.00
Jumlah dibulatkan 21,000,000.00

Sumber : Hasil Perhitungan


JENIS PEKERJAAN : PASANGAN BATU 1 : 4 (TERMASUK SIAR 1 : 3)
SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 1.5000 49,700.00 74,550.00
2 Tukang OH 0.6000 78,700.00 47,220.00
3 Kepala Tukang OH 0.0600 94,500.00
4 Mandor OH 0.0750 82,300.00 6,172.50

B BAHAN
1 PC kg 163.0000 1,257.50 204,972.50
2 Batu Kali m3 1.2000 202,800.00 243,360.00
3 Pasir Pasang m3 0.5200 129,600.00 67,392.00

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan) 643,667.00


Harga pekerjaan (diluar PPN) 643,667.00
Jumlah dibulatkan 643,667.00

JENIS PEKERJAAN : PASANGAN BATU KOSONG (AANSTAMPING)


SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.7800 49,700.00 38,766.00
2 Tukang OH 0.3900 78,700.00 30,693.00
3 Kepala Tukang OH 0.0390 94,500.00
4 Mandor OH 0.0390 82,300.00 3,209.70

B BAHAN
1 Batu Kali m3 1.2000 202,800.00 243,360.00
2 Pasir Urug m3 0.4320 112,500.00 48,600.00

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan) 364,628.70


Harga pekerjaan (diluar PPN) 364,628.70
Jumlah dibulatkan 364,629.00
JENIS PEKERJAAN : PLESTERAN 1 : 3
SATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.2000 49,700.00 9,940.00
2 Tukang OH 0.1500 78,700.00 11,805.00
3 Kepala Tukang OH 0.0150 94,500.00
4 Mandor OH 0.0100 82,300.00 823.00

B BAHAN
1 PC kg 7.7760 1,257.50 9,778.32
2 Pasir Pasang m3 0.0230 129,600.00 2,980.80
3

C PERALATAN
1 -

Jumlah (termasuk biaya umum dan keuntungan) 35,327.12


Harga pekerjaan (diluar PPN) 35,327.12
Jumlah dibulatkan 35,327.00

JENIS PEKERJAAN : PLESTERAN 1 : 4


SATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.2000 49,700.00 9,940.00
2 Tukang OH 0.1500 78,700.00 11,805.00
3 Kepala Tukang OH 0.0150 94,500.00
4 Mandor OH 0.0100 82,300.00 823.00

B BAHAN
1 PC kg 6.2400 1,257.50 7,846.80
2 Pasir Pasang m3 0.0240 129,600.00 3,110.40
3

C PERALATAN
1 -

Jumlah (termasuk biaya umum dan keuntungan) 33,525.20


Harga pekerjaan (diluar PPN) 33,525.20
Jumlah dibulatkan 33,525.00
JENIS PEKERJAAN : GALIAN TANAH BIASA SEDALAM 1 METER
SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.7500 49,700.00 37,275.00
2 Mandor OH 0.0250 82,300.00 2,057.50
3

B BAHAN
1

C PERALATAN
1
2

Jumlah (termasuk biaya umum dan keuntungan) 39,332.50


Harga pekerjaan (diluar PPN) 39,332.50
Jumlah dibulatkan 39,333.00

Sumber : Analisa SNI 2007


JENIS PEKERJAAN : GALIAN TANAH BIASA SEDALAM 2 METER
SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.9000 49,700.00 44,730.00
2 Mandor OH 0.0450 82,300.00 3,703.50
3

B BAHAN
1

C PERALATAN
1
2

Jumlah (termasuk biaya umum dan keuntungan) 48,433.50


Harga pekerjaan (diluar PPN) 48,433.50
Jumlah dibulatkan 48,434.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : GALIAN TANAH KERAS SEDALAM 1 METER


SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 1.0000 49,700.00 49,700.00
2 Mandor OH 0.0320 82,300.00 2,633.60
3

B BAHAN
1

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan) 52,333.60


Harga pekerjaan (diluar PPN) 52,333.60
Jumlah dibulatkan 52,334.00

Sumber : Analisa SNI 2007


JENIS PEKERJAAN : GALIAN TANAH LUMPUR SEDALAM 1 METER
SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 1.2000 49,700.00 59,640.00
2 Mandor OH 0.0450 82,300.00 3,703.50
3

B BAHAN
1

C PERALATAN
1
2
3
4

Jumlah (termasuk biaya umum dan keuntungan) 63,343.50


Harga pekerjaan (diluar PPN) 63,343.50
Jumlah dibulatkan 63,344.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : MEMADATKAN TANAH (PER 20 CM)


SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.5000 49,700.00 24,850.00
2 Mandor OH 0.0500 82,300.00 4,115.00
3
4

B BAHAN
1

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan) 28,965.00


Harga pekerjaan (diluar PPN) 28,965.00
Jumlah dibulatkan 28,965.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : TIMBUNAN TANAH DIDATANGKAN & PEMADATAN DENGAN ALAT BERAT
SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.3000 49,700.00 14,910.00
2 Mandor OH 0.0100 82,300.00 823.00
3 Operator OH 0.2905 122,300.00 35,528.15
4 Pembantu Operator OH 0.2905 75,000.00 21,787.50
B BAHAN
1 Tanah Timbun m3 1.2000 51,700.00 62,040.00

C PERALATAN
1 Excavator Jam 0.0250 343,208.28 8,580.21
2 Buldozer Jam 0.0164 547,125.46 8,969.27
3 Vibro roller Jam 0.0152 267,913.36 4,059.29

Jumlah (termasuk biaya umum dan keuntungan) 156,697.42


Harga pekerjaan (diluar PPN) 156,697.42
Jumlah dibulatkan 156,697.00

Sumber : Analisa SNI 2007


JENIS PEKERJAAN : TIMBUNAN PASIR URUG
SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.3000 49,700.00 14,910.00
2 Mandor OH 0.0100 82,300.00 823.00

B BAHAN
1 Pasir urug m3 1.2000 112,500.00 135,000.00

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan) 150,733.00


Harga pekerjaan (diluar PPN) 150,733.00
Jumlah dibulatkan 150,733.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : PEKERJAAN GEBALAN RUMPUT


SATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.1500 49,700.00 7,455.00
2 Mandor OH 0.0150 82,300.00 1,234.50
3 Alat bantu set 0.0125 10,000.00 125.00

B BAHAN
1 Lempengan Rumput m2 1.2000 28,100.00 33,720.00

Jumlah (termasuk biaya umum dan keuntungan) 42,534.50


Harga pekerjaan (diluar PPN) 42,534.50
Jumlah dibulatkan (B) 42,535.00

Sumber : Hasil Perhitungan


JENIS PEKERJAAN : BETON K.175 (TANPA ACUAN)
SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 1.6500 49,700.00 82,005.00
2 Tukang OH 0.2750 78,700.00 21,642.50
3 Kepala Tukang OH 0.0280 94,500.00 2,646.00
4 Mandor OH 0.0830 82,300.00 6,830.90
5
6

B BAHAN
1 Pasir Beton kg 760.00 100.79 76,597.14
2 Kerikil kg 1,029.00 104.52 107,549.56
3 PC kg 326.00 1,257.50 409,945.00
4 Air Liter 215.00 150.00 32,250.00
5
6

C PERALATAN
1
2
3

Jumlah (termasuk biaya umum dan keuntungan 739,466.10


Harga pekerjaan (diluar PPN) 739,466.10
Jumlah dibulatkan 739,466.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : BETON STRUKTUR K.225 (TANPA ACUAN)


SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 1.6500 49,700.00 82,005.00
2 Tukang OH 0.2750 78,700.00 21,642.50
3 Kepala Tukang OH 0.0280 94,500.00 2,646.00
4 Mandor OH 0.0830 82,300.00 6,830.90
5

B BAHAN
1 Kerikil (batu pecah 2-3 cm) kg 1,047.00 479.70 502,249.78
2 Pasir Beton kg 698.00 100.79 70,348.43
3 PC kg 371.00 1,257.50 466,532.50
4 Air Liter 215.00 150.00 32,250.00

C PERALATAN
1
2

Jumlah (termasuk biaya umum dan keuntungan 1,184,505.11


Harga pekerjaan (diluar PPN) 1,184,505.11
Jumlah dibulatkan 1,184,505.00

Sumber : Analisa SNI 2007


JENIS PEKERJAAN : BESI TULANGAN POLOS
SATUAN PEKERJAAN : 10 KG

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.0700 49,700.00 3,479.00
2 Tukang OH 0.0700 78,700.00 5,509.00
Kepala Tukang OH 0.0070 94,500.00 661.50
3 Mandor OH 0.0040 82,300.00 329.20

B BAHAN
1 Besi beton polos kg 10.5000 16,200.00 170,100.00
2 Kawat Beton kg 0.1500 10,500.00 1,575.00

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan 181,653.70


Harga pekerjaan (diluar PPN) 181,653.70
Jumlah untuk 1 Kg Besi 18,165.37
Jumlah dibulatkan 18,165.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : BESI TULANGAN ULIR


SATUAN PEKERJAAN : 10 KG

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.0700 49,700.00 3,479.00
2 Tukang OH 0.0700 78,700.00 5,509.00
Kepala Tukang OH 0.0070 94,500.00 661.50
3 Mandor OH 0.0040 82,300.00 329.20

B BAHAN
1 Besi beton ulir kg 10.5000 24,800.00 260,400.00
2 Kawat Beton kg 0.1500 10,500.00 1,575.00

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan 271,953.70


Harga pekerjaan (diluar PPN) 271,953.70
Jumlah untuk 1 Kg Besi 27,195.37
Jumlah dibulatkan 27,195.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : ACUAN BETON/BEKISTING UNTUK PONDASI


SATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.5200 49,700.00 25,844.00
2 Tukang OH 0.2600 78,700.00 20,462.00
3 Kepala Tukang OH 0.0260 94,500.00
4 Mandor OH 0.0260 82,300.00 2,139.80

B BAHAN
1 Paku kg 0.3000 11,600.00 3,480.00
2 Kayu kelas III m3 0.0400 3,553,900.00 142,156.00
3 Minyak bekisting liter 0.1000 3,800.00 380.00

C PERALATAN
1 -
Jumlah (termasuk biaya umum dan keuntungan) 194,461.80
Harga pekerjaan (diluar PPN) 194,461.80
Jumlah dibulatkan 194,462.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : ACUAN BETON/BEKISTING UNTUK DINDING


SATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.6600 49,700.00 32,802.00
2 Tukang OH 0.3300 78,700.00 25,971.00
3 Kepala Tukang OH 0.0330 94,500.00 3,118.50
4 Mandor OH 0.0330 82,300.00 2,715.90

B BAHAN
1 Paku kg 0.4000 11,600.00 4,640.00
2 Kayu kelas III m3 0.0300 3,553,900.00 106,617.00
3 Balok kayu kelas II m3 0.0200 3,926,100.00 78,522.00
4 Minyak bekisting liter 0.2000 3,800.00 760.00
5 Plywood tebal 9 mm lembar 0.3500 150,500.00 52,675.00
6 Kayu dolken batang 3.0000 62,500.00 187,500.00
7 Formite/penjaga jarak bekisting/spacer buah 4.0000 4,000.00 16,000.00

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan) 511,321.40


Harga pekerjaan (diluar PPN) 511,321.40
Jumlah dibulatkan 511,321.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : ACUAN BETON/BEKISTING UNTUK LANTAI


SATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.6600 49,700.00 32,802.00
2 Tukang OH 0.3300 78,700.00 25,971.00
3 Kepala Tukang OH 0.0330 94,500.00 3,118.50
4 Mandor OH 0.0330 82,300.00 2,715.90

B BAHAN
1 Paku kg 0.4000 11,600.00 4,640.00
2 Kayu kelas III m3 0.0400 3,553,900.00 142,156.00
3 Balok kayu kelas II m3 0.0150 3,926,100.00 58,891.50
4 Minyak bekisting liter 0.2000 3,800.00 760.00
5 Plywood tebal 9 mm lembar 0.3500 150,500.00 52,675.00
6 Kayu dolken batang 6.0000 62,500.00 375,000.00
-

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan) 698,729.90


Harga pekerjaan (diluar PPN) 698,729.90
Jumlah dibulatkan 698,730.00

Sumber : Analisa SNI 2007


Kebutuhan
Tukanjam
Besi
produkg
Satu Bkg/hariWaktu dan Tenaga untuk Pemasangan Tulangan Pengelak #REF!
hkg 0.27
1.10
4.12
32.96
Vol. db kg
waktujam
jika hari
Pekerja
Besi
Satu Beton
produksi
hari 1jam
(8 Ulirtukang
jam) jam
kg
kg/hari 0.13
1.10
8.27
66.17
Vol. dikerjakan
waktu
jika baja yang
yang akan
dibutuhkan
50 dikerjakan
orang kg
jam
hari #REF!
#REF!
Kebutuhan
Pekerja
Kayu
produksi
Satu acuan
hari Waktu
1(8jam
jam) dan Tenaga untuk Pemasangan Bekisting dan Perancah
danpekerja
perancah m3 Pengelak
jam
m3/jam
m3/hari 2.45
0.52
0.21
1.68
Vol. dikerjakan
waktu
jika Bekisting
yang dan perancah
dibutuhkan
1 orang m3
jam
hari #REF!
#REF!
Kebutuhan
Tukanjam
Besi
produkg
Satu B
hkg
kg/hari Waktu dan Tenaga untuk Pemasangan Tulangan Peimpah32.96
0.27
1.10
4.12
Vol. b
waktujam
jika d kg
hari #REF!
#REF!
Pekerja
Besi
Satu Beton
produksi
hari (8Ulir
1jam tukang
jam) jam
kg
kg/hari 0.13
1.10
8.27
66.17
Vol. dikerjakan
waktu
jika baja yang
yang akan
dibutuhkandikerjakan
50 orang kg
jam
hari #REF!
#REF!
Kebutuhan
Pekerja
Kayu
produksiacuan Waktu
1(8jam dan Tenaga untuk Pemasangan Bekisting dan Perancah
danpekerja
perancah m3 Pelimpah
jam
m3/jam 2.45
0.52
0.21
Satu
Vol.
waktu hari
Bekisting
yang jam)
dan perancah
dibutuhkan m3/hari
m3
jam 1.68
#REF!
jika dikerjakan 1 orang hari
JENIS PEKERJAAN : PENGELASAN
SATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Tukang OH 0.5000 49,700.00 24,850.00
2 Kepala Tukang OH 0.0210 82,300.00 1,728.30
3

B BAHAN
1 Kawat Las Kg 2.3000 16,000.00 36,800.00
2 Solar Liter 0.7500 8,100.00 6,075.00

C PERALATAN
1 Mesin Las (sewa) Jam 0.0710 14,285.71 1,014.29
2

Jumlah (termasuk biaya umum dan keuntungan) 70,467.59


Harga pekerjaan (diluar PPN) 70,467.59
Jumlah dibulatkan 70,468.00

Sumber : Hasil Perhitungan


JENIS PEKERJAAN : PEMASANGAN PIPA PVC DIA. 75 MM - 100 MM
SATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.0810 49,700.00 4,025.70
2 Mandor OH 0.0041 82,300.00 337.43
3 Kepala Tukang OH 0.0135 94,500.00 1,275.75
4 Tukang OH 0.1350 78,700.00 10,624.50

B BAHAN
1

C PERALATAN
1
2

Jumlah (termasuk biaya umum dan keuntungan) 16,263.38


Harga pekerjaan (diluar PPN) 16,263.38
Jumlah dibulatkan 16,263.00

Sumber : Hasil Perhitungan

JENIS PEKERJAAN : PEMASANGAN PIPA PVC DIA. 150 MM


SATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.0972 49,700.00 4,830.84
2 Mandor OH 0.0049 82,300.00 403.27
3 Kepala Tukang OH 0.0162 94,500.00 1,530.90
4 Tukang OH 0.1620 78,700.00 12,749.40

B BAHAN
1

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan) 19,514.41


Harga pekerjaan (diluar PPN) 19,514.41
Jumlah dibulatkan 19,514.00

Sumber : Hasil Perhitungan


JENIS PEKERJAAN : PEMASANGAN PIPA PVC DIA. 200 MM
SATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.1166 49,700.00 5,795.02
2 Tukang OH 0.1944 78,700.00 15,299.28
3 Kepala Tukang OH 0.0194 94,500.00 1,833.30
4 Mandor OH 0.0059 82,300.00 485.57

B BAHAN
1

C PERALATAN
1
2
3
4

Jumlah (termasuk biaya umum dan keuntungan) 23,413.17


Harga pekerjaan (diluar PPN) 23,413.17
Jumlah dibulatkan 23,413.00

Sumber : Hasil Perhitungan

JENIS PEKERJAAN : PEMASANGAN PIPA PVC DIA. 250 MM


SATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.1341 49,700.00 6,664.77
2 Mandor OH 0.2236 78,700.00 17,597.32
3 Kepala Tukang OH 0.0224 94,500.00 2,116.80
4 Mandor OH 0.0068 82,300.00 559.64

B BAHAN
1

C PERALATAN
1

Jumlah (termasuk biaya umum dan keuntungan) 26,938.53


Harga pekerjaan (diluar PPN) 26,938.53
Jumlah dibulatkan 26,939.00

Sumber : Hasil Perhitungan

JENIS PEKERJAAN : PEMASANGAN PIPA GSP/STEEL DIA. 75 MM


SATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH


Rp. Rp.

A TENAGA
1 Pekerja OH 0.1080 49,700.00 5,367.60
2 Tukang OH 0.1800 78,700.00 14,166.00
3 Kepala tukang OH 0.0180 94,500.00 1,701.00
4 Mandor OH 0.0054 82,300.00 444.42
B BAHAN
1 Pengelasan Keliling M' 0.2355 115,292.50 27,151.38

C PERALATAN
1 Alat Bantu Ls 1.0000 75,000.00 75,000.00
2
3

Jumlah (termasuk biaya umum dan keuntungan) 123,830.40


Harga pekerjaan (diluar PPN) 123,830.40
Jumlah dibulatkan 123,830.00

Sumber : Hasil Perhitungan


REKAP ANALISA HARGA SATUAN PEKERJAAN

PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE

KODE
URAIAN SATUAN
ANALISA
A PEKERJAAN PERSIAPAN
A.1 MOBILISASI/DEMOBILISASI LS
B PEKERJAAN TANAH
B.1 GALIAN TANAH BIASA SEDALAM 1 METER M3
B.2 GALIAN TANAH BIASA SEDALAM 2 METER M3
B.3 GALIAN TANAH KERAS SEDALAM 1 METER M3
B.4 GALIAN TANAH LUMPUR SEDALAM 1 METER M3
B.5 MEMADATKAN TANAH (PER 20 CM) M3
B.6 TIMBUNAN TANAH DIDATANGKAN & PEMADATAN DENGAN ALAT BERAT M3
B.7 TIMBUNAN PASIR URUG M3
B.8 PEKERJAAN GEBALAN RUMPUT M2
C PEKERJAAN BETON
C.1 BETON NON STRUKTUR (K.100) M3
C.2 BETON K.175 (TANPA ACUAN) M3
C.3 BETON STRUKTUR K.225 (TANPA ACUAN) M3
C.4 BESI TULANGAN POLOS KG
C.5 BESI TULANGAN ULIR KG
C.6 ACUAN BETON/BEKISTING UNTUK PONDASI M2
C.7 ACUAN BETON/BEKISTING UNTUK DINDING M2
C.8 ACUAN BETON/BEKISTING UNTUK LANTAI M2
D PEKERJAAN PASANGAN
D.1 PASANGAN BATU 1 : 4 (TERMASUK SIAR 1 : 3) M3
D.2 PASANGAN BATU KOSONG (AANSTAMPING) M3
D.3 PLESTERAN 1 : 3 M2
D.4 PLESTERAN 1 : 4 M2
D.5 DRAIN HOLE BH
E PEKERJAAN PIPA
E.1 PENGELASAN M'
E.2 PEMASANGAN PIPA PVC DIA. 75 MM - 100 MM M'
E.3 PEMASANGAN PIPA PVC DIA. 150 MM M'
E.4 PEMASANGAN PIPA PVC DIA. 200 MM M'
E.5 PEMASANGAN PIPA PVC DIA. 250 MM M'
E.6 PEMASANGAN PIPA GSP/STEEL DIA. 75 MM M'
E.7 PEMASANGAN PIPA GSP/STEEL DIA. 100 MM M'
E.8 PEMASANGAN PIPA GSP/STEEL DIA. 150 MM M'
E.9 PEMASANGAN PIPA GSP/STEEL DIA. 200 MM M'
E.10 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 75 MM M'
E.11 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 100 MM M'
E.12 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 150 MM M'
E.13 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 200 MM M'

Sumber : Hasil Perhitungan


ANALISA HARGA SATUAN PEKERJAAN

HARGA SATUAN
Rp.

21,000,000.00

39,333.00
48,434.00
52,334.00
63,344.00
28,965.00
156,697.00
150,733.00
42,535.00

598,775.00
739,466.00
1,184,505.00
18,165.00
194,462.00
194,462.00
511,321.00
698,730.00

643,667.00
364,629.00
35,327.00
33,525.00
22,501.00

70,468.00
16,263.00
19,514.00
23,413.00
26,939.00
123,830.00
138,305.00
163,185.00
188,066.00
1,975.00
2,717.00
4,655.00
6,592.00
PERHITUNGAN PERKIRAAN KEBUTUHAN ALAT

PERSIAPAN LAHAN

1 hari 8 jam kerja


Waktu 7 hari kerja
56 jam kerja
Luas pembersihan 0.46 ha
Target produksi 0.008 m3/jam
Volume galian 916.80 m3
Target produksi 16.37 m3/jam

Alat Produksi Jumlah alat


Excavator 40.00 m3/jam 0.41 1
Dump truck #REF! m3/jam #REF! #REF!
Buldozer 0.0203 ha/jam 0.403 1
Sumber : Hasil Perhitungan

PEMBERSIHAN (LAND CLEARING)

1 hari 8 jam kerja


Waktu 45 hari kerja
360 jam kerja
Luas pembersihan #REF! ha
Target produksi #REF! ha/jam

Alat Produksi Jumlah alat


Buldozer 0.0203 ha/jam #REF! #REF!
Excavator 0.0133 ha/jam #REF! #REF!
Dump truck #REF! ha/jam #REF! #REF!
Sumber : Hasil Perhitungan

GALIAN TANAH DI DAERAH GENANGAN

1 hari 8 jam kerja


Waktu 60 hari kerja
480 jam kerja
Volume galian 35394.69 m3
Target produksi 73.74 m3/jam

Alat Produksi Jumlah alat


Excavator 40.00 m3/jam 1.84 2
Dump truck #REF! m3/jam #REF! #REF!
Sumber : Hasil Perhitungan
PERHITUNGAN PERKIRAAN KEBUTUHAN ALAT

TIMBUNAN KEDAP AIR DAN RANDOM DI DAERAH GENANGAN

1 hari 8 jam kerja


Waktu 75 hari kerja
600 jam kerja
Volume Timbunan #VALUE! m3
Target produksi #VALUE! m3/jam

Alat Produksi Jumlah alat


Excavator 40.00 m3/jam #VALUE! #VALUE!
Dump truck #REF! m3/jam #VALUE! #VALUE!
Bulldozer 61.00 m3/jam #VALUE! #VALUE!
Vibro roller 66.00 m3/jam #VALUE! #VALUE!
Water tanker #REF! m3/jam #VALUE! #VALUE!
Sumber : Hasil Perhitungan

GALIAN UNTUK INLET, SAL.PENGELAK DAN BANG. INTAKE

1 hari 8 jam kerja


Waktu 180 hari kerja
1440 jam kerja
Volume galian 155618.95 m3
Target produksi 108.07 m3/jam

Alat Produksi Jumlah alat


Excavator 40.00 m3/jam 2.70 3
Dump truck #REF! m3/jam #REF! #REF!
Sumber : Hasil Perhitungan

GALIAN PONDASI BENDUNGAN PENGELAK/COFFERDAM

1 hari 8 jam kerja


Waktu 7 hari kerja
56 jam kerja
Volume galian #REF! m3
Target produksi #REF! m3/jam

Alat Produksi Jumlah alat


Excavator 40.00 m3/jam #REF! #REF!
Dump truck #REF! m3/jam #REF! #REF!
Sumber : Hasil Perhitungan

TIMBUNAN CLAY BLANKET

1 hari 8 jam kerja


Waktu 45 hari kerja
360 jam kerja
Volume Timbunan #REF! m3
Target produksi #REF! m3/jam

Alat Produksi Jumlah alat


Excavator 40.00 m3/jam #REF! #REF!
Dump truck #REF! m3/jam #REF! #REF!
Bulldozer 61.00 m3/jam #REF! #REF!
Vibro roller 66.00 m3/jam #REF! #REF!
PERHITUNGAN PERKIRAAN KEBUTUHAN ALAT

Water tanker #REF! m3/jam #REF! #REF!


Sumber : Hasil Perhitungan
PERHITUNGAN PERKIRAAN KEBUTUHAN ALAT

TIMBUNAN TANAH RANDOM DI BLANKET

1 hari 8 jam kerja


Waktu 30 hari kerja
240 jam kerja
Volume Timbunan 21167.81 m3
Target produksi 88.20 m3/jam

Alat Produksi Jumlah alat


Excavator 40.00 m3/jam 2.20 3
Dump truck #REF! m3/jam #REF! #REF!
Bulldozer 61.00 m3/jam 1.45 2
Vibro roller 66.00 m3/jam 1.34 2
Water tanker #REF! m3/jam #REF! #REF!
Sumber : Hasil Perhitungan

PEMASANGAN RIP-RAP DI LERENG HULU COFFERDAM

1 hari 8 jam kerja


Waktu 7 hari kerja
56 jam kerja
Volume galian #REF! m3
Target produksi #REF! m3/jam

Alat Produksi Jumlah alat


Excavator 40.00 m3/jam #REF! #REF!
Dump truck #REF! m3/jam #REF! #REF!
Sumber : Hasil Perhitungan

GALIAN UNTUK BANG. PELIMPAH

1 hari 8 jam kerja


Waktu 90 hari kerja
720 jam kerja
Volume galian #REF! m3
Target produksi #REF! m3/jam

Alat Produksi Jumlah alat


Excavator 40.00 m3/jam #REF! #REF!
Dump truck #REF! m3/jam #REF! #REF!
Sumber : Hasil Perhitungan