Arcam EBM Pre-Installation Guide
1 Document Information
The purpose of this guide is to assist in preparing for the installation of the
Arcam EBM System. The recommendations made within this document are
for reference and any deviation can cause the system to malfunction.
Arcam does not supply all the equipment required for operation of the Arcam
EBM System and will not accept any responsible for the safety or functionality
of any customer-supplied equipment and sub-systems.
Arcam Staff will attend to site for installation connections and commissioning
of the EBM System.
Arcam will not accept any kind of claims for damage or loss caused by errors
or omissions in this document.
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
2
Arcam EBM Pre-Installation Guide
Table of Contents:
1 DOCUMENT INFORMATION ................................................................................................................................... 2
2 SYSTEM COMPONENTS .......................................................................................................................................... 4
2.1 ARCAM SUPPLIED EQUIPMENT ................................................................................................................................................ 4
2.2 CUSTOMER SUPPLIED EQUIPMENT ........................................................................................................................................... 4
3 TRANSPORTATION................................................................................................................................................. 5
3.1 RECEIVING AND STORING ....................................................................................................................................................... 5
3.2 INSTALLATION ...................................................................................................................................................................... 6
3.3 RELOCATION ....................................................................................................................................................................... 6
4 FACILITY AND ROOM LAYOUT ................................................................................................................................ 7
4.1 ROOM SPECIFICATIONS AND DIMENSIONS:................................................................................................................................. 9
4.2 EQUIPMENT CLEARANCE ...................................................................................................................................................... 10
4.2.1 EBM System ......................................................................................................................................................... 10
4.2.2 PRS System........................................................................................................................................................... 10
4.2.3 Electric-Hydraulic Trolley ..................................................................................................................................... 11
4.2.4 Trolley Tool Stand ................................................................................................................................................ 11
4.2.5 Water Chiller........................................................................................................................................................ 11
5 AUXILIARY EQUIPMENT ........................................................................................................................................12
5.1 VACUUM CLEANER.............................................................................................................................................................. 12
5.2 CHILLER ............................................................................................................................................................................ 12
5.2.1 Cooling Water Circuit Specifications: ................................................................................................................... 12
5.2.2 Cooling Water Specifications: .............................................................................................................................. 13
5.3 COMPRESSED AIR ............................................................................................................................................................... 14
5.3.1 PRS System........................................................................................................................................................... 14
5.3.2 Pneumatic Powder Sieve...................................................................................................................................... 14
5.3.3 Vacuum cleaner ................................................................................................................................................... 14
6 ELECTRICAL SUPPLIES............................................................................................................................................15
6.1 EBM SYSTEM .................................................................................................................................................................... 15
6.1.1 Transformer (Not supplied by Arcam) ................................................................................................................. 16
6.1.2 Network connection............................................................................................................................................. 16
6.2 PRS SYSTEM ..................................................................................................................................................................... 16
6.3 WATER CHILLER ................................................................................................................................................................. 16
6.3.1 For EU and rest of world ...................................................................................................................................... 16
6.3.2 For US................................................................................................................................................................... 16
6.4 TROLLEY ........................................................................................................................................................................... 16
7 CUSTOMER-SUPPLIED AUXILIARY EQUIPMENT.......................................................................................................17
7.1 FIRE EXTINGUISHER ............................................................................................................................................................ 17
7.2 HELIUM REGULATOR/GAS ................................................................................................................................................... 17
7.3 FILE PREPARATION COMPUTER/SOFTWARE ............................................................................................................................. 17
7.4 STORAGE CABINET FOR A2 WIDE/TALL EQUIPMENT .................................................................................................................. 17
8 SITE REQUIREMENT CHECKLIST AND RETURN FORM...............................................................................................18
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
3
Arcam EBM Pre-Installation Guide
2 System components
Depending of usage of the machine and already existing equipment the list of required
equipment might vary.
e.g. for a second EBM Machine, no further PRS or Vacuum cleaner would be needed as
long as the EBM Machines runs with the same powder quality.
Compulsory
Supply for compressed air (ISO 8573-1 Class 4)
Helium gas (incl. pressure regulator)
Fire extinguisher, Class D (Metal Powder)
PC Workstation w. Magics RP software incl. support generation module.
Optional
Shelfs or cabinets for storing equipment
Blasting cabinet (Post processing)
Belt grinder (Post processing)
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
4
Arcam EBM Pre-Installation Guide
3 Transportation
3.1 Receiving and storing
The equipment will arrive to site on pallets and in crates, see dimension table below. Upon
arrival to site the crates have to be taken indoors and kept in a temperature controlled
storage facility until the time of installation.
In order to remove the EBM Machine cabinets from its shipping crates, a forklift with
cantilevered forks and a minimum capacity of 1020 kg (2250 lbs) is required.
It can be a manually-operated fork truck, or a warehouse type.
For positioning the cabinets in to their final position a manually-operated pallet jack is
required. It should have a minimum capacity of 1020 kg (2250 lbs).
Dimensions Weight
Specification:
(cm): (kg):
Electrical Cabinet Crate 130 x 113 x 223 400
Vacuum Chamber Cabinet Crate 130 x 113 x 223 1100
Start Pack EUR-pallet 120 x 80 x 95 200
HV Power Units 1/2-pallet 60 x 60 x 90 140
Powder Recovery System Crate 150 x 145 x 229 400
Electrical Trolley EUR-pallet 135 x 80 x 200 400
Stand for Trolley tools Crate 120 x 80 x 150 100
Barrel tool for Trolley (Optional) Crate 106 x 106 x 70 180
Vacuum cleaner 1/2-pallet 65 x 65 x 130 37
Extra build tank (A2 only) 1/2-pallet 60 x 80 x 75 70
Water Chiller (Rittal) ~1/2-pallet 70 x 70 x 85 150
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
5
Arcam EBM Pre-Installation
Installation Guide
3.2 Installation
During installation any door openings where the EBM
EBM System cabinets have to pass
through must have a minimum clearance of
Height
o 215 cm (85 inch)
Width
o EBM System100
System cm (39,5 inch)
o PRS System 130 cm (51 inch)
Handling equipment, such as fork lift and pallet jack, will not be supplied by Arcam and
have to be arranged by customer prior to arrival of Arcam staff.
staff
Caution !
Access route
es have to withstand the load from the
EBM System plus the load from transportation
equipment.
3.3 Relocation
Before any relocation of the EBM
E System please consult Arcam staff.
taff.
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
6
Arcam EBM Pre-Installation
Installation Guide
Each unit’s own requirements are described in detailed within this document.
document
It is recommended that air inlet to the EBM System room is filtered to avoid dust
contamination of powder.
Air quality should meet local laws and regulations for a safe workspace.
Particels, including oil mist, from surrounding equipment might contaminate the EBM
powder and interfere with final material specification.
To minimize the risk of contamination and hazardous environment it is advised that the
floor top is made of hard material allowing an
a easy cleaning.
EBM System room should be air conditioned to keep a stable temperature and to control
humidity. See Room specification below for details.
The water
ater chiller for the cooling liquid circuit is recommended to be placed outside of the
EBM System room to minimize
minimi the heat load in the room. If a central cooling water facility
is used a heat exchanger can be placed within the EBM System room.
Caution !
In addition to the health hazard and contamination
risk there is a potential dust explosion hazard when
handling metal powder.
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
7
Arcam EBM Pre-Installation Guide
8 m (26’)
Sift and
powder
barrels
PRS
Arcam
EBM System
4 m (13’)
Trolley
Tools
Vacuum Vacuum
cleaner cleaner
Shelf
Shelf
Chiller
With a sketch/drawing of the intended room for the EBM System Arcam staff can assist
you to find the best layout for a smooth operation.
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
8
Arcam EBM Pre-Installation Guide
Ceiling height
o EBM System 2,9 m (9,5 feet)
o PRS area 2,4 m (7,9 feet)
Floor
o Weight load
EBM machine 1500 kg (3,300 lbs)
Trolley up to 750 kg (1,700 lbs)
o Surface
Hard surface for easy cleaning
o Level
Maximum 0,5 % slope.
Environmental
o Temperature 16-25 degC (60-78 degF)
o Humidity < 60% Relative, non-condensing.
o EMF < 0,2 µTesla (2 mGauss)
Please consult Arcam Service Dept. for advice if any of these are located near
the intended position of the EBM System.
Doorway openings
Illumination
o Sufficient general illumination is required to facilitate loading and unloading
of builds within the machine.
o Shielding and shading. It is desirable, but not necessary, to be able to dim
the lights and shield of any possible windows in the room to facilitate viewing
of the process through the observation window.
Please note that powerful overhead fluorescent lighting can cause electro-
magnetic interference problems.
If there is any doubt regarding the Room Specifications please consult Arcam Staff.
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
9
Arcam EBM Pre-Installation Guide
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
10
Arcam EBM Pre-Installation Guide
Manual trolley (delivered with EBM S12 system) demand less clearance.
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
11
Arcam EBM Pre-Installation
Installation Guide
5 Auxiliary Equipment
The
e following equipment is required operation of the system. Arcam AB / Arcam Inc. can
supply this if not bought form local supplier.
Caution !
Arcam takes no responsibility for any equipment
which has not been supplied by Arcam. Please note
that some of the auxiliary equipment is crucial for
the operation of the EBM System and any failure
might damage the EBM System or make make the
material specification deviate.
Caution !
The use of a standard vacuum cleaner might be
dangerous as the metal powder flowing in the hose
will generate static electricity and cause a potential
risk of fire/explosion.
explosion.
5.2 Chiller
The EBM system requires re-circulated
re circulated cooling water during operation to keep the vacuum
pumps, cabinets, and electron beam column at an acceptable temperature.
Arcam supplies two types of stand-alone
stand water chillers (Rittal 3334.600 for EU and
Temptech CF-1A for the US).
The EBM System can also be hooked up to a central cooling system via a heat exchanger.
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
12
Arcam EBM Pre-Installation Guide
Property Value
pH value (7) 7.5 – 8.5
Spec. el. Conductivity 200 – 1000 μS/cm
Residue on evaporation < 500 mg/dm³
Depositable substances < 3 mg/dm³
Hardness 3 – 8°dH
Ca + Mg 0.5 – 2 mmol/l
Hydrogen carbonate 1 – 5 mmol/dm³ (60 –300 mg/dm³)
Free CO² < 10 mg/dm³
Sulphide < 0.01 mg/dm³
Sulphate < 250 mg/dm³
Chloride < 50 mg/dm³
Nitrate < 25 mg/dm³
Nitrite < 0.1 mg/m³
COD < 7 mg/dm³
NH4 < 0.05 mg/dm³
FE < 0.1 mg/dm³
Mn < 0.1 mg/dm³
Cu < 0.1 mg/dm³
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
13
Arcam EBM Pre-Installation Guide
Air supply system (compressor and filter) has to meet the demands of
ISO 8573-1 Class 4, preferably Class 3.
Class 4 demands bulk liquid to be removed (air dryer)
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
14
Arcam EBM Pre-Installation Guide
6 Electrical supplies
All electrical connections and work shall be done according to local regulations and laws.
A qualified and licensed electrician should install and maintain any fixed electrical
equipment.
During normal operation of the EBM System there is no need for EX-approved electrical
installation within the area of Arcam EBM System installation.
Contact Arcam if you wish to run multiple machines connected to the same main power
supply.
The EBM System power comes with a 3 meter cable with a Euro 32A plug.
A suitable socket, or junction box, needs to be placed on the wall behind machine.
Alternatively an additional cable could be dropped from the ceiling via conduit.
Machine frame height is 2,1 m (7 feet)
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
15
Arcam EBM Pre-Installation Guide
It is recommended to locate the transformer at least 10 m (about 30 ft) from the EBM
System to avoid influences from any electro-magnetic field created by the transformer. A
typical transformer has the dimensions of approximately a 0,5 meter (2 feet) metal cube
and weighing approximately 100-150 kg (200-300 pounds).
6.3.2 For US
Temptech CF-1A with alternative voltages:
115 V / 1 phase / 60 Hz, full load amperage 24 A
220 V / 1 phase / 60 Hz, full load amperage 12 A
6.4 Trolley
The Electric-Hydraulic Trolley is battery operated but needs a single power outlet for its
charging equipment. Delivered as 115V / 60Hz or 230V / 50Hz version with nominal power
consumption not exceeding 250 W.
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
16
Arcam EBM Pre-Installation
Installation Guide
7 Customer-Supplied
Supplied Auxiliary Equipment
The following equipment is not available for purchase from Arcam but is required for
proper operation of the system.
Consumption:
Building process 1 liter / hour (0,25 Gallon / Hour)
Build cool down 50
50-75 liters / build cycle (13-20
20 Gallons / build cycle)
Caution !
Line pressure above 1 Bar (15 PSI) might damage
internal parts of the EBM System
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
17
Arcam EBM Pre-Installation Guide
Site transportation
□ Access routes, weight load and sufficient clearance.
□ Fork lift and pallet jacket available.
Room requirements
□ Floor space and floor surface.
□ Air quality.
□ EMF conditions.
Electrical connections
□ EBM System.
□ Water chiller.
□ PRS.
□ General sockets for vacuum cleaner and other equipment.
Sub system
□ Compressed air.
□ Cooling water system (not if supplied by Arcam).
□ Helium gas.
Auxiliary equipment
□ Fire extinguisher, Class D.
□ Personal Protection Equipment.
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
18
Arcam EBM Pre-Installation Guide
Arcam AB
Krokslätts Fabriker 27A
SE-431 37 Mölndal
Sweden
www.arcam.com
Changes regarding specification and details within this document might change without prior notification.
Arcam will not accept any claim regarding damage or loss caused by errors or omissions in this document.
19