Anda di halaman 1dari 2

SECTION 1.

1) Prajapita Brahma Kumaris Ishwariya Vishwa Vidyalaya. (Correct as in wherever


mentioned)
2) Satellite imagery from technically and officially reliable various sources.
3) Introduction and back ground may be more informative to highlight the client and
consultant and their respective relations. The need of the hour to preserve the land assets
in order to reduce present and future land disputes shall be more detailed in regards to
discussion on present flaws of land area measurements as recorded in Government
documents with respect to latest available surveying technologies.

SECTION 1.2
1) Survey deliverable has been mentioned suddenly without mentioning the methods prior.
First, respective methods shall be discussed and then deliverable shall be given with an
explanation what each deliverable is more worthy and reliable technically and
administratively. Some technical terms also need to be explained in a line or two.
2) After discussion of each method and its requirements highlighting latest technology and its
accuracy compared to the government scope of works shall be defined. After defining
scope of work deliverable shall be mentioned with its respective necessity and applications
in present and future.

SECTION 1.3
1) Suddenly GIS deliverable comes!!!...please follow above suggestions.

SECTION 1.4
1. Manomohini Bhavan (In image and in documents anywhere)
2. Detail specification of GPS equipment, UAV, Total Station shall be specifically mentioned
along with little explanation highlighting the necessity of the same.

SECTION 3
1. 1A- OKAY
2. 1B- it should be Madhuvan Complex:- Map preparation against this item shall be
referenced with previously mentioned details as would be appeared in the MAP.
3. 2- Satellite imagery collection cost shall be included or not is not clear. If cost is excluded
the rate may be reduced.
4. A note shall be there to depute separate teams simultaneous for each field activity if given
the total work at one go and accordingly total time frame for the same shall be mentioned.
5. A comprehensive documented report may be separately charged. This shall be the strength
of the overall survey. The same we may produce before, technical, administrative and legal
requirements. The report shall be signed by registered, surveyor and expert engineer
together. Their signed Resumes/CV shall be attached with the report.

OVERALL.
The proposal is comprehensive but need to be re-arranged as suggested. Especially, why this
comprehensive survey is needed; is need to be highly discussed with a comparison of previous
methods of survey and present state-of-the-art addressing the present or future possible land
disputes and the strength of this survey report. Any critical technical term shall be explained
in a line or two in definition as a separate section with its relevance to the application and
requirements.

Anda mungkin juga menyukai