Dual expansion system to compensate Slant Shear Bond Str 48 N/mm2 @ 28 days
shrinkage in both in the plastic and BS 6319 Part 4 : 1984
hardened states.
High early and ultimate strength, Setting time
ASTM C953 : 1997 Initial 5.5 hours
suitable to be used for heavy duty
Final 6.5 hours
grouting
Low permeability to ensure durability of
Time for expansion
the hardened grout
Start : 15 minutes
Chloride free Finish : 6 hours
Suitable for pumping or pouring for
large area Fresh wet density : Approximately 2250
Prepacked material, ready to use to kg/m3
overcome on-site batching variations
Young Modulus
Description ASTM 469-83 : 28 kN/mm2
Conbextra HX is high strength non-shrink Expansion (Volume
cementitious grout specially formulated Change) :
from Portland cement, graded filler and ASTM C827 : 1997 : an expansion up to 2 %
special chemical additives. Conbextra HX overcome plastic
is supplied as ready to use dry powder. It is settlement in the unset
only required additional of clean water to material.
produce a flowing non-shrink grout for
grouting of gap thickness up to 100 mm. Specification Clauses
The present of special chemical additives
will control both plastic and hardening state All grouting where shown on the drawing must be
expansion to compensate shrinkage and carried out with a pre-packed cement based
eliminate cracks. product which is chloride free.
Technical Supports It shall be mixed with clean water to the required
consistency. The mixed grout must not be bleed
Fosroc offers a comprehensive range of or segregate.
high quality, high performance construction
products. In addition, Fosroc offers a world- A positive volumetric expansion shall occur while
wide technical support and on-site service the grout in plastic stage by means of a gaseous
to specifiers, end users and contractors. system.
Properties The compressive strength of the grout must
exceed 40 N/mm2 at 1 day and 60 N/mm2 at 28
The following results were obtained at a days.
water : powder ratio of 0.17 and
temperature 30 C : The storage, handling and placement of the grout
must be in strict accordance with the
manufacturer’s instructions.
Conbextra HX
It is essential that this is clean and free from oil, Any bolt pockets should be grouted prior to grouting
grease or scale. Air pressure relief holes should be between the substrate and the base plate.
provided to allow venting of any isolated high spots.
Continuous grout flow is essential. Sufficient grout
Levelling Shims must be prepared before starting. The time taken to
pour a batch must be regulated to the time to prepare
If these are to be removed after the grout has the next one.
hardened, they should be treated with a thin layer of
grease. Curing
Flowable 4.2liter When the air or contact surface temperatures are 50C
or below on a falling thermometer, warm (30-400C) is
Use a high shear mechanical mixer or drill (400 rpm) recommended to accelerate strength development
and mixing paddle (also available from Fosroc). For ambient temperatures below 100C the formwork
Ensure that machine capacity and the number of should be kept in plce for at least 36 hours.
operatives is adequate to enable grouting to be
carried out as a continuous operation. The need to
observe the accurate gauging of water addition and
constructive solutions
Conbextra HX
Placing
Curing
Cleaning
Limitations
constructive solutions
Conbextra HX
PT. Fosroc
Indonesia
Jl. Akasia II Blok A8 No.1
Delta Silicon Industrial Park
Lippo Cikarang telephone: fax: email:
Bekasi 17550 + 62 21 897 2103 + 62 21 897 2107 indonesia@fosroc.com
Indonesia
Registered Office: Jl. Akasia II Blok A8 No.1, Delta Silicon Industrial Park, Lippo Cikarang, Bekasi 17550, Indonesia
www.fosroc.com