Lampiran B.

1 Time Schedule Penggunaan Peralatan

WAKTU PELAKSAN
DURASI
NO. JENIS PERALATAN (HARI)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1 PEKERJAAN LPB
A. WHEEL LOADER 1
B. DUMP TRUCK 1
C. MOTOR GRADER 1
D. VIBRATORY ROLLER 1
E. WATER TANKER 2
2 QUALITY CONTROL 10
3 PEKERJAAN LPA
A. WHEEL LOADER 1
B. DUMP TRUCK 1
C. MOTOR GRADER 1
D. VIBRATORY ROLLER 1
E. WATER TANKER 2
4 QUALITY CONTROL 10
5 PEKERJAAN PRIME COAT
A. COMPRESSOR 1
B. ASPHALT SPHAYER 1
6 PEKERJAAN PENGASPALAN
A. DUMP TRUCK 2
B. ASPHALT FINISHER 2
C. TANDEM ROLLER 1
D. PNEUMATIC TIRE ROLLER 2
7 QUALITY CONTROL 10

SUMBER : PENULIS
WAKTU PELAKSANAAN

27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
Lampiran T.6 Jadwal Waktu Pelaksanaan

WAKTU PELA
DURASI
NO. JENIS PERALATAN SAT. VOL.
(HARI)

1 2 3 4 5 6 7 8 9 10 11
1 PEKERJAAN LPB M3 819.0 4
A. WHEEL LOADER M3 819.0 1
B. DUMP TRUCK M3 819.0 1
C. MOTOR GRADER M3 819.0 1
D. VIBRATORY ROLLER M3 819.0 1
E. WATER TANKER M3 819.0 2
2 PEKERJAAN LPA M3 819.0 4
A. WHEEL LOADER M3 819.0 1
B. DUMP TRUCK M3 819.0 1
C. MOTOR GRADER M3 819.0 1
D. VIBRATORY ROLLER M3 819.0 4
E. WATER TANKER M3 819.0 4
3 PEKERJAAN PRIME COAT Liter 2741.7 1
A. COMPRESSOR Liter 2741.7 1
B. ASPHALT SPHAYER Liter 2741.7 1
4 PEKERJAAN PENGASPALAN Ton 299.48 2
A. DUMP TRUCK Ton 810.68 2
B. ASPHALT FINISHER Ton 810.68 2
C. TANDEM ROLLER Ton 810.68 1
D. PNEUMATIC TIRE ROLLER Ton 810.68 2
Jumlah 11
Sumber : Penulis
WAKTU PELAKSANAAN

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
LAMPIRAN T.7 KURVA S

No URAIAN KEGIATAN VOLUME SATUAN HARGA SATUAN (RP) JUMLAH HARGA (RP)

DIVISI 1. UMUM
1.2 Mobilisasi 1.00 33,570,000.00 33,570,000.00

DIVISI 2. PEKERJAAN TANAH


2.2 Timbunan Pilihan 268.56 374,668.00 100,620,838.08
2.3 Penyiapan Badan Jalan 3,730 2,629.00 9,806,170.00

DIVISI 3. PELEBARAN PERKERASAN DAN BAHU JALAN


3.1 Lapis Pondasi Agregat Kelas B 313.32 489,762.00 153,452,229.84

DIVISI 4. PERKERASAN BERBUTIR


4.1 Lapis Pondasi Agregat Kelas A 671.4 492,440.91 330,624,823.68
4.2 Lapis Pondasi Agregat Kelas B 895.2 488,031.00 436,885,351.20

DIVISI 5. PERKERASAN ASPAL


5.1 Lapis Resap Pengikat - Aspal Cair 1790.4 16,393.00 29,350,027.20
5.2 Laston Lapis Antara (AC - BC) 317.796 1,481,703.00 470,879,286.59

JUMLAH HARGA (Rp) 1,565,188,727


TOTAL BOBOT
PROGRES RENCANA HARIAN (%)
PROGRES RENCANA KOMULATIF HARIAN (%)
JADWAL PELAKSANAAN PEKERJAAN
BOBOT PEKERJAN (%)
1 2 3 4 5 6 7

2.14 2.14

6.43 3.2143356 3.214336


0.63 0.627

9.80 3.27 3.27 3.27

21.1
27.91

1.875
30.08

100.00
2.14 0.63 3.21 3.21 3.27 3.27 3.27
2.14 2.77 5.99 9.20 12.47 15.74 19.00
JADWAL PELAKSANAAN PEKERJAAN

8 9 10 11 12 13 14 15 16 17 18

7.04 7.04 7.04


5.58 5.58 5.58 5.58 5.58

1.875175
15.04225 15.04225

7.04 7.04 7.04 5.58 5.58 5.58 5.58 5.58 1.88 15.04 15.04
26.05 33.09 40.13 45.71 51.29 56.88 62.46 68.04 69.92 84.96 100.00