Anda di halaman 1dari 3

REHAB TOTAL KANTOR LURAH TANAH SEREAL

Pelaksanaan = 122 (Seratus Dua Puluh Dua) Hari Kalender

I. NETWORK PLANNING
E AH AI
8 25
21 40
17 97 15 112 8

H 42 O 56
6 9
17 59 14 73

J 59 P 73
13 16
17 73 14 90 AP
5
L 76 Q 80 AN 90 AO
17 22 27
17 90 14 104 10 114 6

0 A 2 D 8 F 25 G 42 I 59 K 76 M AM
1 0 2 2 2 6
3 8 17
4 25 17
5
42 17
10
59 17
14
76 17 8

93 Y 100 R S 110 T 115 U 120 C 122


29 23 26 105 29 30 31 32
93 7 100 5 105 5 110 5 115 5 120 2 122

V 49 W 59 X
11 73 15
10 10 83 10
AD
2
N 39 AJ 51 AK
7 20
14 63 12 112 8

AL
8

Z AA 53 AB 60 AC 72 AE
12 46 18 24 28
7 91 7 98 7 105 12 117 3

B AF 39 AG
12
13 14
70 25
25
95 25
KETERANGAN :

= JALUR KRITIS Jakarta, 16 Juni 2011

= JALUR TIDAK KRITIS PT. REMBIGA INDAH

= DUMMY

KUSNANDAR, SE.
Direktur Utama
REHAB TOTAL KANTOR LURAH TANAH SEREAL
Pelaksanaan = 122 (Seratus Dua Puluh Dua) Hari Kalender
II. TABEL ESTIMASI CRITICAL PAT

WAKTU PALING AWAL PALING AKHIR FREE FLOAT TOT. FLOAT


NO KODE NAMA PENDAHULU KET
DURASI ES EF LS LF (FF) (TF)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
1 A Pek. Pendahuluan & Persiapan - 2 0.00 2.00 0.00 2.00 0.00 0.00 JALUR KRITIS
2 B Pek. Pendahuluan Pagar Pengaman Proyek A 12 2.00 14.00 2.00 70.00 0.00 56.00 tdk kritis
3 C Pek. Pembersihan Lokasi & Finishing U,AG,AE,AK,AP,AM,AO,AI,AL 2 120.00 122.00 120.00 122.00 0.00 0.00 JALUR KRITIS
4 D Pek. Galian tanah, Pondasi, Sloof A 6 2.00 8.00 2.00 8.00 0.00 0.00 JALUR KRITIS
5 E Pek. Kolom bawah dan beton rabat D 17 8.00 25.00 8.00 97.00 0.00 72.00 tdk kritis
6 F Pek. Beton Kolom/Balok Lt. 1 D 17 8.00 25.00 8.00 25.00 0.00 0.00 JALUR KRITIS
7 G Pek. Balok Konsol janggutan, sewa Pompa Lt. 1 F 17 25.00 42.00 25.00 42.00 0.00 0.00 JALUR KRITIS
8 H Pek. Beton Kolom/Balok Lt. 2 F 17 25.00 42.00 25.00 59.00 0.00 17.00 tdk kritis
9 I Pek. Balok Konsol & Tangga, sewa Pompa Lt. 2 G 17 42.00 59.00 42.00 59.00 0.00 0.00 JALUR KRITIS
10 J Pek. Beton Kolom/Balok Lt. 3 H 17 42.00 59.00 59.00 73.00 0.00 14.00 tdk kritis
11 K Pek. Balok Konsol & Tangga, sewa Pompa Lt. 3 I 17 59.00 76.00 59.00 76.00 0.00 0.00 JALUR KRITIS
12 L Pek. Beton Kolom/Balok Lt. 4 J 17 59.00 76.00 73.00 90.00 0.00 14.00 tdk kritis
13 M Pek. Balok Konsol & Tangga, sewa Pompa Lt. 4 K 17 76.00 93.00 76.00 93.00 0.00 0.00 JALUR KRITIS
14 N Pek. Pasangan/Plesteran Lt. 1 F 14 25.00 39.00 25.00 63.00 0.00 24.00 tdk kritis
15 O Pek. Pasangan/Plesteran Lt. 2 H 14 42.00 56.00 59.00 73.00 0.00 17.00 tdk kritis
16 P Pek. Pasangan/Plesteran Lt. 3 J.O 14 59.00 73.00 73.00 90.00 0.00 17.00 tdk kritis
17 Q Pek. Pasangan/Plesteran Lt. 4 L,P 14 76.00 80.00 90.00 104.00 -10.00 14.00 tdk kritis
18 R Pek. Cat dinding Lt. 1 Y,AD 5 100.00 105.00 100.00 105.00 0.00 0.00 JALUR KRITIS
19 S Pek. Cat dinding Lt. 2 R 5 105.00 110.00 105.00 110.00 0.00 0.00 JALUR KRITIS
20 T Pek. Cat dinding Lt. 3 S 5 110.00 115.00 110.00 115.00 0.00 0.00 JALUR KRITIS
21 U Pek. Cat dinding Lt. 4 T 5 115.00 120.00 115.00 120.00 11.00 0.00 JALUR KRITIS
WAKTU PALING AWAL PALING AKHIR FREE FLOAT TOT. FLOAT
NO KODE NAMA PENDAHULU KET
DURASI ES EF LS LF (FF) (TF)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
22 V Pek. Keramik Lt. 1 N 10 39.00 49.00 63.00 73.00 0.00 24.00 tdk kritis
23 W Pek. Keramik Lt. 2 V 10 49.00 59.00 73.00 107.00 0.00 48.00 tdk kritis
24 X Pek. Keramik Lt. 3 W 10 59.00 93.00 83.00 93.00 24.00 24.00 tdk kritis
25 Y Pek. Keramik Lt. 4 X,M 7 93.00 100.00 93.00 100.00 0.00 0.00 JALUR KRITIS
26 Z Pek. Plafond & Atap Konsole Lt.1 N 7 39.00 46.00 63.00 91.00 0.00 45.00 tdk kritis
27 AA Pek. Plafond & Atap Konsole Lt.2 Z 7 46.00 53.00 91.00 98.00 0.00 45.00 tdk kritis
28 AB Pek. Plafond & Atap Konsole Lt.3 AA 7 53.00 80.00 98.00 105.00 20.00 45.00 tdk kritis
29 AC Pek. Plafond & Atap berikut Rangka Lt.4 AB 12 80.00 72.00 105.00 117.00 -20.00 25.00 tdk kritis
30 AD Pek. Kuzen & Pasangan Glass Block N 5 39.00 100.00 63.00 100.00 56.00 56.00 tdk kritis
31 AE Pek. Talang Tegak AC 3 72.00 120.00 117.00 120.00 45.00 45.00 tdk kritis
32 AF Pek. Halaman, Taman & Jalan masuk B 25 14.00 39.00 70.00 95.00 0.00 56.00 tdk kritis
33 AG Pek. Pagar AF 25 39.00 120.00 95.00 120.00 56.00 56.00 tdk kritis
34 AH Pek. Instalasi Plumbing E 15 25.00 40.00 97.00 112.00 0.00 72.00 tdk kritis
35 AI Pek. Pasangan armature Plumbing AH 8 40.00 120.00 112.00 120.00 72.00 72.00 tdk kritis
36 AJ Pek. Pasangan Instalasi listrik N 12 39.00 51.00 63.00 112.00 0.00 61.00 tdk kritis
37 AK Pek. Pasangan armature listrik AJ 8 51.00 120.00 112.00 120.00 61.00 61.00 tdk kritis
38 AL Pek. Pasangan AC N 8 39.00 120.00 63.00 120.00 73.00 73.00 tdk kritis
39 AM Pek. Pasangan Telephon Q 8 80.00 120.00 104.00 120.00 32.00 32.00 tdk kritis
40 AN Pek. Instalasi Fire Alarm Q 10 80.00 90.00 104.00 114.00 0.00 24.00 tdk kritis
41 AO Pek. Armature Fire Alarm AN 6 90.00 120.00 114.00 120.00 24.00 24.00 tdk kritis
42 AP Pek. Penangkal Petir Q 5 80.00 120.00 104.00 120.00 35.00 35.00 tdk kritis

Jakarta, 16 Juni 2011


PT. REMBIGA INDAH

KUSNANDAR, SE.
Direktur Utama