JADWAL REALISASI PEKERJAAN BULANAN

PAKET PEKERJAAN : PEMBANGUNAN KANTOR RESORT KESATUAN PENGELOLAAN HUTAN DI


: KABUPATEN BELU PROVINSI NUSA TENGGARA TIMUR BULAN KE : 1 JULI
LOKASI : KABUPATEN TIMOR TENGAH UTARA
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5
BULAN I (SATU) BULAN KE II (DUA) BULAN KE III (TIGA) BULAN KE IV (EMPAT)
KONTRAK ASLI BULAN KE V (LIMA)
KE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
NO URAIAN PEKERJAAN SAT KET.
HARGA BOBOT MINGGU 02-Jul 09-Jul 16-Jul 23-Jul 30-Jul 06-Agt 13-Agt 20-Agt 27-Agt 03-Sep 10-Sep 17-Sep 24-Sep 01-Okt 08-Okt 15-Okt 22-Okt 29-Okt 05-Nov 12-Nov 19-Nov 26-Nov 03-Des
VOLUME JUMLAH HARGA (Rp)
SATUAN (Rp) (%) KE s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d

08-Jul 15-Jul 22-Jul 29-Jul 05-Agt 12-Agt 19-Agt 26-Agt 02-Sep 09-Sep 16-Sep 23-Sep 30-Sep 07-Okt 14-Okt 21-Okt 28-Okt 04-Nov 11-Nov 18-Nov 25-Nov 02-Des 08-Des

-
A PEKERJAAN AWAL - 100
A.1 Pembersihan Awal Lokasi Ls 1.00 700,000 700,000.00 0.23% 0.11 0.11

A.2 Pengkuruan dan Pemasangan Bowplank Ls 1.00 1,300,000 1,300,000.00 0.43% 0.43

A.3 Papan Nama Proyek Ls 1.00 200,000 200,000.00 0.07% 0.07

A.4 Penyediaan Air Kerja/Listrik Kerja Ls 1.00 725,000 725,000.00 0.24% 0.24
SUB TOTAL PEKERJAAN AWAL - 2,925,000.00 0.96%
B PEKERJAAN TANAH -
B.1 Galian Tanah untuk Pondasi m3 42.57 60,280 2,566,119.60 0.84% 0.24 0.47 0.13

B.2 Urugan Tanah Galian Kembali m3 10.64 39,050 415,492.00 0.14% 0.14

B.3 Urugan Sirtu Peninggi Lantai m3 63.94 128,432 8,211,916.50 2.69% 1.16 1.52

B.4 Urugan Pasir di Bawah Pondasi m3 3.28 146,850 481,668.00 0.16% 0.16

B.5 Urugan Pasir di Bawah Lantai m3 16.15 146,850 2,371,627.50 0.78% 0.78
SUB TOTAL PEKERJAAN TANAH - 14,046,823.60 4.60%
C PEKERJAAN PASANGAN DAN PLESTERAN -
C.1 Aanstamping m3 12.20 294,534 3,593,320.41 1.18% 1.18

C.2 Pasangan Pondasi Batu Kali (1 Pc : 4 Psr) m3 33.89 578,793 19,615,277.83 6.42% 6.42

C.3 Pasangan Pondasi Rolag & Tangga (1 Pc : 4 Psr) m3 6.92 578,793 4,005,244.10 1.31% 1.31

C.4 Pasangan Tembok Bata Merah (1 Pc : 5 Psr) m2 173.34 150,189 26,033,846.20 8.52% 0.42 4.41 1.48 1.08 1.13

C.5 Plesteran (1 Pc : 5 Psr) Tebal 15 mm m2 403.12 49,013 19,758,265.68 6.46% 3.21 3.25

C.6 Acian m2 403.12 21,802 8,788,822.24 2.88% 0.96 1.92


SUB TOTAL PEKERJAAN PASANGAN DAN PLESTERAN - 81,794,776.46 26.76%
D PEKERJAAN BETON - 80
D.1 Pek. Beton Bertulang untuk Kolom 15/60 m3 0.23 7,118,037 1,637,148.43 0.54% 0.54

D.2 Pek. Beton Bertulang untuk Kolom praktis m3 1.52 7,118,037 10,819,415.69 3.54% 3.54

D.3 Pek. Beton Bertulang untuk Sloof m3 1.85 4,297,497 7,950,368.53 2.60% 2.60

D.4 Pek. Beton Bertulang untuk Ringbalk 15/40 m3 0.33 5,495,951 1,813,663.80 0.59% 0.59

D.5 Pek. Beton Bertulang untuk Ringbalk m3 1.38 5,495,951 7,584,412.24 2.48% 2.48

D.6 Pek. Beton Bertulang untuk Balok Latei m3 0.81 5,495,951 4,451,720.23 1.46% 1.46

D.7 Pek. Beton Bertulang untuk Plat Level m3 1.14 5,041,554 5,747,371.67 1.88% 1.88

D.8 Pek. Beton Bertulang untuk Plat m3 0.14 5,041,554 705,817.57 0.23% 0.23

D.9 Pek. Beton Tidak Bertulang untuk Rabat m3 4.15 825,416 3,425,476.22 1.12% 1.12
SUB TOTAL PEKERJAAN BETON - 44,135,394.38 14.44%
E PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG -
E.1 Kusen Kayu Jati m3 0.34 7,797,020 2,650,986.80 0.87% 0.87

E.2 Kusen + Daun Pintu PVC Beserta Perlengkapannya Unit 1.00 570,000 570,000.00 0.19% 0.19

E.3 Daun Pintu Panil Kayu Jati m2 11.24 477,932 5,371,950.28 1.76% 1.76

E.4 Daun Jendela Panil Kaca Rangka Kayu Jati m2 6.30 425,810 2,682,603.00 0.88% 0.88

E.5 Pasang Kaca Jendela 5 mm m2 4.03 88,536 356,798.87 0.12% 0.12

E.6 Pasang Kunci Tanam 2 x Putar Bh 7.00 250,349 1,752,443.00 0.57% 0.57

E.7 Pasang Engsel Pintu Bh 21.00 36,467 765,811.20 0.25% 0.25

E.8 Pasang Engsel Jendela Bh 20.00 26,142 522,830.00 0.17% 0.17

E.9 Pasang Kait Angin Bh 20.00 31,955 639,100.00 0.21% 0.21

E.10 Pasang Grendel Bh 11.00 64,757 712,327.00 0.23% 0.23 60


E.11 Boven Batu Angin/Roster Bh 22.00 47,523 1,045,512.60 0.34% 0.34

SUB TOTAL PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG 17,070,362.76 5.58%
F PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING
F.1 Pasang Lantai Keramik 40/40 cm m2 87.32 152,807 13,343,063.58 4.37% 4.37

F.2 Pasang Lantai Keramik 20/20 cm m2 4.31 162,289 699,463.44 0.23% 0.23

F.3 Pasang Dinding Keramik 20/25 cm m2 10.08 145,019 1,461,786.48 0.48% 0.48

F.4 Pasang Plint Keramik 10/40 cm m2 67.15 93,023 6,246,467.59 2.04% 2.04

F.5 Rangka Plafond Kayu Klas. II m2 110.97 106,381 11,805,099.57 3.86% 3.86

F.6 Plafond Tripleks 3 mm m2 110.97 39,738 4,409,670.38 1.44% 1.44

F.7 List Plafond Kayu Profil m1 173.20 18,832 3,261,702.40 1.07% 1.07

F.8 Pasang Dinding Batu Alam m2 29.88 282,601 8,444,117.88 2.76% 2.76

SUB TOTAL PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING - 49,671,371.31 16.25%
G PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP -
G.1 Pekerjaan Konstruksi Kuda-kuda Kayu Klas II m3 1.41 5,119,400 7,218,354.01 2.36% 2.36

G.2 Pekerjaan Konstruksi Gording Kayu Klas II m3 1.43 6,252,785 8,941,482.55 2.93% 2.93

G.3 Pekerjaan Atap Seng Gelombang BJLS 0.30 m2 143.37 65,164 9,342,562.68 3.06% 3.06

G.4 Pekerjaan Seng Licin Bubungan m1 32.80 34,551 1,133,272.80 0.37% 0.37

G.5 Pekerjaan Lisplank Kayu Klas II Ukuran (2 x 2,5 x 18) cm m1 44.40 71,610 3,179,484.00 1.04% 1.04
SUB TOTAL PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP - 29,815,156.04 9.75%
H PEKERJAAN PENGECATAN -
H.1 Pengecatan Tembok m2 403.12 25,809 10,403,956.07 3.40% 3.40 40
MATI
H.2 Pengecatan Plafond m2 110.97 25,809 2,863,979.23 0.94% 0.94

H.3 Pengecatan Atap m2 143.37 11,052 1,584,482.23 0.52%


KONTRAK 0.52

H.4 Pengecatan Kayu m2 30.82 12,302 379,148.26 0.12% 0.12

H.5 Teakoil m2 27.01 20,383 550,544.83 0.18% 0.18

H.6 Residu Rangka Atap Ls 1.00 500,000 500,000.00 0.16% 0.16


SUB TOTAL PEKERJAAN PENGECATAN - 16,282,110.62 5.33%
I PEKERJAAN INSTALASI LISTRIK - JADWAL RENCANA
I.1 Instalasi Titik Lampu Ttk 13.00 561,193 7,295,505.36 2.39% TERKONTRAK 2.39

I.2 Pasang MCB + Box Bh 1.00 74,800 74,800.00 0.02% 0.02

I.3 Pasang Saklar Ganda Bh 3.00 72,600 217,800.00 0.07% 0.07

I.4 Pasang Saklar Tunggal Bh 5.00 67,100 335,500.00 0.11% 0.11

I.5 Pasang Lampu LED 13 Watt Bh 6.00 81,686 490,116.00 0.16% 0.16

I.6 Pasang Lampu LED 7 Watt Bh 7.00 72,873 510,109.60 0.17% 0.17

I.7 Pasang Stop Kontak Bh 9.00 50,006 450,054.00 0.15% 0.15


SUB TOTAL PEKERJAAN INSTALASI LISTRIK - 9,373,884.96 3.07%
J PEKERJAAN INSTALASI AIR DAN SANITAIR -
J.1 Pasang Closed Duduk Bh 1.00 621,610 621,610.00 0.20% 0.20

J.2 Pasang Bak Air Bh 1.00 819,390 819,390.00 0.27% 0.27

J.3 Pasang Kran Air Bh 2.00 75,386 150,771.50 0.05% 0.05

J.4 Pasang Floor Drain Bh 1.00 76,087 76,087.00 0.02% 0.02

J.5 Pasang Kictchen Zinc 1 Lubang Bh 1.00 607,761 607,761.00 0.20% 0.20 20
J.6 Pasang Pipa PVC Dia 4" + acc m1 4.00 128,774 515,094.80 0.17% 0.17

J.7 Pasang Pipa PVC Dia 2" + acc m1 4.00 58,375 233,499.20 0.08% 0.08

J.8 Pasang Pipa GIP Dia 0,5" + acc m1 12.00 61,414 736,969.20 0.24% 0.24

J.9 Septiktank dan Peresapan Unit 1.00 2,250,000 2,250,000.00 0.74% 0.74

SUB TOTAL PEKERJAAN INSTALASI AIR DAN SANITAIR - 6,011,182.70 1.97%


K PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN -
K.1 Bak Penampung 5000 L + acc Unit 1.00 9,500,000 9,500,000.00 3.11% 1.55 1.55

K.2 Pompa Air + Instalasi Pipa + acc Ls 1.00 2,000,000 2,000,000.00 0.65% 0.65

K.3 Tralis Besi Hollow 5 cm m2 3.51 365,413 1,282,601.03 0.42% 0.42

K.4 Huruf Nama Kantor Tinggi 20 cm Bh 15.00 200,000 3,000,000.00 0.98% 0.98

K.5 Huruf Nama Kantor Tinggi 15 cm Bh 25.00 150,000 3,750,000.00 1.23% 1.23

K.6 Biaya Pengadaan Genset 5 KVA Ls 1.00 11,500,000 11,500,000.00 3.76% 3.76

K.7 Pek. Tiang Bendera + acc Ls 1.00 1,500,000 1,500,000.00 0.49% JADWAL REALISASI 0.49

SUB TOTAL PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN - 32,532,601.03 10.64% LAPANGAN
L PEKERJAAN AKHIR -
L.1 Pembersihan Akhir Lokasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33

L.2 Biaya Administrasi, Pelaporan, As Built Brawing & Dokumentasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33 0.00
SUB TOTAL PEKERJAAN AKHIR - 2,000,000.00 0.65%

A TOTAL SELURUH 305,658,663.86 100%


B PPN 10% (A X 10%) 30,565,866.39
C TOTAL (A+B) 336,224,530.25
JUMLAH PER MINGGU 0.96 0.63 5.26 12.98 16.22 13.43 14.40 4.81 7.98 7.63 15.05 0.65
RENCANA
JUMLAH KOMULATIF PER MINGGU - 0.96 1.59 6.85 19.83 36.05 49.48 63.88 68.69 76.67 84.30 99.35 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
JUMLAH PER MINGGU 0.11 0.73 0.71 1.46 7.86 4.18 12.18 1.48 1.08 9.36 1.50 4.17 5.17 5.29 4.63 4.61 17.58 7.90 9.99
REALISASI
JUMLAH KOMULATIF PER MINGGU - 0.11 0.84 1.55 3.02 10.88 15.06 27.24 28.72 29.80 39.17 40.66 44.83 50.00 55.29 59.92 59.92 64.53 82.11 90.01 100.00
DEVIASI -0.96 -1.59 -6.85 -19.72 -35.21 -47.93 -60.86 -57.81 -61.61 -57.06 -70.63 -70.20 -60.83 -59.34 -55.17 -50.00 -44.71 -40.08 -40.08 -35.47 -17.89 -9.99 0.00

Konsultan Supervisi PEJABAT PEMBUAT KOMITMEN Kontraktor Pelaksana


CV. NADA SONORA UPT. KPH WILAYAH CV. BERKAT BERSAMA
KABUPATEN BELU

DENI W. LUIS OEMATAN RISSARD E. NDOLU, SP VIRGILIUS YULBRIN AHIN BABULU


Kuasa Kuasa Direktur NIP. 19681118 199703 1 007 Direktur
JADWAL REALISASI PEKERJAAN BULANAN
PAKET PEKERJAAN : PEMBANGUNAN KANTOR RESORT KESATUAN PENGELOLAAN HUTAN DI
: KABUPATEN BELU PROVINSI NUSA TENGGARA TIMUR BULAN KE : 2 AGUSTUS
LOKASI : KABUPATEN TIMOR TENGAH UTARA
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5
BULAN I (SATU) BULAN KE II (DUA) BULAN KE III (TIGA) BULAN KE IV (EMPAT)
KONTRAK ASLI BULAN KE V (LIMA)
KE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
NO URAIAN PEKERJAAN SAT KET.
HARGA BOBOT MINGGU 02-Jul 09-Jul 16-Jul 23-Jul 30-Jul 06-Agt 13-Agt 20-Agt 27-Agt 03-Sep 10-Sep 17-Sep 24-Sep 01-Okt 08-Okt 15-Okt 22-Okt 29-Okt 05-Nov 12-Nov 19-Nov 26-Nov 03-Des
VOLUME JUMLAH HARGA (Rp)
SATUAN (Rp) (%) KE s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d

08-Jul 15-Jul 22-Jul 29-Jul 05-Agt 12-Agt 19-Agt 26-Agt 02-Sep 09-Sep 16-Sep 23-Sep 30-Sep 07-Okt 14-Okt 21-Okt 28-Okt 04-Nov 11-Nov 18-Nov 25-Nov 02-Des 08-Des

-
A PEKERJAAN AWAL - 100
A.1 Pembersihan Awal Lokasi Ls 1.00 700,000 700,000.00 0.23% 0.11 0.11

A.2 Pengkuruan dan Pemasangan Bowplank Ls 1.00 1,300,000 1,300,000.00 0.43% 0.43
A.3 Papan Nama Proyek Ls 1.00 200,000 200,000.00 0.07% 0.07
A.4 Penyediaan Air Kerja/Listrik Kerja Ls 1.00 725,000 725,000.00 0.24% 0.24
SUB TOTAL PEKERJAAN AWAL - 2,925,000.00 0.96%
B PEKERJAAN TANAH -
B.1 Galian Tanah untuk Pondasi m3 42.57 60,280 2,566,119.60 0.84% 0.24 0.47 0.13
B.2 Urugan Tanah Galian Kembali m3 10.64 39,050 415,492.00 0.14% 0.14
B.3 Urugan Sirtu Peninggi Lantai m3 63.94 128,432 8,211,916.50 2.69% 1.16 1.52

B.4 Urugan Pasir di Bawah Pondasi m3 3.28 146,850 481,668.00 0.16% 0.16
B.5 Urugan Pasir di Bawah Lantai m3 16.15 146,850 2,371,627.50 0.78% 0.78
SUB TOTAL PEKERJAAN TANAH - 14,046,823.60 4.60%
C PEKERJAAN PASANGAN DAN PLESTERAN -
C.1 Aanstamping m3 12.20 294,534 3,593,320.41 1.18% 1.18
C.2 Pasangan Pondasi Batu Kali (1 Pc : 4 Psr) m3 33.89 578,793 19,615,277.83 6.42% 6.42
C.3 Pasangan Pondasi Rolag & Tangga (1 Pc : 4 Psr) m3 6.92 578,793 4,005,244.10 1.31% 1.31
C.4 Pasangan Tembok Bata Merah (1 Pc : 5 Psr) m2 173.34 150,189 26,033,846.20 8.52% 0.42 4.41 1.48 1.08 1.13

C.5 Plesteran (1 Pc : 5 Psr) Tebal 15 mm m2 403.12 49,013 19,758,265.68 6.46% 3.21 3.25

C.6 Acian m2 403.12 21,802 8,788,822.24 2.88% 0.96 1.92


SUB TOTAL PEKERJAAN PASANGAN DAN PLESTERAN - 81,794,776.46 26.76%
D PEKERJAAN BETON - 80
D.1 Pek. Beton Bertulang untuk Kolom 15/60 m3 0.23 7,118,037 1,637,148.43 0.54% 0.54

D.2 Pek. Beton Bertulang untuk Kolom praktis m3 1.52 7,118,037 10,819,415.69 3.54% 3.54

D.3 Pek. Beton Bertulang untuk Sloof m3 1.85 4,297,497 7,950,368.53 2.60% 2.60

D.4 Pek. Beton Bertulang untuk Ringbalk 15/40 m3 0.33 5,495,951 1,813,663.80 0.59% 0.59

D.5 Pek. Beton Bertulang untuk Ringbalk m3 1.38 5,495,951 7,584,412.24 2.48% 2.48

D.6 Pek. Beton Bertulang untuk Balok Latei m3 0.81 5,495,951 4,451,720.23 1.46% 1.46

D.7 Pek. Beton Bertulang untuk Plat Level m3 1.14 5,041,554 5,747,371.67 1.88% 1.88

D.8 Pek. Beton Bertulang untuk Plat m3 0.14 5,041,554 705,817.57 0.23% 0.23

D.9 Pek. Beton Tidak Bertulang untuk Rabat m3 4.15 825,416 3,425,476.22 1.12% 1.12
SUB TOTAL PEKERJAAN BETON - 44,135,394.38 14.44%
E PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG -
E.1 Kusen Kayu Jati m3 0.34 7,797,020 2,650,986.80 0.87% 0.87

E.2 Kusen + Daun Pintu PVC Beserta Perlengkapannya Unit 1.00 570,000 570,000.00 0.19% 0.19

E.3 Daun Pintu Panil Kayu Jati m2 11.24 477,932 5,371,950.28 1.76% 1.76

E.4 Daun Jendela Panil Kaca Rangka Kayu Jati m2 6.30 425,810 2,682,603.00 0.88% 0.88

E.5 Pasang Kaca Jendela 5 mm m2 4.03 88,536 356,798.87 0.12% 0.12

E.6 Pasang Kunci Tanam 2 x Putar Bh 7.00 250,349 1,752,443.00 0.57% 0.57

E.7 Pasang Engsel Pintu Bh 21.00 36,467 765,811.20 0.25% 0.25

E.8 Pasang Engsel Jendela Bh 20.00 26,142 522,830.00 0.17% 0.17

E.9 Pasang Kait Angin Bh 20.00 31,955 639,100.00 0.21% 0.21

E.10 Pasang Grendel Bh 11.00 64,757 712,327.00 0.23% 0.23 60


E.11 Boven Batu Angin/Roster Bh 22.00 47,523 1,045,512.60 0.34% 0.34

SUB TOTAL PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG 17,070,362.76 5.58%
F PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING
F.1 Pasang Lantai Keramik 40/40 cm m2 87.32 152,807 13,343,063.58 4.37% 4.37

F.2 Pasang Lantai Keramik 20/20 cm m2 4.31 162,289 699,463.44 0.23% 0.23

F.3 Pasang Dinding Keramik 20/25 cm m2 10.08 145,019 1,461,786.48 0.48% 0.48

F.4 Pasang Plint Keramik 10/40 cm m2 67.15 93,023 6,246,467.59 2.04% 2.04

F.5 Rangka Plafond Kayu Klas. II m2 110.97 106,381 11,805,099.57 3.86% 3.86

F.6 Plafond Tripleks 3 mm m2 110.97 39,738 4,409,670.38 1.44% JADWAL RENCANA 1.44

F.7 List Plafond Kayu Profil m1 173.20 18,832 3,261,702.40 1.07% TERKONTRAK 1.07

F.8 Pasang Dinding Batu Alam m2 29.88 282,601 8,444,117.88 2.76% 2.76

SUB TOTAL PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING - 49,671,371.31 16.25%
G PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP -
G.1 Pekerjaan Konstruksi Kuda-kuda Kayu Klas II m3 1.41 5,119,400 7,218,354.01 2.36% 2.36

G.2 Pekerjaan Konstruksi Gording Kayu Klas II m3 1.43 6,252,785 8,941,482.55 2.93% 2.93

G.3 Pekerjaan Atap Seng Gelombang BJLS 0.30 m2 143.37 65,164 9,342,562.68 3.06% 3.06

G.4 Pekerjaan Seng Licin Bubungan m1 32.80 34,551 1,133,272.80 0.37% 0.37

G.5 Pekerjaan Lisplank Kayu Klas II Ukuran (2 x 2,5 x 18) cm m1 44.40 71,610 3,179,484.00 1.04% 1.04
SUB TOTAL PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP - 29,815,156.04 9.75%
H PEKERJAAN PENGECATAN -
H.1 Pengecatan Tembok m2 403.12 25,809 10,403,956.07 3.40% 3.40 40
MATI
H.2 Pengecatan Plafond m2 110.97 25,809 2,863,979.23 0.94% 0.94

H.3 Pengecatan Atap m2 143.37 11,052 1,584,482.23 0.52%


KONTRAK 0.52

H.4 Pengecatan Kayu m2 30.82 12,302 379,148.26 0.12% 0.12

H.5 Teakoil m2 27.01 20,383 550,544.83 0.18% 0.18

H.6 Residu Rangka Atap Ls 1.00 500,000 500,000.00 0.16% 0.16


SUB TOTAL PEKERJAAN PENGECATAN - 16,282,110.62 5.33%
I PEKERJAAN INSTALASI LISTRIK -
I.1 Instalasi Titik Lampu Ttk 13.00 561,193 7,295,505.36 2.39% 2.39

I.2 Pasang MCB + Box Bh 1.00 74,800 74,800.00 0.02% 0.02

I.3 Pasang Saklar Ganda Bh 3.00 72,600 217,800.00 0.07% 0.07

I.4 Pasang Saklar Tunggal Bh 5.00 67,100 335,500.00 0.11% 0.11

I.5 Pasang Lampu LED 13 Watt Bh 6.00 81,686 490,116.00 0.16% 0.16

I.6 Pasang Lampu LED 7 Watt Bh 7.00 72,873 510,109.60 0.17% 0.17

I.7 Pasang Stop Kontak Bh 9.00 50,006 450,054.00 0.15% 0.15


SUB TOTAL PEKERJAAN INSTALASI LISTRIK - 9,373,884.96 3.07%
J PEKERJAAN INSTALASI AIR DAN SANITAIR -
J.1 Pasang Closed Duduk Bh 1.00 621,610 621,610.00 0.20% 0.20

J.2 Pasang Bak Air Bh 1.00 819,390 819,390.00 0.27% 0.27

J.3 Pasang Kran Air Bh 2.00 75,386 150,771.50 0.05% 0.05

J.4 Pasang Floor Drain Bh 1.00 76,087 76,087.00 0.02% 0.02

J.5 Pasang Kictchen Zinc 1 Lubang Bh 1.00 607,761 607,761.00 0.20% 0.20 20
J.6 Pasang Pipa PVC Dia 4" + acc m1 4.00 128,774 515,094.80 0.17% 0.17

J.7 Pasang Pipa PVC Dia 2" + acc m1 4.00 58,375 233,499.20 0.08% 0.08

J.8 Pasang Pipa GIP Dia 0,5" + acc m1 12.00 61,414 736,969.20 0.24% 0.24

J.9 Septiktank dan Peresapan Unit 1.00 2,250,000 2,250,000.00 0.74% 0.74

SUB TOTAL PEKERJAAN INSTALASI AIR DAN SANITAIR - 6,011,182.70 1.97%


K PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN -
K.1 Bak Penampung 5000 L + acc Unit 1.00 9,500,000 9,500,000.00 3.11% 1.55 1.55

K.2 Pompa Air + Instalasi Pipa + acc Ls 1.00 2,000,000 2,000,000.00 0.65% JADWAL REALISASI 0.65

K.3 Tralis Besi Hollow 5 cm m2 3.51 365,413 1,282,601.03 0.42% LAPANGAN 0.42

K.4 Huruf Nama Kantor Tinggi 20 cm Bh 15.00 200,000 3,000,000.00 0.98% 0.98

K.5 Huruf Nama Kantor Tinggi 15 cm Bh 25.00 150,000 3,750,000.00 1.23% 1.23

K.6 Biaya Pengadaan Genset 5 KVA Ls 1.00 11,500,000 11,500,000.00 3.76% 3.76

K.7 Pek. Tiang Bendera + acc Ls 1.00 1,500,000 1,500,000.00 0.49% 0.49

SUB TOTAL PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN - 32,532,601.03 10.64%
L PEKERJAAN AKHIR -
L.1 Pembersihan Akhir Lokasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33

L.2 Biaya Administrasi, Pelaporan, As Built Brawing & Dokumentasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33 0.00
SUB TOTAL PEKERJAAN AKHIR - 2,000,000.00 0.65%

A TOTAL SELURUH 305,658,663.86 100%


B PPN 10% (A X 10%) 30,565,866.39
C TOTAL (A+B) 336,224,530.25
JUMLAH PER MINGGU 0.96 0.63 5.26 12.98 16.22 13.43 14.40 4.81 7.98 7.63 15.05 0.65
RENCANA
JUMLAH KOMULATIF PER MINGGU - 0.96 1.59 6.85 19.83 36.05 49.48 63.88 68.69 76.67 84.30 99.35 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
JUMLAH PER MINGGU 0.11 0.73 0.71 1.46 7.86 4.18 12.18 1.48 1.08 9.36 1.50 4.17 5.17 5.29 4.63 4.61 17.58 7.90 9.99
REALISASI
JUMLAH KOMULATIF PER MINGGU - 0.11 0.84 1.55 3.02 10.88 15.06 27.24 28.72 29.80 39.17 40.66 44.83 50.00 55.29 59.92 59.92 64.53 82.11 90.01 100.00
DEVIASI -0.96 -1.59 -6.85 -19.72 -35.21 -47.93 -60.86 -57.81 -61.61 -57.06 -70.63 -70.20 -60.83 -59.34 -55.17 -50.00 -44.71 -40.08 -40.08 -35.47 -17.89 -9.99 0.00

Konsultan Supervisi PEJABAT PEMBUAT KOMITMEN Kontraktor Pelaksana


CV. NADA SONORA UPT. KPH WILAYAH CV. BERKAT BERSAMA
KABUPATEN BELU

DENI W. LUIS OEMATAN RISSARD E. NDOLU, SP VIRGILIUS YULBRIN AHIN BABULU


Kuasa Kuasa Direktur NIP. 19681118 199703 1 007 Kuasa Direktur
JADWAL REALISASI PEKERJAAN BULANAN
PAKET PEKERJAAN : PEMBANGUNAN KANTOR RESORT KESATUAN PENGELOLAAN HUTAN DI
: KABUPATEN BELU PROVINSI NUSA TENGGARA TIMUR BULAN KE : 3 SEPTEMBER
LOKASI : KABUPATEN TIMOR TENGAH UTARA
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5
BULAN I (SATU) BULAN KE II (DUA) BULAN KE III (TIGA) BULAN KE IV (EMPAT)
KONTRAK ASLI BULAN KE V (LIMA)
KE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
NO URAIAN PEKERJAAN SAT KET.
HARGA BOBOT MINGGU 02-Jul 09-Jul 16-Jul 23-Jul 30-Jul 06-Agt 13-Agt 20-Agt 27-Agt 03-Sep 10-Sep 17-Sep 24-Sep 01-Okt 08-Okt 15-Okt 22-Okt 29-Okt 05-Nov 12-Nov 19-Nov 26-Nov 03-Des
VOLUME JUMLAH HARGA (Rp)
SATUAN (Rp) (%) KE s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d

08-Jul 15-Jul 22-Jul 29-Jul 05-Agt 12-Agt 19-Agt 26-Agt 02-Sep 09-Sep 16-Sep 23-Sep 30-Sep 07-Okt 14-Okt 21-Okt 28-Okt 04-Nov 11-Nov 18-Nov 25-Nov 02-Des 08-Des

-
A PEKERJAAN AWAL - 100
A.1 Pembersihan Awal Lokasi Ls 1.00 700,000 700,000.00 0.23% 0.11 0.11

A.2 Pengkuruan dan Pemasangan Bowplank Ls 1.00 1,300,000 1,300,000.00 0.43% 0.43
A.3 Papan Nama Proyek Ls 1.00 200,000 200,000.00 0.07% 0.07
A.4 Penyediaan Air Kerja/Listrik Kerja Ls 1.00 725,000 725,000.00 0.24% 0.24
SUB TOTAL PEKERJAAN AWAL - 2,925,000.00 0.96%
B PEKERJAAN TANAH -
B.1 Galian Tanah untuk Pondasi m3 42.57 60,280 2,566,119.60 0.84% 0.24 0.47 0.13
B.2 Urugan Tanah Galian Kembali m3 10.64 39,050 415,492.00 0.14% 0.14
B.3 Urugan Sirtu Peninggi Lantai m3 63.94 128,432 8,211,916.50 2.69% 1.16 1.52
B.4 Urugan Pasir di Bawah Pondasi m3 3.28 146,850 481,668.00 0.16% 0.16
B.5 Urugan Pasir di Bawah Lantai m3 16.15 146,850 2,371,627.50 0.78% 0.78
SUB TOTAL PEKERJAAN TANAH - 14,046,823.60 4.60%
C PEKERJAAN PASANGAN DAN PLESTERAN -
C.1 Aanstamping m3 12.20 294,534 3,593,320.41 1.18% 1.18
C.2 Pasangan Pondasi Batu Kali (1 Pc : 4 Psr) m3 33.89 578,793 19,615,277.83 6.42% 6.42
C.3 Pasangan Pondasi Rolag & Tangga (1 Pc : 4 Psr) m3 6.92 578,793 4,005,244.10 1.31% 1.31
C.4 Pasangan Tembok Bata Merah (1 Pc : 5 Psr) m2 173.34 150,189 26,033,846.20 8.52% 0.42 4.41 1.48 1.08 1.13
C.5 Plesteran (1 Pc : 5 Psr) Tebal 15 mm m2 403.12 49,013 19,758,265.68 6.46% 3.21 3.25

C.6 Acian m2 403.12 21,802 8,788,822.24 2.88% 0.96 1.92


SUB TOTAL PEKERJAAN PASANGAN DAN PLESTERAN - 81,794,776.46 26.76%
D PEKERJAAN BETON - 80
D.1 Pek. Beton Bertulang untuk Kolom 15/60 m3 0.23 7,118,037 1,637,148.43 0.54% 0.54
D.2 Pek. Beton Bertulang untuk Kolom praktis m3 1.52 7,118,037 10,819,415.69 3.54% 3.54
D.3 Pek. Beton Bertulang untuk Sloof m3 1.85 4,297,497 7,950,368.53 2.60% 2.60
D.4 Pek. Beton Bertulang untuk Ringbalk 15/40 m3 0.33 5,495,951 1,813,663.80 0.59% 0.59
D.5 Pek. Beton Bertulang untuk Ringbalk m3 1.38 5,495,951 7,584,412.24 2.48% 2.48
D.6 Pek. Beton Bertulang untuk Balok Latei m3 0.81 5,495,951 4,451,720.23 1.46% 1.46
D.7 Pek. Beton Bertulang untuk Plat Level m3 1.14 5,041,554 5,747,371.67 1.88% 1.88
D.8 Pek. Beton Bertulang untuk Plat m3 0.14 5,041,554 705,817.57 0.23% 0.23
D.9 Pek. Beton Tidak Bertulang untuk Rabat m3 4.15 825,416 3,425,476.22 1.12% 1.12
SUB TOTAL PEKERJAAN BETON - 44,135,394.38 14.44%
E PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG -
E.1 Kusen Kayu Jati m3 0.34 7,797,020 2,650,986.80 0.87% 0.87
E.2 Kusen + Daun Pintu PVC Beserta Perlengkapannya Unit 1.00 570,000 570,000.00 0.19% 0.19
E.3 Daun Pintu Panil Kayu Jati m2 11.24 477,932 5,371,950.28 1.76% 1.76

E.4 Daun Jendela Panil Kaca Rangka Kayu Jati m2 6.30 425,810 2,682,603.00 0.88% 0.88

E.5 Pasang Kaca Jendela 5 mm m2 4.03 88,536 356,798.87 0.12% 0.12

E.6 Pasang Kunci Tanam 2 x Putar Bh 7.00 250,349 1,752,443.00 0.57% 0.57

E.7 Pasang Engsel Pintu Bh 21.00 36,467 765,811.20 0.25% 0.25

E.8 Pasang Engsel Jendela Bh 20.00 26,142 522,830.00 0.17% 0.17

E.9 Pasang Kait Angin Bh 20.00 31,955 639,100.00 0.21% 0.21

E.10 Pasang Grendel Bh 11.00 64,757 712,327.00 0.23% 0.23 60


E.11 Boven Batu Angin/Roster Bh 22.00 47,523 1,045,512.60 0.34% 0.34
SUB TOTAL PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG 17,070,362.76 5.58%
F PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING
F.1 Pasang Lantai Keramik 40/40 cm m2 87.32 152,807 13,343,063.58 4.37% 4.37

F.2 Pasang Lantai Keramik 20/20 cm m2 4.31 162,289 699,463.44 0.23% 0.23

F.3 Pasang Dinding Keramik 20/25 cm m2 10.08 145,019 1,461,786.48 0.48% 0.48

F.4 Pasang Plint Keramik 10/40 cm m2 67.15 93,023 6,246,467.59 2.04% 2.04

F.5 Rangka Plafond Kayu Klas. II m2 110.97 106,381 11,805,099.57 3.86% 3.86

F.6 Plafond Tripleks 3 mm m2 110.97 39,738 4,409,670.38 1.44% JADWAL RENCANA 1.44

F.7 List Plafond Kayu Profil m1 173.20 18,832 3,261,702.40 1.07% TERKONTRAK 1.07

F.8 Pasang Dinding Batu Alam m2 29.88 282,601 8,444,117.88 2.76% 2.76

SUB TOTAL PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING - 49,671,371.31 16.25%
G PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP -
G.1 Pekerjaan Konstruksi Kuda-kuda Kayu Klas II m3 1.41 5,119,400 7,218,354.01 2.36% 2.36

G.2 Pekerjaan Konstruksi Gording Kayu Klas II m3 1.43 6,252,785 8,941,482.55 2.93% 2.93

G.3 Pekerjaan Atap Seng Gelombang BJLS 0.30 m2 143.37 65,164 9,342,562.68 3.06% 3.06

G.4 Pekerjaan Seng Licin Bubungan m1 32.80 34,551 1,133,272.80 0.37% 0.37

G.5 Pekerjaan Lisplank Kayu Klas II Ukuran (2 x 2,5 x 18) cm m1 44.40 71,610 3,179,484.00 1.04% 1.04
SUB TOTAL PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP - 29,815,156.04 9.75%
H PEKERJAAN PENGECATAN -
H.1 Pengecatan Tembok m2 403.12 25,809 10,403,956.07 3.40% 3.40 40
MATI
H.2 Pengecatan Plafond m2 110.97 25,809 2,863,979.23 0.94% 0.94

H.3 Pengecatan Atap m2 143.37 11,052 1,584,482.23 0.52%


KONTRAK 0.52

H.4 Pengecatan Kayu m2 30.82 12,302 379,148.26 0.12% 0.12

H.5 Teakoil m2 27.01 20,383 550,544.83 0.18% 0.18

H.6 Residu Rangka Atap Ls 1.00 500,000 500,000.00 0.16% 0.16


SUB TOTAL PEKERJAAN PENGECATAN - 16,282,110.62 5.33%
I PEKERJAAN INSTALASI LISTRIK -
I.1 Instalasi Titik Lampu Ttk 13.00 561,193 7,295,505.36 2.39% 2.39

I.2 Pasang MCB + Box Bh 1.00 74,800 74,800.00 0.02% 0.02

I.3 Pasang Saklar Ganda Bh 3.00 72,600 217,800.00 0.07% 0.07

I.4 Pasang Saklar Tunggal Bh 5.00 67,100 335,500.00 0.11% 0.11

I.5 Pasang Lampu LED 13 Watt Bh 6.00 81,686 490,116.00 0.16% 0.16

I.6 Pasang Lampu LED 7 Watt Bh 7.00 72,873 510,109.60 0.17% 0.17

I.7 Pasang Stop Kontak Bh 9.00 50,006 450,054.00 0.15% 0.15


SUB TOTAL PEKERJAAN INSTALASI LISTRIK - 9,373,884.96 3.07%
J PEKERJAAN INSTALASI AIR DAN SANITAIR -
JADWAL REALISASI
J.1 Pasang Closed Duduk Bh 1.00 621,610 621,610.00 0.20% LAPANGAN
0.20
J.2 Pasang Bak Air Bh 1.00 819,390 819,390.00 0.27% 0.27
J.3 Pasang Kran Air Bh 2.00 75,386 150,771.50 0.05% 0.05

J.4 Pasang Floor Drain Bh 1.00 76,087 76,087.00 0.02% 0.02

J.5 Pasang Kictchen Zinc 1 Lubang Bh 1.00 607,761 607,761.00 0.20% 0.20 20
J.6 Pasang Pipa PVC Dia 4" + acc m1 4.00 128,774 515,094.80 0.17% 0.17

J.7 Pasang Pipa PVC Dia 2" + acc m1 4.00 58,375 233,499.20 0.08% 0.08

J.8 Pasang Pipa GIP Dia 0,5" + acc m1 12.00 61,414 736,969.20 0.24% 0.24

J.9 Septiktank dan Peresapan Unit 1.00 2,250,000 2,250,000.00 0.74% 0.74

SUB TOTAL PEKERJAAN INSTALASI AIR DAN SANITAIR - 6,011,182.70 1.97%


K PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN -
K.1 Bak Penampung 5000 L + acc Unit 1.00 9,500,000 9,500,000.00 3.11% 1.55 1.55

K.2 Pompa Air + Instalasi Pipa + acc Ls 1.00 2,000,000 2,000,000.00 0.65% 0.65

K.3 Tralis Besi Hollow 5 cm m2 3.51 365,413 1,282,601.03 0.42% 0.42

K.4 Huruf Nama Kantor Tinggi 20 cm Bh 15.00 200,000 3,000,000.00 0.98% 0.98

K.5 Huruf Nama Kantor Tinggi 15 cm Bh 25.00 150,000 3,750,000.00 1.23% 1.23

K.6 Biaya Pengadaan Genset 5 KVA Ls 1.00 11,500,000 11,500,000.00 3.76% 3.76

K.7 Pek. Tiang Bendera + acc Ls 1.00 1,500,000 1,500,000.00 0.49% 0.49

SUB TOTAL PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN - 32,532,601.03 10.64%
L PEKERJAAN AKHIR -
L.1 Pembersihan Akhir Lokasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33

L.2 Biaya Administrasi, Pelaporan, As Built Brawing & Dokumentasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33 0.00
SUB TOTAL PEKERJAAN AKHIR - 2,000,000.00 0.65%

A TOTAL SELURUH 305,658,663.86 100%


B PPN 10% (A X 10%) 30,565,866.39
C TOTAL (A+B) 336,224,530.25
JUMLAH PER MINGGU 0.96 0.63 5.26 12.98 16.22 13.43 14.40 4.81 7.98 7.63 15.05 0.65
RENCANA
JUMLAH KOMULATIF PER MINGGU - 0.96 1.59 6.85 19.83 36.05 49.48 63.88 68.69 76.67 84.30 99.35 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
JUMLAH PER MINGGU 0.11 0.73 0.71 1.46 7.86 4.18 12.18 1.48 1.08 9.36 1.50 4.17 5.17 5.29 4.63 4.61 17.58 7.90 9.99
REALISASI
JUMLAH KOMULATIF PER MINGGU - 0.11 0.84 1.55 3.02 10.88 15.06 27.24 28.72 29.80 39.17 40.66 44.83 50.00 55.29 59.92 59.92 64.53 82.11 90.01 100.00
DEVIASI -0.96 -1.59 -6.85 -19.72 -35.21 -47.93 -60.86 -57.81 -61.61 -57.06 -70.63 -70.20 -60.83 -59.34 -55.17 -50.00 -44.71 -40.08 -40.08 -35.47 -17.89 -9.99 0.00

Konsultan Supervisi PEJABAT PEMBUAT KOMITMEN Kontraktor Pelaksana


CV. NADA SONORA UPT. KPH WILAYAH CV. BERKAT BERSAMA
KABUPATEN BELU

DENI W. LUIS OEMATAN RISSARD E. NDOLU, SP VIRGILIUS YULBRIN AHIN BABULU


Kuasa Kuasa Direktur NIP. 19681118 199703 1 007 Kuasa Direktur
JADWAL REALISASI PEKERJAAN BULANAN
PAKET PEKERJAAN : PEMBANGUNAN KANTOR RESORT KESATUAN PENGELOLAAN HUTAN DI
: KABUPATEN BELU PROVINSI NUSA TENGGARA TIMUR BULAN KE : 4 OKTOBER
LOKASI : KABUPATEN TIMOR TENGAH UTARA
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5
BULAN I (SATU) BULAN KE II (DUA) BULAN KE III (TIGA) BULAN KE IV (EMPAT)
KONTRAK ASLI BULAN KE V (LIMA)
KE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
NO URAIAN PEKERJAAN SAT KET.
HARGA BOBOT MINGGU 02-Jul 09-Jul 16-Jul 23-Jul 30-Jul 06-Agt 13-Agt 20-Agt 27-Agt 03-Sep 10-Sep 17-Sep 24-Sep 01-Okt 08-Okt 15-Okt 22-Okt 29-Okt 05-Nov 12-Nov 19-Nov 26-Nov 03-Des
VOLUME JUMLAH HARGA (Rp)
SATUAN (Rp) (%) KE s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d

08-Jul 15-Jul 22-Jul 29-Jul 05-Agt 12-Agt 19-Agt 26-Agt 02-Sep 09-Sep 16-Sep 23-Sep 30-Sep 07-Okt 14-Okt 21-Okt 28-Okt 04-Nov 11-Nov 18-Nov 25-Nov 02-Des 08-Des

-
A PEKERJAAN AWAL - 100
A.1 Pembersihan Awal Lokasi Ls 1.00 700,000 700,000.00 0.23% 0.11 0.11

A.2 Pengkuruan dan Pemasangan Bowplank Ls 1.00 1,300,000 1,300,000.00 0.43% 0.43
A.3 Papan Nama Proyek Ls 1.00 200,000 200,000.00 0.07% 0.07
A.4 Penyediaan Air Kerja/Listrik Kerja Ls 1.00 725,000 725,000.00 0.24% 0.24
SUB TOTAL PEKERJAAN AWAL - 2,925,000.00 0.96%
B PEKERJAAN TANAH -
B.1 Galian Tanah untuk Pondasi m3 42.57 60,280 2,566,119.60 0.84% 0.24 0.47 0.13
B.2 Urugan Tanah Galian Kembali m3 10.64 39,050 415,492.00 0.14% 0.14
B.3 Urugan Sirtu Peninggi Lantai m3 63.94 128,432 8,211,916.50 2.69% 1.16 1.52
B.4 Urugan Pasir di Bawah Pondasi m3 3.28 146,850 481,668.00 0.16% 0.16
B.5 Urugan Pasir di Bawah Lantai m3 16.15 146,850 2,371,627.50 0.78% 0.78
SUB TOTAL PEKERJAAN TANAH - 14,046,823.60 4.60%
C PEKERJAAN PASANGAN DAN PLESTERAN -
C.1 Aanstamping m3 12.20 294,534 3,593,320.41 1.18% 1.18
C.2 Pasangan Pondasi Batu Kali (1 Pc : 4 Psr) m3 33.89 578,793 19,615,277.83 6.42% 6.42
C.3 Pasangan Pondasi Rolag & Tangga (1 Pc : 4 Psr) m3 6.92 578,793 4,005,244.10 1.31% 1.31
C.4 Pasangan Tembok Bata Merah (1 Pc : 5 Psr) m2 173.34 150,189 26,033,846.20 8.52% 0.42 4.41 1.48 1.08 1.13
C.5 Plesteran (1 Pc : 5 Psr) Tebal 15 mm m2 403.12 49,013 19,758,265.68 6.46% 3.21 3.25
C.6 Acian m2 403.12 21,802 8,788,822.24 2.88% 0.96 1.92
SUB TOTAL PEKERJAAN PASANGAN DAN PLESTERAN - 81,794,776.46 26.76%
D PEKERJAAN BETON - 80
D.1 Pek. Beton Bertulang untuk Kolom 15/60 m3 0.23 7,118,037 1,637,148.43 0.54% 0.54
D.2 Pek. Beton Bertulang untuk Kolom praktis m3 1.52 7,118,037 10,819,415.69 3.54% 3.54
D.3 Pek. Beton Bertulang untuk Sloof m3 1.85 4,297,497 7,950,368.53 2.60% 2.60
D.4 Pek. Beton Bertulang untuk Ringbalk 15/40 m3 0.33 5,495,951 1,813,663.80 0.59% 0.59
D.5 Pek. Beton Bertulang untuk Ringbalk m3 1.38 5,495,951 7,584,412.24 2.48% 2.48
D.6 Pek. Beton Bertulang untuk Balok Latei m3 0.81 5,495,951 4,451,720.23 1.46% 1.46
D.7 Pek. Beton Bertulang untuk Plat Level m3 1.14 5,041,554 5,747,371.67 1.88% 1.88
D.8 Pek. Beton Bertulang untuk Plat m3 0.14 5,041,554 705,817.57 0.23% 0.23
D.9 Pek. Beton Tidak Bertulang untuk Rabat m3 4.15 825,416 3,425,476.22 1.12% 1.12
SUB TOTAL PEKERJAAN BETON - 44,135,394.38 14.44%
E PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG -
E.1 Kusen Kayu Jati m3 0.34 7,797,020 2,650,986.80 0.87% 0.87
E.2 Kusen + Daun Pintu PVC Beserta Perlengkapannya Unit 1.00 570,000 570,000.00 0.19% 0.19
E.3 Daun Pintu Panil Kayu Jati m2 11.24 477,932 5,371,950.28 1.76% 1.76

E.4 Daun Jendela Panil Kaca Rangka Kayu Jati m2 6.30 425,810 2,682,603.00 0.88% 0.88

E.5 Pasang Kaca Jendela 5 mm m2 4.03 88,536 356,798.87 0.12% 0.12

E.6 Pasang Kunci Tanam 2 x Putar Bh 7.00 250,349 1,752,443.00 0.57% 0.57

E.7 Pasang Engsel Pintu Bh 21.00 36,467 765,811.20 0.25% 0.25

E.8 Pasang Engsel Jendela Bh 20.00 26,142 522,830.00 0.17% 0.17

E.9 Pasang Kait Angin Bh 20.00 31,955 639,100.00 0.21% 0.21

E.10 Pasang Grendel Bh 11.00 64,757 712,327.00 0.23% 0.23 60


E.11 Boven Batu Angin/Roster Bh 22.00 47,523 1,045,512.60 0.34% 0.34
SUB TOTAL PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG 17,070,362.76 5.58%
F PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING
F.1 Pasang Lantai Keramik 40/40 cm m2 87.32 152,807 13,343,063.58 4.37% 4.37

F.2 Pasang Lantai Keramik 20/20 cm m2 4.31 162,289 699,463.44 0.23% 0.23

F.3 Pasang Dinding Keramik 20/25 cm m2 10.08 145,019 1,461,786.48 0.48% 0.48

F.4 Pasang Plint Keramik 10/40 cm m2 67.15 93,023 6,246,467.59 2.04% 2.04

F.5 Rangka Plafond Kayu Klas. II m2 110.97 106,381 11,805,099.57 3.86% 3.86

F.6 Plafond Tripleks 3 mm m2 110.97 39,738 4,409,670.38 1.44% JADWAL RENCANA 1.44

F.7 List Plafond Kayu Profil m1 173.20 18,832 3,261,702.40 1.07% TERKONTRAK 1.07

F.8 Pasang Dinding Batu Alam m2 29.88 282,601 8,444,117.88 2.76% 2.76

SUB TOTAL PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING - 49,671,371.31 16.25%
G PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP -
G.1 Pekerjaan Konstruksi Kuda-kuda Kayu Klas II m3 1.41 5,119,400 7,218,354.01 2.36% 2.36
G.2 Pekerjaan Konstruksi Gording Kayu Klas II m3 1.43 6,252,785 8,941,482.55 2.93% 2.93
G.3 Pekerjaan Atap Seng Gelombang BJLS 0.30 m2 143.37 65,164 9,342,562.68 3.06% 3.06

G.4 Pekerjaan Seng Licin Bubungan m1 32.80 34,551 1,133,272.80 0.37% 0.37

G.5 Pekerjaan Lisplank Kayu Klas II Ukuran (2 x 2,5 x 18) cm m1 44.40 71,610 3,179,484.00 1.04% 1.04
SUB TOTAL PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP - 29,815,156.04 9.75%
H PEKERJAAN PENGECATAN -
H.1 Pengecatan Tembok m2 403.12 25,809 10,403,956.07 3.40% 3.40 40
MATI
H.2 Pengecatan Plafond m2 110.97 25,809 2,863,979.23 0.94% 0.94

H.3 Pengecatan Atap m2 143.37 11,052 1,584,482.23 0.52%


KONTRAK 0.52

H.4 Pengecatan Kayu m2 30.82 12,302 379,148.26 0.12% 0.12

H.5 Teakoil m2 27.01 20,383 550,544.83 0.18% JADWAL REALISASI


0.18

H.6 Residu Rangka Atap Ls 1.00 500,000 500,000.00 0.16% 0.16 LAPANGAN
SUB TOTAL PEKERJAAN PENGECATAN - 16,282,110.62 5.33%
I PEKERJAAN INSTALASI LISTRIK -
I.1 Instalasi Titik Lampu Ttk 13.00 561,193 7,295,505.36 2.39% 2.39

I.2 Pasang MCB + Box Bh 1.00 74,800 74,800.00 0.02% 0.02

I.3 Pasang Saklar Ganda Bh 3.00 72,600 217,800.00 0.07% 0.07

I.4 Pasang Saklar Tunggal Bh 5.00 67,100 335,500.00 0.11% 0.11

I.5 Pasang Lampu LED 13 Watt Bh 6.00 81,686 490,116.00 0.16% 0.16

I.6 Pasang Lampu LED 7 Watt Bh 7.00 72,873 510,109.60 0.17% 0.17

I.7 Pasang Stop Kontak Bh 9.00 50,006 450,054.00 0.15% 0.15


SUB TOTAL PEKERJAAN INSTALASI LISTRIK - 9,373,884.96 3.07%
J PEKERJAAN INSTALASI AIR DAN SANITAIR -
J.1 Pasang Closed Duduk Bh 1.00 621,610 621,610.00 0.20% 0.20
J.2 Pasang Bak Air Bh 1.00 819,390 819,390.00 0.27% 0.27
J.3 Pasang Kran Air Bh 2.00 75,386 150,771.50 0.05% 0.05
J.4 Pasang Floor Drain Bh 1.00 76,087 76,087.00 0.02% 0.02
J.5 Pasang Kictchen Zinc 1 Lubang Bh 1.00 607,761 607,761.00 0.20% 0.20 20
J.6 Pasang Pipa PVC Dia 4" + acc m1 4.00 128,774 515,094.80 0.17% 0.17
J.7 Pasang Pipa PVC Dia 2" + acc m1 4.00 58,375 233,499.20 0.08% 0.08

J.8 Pasang Pipa GIP Dia 0,5" + acc m1 12.00 61,414 736,969.20 0.24% 0.24

J.9 Septiktank dan Peresapan Unit 1.00 2,250,000 2,250,000.00 0.74% 0.74
SUB TOTAL PEKERJAAN INSTALASI AIR DAN SANITAIR - 6,011,182.70 1.97%
K PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN -
K.1 Bak Penampung 5000 L + acc Unit 1.00 9,500,000 9,500,000.00 3.11% 1.55 1.55

K.2 Pompa Air + Instalasi Pipa + acc Ls 1.00 2,000,000 2,000,000.00 0.65% 0.65

K.3 Tralis Besi Hollow 5 cm m2 3.51 365,413 1,282,601.03 0.42% 0.42

K.4 Huruf Nama Kantor Tinggi 20 cm Bh 15.00 200,000 3,000,000.00 0.98% 0.98

K.5 Huruf Nama Kantor Tinggi 15 cm Bh 25.00 150,000 3,750,000.00 1.23% 1.23

K.6 Biaya Pengadaan Genset 5 KVA Ls 1.00 11,500,000 11,500,000.00 3.76% 3.76

K.7 Pek. Tiang Bendera + acc Ls 1.00 1,500,000 1,500,000.00 0.49% 0.49

SUB TOTAL PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN - 32,532,601.03 10.64%
L PEKERJAAN AKHIR -
L.1 Pembersihan Akhir Lokasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33

L.2 Biaya Administrasi, Pelaporan, As Built Brawing & Dokumentasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33 0.00
SUB TOTAL PEKERJAAN AKHIR - 2,000,000.00 0.65%

A TOTAL SELURUH 305,658,663.86 100%


B PPN 10% (A X 10%) 30,565,866.39
C TOTAL (A+B) 336,224,530.25
JUMLAH PER MINGGU 0.96 0.63 5.26 12.98 16.22 13.43 14.40 4.81 7.98 7.63 15.05 0.65
RENCANA
JUMLAH KOMULATIF PER MINGGU - 0.96 1.59 6.85 19.83 36.05 49.48 63.88 68.69 76.67 84.30 99.35 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
JUMLAH PER MINGGU 0.11 0.73 0.71 1.46 7.86 4.18 12.18 1.48 1.08 9.36 1.50 4.17 5.17 5.29 4.63 4.61 17.58 7.90 9.99
REALISASI
JUMLAH KOMULATIF PER MINGGU - 0.11 0.84 1.55 3.02 10.88 15.06 27.24 28.72 29.80 39.17 40.66 44.83 50.00 55.29 59.92 59.92 64.53 82.11 90.01 100.00
DEVIASI -0.96 -1.59 -6.85 -19.72 -35.21 -47.93 -60.86 -57.81 -61.61 -57.06 -70.63 -70.20 -60.83 -59.34 -55.17 -50.00 -44.71 -40.08 -40.08 -35.47 -17.89 -9.99 0.00

Konsultan Supervisi PEJABAT PEMBUAT KOMITMEN Kontraktor Pelaksana


CV. NADA SONORA UPT. KPH WILAYAH CV. BERKAT BERSAMA
KABUPATEN BELU

DENI W. LUIS OEMATAN RISSARD E. NDOLU, SP VIRGILIUS YULBRIN AHIN BABULU


Kuasa Kuasa Direktur NIP. 19681118 199703 1 007 Kuasa Direktur
JADWAL REALISASI PEKERJAAN BULANAN
PAKET PEKERJAAN : PEMBANGUNAN KANTOR RESORT KESATUAN PENGELOLAAN HUTAN DI
: KABUPATEN BELU PROVINSI NUSA TENGGARA TIMUR BULAN KE : 5 NOVEMBER
LOKASI : KABUPATEN TIMOR TENGAH UTARA
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5
BULAN I (SATU) BULAN KE II (DUA) BULAN KE III (TIGA) BULAN KE IV (EMPAT)
KONTRAK ASLI BULAN KE V (LIMA)
KE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
NO URAIAN PEKERJAAN SAT KET.
HARGA BOBOT MINGGU 02-Jul 09-Jul 16-Jul 23-Jul 30-Jul 06-Agt 13-Agt 20-Agt 27-Agt 03-Sep 10-Sep 17-Sep 24-Sep 01-Okt 08-Okt 15-Okt 22-Okt 29-Okt 05-Nov 12-Nov 19-Nov 26-Nov 03-Des
VOLUME JUMLAH HARGA (Rp)
SATUAN (Rp) (%) KE s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d

08-Jul 15-Jul 22-Jul 29-Jul 05-Agt 12-Agt 19-Agt 26-Agt 02-Sep 09-Sep 16-Sep 23-Sep 30-Sep 07-Okt 14-Okt 21-Okt 28-Okt 04-Nov 11-Nov 18-Nov 25-Nov 02-Des 08-Des

-
A PEKERJAAN AWAL - 100
A.1 Pembersihan Awal Lokasi Ls 1.00 700,000 700,000.00 0.23% 0.11 0.11

A.2 Pengkuruan dan Pemasangan Bowplank Ls 1.00 1,300,000 1,300,000.00 0.43% 0.43
A.3 Papan Nama Proyek Ls 1.00 200,000 200,000.00 0.07% 0.07
A.4 Penyediaan Air Kerja/Listrik Kerja Ls 1.00 725,000 725,000.00 0.24% 0.24
SUB TOTAL PEKERJAAN AWAL - 2,925,000.00 0.96%
B PEKERJAAN TANAH -
B.1 Galian Tanah untuk Pondasi m3 42.57 60,280 2,566,119.60 0.84% 0.24 0.47 0.13
B.2 Urugan Tanah Galian Kembali m3 10.64 39,050 415,492.00 0.14% 0.14
B.3 Urugan Sirtu Peninggi Lantai m3 63.94 128,432 8,211,916.50 2.69% 1.16 1.52
B.4 Urugan Pasir di Bawah Pondasi m3 3.28 146,850 481,668.00 0.16% 0.16
B.5 Urugan Pasir di Bawah Lantai m3 16.15 146,850 2,371,627.50 0.78% 0.78
SUB TOTAL PEKERJAAN TANAH - 14,046,823.60 4.60%
C PEKERJAAN PASANGAN DAN PLESTERAN -
C.1 Aanstamping m3 12.20 294,534 3,593,320.41 1.18% 1.18
C.2 Pasangan Pondasi Batu Kali (1 Pc : 4 Psr) m3 33.89 578,793 19,615,277.83 6.42% 6.42
C.3 Pasangan Pondasi Rolag & Tangga (1 Pc : 4 Psr) m3 6.92 578,793 4,005,244.10 1.31% 1.31
C.4 Pasangan Tembok Bata Merah (1 Pc : 5 Psr) m2 173.34 150,189 26,033,846.20 8.52% 0.42 4.41 1.48 1.08 1.13
C.5 Plesteran (1 Pc : 5 Psr) Tebal 15 mm m2 403.12 49,013 19,758,265.68 6.46% 3.21 3.25
C.6 Acian m2 403.12 21,802 8,788,822.24 2.88% 0.96 1.92
SUB TOTAL PEKERJAAN PASANGAN DAN PLESTERAN - 81,794,776.46 26.76%
D PEKERJAAN BETON - 80
D.1 Pek. Beton Bertulang untuk Kolom 15/60 m3 0.23 7,118,037 1,637,148.43 0.54% 0.54
D.2 Pek. Beton Bertulang untuk Kolom praktis m3 1.52 7,118,037 10,819,415.69 3.54% 3.54
D.3 Pek. Beton Bertulang untuk Sloof m3 1.85 4,297,497 7,950,368.53 2.60% 2.60
D.4 Pek. Beton Bertulang untuk Ringbalk 15/40 m3 0.33 5,495,951 1,813,663.80 0.59% 0.59
D.5 Pek. Beton Bertulang untuk Ringbalk m3 1.38 5,495,951 7,584,412.24 2.48% 2.48
D.6 Pek. Beton Bertulang untuk Balok Latei m3 0.81 5,495,951 4,451,720.23 1.46% 1.46
D.7 Pek. Beton Bertulang untuk Plat Level m3 1.14 5,041,554 5,747,371.67 1.88% 1.88
D.8 Pek. Beton Bertulang untuk Plat m3 0.14 5,041,554 705,817.57 0.23% 0.23
D.9 Pek. Beton Tidak Bertulang untuk Rabat m3 4.15 825,416 3,425,476.22 1.12% 1.12
SUB TOTAL PEKERJAAN BETON - 44,135,394.38 14.44%
E PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG -
E.1 Kusen Kayu Jati m3 0.34 7,797,020 2,650,986.80 0.87% 0.87
E.2 Kusen + Daun Pintu PVC Beserta Perlengkapannya Unit 1.00 570,000 570,000.00 0.19% 0.19
E.3 Daun Pintu Panil Kayu Jati m2 11.24 477,932 5,371,950.28 1.76% 1.76
E.4 Daun Jendela Panil Kaca Rangka Kayu Jati m2 6.30 425,810 2,682,603.00 0.88% 0.88
E.5 Pasang Kaca Jendela 5 mm m2 4.03 88,536 356,798.87 0.12% 0.12
E.6 Pasang Kunci Tanam 2 x Putar Bh 7.00 250,349 1,752,443.00 0.57% 0.57
E.7 Pasang Engsel Pintu Bh 21.00 36,467 765,811.20 0.25% 0.25
E.8 Pasang Engsel Jendela Bh 20.00 26,142 522,830.00 0.17% 0.17
E.9 Pasang Kait Angin Bh 20.00 31,955 639,100.00 0.21% 0.21
E.10 Pasang Grendel Bh 11.00 64,757 712,327.00 0.23% 0.23 60
E.11 Boven Batu Angin/Roster Bh 22.00 47,523 1,045,512.60 0.34% 0.34
SUB TOTAL PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG 17,070,362.76 5.58%
F PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING
F.1 Pasang Lantai Keramik 40/40 cm m2 87.32 152,807 13,343,063.58 4.37% 4.37
F.2 Pasang Lantai Keramik 20/20 cm m2 4.31 162,289 699,463.44 0.23% 0.23
F.3 Pasang Dinding Keramik 20/25 cm m2 10.08 145,019 1,461,786.48 0.48% 0.48
F.4 Pasang Plint Keramik 10/40 cm m2 67.15 93,023 6,246,467.59 2.04% 2.04
F.5 Rangka Plafond Kayu Klas. II m2 110.97 106,381 11,805,099.57 3.86% 3.86
F.6 Plafond Tripleks 3 mm m2 110.97 39,738 4,409,670.38 1.44% JADWAL RENCANA 1.44
F.7 List Plafond Kayu Profil m1 173.20 18,832 3,261,702.40 1.07% TERKONTRAK 1.07
F.8 Pasang Dinding Batu Alam m2 29.88 282,601 8,444,117.88 2.76% 2.76

SUB TOTAL PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING - 49,671,371.31 16.25%
G PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP -
G.1 Pekerjaan Konstruksi Kuda-kuda Kayu Klas II m3 1.41 5,119,400 7,218,354.01 2.36% 2.36
G.2 Pekerjaan Konstruksi Gording Kayu Klas II m3 1.43 6,252,785 8,941,482.55 2.93% 2.93
G.3 Pekerjaan Atap Seng Gelombang BJLS 0.30 m2 143.37 65,164 9,342,562.68 3.06% 3.06
G.4 Pekerjaan Seng Licin Bubungan m1 32.80 34,551 1,133,272.80 0.37% 0.37
G.5 Pekerjaan Lisplank Kayu Klas II Ukuran (2 x 2,5 x 18) cm m1 44.40 71,610 3,179,484.00 1.04% 1.04
SUB TOTAL PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP - 29,815,156.04 9.75%
H PEKERJAAN PENGECATAN -
H.1 Pengecatan Tembok m2 403.12 25,809 10,403,956.07 3.40% 3.40 40
MATI
H.2 Pengecatan Plafond m2 110.97 25,809 2,863,979.23 0.94% 0.94
H.3 Pengecatan Atap m2 143.37 11,052 1,584,482.23 0.52%
KONTRAK 0.52
H.4 Pengecatan Kayu m2 30.82 12,302 379,148.26 0.12% 0.12
H.5 Teakoil m2 27.01 20,383 550,544.83 0.18% 0.18
H.6 Residu Rangka Atap Ls 1.00 500,000 500,000.00 0.16% 0.16
SUB TOTAL PEKERJAAN PENGECATAN - 16,282,110.62 5.33%
I PEKERJAAN INSTALASI LISTRIK -
I.1 Instalasi Titik Lampu Ttk 13.00 561,193 7,295,505.36 2.39% 2.39
I.2 Pasang MCB + Box Bh 1.00 74,800 74,800.00 0.02% 0.02
I.3 Pasang Saklar Ganda Bh 3.00 72,600 217,800.00 0.07% JADWAL REALISASI 0.07
I.4 Pasang Saklar Tunggal Bh 5.00 67,100 335,500.00 0.11% LAPANGAN 0.11
I.5 Pasang Lampu LED 13 Watt Bh 6.00 81,686 490,116.00 0.16% 0.16
I.6 Pasang Lampu LED 7 Watt Bh 7.00 72,873 510,109.60 0.17% 0.17
I.7 Pasang Stop Kontak Bh 9.00 50,006 450,054.00 0.15% 0.15
SUB TOTAL PEKERJAAN INSTALASI LISTRIK - 9,373,884.96 3.07%
J PEKERJAAN INSTALASI AIR DAN SANITAIR -
J.1 Pasang Closed Duduk Bh 1.00 621,610 621,610.00 0.20% 0.20
J.2 Pasang Bak Air Bh 1.00 819,390 819,390.00 0.27% 0.27
J.3 Pasang Kran Air Bh 2.00 75,386 150,771.50 0.05% 0.05
J.4 Pasang Floor Drain Bh 1.00 76,087 76,087.00 0.02% 0.02
J.5 Pasang Kictchen Zinc 1 Lubang Bh 1.00 607,761 607,761.00 0.20% 0.20 20
J.6 Pasang Pipa PVC Dia 4" + acc m1 4.00 128,774 515,094.80 0.17% 0.17
J.7 Pasang Pipa PVC Dia 2" + acc m1 4.00 58,375 233,499.20 0.08% 0.08

J.8 Pasang Pipa GIP Dia 0,5" + acc m1 12.00 61,414 736,969.20 0.24% 0.24

J.9 Septiktank dan Peresapan Unit 1.00 2,250,000 2,250,000.00 0.74% 0.74
SUB TOTAL PEKERJAAN INSTALASI AIR DAN SANITAIR - 6,011,182.70 1.97%
K PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN -
K.1 Bak Penampung 5000 L + acc Unit 1.00 9,500,000 9,500,000.00 3.11% 1.55 1.55

K.2 Pompa Air + Instalasi Pipa + acc Ls 1.00 2,000,000 2,000,000.00 0.65% 0.65

K.3 Tralis Besi Hollow 5 cm m2 3.51 365,413 1,282,601.03 0.42% 0.42

K.4 Huruf Nama Kantor Tinggi 20 cm Bh 15.00 200,000 3,000,000.00 0.98% 0.98

K.5 Huruf Nama Kantor Tinggi 15 cm Bh 25.00 150,000 3,750,000.00 1.23% 1.23

K.6 Biaya Pengadaan Genset 5 KVA Ls 1.00 11,500,000 11,500,000.00 3.76% 3.76

K.7 Pek. Tiang Bendera + acc Ls 1.00 1,500,000 1,500,000.00 0.49% 0.49

SUB TOTAL PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN - 32,532,601.03 10.64%
L PEKERJAAN AKHIR -
L.1 Pembersihan Akhir Lokasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33

L.2 Biaya Administrasi, Pelaporan, As Built Brawing & Dokumentasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33 0.00
SUB TOTAL PEKERJAAN AKHIR - 2,000,000.00 0.65%

A TOTAL SELURUH 305,658,663.86 100%


B PPN 10% (A X 10%) 30,565,866.39
C TOTAL (A+B) 336,224,530.25
JUMLAH PER MINGGU 0.96 0.63 5.26 12.98 16.22 13.43 14.40 4.81 7.98 7.63 15.05 0.65
RENCANA
JUMLAH KOMULATIF PER MINGGU - 0.96 1.59 6.85 19.83 36.05 49.48 63.88 68.69 76.67 84.30 99.35 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
JUMLAH PER MINGGU 0.11 0.73 0.71 1.46 7.86 4.18 12.18 1.48 1.08 9.36 1.50 4.17 5.17 5.29 4.63 4.61 17.58 7.90 9.99
REALISASI
JUMLAH KOMULATIF PER MINGGU - 0.11 0.84 1.55 3.02 10.88 15.06 27.24 28.72 29.80 39.17 40.66 44.83 50.00 55.29 59.92 59.92 64.53 82.11 90.01 100.00
DEVIASI -0.96 -1.59 -6.85 -19.72 -35.21 -47.93 -60.86 -57.81 -61.61 -57.06 -70.63 -70.20 -60.83 -59.34 -55.17 -50.00 -44.71 -40.08 -40.08 -35.47 -17.89 -9.99 0.00

Konsultan Supervisi PEJABAT PEMBUAT KOMITMEN Kontraktor Pelaksana


CV. NADA SONORA UPT. KPH WILAYAH CV. BERKAT BERSAMA
KABUPATEN BELU

DENI W. LUIS OEMATAN RISSARD E. NDOLU, SP VIRGILIUS YULBRIN AHIN BABULU


Kuasa Kuasa Direktur NIP. 19681118 199703 1 007 Kuasa Direktur
JADWAL REALISASI PEKERJAAN BULANAN
PAKET PEKERJAAN : PEMBANGUNAN KANTOR RESORT KESATUAN PENGELOLAAN HUTAN DI
: KABUPATEN BELU PROVINSI NUSA TENGGARA TIMUR BULAN KE : 6 DESEMBER
LOKASI : KABUPATEN TIMOR TENGAH UTARA
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 5
BULAN I (SATU) BULAN KE II (DUA) BULAN KE III (TIGA) BULAN KE IV (EMPAT)
KONTRAK ASLI BULAN KE V (LIMA)
KE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
NO URAIAN PEKERJAAN SAT KET.
HARGA BOBOT MINGGU 02-Jul 09-Jul 16-Jul 23-Jul 30-Jul 06-Agt 13-Agt 20-Agt 27-Agt 03-Sep 10-Sep 17-Sep 24-Sep 01-Okt 08-Okt 15-Okt 22-Okt 29-Okt 05-Nov 12-Nov 19-Nov 26-Nov 03-Des
VOLUME JUMLAH HARGA (Rp)
SATUAN (Rp) (%) KE s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d

08-Jul 15-Jul 22-Jul 29-Jul 05-Agt 12-Agt 19-Agt 26-Agt 02-Sep 09-Sep 16-Sep 23-Sep 30-Sep 07-Okt 14-Okt 21-Okt 28-Okt 04-Nov 11-Nov 18-Nov 25-Nov 02-Des 08-Des

-
A PEKERJAAN AWAL - 100
A.1 Pembersihan Awal Lokasi Ls 1.00 700,000 700,000.00 0.23% 0.11 0.11
A.2 Pengkuruan dan Pemasangan Bowplank Ls 1.00 1,300,000 1,300,000.00 0.43% 0.43
A.3 Papan Nama Proyek Ls 1.00 200,000 200,000.00 0.07% 0.07
A.4 Penyediaan Air Kerja/Listrik Kerja Ls 1.00 725,000 725,000.00 0.24% 0.24
SUB TOTAL PEKERJAAN AWAL - 2,925,000.00 0.96%
B PEKERJAAN TANAH -
B.1 Galian Tanah untuk Pondasi m3 42.57 60,280 2,566,119.60 0.84% 0.24 0.47 0.13
B.2 Urugan Tanah Galian Kembali m3 10.64 39,050 415,492.00 0.14% 0.14
B.3 Urugan Sirtu Peninggi Lantai m3 63.94 128,432 8,211,916.50 2.69% 1.16 1.52
B.4 Urugan Pasir di Bawah Pondasi m3 3.28 146,850 481,668.00 0.16% 0.16
B.5 Urugan Pasir di Bawah Lantai m3 16.15 146,850 2,371,627.50 0.78% 0.78
SUB TOTAL PEKERJAAN TANAH - 14,046,823.60 4.60%
C PEKERJAAN PASANGAN DAN PLESTERAN -
C.1 Aanstamping m3 12.20 294,534 3,593,320.41 1.18% 1.18
C.2 Pasangan Pondasi Batu Kali (1 Pc : 4 Psr) m3 33.89 578,793 19,615,277.83 6.42% 6.42
C.3 Pasangan Pondasi Rolag & Tangga (1 Pc : 4 Psr) m3 6.92 578,793 4,005,244.10 1.31% 1.31
C.4 Pasangan Tembok Bata Merah (1 Pc : 5 Psr) m2 173.34 150,189 26,033,846.20 8.52% 0.42 4.41 1.48 1.08 1.13
C.5 Plesteran (1 Pc : 5 Psr) Tebal 15 mm m2 403.12 49,013 19,758,265.68 6.46% 3.21 3.25
C.6 Acian m2 403.12 21,802 8,788,822.24 2.88% 0.96 1.92
SUB TOTAL PEKERJAAN PASANGAN DAN PLESTERAN - 81,794,776.46 26.76%
D PEKERJAAN BETON - 80
D.1 Pek. Beton Bertulang untuk Kolom 15/60 m3 0.23 7,118,037 1,637,148.43 0.54% 0.54
D.2 Pek. Beton Bertulang untuk Kolom praktis m3 1.52 7,118,037 10,819,415.69 3.54% 3.54
D.3 Pek. Beton Bertulang untuk Sloof m3 1.85 4,297,497 7,950,368.53 2.60% 2.60
D.4 Pek. Beton Bertulang untuk Ringbalk 15/40 m3 0.33 5,495,951 1,813,663.80 0.59% 0.59
D.5 Pek. Beton Bertulang untuk Ringbalk m3 1.38 5,495,951 7,584,412.24 2.48% 2.48
D.6 Pek. Beton Bertulang untuk Balok Latei m3 0.81 5,495,951 4,451,720.23 1.46% 1.46
D.7 Pek. Beton Bertulang untuk Plat Level m3 1.14 5,041,554 5,747,371.67 1.88% 1.88
D.8 Pek. Beton Bertulang untuk Plat m3 0.14 5,041,554 705,817.57 0.23% 0.23
D.9 Pek. Beton Tidak Bertulang untuk Rabat m3 4.15 825,416 3,425,476.22 1.12% 1.12
SUB TOTAL PEKERJAAN BETON - 44,135,394.38 14.44%
E PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG -
E.1 Kusen Kayu Jati m3 0.34 7,797,020 2,650,986.80 0.87% 0.87
E.2 Kusen + Daun Pintu PVC Beserta Perlengkapannya Unit 1.00 570,000 570,000.00 0.19% 0.19
E.3 Daun Pintu Panil Kayu Jati m2 11.24 477,932 5,371,950.28 1.76% 1.76
E.4 Daun Jendela Panil Kaca Rangka Kayu Jati m2 6.30 425,810 2,682,603.00 0.88% 0.88
E.5 Pasang Kaca Jendela 5 mm m2 4.03 88,536 356,798.87 0.12% 0.12
E.6 Pasang Kunci Tanam 2 x Putar Bh 7.00 250,349 1,752,443.00 0.57% 0.57
E.7 Pasang Engsel Pintu Bh 21.00 36,467 765,811.20 0.25% 0.25
E.8 Pasang Engsel Jendela Bh 20.00 26,142 522,830.00 0.17% 0.17
E.9 Pasang Kait Angin Bh 20.00 31,955 639,100.00 0.21% 0.21
E.10 Pasang Grendel Bh 11.00 64,757 712,327.00 0.23% 0.23 60
E.11 Boven Batu Angin/Roster Bh 22.00 47,523 1,045,512.60 0.34% 0.34
SUB TOTAL PEKERJAAN KUSEN, PINTU/JENDELA, KACA, KUNCI DAN PENGANTUNG 17,070,362.76 5.58%
F PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING
F.1 Pasang Lantai Keramik 40/40 cm m2 87.32 152,807 13,343,063.58 4.37% 4.37
F.2 Pasang Lantai Keramik 20/20 cm m2 4.31 162,289 699,463.44 0.23% 0.23
F.3 Pasang Dinding Keramik 20/25 cm m2 10.08 145,019 1,461,786.48 0.48% 0.48
F.4 Pasang Plint Keramik 10/40 cm m2 67.15 93,023 6,246,467.59 2.04% 2.04
F.5 Rangka Plafond Kayu Klas. II m2 110.97 106,381 11,805,099.57 3.86% 3.86
F.6 Plafond Tripleks 3 mm m2 110.97 39,738 4,409,670.38 1.44% JADWAL RENCANA 1.44
F.7 List Plafond Kayu Profil m1 173.20 18,832 3,261,702.40 1.07% TERKONTRAK 1.07
F.8 Pasang Dinding Batu Alam m2 29.88 282,601 8,444,117.88 2.76% 2.76
SUB TOTAL PEKERJAAN PLAFOND, PENUTUP LANTAI DAN DINDING - 49,671,371.31 16.25%
G PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP -
G.1 Pekerjaan Konstruksi Kuda-kuda Kayu Klas II m3 1.41 5,119,400 7,218,354.01 2.36% 2.36
G.2 Pekerjaan Konstruksi Gording Kayu Klas II m3 1.43 6,252,785 8,941,482.55 2.93% 2.93
G.3 Pekerjaan Atap Seng Gelombang BJLS 0.30 m2 143.37 65,164 9,342,562.68 3.06% 3.06
G.4 Pekerjaan Seng Licin Bubungan m1 32.80 34,551 1,133,272.80 0.37% 0.37
G.5 Pekerjaan Lisplank Kayu Klas II Ukuran (2 x 2,5 x 18) cm m1 44.40 71,610 3,179,484.00 1.04% 1.04
SUB TOTAL PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP - 29,815,156.04 9.75%
H PEKERJAAN PENGECATAN -
H.1 Pengecatan Tembok m2 403.12 25,809 10,403,956.07 3.40% 3.40 40
MATI
H.2 Pengecatan Plafond m2 110.97 25,809 2,863,979.23 0.94% 0.94
H.3 Pengecatan Atap m2 143.37 11,052 1,584,482.23 0.52%
KONTRAK 0.52
H.4 Pengecatan Kayu m2 30.82 12,302 379,148.26 0.12% 0.12
H.5 Teakoil m2 27.01 20,383 550,544.83 0.18% 0.18
H.6 Residu Rangka Atap Ls 1.00 500,000 500,000.00 0.16% 0.16
SUB TOTAL PEKERJAAN PENGECATAN - 16,282,110.62 5.33%
I PEKERJAAN INSTALASI LISTRIK -
I.1 Instalasi Titik Lampu Ttk 13.00 561,193 7,295,505.36 2.39% 2.39
I.2 Pasang MCB + Box Bh 1.00 74,800 74,800.00 0.02% 0.02
I.3 Pasang Saklar Ganda Bh 3.00 72,600 217,800.00 0.07% 0.07
I.4 Pasang Saklar Tunggal Bh 5.00 67,100 335,500.00 0.11% 0.11
I.5 Pasang Lampu LED 13 Watt Bh 6.00 81,686 490,116.00 0.16% JADWAL REALISASI 0.16
I.6 Pasang Lampu LED 7 Watt Bh 7.00 72,873 510,109.60 0.17% LAPANGAN 0.17
I.7 Pasang Stop Kontak Bh 9.00 50,006 450,054.00 0.15% 0.15
SUB TOTAL PEKERJAAN INSTALASI LISTRIK - 9,373,884.96 3.07%
J PEKERJAAN INSTALASI AIR DAN SANITAIR -
J.1 Pasang Closed Duduk Bh 1.00 621,610 621,610.00 0.20% 0.20
J.2 Pasang Bak Air Bh 1.00 819,390 819,390.00 0.27% 0.27
J.3 Pasang Kran Air Bh 2.00 75,386 150,771.50 0.05% 0.05
J.4 Pasang Floor Drain Bh 1.00 76,087 76,087.00 0.02% 0.02
J.5 Pasang Kictchen Zinc 1 Lubang Bh 1.00 607,761 607,761.00 0.20% 0.20 20
J.6 Pasang Pipa PVC Dia 4" + acc m1 4.00 128,774 515,094.80 0.17% 0.17
J.7 Pasang Pipa PVC Dia 2" + acc m1 4.00 58,375 233,499.20 0.08% 0.08

J.8 Pasang Pipa GIP Dia 0,5" + acc m1 12.00 61,414 736,969.20 0.24% 0.24

J.9 Septiktank dan Peresapan Unit 1.00 2,250,000 2,250,000.00 0.74% 0.74
SUB TOTAL PEKERJAAN INSTALASI AIR DAN SANITAIR - 6,011,182.70 1.97%
K PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN -
K.1 Bak Penampung 5000 L + acc Unit 1.00 9,500,000 9,500,000.00 3.11% 1.55 1.55

K.2 Pompa Air + Instalasi Pipa + acc Ls 1.00 2,000,000 2,000,000.00 0.65% 0.65

K.3 Tralis Besi Hollow 5 cm m2 3.51 365,413 1,282,601.03 0.42% 0.42

K.4 Huruf Nama Kantor Tinggi 20 cm Bh 15.00 200,000 3,000,000.00 0.98% 0.98

K.5 Huruf Nama Kantor Tinggi 15 cm Bh 25.00 150,000 3,750,000.00 1.23% 1.23

K.6 Biaya Pengadaan Genset 5 KVA Ls 1.00 11,500,000 11,500,000.00 3.76% 3.76

K.7 Pek. Tiang Bendera + acc Ls 1.00 1,500,000 1,500,000.00 0.49% 0.49
SUB TOTAL PEKERJAAN BAK PENAMPUNG DAN LAIN - LAIN - 32,532,601.03 10.64%
L PEKERJAAN AKHIR -
L.1 Pembersihan Akhir Lokasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33

L.2 Biaya Administrasi, Pelaporan, As Built Brawing & Dokumentasi Ls 1.00 1,000,000 1,000,000.00 0.33% 0.33 0.00
SUB TOTAL PEKERJAAN AKHIR - 2,000,000.00 0.65%

A TOTAL SELURUH 305,658,663.86 100%


B PPN 10% (A X 10%) 30,565,866.39
C TOTAL (A+B) 336,224,530.25
JUMLAH PER MINGGU 0.96 0.63 5.26 12.98 16.22 13.43 14.40 4.81 7.98 7.63 15.05 0.65
RENCANA
JUMLAH KOMULATIF PER MINGGU - 0.96 1.59 6.85 19.83 36.05 49.48 63.88 68.69 76.67 84.30 99.35 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
JUMLAH PER MINGGU 0.11 0.73 0.71 1.46 7.86 4.18 12.18 1.48 1.08 9.36 1.50 4.17 5.17 5.29 4.63 4.61 17.58 7.90 9.99
REALISASI
JUMLAH KOMULATIF PER MINGGU - 0.11 0.84 1.55 3.02 10.88 15.06 27.24 28.72 29.80 39.17 40.66 44.83 50.00 55.29 59.92 59.92 64.53 82.11 90.01 100.00
DEVIASI -0.96 -1.59 -6.85 -19.72 -35.21 -47.93 -60.86 -57.81 -61.61 -57.06 -70.63 -70.20 -60.83 -59.34 -55.17 -50.00 -44.71 -40.08 -40.08 -35.47 -17.89 -9.99 0.00

Konsultan Supervisi PEJABAT PEMBUAT KOMITMEN Kontraktor Pelaksana


CV. NADA SONORA UPT. KPH WILAYAH CV. BERKAT BERSAMA
KABUPATEN BELU

DENI W. LUIS OEMATAN RISSARD E. NDOLU, SP VIRGILIUS YULBRIN AHIN BABULU