MANUFACTURING PROGRAMME STATUS

OF MC-21-300 TEST AIRCRAFT

Installation of the modular and final assembly line is completed


at the Irkutsk Aviation Plant.

Фото Самолеты
Фото Первый Фото Самолет для для летных
летный самолет наземных испытаний испытаний МС-21-
МС-21-300-0001 МС-21-300-0002 300-0003 и МС-21-
300-0004

MC-21-300-0001 MC-21-300-0002 ground test aircraft MC-21-300-0003


first flight test aircraft is completing additional assembly and MC-21-300-0004 aircraft
is under preparation for flight tests for static tests are in the process of assembling

Applications to obtain type certificate were submitted to:


 ROSAVIATION in July 2016;
 EASA in October 2016.

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 2
MC-21-300-0001 PROGRAMME STATUS

FIRST FLIGHT TEST AIRCRAFT

The aircraft is under preparation for flight tests:


 fuselage has been tested for airtightness;
 on-board measurement systems and equipment have been installed;
 aircraft systems are undergoing adjustment procedures;
 the aircraft is switched to electric power;
 frequency response tests haves been started to identify frequencies
of natural oscillations of the structure.
© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016
MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 3
MC-21-300-0002 PROGRAMME STATUS

GROUND TEST AIRCRAFT

Assembly works of the MC-21-300-0002 aircraft for static tests


to be conducted in TSaGI, are near completion.

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 4
PROGRAMME STATUS

AIRCRAFT FOR FLIGHT TESTS

Manufacturing of МС-21-300-0003 and МС-21-300-0004


components, units, and assemblies is established.
Assembling of MC-21-300-0003 aircraft is being performed
at the Irkutsk Aviation Plant.

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 5
PROGRAMME STATUS

STRENGTH TESTS

Strength tests ensure safe operation of aircraft during entire life.


Unprecedented large-scale strength tests have been implemented,
as the significant part of the airframe is made of composites.

 Static tests to identify ability of the aircraft’s construction to withstand


high one-time loads
 Endurance tests to ensure prognosis of construction behavior
under repetitive loads, indicative for typical operation
 Climate tests, bird-strike tests, lightning-strike tests,
fire-resistance tests, etc.

Tests are performed at TsAGI, TsIAM, Aviatest

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 6
PROGRAMME STATUS

STATIC STRENGTH TESTS

The following tests have been accomplished:


 hundreds of similar-in-design samples representing operation
of major structural elements;
 fin;
 stabilizer;
 landing gear;
 full-scale samples of high-lift devices and empennage made of composites
(flaps, aileron, air-brake, spoilers, elevators, and rudders).

Fin tests Stabilizer tests

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 7
PROGRAMME STATUS

STRENGTH TESTS

Isolated testing of composite wing:


 four prototypes of wing box have been tested;
 testing of the full-scale wing box sample is going on.

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 8
PROGRAMME STATUS

STRENGTH TESTS

Endurance tests
 Regular fuselage section has passed 47,000 load cycles.
 Fuselage tail section has passed 240,000 load cycles.
 Each load cycle has corresponded to real flight.

Regular fuselage section tests Fuselage tail section tests

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 9
PROGRAMME STATUS

STRENGTH TESTS

Environmental durability tests


 Fuselage nose and fin sections have successfully passed bird-strike test at maximum speed.

 Stabilizer is being prepared for bird-strike test.

 Certification tests of windshield, radome, and nose landing gear door for direct lightning strike and
static discharge have been successfully passed.

 Wing high-lift devices and empennage are being prepared for environmental static and life-cycle
tests.

Fin tests Fuselage nose section tests Radome tests

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 10
PROGRAMME STATUS

SYSTEM TESTING

Testing and refining of aircraft systems, equipment and structural elements are being
performed with the use of over 100 test benches, including 4 integration ones.

Integration test benches


 Test bench of electrical power supply systems.

 Iron Bird (Test bench of hydraulic systems and machinery with hardware-in-the-loop
simulation of integrated flight control system, and with general aircraft equipment
control system).

 Electronic Bird (avionics suite test bench).

 Test bench for electronic and hardware-in-the-loop simulation of integrated flight


control system.

Tests are being performed at TsAGI, GosNIIAS, Airspace Systems DB

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 11
PROGRAMME STATUS

SYSTEM TESTING

Test bench of electrical power supply system (EPSS)


 Full scope of EPSS functional testing under normal conditions has been performed
to support first flight.
 Tests for failure and abnormal conditions are almost completed.

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 12
PROGRAMME STATUS

SYSTEM TESTING

Iron Bird
 First stage of landing gear functional test (extension, retraction, steering)
has been completed.

 Integrated flight control system and hydraulic system testing is being performed.

Gear functional test

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 13
PROGRAMME STATUS

SYSTEM TESTING
Test bench for electronic and hardware-in-the-loop simulation
of integrated flight control system
 Algorithms and aircraft controls are being tested.

 Full scope of development and test-pilot assessment of controller’s algorithms and hardware,
as well as manual aircraft and engines control means while simulating flights according
to AP-25 Airworthiness Regulations, Section “Flight”, has been completed.

 Independent testing of genuine flight controller is being performed,


flight crews are being trained for the first flight.

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 14
PROGRAMME STATUS

SYSTEM TESTING

Electronic Bird
 Integration of all electronic airborne systems into avionics suite is being performed.

 Development and supervision of the overall indication-and-signalization concept of MC-21 flight


crew cabin is being performed at the prototyping test bench (a component of Electronic Bird).

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 15
PROGRAMME STATUS

ENGINES

PW1400G-JM – Pratt & Whitney PD-14 – ODK


Certified: The second stage of flight tests started.

 in FAA (USA) in May 2016

 In Russia in September 2016

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 16
PROGRAMME STATUS

NEW TESTING FACILITY

 Works for creation of flight tests infrastructure at Irkutsk Aviation Plant and Yakovlev DB Flight
Test Facility at Zhukovsky are close to completion.

 The flight information processing facility is being established in the new hangar in Zhukovsky.

Yakovlev DB Flight Test Facility at Zhukovsky Irkutsk Aviation Plant

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 17
PROGRAMME STATUS

TRAINING MEANS

Pilot training simulators have been built:


 procedural simulator;

 KTS MC-21-300 full-flight integrated simulator with motion system.

Manufacturing of crew cabin simulator prototypes is close to completion.

Simulators are located at the Aeroflot Training Centre

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 18
PROGRAMME STATUS

THANK YOU FOR ATTENTION!

© INFORMATION CONTAINED HEREIN IS PROPRIETARY INFORMATION OF IRKUT CORPORATION December 2016


MAY NOT BE COPIED OR USED, IN WHOLE OR PART, WITHOUT THE PRIOR WRITTEN CONSENT OF IRKUT CORPORATION. 19

Anda mungkin juga menyukai