Change Brief
Version
Sno Date Page No Mode Description of
No
(A/M/D) Change
1. Introduction
1.1. Objectives
1.3. Scope
2. Test Items
3. Features To Be Tested
a) Admin
b) Masters
c) Transactions
d) Reports
Not Applicable
5. Approach
5.5. Re-Testing
The testing on the AUT when the modules within the AUT are
being integrated together to ensure the functionalities are
still working fine even after Integration.
Testing done on the AUT when all the proposed modules are
integrated as a single unit and deployed in the Client
specified environment. The focus areas of System testing are
Non-Functional areas like Compatibility, Configuration,
Database, Load/Stress/Performance, Browser Compatibility/
Capability and Network testing.
6. Pass/Fail Criteria
7. Testing Process
7.4. Resources
7.5. Schedule
Schedule
Sno Task (in From Date To Date
Days)
Admin
a) WF – UCD (User
1 1.5 days 22-jun-06 23-jun-06
Levels) Review and
RR preparation
a) RR with
clarificati
2. .5 days 23-jun-06 23-jun-06
on release
b) Review Meeting
a) TCD Preparation
3. (User 3 days 24-jun-06 27-jun-06
Levels)
a) Refinement and
4. Baseline of 1 Day 28-jun-06 28-jun-06
TCD
Masters
a) WF – UCD (Item)
5. 1.5 days 29-jun-06 30-jun-06
Review and RR
preparation
a) RR with
clarificati
6. .5 days 30-jun-06 30-jun-06
on release
b) Review Meeting
TCD Preparation
7. (Item 2.5 days 31-jun-06 3-Jul-06
Master)
Refinement and
8.
Baseline of .5 Day 3-Jul-06 3-Jul-06
TCD
Transactions
a) WF – UCD
9. 1.5 Days 4-Jul-06 5-Jul-06
(Receipts) Review
and RR preparation
8. Environmental Requirements
8.1. Hardware
8.2. Software
8.3. Tools
8.4. Publications
a) Schedule
b) Personnel
d) Requirements
10.Plan Approvals