Perdidas de carga
Diámetro H (m) hs (m) Hf1 (m) Hf2 (m)
0.6 m/s
3.0 m/s
m/s cumple
m/s no cumple
m/s
Costo mensual
25.05
26.29
28.56
Diámetro Costo tuberia
1 1/4 Q 25.05
= 1.25% mensual 1 1/2 Q 26.29
= 120 meses 2 Q 28.56
Potenica de la No. de
Hf2 (m) Hfv (m) Hm (m) Total (m)
Bomba (Hp) horas/mes
24.64 0.30 5.62 61.87 4.34 360
10.14 0.14 4.14 45.51 3.19 360
2.50 0.05 3.35 36.87 2.59 360
m.c.a.
m.c.a
10.28 0.64
15.01 0.87
12.10 0.61
10.23 0.73
16.98 0.72
16.97 0.73
10.81 0.73
diámetro comercial(pulg) diámetro interno (pulg)
1 1.195
1 1/4 1.532
1 1/2 1.754
2 2.193
2 1/2 2.655
3 3.23
4 4.154
5 5.135
6 6.115
8 7.924
10 9.24