INSTALLATION OF SWITCHBOARD
Date Created: _____ / _____ / _____ Approved by: Review Date: _____ / _____ / _____
Falling objects Risk of objects falling from HIGH Barriers and control of lift area. MOD (E1)
height. (C1) Certified person/s using lift equipment.
Page 1 of 2
07 Mark out location ensuring N/A N/A N/A N/A N/A N/A
coordination with other services.
08 Install switchboard to manufacturers Electrical Failure to prevent contact HIGH Implement Isolate, Lockout & Test SWMS Isolate MOD (E1)
and clients specifications. contact with live electrical (C1) Administrative
components PPE
Manual Failure to prevent manual HIGH Implement Manual Handling SWMS LOW (E3)
handling. handling injuries (C1)
Strains/sprains
Cuts/abrasions
09 Commission switchboard. Electrical Failure to prevent contact HIGH Implement Isolate, Lockout & Test SWMS Isolate MOD (E2)
contact with live electrical (B2) Administrative
components PPE
Electrical Failure to prevent risk of
explosion Electrical explosion
10 Clean area. Manual Failure to prevent manual MOD Implement Manual Handling SWMS Redesign LOW (E3)
handling. handling injuries (C3) Administrative
Strains/sprains PPE
Cuts/abrasions
Page 2 of 2