• ADJUSTABLE STUMPS

• JOIST OVER BEARER or

• BEARER & JOIST IN SAME PLANE

• CUSTOM CUT

Steeline Flooring Systems


GEELONG 75 Heales Road Corio 3214 Phone 03 5274 6222 Fax 03 5274 6200

NORTH GEELONG 152 Victoria Street North Geelong 3215 Phone 03 5274 6222 Fax 03 5274 6200

LAVERTON 11 Westside Drive Laverton North 3026 Phone 03 9314 1044 Fax 03 9314 5675

JH STEPHENSON & SON PTY LTD ABN 52 004 570 370 www.steeline.com.au
Steeline TOP HAT FLOORING SYSTEM
EASY FLOOR
FIG 1
Install concrete pads Top Hat Joists

and stumps Edge Joist


• Provide concrete pads to suit
Bearer
pier layout. Veranda

• Mark out stump positions and fix Bearer Load Bearing


Angle
to pads using 12 x 125
masonary anchors.
NOTE: Set base plates at right
angles to previous stump to assist
bracing.

• Install stump caps to required


Adjustable Stumps
height using 14 x 20 Teks.
• Make sure to use the correct
stump cap where required.
Cross Brace
(Figs 2, 3 & 4).
Typical Layout
Install Main Bearer
and Sleeves
• Install sleeves to bearer where
a stump is flange mounted and
where bearers butt-join on a
stump (Fig 3 & 9). FIG 2 FIG 4 FIG 5
• Bolt sleeve and bearer to stump. Joist 450 Centres Side Elevation Internal Stumps Web Fixing
• Fix sleeve to bearer using 4 off
14 x 22 Teks through lip of Load Bearing Flooring Flooring
Top Hat 120-12
bearer (Fig 3). Angle
1.5 x 40 x 165
Top Hat 120-12 Top Hat 120-12
Install Bracing
• Make sure stumps and bearers C200 24 Bearer C195-24 Sleeve

are level and plumb before C200 24


C200 24 Bearer 4 off Bearer
bracing. 4 x 20 Teks
• Fit a bearer brace between
75 x 75 x 4 125 Min Lap
stumps where bracing is required. RHS

• Fit angle brace (Fig 6).

Install Joists 65 x 65 x 2.5 Adjustable Stump


RHS
• Install Joists with C120 Edge
Joist (Fig 3).
• The remaining joists at 450mm
centres.
NOTE: Joists will be required under
internal load bearing walls.
FIG 3 Perimeter Stumps Flange Fixing ( with Sleeve )
Load Bearing Angles 450 Centres
• Add the load bearing angle to Floor Joist
Flooring
the ends of floor joists (Fig 8).
• Fix the load bearing angle to C120-19
Load Bearing Top Hat 120-12
4 off 14 x 20 Teks
Sleeve to Bearer
the web of the bearer mid span Edge Joist

between joists (Fig 8).


C200-24
Install Corner Brackets Bearer 300 Long Sleeve
C195-24
• Corner brackets are provided
to join edge joist, load bearing 6 mm
angle and main bearers at all 1 off Bolt M12 2 off Bolt M12
Stump Bearer Sleeve Stump Bearer Sleeve
corners (Fig 10).
8 off 14 x 20 Teks 2 off M12 x 125
The floor frame is Masonary Anchors
now ready for floor 8 mm
sheeting.
TOP HAT FLOORING SYSTEM
The Top Hat Flooring System
is similar to a traditional
Top Hat Flooring System Single Storey Metal Roof
timber floor where the Joist
Joist Simply Supported Two Equal Spans Multiple Equal Spans
(Top Hat) is fastened to the
Bearer (C20024 Purlin).
TH-12012 2.7 3.1 3.0
The Steel Flooring System
uses Adjustable Galvanised
Stumps. Bearers and Joists Bearer Simply Supported Two Equal Spans Multiple Equal Spans
are custom cut to suit.
C-20024 3.0 3.0 3.0
All sections are manufactured
from Galvanised Z350-G450
Hi Tensile Steel. • These tables to be used as a guide only.
• Independant engineering is required for steel
FIG
FIG77
Note: If flooring is used flooring systems and is not available in this
in corrosive environment brochure.
corrosive paint protection will
TH 120 Joist
be required.
Adequate ventilation should
FIG 8
be provided for flooring
systems close to the ground.

Top Hat

C200 24
Bearer

C200-24 Bearer
FIG 9

C120-19 Edge Joist

Adjustable Stump
S195-24 Sleeve

C200-24 Bearer

Adjustable Stump

FIG 6
2 off 14 x 22 Teks
Cross Brace 20mm
r from Top & Bottom
e are of Stump
in B
Ma FIG 10

Angle Connector
4 off 14 x 22 Teks
er
ear
Load
Bra per face
ce B Bearing
Be M ain Angle
are
r Edge Joist

Corner Bracket
14 x 22 Teks
Screw Overlap
C200-24 Bearer
50 x 50 x 2.5
Angle Brace
Steeline “C” SECTION FLOORING SYSTEM
This system offers a reduced
height (240mm max) because
the bearers and joists are in the
same plane, which can be an
advantage in some applications.

This system uses adjustable


galvanised stumps. Bearers and
joists are custom cut to suit.

All sections are manufactured


from galvanised Z350-G450
hi-tensile steel.

Flooring System can be screwed


together - Fig 3, 4 & 7 or welded
on site - Fig 6.
Assembled and welded on site.

Section D W T Mass Kg/m

FB 182-19 187 58 1.9 4.46


Bearer
FB 182-24 187 58 2.4 5.62
D
FB 235-19 240 72 1.9 5.68

W FB 235-24 240 72 2.4 7.15

Section D W T Mass Kg/m

FJ 182-19 182 51 1.9 4.46


Joist
FJ 182-24 182 51 2.4 5.62
D
FJ 235-19 240 64 1.9 5.68

W FJ 235-24 240 64 2.4 7.15

Joist Spans Bearer Spans

Single Storey Steel Roof Single Storey Steel Roof

Joist 450 Centres Joist Span FB 182-24 FB 235-24

FJ 182-19 2650 2400 2800 3500

FJ 182-24 2900 3000 2700 3400

FJ 235-19 3300 3600 2500 3000

FJ 235-24 3600

These tables to be used as a guide only.


Independant engineering is required for Steel Flooring Systems and is not available in this brochure.
“C” SECTION FLOORING SYSTEM [ Bearer & joist in the same plane ]

FIG 1 All Joists are simply supported

m s
0m
45 entre
tC
J ois

a rer
Be
Joi
s t

Adjustable Stump

Bearer strengthening required at stump

FIG 2 FIG 3 FIG 4

Web Stregthening Bracket Web Stregthening Bracket 14 x 20 Screws

14 x 20
Screws

M10 bolt

FIG 5 FIG 6 FIG 7

Floor Screw
or Rivet 30mm Fillet Weld Angle Bracket

14 x 20
Screws
Adjustable Stumps

Adjustable Stumps and Bearer

C Section Bearer - 120 Top Hat Joists Extension using inline C Section Bearers and Joists

Whilst every care is taken in the

www.steeline.com.au
preparation of these specifications,
JH Stephenson & Son Pty Ltd accept
no responsibility for the accuracy of
the information supplied.

JH STEPHENSON & SON PTY LTD


ABN 52 004 570 370
GEELONG
75 Heales Road Corio 3214 VIC Phone 03 5274 6222
152-154 Victoria Street Geelong Nth VIC 3215 Phone 03 5278 7044
LAVERTON
11 Westside Drive Laverton North 3026 VIC Phone 03 9314 1044

Anda mungkin juga menyukai