TAHUN
KETERANGAN UNIT
0 1 2 3 4
A. PENGGALIAN
Tanah Pucuk bcm/thn 0 180,000 247,500 306,250 247,500
Tanah penutup bcm/thn 0 6,131,981 12,376,461 12,317,711 12,376,461
Batubara ton/thn 0 1,051,997 2,103,994 2,103,994 2,103,994
B. PENGANGKUTAN
Disposal tanah penutupbcm/thn 0 179,999 247,499 306,249 247,499
ROM ke CPP ton/thn 0 1,015,177 2,030,354 2,030,354 2,030,354
Stockpile di CPP ton/thn 0 1,005,025 2,010,050 2,010,050 2,010,050
C. TONGKANG ton/thn 0 1,000,000 2,000,000 2,000,000 2,000,000
D. PORT (Sale Coal) ton/thn 0 1,000,000 2,000,000 2,000,000 2,000,000
96.50%
99%
99.50%
UKSI
N
5 6 7
TAHUN
DESKRIPSI NOTASI UNIT
0 1 2 3 4
PRODUKSI ALAT ANGKUT HP LCM/JAM 0
BCM/JAM 0
KAPASITAS MUAT C LCM 0
FAKTOR KOREKSI CF 0
JUMLAH PEMUATAN n 0
WAKTU EDAR ALAT MUAT Ctm MENIT 0
JARAK ANGKUT J MENIT 0
KECEPATAN TRUK ISI v1 M/MENIT 0
KECEPATAN TRUK KOSONG V2 M/MENIT 0
WAKTU DUMPING T1 MENIT 0
SPOTTING TIME T2 MENIT 0
WAKTU EDAR DUMP TRUCK Cta MENIT 0
PRODUKSI ALAT MUAT HP BCM/JAM 0
LCM/JAM 0
TON/JAM 0
Faktor Koreksi 83%
Waktu edar alat muat 0.5 menit
jarak angkut 800 m
kecepatan truk isi = 200 m/menit
kecepatan truk kosong 500 m/menit
waktu dumping= 1 menit
spotting time= 0.5 menit
HUN
5 6 7