Anda di halaman 1dari 1

SUMMARY OF QUANTITIES

QUANTITY
ITEM DESCRIPTION OF WORK UNIT REMARKS
AS-PLANNED AS-STAKED AS-BUILT

FACILITIES FOR THE ENGINEER


A.1.A(8) PROVISION OF FIELD OFFICE FOR THE ENGINEERS(RENTAL BASIS) MO. 4.03 4.03 4.03

FACILITIES FOR THE ENGINEER


B.5 PROJECT BILLBOARD EA. 2.00 2.00 2.00
B.7 OCCUPATIONAL SAFETY & HEALTH PROGRAM MO. 4.03 4.03 4.03
B.8 TRAFFIC MANAGEMENT MO. 4.03 4.03 4.03
B.9 MOBILIZATION / DEMOBILIZATION L.S. 1.00 1.00 1.00

EARTHWORKS

100(3)a1 INDIVIDUAL REMOVAL OF TREES EA. 62.00 62.00 62.00

100(3)a1 INDIVIDUAL REMOVAL OF TREES EA. 25.00 25.00 25.00

100(3)a1 INDIVIDUAL REMOVAL OF TREES EA. 8.00 8.00 8.00

101(4)c REMOVAL OF ACTUAL STRUCTURES/OBSTRUCTION LM 8.00 8.00 8.00

102(2) SURPLUS COMMON EXCAVATION CU. M. 5,095.00 5,215.00 5,215.00 Please refer to V.O. # 1

103(1)a STRUCTURE EXCAVATION CU. M. 1,115.00 1,115.00 1,115.00 Common Soil

103(3) FOUNDATION FILL CU. M. 98.00 98.00 98.00

103(5)b SHORING, CRIBBING AND RELATED WORKS CU. M. 1.00 - - Item was deleted, refer to V.O. # 1

103(6)a PIPE CULVERTS AND DRAIN EXCAVATION CU. M. 108.00 108.00 108.00 Common Soil
104(1)a EMBANKMENT FROM ROADWAY EXCAVATION CU. M. 1,320.00 1,411.00 1,411.00 Please refer to V.O. # 1

105(1)a SUB - GRADE PREPARATION SQ. M. 6,162.00 6,943.75 6,943.75 Please refer to V.O. # 1

SUBBASE AND BASE COURSES

200(1) AGGREAGATE SUBBASE COURSE CU. M. 1,368.00 1,541.55 1,541.55 Please refer to V.O. # 1

SURFACE COURSES

311(1)a.5 PCC PAVEMENT (UNREINFORCED) SQ.M. 6,097.00 6,788.60 6,788.60 Please refer to V.O. # 1

DRAINAGE AND SLOPE PROTECTION STRUCTURES (including Road Safety & GAD)

404(1)a REINFORCING STEEL BARS, GRADE 40 KG. 18,397.00 18,397.00 18,397.00 Grade 40

405(1)a3 STRUCTURAL CONCRETE CU. M. 267.00 267.00 267.00 f 'c = 20.68 Mpa 28 days

407(8) LEAN CONCRETE CU. M. 5.00 5.00 5.00 Class B (16.50 Mpa) (0.05 m thk)

500(1)a3 PIPE CULVERTS L. M. 20.00 40.00 40.00 Please refer to V.O. # 1

505 GROUTED RIPRAP CU. M. 160.00 160.00 160.00 Class A 0.30 m thk.

506 STONE MASONRY CU. M. 118.00 118.00 118.00

508(1) HAND LAID ROCK EMBANKMENT CU. M. 30.00 30.00 30.00 0.30 m thk.

Anda mungkin juga menyukai