PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
A. UPAH
U01 Pekerja Org/ Hari 49,700.00
U02 Mandor Org/ Hari 82,300.00
U03 Tukang Org/ Hari 78,700.00
U04 Kepala Tukang Org/ Hari 94,500.00
U05 Operator Org/ Hari 122,300.00
U06 Pembantu Operator Org/ Hari 75,000.00
U07 Mekanik Org/ Hari 122,300.00
U08 Mekanik Pembantu Org/ Hari 75,000.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
B. BAHAN
M01 Air Bersih Pengecoran Liter 150.00
M02 Angker Bolt D22+Mur+Ring Bh 42,000.00
M03 Bar Pengaman Unit 1,200,000.00
M04 Baja profil Kg 28,300.00
M05 Bambu Btg 34,100.00
M06 Batu Bata Buah 600.00
M07 Batukali / Batu Belah (Sungai / Gunung) M3 202,800.00
M08 Batu pecah 3 - 5 cm M3 290,950.00
M09 Batu pecah 2 - 3 cm M3 647,600.00
M10 Baut dan Mur Steel 1 1/2" Bh 22,000.00
M11 Baut Picer Ø16 mm Bh 12,000.00
M12 Base Plat 16 mm Bh 170,000.00
M13 Besi beton polos Kg 16,200.00
M14 Besi beton ulir/strip Kg 24,800.00
M15 Cat Tembok Kg 25,900.00
M16 Cat Menie Besi Kg 22,200.00
M17 Filter Bh 400,000.00
M18 Formite/penjaga jarak bekisting/spacer Bh 4,000.00
M19 Ijuk Kg 13,600.00
M20 Kantor Lapangan (Type C) M2 2,220,000.00
M21 Kawat beton Kg 10,500.00
M22 Kawat Bronjong dia. 5 mm Kg 22,800.00
M23 Kawat las Kg 16,000.00
M24 Koral Beton M3 141,100.00
M25 Balok Kayu Klas II M3 3,926,100.00
M26 Kayu Klas III (Borneo) M3 3,553,900.00
M27 Kayu Klas IV (Sengon) untuk Papan Begesting M3 2,948,100.00
M28 Kayu Dolken Ø 8-10 cm (panjang 4 M) Btg 62,500.00
M29 Lempengan Rumput M2 28,100.00
M30 Minyak Bensin Ltr 8,100.00
M31 Minyak cat Ltr 21,700.00
M32 Minyak Solar Ltr 8,100.00
M33 Minyak Tanah Ltr 6,700.00
M34 Minyak Bekisting Ltr 3,800.00
M35 Paku Kayu Kg 11,600.00
M36 Pasir beton/Kerikil M3 141,100.00
M37 Pasir Pasang M3 129,600.00
M38 Pasir urug M3 112,500.00
M39 Paving blok M2 83,700.00
M40 Pelumas / Oli Ltr 36,200.00
M41 Plywood 9 mm Lbr 150,500.00
M42 Pipa PVC Ø 1 12" Btg 71,900.00
M43 Semen Portland (@ 40 Kg) Zak 50,300.00
M44 Tanah Timbun M3 51,700.00
M45 Tanah Timbun Pilihan M3 122,600.00
M46 Plat Baja, t = 5 mm m2 25,700.00
M47 Pintu Air Sorong (B = 0,7 H = 1,0) Lengkap+pemasangan Set 3,000,000.00
M48 Pintu Air Koklep (B = 0,7 H = 1,25) Lengkap+pemasangan Set 4,000,000.00
M49 Pipa GIP ¢ 75 mm M' 96,006.00
M50 Pipa GIP ¢ 100 mm M' 200,946.00
M51 Pipa GIP ¢ 150 mm M' 272,689.50
M52 Pipa GIP ¢ 200 mm M' 344,433.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
M53 Pipa GIP ¢ 250 mm M' 544,978.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
C. SEWA ALAT
A01 Alat Pengetesan Pipa Hk 75,000.00
A02 Jack Hammer Hk 150,000.00
A03 Concrete Mixer dan Vibrator Hk 100,000.00
A04 Stamper Hk 150,000.00
A05 Excavator Jam 343,208.28
A06 Buldozer Jam 547,125.46
A07 Vibro roller Jam 267,913.36
A08 Mesin Las Hk 100,000.00
A09 Alat Bantu Perpipaan (tracker & katrol) Hk 50,000.00
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP A05
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp 0.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 770,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000 Jam Alat Baru
c. Harga Alat (*) B' 770,000,000 Rupiah Alat Baru
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 17,471.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,100.00 Liter
5. Bahan Bakar Solar Ms 8,100.00 Liter
6. Minyak Pelumas Mp 36,200.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. A07
2. Tenaga Pw 75.0 HP
3. Kapasitas Cp 7.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600.0 Jam
c. Harga Alat B 431,200,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,280 Jam Sewa Alat
c. Harga Alat (*) B' 287,466,667 Rupiah Sewa Alat
B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 43,120,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 17,471.43 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 8,100.00 Liter
5. Bahan Bakar Solar Ms 8,100.00 Liter
6. Minyak Pelumas Mp 36,200.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN PRODUKSI ALAT
1. BULDOZER
2. EXCAVATOR
3. VIBRATOR ROLLER
KONSULTAN PERENCANA
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYA
Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915
KONSULTAN PERENCANA
CV. ZIYAD IDOLA CONSULTANT
KONSULTAN PERENCANAAN UMUM DAN PENGAWASAN
Head Office : Jl. Prada Utama Lr. Delima No. 10 Banda Aceh
REKAPITULASI TOTAL
Terbilang : Enam Milyar Empat Ratus Empat Puluh Tujuh Juta Lima Ratus Delapan Puluh Lima Ribu Rupiah,-
Mengetahui ;
Kepala Bidang Program dan Pelaporan
Dinas Bina Marga dan Cipta Karya
Kuasa Pengguna Anggaran / Kuasa Pengguna Barang
Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa Barat
Pekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh
Lokasi : Kecamatan Langsa Barat, Kota Langsa
Tahun Anggaran : 2010
HARGA JUMLAH
KODE
NO. URAIAN PEKERJAAN SAT KUANTITAS SATUAN HARGA
ANALISA
(Rp) (Rp)
1 2 3 4 6 7=4x6
I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Ls 1.00 A.1 21,000,000.00 21,000,000.00
2 Pembersihan Lapangan Ls 1.00 Taksir 2,000,000.00 2,000,000.00
3 Dewatering Ls 1.00 Taksir 6,500,000.00 6,500,000.00
4 Sewa Direksi Keet Unit 1.00 Taksir 2,000,000.00 2,000,000.00
5 Papan Nama Proyek Unit 1.00 Taksir 750,000.00 750,000.00
6 Adm. / Gbr. Lap / Dok. / Pas. Profil Ls 1.00 Taksir 4,500,000.00 4,500,000.00
Jumlah Harga Pekerjaan I (dipindah ke lembar Rekapitulasi) 36,750,000.00
Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa Barat
Pekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh
Lokasi : Kecamatan Langsa Barat, Kota Langsa
Tahun Anggaran : 2010
HARGA JUMLAH
KODE
NO. URAIAN PEKERJAAN SAT KUANTITAS SATUAN HARGA
ANALISA
(Rp) (Rp)
1 2 3 4 6 7=4x6
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa Barat
Pekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh
Lokasi : Kecamatan Langsa Barat, Kota Langsa
Tahun Anggaran : 2010
JUMLAH
NO. URAIAN PEKERJAAN HARGA KET.
(Rp)
1 2 3 4
Terbilang : Tiga Milyar Delapan Ratus Empat Puluh Juta Empat Ratus Lima Puluh Dua Ribu Rupiah,-
ENGINEER'S ESTIMATE
KEGIATAN : PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA
PEKERJAAN : INSTALASI JARINGAN PIPA TRANSMISI PDAM TIRTA KEUMUNENG - LANGSA
LOKASI : KOTA LANGSA
TAHUN ANGGARAN : 2010
HARGA JUMLAH
No URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7
2 Pekerjaan Beton
- Beton Cor K175 (trust block) 2.400 M³ C.2 739,466.00 1,774,718.40
1 2 3 4 5 6 7
V. PERLINTASAN PIPA
1 Perlintasan Pipa dia. 200 mm (5 unit) ###
- Pipa GIP dia. 200 mm 32.000 M' M52 344,433.00 11,021,856.00
Asesories :
- Flange GIP dia. 200 mm 8.000 Bh M83 200,000.00 1,600,000.00
- Flange GIP dia. 150 mm 8.000 Bh M82 165,000.00 1,320,000.00
- Tee GIP dia. 150 x 150 x 150 mm 1.000 Bh M104 972,162.00 972,162.00
- Gate Valve CI dia. 200 mm x 90º 1.000 Bh M94 2,822,393.00 2,822,393.00
- Gate Valve CI dia. 150 mm x 90º 1.000 Bh M93 1,702,905.00 1,702,905.00
- Bend CI dia. 200 mm x 45º 8.000 Bh M66 626,325.00 5,010,600.00
- Los Flange GIP dia. 200 mm 12.000 Bh M89 164,500.00 1,974,000.00
- Flange Socket PVC RRJ dia. 200 mm 4.000 Bh M140 466,520.00 1,866,080.00
- Baut dan Mur Ring Flange dia. 200 mm 2.000 Set M97 137,500.00 275,000.00
- Trust Block 0.600 M³ C.2 739,466.00 443,679.60
- Clamp dia. 200 mm dan Angker Bolt+Mur+Ring 10.000 Set M74 250,098.00 2,500,980.00
- Pabrikasi dan Pemasangan Perlintasan Jalan Pipa 5.000 Unit Ditaksir 8,500,000.00 42,500,000.00
(termasuk galian dan urugan)
1 2 3 4 5 6 7
2 Pekerjaan Pasangan/Beton
- Pasangan Batu Kosong 1.620 M³ D.2 364,629.00 590,698.98
- Beton Cor Lantai K100 0.810 M³ C.1 598,775.00 485,007.75
- Beton Bertulang K225 24.696 M³ C.3 1,184,505.00 29,252,535.48
- Pembesian 798.360 Kg C.4 18,165.00 14,502,209.40
- Bekisting Pondasi 31.740 M2 C.6 194,462.00 6,172,223.88
KEGIATAN : PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA
PEKERJAAN : INSTALASI JARINGAN PIPA TRANSMISI PDAM TIRTA KEUMUNENG - LANGSA
LOKASI : KOTA LANGSA
TAHUN ANGGARAN : 2010
JUMLAH HARGA
NO. URAIAN PEKERJAAN KET
(Rp.)
1 2
Terbilang : Dua Milyar Enam Ratus Tujuh Juta Seratus Tiga Puluh Tiga Ribu Rupiah,-
JENIS PEKERJAAN : MOBILISASI/DEMOBILISASI
SATUAN PEKERJAAN : LS
KODE ANALISA : A.1
A TENAGA
1 Pekerja OH 1.5000 49,700.00 74,550.00
2 Tukang OH 0.6000 78,700.00 47,220.00
3 Kepala Tukang OH 0.0600 94,500.00
4 Mandor OH 0.0750 82,300.00 6,172.50
B BAHAN
1 PC kg 163.0000 1,257.50 204,972.50
2 Batu Kali m3 1.2000 202,800.00 243,360.00
3 Pasir Pasang m3 0.5200 129,600.00 67,392.00
C PERALATAN
1
A TENAGA
1 Pekerja OH 0.7800 49,700.00 38,766.00
2 Tukang OH 0.3900 78,700.00 30,693.00
3 Kepala Tukang OH 0.0390 94,500.00
4 Mandor OH 0.0390 82,300.00 3,209.70
B BAHAN
1 Batu Kali m3 1.2000 202,800.00 243,360.00
2 Pasir Urug m3 0.4320 112,500.00 48,600.00
C PERALATAN
1
A TENAGA
1 Pekerja OH 0.2000 49,700.00 9,940.00
2 Tukang OH 0.1500 78,700.00 11,805.00
3 Kepala Tukang OH 0.0150 94,500.00
4 Mandor OH 0.0100 82,300.00 823.00
B BAHAN
1 PC kg 7.7760 1,257.50 9,778.32
2 Pasir Pasang m3 0.0230 129,600.00 2,980.80
3
C PERALATAN
1 -
A TENAGA
1 Pekerja OH 0.2000 49,700.00 9,940.00
2 Tukang OH 0.1500 78,700.00 11,805.00
3 Kepala Tukang OH 0.0150 94,500.00
4 Mandor OH 0.0100 82,300.00 823.00
B BAHAN
1 PC kg 6.2400 1,257.50 7,846.80
2 Pasir Pasang m3 0.0240 129,600.00 3,110.40
3
C PERALATAN
1 -
A TENAGA
1 Pekerja OH 0.7500 49,700.00 37,275.00
2 Mandor OH 0.0250 82,300.00 2,057.50
3
B BAHAN
1
C PERALATAN
1
2
A TENAGA
1 Pekerja OH 0.9000 49,700.00 44,730.00
2 Mandor OH 0.0450 82,300.00 3,703.50
3
B BAHAN
1
C PERALATAN
1
2
A TENAGA
1 Pekerja OH 1.0000 49,700.00 49,700.00
2 Mandor OH 0.0320 82,300.00 2,633.60
3
B BAHAN
1
C PERALATAN
1
A TENAGA
1 Pekerja OH 1.2000 49,700.00 59,640.00
2 Mandor OH 0.0450 82,300.00 3,703.50
3
B BAHAN
1
C PERALATAN
1
2
3
4
A TENAGA
1 Pekerja OH 0.5000 49,700.00 24,850.00
2 Mandor OH 0.0500 82,300.00 4,115.00
3
4
B BAHAN
1
C PERALATAN
1
JENIS PEKERJAAN : TIMBUNAN TANAH DIDATANGKAN & PEMADATAN DENGAN ALAT BERAT
SATUAN PEKERJAAN : M3
A TENAGA
1 Pekerja OH 0.3000 49,700.00 14,910.00
2 Mandor OH 0.0100 82,300.00 823.00
3 Operator OH 0.2905 122,300.00 35,528.15
4 Pembantu Operator OH 0.2905 75,000.00 21,787.50
B BAHAN
1 Tanah Timbun m3 1.2000 51,700.00 62,040.00
C PERALATAN
1 Excavator Jam 0.0250 343,208.28 8,580.21
2 Buldozer Jam 0.0164 547,125.46 8,969.27
3 Vibro roller Jam 0.0152 267,913.36 4,059.29
A TENAGA
1 Pekerja OH 0.3000 49,700.00 14,910.00
2 Mandor OH 0.0100 82,300.00 823.00
B BAHAN
1 Pasir urug m3 1.2000 112,500.00 135,000.00
C PERALATAN
1
A TENAGA
1 Pekerja OH 0.1500 49,700.00 7,455.00
2 Mandor OH 0.0150 82,300.00 1,234.50
3 Alat bantu set 0.0125 10,000.00 125.00
B BAHAN
1 Lempengan Rumput m2 1.2000 28,100.00 33,720.00
A TENAGA
1 Pekerja OH 1.6500 49,700.00 82,005.00
2 Tukang OH 0.2750 78,700.00 21,642.50
3 Kepala Tukang OH 0.0280 94,500.00 2,646.00
4 Mandor OH 0.0830 82,300.00 6,830.90
5
6
B BAHAN
1 Pasir Beton kg 760.00 100.79 76,597.14
2 Kerikil kg 1,029.00 104.52 107,549.56
3 PC kg 326.00 1,257.50 409,945.00
4 Air Liter 215.00 150.00 32,250.00
5
6
C PERALATAN
1
2
3
A TENAGA
1 Pekerja OH 1.6500 49,700.00 82,005.00
2 Tukang OH 0.2750 78,700.00 21,642.50
3 Kepala Tukang OH 0.0280 94,500.00 2,646.00
4 Mandor OH 0.0830 82,300.00 6,830.90
5
B BAHAN
1 Kerikil (batu pecah 2-3 cm) kg 1,047.00 479.70 502,249.78
2 Pasir Beton kg 698.00 100.79 70,348.43
3 PC kg 371.00 1,257.50 466,532.50
4 Air Liter 215.00 150.00 32,250.00
C PERALATAN
1
2
A TENAGA
1 Pekerja OH 0.0700 49,700.00 3,479.00
2 Tukang OH 0.0700 78,700.00 5,509.00
Kepala Tukang OH 0.0070 94,500.00 661.50
3 Mandor OH 0.0040 82,300.00 329.20
B BAHAN
1 Besi beton polos kg 10.5000 16,200.00 170,100.00
2 Kawat Beton kg 0.1500 10,500.00 1,575.00
C PERALATAN
1
A TENAGA
1 Pekerja OH 0.0700 49,700.00 3,479.00
2 Tukang OH 0.0700 78,700.00 5,509.00
Kepala Tukang OH 0.0070 94,500.00 661.50
3 Mandor OH 0.0040 82,300.00 329.20
B BAHAN
1 Besi beton ulir kg 10.5000 24,800.00 260,400.00
2 Kawat Beton kg 0.1500 10,500.00 1,575.00
C PERALATAN
1
A TENAGA
1 Pekerja OH 0.5200 49,700.00 25,844.00
2 Tukang OH 0.2600 78,700.00 20,462.00
3 Kepala Tukang OH 0.0260 94,500.00
4 Mandor OH 0.0260 82,300.00 2,139.80
B BAHAN
1 Paku kg 0.3000 11,600.00 3,480.00
2 Kayu kelas III m3 0.0400 3,553,900.00 142,156.00
3 Minyak bekisting liter 0.1000 3,800.00 380.00
C PERALATAN
1 -
Jumlah (termasuk biaya umum dan keuntungan) 194,461.80
Harga pekerjaan (diluar PPN) 194,461.80
Jumlah dibulatkan 194,462.00
A TENAGA
1 Pekerja OH 0.6600 49,700.00 32,802.00
2 Tukang OH 0.3300 78,700.00 25,971.00
3 Kepala Tukang OH 0.0330 94,500.00 3,118.50
4 Mandor OH 0.0330 82,300.00 2,715.90
B BAHAN
1 Paku kg 0.4000 11,600.00 4,640.00
2 Kayu kelas III m3 0.0300 3,553,900.00 106,617.00
3 Balok kayu kelas II m3 0.0200 3,926,100.00 78,522.00
4 Minyak bekisting liter 0.2000 3,800.00 760.00
5 Plywood tebal 9 mm lembar 0.3500 150,500.00 52,675.00
6 Kayu dolken batang 3.0000 62,500.00 187,500.00
7 Formite/penjaga jarak bekisting/spacer buah 4.0000 4,000.00 16,000.00
C PERALATAN
1
A TENAGA
1 Pekerja OH 0.6600 49,700.00 32,802.00
2 Tukang OH 0.3300 78,700.00 25,971.00
3 Kepala Tukang OH 0.0330 94,500.00 3,118.50
4 Mandor OH 0.0330 82,300.00 2,715.90
B BAHAN
1 Paku kg 0.4000 11,600.00 4,640.00
2 Kayu kelas III m3 0.0400 3,553,900.00 142,156.00
3 Balok kayu kelas II m3 0.0150 3,926,100.00 58,891.50
4 Minyak bekisting liter 0.2000 3,800.00 760.00
5 Plywood tebal 9 mm lembar 0.3500 150,500.00 52,675.00
6 Kayu dolken batang 6.0000 62,500.00 375,000.00
-
C PERALATAN
1
A TENAGA
1 Tukang OH 0.5000 49,700.00 24,850.00
2 Kepala Tukang OH 0.0210 82,300.00 1,728.30
3
B BAHAN
1 Kawat Las Kg 2.3000 16,000.00 36,800.00
2 Solar Liter 0.7500 8,100.00 6,075.00
C PERALATAN
1 Mesin Las (sewa) Jam 0.0710 14,285.71 1,014.29
2
A TENAGA
1 Pekerja OH 0.0810 49,700.00 4,025.70
2 Mandor OH 0.0041 82,300.00 337.43
3 Kepala Tukang OH 0.0135 94,500.00 1,275.75
4 Tukang OH 0.1350 78,700.00 10,624.50
B BAHAN
1
C PERALATAN
1
2
A TENAGA
1 Pekerja OH 0.0972 49,700.00 4,830.84
2 Mandor OH 0.0049 82,300.00 403.27
3 Kepala Tukang OH 0.0162 94,500.00 1,530.90
4 Tukang OH 0.1620 78,700.00 12,749.40
B BAHAN
1
C PERALATAN
1
A TENAGA
1 Pekerja OH 0.1166 49,700.00 5,795.02
2 Tukang OH 0.1944 78,700.00 15,299.28
3 Kepala Tukang OH 0.0194 94,500.00 1,833.30
4 Mandor OH 0.0059 82,300.00 485.57
B BAHAN
1
C PERALATAN
1
2
3
4
A TENAGA
1 Pekerja OH 0.1341 49,700.00 6,664.77
2 Mandor OH 0.2236 78,700.00 17,597.32
3 Kepala Tukang OH 0.0224 94,500.00 2,116.80
4 Mandor OH 0.0068 82,300.00 559.64
B BAHAN
1
C PERALATAN
1
A TENAGA
1 Pekerja OH 0.1080 49,700.00 5,367.60
2 Tukang OH 0.1800 78,700.00 14,166.00
3 Kepala tukang OH 0.0180 94,500.00 1,701.00
4 Mandor OH 0.0054 82,300.00 444.42
B BAHAN
1 Pengelasan Keliling M' 0.2355 115,292.50 27,151.38
C PERALATAN
1 Alat Bantu Ls 1.0000 75,000.00 75,000.00
2
3
PROPINSI : ACEH
KOTA : LANGSA
TAHUN ANGGARAN : 2010
PAKET : SEKTOR AIR BERSIH DAN DRAINASE
PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KODE
URAIAN SATUAN
ANALISA
A PEKERJAAN PERSIAPAN
A.1 MOBILISASI/DEMOBILISASI LS
B PEKERJAAN TANAH
B.1 GALIAN TANAH BIASA SEDALAM 1 METER M3
B.2 GALIAN TANAH BIASA SEDALAM 2 METER M3
B.3 GALIAN TANAH KERAS SEDALAM 1 METER M3
B.4 GALIAN TANAH LUMPUR SEDALAM 1 METER M3
B.5 MEMADATKAN TANAH (PER 20 CM) M3
B.6 TIMBUNAN TANAH DIDATANGKAN & PEMADATAN DENGAN ALAT BERAT M3
B.7 TIMBUNAN PASIR URUG M3
B.8 PEKERJAAN GEBALAN RUMPUT M2
C PEKERJAAN BETON
C.1 BETON NON STRUKTUR (K.100) M3
C.2 BETON K.175 (TANPA ACUAN) M3
C.3 BETON STRUKTUR K.225 (TANPA ACUAN) M3
C.4 BESI TULANGAN POLOS KG
C.5 BESI TULANGAN ULIR KG
C.6 ACUAN BETON/BEKISTING UNTUK PONDASI M2
C.7 ACUAN BETON/BEKISTING UNTUK DINDING M2
C.8 ACUAN BETON/BEKISTING UNTUK LANTAI M2
D PEKERJAAN PASANGAN
D.1 PASANGAN BATU 1 : 4 (TERMASUK SIAR 1 : 3) M3
D.2 PASANGAN BATU KOSONG (AANSTAMPING) M3
D.3 PLESTERAN 1 : 3 M2
D.4 PLESTERAN 1 : 4 M2
D.5 DRAIN HOLE BH
E PEKERJAAN PIPA
E.1 PENGELASAN M'
E.2 PEMASANGAN PIPA PVC DIA. 75 MM - 100 MM M'
E.3 PEMASANGAN PIPA PVC DIA. 150 MM M'
E.4 PEMASANGAN PIPA PVC DIA. 200 MM M'
E.5 PEMASANGAN PIPA PVC DIA. 250 MM M'
E.6 PEMASANGAN PIPA GSP/STEEL DIA. 75 MM M'
E.7 PEMASANGAN PIPA GSP/STEEL DIA. 100 MM M'
E.8 PEMASANGAN PIPA GSP/STEEL DIA. 150 MM M'
E.9 PEMASANGAN PIPA GSP/STEEL DIA. 200 MM M'
E.10 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 75 MM M'
E.11 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 100 MM M'
E.12 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 150 MM M'
E.13 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 200 MM M'
HARGA SATUAN
Rp.
21,000,000.00
39,333.00
48,434.00
52,334.00
63,344.00
28,965.00
156,697.00
150,733.00
42,535.00
598,775.00
739,466.00
1,184,505.00
18,165.00
194,462.00
194,462.00
511,321.00
698,730.00
643,667.00
364,629.00
35,327.00
33,525.00
22,501.00
70,468.00
16,263.00
19,514.00
23,413.00
26,939.00
123,830.00
138,305.00
163,185.00
188,066.00
1,975.00
2,717.00
4,655.00
6,592.00
PERHITUNGAN PERKIRAAN KEBUTUHAN ALAT
PERSIAPAN LAHAN