Conbextra HX constructive solutions

Srinkage compensated cementitious grout


Uses Test Typical result
Conbextra HX is used for precision Compressive strength 42 N/mm2 @ 1day
grouting in a wide range of applications, ASTM C942: 1999 55 N/mm2 @ 7 days
including heavy duty support beneath 65 N/mm2 @ 28 days
machine base plates, bridge bearings and
crane rails . Flexural strength
Advantages
BS 4551 1980 10.0 N/mm2 @ 28 days

Dual expansion system to compensate Slant Shear Bond Str 48 N/mm2 @ 28 days
shrinkage in both in the plastic and BS 6319 Part 4 : 1984
hardened states.
High early and ultimate strength, Setting time
ASTM C953 : 1997 Initial 5.5 hours
suitable to be used for heavy duty
Final 6.5 hours
grouting
Low permeability to ensure durability of
Time for expansion
the hardened grout
Start : 15 minutes
Chloride free Finish : 6 hours
Suitable for pumping or pouring for
large area Fresh wet density : Approximately 2250
Prepacked material, ready to use to kg/m3
overcome on-site batching variations
Young Modulus
Description ASTM 469-83 : 28 kN/mm2
Conbextra HX is high strength non-shrink Expansion (Volume
cementitious grout specially formulated Change) :
from Portland cement, graded filler and ASTM C827 : 1997 : an expansion up to 2 %
special chemical additives. Conbextra HX overcome plastic
is supplied as ready to use dry powder. It is settlement in the unset
only required additional of clean water to material.
produce a flowing non-shrink grout for
grouting of gap thickness up to 100 mm. Specification Clauses
The present of special chemical additives
will control both plastic and hardening state All grouting where shown on the drawing must be
expansion to compensate shrinkage and carried out with a pre-packed cement based
eliminate cracks. product which is chloride free.
Technical Supports It shall be mixed with clean water to the required
consistency. The mixed grout must not be bleed
Fosroc offers a comprehensive range of or segregate.
high quality, high performance construction
products. In addition, Fosroc offers a world- A positive volumetric expansion shall occur while
wide technical support and on-site service the grout in plastic stage by means of a gaseous
to specifiers, end users and contractors. system.
Properties The compressive strength of the grout must
exceed 40 N/mm2 at 1 day and 60 N/mm2 at 28
The following results were obtained at a days.
water : powder ratio of 0.17 and
temperature 30 C : The storage, handling and placement of the grout
must be in strict accordance with the
manufacturer’s instructions.
Conbextra HX

Application Instruction the stated mixing time should be stressed to all


operatives. When using a mechanical mixer to
Preparation prepare pump and flow consistency grouts, add
approximately 90 % (w/w) of the recommended water
Foundation Surface requirement (see above) to the mixer before adding
the dry powder. Mix until lumps are broken up
The substrate surface must be free from oil, grease (approximately 2 minutes), before adjusting the
or any loosely adherent material. If the concrete consistency with the addition of the gauge water. Mix
surface is defective or has laitance. It must be cut until homogeneous for at least another 3 minutes.
back to a sound base. Bolt holes and fixing pockets
must be blown clean of any dirt or debris. Placing

Pre-soaking At 20 C place the grout within 20 minutes of mixing to


gain full benefit of the expansion process.
Several hours prior to grouting the area of cleaned
foundation should be flooded with fresh water. Conbextra HX can be place in thickness up to 100
Immediately before grouting takes place any free mm in a single pour when used as an underplate
water should be removed with particular care being grout. For thicker sections, it is necessary to fill out
taken to blow out all bolt holes and pockets. Conbextra HX with well graded silt free aggregate to
minimise heat build up. Typically a 10 mm aggregate
Base plate is suitable.

It is essential that this is clean and free from oil, Any bolt pockets should be grouted prior to grouting
grease or scale. Air pressure relief holes should be between the substrate and the base plate.
provided to allow venting of any isolated high spots.
Continuous grout flow is essential. Sufficient grout
Levelling Shims must be prepared before starting. The time taken to
pour a batch must be regulated to the time to prepare
If these are to be removed after the grout has the next one.
hardened, they should be treated with a thin layer of
grease. Curing

Formwork On completion of the grouting operation, exposed


area should be thoroughly cured. This should be
The formwork should be constructed to be leak- done by the use of Concure curing membrane,
proof. This can be achieved by using foam rubber continuous application of water and/or wet hessian.
strip or mastic sealant, beneath the constructed
grout. Cleaning

Mixing Conbextra HX should be removed from tools and


equipment clean water immediately after use.
The quantity of water required to achieve the desired Cured material can be removed mechanically, or with
consistency is precise, and the volume used should Fosroc Acid Etch.
be in accordance with the following
Limitations
Desired Mix Water in liter per
Consistency 25 kg bag Low temperature working

Flowable 4.2liter When the air or contact surface temperatures are 50C
or below on a falling thermometer, warm (30-400C) is
Use a high shear mechanical mixer or drill (400 rpm) recommended to accelerate strength development
and mixing paddle (also available from Fosroc). For ambient temperatures below 100C the formwork
Ensure that machine capacity and the number of should be kept in plce for at least 36 hours.
operatives is adequate to enable grouting to be
carried out as a continuous operation. The need to
observe the accurate gauging of water addition and

constructive solutions
Conbextra HX

the stated mixing time should be stressed to all


operatives. When using a mechanical mixer to
prepare pump and flow consistency grouts, add
approximately 90 % (w/w) of the recommended water
requirement (see above) to the mixer before adding
the dry powder. Mix until lumps are broken up
(approximately 2 minutes), before adjusting the
consistency with the addition of the gauge water. Mix
until homogeneous for at least another 3 minutes.

Placing

At 20 C place the grout within 20 minutes of mixing to


gain full benefit of the expansion process.

Conbextra HX can be place in thickness up to 100


mm in a single pour when used as an underplate
grout. For thicker sections, it is necessary to fill out
Conbextra HX with well graded silt free aggregate to
minimise heat build up. Typically a 10 mm aggregate
is suitable.

Any bolt pockets should be grouted prior to grouting


between the substrate and the base plate.

Continuous grout flow is essential. Sufficient grout


must be prepared before starting. The time taken to
pour a batch must be regulated to the time to prepare
the next one.

Curing

On completion of the grouting operation, exposed


area should be thoroughly cured. This should be
done by the use of Concure curing membrane,
continuous application of water and/or wet hessian.

Cleaning

Conbextra HX should be removed from tools and


equipment clean water immediately after use.
Cured material can be removed mechanically, or with
Fosroc Acid Etch.

Limitations

Low temperature working

When the air or contact surface temperatures are 50C


or below on a falling thermometer, warm (30-400C) is
recommended to accelerate strength development
For ambient temperatures below 100C the formwork
should be kept in plce for at least 36 hours.

constructive solutions
Conbextra HX

PT. Fosroc
Indonesia
Jl. Akasia II Blok A8 No.1
Delta Silicon Industrial Park
Lippo Cikarang telephone: fax: email:
Bekasi 17550 + 62 21 897 2103 + 62 21 897 2107 indonesia@fosroc.com
Indonesia
Registered Office: Jl. Akasia II Blok A8 No.1, Delta Silicon Industrial Park, Lippo Cikarang, Bekasi 17550, Indonesia

www.fosroc.com

Anda mungkin juga menyukai