Anda di halaman 1dari 10

PIPELINE PROJECT

JOB No: 001

PT. PERTAMINA EP – FIELD LIMAU

PROJECT SPECIFICATION

PROTECTIVE COATING

DOCUMENT NUMBER: 005/2014-LMU-001

REV REV DESCRIPTION PREP’D CHK’D APP’D NOTE


A 00 ISSUED FOR INTERNAL REVIEW AS
B 00 ISSUED FOR CONSTRUCTION AS
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU

PROJECT SPECIFICATION
PROTECTIVE COATING

TABLE OF CONTENTS

Page
1.0 SCOPE ………………………………………………………………………………………………. 3
2.0 CODES AND STANDARDS ……………………………………………………………………….. 3
3.0 GENERAL REQUIREMENTS ……………………………………………………………………... 3
4.0 SURFACE PREPARATION ………………………………………………………………………... 3
5.0 COATING SYSTEMS ……………………………………………………………………………... 4
6.0 APPLICATION ……………………………………………………………………………………... 6
7.0 INSPECTION ……………………………………………………………………………………….. 6
8.0 CAUSE FOR REJECTION …………………………………………………………………………. 8
9.0 COLOR CODING ………………………………………………………………………………….. 8
10.0 GUARANTEE ……………………………………………………………………………………….. 10

Page 2 of 10
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU

1.0 SCOPE
This Specification covers the requirements governing the coating systems to be used on exterior
steel surfaces of production facilities including, but not limited to, structural steel, piping, vessels,
skids, heat stacks and equipment not supplied with a COMPANY approved factory applied
coating or galvanizing.

2.0 CODES AND STANDARDS


The requirements and recommendations of the latest revisions of the following listed codes and
standards shall apply:
2.1 Steel Structures Painting Manual - SSPC
2.2 Internal of Portable Water Tanks - U.S. Public Health Service Regulation.

3.0 GENERAL REQUIREMENT


3.1 The purpose of this Specification and its referenced codes and standards is to establish a minimum
level of acceptable quality. Alternate standard designs of equal or superior quality may be
proposed, provided all exceptions are listed and written approval for all exceptions is obtained
from COMPANY.
3.2 In the case of conflict between documents, CONTRACTOR shall submit the discrepancy
immediately to COMPANY for final resolution. In its Bid Document, CONTRACTOR shall
provide for the more stringent requirement unless otherwise instructed in writing by COMPANY.
3.3 Substitutions or modifications of any item, material or detail shall be made only upon written
approval of COMPANY.
3.4 The material supplied shall be of a standard model or series in regular production at
Manufacturer's facilities.
3.5 COMPANY has the right to stop blasting and painting operations when, in COMPANY's opinion,
weather conditions are not deemed suitable for such operations.

4.0 SURFACE PREPARATION


4.1 All steel surfaces shall be prepared and dry abrasive blasted in accordance with SSPC. The
maximum rough peak in the surface pattern shall be 6 mils.
4.2 The compressed air used for the blasting shall be free from detrimental amounts of water and oil.
Adequate traps and separators shall be provided at the compressor and at the pot inlet.
4.3 Blast cleaning abrasives shall be free from detrimental amounts of dirt or other such contaminants
and water soluble, acid soluble, or other such soluble contaminants. It shall contain no more than
100 ppm of chloride (Na). A flash rust 15 minutes after blasting indicates excessive salt presence.
The surface must be fresh water cleaned and reblasted.
Copper slag may be reused a maximum of two times and only if it meets the other
requirements of this Specification, and if a representative grit sample of 200 gms is sieved
and meets grit size G-14.

Page 3 of 10
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
4.4 Dry blast cleaning operations shall not be conducted on surfaces that will be wet after blasting and
before painting or on surfaces that are less than 5° above the dew point or when the relative
humidity of the air is greater than 85%.
4.5 Extreme care shall be exercised to prevent damage when blasting near flange faces, valve stems,
coated bolts and nuts, control panels, instrument valves, nameplates, machined surfaces and
factory coated items. These surfaces shall be protected during blasting and coating operations.
4.6 Abrasive blasting shall be permitted only during daylight hours. Rough blasting shall be allowed
at night, and shall be touched up during the day.

5.0 COATING SYSTEMS


5.1 General
Protective coatings shall be used in accordance with the Paint Manufacturer's application
instructions. For the various service areas, the systems selected shall have their prime,
intermediate and top coats supplied by the same Manufacturer. The minimum pot life shall
be 1 hour at 86° F for all coatings.
5.2 Generic Names
5.2.1 Inorganic Zinc
A self, acid curing alko silicate based inorganic zinc primer, two component
systems with metallic zinc content minimum 88% by weight of the non-volatile
portion. The dry film thickness (dft) must be lead free and shall comply with
SSPC-Paint 20.
5.2.2 Epoxy-Polyamide
A high wetting, high build 2 pack epoxy containing solids not less than 65% of
the non-volatiles. Capable of being used as a self primer and for overcoating old
alkyd and chlorinated rubber paints. Must be able to achieve at least 6 mils d.f.t.
in single application without sagging and shall comply with SSPC-Paint 22.
5.2.3 Aliphatic Polyurethane
A two component aliphatic polyurethane modified with acrylic resin to achieve
minimum dry film thickness of 50 microns. Must comply with SSPC-PS Guide
17.00, Type V.
5.2.4 Zinc Primer (Touch-up)
A modified inorganic zinc rich primer or modified epoxy zinc rich primer for
touch-up consisting of single pack zinc rich primer capable of brush or spray
application. Must be suitable for overlapping existing coatings and for spot
priming power tool cleaned steel where necessary. Minimum volume solids 34%
with minimum 65 microns d.f.t. capabilities, and otherwise meeting SSPC-Paint
20 (such as Amercoat 160).
5.2.5 Polymeric Epoxy Resin
A two pack wave and impact resistant epoxy resin cladding capable of being
sprayed to a thickness of 200 mils. Paint Manufacturer must produce a record of
successful applications of similar nature.
5.2.6 Epoxy-Polyamid Anti-Skid
A sprayable two pack polyamide cured epoxy coatings with anti skid properties.
Must be capable of spray application with d.f.t. capability of 8 mils minimum in
one application and shall comply with SSPC-Paint 22.
Page 4 of 10
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
5.3 Purchased Equipment
All purchased equipment items such as compressors, motors, drivers, valves, switchgear,
panel boards, transmitters and packaged units such as chlorinators, watermakers, etc. shall
be coated in accordance with the Painting Schedule Service Area II. Alternative systems
may be approved by COMPANY if technical data on the proposed coating system is
submitted for COMPANY's approval.
All purchased equipment items and other surfaces that have a factory finish that is not in
compliance with this Specification shall be recoated or repaired in accordance with this
Specification by CONTRACTOR at no cost to COMPANY.
5.4 Galvanizing
All surfaces to be galvanized shall be in accordance with ASTM A123 or A153 and the
provisions of this Specification. Before galvanizing, all material shall be fully fabricated,
free from all flashes or burrs, with smooth edges, and with all welding completed.
All galvanized surfaces other than grating shall be cleaned and degreased in accordance
with SSPC SP1. It shall be allowed to dry, then coated with a single 7 to 15 micron DFT
application of butyral etch primer such as Unilite 220 or Carboline 1037WP. Brush blasting
may be used in lieu of etch priming. Epoxy and polyurethane intermediate and top coats
shall be applied per Service Area II within two hours of cleaning with due regard to drying
times.
Reinstatement of damaged galvanized surfaces may be repaired by removing any sharp
burrs, insuring that any required welding is complete, followed by pre-treatment in
accordance with SSPC SP1, and subject to approval by COMPANY. The damaged surfaces
shall then receive a coating of "ZRC" cold galvanizing compound or approved equivalent
material.
5.5 Touch-Up
Touch-up or repair of defective areas shall be accomplished using the procedures and
coatings as specified in this Specification for the original coating.
Touch-up painting shall be conducted at least weekly. Any item remaining uncoated in the
structure or piping system shall be removed and coated at CONTRACTOR's expense.
5.6 Preconstruction Primers
Preconstruction primers may be used. The brand and generic type shall be submitted to
COMPANY for prior approval.
5.7 Diesel Fuel Line Internals
The internal surface of diesel fuel line piping shall be surface prepared and coated with an
epoxy system. CONTRACTOR shall submit the system for COMPANY's prior approval.
5.8 Anode Areas
The surface of the stand-off leg directly beneath the anode is to be coated with coal tar
epoxy such as Amercoat 78HB. This area of the stand-off shall be blasted to SSPC SP5 and
coated with two (2) coats of coal tar epoxy to a minimum dry film thickness of 8 mils each
coat.

Page 5 of 10
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
6.0 APPLICATION
6.1 The protective coatings shall be thoroughly mixed applied in strict accordance with SSPC and the
Paint Manufacturer's instructions over clean, properly prepared surfaces.
6.2 The cleaned metal surface is to have the initial coat applied within a period not to exceed 4 hours
after blasting.
6.3 A minimum of 6" around the edge of blasted areas shall be left uncoated unless adjoining a newly
coated surface. Blasting shall continue to a minimum of 1" into adjoining coated surfaces.
6.4 Structural members designed in such a manner as to contain a field splice by welding shall not be
coated in the splice area prior to splicing for a distance of 4". This area shall be included in the
blasting operation but shall be properly masked-off prior to application of coating. Masking shall
remain on members to protect the splice area from rust and other contamination until the field
splice is made. After the weld is made and cleaned, coating shall be applied in accordance with
this Specification.
6.5 Surface imperfections such as slag, arc strikes, weld splatter, porosity, sharp edges, pits,
laminations, slivers or crevices shall be removed or repaired prior to coating. Any areas where
grinding is required after blasting shall be blast cleaned by CONTRACTOR to obtain the required
surface pattern.
6.6 In areas inaccessible to blasting and painting, seal plates 1/8" thick shall be added and seal welded
all around. These plates shall receive the full coating system. Areas that cannot be boxed in shall,
subject to approval by COMPANY, be filled with epoxy mastic, caulking compound or other
suitable filler to prevent retention of dirt and moisture. These areas include deck penetrations.
6.7 All landing surfaces for gratings shall be completely coated to the finish coat prior to fixing. All
landing surfaces of equipment, pipe-spools, support brackets, flange faces, bolt holes and areas
under "U" bolts are to be coated with the specified intermediate coat of epoxy before installation.
6.8 Inorganic zinc primers exposed for prolonged periods shall have white stains and zinc corrosion
products removed by washing with clean fresh water prior to applying top coating. Following
such washing, surfaces should be completely dry prior to applying the top coat.
6.9 In all cases where the second or third coats were applied more than three days previously and have
to be over-coated, the surfaces shall be lightly abraded or solvent wiped to ensure good inter-coat
adhesion between these coatings. Method of preparing a coated surface include light whip blasting
or power disc sanding and washing with solvent recommended by the Manufacturer.

7.0 INSPECTION
7.1 General
All stages of the Work shall be subject to full time inspection by COMPANY. Such
inspection shall not relieve CONTRACTOR of its responsibility to provide materials and
workmanship in accordance with this Specification.
All records of inspection and testing of material supplied by CONTRACTOR and all
Manufacturer material certificates shall be submitted to COMPANY.
All materials shall be certified by means of the Manufacturer's certificate of analysis for
each batch of material supplied. This certificate of analysis shall be submitted to
COMPANY before the pipe is coated with the material. Representative samples of material
may be tested prior to or during coating operations by COMPANY. If material is rejected,
the cost of testing shall be borne by CONTRACTOR.

Page 6 of 10
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
COMPANY shall be permitted to test the coating and any repairs subsequently made to it,
in compliance with this Specification. CONTRACTOR shall repair such tests and other
defects in the coating at no extra compensation.
COMPANY shall have the right to:
(a) Test CONTRACTOR's coating application personnel
(b) Examine the condition of the material being applied in the containers of the spray
equipment
(c) Satisfy itself that all equipment being used for coating application is of the proper
type recommended for that application and that the equipment is being maintained in
good working condition
(d) Satisfy itself that the materials are at all times being properly stored and handled in
accordance with Manufacturer's recommendations.
CONTRACTOR shall perform all testing required to ensure compliance with this
Specification at its cost.
7.2 Inspection Equipment
CONTRACTOR shall supply adequate inspection tools for COMPANY's use in determining
acceptability of coatings. These tools are to be supplied at CONTRACTOR's expense and
shall include :
(a) Visual Standards
(b) Dry Paint Thickness Gauges
1. Elcometer Pull Off Gauge
2. Elcometer Thickness Gauges
(c) Wet Paint Thickness Gauges
1. Wet Film Thickness Comb
2. Elcometer Wet Film Wheel
(d) Surface Profile
1. Gauge No. 123 (Elcometer)
2. Keane Tator Gauges
3. Testing Press on film tape
(e) Abrasives
Set of sieves to ASTM E11
(f) Merkquant and Emquant 2+ iron strips or Ames Quantab chlorides strip
(g) Ferricyanide 5% solution with filter paper
(h) Wet and dry bulb hygrometers
(i) Tables for relative humidity and dew point
(j) Surface thermometer
(k) Two copies of SSPC Vol. 1 and 2.

Page 7 of 10
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
8.0 CAUSES FOR REJECTION
COMPANY shall have the right to reject any Work which is not carried out in strict accordance
with the Specification requirements. All expenses incurred in the correction of rejected Work
shall be borne by CONTRACTOR. Causes for rejection shall include but not be limited to:
(a) Surface preparation not meeting SSPC Visual Standard # 1 or considered unsatisfactory by
presence of dust, other foreign matter or contaminants or an extended period of time
between cleaning and coating.
(b) Failure of CONTRACTOR to apply the minimum number of coats of the thickness
required.
(c) Failure of CONTRACTOR to allow minimum specified drying time between coats.
(d) Use of coating materials not meeting this specification.
(e) Failure of coating to meet adhesion requirements as specified by Paint Manufacturer.

9.0 COLOR CODING


9.1 Structure, Piping, Equipment, Vessels, etc.
Unless otherwise specified, the final coat color of the protective coating shall be as follows.
The final selection of colors is subject to COMPANY approval.

Red
1. Fire protection equipment & danger areas including :
2. Dry chemical skid
3. All hose reels
4. Dry chemical pipelines
5. Fire water lines (except main headers)
6. Fire extinguisher backgrounds.
7. Emergency shutdown equipment.
Yellow (Non-skid)
1. Deck floor plate and hatches
Pearl Gray (Non-skid)
1. Deck floor plate and hatches.
Pearl Gray
1. The rest of the deck and crane
2. The rest of the piping
3. Vessels, tanks & equipment
4. Buildings
5. Jackets (except Service Area I)
6. Conductors
7. Flare bridges
8. Personnel bridges and boat landings.

Page 8 of 10
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
Yellow
1. All handrails and safety nets
2. All stairs and landings
3. Cranes and 'A' frames
White*
1. Conductor guides (bullets)
2. Elev. -25 riser clamps
3. Riser installation aids at mudline.
* Note : Underwater installation aids shall be painted white per a paint system
approved by COMPANY.
9.2 Piping Color Bands and Flow Direction Arrows
All piping fabricated and installed by CONTRACTOR shall be identified by color bands.
The width of the color bands measured along the pipe shall be 12 inches. All process and
utility piping which has directional flow shall also be marked with color flow direction
arrows. The arrows shall be minimum 4" wide and 18" long and orientated such that they
are visible from normal operator access areas. The bands and arrows shall be of paint or
permanent adhesive color tape (3M type) applied over the final paint coat.
The arrows may replace color bands in areas approved by COMPANY. The arrows and
bands shall be located as follows:
(a) On each side of valves and tees
(b) Where pipe emerges from walls or decks, on both sides of walls or decks
(c) Adjacent to equipment such as vessels, tanks and pumps
(d) At intervals of approximately 15 feet along the pipe run
(e) At locations specified by COMPANY.
The color of the bands for various piping services shall be as follows:
Service Band Color
Crude Oil Dark brown/Black
Gas Orange/Yellow
Slop & Waste Oil Black
Oil Oxide Red
Lube Oil Light brown
Fire Water Red
Dry Chemical Red
Water, Sea or Potable Blue
Service Air Green

Panels shall be installed showing the color coding indicated in the above paragraph for color
and corresponding services, at locations specified by COMPANY.

Page 9 of 10
PIPELINE PROJECT
PT. PERTAMINA EP – FIELD LIMAU
10.0 GUARANTEE
Material and/or equipment shall be guaranteed by CONTRACTOR/Vendor/Manufacturer to
perform in accordance with Specification requirements and to be free of defects and poor
workmanship including, but not limited to, those caused by inadequate preparation for shipment,
for a period of one (1) year after material/equipment is placed in service, but not exceeding
eighteen (18) months following delivery to the contracted destination.
CONTRACTOR shall repair or replace all defective items during the guarantee period at no cost
to COMPANY.

Page 10 of 10

Anda mungkin juga menyukai