Anda di halaman 1dari 9

SUS ROA

D
H9OTEL SAFFRON

SANT TUKARAM
MANGAL KARYALAY
PASHAN SUTARWADI LINK RD

SU
S
RO
RD

AD

PROPOSED
R
DI

SITE
AN
M
JI
LA
BA

D
ROA

D BUILDING
KUMAR PRIYADARSHAN

LOCATION PLAN DATE REV.NO. REV.BY DESCRIPTION

CLIENT
INDUS TOWERS LIMITED
SITE NAME
IN-1350073 RNN-304080 RELOCATION OF 4801

DATE :- 29.09.2018 SURVEY DRAWN DESIGN CHECKED


DRAWING NO. CONSULTANT

SCALE: NOT TO SCALE DATTA JAYRAJ PAVAN RIYAJ


CS / INDUS / 18-19 / 279 CONSTRO SPACE
1.80 2.43 2.50

WATER TANK
1.30

LEVEL+4.00M

1.67
WATER
TANK

G+2
LEVEL-3.00M

3.82
LEVEL=0.00M
G+1

SCR
LEVEL+2.70M

SCR
LEVEL+2.70M
LEVEL-3.00M

3.67
G+1

G+2
LEVEL=0.00M
1.70

WATER TANK
LEVEL+4.00M

BUILDING HT.= G+2 BASIC LAYOUT PLAN DATE REV.NO. REV.BY DESCRIPTION

CLIENT
SCR/LMR/WT HT.= 4.00M
INDUS TOWERS LIMITED
SITE NAME
IN-1350073 RNN-304080 RELOCATION OF 4801

DATE :- 29.09.2018 SURVEY DRAWN DESIGN CHECKED


DRAWING NO. CONSULTANT

SCALE: NOT TO SCALE DATTA JAYRAJ PAVAN RIYAJ


CS / INDUS / 18-19 / 279 CONSTRO SPACE
NOTE:- EXISTING RCC WATER TANK ON SCR NEED TO BE BREAK WHERE 15M TOWER IS PROPOSED.

2.43 2.50
P1

P1 B2
3.00
15M
B1X

B1
TOWER WATER
TANK
1.60 PROPOSED

3.00
O/D BTS PAD
B2
LEVEL-3.00M

3.0M x 3.0M

3.82
G+1

P1

SCR
LEVEL+2.70M
G+2
LEVEL=0.00M

P1

SCR
LEVEL+2.70M
LEVEL-3.00M

3.67
G+1

G+2
LEVEL=0.00M
1.70

WATER TANK
LEVEL+4.00M

BUILDING HT.= G+2 PROPOSED TOWER LAYOUT PLAN DATE REV.NO. REV.BY DESCRIPTION

CLIENT
SCR/LMR/WT HT.= 2.70M
INDUS TOWERS LIMITED
TOWER HT.= 15.0M
AGL HT.= 26.70M SITE NAME
IN-1350073 RNN-304080 RELOCATION OF 4801

DATE :- 29.09.2018 SURVEY DRAWN DESIGN CHECKED


DRAWING NO. CONSULTANT

SCALE: NOT TO SCALE DATTA JAYRAJ PAVAN RIYAJ


CS / INDUS / 18-19 / 279 CONSTRO SPACE
230 4-20 TOR
4-20 TOR
NOTES.
8 TOR @150C/C 1. ALL DIMENSIONS ARE IN MM LEVELS IN METEAR UNO.
P1 2.26 P1 2. DO NOT SCALE THE DRAWING ONLY WRITTEN

900
(230X300) B2 B2 DIMENSIONS TO BE FOLLOWED .
(230X300) 1.80 4-12TOR
ALL DIMENSIONS TO BE VERIFIED AT SITE BEFORE

900
COMMENCEMENT OF WORK.
B2 ANY DISCRIPENCES SHALL BE BROUGHT TO THE NOTICE OF
4-20 TOR THE CONSULTANT PRIOR TO

300
300
THE START OF THE WORK.
15M 4-20 TOR 3. MATERIALS :
TOWER (I) CEMENT : 43 /53 GRADE OPC CEMENT OF APPROVED

B1
2.20

B1X
1.67
MAKE TO BE USED.
DETAILS OF BEAM `B1,B1X' (II) AGGREGATES : COARSE AND FINE AGGREGATES SHALL
1.60
(230X900) DETAILS OF `B1,B1X' CONFIRM TO EITHER BE : 383-1963 OR IS - 515-1959.
B2 (III) WATER : POTABLE WATER IS GENERALLY CONSIDERED
SATISFACTORY FOR MIXING AND CURING CONCRETE.

4.35
(IV) REINFORCEMENT :

3.82
P1 STEEL SHALL BE CONFORMED OF FE500 GRADE.M TO
400 IS:1786 AND SHALL BE OF FE500 GRADE.SITE SPECIFIC
ANCHOR BOLTS GROUT WITH ACC ANCHOR BOLTS
(230X300) 4-20 TOR 4. CONCRETE MIX SHALL BE M20 UNLESS OTHERWISE
SHRINKKOMP 30 OR EQUTV

4-20 TOR NOTED.

1.99
5. CLEAR COVER TO MAIN REINEFORCEMANT SHALL
BE COLUMN: 25MM PEDESTALS :50MM, BEAMS/SLAB :25MM
6. UNLESS NOTED OTHERWISE, LAP LENGTH AND
B1 B1 4-12TOR DEVELOPMENT

900
900
8 TOR @150C/C
LENGTH OF REINFORCEMENT BAR SHALL BE 50 x DIA OF
P1 BAR & LOCATION OF LAP SHALL BE STAGGERD
WITH APPROVAL OF SITE ENGINEER.
(230X300) 4-20 TOR 7. MEASUREMENT OF BENDING DIMENSIONS FOR STIRRUPS/
4-20 TOR LINKS = 20X DIA. OF BAR CONFIRM TO IS:2502 - 1963
8. ANCHORING OF ROOF TOP TOWERS TO EXISTING
PROPOSED TOWER LAYOUT DETAILS OF BEAM `B2' STRUCTURE TO BE DONE WITH FOLLOWING ORDER OF
DETAILS OF `B2' PREFERENCES;
TOWER HEIGHT=15M (400X900) A. WELDING OF EXISTING & NEW REBAR
B. REBARRING BY HILTI RE-500 OR EQUIVALENT
C. CHEMICAL ANCHOR FASTENERS.
(*SITE SHALL REVRT TO ENGINEERS IF THIS OPTION IS TO
BE FOLLOWED)
LOCK NUT
(*SITE SHALL REVRT TO ENGINEERS IF THIS OPTION IS TO
NUT LEVEL=+1.20M BE FOLLOWED)
OLD BAR PLAIN WASHER 9. PROPOSED COLUMN REINFORCEMANT SHALL BE WELDED
TO
L-SHAPE BAR BASE PLATE TOP

125
6MM WELD L-SHAPED BAR THE EXITING REINFT.WELD SIZE:6MM, WELD LENGTH:390 MM
LEVEL=+1.20M FOR PEDESTAL 10. WHERE EXISTING REBAR IS NOT AVAILABLE FOR
BASE PLATE
WELDING OF NEW REBAR
CHECK NUT
DEVELOPMENT LENGHT THEN REBRRING BY HILTI RE-500 OR EQUIVALENT TO BE
NEW PEDESTAL 230X300
SHOULD BE 48D FOLLOWED.
DEVELDPMENT DIAMETER OF BAR SHALL BE LESS 11. THERE IS WATER PROOFING PRESENT ON ROOF TOP &
THAN OR EQUAL IN FUTURE THE WATER PROOF SHALL BE AS PER DETAIL
WELD NEW BAR FOR COL. 20 #-6 NOS TO EXISTING REINFORCEMENT DIAMETER
LENGHT 575 25MM NOTCH AT 150MM
575 MIN SHOWN.
25MM NOTCH AT 150MM
ALLAROUND

( THREADED GALVANIZED PORTION )


RE-BAR ABOVE ROOF LEVEL 12. IN CASE, EXISTING REBAR AT SITE IS NOT AVAILABLE

900
ABOVE ROOF LEVEL
LENGTH SUITABLE WATER PROOFING FOR LAPPING WITH NEW REBAR, REBARRING BY HILTI
SUITABLE WATER PROOFING 6 (TYP) SPECIFICATIONS RE-500 OR EQUIVALENT SHALL BE FOLLOWED
EXISTING
NEW PEDESTAL SPECIFICATIONS AS PER MANUFACTURER
SLAB 12 #- 6 NOS. 13. WHEREVER NECESSARY,DAMAGED WATER PROOFING
230X300
WELDING 350 TO BE REBARED SHALL BE TESTED AFTER RESTORATION OF WATER
(LENGTH AS MIN.390MM 6MM FILLET WELD) TIGHTNESS BY PONDING ALL AROUND, 150MM MORE THAN
F42 CHIPPED PORTIONS EXISTING BAR = 12 # -6 NOS.
EXISTING BAR = 12 # - 6NOS. NEW CONCRETE AREA FOR 48 HOURS.

150
14. LAP SIZE SHALL BE 45D IN COMPRESSION &50D IN
TENSION
EXISTING COLUMN 25Ø ANCHOR BOLT-1025 Lg. (32 Nos.)
15. CONCRETE MIX SHALL BE OF GRADE M20(1:1.5:3)
230 X 300 EXISTING COLUMN 16.REINFORCEMENT SHALL BE TOR BARS OF GRADE FE 500
DETAIL OF ANCHOR BOLT FOR 15M 230X300 17. ANY DAMAGE TO EXISTING WATER PROOFING TO BE
MADE GOOD AT SITE,
18. DAMAGE WATER PROOFING SHALL BE TESTED AFTER
PROPOSED SCHEME FOR WELDING TOWER FOUNDATION QTY. PROPOSED SCHEME FOR RE-BARING RESTORATION OF
WATER TIGHTNESS BY POUNDING ALL AROUND 150MM
REINFORCEMENT CONCRETE = 2.77 CU.M OF NEW REINFORCEMENT MORE THAN NEW CONCRETE AREA FOR 48 HOURS.
TO EXISTING REINFORCEMENT 19. ASSUMED MIN. 6-12MM BARS IF LESSER THAN STEEL
OF NEW PEDESTAL TO REINFORCEMENT OF EXISTING COLUMN STEEL = 510.88 KG AVAILABLE ON SITE THEN CONTACT CONSULTANT
IMMEDIATE
CONSULTANT REV.NO. DATE REGION NAME MAHARASHTRA
PROJECT DESCRIPTION
CONSTRO SPACE REV.NO.-00 29-09-18
CITY NAME PUNE

DESCRIPTION
TOWER DETAILS SITE NAME IN-1350073 RNN-304080
RELOCATION OF 4801
SCALE DRAWN DESIGN CHECKED
SITE ADDRESS.- Mr.Ravindra Manohar Talele,Mrs.Himali Atul Zambare, S.NO.120/9,Plot No.3,
DRAWING NO.
NTS JAYRAJ PAVAN RIYAJ Sus Road, Pashan Pune-411021.
SIGNATURE CS / INDUS / 18-19 / 279
M/S CONSTRO SPACE
BAR BENDING SCHEDULE

SITE NAME :- IN-1350073 RNN-304080 RELOCATION OF 4801


TOWER :- 15M

SCHEDULE OF BAR BENDING (TOWER)


BAR DIA BAR SHAPE LENGTH NOS. UNIT WT. TOTAL WT.
MARK DESCRIPTION
(mm) (mm) REQD. (kg/m) (kg)
COLUMN

20 1150
P1 MAIN 1300 24 2.47 77.06
150

P1 STIRRUPS 8

170
970 40 0.39 15.13
@125c/c
240

TIE BEAM

B1 MAIN
2140
REINFORCEMENT 20 3140 08 2.47 62.05
500
500

840

STIRRUPS 8 2170 12@ 0.39 10.16


150C/C
170
SIDE
12 2140 2140 04 0.89 7.62
REINFORCEMENT

B1X MAIN
4290
REINFORCEMENT 20 5290 08 2.47 104.53
500
500

840

STIRRUPS 8 2170 26@ 0.39 22.00


150C/C
170
SIDE
12 4290 4290 04 0.89 15.27
REINFORCEMENT

MAIN 2200
B2 3200 16 2.47 126.46
500

500

20
REINFORCEMENT

SIDE 3200 3200 08 0.89 22.78


REINFORCEMENT 12
840

STIRRUPS 2510 24@


8 0.39 23.49
150C/C
340

TOTAL 486.55
IMP. NOTE:- BEFORE CUTTING THE STEEL PLEASE CHECK THE ADD 5%
WASTAGE 24.33
BEAM COL. DISTANCES & GIVEN CUTTING LENGTH.
TOTAL 510.88

FOR CONSTRO SPACE FOR INDUS


8TOR CHAIR

A
AT 1000 C/C

3000

HB

3000

5-12TOR STIRRUPS 5-12TOR


8TOR@150C/C

HB HB

150
8TOR@300C/C 8TOR@300C/C
(TOP & BOTTOM) (TOP & BOTTOM) O/D BTS PAD
3000 HB HB
3.00 X 3.00
SECTION `A-A'
FOR O/D BTS PAD

HB

GENERAL NOTES:
A

1) THE BTS BEAM SHOULD BE CASTED ON BEAMS/ COL. ONLY.


2) BEFORE CASTING THE BEAM TERRACE SHOULD BE PROPERLY CHIPPED.
3) THE DISTANCES BETWEEN BEAMS MAY SLIGHTLY VARY ON SITE IT SHOULD BE CHECKED.
4) WATER PROOFING SHOULD BE DONE AROUND THE PEDESTAL.
O/D BTS LAYOUT
5) ALL DIMENSIONS ARE IN MM U.N.O. (O/D BTS. set on terrace location)
6) GRADE OF CONCRETE M20.
7) GRADE OF STEEL FE 415 - TMT
8) CEMENT SHOULD BE OPC 43 OR 53 GRADE.
9) COURSE AGGREGATE SHOULD BE WELL GRADED, ROUNDED AND CUBICLE.
10) ONLY ZONE 2 SAND TO BE USED AND SHOULD BE FREE FROM IMPURITIES (MUST BE SCREENED).
O/D BTS PAD QUANTITIES
11) WATER SHOULD BE POTABLE.
12) SHUTTERING HAS TO BE IN PLYWOOD AND BOLTING TYPE, WATER TIGHT AND SMOOTH. CONCRETE = 1.35 CU.M
13) THE SHUTTERING HAS TO BE ERECTED IN PERFECT LINE AND LEVEL.
STEEL = 121.53 KG.
PROJECT HEAD CONSULTANT REV.NO. DATE MAHARASHTRA
DESCRIPTION REGION NAME
CONSTRO SPACE,KOLHAPUR REV.NO.-00 29-09-18
INDUS TOWERS LIMITED CITY NAME PUNE
OUT/D BTS PAD
DESCRIPTION IN-1350073 RNN-304080
DETAILS SITE NAME RELOCATION OF 4801
SCALE DRAWN DESIGN CHECKED
DRAWING NO.
SITE ADDRESS.- Mr.Ravindra Manohar Talele,Mrs.Himali Atul Zambare,
NTS JAYRAJ PAVAN RIYAJ S.NO.120/9,Plot No. 3, Sus Road, Pashan Pune-411021.
SIGNATURE CS / INDUS / 18-19 / 279
M/S CONSTRO SPACE
SITE NAME :- IN-1350073 RNN-304080 RELOCATION OF 4801
TOWER :- 15M
SCHEDULE OF BAR BENDING (O/D/BTS SLAB)
MARK DESCRIPTION BAR DIA BAR SHAPE LENGTH NOS. UNIT WT. TOTAL WT.
(mm) (mm) REQD. (kg/m) (kg)

BEAMS
HB MAIN
2900
12 3000 20 0.89 53.40
REINFORCEMENT 50 50

200
100

STIRRUPS 8 650 80 0.39 20.28

O/D BTS SLAB PAD


MAIN(SHORT)
2950 2950 20 0.39 23.01
S1 8
REINFORCEMENT

MAIN(LONG) 2950
8 2950 20 0.39 23.01
REINFORCEMENT
300
90

780 06 0.39 1.83


CHAIR 8 150

IMP. NOTE:- BEFORE CUTTING THE STEEL PLEASE CHECK THE TOTAL 121.53
BEAM COL. DISTANCES & GIVEN CUTTING LENGTH. ADD
WASTAGE 5%
6.08
TOTAL 127.61
FOR CONSTRO SPACE
FOR INDUS TOWERS LTD.
Date: - 29.09.18

STRUCTURAL STABILITY CERTIFICATE

PROJECT :- INDUS TOWER LIMITED.

SITE ID :- IN-1350073

REFERENCE ID :- RNN-304080

SITE NAME :- Relocation of 48011

SITE ADDRESS : - Mr.Ravindra Manohar Talele,Mrs.Himali Atul


Zambare, S.NO.120/9,Plot No.3,Sus Road,
Pashan Pune-411021.

Based on the detailed Structural Stability Survey carried out by us. And the
instruction given by them, we here by certify that the existing framed structure of Building will
be capable of sustaining the additional load imposed by TOWER ht (15M) and RCC O/D BTS
Pad ( 3.0M x 3.0M ) of INDUS TOWER LIMITED with their RCC foundation indicated in
the plan. The validity of this certificate is subject to the execution and supervision carried out by
INDUS TOWER LIMITED at this site as per layout and structural design.
As per the discussion and information and observations given by client during
the site visit, existing building does not show any signs of deterioration, no structural cracking
and no foundation settlement. Hence, we can say that the condition of the building is good and
stable to take the additional load.