Anda di halaman 1dari 30

TABEL XI.

ANALISA HARGA SATUAN (AHS) PEKERJAAN INSTALASI LISTRIK

Harga Sat. Jumlah Harga


No. Uraian Jenis pekerjaan Sat. Koeff. Bahan / Upah / Alat Bahan Upah Alat
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
XI PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 20 S/D 100 WATT
Lampu pijar 25 s/d 100 watt bh 1.000 Rp6,000.00 Rp6,000.00 - -
Pekerja Oh 2.237 Rp38,000.00 Rp85,000.00
Mandor Oh 0.5 Rp60,000.00 Rp30,000.00
Jumlah Rp6,000.00 Rp115,000.00
XI.2 LAMPU SL PHILIP 20 WATT
Lampu Sl philip 25 watt bh 1.000 Rp32,000.00 Rp32,000.00 - -
Pekerja Oh 2.237 Rp38,000.00 Rp85,000.00
Mandor Oh 0.5 Rp60,000.00 Rp30,000.00
Jumlah Rp32,000.00 Rp115,000.00
XI.3 LAMPU DOWNLIGHT
Downlight + SL 25 watt philip bh 1.000 Rp33,500.00 Rp33,500.00 - -
Pekerja Oh 2.237 Rp38,000.00 Rp85,000.00
Mandor Oh 0.5 Rp60,000.00 Rp30,000.00
Jumlah Rp33,500.00 Rp115,000.00
XI.4 LAMPU TAMAN
Lampu taman + tiang + lampu 1 buah bh 1.000 Rp146,500.00 Rp146,500.00 - -
Pekerja Oh 2.237 Rp38,000.00 Rp85,000.00
Mandor Oh 0.5 Rp60,000.00 Rp30,000.00
Jumlah Rp146,500.00 Rp115,000.00
XI.5 STOP KONTAK
Stop kontak broko standard (1 phase) bh 1.000 Rp13,500.00 Rp13,500.00 - -
Pekerja Oh 2.237 Rp38,000.00 Rp85,000.00
Mandor Oh 0.5 Rp60,000.00 Rp30,000.00
Jumlah Rp13,500.00 Rp115,000.00
XI.6 SAKLAR
Saklar broko tunggal standard bh 1.000 Rp10,000.00 Rp10,000.00 - -
Pekerja Oh 2.237 Rp38,000.00 Rp85,000.00
Mandor Oh 0.5 Rp60,000.00 Rp30,000.00
Jumlah Rp10,000.00 Rp115,000.00
XI.7 KABEL NYM SUPREME 2 X 10
Saklar broko tunggal standard m' 1.000 Rp20,800.00 Rp20,800.00 - -
Pekerja Oh 2.237 Rp38,000.00 Rp85,000.00
Mandor Oh 0.5 Rp60,000.00 Rp30,000.00
Jumlah Rp20,800.00 Rp115,000.00
TABEL XI.1

TUAN (AHS) PEKERJAAN INSTALASI LISTRIK

Jumlah Harga
Bahan + Upah
Rp.
9

121,000.00

147,000.00

148,500.00
261,500.00

128,500.00

125,000.00

135,800.00
TABEL XI.2

RAB BAHAN PEKERJAAN INSTALASI LISTRIK

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
BAHAN Biaya Bahan Bid Price Biaya Bahan Pelaksanaan
1 2 3 4 5 6 7
XI. PEKERJAAN INSTALASI LISTRIK
K.1 Lampu Pijar 25 Watt 2 bh Rp6,000 Rp12,000.00 Rp12,000.00
K.2 Lampu SL Philip 25 Watt 6 bh Rp32,000 Rp192,000.00 Rp192,000.00
K.3 Lampu Downlight 6 bh Rp33,500 Rp201,000.00 Rp201,000.00
K.4 Lampu Taman 2 bh Rp146,500 Rp293,000.00 Rp293,000.00
K.5 Stop Kontak 11 bh Rp13,500 Rp148,500.00 Rp148,500.00
K.6 Stop Kontak Dobel 4 bh Rp13,500 Rp54,000.00 Rp54,000.00
K.7 Saklar 8 bh Rp10,000 Rp80,000.00 Rp80,000.00
K.8 Kabel NYM supreme 2 x 10 100 m' Rp20,800 Rp2,080,000.00 Rp2,080,000.00
Jumlah Rp3,060,500 Rp3,060,500

RAB UPAH PEKERJAAN INSTALASI LISTRIK

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
UPAH Biaya Upah Bid Price Biaya Upah Pelaksanaan
1 2 3 4 5 6 7
XI. PEKERJAAN INSTALASI LISTRIK
K.1 Lampu Pijar 25 Watt 2 bh Rp115,000 Rp230,000.00 Rp207,000.00
K.2 Lampu SL Philip 25 Watt 6 bh Rp115,000 Rp690,000.00 Rp621,000.00
K.3 Lampu Downlight 6 bh Rp115,000 Rp690,000.00 Rp621,000.00
K.4 Lampu Taman 2 bh Rp115,000 Rp230,000.00 Rp207,000.00
K.5 Stop Kontak 11 bh Rp115,000 Rp1,265,000.00 Rp1,138,500.00
K.6 Stop Kontak Dobel 4 bh Rp115,000 Rp460,000.00 Rp414,000.00
K.7 Saklar 8 bh Rp115,000 Rp920,000.00 Rp828,000.00
K.8 Kabel NYM supreme 2 x 10 100 m' Rp115,000 Rp11,500,000.00 Rp10,350,000.00
Jumlah Rp15,985,000 Rp14,386,500
TABEL XI.3

KEBUTUHAN TENAGA KERJA

Koeff. Koeff.
No. Uraian Jenis pekerjaan Sat. Volume Sat Kebutuhan Tenaga Kerja
(Awal) (Akhir)

1 2 3 4 5 6 7 8=5x6
XI PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Pekerja Oh 2.237 2.013 2.000 bh 4.026
Mandor Oh 0.500 0.450 2.000 bh 0.900
Jumlah 4.926
XI.2 LAMPU SL PHILIP 25 WATT
Pekerja Oh 2.237 2.013 6.000 bh 12.079
Mandor Oh 0.500 0.450 6.000 bh 2.700
Jumlah 14.779
XI.3 LAMPU DOWNLIGHT
Pekerja Oh 2.237 2.013 6.000 bh 12.079
Mandor Oh 0.500 0.450 6.000 bh 2.700
Jumlah 14.779
XI.4 LAMPU TAMAN
Pekerja Oh 2.237 2.013 2.000 bh 4.026
Mandor Oh 0.500 0.450 2.000 bh 0.900
Jumlah 4.926
XI.5 STOP KONTAK
Pekerja Oh 2.237 2.013 11.000 bh 22.145
Mandor Oh 0.500 0.450 11.000 bh 4.950
Jumlah 27.095
XI.6 STOP KONTAK DOBEL
Pekerja Oh 2.237 2.013 4.000 bh 8.053
Mandor Oh 0.500 0.450 4.000 bh 1.800
Jumlah 9.853
XI.7 SAKLAR
Pekerja Oh 2.237 2.013 8.000 bh 16.105
Mandor Oh 0.500 0.450 8.000 bh 3.600
Jumlah 19.705
XI.8 KABEL NYM SUPREME 2 X 10
Pekerja Oh 2.237 2.013 100.000 m' 201.316
Mandor Oh 0.500 0.450 100.000 m' 45.000
Jumlah 246.316
TABEL XI.4

ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Tenaga Harga Satuan Durasi Volume


No. Uraian Pekerja Sat Biaya Upah
Kerja Upah (Hari) Pekerjaan
1 2 3 4 5 6=4x5 7 8
XI. PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Pekerja Oh 4.026 Rp38,000 Rp153,000
Mandor Oh 0.900 Rp60,000 Rp54,000 1 2.000
Jumlah Rp207,000
XI. 2 LAMPU SL PHILIP 25 WATT
Pekerja Oh 12.079 Rp38,000 Rp459,000
Mandor Oh 2.700 Rp60,000 Rp162,000 1 6
Jumlah Rp621,000
XI.3 LAMPU DOWNLIGHT
Pekerja Oh 12.079 Rp38,000 Rp459,000
Mandor Oh 2.700 Rp60,000 Rp162,000 1 6.000
Jumlah Rp621,000
XI.4 LAMPU TAMAN
Pekerja Oh 4.026 Rp38,000 Rp153,000
Mandor Oh 0.900 Rp60,000 Rp54,000 2 2.000
Jumlah Rp207,000
XI.5 STOP KONTAK
Pekerja Oh 22.145 Rp38,000 Rp841,500
Mandor Oh 4.950 Rp60,000 Rp297,000 2 11.000
2 11.000
Jumlah Rp1,138,500
XI.6 STOP KONTAK DOBEL
Pekerja Oh 8.053 Rp38,000 Rp306,000
Mandor Oh 1.800 Rp60,000 Rp108,000 2 4.000
Jumlah Rp414,000
XI.7 SAKLAR
Pekerja Oh 16.105 Rp38,000 Rp612,000
Mandor Oh 3.600 Rp60,000 Rp216,000 2 8.000
Jumlah Rp828,000
XI.8 KABEL NYM SUPREME 2 X 10
Pekerja Oh 201.316 Rp38,000 Rp7,650,000
Mandor Oh 45.000 Rp60,000 Rp2,700,000 2 100.000
Jumlah Rp10,350,000
TABEL XI.4

ISIS PRODUKTIVITAS KERJA

Sat Kebutuhan Tenaga Kerja Produktivitas Kerja Sat


(Per Hari) (Per Hari)
9 10 = 4 ÷ 7 11 = 8 ÷ 10 12

4.026
bh 0.900 2.000 bh

12.079
bh 2.700 6.000 bh

12.079
bh 2.700 6.000 bh

4.026
bh 0.900 2.000 bh

22.145
bh 4.950 11.000 bh
bh 11.000 bh

8.053
bh 1.800 4.000 bh

16.105
bh 3.600 8.000 bh

201.316
m' 45.000 100.000 m'
TABEL XI.5

ANALISIS BAHAN DAN KEBUTUHAN BAHAN

Harga Satuan
No. Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan Sat Bahan

1 2 3 4 5 6 7=5x4 7 8
XI PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Lampu pijar 25 s/d 100 watt bh 1.000 2.00 bh 2.000 bh Rp6,000
Jumlah
XI.2 LAMPU SL PHILIP 25 WATT
Lampu Sl philip 25 watt bh 1.0000 6.00 bh 6.000 bh Rp32,000
Jumlah
XI.3 LAMPU DOWNLIGHT
Downlight + SL 25 watt philip bh 1.0000 6.00 bh 6.000 bh Rp33,500
Jumlah
XI.4 LAMPU TAMAN
Lampu taman + tiang + lampu 1 buah bh 1.0000 2.00 bh 2.000 bh Rp146,500
Jumlah
XI.5 STOP KONTAK
Stop kontak broko standard (1 phase) bh 1.0000 11.00 bh 11.000 bh Rp13,500
Jumlah
XI.6 STOP KONTAK DOBEL
Stop kontak broko standard (1 phase) bh 1.0000 4.00 bh 4.000 bh Rp13,500
Jumlah
XI.7 SAKLAR
Saklar broko tunggal standard bh 1.0000 8.00 bh 8.000 bh Rp10,000
Jumlah
XI.8 KABEL NYM SUPREME 2 X 10
Saklar broko tunggal standard m' 1.0000 100.00 m' 100.000 m' Rp20,800
Jumlah
TABEL XI.5

S BAHAN DAN KEBUTUHAN BAHAN

Durasi Kebutuhan Produktivitas/


RAB Bahan Sat Sat
(Hari) Bahan/Hari Hari

9 10 11 12 13 14

Rp12,000 2.000 bh
1 2.00 m2
Rp12,000

Rp192,000 6.000 bh 6.00 m2


1
Rp192,000

Rp201,000 6.000 bh 6.00 m2


1
Rp201,000

Rp293,000 2.000 bh 1.00 m2


2
Rp293,000
Rp148,500 11.000 bh 5.50 m2
2
Rp148,500

Rp54,000 4.000 bh 2.00 m2


2
Rp54,000

Rp80,000 8.000 bh 4.00 m2


2
Rp80,000

Rp2,080,000 100.000 m' 50.00 m2


2
Rp2,080,000
TABEL XI.6
REKAPITULASI

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN LISTRIK

No. Jenis Pekerja Sat Jumlah Pekerja Sat Harga Satuan RAB Upah Jumlah
Upah Pekerja/Hari
1 Pekerja Oh 279.829 Oh Rp38,000 Rp10,633,500 39.976
2 Mandor Oh 62.550 Oh Rp60,000 Rp3,753,000 8.936
Jumlah Rp14,386,500 Jumlah

REKAPITULASI BAHAN PEKERJAAN LISTRIK

No. Jenis Bahan Sat Jumlah Bahan Sat Harga Satuan RAB Bahan Jumlah
Bahan Bahan/Hari
1 Lampu Pijar 25 Watt bh 2.000 bh Rp6,000 Rp12,000 0.286
2 Lampu SL Philip 25 Watt bh 6.000 bh Rp32,000 Rp192,000 0.857
3 Lampu Downlight bh 6.000 bh Rp33,500 Rp201,000 0.857
4 Lampu Taman bh 2.000 bh Rp146,500 Rp293,000 0.286
5 Stop Kontak bh 11.000 bh Rp13,500 Rp148,500 1.571
6 Stop Kontak Dobel bh 4.000 bh Rp13,500 Rp54,000 0.571
7 Saklar bh 8.000 bh Rp10,000 Rp80,000 1.143
8 Kabel NYM supreme 2 x 10 m' 100.000 m' Rp20,800 Rp2,080,000 14.286
Jumlah Rp3,060,500 Jumlah
Biaya
Upah/Hari
Rp1,519,071
Rp536,143
Rp2,055,214

Biaya
Bahan/Hari
Rp1,714
Rp27,429
Rp28,714
Rp41,857
Rp21,214
Rp7,714
Rp11,429
Rp297,143
Rp437,214
RAB BAHAN PEKERJAAN INSTALASI LISTRIK

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
BAHAN Biaya Bahan Bid Price
1 2 3 4 5 6
XI. PEKERJAAN INSTALASI LISTRIK
K.1 Lampu Pijar 25 Watt 13 bh Rp6,000 Rp78,000.00
K.2 Lampu SL Philip 25 Watt 10 bh Rp32,000 Rp320,000.00
K.3 Lampu Downlight 7 bh Rp33,500 Rp234,500.00
K.4 Lampu Taman 5 bh Rp146,500 Rp732,500.00
K.5 Stop Kontak 6 bh Rp13,500 Rp81,000.00
K.6 Stop Kontak Dobel 9 bh Rp13,500 Rp121,500.00
K.7 Saklar 10 bh Rp10,000 Rp100,000.00
K.8 Kabel NYM supreme 2 x 10 100 m' Rp20,800 Rp2,080,000.00
Jumlah Rp3,747,500
RAB UPAH PEKERJAAN INSTALASI LISTRIK

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
UPAH Biaya Upah Bid Price
1 2 3 4 5 6
XI. PEKERJAAN INSTALASI LISTRIK
K.1 Lampu Pijar 25 Watt 13 bh Rp115,000 Rp1,495,000.00
K.2 Lampu SL Philip 25 Watt 10 bh Rp115,000 Rp1,150,000.00
K.3 Lampu Downlight 7 bh Rp115,000 Rp805,000.00
K.4 Lampu Taman 5 bh Rp115,000 Rp575,000.00
K.5 Stop Kontak 6 bh Rp115,000 Rp690,000.00
K.6 Stop Kontak Dobel 9 bh Rp115,000 Rp1,035,000.00
K.7 Saklar 10 bh Rp115,000 Rp1,150,000.00
K.8 Kabel NYM supreme 2 x 10 100 m' Rp115,000 Rp11,500,000.00
Jumlah Rp18,400,000
REKAPITULASI UPAH TENAGA KERJA PEKERJAAN LANTAI

No. Jenis Pekerja Sat Jumlah Pekerja Sat Harga Satuan Upah

1 Lampu Pijar 25 Watt bh 11.700 ttk Rp115,000


2 Lampu SL Philip 25 Watt bh 9.000 ttk Rp115,000
3 Lampu Downlight bh 6.300 ttk Rp115,000
4 Lampu Taman bh 4.500 ttk Rp115,000
5 Stop Kontak bh 5.400 ttk Rp115,000
6 Stop Kontak Dobel bh 8.100 ttk Rp115,000
7 Saklar bh 9.000 ttk Rp115,000
8 Kabel NYM supreme 2 x 10 m' 90.000 ttk Rp115,000
Jumlah

REKAPITULASI BAHAN PEKERJAAN LANTAI

No. Jenis Bahan Sat Jumlah Bahan Sat Harga Satuan Bahan

1 Lampu Pijar 25 Watt bh 13.000 bh Rp6,000


2 Lampu SL Philip 25 Watt bh 10.000 bh Rp32,000
3 Lampu Downlight bh 7.000 bh Rp33,500
4 Lampu Taman bh 5.000 bh Rp146,500
5 Stop Kontak bh 6.000 bh Rp13,500
6 Stop Kontak Dobel bh 9.000 bh Rp13,500
7 Saklar bh 10.000 bh Rp10,000
8 Kabel NYM supreme 2 x 10 m' 100.000 m' Rp20,800
Jumlah
TRIK KEBUTUHAN TENAGA KERJA

JUMLAH HARGA
Biaya Bahan Pelaksanaan
Koeff. Koeff.
7 No. Uraian Jenis pekerjaan Sat.
(Awal) (Akhir)

Rp78,000.00 1 2 3 4 5
Rp320,000.00 XI PEKERJAAN INSTALASI LISTRIK
Rp234,500.00 XI.1 LAMPU PIJAR 25 WATT
Rp732,500.00 Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000
Rp81,000.00 Jumlah
Rp121,500.00 XI.2 LAMPU SL PHILIP 25 WATT
Rp100,000.00 Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000
Rp2,080,000.00 Jumlah
Rp3,747,500 XI.3 LAMPU DOWNLIGHT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000
RIK
Jumlah
JUMLAH HARGA XI.4 LAMPU TAMAN
Biaya Upah Pelaksanaan Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000
7 Jumlah
XI.5 STOP KONTAK
Rp1,345,500.00 Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000
Rp1,035,000.00 Jumlah
Rp724,500.00 XI.6 STOP KONTAK DOBEL
Rp517,500.00 Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000
Rp621,000.00 Jumlah
Rp931,500.00 XI.7 SAKLAR
Rp1,035,000.00 Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000
Rp10,350,000.00 Jumlah
Rp16,560,000 XI.8 KABEL NYM SUPREME 2 X 10
Instalasi titik lampu/stop kontak (upah dan alat) ttk 1.0000 0.9000
PEKERJAAN LANTAI
Jumlah
Jumlah Biaya
RAB Upah Upah/Hari A
Pekerja/Hari
Rp1,345,500 1.671 Rp192,214
Rp1,035,000 1.286 Rp147,857 No. Uraian Jenis pekerjaan Sat. Koeff. Volume
Rp724,500 0.900 Rp103,500
Rp517,500 0.643 Rp73,929 1 2 3 4 5
Rp621,000 0.771 Rp88,714 XI PEKERJAAN INSTALASI LISTRIK
Rp931,500 1.157 Rp133,071 XI.1 LAMPU PIJAR 25 WATT
Rp1,035,000 1.286 Rp147,857 Lampu pijar 25 s/d 100 watt bh 1.000 13.00
Rp10,350,000 12.857 Rp1,478,571
Rp16,560,000 Jumlah Rp2,365,714 XI.2 LAMPU SL PHILIP 25 WATT
Lampu Sl philip 25 watt bh 1.0000 10.00
AAN LANTAI

XI.3 LAMPU DOWNLIGHT


RAB Bahan Jumlah Biaya
Bahan/Hari Bahan/Hari Downlight + SL 25 watt philip bh 1.0000 7.00
Rp6,000 1.857 Rp11,143
Rp320,000 1.429 Rp45,714 XI.4 LAMPU TAMAN
Rp234,500 1.000 Rp33,500 Lampu taman + tiang + lampu 1 buah bh 1.0000 5.00
Rp732,500 0.714 Rp104,643
Rp81,000 0.857 Rp11,571 XI.5 STOP KONTAK
Rp121,500 1.286 Rp17,357 Stop kontak broko standard (1 phase) bh 1.0000 6.00
Rp100,000 1.429 Rp14,286
Rp2,080,000 14.286 Rp297,143 XI.6 STOP KONTAK DOBEL
Rp3,675,500 Jumlah Rp535,357 Stop kontak broko standard (1 phase) bh 1.0000 9.00

XI.7 SAKLAR
Saklar broko tunggal standard bh 1.0000 10.00

XI.8 KABEL NYM SUPREME 2 X 10


Saklar broko tunggal standard m' 1.0000 100.00
A KERJA ANALISIS PRODUKTIVITAS

Kebutuhan
Kebutuhan No. Uraian Pekerja Sat
Volume Sat Tenaga Kerja
Tenaga Kerja
1 2 3 4
6 7 8=5x6 XI. PEKERJAAN INSTALASI LISTRIK
XI.1 LAMPU PIJAR 25 WATT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 11.700
13.000 bh 11.700
11.700 XI. 2 LAMPU SL PHILIP 25 WATT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 9.000
10.000 bh 9.000
9.000 XI.3 LAMPU DOWNLIGHT
Instalasi titik lampu/stop kontak (upah dan alat) ttk 6.300
7.000 bh 6.300
6.300 XI.4 LAMPU TAMAN
Instalasi titik lampu/stop kontak (upah dan alat) ttk 4.500
5.000 bh 4.500
4.500 XI.5 STOP KONTAK
Instalasi titik lampu/stop kontak (upah dan alat) ttk 5.400
6.000 bh 5.400
5.400 XI.6 STOP KONTAK DOBEL
Instalasi titik lampu/stop kontak (upah dan alat) ttk 8.100
9.000 bh 8.100
8.100 XI.7 SAKLAR
Instalasi titik lampu/stop kontak (upah dan alat) ttk 9.000
10.000 bh 9.000
9.000 XI.8 KABEL NYM SUPREME 2 X 10
Instalasi titik lampu/stop kontak (upah dan alat) ttk 90.000
100.000 m' 90.000
90.000

ANALISIS BAHAN DAN KEBUTUHAN BAHAN

Harga Kebutuhan
Sat Kebutuhan Bahan Sat Satuan RAB Bahan Durasi (Hari) Sat
Bahan/Hari
Bahan

6 7=5x4 7 8 9 10 11 12

bh 13.000 bh Rp6,000 Rp78,000 6.500 bh


2
Jumlah Rp78,000

bh 10.000 bh Rp32,000 Rp320,000 5.000 bh


2
Jumlah Rp320,000

bh 7.000 bh Rp33,500 Rp234,500 3.500 bh


2
Jumlah Rp234,500

bh 5.000 bh Rp146,500 Rp732,500 2.500 bh


2
Jumlah Rp732,500

bh 6.000 bh Rp13,500 Rp81,000 3.000 bh


2
2
Jumlah Rp81,000

bh 9.000 bh Rp13,500 Rp121,500 4.500 bh


2
Jumlah Rp121,500

bh 10.000 bh Rp10,000 Rp100,000 5.000 bh


2
Jumlah Rp100,000

m' 100.000 m' Rp20,800 Rp2,080,000 50.000 m'


2
Jumlah Rp2,080,000
ANALISIS PRODUKTIVITAS KERJA

Harga Satuan Kebutuhan


Durasi Volume Tenaga Kerja Produktivitas
Biaya Upah Sat Sat
Upah (Hari) Pekerjaan (Per Hari) Kerja (Per Hari)
5 6=4x5 7 8 9 10 = 4 ÷ 7 11 = 8 ÷ 10 12

Rp115,000 Rp1,345,500 5.850


2 13.000 bh 6.500 bh
Jumlah Rp1,345,500

Rp115,000 Rp1,035,000 4.500


2 10 bh 5.000 bh
Jumlah Rp1,035,000

Rp115,000 Rp724,500 3.150 3.500 bh


2 7.000 bh
Jumlah Rp724,500

Rp115,000 Rp517,500 2.250 2.500 bh


2 5.000 bh
Jumlah Rp517,500

Rp115,000 Rp621,000 2.700 3.000 bh


2 6.000 bh
Jumlah Rp621,000

Rp115,000 Rp931,500 4.050 4.500 bh


2 9.000 bh
Jumlah Rp931,500
Rp115,000 Rp1,035,000 4.500 5.000 bh
2 10.000 bh
Jumlah Rp1,035,000

Rp115,000 Rp10,350,000 45.000 50.000 m'


2 100.000 m'
Jumlah Rp10,350,000

Produktivitas/ Sat
Hari

13 14

6.50 m2

5.00 m2

3.50 m2

2.50 m2

3.00 m2
4.50 m2

5.00 m2

50.00 m2

Anda mungkin juga menyukai