DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PENGADAAAN SEPTICTANK DESA SOBA, KEC AMARASI BARAT


LOKASI : DESA SOBA KEC AMARASI BARAT KABUPATEN KUPANG
TAHUN ANGARAN : 2018

NO URIAN SATUAN HARGA SATUAN KET


(Rp)
BAHAN
1 Air kerja Ltr 24,43 On Site
2 Angker Besi Kg 25.002,36 On Site
3 Alat Batu Ls 49.142,86 On Site
4 Armatur Downlight Bh 80.023,57 On Site
5 Amplas Lmbr 7.562,86 On Site
6 Armatur downligth Bh 80.023,57 On Site
7 Balok kayu klas I (bayam) M³ 11.016.696,43 On Site
8 Balok kayu klas II M³ 2.016.696,43 On Site
9 Balok kayu klas III M³ 1.616.696,43 On Site
10 Balok Kayu Jati M³ 3.816.696,43 On Site
11 Batako Bh 1.547,14 On Site
12 Batu Bata Merah kecil Bh 1.247,14 On Site
13 Batu candi/batu tempel hitam/paras M2 107.357,14 On Site
14 Batu palimanan M2 82.357,14 On Site
15 batu sisir M2 107.357,14 On Site
16 Batu Kali M³ 49.732,14 On Site
17 Batu Karang / Gunung M³ 49.732,14 On Site
18 Batu pecah 2/3 M³ 181.785,71 On Site
19 Batu pecah 3/5 M³ 231.785,71 On Site
20 Baut Galvalum Bh 600,24 On Site
21 Baut Dinabolt Dia. 12 L = 10 cm Bh 7.000,24 On Site
22 Besi Beton Kg 9.011,79 On Site
23 Besi Beton Ø 12mm Kg 12.011,79 On Site
24 Batu Angin ( Keramik ) Bh 25.047,14 On Site
25 Besi kotak 1 7/8" x 1 7/8" M1 35.015,71 On Site
26 Besi kotak 1 3/8" x 1 3/8" (36 mm x 36 mm) M1 27.015,71 On Site
27 Besi kotak 5/8" x 1 3/8" (16 mm x 36 mm) M1 22.015,71 On Site
28 Besi siku L 50x50x5 Kg 10.015,71 On Site
29 Besi Strip 1,5x15 mm Kg 15.015,71 On Site
30 Besi Hollow 4/4 galvalum M 8.515,71 On Site
31 Besi Hollow 4/4 M 28.015,71 On Site
32 Besi Hollow 2/4 M 24.015,71 On Site
33 Besi Strip Kg 18.007,86 On Site
34 Bak Air Fiberglas Bh 350.942,86 On Site
35 Besi siku L 70.70.7 Kg 15.008,57 On Site
36 Besi siku L40.40.4 Kg 13.008,57 On Site
37 Besi siku L30.30.3 Kg 10.008,57 On Site
38 Besi siku 50.50.5 Kg 15.008,57 On Site
39 Cat Besi ( Altex ) Kg 37.025,14 On Site
KONTRAKTOR DAN PENGADAAN
Jln. Bung Tomo RT021/RW.009 Kel. Kelapa Lima Kota Kupang
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PENGADAAAN SEPTICTANK DESA SOBA, KEC AMARASI BARAT


LOKASI : DESA SOBA KEC AMARASI BARAT KABUPATEN KUPANG
TAHUN ANGARAN : 2018

40 Cat kayu mengkilat Kg 60.025,14 On Site


41 Cat meni besi Kg 35.025,14 On Site
42 Cat meni kayu Kg 35.025,14 On Site
43 Cat tembok setara deluxe Kg 30.025,14 On Site
44 Cat dasar Kg 30.025,14 On Site
45 Cat Waterproof Kg 35.025,14 On Site
46 Cat Batu Alam Kg 70.025,14 On Site
47 Closed duduk/monoblock Bh 500.094,29 On Site
48 Closed jongkok porselen Bh 150.094,29 On Site
49 Dempul Kayu Kg 18.023,57 On Site
50 Door closer Bh 150.009,43 On Site
51 Door holder Bh 50.009,43 On Site
52 Dynabolt Bh 809,43 On Site
53 Embul dos Bh 5.509,43 On Site
54 Engsel Pintu ARCH Bh 35.009,43 On Site
55 Engsel Jendela Bh 23.509,43 On Site
56 Expagnolet Pintu Bh 121.009,43 On Site
57 Fitting Bh 20.009,43 On Site
58 Floor hinge+acc Set 2.500.002,36 On Site
59 Floordrain Bh 28.002,36 On Site
60 Formite/penjaga jarak bekisting/spacer Bh 10.047,14 On Site
61 Gagang Pintu Bh 150.009,43 On Site
62 Genteng metal Lmbr 110.009,43 On Site
63 Gembok Bh 15.009,43 On Site
64 Glassblock Bh 25.009,43 On Site
65 Grendel Bh 25.009,43 On Site
66 Gymfloor M2 80.047,14 On Site
67 Gypsum Board 9 mm Lmbr 65.047,14 On Site
68 Handle pintu/pegangan pintu Set 200.009,43 On Site
69 Ijuk Kg 5.006,29 On Site
70 Isolasi Listrik Buah 25.006,29 On Site
71 Isolasi pipa Buah 2.502,36 On Site
72 Instalasi titik lampu Titik 155.000,00 On Site
73 Jarum keras dia 12mm Bh 36.009,43 On Site
74 Jendela nako 7 sisir (bingkai+tralis+kaca 5mm po Unit 500.000,00 On Site
75 Kabel NYA 3x2.5mm M1 13.062,86 On Site
76 Kabel NYA 1x1,5mm M1 9.062,86 On Site
77 Kabel NGA 1 x 2,5 mm M1 7.062,86 On Site
78 Kabel NYM 2 x 2.5 mm M1 10.062,86 On Site
79 Kabel NYM 3 x 2.5 mm M1 12.062,86 On Site
80 Kaca cermin 5 mm M2 80.023,57 On Site
81 Kaca polos 12 mm M2 300.023,57 On Site
82 Kaca polos 3 mm M2 55.023,57 On Site
KONTRAKTOR DAN PENGADAAN
Jln. Bung Tomo RT021/RW.009 Kel. Kelapa Lima Kota Kupang
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PENGADAAAN SEPTICTANK DESA SOBA, KEC AMARASI BARAT


LOKASI : DESA SOBA KEC AMARASI BARAT KABUPATEN KUPANG
TAHUN ANGARAN : 2018

83 Kaca polos 5 mm M2 80.023,57 On Site


84 Kaca polos 8 mm M2 200.023,57 On Site
85 Kaca rayben 5 mm M2 100.023,57 On Site
86 Kait angin Bh 17.009,43 On Site
87 Karet List M1 3.009,43 On Site
88 Karpet M2 150.000,00 On Site
89 Kawat ikat Kg 20.009,43 On Site
90 Kawat Las Kg 35.009,43 On Site
91 Kayu bulat/dolken Btg 10.029,46 On Site
92 Keramik 20 x 20 cm M2 80.094,29 On Site
93 Keramik 20 x 25 cm M2 85.094,29 On Site
94 Keramik 30 x 30 cm M2 90.094,29 On Site
95 Keramik 40 x 40 cm M2 130.094,29 On Site
96 Keramik motif 30 x 30 cm M2 75.094,29 On Site
97 Kran air Bh 20.002,36 On Site
98 Kuas Bh 5.002,36 On Site
Kalsibord Lbr 80.694,29 On Site
99 Kunci Pintu Alumunium Bh 250.000,00 On Site
100 Kunci tanam 2 x putar Bh 250.009,43 On Site
101 Kloset Jongkok INA Bh 150.094,29 On Site
102 Kloset Duduk Bh 500.094,29 On Site
103 Lampu hemat energi 25 watt philips (spiral) Bh 90.006,29 On Site
104 Lampu Hemat Energi 10 watt Philips Bh 60.006,29 On Site
109 Lem kayu Ltr 12.002,36 On Site
110 List gypsum profil M1 15.009,43 On Site
111 List kayu profil M1 6.009,43 On Site
112 Marmer M2 650.094,29 On Site
113 MCB + Rumah MCB Bh 105.006,29 On Site
114 Minyak Bekesting Ltr 18.009,43 On Site
115 Minyak Pelumas Ltr 30.009,43 On Site
116 Paku biasa < 5 cm Kg 17.000,24 On Site
117 Paku biasa > 5 cm Kg 17.000,24 On Site
118 Paku genteng metal Kg 35.000,24 On Site
119 Paku seng Kg 22.500,24 On Site
120 Papan kayu klas I M³ 5.016.696,43 On Site
121 Papan kayu klas II M³ 2.514.732,14 On Site
122 Papan kayu klas III M³ 1.214.732,14 On Site
123 Papan kayu kls I (Jati) M³ 4.214.732,14 On Site
124 Paku gypsum Kg 25.000,24 On Site
125 plint keramik (10 x 40 ) Bh 75.047,14 On Site
126 Pasir pasang/ beton M³ 143.214,29 On Site
127 Pasir Urug M³ 89.464,29 On Site
128 Paving block M2 130.047,14 On Site
KONTRAKTOR DAN PENGADAAN
Jln. Bung Tomo RT021/RW.009 Kel. Kelapa Lima Kota Kupang
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PENGADAAAN SEPTICTANK DESA SOBA, KEC AMARASI BARAT


LOKASI : DESA SOBA KEC AMARASI BARAT KABUPATEN KUPANG
TAHUN ANGARAN : 2018

129 Penguras bak air Bh 20.002,36 On Site


130 Pintu PVC Unit 400.235,71 On Site
131 Pipa GIP dia 1" M1 27.594,29 On Site
132 Pipa GIP dia 1 1/2" M1 30.094,29 On Site
133 Pipa GIP dia 1/2" M1 20.094,29 On Site
134 Pipa GIP dia 3/4" M1 22.094,29 On Site
135 Pipa kabel Btg 8.223,57 On Site
136 Pipa PVC dia 1/2" M1 14.094,29 On Site
137 Pipa PVC dia 3/4" M1 16.094,29 On Site
138 Pipa PVC dia 1" M1 20.094,29 On Site
139 Pipa PVC dia 2" M1 22.094,29 On Site
140 Pipa PVC dia 3" M1 24.094,29 On Site
141 Pipa PVC dia 4" M1 22.594,29 On Site
142 Plamir Kg 12.009,43 On Site
143 Plat baja Kg 10.094,29 On Site
144 Plat baja M2 350.094,29 On Site
145 Plat beton pijakan Bh 500.000,00 On Site
146 Playwood 4 mm Lmbr 85.047,14 On Site
147 Plint keramik 10 x 20 cm Dos 62.547,14 On Site
148 Plint keramik 10 x 30 cm Dos 62.547,14 On Site
149 Plint keramik 10 x 40 cm Dos 75.047,14 On Site
150 Plint keramik 10 x 60 cm Dos 185.047,14 On Site
151 Politur Ltr 20.025,14 On Site
152 Profil kaca M1 25.009,43 On Site
153 Profil Baja Ringan C - 75 M1 13.023,57 On Site
154 Profil Reng Baja Ringan M1 8.023,57 On Site
155 Roda Pagar Bh 50.023,57 On Site
156 Rel Pintu Bh 175.047,14 On Site
157 Seal tape Bh 2.502,36 On Site
158 Profil Alumunium M 110.009,43 On Site
159 Sealant Bh 10.047,14 On Site
160 Semen PC @ 40 kg Zak 40.094,29 On Site
161 Semen PC @ 40 kg Kg 1.002,36 On Site
162 Semen warna Kg 10.002,36 On Site
163 Seng gelombang BJLS 0.20 Lmbr 65.047,14 On Site
164 Seng Licin M' 18.023,57 On Site
165 Seng bajadeck 0,03mm - 3m M' 320.047,14 On Site
166 Sekrup Fixer Bh 2.000,24 On Site
168 Sirtu M³ 44.642,86 On Site
169 Solar Ltr 7.509,43 On Site
170 Saklar Tunggal Bh 25.006,29 On Site
171 Saklar Ganda Bh 25.006,29 On Site
172 Saklar Tripel Bh 30.006,29 On Site
KONTRAKTOR DAN PENGADAAN
Jln. Bung Tomo RT021/RW.009 Kel. Kelapa Lima Kota Kupang
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PENGADAAAN SEPTICTANK DESA SOBA, KEC AMARASI BARAT


LOKASI : DESA SOBA KEC AMARASI BARAT KABUPATEN KUPANG
TAHUN ANGARAN : 2018

173 Stop kontak Bh 28.006,29 On Site


174 T dos Bh 8.006,29 On Site
175 Tanah Humus M³ 59.642,86 On Site
176 Tanah Urug M³ 44.642,86 On Site
177 Teakoil Ltr 15.025,14 On Site
178 Teakwood 3,8 mm Lmbr 75.047,14 On Site
179 Tee PVC 4" Bh 19.894,29 On Site
180 Tepung gypsum Kg 3.125,71 On Site
181 Terawang/Roster 15 x 30 x 10 Bh 45.047,14 On Site
182 Thiner Ltr 35.025,14 On Site
183 Tripleks 3,8 mm Lmbr 59.047,14 On Site
184 Tripleks 9 mm Lmbr 87.047,14 On Site
185 Tripleks lapis alumunium voil Lmbr 94.047,14 On Site
186 Usuk 5/7 M3 1.814.732,14 On Site
187 Wastafel set + cermin Bh 250.094,29 On Site
188 Woodplank 30 cm M1 45.047,14 On Site
189 Woodplank 20 cm M1 25.047,14 On Site

Kupang, 05 JULI 2018


Penawar,
CV. TIFANNY KARYA

YOHANIS BOIMAU