Halaman
HALAMAN PENGESAHAN ........................................................................ i
KATA PENGANTAR ................................................................................... ii
DAFTAR ISI ................................................................................................. iv
DAFTAR TABEL .......................................................................................... vii
DAFTAR GAMBAR ..................................................................................... viii
DAFTAR LAMPIRAN .................................................................................. xii
iv
3.4.3 Hooper Car ...................................................................... 30
3.4.4 Cable Ral Car .................................................................. 31
3.4.5 Conveyor System ............................................................ 31
3.4.6 Spreader dan Tripper Car ................................................ 34
3.4.7 Train Loading System ..................................................... 35
3.5 Alat Penunjang Tambang ........................................................... 36
3.6 Produktivitas Bucket Wheel Excavator....................................... 39
3.7 Spesific Production F actor ........................................................ 40
3.8 Jam Jalan Efektif ........................................................................ 40
3.9 Perhitungan Volume Galian ........................................................ 41
3.10 Prasyarat Kerja Alat ................................................................... 41
3.11 Kemampuan Gali dan Spesifikasi Alat ....................................... 43
3.12 Faktor – Faktor Yang Mempengaruhi Produksi .......................... 43
v
4.5.3 Pengamatan MCC MTBU ............................................... 78
4.6 Hasil Pengamatan di Lapangan ................................................... 79
4.6.1 Waktu Kerja Efektif BWE System .................................. 80
4.7 Analisa Prakiraan Ketercapaiaan Produksi Bucket ..................... 81
Wheel Excavator pada Bulan Juli Agustus Pada
Tambang Muara Tiga Besar Utara
PT.Bukit Asam (Persero),Tbk .....................................................
4.7.1 Analisa Ketercapaian Produksi sampai dengan............... 83
Akhir Juli 2016`...............................................................
4.7.2 Analisa Ketercapaian Sampai Dengan ............................ 85
Akhir Agustus 2016.........................................................
4.8 Analisa Perbandingan Produktivitas Bucket Wheel Excavator .. 86
Pada Bulan Juli dan Agustus .......................................................
4.9 Faktor Yang Mempengaruhi Produksi ........................................ 87
4.9.1 Keadaan Material Yang Akan Digali .............................. 88
4.9.2 Kondisi Lapangan ........................................................... 88
4.9.3 Aspek Manajerial ........................................................... 89
4.9.4 Halangan Dominan ATU................................................. 90
vi