02. Access control for PRT area 03. Toe guards for slab area 04. Access near to stair shall be closed or railing height shall be increased 05. Electrical connections shall be checked to ensure joints made with standard connectors 06. Close all opening on slab made for panel fittings 07. Electrical equipment shall be checked by electrical competent persons 08. Earthing to be checked 09. Spark arrester for DG shall be fixed properly 10. DG service records to be checked 11. Material stacking area shall be identified in advance for new PRT 12. Eye wash water changing records to be fixed on eye wash 13. Sign board to show way for eye wash 14. First aid box refile dates shall be recorded in checklist 15. Checklist for first aid box shall be in line with contents 16. Contact details with photo for first aider and fire warden to be fixed at visible locations 17. Fire extinguishers shall be placed properly in box or hanged on elevated location 18. Fire extinguisher monthly inspection tag shall be provided 19. All DB shall be fixed with ELCB 20. Socket in DG is modified. Need to change 21. Drip tray cleaning schedule to be prepared 22. Noise survey shall be carried out 23. Stickers for rack identification in stores 24. Quarantine bags at store area 25. Stickers for portable tools to be ensured 26. Lifting belt certificate for A04/2632 27. Temperature monitoring for chemical storage area 28. Chemical storage area shall be separate – all other materials shall be shifted to other location 29. Safety harness belt shall be stored at elevated place in hanging condition 30. Eye wash to be provided at chemical storage area 31. MSDS for all chemicals shall be available at store 32. Spill containment shall be provided at chemical storage area 33. Earthing for store container 34. Cement storage area to be identified