Anda di halaman 1dari 1

6000 1800

2300

D 16 - 198.4

2050
D 16 - 198.4

2300
2900

400
d 13 - 150

300
5 D 16

2 d 13

800
2 D 16

2 d 13 2300
5 D 16
800

400 400 400 400 B - B' SECTION B - B' SECTION


1750 1750 1750
1 : 100 1 : 100
RENCANA PONDASI ALTERNATIF -1 RENCANA PONDASI ALTERNATIF -1

TAMPAK DEPAN B - B' SECTION


1 : 100 1 : 100
SEEDING TANK RENCANA PONDASI ALTERNATIF -1
2300
d 13 - 198.4
d 13 - 198.4

D 16 - 198.4

300
400 400 400 400 2600 d 13 - 198.4

2300

2300
d 13 - 200 d 13 - 150

5 D 16

2 d 13
800

2 D 16

2 d 13

5 D 16
2600

B - B' SECTION
1 : 100 B - B' SECTION B - B' SECTION
RENCANA PONDASI ALTERNATIF -1 1 : 100 1 : 100
1750 1750 1750 RENCANA PONDASI ALTERNATIF -1 RENCANA PONDASI ALTERNATIF -1
5650

B - B' SECTION
1 : 100
RENCANA PONDASI ALTERNATIF -1

ENGINEERING
This Drawing Is The Exclusive
Property Of PT. Pertamina EP Asset 3 BY DATE
UPGRADING INSTALASI PENGOLAHAN AIR LIMBAH
and It Contains Information Regarded Note : PROJECT MGS - BALONGAN
REVISIONS

As Confidential By PT. Pertamina EP GEODETIC


1. Concrete fc' 30 MPa
Asset 3. This Drawing Shall Not Be CIVIL & STRUCTURAL Title :
Traced, Copied Or Reproduced in Any
2. Steel Bar fy 240 MPa
3. Development Length ( If Needed) 300mm
PROCESS PARTITION WALL OF
Manner, Not Used For Any Used For MECHANICAL
Any Purpose Whatso Ever Except 4. All Unit Are in mm PHYSICAL CHEMICAL TREATMENT TANK (3-22-T-04)
NO. DRAWING No TITTLE ELECTRICAL
Written Permission Of PT. Pertamina
EP Asset 3
REFFERENCE DOCUMENT REV BY DATE DESCRIPTION PREPD CHKD APPD
PIPING
PIPELINE
ASSET 3 SURFACE FACILITIES Scale DRAWING No
1
SHEET
1
REV

Anda mungkin juga menyukai