KAR OIL & GAS CO.

Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location

References RTKB
Well KDN-21(K-448)
Depth (mMD) 406.5
Upper Fars Formation
Current Formation

Bleed off the closing unit pressure


Current Operation at 24:00:

Begin to tighten all studs and bolt


cross.Install 20" bell nipple and we
test of pipe ram, blind ram, annu
Operations last 24 hours(00:00 to 24:00)

Totco
Totco

Last Survey m MD

MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GEO
Interval m. MD

(m)

Interval m. MD

Gas Type Interval


(m)
Background Gas

Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Ao 750
R6
R7
R8
R9

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Seepage Beds 802
B1
B2
B3
B4
Saliferous Beds 836
S1
Transition Beds 913
T1
T2
T3
T4
T5
BFC
Avana Dense 943
Avana Porous 1012
Khurmala A 1059
Total Depth
0
Depth (mMD) 406.5

Operations 00:00–06:00

Plan next 24 hrs

Overall Comments

Supervisor Geologist Akram Maqsud


Wellsite Geologist Kovan waleed
Wellsite Geologist Twana alias
Signature

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


DAILY GEOLOGY REPORT (DGR)

ENTRY DATA
318 GL 309 Rig
Date 21/8/2018 day spud 10/8/2018
Depth (mTVD RT 406.5 Progress
per Fars Formation

eed off the closing unit pressure and disconnect hydraulic lines Remove bell nipple

gin to tighten all studs and bolts.Connect choke line co-flex hose in between choke manifold and si
ss.Install 20" bell nipple and weld flow line.Connect hydraulic lines in between closing unit and BOP
t of pipe ram, blind ram, annular ram and HCR valve on choke line.OK

Inc 0.5 Azi


Inc 0 Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Csg Size (inch) 17'' Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GEOLOGICAL SUMMARY
Lithology Descriptions

Shows
Description

GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm

Well site Top MD Actual Depth Actual Difference


Depth TVDss Thickness
M m +/-

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


06:00 UPDATE
Depth (mTVD RT) 406.5 Current Activity
Working on BOPUntighten all the bolts and nuts in between flanges , Remove the bolts .Rem
and riser spool one by one.
Cut out CHH and machining and weld on 20" casing again

Team Crew
Days on Ranjdar Ahmed
Days on Ahmed Adnan
Days on Hemn salih

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GYP.8
Rpt No 12
ROP m/h

Remove bell nipple

ose in between choke manifold and side outlet valves of mud


nes in between closing unit and BOP stack. Charge closing unit.Function
oke line.OK

Csg Depth (m) 406m


Csg Depth (m)
Csg Depth (m)
Csg Depth (m)
Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


ion

iC4 nC4 iC5 nC5


ppm ppm ppm ppm

Basis of Pick

BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Working on BOP
between flanges , Remove the bolts .Remove annular bag, ram type BOP

ng again

Ranjdar Ahmed Days Off


Ahmed Adnan Days Off
Hemn salih Days Off

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)