Anda di halaman 1dari 1

45.

000

REKAYASA INFRASTRUKTUR
LINGKUNGAN
15.000 FAKULTAS TEKNIK SIPIL
DAN LINGKUNGAN

MATA KULIAH

IL4102
PERANCANGAN INSTALASI PENGOLAHAN
LIMBAH CAIR
KEGIATAN
Pipa Oulet
Menuju CMAS PERANCANGAN INSTALASI PENGOLAHAN
LIMBAH CAIR

DOSEN MATA KULIAH

Prof. Ir. Prayatni S


Dr. Ing. Marisa Handajani, S.T., M.T.
Dr. M. Sonny Abfertiawan, S.T., M.T.

ASISTEN PEMBIMBING

Marchella C Gultom, S.T.

LEGENDA

PERENCANAA TAHAP 2

TAMPAK ATAS PRIMARY


Pipa Oulet
SEDIMENTATION Menuju CMAS

3,5.000
NAMA PERENCANA
1. M Nasrullah Ahmad (15715001)
2. Abdul Karim (15715002)
3. Saffanah Gumilang (15715003)
4. Egi Ghifari Maulana (15715004)

JUDUL GAMBAR

TAMPAK ATAS DAN POTONGAN AA


45.000 PRIMARY SEDIMENTATION

POTONGAN A-A SKALA SATUAN

1:300 METER

KELOMPOK TANGGAL

1A