Anda di halaman 1dari 5

EXISTING COLUMN NEW STEEL COLUMN

W10 x 49 1 LAYER SCH-11UP CONTINUOUS


1 LAYER SCH-11UP CONTINUOUS U-WRAP @ 0.3L FROM COLUMN
U-WRAP @ 0.3L FROM COLUMN 1 LAYER SCH-11UP,
400mm WIDE @ 0.8L
BEAM 1 FINNISH
FLOOR LINE
1 LAYER SCH-11UP CONTINUOUS
U-WRAP @ 0.3L FROM COLUMN
1 LAYER SCH-11UP , NEW STEEL COLUMN
400mm WIDE@ 0.8L W10 x 49
15" x 15" x 21" BASE PLATE
FRP APPLICATION BEAM DETAIL & 3
4" DIA. ANCHOR BOLT
SCALE: NTS FRP APPLICATION
SCALE: NTS
NGL
FINNISH
VERTICAL BARS
VERIFY

FLOOR LINE
0.4
EXISTING TIE BEAM
ROUGHEN SURFACE, APPLY EPOXY BONDING
PRIOR TO POURING OF NEW CONCRETE NEW STEEL COLUMN
15" x 15" x 21" BASE PLATE W10 x 49
0.6

4-43" DIA. ANCHOR BOLT 15" x 15" x 21" BASE PLATE ADDITIONAL
NEW PEDESTAL
4-43" DIA. ANCHOR BOLT COLUMN ELEVATION
W10 x 49
SCALE: NTS
LATERAL TIES
0.55
2ND APPLICATION 1 LAYER SCH-11UP
1 LAYER SEH-25A GLASS FIBER,
FULL WRAP W/ VERTICAL ORIENTATION
EXISTING TIE BEAM- WRAP AROUND ( FULL LENGTH )
NEW PEDESTAL CONN. DET.
SCALE: NTS
1ST APPLICATION 2 LAYERS SEH-25A
ADDITIONAL STEEL FULL WRAP W/ HORIZONTAL ORIENTATION
COLUMN DETAIL
SCALE: NTS
FINNISH
FLOOR LINE FINNISH
FLOOR LINE
15" x 15" x 21" BASE PLATE
NEW STEEL COLUMN
4-43" DIA. ANCHOR BOLT NATURAL GROUND LINE

W10 x 49 UP TO ROOF BEAM


W10 x 49
15-25 mm DIA 2ND APPLICATION 2 LAYERS SEH-25A
RSB EACH WAY 15" x 15" x 21" BASE PLATE FULL WRAP W/ HORIZONTAL ORIENTATION
3
4" DIA. ANCHOR BOLT 1ST APPLICATION 1 LAYERS SCH-11UP
300mm EMBEDMENT
FULL WRAP W/ VERTICAL ORIENTATION
8 - 25mm Ø VERTICAL BARS
10mmØ LATERAL TIES @
3-50mm, 4-100mm,REST 150mm
15-25 mm DIA
RSB EACH WAY
FINNISH FINNISH
FLOOR LINE FLOOR LINE
TYPE 1 TYPE 2
TYP. FRP APPLICATION
FOOTING EXTENSION DETAIL FOOTING EXTENSION ELEV. FOR COLUMN 2ND-5TH FLR.
SCALE: NTS SCALE: NTS
SCALE: NTS
CONTRACTOR: ENGINEER: CLIENT: PROJECT TITLE: SHEET CONTENT: REVISION: SHEET NO.:
No: REFERENCE No. DATE
EC STRUCTURAL COMPOSITES, INC.
ENGR. HEHERSON B. JUAN
1 REVISION 12-03-18 5
4F EC Center Bldg., Mindanao Avenue Ext., Brgy. Pasong Putik, Quezon City, 1118
Trunkline: 962-55-55 Fax: loc. 801 PRC. NO.: TIN NO:

LOCATION:
5
E-mail: ecstructuralcomposites@gmail.com
Website: www.ecstructural.com PTR NO.: PLACE/DATE ISSUED:
DRAWN BY: CJB CHECKED BY: HBJ DATE: OCT,2018
CONTRACTOR:
EC STRUCTURAL COMPOSITES, INC.
4F EC Center Bldg., Mindanao Avenue Ext., Brgy. Pasong Putik, Quezon City, 1118

1 2 3 4 4' '5 5 6 7 8

6.00M 2.50M 6.00M 5.00M 10.00M 5.00M 6.00M 2.50M 6.00M


E-mail: ecstructuralcomposites@gmail.com

F-1 F-1 F-1 F-1 F-1 F-1


Trunkline: 962-55-55 Fax: loc. 801
Website: www.ecstructural.com

S
B2 B2 B2 B2

3.70M

B2

B2

B2

B2

B2

B2
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1

R
B2 B2 B2 B2 B2 B2

4.00M

B2

B2

B2

B2

B2

B2

B2

B2
F-2 F-2 F-2 F-2
F-1 F-1 F-1 F-1

Q
B2 B2 B2 B2 B2 B2
4.00M

B2

B2

B2

B2

B2

B2

B2

B2
F-2 F-2 F-2 F-2
F-1 F-1 F-1 F-1

P
B2 B2 B2 B2 B2 B2
4.00M

B2

B2

B2

B2

B2

B2

B2

B2
F-2 F-2 F-2 F-2
PTR NO.:

PRC. NO.:

F-1 F-1 F-1 F-1


ENGINEER:

O
B2 B2 B2 B2 B2 B2
4.00M

B2

B2

B2

B2

B2

B2

B2

B2
ENGR. HEHERSON B. JUAN

F-2 F-2 F-2 F-2


F-1 F-1 F-1 F-1

N
B2 B2 B2 B2 B2 B2
5.00M

B2

B2

B2

B2

B2

B2

B2

B2
PLACE/DATE ISSUED:

TIN NO:

F-2 F-2 F-2 F-2


F-1 F-1 F-1 F-1

M
B2 B2 B2 B2 B2 B2
5.00M

B2

B2

B2

B2

B2

B2

B2

B2
F-3 F-3
F-2 F-2 F-2 F-2
F-1 F-1

L
B2 B2 B2 B1 B1 B2 B2 B2
5.21M

B1
CLIENT:

B2

B2

B2

B2

B2

B2

B2

B2
K
2.79M

F-3 F-3
B2

B2
F-2 F-2 F-2 F-2
F-1 F-1

J
B2 B2 B2 B1 B1 B1 B2 B2 B2
4.00M

B2

B2

B2

B2

B2

B2

B2

B2
F-2 F-2 F-2 F-2
F-1 F-1

I B1 B1 B1
B2 B2 B2 B2 B2 B2
3.00M

B2

B2

B2

B2

B2

B2

B2

B2
F-1 F-1

H
B2 B2 B2 B1 B1 B1 B2 B2 B2
5.00M

F-4 F-4
B2

B2

B2

B2

B2

B2

B2

B2
F-2 F-2 F-2 F-2
F-1 F-1

G B1 B1 B1
B2 B2 B2 B2 B2 B2
4.00M

B2

B2

B2

B2

B2

B2

B2

B2
LOCATION:

PROJECT TITLE:

F-2 F-2 F-2 F-2


F-1 F-1

F
B2 B2 B2 B1 B1 B1 B2 B2 B2
5.00M

B2

B2

B2

B2

B2

B2

B2

B2
F-2 F-2 F-2 F-2
F-1 F-1

E
B2 B2 B2 B1 B1 B1 B2 B2 B2
5.00M

B2

B2

B2

B2

B2

B2

B2

B2

F-2 F-2 F-2 F-2


F-1 F-1

D
B2 B2 B2 B1 B1 B1 B2 B2 B2
5.00M

B2

B2

B2

B2

B2

B2

B2

B2

F-2 F-2 F-2 F-2


F-1 F-1

C
B1 B1 B1
DRAWN BY: CJB

B2 B2 B2 B2 B2 B2
SHEET CONTENT:

5.00M

B2

B2

B2

B2

B2

B2

B2

B2

F-2 F-2 F-2 F-2


F-1 F-1

B
B2 B2 B2 B1 B1 B1 B2 B2 B2
5.00M

B2

B2

B2

B2

B2

B2

B2

B2
CHECKED BY: HBJ

F-3 F-3
F-2 F-2 F-2 F-2
F-1 F-1

A
B2 B2 B2 B1 B1 B1 B2 B2 B2
1

No:

REVISION:
REVISION

REFERENCE No.

FOUNDATION KEY PLAN


SCALE: NTS
12-03-18

DATE:

LEGEND:
DATE: OCT,2018

SHEET NO.:

= EXTENTION FOOTING
5
1
B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
8
6.00M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
7

2.50M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
6

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
6.00M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

NTS
TYPICAL KEY PLAN FROM
GROUND TO 5TH FLOOR
5

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
5.00M

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1
'5

10.00M

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1
4'

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1
5.00M

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2

SCALE:
4

6.00M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
3

2.50M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

FROM 2ND FLR TO ROOF FLR FRAMING


2

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2

FROM GROUND FLR TO 5TH FLR


COLUMN TO BE RETROFITTED
6.00M

BEAMS TO BE RETROFITTED
B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

ADDITIONAL COLUMN
1

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
3.70M 4.00M 4.00M 4.00M 4.00M 5.00M 5.00M 5.21M 2.79M 4.00M 3.00M 5.00M 4.00M 5.00M 5.00M 5.00M 5.00M 5.00M

=TYPE 1

=TYPE 2
M
Q

C
R

D
S

H
K

F
P

A
E

B
L

LEGEND:
CONTRACTOR: ENGINEER: CLIENT: PROJECT TITLE: SHEET CONTENT: REVISION: SHEET NO.:
No: REFERENCE No. DATE
EC STRUCTURAL COMPOSITES, INC.
ENGR. HEHERSON B. JUAN
1 REVISION 12-03-18 2
4F EC Center Bldg., Mindanao Avenue Ext., Brgy. Pasong Putik, Quezon City, 1118
Trunkline: 962-55-55 Fax: loc. 801 PRC. NO.: TIN NO:

LOCATION:
5
E-mail: ecstructuralcomposites@gmail.com
Website: www.ecstructural.com PTR NO.: PLACE/DATE ISSUED:
DRAWN BY: CJB CHECKED BY: HBJ DATE: OCT,2018
B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
8
6.00M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
7
2.50M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
6

ROOF FRAMING KEY PLAN


B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2

NTS
6.00M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
5

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
5.02M

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1
'5
10.00M

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1
4'

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1
4.98M

SCALE:
B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
4
6.00M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
3

FROM 2ND FLR TO ROOF FLR FRAMING


2.50M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
2

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2

BEAMS TO BE RETROFITTED
6.00M

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
1

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
3.70M 4.00M 4.00M 4.00M 4.00M 5.00M 5.00M 5.21M 2.79M 4.00M 3.00M 5.00M 4.00M 5.00M 5.00M 5.00M 5.00M 5.00M

M
O

C
R

LEGEND:
S

F
P

A
Q

B
L

I
CONTRACTOR: ENGINEER: CLIENT: PROJECT TITLE: SHEET CONTENT: REVISION: SHEET NO.:
No: REFERENCE No. DATE
EC STRUCTURAL COMPOSITES, INC.
ENGR. HEHERSON B. JUAN
1 REVISION 12-03-18 3
4F EC Center Bldg., Mindanao Avenue Ext., Brgy. Pasong Putik, Quezon City, 1118
Trunkline: 962-55-55 Fax: loc. 801 PRC. NO.: TIN NO:

LOCATION:
5
E-mail: ecstructuralcomposites@gmail.com
Website: www.ecstructural.com PTR NO.: PLACE/DATE ISSUED:
DRAWN BY: CJB CHECKED BY: HBJ DATE: OCT,2018
SEE FOOTING DETAILS

COLUMN ELEVATION BY LEVEL


NTS
TOP OF ROOF BEAM

GROUND FLOOR
SECOND FLOOR
FOURTH FLOOR

NGL
THIRD FLOOR
FIFTH FLOOR

SCALE:
LINE

LINE

LINE

LINE

LINE
CONTRACTOR: ENGINEER: CLIENT: PROJECT TITLE: SHEET CONTENT: REVISION: SHEET NO.:
No: REFERENCE No. DATE
EC STRUCTURAL COMPOSITES, INC.
ENGR. HEHERSON B. JUAN
1 REVISION 12-03-18 4
4F EC Center Bldg., Mindanao Avenue Ext., Brgy. Pasong Putik, Quezon City, 1118
Trunkline: 962-55-55 Fax: loc. 801 PRC. NO.: TIN NO:

LOCATION:
5
E-mail: ecstructuralcomposites@gmail.com
Website: www.ecstructural.com PTR NO.: PLACE/DATE ISSUED:
DRAWN BY: CJB CHECKED BY: HBJ DATE: OCT,2018

Anda mungkin juga menyukai