Summery of Costing

SL No. Description of Item

1 Cost for construction of new EPI Building with necessary sanitary costing (Including 15% VAT)

2 Cost for construction of new Generator Building (Including 15% VAT)


3 Electric Cost for Extension work (Including 15% VAT)
Total

Total In Word: One Crore Twenty Lakh Forty One Thousand One Hundred Twenty Two BDT. Only

Authorized Signature
On Behalf of
Environment & Infrastructure Management Solution (EIMS) Limited
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka-1215, Bangladesh
NT SOLUTION (EIMS) LIMITED
, Dhaka-1215, Bangladesh
ffice@eimslbd.com

UNICEF Bangladesh
13/09/2017

Amount (Tk) Remarks

10,190,413

705,500
1,145,209
12,041,122

nly
ENVIRONMENT & INFRASTRUCTURE MANAGEMENT SOLUTION (EIMS) LIMITED
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka-1215, Bangladesh
Tel: +88029113078, +8801708459575; Email: office@eimslbd.com

Bill of Quantities of Two storied EPI RCC Building (New Construction)


Project: UNICEF GAVI Programme (HSS-2) Client: UNICEF Bangladesh
Location: Civil Surgeon Office, Bagherhat Sadar, Bagherhat Date: 13/09/2017

Civil Works
SL. NO. DESCRIPTION Unit Quantity Rate Taka Remarks
Earth work in excavation of all kinds of soils of foundation trenches including leveling, ramming and preparing the base, bailing out
1 water and shoring if necessary and disposal of cutting earth to be deposited at suitable place (Within 30 m from the working place) Cum 106.93 470 50,257
etc. all complete.as per design, drawing and direction of the Engineer-in-charge.

2 Providing and laying double layer polythene sheet weighing 1.00kg per 6.5 sqm under footing, mat, below floor slab, grade beam Sqm 224.76 25 5,619
etc. all complete as per direction of EIC.
One layer of brick flat soling under foundation, floor slab, grade beam, ramp and all other areas where required as per design with
3 1st class bricks in/c preparation of bed and filling the interstices with local sand, leveling in/c costs of tools and plants etc. all Sqm 229.08 420 96,212
complete as per direction of the engineer-in-charge.

Mass concrete works in floor, ramp, foundation and all other required area as per design with mixing ratio 1:1.5:3 with OPC cement
(BDS EN-197-1-CEM I), 50% Sylhet sand (F.M. 2.4), 50% Local sand (F.M. 1.2) and picked jhama chips including breaking chips,
4 screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, electricity and other
Cum 13.11 8,300 108,838
charges and costs of tools and plants etc. all complete and accepted by the Engineer.

Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar (1:4) in foundation and plinth, filling the joints/interstices
5 fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 Cum 2.44 6,700 16,356
days etc. all complete including cost of water, electricity and other charges and accepted by the Engineer.(Cement: CEM-I/A-M)

Shuttering Work with new wood plunk, new joint sheet as joint materials, new plain sheet including fiiting, fixing, necessary
6 propoing(Bamboo good quality), Steel pin, 24 no. GI Wire etc all completed and accepted by the Engineer in Cahage.
Sqm 1090.59 510 556,202

Reinforcement cement concrete works of mixing ratio 1:1.2:2.5 having specified compressive strength minimum f'c=4000 psi or
27.5 MPa (*for normal concrete) at 28 days cylinder strength with cement confirming to ASTM like BDS EN 197-1-CEM I standard,
best quality sylhet sand having F.M=2.4 (min.), Stone chips with size 20 mm downgraded and it should be well graded crushed
7 stone chips including breaking chips and screening through proper sieve analysis , making , placing in position, placing of Cum 111.58 14,070 1,569,966
reinforcement in position; concrete mixing with mixer machine , casting in forms , compacting by vibrator machine and curing at
least for 28 days. All complete including cost of testing materials and concrete & other charges as per direction of the engineer in
charge .

Sand filling/Back Filling in foundation trenches, and plinth with fine sand or filling sand having min. F.M 0.8 in 150 mm layers
8 including leveling, watering and consolidating each layer up to finished level to achieve standard compaction as per design Cum 148.18 610 90,387
standard.

125mm Brick Masonry work with first class brick, cement BDS EN-197-1-CEM I, best quality local sand (F.M.1.2), mortar
preparation with ratio 1:4 and making bond with connected wall including necessary scaffolding, raking out joint, cleanning, and
9 Sqm 501.58 954 478,509
soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floor including cost of water,
electricity, and other charges etc all complete and accepted by the Engineer.

250mm Brick Masonry work with first class brick, cement BDS EN-197-1-CEM I, best quality local sand (F.M.1.2), mortar
preparation with ratio 1:4 and making bond with connected wall including necessary scaffolding, raking out joint, cleanning, and
10 Cum 5.83 7,005 40,857
soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floor including cost of water,
electricity, and other charges etc all complete and accepted by the Engineer.

Minimum 12 mm thick Plaster with cement (BDS EN-197-1-CEM I), sand (F.M. 1.2) having mortar ratio (1:4) to wall both inner-and
11 outer surface, finishing the corner and edges in/c sand cleaning like seieving and washing and curing at least for 7 days, all complete Sqm 1627.15 320 520,687
in all respect as per drawing and direction of the engineer-in-charge.
Supply & Works of Weather coat on out side wall of approved best quality like (Berger) or equivalent and color approved by
relating authority in a sealed container, made from water based powder mixed with water (1:1), applying 85 no stone before
applying primer coat like sealer to achive smoot surface, and then apply primer coat (sealer), curing the same after 7 days, then 1st
12 coat applied and curing the same for 7 (seven) days etc., and further apply 2nd coat taking care and cleaning the surface fully from Sqm 531.19 221 117,394
grease, oily substances, old paints, lime wash, fungus, algae etc., sand papering the surface before applying 1st and 2nd coat,
complete as per direction of the engineer-in-charge.

Supplying & works of Plastic emulsion paint of approved best quality (Berger or equivalent) and color approved by relating
authority,supplied with a sealed container, made from water based powder mixed with water (1:1), applying 85 no stone before
13 applying primer coat like sealer to achive smoot surface, and then apply primer coat (sealer), curing the same after 7 days, then 1st Sqm 1072.12 215 230,505
coat applied and curing the same for 7 (seven) days etc., and further apply 2nd coat taking care and cleaning the surface fully from
grease, oily substances, old paints, lime wash, fungus, algae etc., sand papering the surface before applying 1st and 2nd coat,
complete as per direction of the engineer-in-charge.

Supplying & works of Enamel paint of grill approved best quality (Berger or equivalent) and color delivered from authorized local
agent of the manufacturer in a sealed container, applying to Grill two coats over a primer or sealer coat elapsing specified time for
14 drying/recoating (these sealer should be applied over red oxide) with specified brand like (Berger or equivalent) including cleaning Sqm 122.60 221 27,095
drying, making free from dirt, grease, wax, removing all chalked & scaled materials, fungus, mending good the surface defects, sand
papering the surface and necessary scaffolding, spreading by brush/ roller/spray etc. all complete in all floor as per direction of the
engineer-in-charge.

15 Supplying, fitting and fixing window grill made of ½” x ½” M.S. solid bar 5.5” c/c with outer frame of 1.5” x ¼” F.I. bar with applying Sqm 64.26 2,416 155,252
red oxide over grill surface as per design approved and accepted by the Engineer.

Supplying, Fitting, Fixing, Carring, Polishing of Double Wooden door of required size (i) door shutter (LxBx1.5") where L and B are
16 length and width as per drawing (ii) Door Frame 6"x2.5"x7' having the following wood specification like for door shutter (Burma No's 3.00 35,000 105,000
Teak, Chittagong Teak) and Door frame will be (Burma Teak or Chittagong Teak) all completed and accepted by Engineer in charge.

Supplying, Fitting, Fixing, Carring, Polishing of Single Wooden door of required size (i) door shutter (LxBx1.5") where L and B are
17 length and width as per drawing (ii) Door Frame 6"x2.5"x7' having the following wood specification like for door shutter (Burma No's 7.00 25,000 175,000
Teak, Chittagong Teak) and Door frame will be (Burma Teak or Chittagong Teak) all completed and accepted by Engineer in charge.

Supply Fitting, Fixing, Carring, of best quality Upvc Plastic door (RFL, Partex) of required size including 4'x3' Cat door with two main
18 toilet door all completed and accepted by Engineer in charge.(Plastic Door Upvc)
No's 4.00 12,500 50,000

20 Supply Fitting, Fixing, Carring, of best quality steel door of required size including with necessary fittings(Hinge angle, bracing No's 1.00 12,000 12,000
angle,ms sheet, welding, redoxiding, polishing) all completed as per design and accepted by Engineer in charge.

Supplying, fitting and fixing of Aluminium sliding window as per the U.S. Architectural Aluminium Manufacturer’s Association
(AAMA) standard specification having 1.2 mm thick outer bottom (size 75.50 mm, 32mm), 1.2 mm thick outer top (size 75.50 mm,
16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80, 22 mm), 1.2 mm thick shutter bottom (size 60mm, 24.40 mm), 1.2 mm
thick outer side (size 75.50 mm,19.90 mm), 1.2 mm thick sliding fixed side (size 31 mm, 26 mm),1.2 mm thick shutter lock (size
49.20 mm 26.20 mm) and 1.2 mm thick inter lock (size 34.40 mm, 32.10 mm) sections all aluminium members (total weight
19 Sqm 64.26 3,335 214,307
kg/sqm) will be anodized to aluminium bronze/silver colour with a coat not less than 15 micron in thickness and density of 4 mg per
square cm etc. including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene,
bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories,
making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the
Engineer.
Supplying, fitting, fixing of homogeneous floor tiles of size 16"x16" with approved brand (RAK, AKIJ, Best Quality China) and color
20 with cement (BDS EN-197-1-CEM I) sand (F.M. 1.2) mortar 1:4 base raking out joint with white cement/putty including cutting and Sqm 332.23 2,100 697,679
laying tiles in proper way, finishing, and curing for 14 days with care etc. all completed and accecpted by the Engineer in Charge.

Supplying, fitting, fixing of homogeneous Wall tiles of size 8"x12" with approved brand (RAK, AKIJ, Best Quality China) and color
21 with cement (BDS EN-197-1-CEM I) sand (F.M. 1.2) mortar 1:4 base raking out joint with white cement/putty including cutting and Sqm 101.88 1,604 163,423
laying tiles in proper way, finishing, and curing for 14 days with care etc. all completed and accecpted by the Engineer in Charge.
Supplying, fitting, fixing of Stair tiles of size 12"x12" with approved brand (RAK, AKIJ, Best Quality China) and color with cement
22 (BDS EN-197-1-CEM I) sand (F.M. 1.2) mortar 1:4 base raking out joint with white cement/putty including cutting and laying tiles in Sqm 56.09 1,536 86,149
proper way, finishing, and curing for 14 days with care etc. all completed and accecpted by the Engineer in Charge.

Supplying, fabrication and fixing to details as per design M.S deformed bar as reinforcement of required size and length for all
23 types of RCC work in/c straightening the rod, removing rusts, cleaning, cutting, hooking, bending, binding with 24 no. GI wire, Kgs 18329.97 95 1,741,347
placing the bars in position, in/c lapping, spacing and securing them in position by concrete blocks, metal chairs, etc. complete as
per specifications, drawings and direction of the Engineer-in-charge. (60G Deformed Bar with 420 Mpa Yield Strength)

Special cement concrete works as Patent Stone with mixing ratio 1:1.2:2.2 of thickness 2.5" on roof for damp proofing with net
cement finishing using standard required amount of damp proofing admixture (250ml/Bag) with the best quality sylhet sand
24 having F.M=2.4 (min.) , 5 mm or down graded crushed stone pie chips and cement standard (BDS EN-197-1-CEM I) including Sqm 163.06 830 135,341
breaking chips and screening through proper sieve analysis , making , placing in position, placing of reinforcement in position;
concrete mixing with mixer machine , casting in forms , compacting by vibrator machine and curing at least for 21 days. All
complete and accepted by the Engineer in Charge.

25 Admixture For Damp Proof named Foam Lube or equivalent availabe in market Litre 254.86 245 62,440
Co2,Gas Type Fire Extinguisher, Capacity 5kg, with filling agent 99% Co2 Gas, Cylinder size D114*H475, thickness Ck45-4mm,
26 neck Ring, Flat bottom, Brush Vulve with top hanger loop, black hose and working pressure 150 Bar with fitting fixing all completed Nos 6.00 4,000 24,000
as per Engineer in Charge.

Supply, fitting, fixing, making, welding, carring, of MS Angle rack of size 2.4m hight, .9m width and 2.1m in length
27 (2.4mX2.1mX.9m) with (50mmX50mmX3mm) MS angle as vertical post, (38mmX38mmX3mm) MS angle for horizontal framing at Unit Rack 7.00 53,000 371,000
outer side as well as inside horizontal bracing and (38mmX3mm) flat bar for vertical side bracing including (150mmX150mmX5mm)
base plate for each vertical post all completed as per Engineer in Charge.

Supply, fitting, fixing carrying, of MS slotted Angle rack of brand Partex Model No. RSA-0201-W-1200xD-600xH-1830 to site and Unit Rack 3.00 23,000 69,000
fixed as per drawing all completed and accepted by the engineer in charge.
Site mobilization like site preparation, Site office building, Labor shade building, manpower mobilzation, material mobilization,
29 testing apparatus mobilization, Technical staff mobilization and additional Caring cost related to materials excluding the BoQ L.S. 1.00 50000.00 50000.00
specific item.
Dismantling unserviceable/damaged brick works of any thickness and, disposal of debris to be deposited at suitable place (Within
31 30 m from the working place) etc. all complete as per design, drawing and direction of the Engineer-in-charge.
Cum 33.17 592.00 19639.01

32 Demolishing R.C.C. work including stacking of steel bars and disposal of debris to be deposited at suitable place (Within 30 m from Cum 19.88 850.00 16893.75
the working place) etc. all complete as per design, drawing and direction of the Engineer-in-charge.

Manufacturing, Supplying, fitting and Fixing collapsible gate of any design and shape of 1"x1"x1/8" M.S. angle as vertical member
and 1"x1/8" F.I bar scissors 525 mm/600mm long provided in 3 rows including cutting the different M.S members to required size,
fabricating, welding, riveting with required size size rivets, providing required size wheel, pulling handles on both sides, suitable
34 locking arrangement, electrode, grease and finally placing the same position in between two nos. 50x50x6mm M.S Tee rail made by Sqm 4.20 4,876 20479.20
welding 2 nos 50x6mm M.S flat bar fitted and fixwd with at top and bottom with RCC lintel/roof slab, floors and side wall with
required Nos 150mm long 38x6 mm M.S flat bar clamps one end welded with the gate member and the other end bifurcated and
embeded in C.C at the respective point including cutting holes and mending good the damges by pouring concrete (1:2:4) into the
holes and finishing etc all completed and accepted by the Engineer in Chage.

Miscellaneous cost (tree removal, Bill board elecrtic pole replace, rcc seat bench dismantle , fench dismantle, bush removal & all
35 other structures on poropsed site are not included in BoQ).
L.S. 1.00 20,000 20000.00

Supplying, fitting and fixing 38 mm dia G.I pipe stair railing of any standard height of any design and shape with 60X60X6 mm M.S.
plate as base plate at the bottom of 38 mm dia G.I pipe and fitted and fixed by welding. Placing the pipes vertically @ 250 mm c/c (1
36 Nos. in each steps) 150 mm embedded into R.C.C tread of stair after cutting grooves and clamping with necessary support like royal Sqm 15.00 3,150 47250.00
Bolt or etc. and mending the damages properly with C.C. and providing 50 mm G.I. pipe as handrail over the vertical post and
provide 12mm circular GI pipe as horizontal support at mid height of vertical post in between two vertical post including polishing
painting etc. all complete and accepted by the Engineer in charge.

Total 8,145,084

Sanitary Item
SL NO. Descrition
Supplying,offitting
Item and fixing single bowl stainless steel sink with sink tray size (450 x 1050 mm.) or equivalent availabe in market Unit Quantity Rates Total Remarks

1
with heavy type CI steel brackets 12mm dia C.P. bib-cock 40 mm dia C.P. chain plug. 40 mm dia C.P. waste. 40 mm dia PVC waste pcs 1 4300 4,300.00
pipe with brass coupling (750 mm length) including making hole in walls and floors and mending good the damages, finishing with
1:4 cement mortar etc. all complete approved and accepted by the Engineer.
Supplying, fitting and fixing, Bangladesh pattern BISF standard simple type porcelain long pan (Model-323, size-
520X290X260mm,White) or equivalent simple type of vitreous china with siphon and preparing the base of pan with cement
concrete and wire net or rods including making holes in walls and floors wherever required and mending good the damages,
2 supplying porcelain lowdown with master siphon with low down cover and all fittings, fitting fixing the same in position with C.I. No's 4 6300 25,200.00
brackets including supplying best quality 38 mm dia PVC flush pipe with brass coupling (not exceeding 1.80 m in length), 12mm dia
plastic connection pipe with brass coupling, 12 mm dia brass stop cock, 12 mm dia ball cock and pulling chain etc. all complete as
per direction of the E-I-C.

Supplying, fitting and fixing white glazed vitreous W/H Wash Basin 580 x 445 x 235 mm size, approx. 14 kg by weighteqivqlent
3
availabe in market including fitting, fixing the same in position with heavy type C.I. Brackets. 30 mm dia PVC waste water pipe with No's 4 2500 10,000.00
brass coupling (not exceeding 750 mm in length), basin waste with chain plug including making holes in walls and floors and fitting
with wooden blocks, screws and mending good the damages, finishing etc. all complete approved and accepted by the Engineer.

Supplying, fitting and fixing of 450 x 350 mm size and 5 mm thick unframed super quality mirror with hard boards at the back with
4 all necessary fitting including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete No's 4 825 3,300.00
approved and accepted by the Engineer. (Made in Japan or equivalent)

5
Supplying, fitting and fixing Pedestal, 652 x 200 x 205 mm in size, approx. 5.6 kg by weight with rowel plug and screws etc. all No's 4 2455 9,820.00
complete approved and accepted by the Engineer.
Supplying, fitting and fixing super quality 600 x 125 mm coloured glass (plate) shelf having 5 mm thickness with fancy C.P. brackets,
6 screws and frames including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete No's 4 1282 5,128.00
approved and accepted by the Engineer.

7
Supplying, fitting and fixing medium quality C.P. Towel rail of 600 mm long and 20 mm in dia with C.P. holder including making holes No's 4 558 2,232.00
in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer.

Supplying, fitting and fixing of special coloured toilet paper holder Size (150 mm x 150 mm x 126 mm) including making holes in
8 walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. No's 4 720 2,880.00

Supplying, fitting and fixing standard size soap tray including making holes in walls and mending good the damages with cement
9 mortar (1:4) etc. all complete approved and accepted by the Engineer. No's 4 224 896.00

10 Necessary uPVC Fittings


100 mm dia uPVC Pipe: 20 rft (6m) long pcs 9 2083 18,747
100 mm dia uPVC bend/offset pcs 60 292 17,520
100 mm dia uPVC Tee/T-Y/Y (50 x 50 mm) pcs 58 457 26,506
100 mm dia Socket pcs 60 295 17,700
100 mm dia Elbow pcs 60 290 17,400
100mm dia side door bent pcs 50 295 14,750
100mm MS clamp pcs 52 40 2,080
uPVC Pipe (37mm) ft 700 115 80,500
Clamp pcs 110 80 8,800
Socket pcs 100 48 4,800
9 Elbow pcs 90 75 6,750
Bent pcs 100 46 4,600
Bib cock pcs 16 680 10,880
Concealed Stop Cock pcs 16 1000 16,000
Solvent Cement (500ml) Cont. 15 450 6,750
Tee pcs 60 48 2,880
11 Deep Tube well Necessary Items & Fittings:
Boring by using 100mm dia cutter Meter 200 130 26000
38mm dia water grade PVC pipe (D-Class or eqv.) in/c carriage Meter 230 110 25300
38mm dia socket adopter each 45 60 2700
Best quality 38mm dia PVC Cap each 5 43 215
Disinfections of tube-well using bleaching powder L.S 1 500 500
Maintaining & filling and sealing test bore Each bore 1 3000 3000
200mm test boring Each bore 1 6000 6000
Mobilization of equipment for drilling 38mm dia test and observation test L.S 1 7500 7500
Centrifugal Pump (2H.P) Pcs 1 15000 15000
Plastic Water Tank (Capacity 1000 Ltr) Pcs 1 5500 5500
G.I Pipe RFT 50 130 6500
G. I Fittings( required all to connect pumping station to water tank) Set 1 3500 3500
Stinner pipe 100mm dia RFT 10 300 3000
12 Labor Cost including necessary fittings and pipe networking for deep tube well all completed and accepted by the Engineer in Charge set 1 10000 10000

Necessay pipe networking( Vertical, inner interconnected pipe network), fixtures fittings (Tape, sink, basin, comode or pand, mirror , tissue
13 stand etc), connecting with septic tank, overhead tank, necessary pipe laying for sewarge discharge, groove cutting, cleaning, clamping and L.S. 1 80000 80,000.00
disposal of debris all completed and accepted by the Engineer in charge.
Total 515,134

Summary
Total Civil work 8,145,084
Sanitary Work 515,134
Total Bill For Civil and Sanitary work 8,660,218
Vat (15%) 1,299,033
Grand Total 9,959,251
Civil Works
SL.NO DESCRIPTION OF WORK Quantity Unit
1 Earth Excavation 106.929 m3
2 Polythene Laying 224.757 m2
3 Brick Solling 229.077 m2
4 CC Work 13.113 m3
5 Brick work in Foundation 2.441 m3
6 Shuttering Work 1090.593 m2
7 RCC Casting 111.583 m3
8 Sand Filling 148.175 m3
9 125mm Brick Masonry Work 501.582 m2
10 250mm Brick Masonry Work 5.833 m3
11 Plaster Work 1627.147 m2
12 Weather Coat 531.193 m2
13 Plastic Paint 1072.115 m2
14 Enamel Paint 122.601 m2
15 Grill Work 64.260 m2
16 Door Installation 15.000 Nos
Double 3.000
Single 7.000
Plastic 4.000
Steel Door 1.000
17 Thai Aluminium 64.260 m2
18 Floor Tiles 332.228 m2
19 Wall Tiles 101.885 m2
20 Stair Tiles 56.087 m2
21 Reinforcement Work 18329.967 Kgs
22 Patant Stone work 163.061 m2
23 Damp proof Admixture 254.857 Litre
24 Fire Extinguisher 6.000 Nos
25 Rack Installtion(Large) 7.000 Nos
26 Rack Installtion(Small) 3.000 Nos
27 Dismalting Brick Work 33.1740035156 m3
28 Dismalting RCC Work 19.875 m3
29 Collapsible Gate 4.2 m2

Earth Excavation
Size
Location Work At Length
mm
Foundation
Excavation for Footing (F1) Below EGL 1625
Excavation for Footing (F2) Below EGL 1800
Exczvation For Footing(F3) Below EGL 1900
Exczvation For Footing(F4) Below EGL 1975
Exczvation For Footing(F5) Below EGL 2250
Stair Ramp 8400
Total Earth cutting

Polythene Laying
Size
Location Work At Length
mm
Foundation
F1 Below EGL 1325
F2 Below EGL 1500
f3 Below EGL 1600
F4 Below EGL 1675
F5 Below EGL 1950
Upon Brick Solling Floor EGL 19700
GB 99900
Total Polythene Laying

Brick Solling
Size
Location Work At Length
mm
Foundation
F1 Below EGL 1325
F2 Below EGL 1500
F3 Below EGL 1600
F4 Below EGL 1675
F5 Below EGL 1950
Upon Brick Solling Floor Ramp 3600
EGFL 19700
GB 99900
Total Brick solling

CC Work
Size
Location Work At Length
mm
Foundation
PL 20300
Ramp 3600
Total CC Work
Shuttering Work
Size
Location Work At Length
mm
F1 Below EGL 5600
F2 Below EGL 6300
F3 Below EGL 6700
F4 Below EGL 7000
F5 Below EGL 8100
Column
C1,C2 Below plinth level 1950
C3,C4,C5 Below plinth level 1950
C1,C2 GF to 1st 3000
C3,C4,C5 GF to 1st 3000
C1,C2 1st to Roof 3000
C3,C4,C5 1st to Roof 3000
Roof Top 2100
2100
Grade Beam Grade Beam Level 99525
Floor Beam 1F+2F 99525
Stair Roof Top Beam Roof Top 16850
Slab 1F 8700
3650
Slab 2F 8700
3650
Stair SLAB Roof 4850
Lintel D1 1500
D2 1300
D3 1050
SD 1300
W 1800
W1 1500
W2 1300
HW 2700
HW1 2100
HW2 750
SLD 2100
C.G 2300
Sunshade W 1800
W1 1500
W2 1300
HW1 2100
HW2 750
Stair landing 1900
Slope 11185
Rise , Trade 1500
Total Shuttering Work

RCC Casting
Size
Location Work At Length
mm
F1 Below EGL 1325
F2 Below EGL 1500
F3 Below EGL 1600
F4 Below EGL 1675
F5 Below EGL 1950
C1,C2 Below plinth level 450
C3,C4,C5 525
C1,C2 1F 375

C3,C4,C5 450
C1,C2 2F 375
C3,C4,C5 450
Roof 375
450

Grade Beam Grade Beam Level 99525


Floor Beam 1F+2F 99525
Roof Beam 16850
Slab 1F + 2F 20300
2800
Stair Slab Roof 4850
Fall Slab 2050
Lintel D1 1500
D2 1300
D3 1050
SD 1300
W 1800
W1 1500
W2 1300
HW 2700
HW1 2100
HW2 750
SLD 2100
C.G 2300
Sunshade W 1800
W1 1500
W2 1300
HW1 2100
HW2 750
Stair 11185
5592.5
Landing 1750
Total RCC Work

Sand Filling
Size
Location Work At Length
mm
PL
F1 Below EGL 1625
F2 Below EGL 1800
F3 Below EGL 1900
F4 Below EGL 1975
F5 Below EGL 2250
PL 20300
Ramp portion 3600
Deduct F1 1325
F2 1500
F3 1600
F4 1675
F5 1950
GB 99525
Column 450
525
Total Earth filling

125mm Brick Masonry W


Size
Location Work At Length
mm
GF Out Side
Outside East-West side 37600
North-South side 15000
Inside Inside 50510
1F East-West side 37600
North-South side 15000
Inside 22550
Roof Parapet wall 56400
Stair Roof 15350
Parapet wall 15350
Deduct D1 1200
D2 1000
D3 750
SD 1000
W 1500
W1 1200
W2 1000
HW 2400
HW1 1800
HW2 750
SLD 2100
C.G 2300
EX 375
Total Brick work

Plaster Work
Size
Location Work At Length
mm
Outside
GF East-West side 40600
North-South side 16800
Sunshade 48700
1F East-West side 40600
North-South side 16800
Sunshade 9900
Roof Parapet wall 56400
Roof Stair Wall 15350
Parapet wall 15350
Deduct SD 1000
W 1500
W1 1200
W2 1000
HW 2400
HW1 1800
HW2 750
C.G 2300
EX 375
Inside
GF
East-West side 40100
North-South side 16300
Wall 51510
Ceiling 12761.8588101
Fall Slab 2050
1F East-West side 40100
North-South side 16300
Wall 23550
Ceiling 12761.8588101
Fall Slab 2050
Roof Wall 15350
Ceiling 4025
Deduct D1 1200
D2 1000
D3 750
SD 1000
W 1500
W1 1200
W2 1000
HW 2400
HW1 1800
HW2 750
SLD 2100
C.G 2300
EX 375
Total

Paint Work
Size
Location Work At Length
mm
Weather Coat
GF East-West side 40600
North-South side 16800
Sunshade 65800
1F East-West side 40600
North-South side 16800
Roof Parapet wall 56400
Roof Stair Wall 15350
Parapet wall 19490
Deduct SD 1000
W 1500
W1 1200
W2 1000
HW 2400
HW1 1800
HW2 750
C.G 2300
EX 375
Total
Plastic Paint
GF
East-West side 40100
North-South side 16300
Wall 51510
Ceiling 12761.8588101
Fall Slab 2050
1F East-West side 40100
North-South side 16300
Wall 23550
Ceiling 12761.8588101
Fall Slab 2050
Roof Wall 1500
Ceiling 4025

Deduct D1 1200
D2 1000
D3 750
SD 1000
W 1500
W1 1200
W2 1000
HW 2400
HW1 1800
HW2 750
SLD 2100
C.G 2300
EX 375
Total
Enamel Paint
Deduct D1 1200
D2 1000
SD 1000
W 1500
W1 1200
W2 1000
HW 2400
HW1 1800
HW2 750
C.G 2300
EX 375
Total
Grill Work
Size
Location Work At Length
mm
W 1500
W1 1200
W2 1000
HW 2400
HW1 1800
HW2 750
Total Grill work

Door Installation
Size
Location Work At Length
mm
Deduct D1 1200
D2 1000
D3 750
SD 1000
Total Door Installation

Thai Aluminium
Size
Location Work At Length
mm
W 1500
W1 1200
W2 1000
HW 2400
HW1 1800
HW2 750
Total

Tiles Work
Size
Location Work At Length
mm
Floor Tiles
GF+1F 12761.8588101
Skirting Side Wall 59550
Inside Wall 73060
Deduct D1 1500
D2 1050
D3 750
Wall 73060
Deduct Stair portion 3650
Total Floor Tiles
Wall Tiles Toilet(GF) 6410
Toilet(1F) 6000
Sink area 1250
WIC ,PRTE colling 21350
Deduct W 1500
HW2 600
SLD 1800
D1 1200
D3 750
Total Wall Tiles
Stair Tiles
Step 1500
Waist slab 5500
Laning 1500
Skirting 29446
Total

Reinforcement Wo
Main Bar No. of Item
Footing For Footing (16mm) F1 2
For Footing (16mm) F2 2
For Footing (16mm) F3 3
For Footing (16mm) F4 5
For Footing (16mm) F5 3
Column Below GB C1 column 7
7
Seimic Hook (10mm) 7
Tie (10mm) 7
C2 column 1
Seimic Hook (10mm) 1
Tie (10mm) 1
C3 column 2
Seimic Hook (10mm) 2
Tie (10mm) 2
C4 column 3
3
Seimic Hook (10mm) 3
Tie (10mm) 1
C5 column 2
2
Seimic Hook (10mm) 2
Tie (10mm) 2
Column GF C1 column 7
7
Seimic Hook (10mm) 7
Tie (10mm) 7
C2 column 1
Seimic Hook (10mm) 1
Tie (10mm) 1
C3 column 2
Seimic Hook (10mm) 2
Tie (10mm) 2
C4 column 3
3
Seimic Hook (10mm) 3
Tie (10mm) 3
C5 column 2
2
Seimic Hook (10mm) 2
Tie (10mm) 2
Column 1F C1 column 7
Seimic Hook (10mm) 7
Tie (10mm) 7
C2 column 1
1
Seimic Hook (10mm) 1
Tie (10mm) 1
C3 column 2
Seimic Hook (10mm) 2
Tie (10mm) 2
C4 column 3
Seimic Hook (10mm) 3
Tie (10mm) 3
C5 column 2
Seimic Hook (10mm) 2
Tie (10mm) 2
Roof Column (Stair)
C4 column 2
Seimic Hook (10mm) 2
Tie (10mm) 2
C5 column 2
Seimic Hook (10mm) 2
Tie (10mm) 2
Grade Beam GB1 2
Stirrup (10mm) 2
GB2 1
Extra Top 1
Stirrup (10mm) 1
GB3 1
Extra Top 1
Extra Bottom 1
1
Stirrup (10mm) 1
GB4 1
Extra Top 1
Extra Bottom 1
Stirrup (10mm) 1
GB5 1
Extra Top 1
1
Extra Bottom 1
1
Stirrup (10mm) 1
GB6 1
Extra Top 1
Extra Bottom 1
Stirrup (10mm) 1
GB7 1
Extra Top 1
Stirrup (10mm) 1
Floor Beam (1F) FB1 1
Extra Top 1
Stirrup (10mm) 1
FB2 1
Extra Top 1
Stirrup (10mm) 1
FB3 1
Extra Top 1
Stirrup (10mm) 1
FB6 1
Extra Top 1
Extra Bottom 1
1
Stirrup (10mm) 1
FB7 3
Extra Top 3
Extra Bottom 3
Stirrup (10mm) 3
FB8 1
Extra Top 1
Stirrup (10mm) 1
Floor Beam (2F) FB1 1
Extra Top 1
Stirrup (10mm) 1
FB2 1
Extra Top 1
Stirrup (10mm) 1
FB3 1
Extra Top 1
Stirrup (10mm) 1
FB6 1
Extra Top 1
Extra Bottom 1
1
Stirrup (10mm) 1
FB7 3
Extra Top 3
Extra Bottom 3
Stirrup (10mm) 3
FB8 1
Extra Top 1
Stirrup (10mm) 1
Roof Beam (Stair)
B1 2
Stirrup (10mm) 2
B1 2
Stirrup (10mm) 2
Slab direction X Directiom
Bottom bar All through bottom RF (10mm) 2
2
2
2
Extra Top Edge 2
Mid 2
Y Direction 2
2
2
2
Extra top (10mm) Edge 2
Mid 2
Stair Slab Roof 1
1
1
1
Extra Top Edge 1
1
Door & Window RCC Lintel
main rod (10mm) 1
Stirrup 1
Sunshade 1
1
Stair main rod (10mm) 2
2
Binder Slope 2
2
Landing 2
Total

Patant Stone Work


Size
Location Work At Length
mm
Roof Roof Patant Stone 12769.5416053
Total

Damp Proof Admixture


Size
Location Work At
Area
m2
Patant Stone Work 163.06
Plaster 1627.15
Casting 111.58
Total

Brick Work In Foundatio


Size
Location Work At Length
mm
Brick Footing 8400
8400
8400
8400
Total Brick Work

250mm Brick Masonry W


Size
Location Work At Length
mm
PL
Above GB GB 99525
Stair 2700
2700
2700
Total

Compacted Sand Pile Found


Size
Location Work At Length
mm
F1
Total Earth filling

Dismalting Brick Work


Size
Location Work At Length
mm

Floor Level 43401.15


24000
Total Back Filling

Dismalting RCC Work


Size
Location Work At Length
mm

Floor Level 16000


6000
Total Back Filling

New H.B.B Road


Size
Location Work At Length
mm
PL
Excavation 59798
Sand Filling 59798
Ending/Edge Work 137244
Brick Soling 59498
4414
1710

Brick Work 59498


4414
1710

Total

Collapsible Gate
Size
Location Work At Length
mm
Security Door, Front CG1 2000
Total Grill work

Entry Gate (Mild Steel


Size
Location Work At Length
mm
Security Door, Front CG1 4000
Total Grill work
Earth Excavation
Size
Breath Depth Quantity Total Volume
Volume (Cu.M.)
(No's) (Cu.M.)
mm mm

1625 1800 2 9.50625 9.50625


1800 1800 2 11.664 11.664
1900 1800 3 19.494 19.494
1975 1800 5 35.105625 35.105625
2250 1800 3 27.3375 27.3375
700 650 1 3.822 3.822
Total Earth cutting 106.929375

Polythene Laying
Size
Breath Depth Quantity Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm

1325 2 3.51125 3.51125


1500 2 4.5 4.5
1600 3 7.68 7.68
1675 5 14.028125 14.028125
1950 3 11.4075 11.4075
7800 1 153.66 153.66
300 1 29.97 29.97
otal Polythene Laying 224.756875

Brick Solling
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm

1325 2 3.51125 3.51125


1500 2 4.5 4.5
1600 3 7.68 7.68
1675 5 14.028125 14.028125
1950 3 11.4075 11.4075
1200 1 4.32 4.32
7800 1 153.66 153.66
300 1 29.97 29.97
Total Brick solling 229.076875

CC Work
Size
Quantity Total Volume
Breath Depth Volume (Cum.)
(No's) (Cum)
mm mm

8400 75 1 12.789 12.789


1200 75 1 0.324 0.324
Total CC Work 13.113
Shuttering Work
Size
Quantity Total Volume
Breath Depth Volume (Sqm.)
(No's) (Sqm.)
mm mm
375 2 4.2 4.2
375 2 4.725 4.725
375 3 7.5375 7.5375
375 5 13.125 13.125
375 3 9.1125 9.1125

1800 8 28.08 28.08


1950 7 26.6175 26.6175
1650 8 39.6 39.6
1800 7 37.8 37.8
1650 8 39.6 39.6
1800 7 37.8 37.8
1650 2 6.93 6.93
1800 2 7.56 7.56
1050 1 104.50125 104.50125
1200 2 238.86 238.86
1200 1 20.22 20.22
20600 1 179.22 179.22
2805 -1 -10.23825 -10.23825
20600 1 179.22 179.22
2805 -1 -10.23825 -10.23825
4895 1 23.74075 23.74075
425 3 1.9125 1.9125
425 7 3.8675 3.8675
425 2 0.8925 0.8925
425 1 0.5525 0.5525
425 16 12.24 12.24
425 14 8.925 8.925
425 1 0.5525 0.5525
425 3 3.4425 3.4425
425 2 1.785 1.785
425 4 1.275 1.275
425 1 0.8925 0.8925
425 1 0.9775 0.9775
475 16 13.68 13.68
475 14 9.975 9.975
425 1 0.5525 0.5525
475 2 1.995 1.995
475 4 1.425 1.425
3250 2 12.35 12.35
1500 1 16.7775 16.7775
150 38 8.55 8.55
otal Shuttering Work 1090.593

RCC Casting
Size
Breath Depth Quantity Total Volume
Volume (Cu.M.)
(No's) (Cu.M.)
mm mm
1325 300 2 1.053375 1.053375
1500 300 2 1.35 1.35
1600 300 3 2.304 2.304
1675 300 5 4.2084375 4.2084375
1950 300 3 3.42225 3.42225
375 1950 8 2.6325 2.6325
375 1950 7 2.68734375 2.68734375
300 2850 8 2.565 2.565
300 2850 7 2.69325 2.69325
300 2850 8 2.565 2.565
300 2850 7 2.69325 2.69325
300 2100 2 0.4725 0.4725
300 2100 2 0.567 0.567
300 450 1 13.435875 13.435875
300 250 2 14.92875 14.92875
300 250 1 1.26375 1.26375
8400 125 2 42.63 42.63
3650 125 -2 -2.555 -2.555
4895 125 1 2.96759375 2.96759375
3040 75 2 0.9348 0.9348
125 150 3 0.084375 0.084375
125 150 7 0.170625 0.170625
125 150 2 0.039375 0.039375
125 150 1 0.024375 0.024375
125 150 16 0.54 0.54
125 150 14 0.39375 0.39375
125 150 1 0.024375 0.024375
125 150 3 0.151875 0.151875
125 150 2 0.07875 0.07875
125 150 4 0.05625 0.05625
125 150 1 0.039375 0.039375
125 150 1 0.043125 0.043125
475 125 16 1.71 1.71
475 125 14 1.246875 1.246875
425 125 1 0.0690625 0.0690625
475 125 2 0.249375 0.249375
475 125 4 0.178125 0.178125
1500 125 1 2.0971875 2.0971875
250 150 1 0.20971875 0.20971875
3100 125 2 1.35625 1.35625
Total RCC Work 111.58251875

Sand Filling
Size
Quantity Total Volume
Breath Depth Volume (Cu.M.)
(No's) (Cu.M.)
mm mm

1625 1800 2 9.50625 9.50625


1800 1800 2 11.664 11.664
1900 1800 3 19.494 19.494
1975 1800 5 35.105625 35.105625
2250 1800 3 27.3375 27.3375
8400 450 1 76.734 76.734
1200 250 1 1.08 1.08
1325 375 -2 -1.31671875 -1.31671875
1500 375 -2 -1.6875 -1.6875
1600 375 -3 -2.88 -2.88
1675 375 -5 -5.260546875 -5.260546875
1950 375 -3 -4.2778125 -4.2778125
450 300 -1 -13.435875 -13.435875
375 1425 -8 -1.92375 -1.92375
375 1425 -7 -1.963828125 -1.963828125
Total Earth filling 148.17534375

125mm Brick Masonry Work


Size
Quantity
Breath Depth Area (Sq.M.) Area (Sq.M.)
(No's)
mm mm

2850 1 107.16 107.16


2850 1 42.75 42.75
3150 1 159.1065 159.1065
2850 1 107.16 107.16
2850 1 42.75 42.75
3150 1 71.0325 71.0325
750 1 42.3 42.3
2275 1 34.92125 34.92125
150 1 2.3025 2.3025
2100 -3 -7.56 -7.56
2100 -7 -14.7 -14.7
2100 -2 -3.15 -3.15
2100 -1 -2.1 -2.1
1350 -16 -32.4 -32.4
1350 -14 -22.68 -22.68
1350 -1 -1.35 -1.35
600 -3 -4.32 -4.32
600 -2 -2.16 -2.16
450 -4 -1.35 -1.35
2100 -1 -4.41 -4.41
2100 -1 -4.83 -4.83
375 -49 -6.890625 -6.890625
Total Brick work 501.582125

Plaster Work
Size
Quantity
Breath Area (Sqm.) Total Area (Sqm.)
(No's)
mm Side

3900 1 1 158.34 158.34


3900 1 1 65.52 65.52
475 2 1 46.265 46.265
3300 1 1 133.98 133.98
3300 1 1 55.44 55.44
475 2 1 9.405 9.405
750 2 1 84.6 84.6
2375 1 1 36.45625 36.45625
150 2 1 4.605 4.605
2100 1 -1 -2.1 -2.1
1350 1 -16 -32.4 -32.4
1350 1 -14 -22.68 -22.68
1350 1 -1 -1.35 -1.35
600 1 -3 -4.32 -4.32
600 1 -2 -2.16 -2.16
450 1 -4 -1.35 -1.35
2100 1 -1 -4.83 -4.83
375 1 -49 -6.890625 -6.890625

3175 1 1 127.3175 127.3175


3175 1 1 51.7525 51.7525
3175 2 1 327.0885 327.0885
12761.85881 1 1 162.86504029 162.86504029
4030 2 1 16.523 16.523
3175 1 1 127.3175 127.3175
3175 1 1 51.7525 51.7525
3175 2 1 149.5425 149.5425
12761.85881 1 1 162.86504029 162.86504029
4030 2 1 16.523 16.523
2325 1 1 35.68875 35.68875
3650 1 1 14.69125 14.69125
2100 2 -3 -15.12 -15.12
2100 2 -7 -29.4 -29.4
2100 2 -2 -6.3 -6.3
2100 1 -1 -2.1 -2.1
1350 1 -16 -32.4 -32.4
1350 1 -14 -22.68 -22.68
1350 1 -1 -1.35 -1.35
600 1 -3 -4.32 -4.32
600 1 -2 -2.16 -2.16
450 1 -4 -1.35 -1.35
2100 1 -1 -4.41 -4.41
2100 1 -1 -4.83 -4.83
375 1 -49 -6.890625 -6.890625
Total 1627.14708058

Paint Work
Size
Quantity
Breath Area (Sqm.) Total Area (Sqm.)
(No's)
mm Side

3900 1 1 158.34 158.34


3900 1 1 65.52 65.52
525 2 1 69.09 69.09
3300 1 1 133.98 133.98
3300 1 1 55.44 55.44
750 2 1 84.6 84.6
2375 1 1 36.45625 36.45625
150 2 1 5.847 5.847
2100 1 -1 -2.1 -2.1
1350 1 -16 -32.4 -32.4
1350 1 -14 -22.68 -22.68
1350 1 -1 -1.35 -1.35
600 1 -3 -4.32 -4.32
600 1 -2 -2.16 -2.16
450 1 -4 -1.35 -1.35
2100 1 -1 -4.83 -4.83
375 1 -49 -6.890625 -6.890625
Total 531.192625

3175 1 1 127.3175 127.3175


3175 1 1 51.7525 51.7525
3175 2 1 327.0885 327.0885
12761.85881 1 1 162.86504029 162.86504029
4030 2 1 16.523 16.523
3175 1 1 127.3175 127.3175
3175 1 1 51.7525 51.7525
3175 2 1 149.5425 149.5425
12761.85881 1 1 162.86504029 162.86504029
4030 2 1 16.523 16.523
2325 1 1 3.4875 3.4875
3650 1 1 14.69125 14.69125
0 0
2100 2 -3 -15.12 -15.12
2100 2 -7 -29.4 -29.4
2100 2 -4 -12.6 -12.6
2100 1 -1 -2.1 -2.1
1350 1 -16 -32.4 -32.4
1350 1 -14 -22.68 -22.68
1350 1 -1 -1.35 -1.35
600 1 -3 -4.32 -4.32
600 1 -2 -2.16 -2.16
450 1 -4 -1.35 -1.35
2100 1 -1 -4.41 -4.41
2100 1 -1 -4.83 -4.83
375 1 -49 -6.890625 -6.890625
Total 1072.11520558

2100 2 3 15.12 15.12


2100 2 7 29.4 29.4
2100 1 1 2.1 2.1
1350 1 16 32.4 32.4
1350 1 14 22.68 22.68
1350 1 1 1.35 1.35
600 1 3 4.32 4.32
600 1 2 2.16 2.16
450 1 4 1.35 1.35
2100 1 1 4.83 4.83
375 1 49 6.890625 6.890625
Total 122.600625
Grill Work
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
1350 1 16 32.4 32.4
1350 1 14 22.68 22.68
1350 1 1 1.35 1.35
600 1 3 4.32 4.32
600 1 2 2.16 2.16
450 1 4 1.35 1.35
Total Grill work 64.26

Door Installation
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
2100 2 3 15.12 15.12
2100 2 7 29.4 29.4
2100 2 4 12.6 12.6
2100 1 1 2.1 2.1
Total Door Installation 15 59.22

Thai Aluminium
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
1350 1 16 32.4 32.4
1350 1 14 22.68 22.68
1350 1 1 1.35 1.35
600 1 3 4.32 4.32
600 1 2 2.16 2.16
450 1 4 1.35 1.35
Total 64.26

Tiles Work
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm

12761.85881 2 325.73008058 325.73008058


150 2 17.865 17.865
150 2 21.918 21.918
250 -3 -1.125 -1.125
250 -7 -1.8375 -1.8375
250 -4 -0.75 -0.75
125 -1 -9.1325 -9.1325
2800 -2 -20.44 -20.44
Total Floor Tiles 332.22808058
2100 2 26.922 26.922
2100 2 25.2 25.2
2100 1 2.625 2.625
3150 1 67.2525 67.2525
1350 -3 -6.075 -6.075
600 -4 -1.44 -1.44
2100 -1 -3.78 -3.78
2100 -1 -2.52 -2.52
2100 -4 -6.3 -6.3
Total Wall Tiles 101.8845

400 38 22.8 22.8


3050 1 16.775 16.775
3050 2 9.15 9.15
250 1 7.3615 7.3615
Total 56.0865

Reinforcement Work Length of bar


No. of Bar NO of Side (ft) Unit wt Total (Kgs)
10 2 5.0833333333 0.48107 96.1863444307
11 2 5.6666666667 0.48107 119.9456276202
12 2 6 0.48107 202.0474475956
12 2 6.25 0.48107 365.8101109741
14 2 7.1666666667 0.48107 289.6013415536
4 1 8.25 0.75166 173.6345252774
2 1 8.25 0.48107 55.5630480888
13 1 5.5 0.18792 94.0520345253
13 1 2.25 0.18792 38.4758323058
8 1 8.25 0.75166 49.609864365
13 1 5.5 0.18792 13.4360049322
13 1 2.25 0.18792 5.4965474723
8 1 8.25 0.48107 63.5006263872
13 1 5.5 0.18792 26.8720098644
13 1 2.25 0.18792 10.9930949445
4 1 8.25 0.75166 74.4147965475
6 1 8.25 0.48107 71.4382046856
13 1 5.5 0.18792 40.3080147965
13 1 2.25 0.18792 5.4965474723
10 1 7.75 0.75166 116.5080147965
2 1 8.25 0.48107 15.8751565968
13 1 5.5 0.18792 26.8720098644
13 1 2.25 0.18792 10.9930949445
4 1 12.25 0.75166 257.8209617756
2 1 12.25 0.48107 82.5027077682
21 1 5.5 0.18792 151.9302096178
21 1 2.25 0.18792 62.1532675709
8 1 12.25 0.75166 73.6631319359
21 1 5.5 0.18792 21.7043156597
21 1 2.25 0.18792 8.8790382244
8 1 12.25 0.48107 94.2888088779
21 1 5.5 0.18792 43.4086313194
21 1 2.25 0.18792 17.7580764488
4 1 12.25 0.75166 110.4946979038
6 1 12.25 0.48107 106.0749099877
21 1 5.5 0.18792 65.112946979
21 1 2.25 0.18792 26.6371146732
10 1 12.25 0.75166 184.1578298397
2 1 12.25 0.48107 23.5722022195
21 1 5.5 0.18792 43.4086313194
21 1 2.25 0.18792 17.7580764488
6 1 12.25 0.48107 247.5081233046
21 1 5.5 0.18792 151.9302096178
21 1 2.25 0.18792 62.1532675709
4 1 12.25 0.75166 36.8315659679
4 1 12.25 0.48107 23.5722022195
21 1 5.5 0.18792 21.7043156597
21 1 2.25 0.18792 8.8790382244
8 1 12.25 0.48107 94.2888088779
21 1 5.5 0.18792 43.4086313194
21 1 2.25 0.18792 17.7580764488
8 1 12.25 0.48107 141.4332133169
21 1 5.5 0.18792 65.112946979
21 1 2.25 0.18792 26.6371146732
12 1 12.25 0.48107 141.4332133169
21 1 5.5 0.18792 43.4086313194
21 1 2.25 0.18792 17.7580764488

8 1 9.25 0.48107 71.1976720099


15 1 5.5 0.18792 31.0061652281
15 1 2.25 0.18792 12.6843403206
12 1 9.25 0.48107 106.7965080148
15 1 5.5 0.18792 31.0061652281
15 1 2.25 0.18792 12.6843403206
4 1 103.83 0.48107 399.5921235019
183 1 4.50 0.18792 309.7900280238
4 1 103.83 0.48107 199.7960617509
1 1 10 0.48107 4.8106535142
183 1 4.50 0.18792 154.8950140119
4 1 43.6633333333 0.75166 131.280729963
1 1 23.0466666667 0.48107 11.086952799
1 1 3.5033333333 0.48107 1.6853322811
1 1 8.9666666667 0.75166 6.7399260173
75 1 4.50 0.18792 63.414014124
4 1 43.1633333333 0.75166 129.7774007398
1 1 16.7 0.48107 8.0337913687
1 1 12.47 0.75166 9.3732577065
75 1 4.50 0.18792 63.414014124
4 1 43.1633333333 0.75166 129.7774007398
1 1 24.28 0.48107 11.6802667324
1 1 7.7333333333 0.75166 5.8128729963
1 1 28.4433333333 0.48107 13.6831021455
1 1 4.5566666667 0.75166 3.4250850801
75 1 4.50 0.18792 63.414014124
4 1 43.1633333333 0.75166 129.7774007398
1 1 17.9333333333 0.48107 8.6271053021
1 1 17.9333333333 0.48107 8.6271053021
75 1 4.50 0.18792 63.414014124
4 1 43.1633333333 0.75166 129.7774007398
1 1 3.6033333333 0.48107 1.7334388163
75 1 4.50 0.18792 63.414014124
4 1 103.83 0.48107 199.7960617509
1 1 28.72 0.48107 13.8161968927
183 1 4.00 0.18792 137.6844568995
4 1 103.83 0.48107 199.7960617509
1 1 28.72 0.48107 13.8161968927
183 1 4.00 0.18792 137.6844568995
4 1 103.83 0.48107 199.7960617509
1 1 28.72 0.48107 13.8161968927
183 1 4.00 0.18792 137.6844568995
4 1 43.6633333333 0.75166 131.280729963
1 1 16.9333333333 0.48107 8.1460399507
1 1 3.5033333333 0.48107 1.6853322811
1 1 8.9666666667 0.75166 6.7399260173
75 1 4.00 0.18792 56.3680125546
4 1 43.1633333333 0.75166 389.3322022195
1 1 13.5266666667 0.75166 30.5025499383
1 1 8.9666666667 0.48107 12.9406579531
75 1 4.00 0.18792 169.1040376639
4 1 43.1633333333 0.48107 83.0575364735
1 1 12.14 0.48107 5.8401333662
75 1 4.00 0.18792 56.3680125546
4 1 103.83 0.48107 199.7960617509
1 1 28.72 0.48107 13.8161968927
183 1 4.00 0.18792 137.6844568995
4 1 103.83 0.48107 199.7960617509
1 1 28.72 0.48107 13.8161968927
183 1 4.00 0.18792 137.6844568995
4 1 103.83 0.48107 199.7960617509
1 1 28.72 0.48107 13.8161968927
183 1 4.00 0.18792 137.6844568995
4 1 43.6633333333 0.75166 131.280729963
1 1 16.9333333333 0.48107 8.1460399507
1 1 3.5033333333 0.48107 1.6853322811
1 1 8.9666666667 0.75166 6.7399260173
75 1 4.00 0.18792 56.3680125546
4 1 43.1633333333 0.75166 389.3322022195
1 1 13.5266666667 0.75166 30.5025499383
1 1 8.9666666667 0.48107 12.9406579531
75 1 4.00 0.18792 169.1040376639
4 1 43.1633333333 0.48107 83.0575364735
1 1 12.14 0.48107 5.8401333662
75 1 4.00 0.18792 56.3680125546

4 1 26.25 0.48107 101.0237237978


42 1 4.50 0.18792 70.3404326869
4 1 17.1666666667 0.48107 66.0663082614
38 1 4.50 0.18792 64.1904495012

163.4 1 17.75 0.1879161529 1090.0452281134


90.288 1 10.25 0.1879161529 347.8147590629
68.666666667 1 17.75 0.1879161529 458.0769420469
55.066666667 1 10.25 0.1879161529 212.1322811344
68.666666667 1 8.0233333333 0.1879161529 207.0593801891
68.666666667 1 9.2533333333 0.1879161529 238.8021767365
41.2 1 67.6666666667 0.1879161529 1047.7703575832
25.6 1 37.2033333333 0.1879161529 357.9446924784
17.75 1 67.6666666667 0.1879161529 451.405918619
11.25 1 37.2033333333 0.1879161529 157.2999136868
68.666666667 1 9.5733333333 0.1879161529 247.0604652692
68.666666667 1 22.0566666667 0.1879161529 569.2197418825
33.233333333 1 16.0333333333 0.1879161529 100.1294517057
33.066666667 1 16.1166666667 0.1879161529 100.1451113851
17.116666667 1 16.0333333333 0.1879161529 51.5711870119
17.033333333 1 16.1166666667 0.1879161529 51.5868466913
17.116666667 1 10.37 0.1879161529 33.35508582
17.033333333 1 12.52 0.1879161529 40.0744976572

4 1 294.333333333 0.18792 221.2399506782


588.66666667 1 1.8333333333 0.18792 202.8032881217
5.2 1 220.333333333 0.18792 215.3018002466
330.5 1 1.75 0.18792 108.6860049322
12 1 36.01 0.27060 233.8627046116
12 1 31.1233333333 0.27060 202.1268233785
22.2 2 5 0.18792 83.4347718866
14.302857143 1 5 0.18792 26.8773788973
8.6914285714 2 10.3333333333 0.18792 67.5080725735
Total 18329.967387668

Patant Stone Work


Size
Volume of
Bredth Thickness Area (Sqm) Total Area (Sqm)
Work (Cum)
mm mm
12769.541605 75 12.230 163.06 163.06
Total 163.06

Damp Proof Admixture


No. of Bag Of
Size Admixture
Cement Total Amount in
Required per
Volume Total Volume (Litre)
Bag(ml)
cf
431.827 123.379086817 250 30.8447717042
919.273 220.625523515 250 55.1563808787
3939.979 675.424926354 250 168.8562315884
Total 254.8573841713

Brick Work In Foundation


Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
625 150 1 5.25 0.7875
500 150 1 4.2 0.63
375 225 1 3.15 0.70875
250 150 1 2.1 0.315
Total Brick Work In Foundation 2.44125

250mm Brick Masonry Work


Size
Quantity
Breath Depth Volume (Cum.) Volume (Cum.)
(No's)
mm mm

300 175 1 5.2250625 5.2250625


750 150 1 0.30375 0.30375
500 150 1 0.2025 0.2025
250 150 1 0.10125 0.10125
Total 5.8325625

ompacted Sand Pile Foundation


Size
Quantity
Breath Depth RFT RFT
(No's)
mm FT
30 850 25500 25500
Total Earth filling 25500

Dismalting Brick Work


Size
Quantity
Breath Depth Area (Cum.) Total Area (Cum.)
(No's)
mm mm

3150 125 1 17.0892028125 17.0892028125


3150 125 1 9.45 9.45
Total Back Filling 33.1740035156

Dismalting RCC Work


Size
Quantity
Breath Depth Area (Cum.) Total Area (Cum.)
(No's)
mm mm

5700 125 1 11.4 11.4


6000 125 1 4.5 4.5
Total Back Filling 19.875

New H.B.B Road


Size
Quantity
Breath Depth Volume (Cum.) Volume (Cum.)
(No's)
mm mm

3300 600 1 118.40004 118.40004


3300 450 1 88.80003 88.80003
RM 137.244 Sqm Sqm
3000 1 178.494 178.494
4100 1 18.0974 18.0974
5177 1 8.85267 8.85267
205.44407
3000 1 178.494 178.494
4150 1 18.3181 18.3181
5177 1 8.85267 8.85267
205.66477
Total

Collapsible Gate
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
2100 1 4.2 4.2
Total Grill work 4.2

Entry Gate (Mild Steel)


Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
1800 1 7.2 7.2
Total Grill work 7.2
s
ENVIRONMENT & INFRASTRUCTURE MANAGEMENT SO
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhak
Tel: +88029113078, +8801708459575; Email: office@eim

Bill of Quantities of One Storied RCC Generator Buildin

Civil Works
SL. NO.

7
8

10

11

12

13

14

15
16

17

18

19

20

21

22

Total
CIVIL WORKS
VAT (15%)
GRAND TOTAL AMOUNT
ENVIRONMENT & INFRASTRUCTURE MANAGEMENT SOLUTIO
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka-1215,
Tel: +88029113078, +8801708459575; Email: office@eimslbd.com

Bill of Quantities of One Storied RCC Generator Building (New


Project: UNICEF GAVI Programme (HSS-2)
Location: Civil Surgeon Office, Bagherhat Sadar, Bagherhat

Civil Works
DESCRIPTION
Earth work in excavation of all kinds of soils of foundation trenches including leveling, ramming and preparing th
base, bailing out water and shoring if necessary and disposal of cutting earth to be deposited at suitable plac
(Within 30 m from the working place) etc. all complete.as per design, drawing and direction of the Engineer-in
charge.
Providing and laying double layer polythene sheet weighing 1.00kg per 6.5 sqm under footing, mat, below floo
slab, grade beam etc. all complete as per direction of EIC.
One layer of brick flat soling under foundation, floor slab, grade beam, ramp and all other areas where require
as per design with 1st class bricks in/c preparation of bed and filling the interstices with local sand, leveling in/c
costs of tools and plants etc. all complete as per direction of the engineer-in-charge.

Mass concrete works in floor, ramp, foundation and all other required area as per design with mixing ratio
1:1.5:3 with OPC cement (BDS EN-197-1-CEM I), 50% Sylhet sand (F.M. 2.4), 50% Local sand (F.M. 1.2) and picke
jhama chips including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 day
including the supply of water, electricity and other charges and costs of tools and plants etc. all complete an
accepted by the Engineer.

Shuttering Work with new wood plunk, new joint sheet as joint materials, new plain sheet including fiiting, fixing
necessary propoing(Bamboo good quality), Steel pin, 24 no. GI Wire etc all completed and accepted by th
Engineer in Cahage.

Reinforcement cement concrete works of mixing ratio 1:1.2:2.5 having specified compressive strength minimum
f'c=4000 psi or 27.5 MPa (*for normal concrete) at 28 days cylinder strength with cement confirming BDS EN 197
1-CEM I standard, best quality sylhet sand having F.M=2.4 (min.), Stone chips with size 20 mm downgraded and
should be well graded crushed stone chips including breaking chips and screening through proper sieve analysis
making , placing in position, placing of reinforcement in position; concrete mixing with mixer machine , casting i
forms , compacting by vibrator machine and curing at least for 28 days. All complete including cost of testin
materials and concrete & other charges as per direction of the engineer in charge .

Sand filling/Back Filling in foundation trenches, and plinth with fine sand or filling sand having min. F.M 0.8 in 15
mm layers including leveling, watering and consolidating each layer up to finished level to achieve standar
compaction as per design standard.
125mm Brick Masonry work with first class brick, cement BDS EN-197-1-CEM I, best quality local sand (F.M.1.2
mortar preparation with ratio 1:4 and making bond with connected wall including necessary scaffolding, rakin
out joint, cleanning, and soaking the bricks for at least 24 hours before use and washing of sand curing at least fo
7 days in all floor including cost of water, electricity, and other charges etc all complete and accepted by th
Engineer.

250mm Brick Masonry work with first class brick, cement BDS EN-197-1-CEM I, best quality local sand (F.M.1.2
mortar preparation with ratio 1:4 and making bond with connected wall including necessary scaffolding, rakin
out joint, cleanning, and soaking the bricks for at least 24 hours before use and washing of sand curing at least fo
7 days in all floor including cost of water, electricity, and other charges etc all complete and accepted by th
Engineer.

Minimum 12 mm thick Plaster with cement (BDS EN-197-1-CEM I), sand (F.M. 1.2) having mortar ratio (1:4) t
wall both inner-and outer surface, finishing the corner and edges in/c sand cleaning like seieving and washing an
curing at least for 7 days, all complete in all respect as per drawing and direction of the engineer-in-charge.

Supply & Works of Weather coat on out side wall of approved best quality like (Berger) or equivalent and colo
approved by relating authority in a sealed container, made from water based powder mixed with water (1:1
applying 85 no stone before applying primer coat like sealer to achive smoot surface, and then apply primer coa
(sealer), curing the same after 7 days, then 1st coat applied and curing the same for 7 (seven) days etc., an
further apply 2nd coat taking care and cleaning the surface fully from grease, oily substances, old paints, lim
wash, fungus, algae etc., sand papering the surface before applying 1st and 2nd coat, complete as per direction o
the engineer-in-charge.

Supplying & works of Plastic emulsion paint of approved best quality (Berger or equivalent) and color approved
by relating authority,supplied with a sealed container, made from water based powder mixed with water (1:1),
applying 85 no stone before applying primer coat like sealer to achive smoot surface, and then apply primer coat
(sealer), curing the same after 7 days, then 1st coat applied and curing the same for 7 (seven) days etc., and
further apply 2nd coat taking care and cleaning the surface fully from grease, oily substances, old paints, lime
wash, fungus, algae etc., sand papering the surface before applying 1st and 2nd coat, complete as per direction o
the engineer-in-charge.

Supplying & works of Enamel paint of grill approved best quality (Berger or equivalent) and color delivered from
authorized local agent of the manufacturer in a sealed container, applying to Grill two coats over a primer or
sealer coat elapsing specified time for drying/recoating (these sealer should be applied over red oxide) with
specified brand like (Berger or equivalent) including cleaning drying, making free from dirt, grease, wax,
removing all chalked & scaled materials, fungus, mending good the surface defects, sand papering the surface
and necessary scaffolding, spreading by brush/ roller/spray etc. all complete in all floor as per direction of the
engineer-in-charge.

Floor Finishing (Required area mentioned in the drawing) with 1-1.5" thick cement Sylhet mortar with ne
cement finishing having water/cemet ratio of grouting 0.4 including water supply, labor cost, all complete an
accepted by Engineer
Supplying, fitting and fixing window grill made of ½” x ½” M.S. solid bar 5.5” c/c with outer frame of 1.5” x ¼” F.
bar with applying red oxide over grill surface as per design approved and accepted by the Engineer.
Supplying fitting and fixing of rolling shutter of any design and shape made of 24 SWG G.P. sheet unit minimum
69 mm width having 10 mm and 12 mm dia circular folding at ends, rolled in machine, locked together properl
to form rolling shutter, top of the shutter to be fitted with circular spring made of 22 BWG sheet, containing bes
quality spring made in china, nutted with 38 mm G.I. pipe at one end and the other end nutted to shutte
including fitting the G.I. pipe again with 375x300x6 mm pankha at ends with side guide channel (side channe
consist of 50x100x6 mm M.S. plate with 2x19x3 mm F.I. bar, middle channel (if any) consist of 2x150x6 mm M.S
plate with 2x19x6 mm fixed to wall or column with clamps embedded in R.C.C. part by cement concrete (1:2:4
including cutting holes (minimum 3x25x6 mm) mending the damages, finishing, curing, bottom end of shutte
fitted to folded G.P. sheet (min 125 mm width in two layers), which is again fitted to 25x25x3 mm angle, providin
handle with F.I. bar 25x6 mm and locking arrangement in both sides, painting two coats with approved color an
brand of synthetic enamel paint over a coat of priming etc. complete in all respect accepted by the engineer. [rat
is excluding the cost of painting]

Supplying, fitting and fixing of Aluminium sliding window as per the U.S. Architectural Aluminium Manufacturer
Association (AAMA) standard specification having 1.2 mm thick outer bottom (size 75.50 mm, 32mm), 1.2 mm
thick outer top (size 75.50 mm, 16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80, 22 mm), 1.2 mm thic
shutter bottom (size 60mm, 24.40 mm), 1.2 mm thick outer side (size 75.50 mm,19.90 mm), 1.2 mm thick slidin
fixed side (size 31 mm, 26 mm),1.2 mm thick shutter lock (size 49.20 mm 26.20 mm) and 1.2 mm thick inter loc
(size 34.40 mm, 32.10 mm) sections all aluminium members (total weight kg/sqm) will be anodized to aluminium
bronze/silver colour with a coat not less than 15 micron in thickness and density of 4 mg per square cm etc
including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene
bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fittin
of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect a
per drawing and accepted by the Engineer.

Supplying, fitting, fixing of homogeneous floor tiles of size 16"x16" with approved brand (RAK, AKIJ, Best Quality
China) and color with cement (BDS EN-197-1-CEM I) sand (F.M. 1.2) mortar 1:4 base raking out joint with white
cement/putty including cutting and laying tiles in proper way, finishing, and curing for 14 days with care etc. all
completed and accecpted by the Engineer in Charge.

Special cement concrete works as Patent Stone with mixing ratio 1:1.2:2.2 of thickness 2.5" on roof for dam
proofing with net cement finishing using standard required amount of damp proofing admixture (250ml/Bag
with the best quality sylhet sand having F.M=2.4 (min.) , 5 mm or down graded crushed stone pie chips an
cement standard BDS EN 197-1-CEM I including breaking chips and screening through proper sieve analysis
making , placing in position, placing of reinforcement in position; concrete mixing with mixer machine , casting i
forms , compacting by vibrator machine and curing at least for 21 days. All complete and accepted by th
Engineer in Charge.

Admixture For Damp Proof (250 ml per Bag of cement) named Foam Lube or equivalent availabe in market.

Supplying, fabrication and fixing to details as per design M.S deformed bar as reinforcement of required size an
length for all types of RCC work in/c straightening the rod, removing rusts, cleaning, cutting, hooking, bending
binding with 24 no. GI wire, placing the bars in position, in/c lapping, spacing and securing them in position b
concrete blocks, metal chairs, etc. complete as per specifications, drawings and direction of the Engineer-in
charge. (60G Deformed Bar with 420 Mpa Yield Strength)

CO2, Gas Type Fire Extinguisher, Capacity 5kg, with filling agent 99% Co2 Gas, Cylinder size D114*H475, thicknes
Ck45-4mm, neck Ring, Flat bottom, Brush Vulve with top hanger loop, black hose and working pressure 150 Ba
with fitting fixing all completed as per Engineer in Charge.
Total
CIVIL WORKS
VAT (15%)
GRAND TOTAL AMOUNT
OLUTION (EIMS) LIMITED
a-1215, Bangladesh
mslbd.com

g (New Construction)
Client: UNICEF Bangladesh
Date: 13/9/2018

Unit Quantity Rate Taka Remarks

Cum 13.50 470 6,345

Sqm 9.00 25 225

Sqm 28.64 420 12,029

Cum 0.30 8,300 2,511

Sqm 100.95 510 51,485

Cum 11.07 14,070 155,818

Cum 16.57 610 10,109


Sqm 36.54 954 34,859

Cum 2.47 7,005 17,285

Sqm 130.07 320 41,623

Sqm 70.74 221 15,634

Sqm 61.37 215 13,195

Sqm 11.70 221 2,586

Sqm 2.31 430 993

Sqm 4.14 2,416 10,002


Sqm 3.78 5,300 20,034

Sqm 4.14 3,335 13,807

Sqm 17.96 2,100 37,706

Sqm 20.00 830 16,600

Litre 9.28 245 2,274

Kgs 1519.58 95 144,360

No's 1.00 4,000 4,000

613,478
613,478
92,022
705,500
UNICEF GAVI HSS-2 PROGRAMME
Civil Works
DESCRIPTION OF WORK Quantity Unit
Earth Excavation 13.50 m3
Polythene Laying 9.00 m2
Brick Solling 28.64 m2
CC Work 0.30 m3
Shuttering Work 100.95 m2
RCC Casting 11.0745 m3
Sand Filling 16.57 m3
125mm Brick Masonry Work 36.54 m2
250mm Brick Masonry Work 2.4675 m3
Plaster Work 130.070436 m2
Weather Coat 70.74 m2
Plastic Paint 61.370436 m2
Enamel Paint 11.7 m2
Net Cement Finishing (Floor) 2.31 m2
Grill Work 4.14 m2
Shutter Door Installation 3.78 m2
Thai Aluminium 4.14 m2
Tiles 17.955436 m2
Patent Stone 20 m2
Damp Proof Admixture 9.2803472586 Litre
Reinforcement Work 1519.58 kg
Fire Extinguisher 1 Nos

Earth Excavation
Size
Location Work At Length
mm
Foundation
Excavation for Footing Below EGL 1500

Total Earth Excavation

Polythene Laying
Size
Location Work At Length
Location Work At
mm
Foundation
Below EGL 1500
Total Polythene Laying

Brick Solling
Size
Location Work At Length
mm
Foundation
Below Footing 1500
Below GB 15600
Floor Area 3400
Total Solling work

CC Work
Size
Location Work At Length
mm
Generator Platform
GF 2200
Total CC Work

Shuttering Work
Size
Location Work At Length
mm

Footing 5100
Column Upto PL 1800
PL to 1st Floor 1500
GB 16800
FB 16800
GF Floor Side 18000
Top Floor Slab 5300
Sunshade R/s 1500
1050
Door Sunshade 2200
Lintel WH 1050
W1 1500
Door 2200
Total Shuttering work

RCC Casting
Size
Location Work At Length
mm

Footing Below EGL 1200


Short Column Below EGL to PL 375
Column 300
Floor Slab 5000
GRADE BEAM GB 17000
Floor Beam FB 17000
Roof slab 5000
Sunshade R/s 1350
Door 1950
Lintel HW 1050
Lintel W1 1500
Door Lintel 2100
Total RCC Casting

Sand Filling
Size
Location Work At Length
mm
PL
Back Filling Footing 1500
PL 4400
Deduct Footing 1200
Column 375
Sand Filling

125mm Brick Masonry Work


Size
Location Work At Length
mm

Outside 15600
Parapet Wall 15600
Deduct R/S 1800
HW 750
W1 1200
Total Brick Work

250mm Brick Masonry Work


Size
Location Work At Length
mm

GF Above GB 17000
Stair 2100
Total Brick Work

Plaster Work
Size
Location Work At Length
mm
Outside
Outside Outside Wall 18000
Parapat wall 18000
Sunshade (Door) 2100
Sunshade (Window) 1500
1050
Deduct R/S 1800
HW 750
W1 1200
Total

Inside Inside wall 17200


Ceiling 4206
Deduct R/S 1800
HW 750
W1 1200
Total
Total Plaster Work

Paint Work
Size
Location Work At Length
mm
Weather Coat
Outside Outside Wall 18000
Parapat wall 18000
Sunshade (Door) 2100
Sunshade (Window) 1500
1050
Deduct Outside Wall 1800
Parapat wall 750
W1 1200
Total Weather Coat
Plastic Paint
Inside Inside wall 17200
Ceiling 4206
Deduct R/S 1800
HW 750
W1 1200
Total Plastic Paint
EE
Enamel Paint W1 1200
HW 750
Steel shutter door 1800
Total Enamel Paint

Net Cement Finishing (Floor)


Size
Location Work At Length
mm

GF Generator Base 2100


Total net Cement Finishing (Floor)

Grill Work
Size
Location Work At Length
mm
GF W1 1200
HW 750
Total Grill Work

Shutter Door Installation


Size
Location Work At Length
mm

GF Steel shutter door 1800


Total Shutter Door Installation

Thai Aluminium
Size
Location Work At Length
mm

Floor Level W1 1200


HW 750
Total Thai Work

Tiles
Size

Location Work At Length

mm

Scarting wall 17900


Floor Floor 4206
Deduct Gennerator Platform 2200
Total Tiles Work

Patent Stone
Size
Location Work At Length
mm

Roof Floor 5000


Total Patent Stone Work

Damp Proof Admixture


Size
Location Work At
Area
m2
Plaster 130.07
Casting 20.00
Total Damp Proof Admixture

Reinforcement Work
Main Bar No. of Item
Footing For Footing (12mm) F1 4
Column Below GB Main Reinforcement(16mm) 4
Seimic Hook (10mm) 4
Tie (10mm) 4
Column Above Top Main Reinforcement(16mm) 4
Seimic Hook(10mm) 4
Tie (10mm) 4
Grade Beam Main GB1(16mm) 2
2
Stirrup (10mm) 1
Floor Slab Long Rod (10mm) 1
Short Rod (10mm) 1
Floor Beam B1 (16mm) 2
2
Stirrup (10mm) 1
Slab Roof Slab 1
1
Lintel 1
1
Sunshade (Door) 1
1
Total Reinforcement
Earth Excavation
Depth
Quantity Volume Total Volume
Breath (No's) (Cu.M.) (Cu.M.)
mm

1500 1500 4 13.50 13.50

h Excavation 13.50

Polythene Laying
Depth
Quantity Volume Total Volume
Breath mm (No's) (Sqm.) (Sqm.)
Quantity Volume Total Volume
(No's) (Sqm.) (Sqm.)
mm

1500 4 9.00 9.00


thene Laying 9.00

Brick Solling
Depth
Quantity Volume Total Volume
Breath mm (No's) (Sqm.) (Sqm.)
mm

1500 4 9.00 9.00


300 1 4.68 4.68
4400 1 14.96 14.96
olling work 28.64

CC Work
Depth
Quantity Volume Total Volume
Breath mm (No's) (Cum.) (Cum.)
mm

1100 125 1 0.30 0.30


CC Work 0.30

Shuttering Work
Depth
Quantity Volume Total Volume
Breath mm (No's) (Sqm.) (Sqm.)
mm

350 4 7.14 7.14


1650 4 11.88 11.88
2650 4 15.9 15.9
1150 1 19.32 19.32
850 1 14.28 14.28
130 1 2.34 2.34
4300 1 22.79 22.79
575 2 1.725 1.725
575 2 1.2075 1.2075
575 1 1.265 1.265
425 2 0.8925 0.8925
425 2 1.275 1.275
425 1 0.935 0.935
ttering work 100.95

RCC Casting
Depth
Quantity Volume Total Volume
Breath mm (No's) (Cu.M.) (Cu.M.)
mm

1200 300 4 1.728 1.728


300 1650 4 0.7425 0.7425
300 2650 4 0.954 0.954
4000 112 1 2.24 2.24
250 300 1 1.275 1.275
250 300 1 1.275 1.275
4000 125 1 2.5 2.5
450 125 1 0.0759375 0.0759375
450 125 1 0.1096875 0.1096875
150 125 2 0.039375 0.039375
150 125 2 0.05625 0.05625
150 125 2 0.07875 0.07875
CC Casting 11.0745

Sand Filling
Depth
Quantity Volume Total Volume
Breath mm (No's) (Cu.M.) (Cu.M.)
mm

1500 1500 4 13.50 13.50


3500 400 1 6.16 6.16
1200 375 -4 -2.16 -2.16
375 1650 -4 -0.93 -0.93
d Filling 16.57

m Brick Masonry Work


Depth
Quantity Volume Total Volume
Breath mm (No's) (Sqm.) (Sqm.)
mm

2700 1 42.12 42.12


150 1 2.34 2.34
2100 -1 -3.78 -3.78
600 -2 -0.9 -0.9
1350 -2 -3.24 -3.24
rick Work 36.54

m Brick Masonry Work


Depth
Quantity Volume Total Volume
Breath mm (No's) (Sqm.) (Sqm.)
mm

300 175 1 0.8925 0.8925


250 150 3 1.575 1.575
rick Work 2.4675

Plaster Work
Depth
Breath mm Quantity Area (Sqm.) Total Area (Sqm.)
(No's)
mm

3600 1 64.8 64.8


450 1 8.1 8.1
400 2 1.68 1.68
400 2 1.2 1.2
400 2 0.84 0.84
2100 -1 -3.78 -3.78
600 -2 -0.9 -0.9
1350 -2 -3.24 -3.24
Total 68.7

3000 1 51.6 51.6


4206 1 17.690436 17.690436
2100 -1 -3.78 -3.78
600 -2 -0.9 -0.9
1350 -2 -3.24 -3.24
Total 61.370436
aster Work 130.070436

Paint Work
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm

3600 1 64.8 64.8


450 1 8.1 8.1
400 2 1.68 1.68
400 4 2.4 2.4
400 4 1.68 1.68
2100 -1 -3.78 -3.78
600 -2 -0.9 -0.9
1350 -2 -3.24 -3.24
eather Coat 70.74

3000 1 51.6 51.6


4206 1 17.690436 17.690436
2100 -1 -3.78 -3.78
600 -2 -0.9 -0.9
1350 -2 -3.24 -3.24
astic Paint 61.370436

1350 2 3.24 3.24


600 2 0.9 0.9
2100 2 7.56 7.56
namel Paint 11.7

ement Finishing (Floor)


Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm

1100 1 2.31 2.31


nt Finishing (Floor) 2.31

Grill Work
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm
1350 2No's 3.24 3.24
600 2 0.9 0.9
Grill Work 4.14

tter Door Installation


Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm

2100 1 3.78 3.78


Door Installation 3.78

Thai Aluminium
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm

1350 2No's 3.24 3.24


600 2 0.9 0.9
Thai Work 4.14

Tiles
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm

150 1 2.685 2.685


4206 1 17.690436 17.690436
1100 -1 -2.42 -2.42
iles Work 17.955436

Patent Stone
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm

4000 1 20 20
nt Stone Work 20

mp Proof Admixture
No. of Bag Of
Size Admixture
Cement Total Amount in
Required per
Area in Total Volume (Litre)
Bag(ml)
Sf Cf
1400.203 91.8768484772 22.0504436345 250 5.5126109086
215.299 62.7956058333 15.0709454 250 3.76773635
dmixture 9.2803472586

einforcement Work
Length of bar
No. of Bar NO of Side (ft) Unit wt Total (Kgs)
12 2 4.5 0.27067 116.928814171
4 1 7.5 0.48107 57.7278421702
15 1 4.3333333333 0.18792 48.8581997534
15 1 2.25 0.18792 25.3686806412
4 1 10.3333333333 0.48107 79.5361381011
23 1 3.25 0.18792 56.0964515687
23 1 1.50 0.18792 25.8906699548
4 1 17.4166666667 0.48107 67.0284389642
4 1 14.0833333333 0.48107 54.2000295931
95 1 2.92 0.18792 51.96693611
33 1 15.83 0.18792 97.234081381
41 1 12.50 0.18792 95.5553637485
4 1 17.4166666667 0.48107 67.0284389642
4 1 14.0833333333 0.48107 54.2000295931
95 1 2.9166666667 0.18792 51.96693611
45.48 2 15.2 0.18792 259.8113696671
37.48 2 18.5333333333 0.18792 261.0641440197
4 1 24 0.18792 18.0399506782
48 1 1.4 0.18792 12.6279654747
3 1 15.5 0.18792 8.7381011097
31 1 1.6666666667 0.18792 9.709001233
nforcement 1519.58
753.2
ENVIRONMENT & INFRASTRUCTURE MANAGEMENT SOLUTION (EIMS) LIMITED
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka-1215, Bangladesh
Tel: +88029113078, +8801708459575; Email: office@eimslbd.com

Bill of Quantities of Septic Tank & Soak Pit


Project: UNICEF GAVI Programme (HSS-2) Client: UNICEF Bangladesh
Date: 13/9/2018

Civil Works
SL. NO. DESCRIPTION Unit Quantity Rate Taka Remarks
Earth work in excavation of all kinds of soils of foundation trenches including leveling, ramming and preparing the base, bailing out
1 water and shoring if necessary and disposal of cutting earth to be deposited at suitable place (Within 30 m from the working place) Cum 26.01 470 12,224
etc. all complete.as per design, drawing and direction of the Engineer-in-charge.

2 Providing and laying double layer polythene sheet weighing 1.00kg per 6.5 sqm under footing, mat, below floor slab, grade beam Sqm 9.36 25 234
etc. all complete as per direction of EIC.
One layer of brick flat soling under foundation, floor slab, grade beam, ramp and all other areas where required as per design with
3 1st class bricks in/c preparation of bed and filling the interstices with local sand, leveling in/c costs of tools and plants etc. all Sqm 9.36 420 3,932
complete as per direction of the engineer-in-charge.

Mass concrete works in floor, ramp, foundation and all other required area as per design with mixing ratio 1:1.5:3 with OPC cement
4 (BDS EN-197-1-CEM I), 50% Sylhet sand (F.M. 2.4), 50% Local sand (F.M. 1.2) and picked jhama chips including breaking chips, Cum 1.40 8,300 11,656
screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, electricity and other
charges and costs of tools and plants etc. all complete and accepted by the Engineer.

Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar (1:4) in foundation and plinth, filling the joints/interstices
5 fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 Cum 13.23 6,700 88,644
days etc. all complete including cost of water, electricity and other charges and accepted by the Engineer.(Cement: CEM-I/A-M)

Shuttering Work with new wood plunk, new joint sheet as joint materials, new plain sheet including fiiting, fixing, necessary
6 propoing(Bamboo good quality), Steel pin, 24 no. GI Wire etc all completed and accepted by the Engineer in Cahage.
Sqm 9.36 510 4,775

Reinforcement cement concrete works of mixing ratio 1:1.2:2.5 having specified compressive strength minimum f'c=4000 psi or
27.5 MPa (*for normal concrete) at 28 days cylinder strength with cement confirming BDS EN 197-1-CEM I standard, best quality
7 sylhet sand having F.M=2.4 (min.), Stone chips with size 20 mm downgraded and it should be well graded crushed stone chips Cum 1.51 14,070 21,314
including breaking chips and screening through proper sieve analysis , making , placing in position, placing of reinforcement in
position; concrete mixing with mixer machine , casting in forms , compacting by vibrator machine and curing at least for 28 days. All
complete including cost of testing materials and concrete & other charges as per direction of the engineer in charge .

Sand filling/Back Filling in foundation trenches, and plinth with fine sand or filling sand having min. F.M 0.8 in 150 mm layers
8 including leveling, watering and consolidating each layer up to finished level to achieve standard compaction as per design Cum 22.16 610 13,518
standard.
Floor Finishing (Required area mentioned in the drawing) with 1-1.5" thick cement Sylhet mortar with net cement finishing having
9 Sqm 95.84 430 41,211
water/cemet ratio of grouting 0.4 including water supply, labor cost, all complete and accepted by Engineer.

Supplying, fabrication and fixing to details as per design M.S deformed bar as reinforcement of required size and length for all
types of RCC work in/c straightening the rod, removing rusts, cleaning, cutting, hooking, bending, binding with 24 no. GI wire,
10 Kgs 164.78 95 15,654
placing the bars in position, in/c lapping, spacing and securing them in position by concrete blocks, metal chairs, etc. complete as
per specifications, drawings and direction of the Engineer-in-charge. (60G Deformed Bar with 420 Mpa Yield Strength)

11 Additional Coarse sand, khoa & Brick bats use in soak pit by the direction of Engineer-in-charge. set 1.00 2,000 2,000
Inspection Pit of dimension 2'x2' with 1st class bricks with cement and sand including earthwork, brickwork, pit slab, finishing work
12 all completed as per direction of Engineer in charge.
Nos 4.00 4,000 16,000

Total 231,163
Summary
Total Civil work 231,163
Civil Works
SL.NO DESCRIPTION OF WORK Quantity Unit
1 Earth Excavation 26.008 m3
2 Polythene Laying 9.363 m2
3 Brick Solling 9.363 m2
4 CC Work 1.404 m3
5 Brick work in Foundation 13.230 m3
6 Shuttering Work 9.363 m2
7 RCC Casting 1.515 m3
8 Sand Filling 22.161 m3
9 Net Cement Finishing 95.840 m2
10 Reinforcement Work 164.781 kgs

Earth Excavation
Size
Location Work At Length
mm
Foundation
Septic Tank Below EGL 2350
500
Soak Pit 0.7854
Total Earth cutting

Polythene Laying
Size
Location Work At Length
mm
Foundation
Septic Tank Below EGL 3750
500
Total Polythene Laying

Brick Solling
Size
Location Work At Length
mm
Foundation
Septic Tank Below EGL 3750
500
Total Brick solling
CC Work
Size
Location Work At Length
mm
Foundation
Septic Tank Below GL 3750
500
Total CC Work

Shuttering Work
Size
Location Work At Length
mm
Septic Tank Below EGL 3750
500
Total Shuttering Work

RCC Casting
Size
Location Work At Length
mm
Septic Tank Below EGL 2350
500
Soak Pit Below EGL 3.1416
250
600
Total RCC Work

Sand Filling
Size
Location Work At Length
mm

F1 Below EGL 4700


F2 0 500
F3 Below EGL 4869.48
Total Earth filling

Net Cement Finishing


Size
Location Work At Length
mm
Outside
Tank 16900
Rcc Cover Top & Bottom 2350
3298.68
3298.68
600
Total

Brick Work In Foundatio


Size
Location Work At Length
mm
Septic Tank Brick Footing 12200
12200
12200
2350
Soak Pit 4869.48
Total Brick Work In Foundati

Reinforcement Wo
Main Bar No. of Item
Septic Tank 2
2
4
3
4
Total Reinforcement
Earth Excavation
Size
Quantity Total Volume
Breath Depth Volume (Cu.M.)
(No's) (Cu.M.)
mm mm

3750 1750 1 15.421875 15.421875


1100 1750 1 0.9625 0.9625
2402500 5100 1 9.62330985 9.62330985
Total Earth cutting 26.00768485

Polythene Laying
Size
Breath Depth Quantity Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm

2350 1 8.8125 8.8125


1100 1 0.55 0.55
Total Polythene Laying 9.3625

Brick Solling
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm

2350 1 8.8125 8.8125


1100 1 0.55 0.55
Total Brick solling 9.3625
CC Work
Size
Quantity Total Volume
Breath Depth Volume (Cum.)
(No's) (Cum)
mm mm

2350 150 1 1.321875 1.321875


1100 150 1 0.0825 0.0825
Total CC Work 1.404375

Shuttering Work
Size
Quantity Total Volume
Breath Depth Volume (Sqm.)
(No's) (Sqm.)
mm mm
2350 1 8.8125 8.8125
1100 1 0.55 0.55
Total Shuttering Work 9.3625

RCC Casting
Size
Quantity Total Volume
Breath Depth Volume (Cu.M.)
(No's) (Cu.M.)
mm mm
3750 112.5 1 0.99140625 0.99140625
1100 112.5 1 0.061875 0.061875
1550 375 1 0.001826055 0.001826055
375 1550 4 0.58125 0.58125
600 112.5 -3 -0.1215 -0.1215
Total RCC Work 1.514857305

Sand Filling
Size
Quantity Total Volume
Breath Depth Volume (Cu.M.)
(No's) (Cu.M.)
mm mm

7500 500 1 17.625 17.625


1100 500 1 0.275 0.275
1750 500 1 4.260795 4.260795
Total Earth filling 22.160795

Net Cement Finishing


Size
Quantity
Breath Area (Sqm.) Total Area (Sqm.)
(No's)
mm Side

1750 1 1 29.575 29.575


3750 2 1 17.625 17.625
5100 1 1 16.823268 16.823268
5150 2 1 33.976404 33.976404
600 -2 3 -2.16 -2.16
Total 95.839672

Brick Work In Foundation


Size
Quantity
Breath Depth Volume (Cum) Total Area (Cum.)
(No's)
mm mm
500 275 1 1.6775 1.6775
375 600 1 2.745 2.745
250 650 1 1.9825 1.9825
150 1750 1 0.616875 0.616875
250 5100 1 6.208587 6.208587
Total Brick Work In Foundation 13.230462

Reinforcement Work Length of bar


No. of Bar NO of Side (ft) Unit wt Total (Kgs)
13 1 11.5833333333 0.18796 58.4747898738
21 1 8.0833333333 0.18796 65.1161941424
5 1 5.1666666667 0.18796 19.4229747476
8 1 4 0.18796 18.0445700881
2.5833333333 1 1.9166666667 0.18796 3.7227368266
Total Reinforcement 164.78
Environment & Infrastructure Management Soluti
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka
Tel: +88029113078, +8801708459575; Email: office@eim

Bill of Quantities of One storied RCC building for EPI Renovation and
Project: UNICEF GAVI Programme (HSS-2)
Location: Civil Surgeon Office, Bagherhat Sadar, Bagherhat

Sl. No. Description of Item in Short

INTERNAL ELECTRICAL WORKS


1 P.V.C Concealed Conduit Wiring
PVC concealed conduit wiring for following point looping at the GANG SWITCH MK TYPE BOARD with earth terminal including circuit wiri
PVC insulated and sheathed stranded cable (BYM) & 1.5 sq.mm PVC insulated green/white coloured ECC wire (BYA) through minimum 3/4" d
SWG GP sheet, with 3mm thick ebonite sheet cover only for celling rose, 10 Amp-MK TYPE GANG SWITCH ., ceiling rose, fixing materials et
mending the damages good (all electrical contacts shall be of brass/copper). Cable should be M/s. Eastern Cables Ltd. or approved equivalent

i. Light/Exhaust or wall bracket fan point


ii. Fan point
iii. Calling bell point with bell push (instead of switch)
iv. 2-pin 6 Amps socket point (outlet) with control switch on switch board
2 PVC concealed conduit wiring through minimum 3/4'' thick and 1'' thick PVC concealed conduit with the following size(s) single-core (
sheathed Cable (manufactured by M/S. Eastern Cables Ltd. or approved best quality).

i. 1C-2x2.5mm2 BYM cable with 2.5mm² (BYA) ECC wire through through minimum 1'' thick PVC pipe
ii. 1C-2x4mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC Pipe
iii. 1C-2x6mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC pipe
iv. 1C-2x10mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC pipe
v 1C-4x16mm2 BYM Cable with 6mm2 (BYA) ECC through minimum 1.5'' thick PVC pipe or trench.

3 Distribution/Sub-Distribution/Meter/ Machine Box:


Supply, fitting and installation of distribution/Sub-distribution/ Meter /Machine box of size(s) in the bill of quantities for housing the required in
breakers and bus-bars etc. The distribution box shall be made of 18 SWG galvanized steel sheet and should be of suitable dimension
breakers, cut-out and bus-bars with sufficient spacing. The box shall be spray painted with grey/white synthetic enamel paint, shall have knoc
and exit, a copper plate earthing block must be provided inside the box. In all cases sufficient gap must be maintained between the bus-bars a
The rate shall be inclusive of platform/channel for fixing MCB's copper washer, handle, system locking arrangement with lock (China) on
earthing block etc. all complete in all respect as per direction of the Engineer-in-Charge.

i. Box size: 915 x 915x 150mm (MDB)


ii. Box size: 600 x 450 x 125mm (SDB)
4 Bus-bar
Supply of copper bus-bar of size(s) mentioned in the bill of quantities with appropriate size of ebonite sheet cover of 3mm thickness and instal
steeli.box, supplying
25 x 4.7 xnecessary insulators, nut-bolts and fixing hardware etc. complete in all respect as per direction of the Engineer-in-Charge.
200mm SP&N
5 Providing and fixing on a prepared board 250/500 volts grade following single /triple/pole Circuit breaker (SP MCB/TP MCCB) Brand & countr
MCCBs i. as 6A
Siemens (Germany/USA,
- 32A SP MCB (6 KA) MEM (England), Dorman Smith (England) AEG (Germany).
ii. 63A MCCB (25 KA)
iii. 40A TP MCB(10 KA)

6 Light Fittings:
a Saucer light fitting with shade, brass holder, bracket earth terminal and necessary wiring etc. (without lamp).
i.
b Security Light
Water tight light fitting with cast aluminium base, splited aluminium cover, brass holder, earth terminal, wiring etc. (without lamp).
i.

7 Providing fitting and fixing following type fluorescent/ Incandescent Lamp.


a. 1.22m long 40W fluorescent tube light (Eastern or Tosiba)
b. 100W Incandescent lamp (Phillips)
c. LED & XENON BULB, 1x4'-0" , 20 Watt T5AC LED Tub lamp
8 Fan Items:
Supply and installation of A.C. Capacitor type ceiling fan of sizes as mentioned in the bill of quantities complete ith 16mm dia 3.048m (or of re
downi. rod, blades,
1400mm canopy,
Sweepcapacitory, regulator,
or Delux, GEC brandconnecting PVC
or equivalent wire etc.by
approved allEngineer-in-Charge
complete in all respect as per direction of the Engineer-in-Charge
Exhaust Fan Items:
Supply and installation of following axial flpow A.C. Capacitor type wall mounted exhaust fan fan complete with blade, steel or plastic fram stan
PVC i.insulated
375connecting
mm exhaustwire
fanetc. complete
plastic icluding cutting
body approved wall and mending good the damages as per direction of the Engineer-in-Charge.
by Engineer-in-Charge
ii. 375 mm in-let fan plastic body approved by Engineer-in-Charge
9 Fan box:
i. Providing fan box & fixing of U-type Fan clamp made of 16mm dia M.S. Rod hook.
10 Socket Out-let (Concealed/Surface):
a. Supply and installation of 250 volts single phase 3-pin 16A combined switch socket outlet (MK England or equivalent produc
France/Japan/Itally/
i. Sweden/ Switzerland/Australia) mounted on required size 18 SWG galvanized plain sheet box of 76.2mm de
ii.
iii.
10 Earthing System
Earthing the electrical installation with 40mm (1.5") dia G.I. pipe (Earth electrode) having 6.35mm dia hole across the pipe of 305mm interval
nos. i.of Nos.Depth
2 SWG HDBC
of Main earth leads
Electrode with its protection
at 12192mm (40 ft) by 20mm (3/4") dia G.I. pipe up to pinth level run of a depth of 609.6mm (2 ft) below
ii. Earth inspection pit (sizes 600 x 600 x 600) including R.C.C. slab, top cover with hook).
11 Energy Meter
Providing and fixing of following rating 230V, 50 Hz, single/ three phase electric energy meter (KWH meter) steel body with glass cover on prep
(i) 10A to 40Amp (3-phase) Energy meter (PDB/REB approved).
L.T. Line connection PDB/REB charges including load security deposit.
12 PVC pipe
Supply & Installaton of following size(s) of through minimum PVC pipe as per direction, in floor in walls and where necessary (including n
and
(i) mending good all20mm
Minimum damages done) work
& minimum wall required
thicknessto1.5mm
be done within such a time as not to retard the progress of civil works complete with
(ii) Minimum 25mm & minimum wall thickness 1.5mm
(iii) Minimum 50mm & minimum wall thickness 2.5mm
13 Switch Board
Supply, fitting and fixing of 18 SWG G.P. sheet made switch board of the following size having threaded ears at the four corners for fixing the
counter sunk galvanized machine screws & complete with necessary accessories etc.
(i) 76mm x 101mm x 50mm
(ii) 101mm x 152mm x 50mm
(iii) 203mm x 304mm x 76mm
(iv) 304mm x 304mm x 76mm
14 Switch Board
Gang Switch Supply, fitting and fixing of 18 SWG MK Back box. sheet made switch board of the following size having threaded ears at the fo
with
(i) counter4 sunk
Ganggalvanized
Switch machine screws & complete with necessary accessories etc.
(ii) 3 Gang Switch
(iii) 2 Gang Switch
(iv) 1 Gang Switch

15 Auto Transfer Switch


TPMCB of required rating for over load and instaneous short circuit release, auto start and auto change over to load within 10 secduring norma
stop
Totaland
for auto change
Internal over toWorks
Electrical normal supply within 5 minites after restoration of normal power supply indicator for three phase ON-OFF - Trip e
Total Electric work including VAT (15%)
Total
In Word: Eleven Lakh Forty Five Thousand Two Hundred Nine BDT Only.
Environment & Infrastructure Management Solution (EIMS) Lim
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka-1215, Bangladesh
Tel: +88029113078, +8801708459575; Email: office@eimslbd.com

Bill of Quantities of One storied RCC building for EPI Renovation and Extension (Electr
oject: UNICEF GAVI Programme (HSS-2)
cation: Civil Surgeon Office, Bagherhat Sadar, Bagherhat

Description of Item in Short

ERNAL ELECTRICAL WORKS


C Concealed Conduit Wiring
C concealed conduit wiring for following point looping at the GANG SWITCH MK TYPE BOARD with earth terminal including circuit wiring with IC-2x1.5 sq.mm
C insulated and sheathed stranded cable (BYM) & 1.5 sq.mm PVC insulated green/white coloured ECC wire (BYA) through minimum 3/4" dia PVC Pipe MK type 18
G GP sheet, with 3mm thick ebonite sheet cover only for celling rose, 10 Amp-MK TYPE GANG SWITCH ., ceiling rose, fixing materials etc. as required including
nding the damages good (all electrical contacts shall be of brass/copper). Cable should be M/s. Eastern Cables Ltd. or approved equivalent quality.

Light/Exhaust or wall bracket fan point


Fan point
Calling bell point with bell push (instead of switch)
2-pin 6 Amps socket point (outlet) with control switch on switch board
C concealed conduit wiring through minimum 3/4'' thick and 1'' thick PVC concealed conduit with the following size(s) single-core (1C) PVC insulated and
athed Cable (manufactured by M/S. Eastern Cables Ltd. or approved best quality).

1C-2x2.5mm2 BYM cable with 2.5mm² (BYA) ECC wire through through minimum 1'' thick PVC pipe
1C-2x4mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC Pipe
1C-2x6mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC pipe
1C-2x10mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC pipe
1C-4x16mm2 BYM Cable with 6mm2 (BYA) ECC through minimum 1.5'' thick PVC pipe or trench.

ribution/Sub-Distribution/Meter/ Machine Box:


ply, fitting and installation of distribution/Sub-distribution/ Meter /Machine box of size(s) in the bill of quantities for housing the required incoming/ outgoing circuit
akers and bus-bars etc. The distribution box shall be made of 18 SWG galvanized steel sheet and should be of suitable dimension to accommodate circuit
akers, cut-out and bus-bars with sufficient spacing. The box shall be spray painted with grey/white synthetic enamel paint, shall have knock outs for conduits entry
exit, a copper plate earthing block must be provided inside the box. In all cases sufficient gap must be maintained between the bus-bars and the back side of box.
rate shall be inclusive of platform/channel for fixing MCB's copper washer, handle, system locking arrangement with lock (China) one door with screws and
hing block etc. all complete in all respect as per direction of the Engineer-in-Charge.

Box size: 915 x 915x 150mm (MDB)


Box size: 600 x 450 x 125mm (SDB)
-bar
ply of copper bus-bar of size(s) mentioned in the bill of quantities with appropriate size of ebonite sheet cover of 3mm thickness and installation in a pre-fabricated
l box, supplying
25 x 4.7 xnecessary insulators, nut-bolts and fixing hardware etc. complete in all respect as per direction of the Engineer-in-Charge.
200mm SP&N
viding and fixing on a prepared board 250/500 volts grade following single /triple/pole Circuit breaker (SP MCB/TP MCCB) Brand & country of origin of SPMCB/TP
CBs as 6ASiemens (Germany/USA,
- 32A SP MCB (6 KA) MEM (England), Dorman Smith (England) AEG (Germany).
63A MCCB (25 KA)
40A TP MCB(10 KA)

t Fittings:
Saucer light fitting with shade, brass holder, bracket earth terminal and necessary wiring etc. (without lamp).
Crescent Cat No. CP-8R Equivalent Product Like as Shwash/Gloria.
Security Light
Water tight light fitting with cast aluminium base, splited aluminium cover, brass holder, earth terminal, wiring etc. (without lamp).
Crescent Cat No. CBH-20 or equivalent product like as Shwash/Gloria

viding fitting and fixing following type fluorescent/ Incandescent Lamp.


1.22m long 40W fluorescent tube light (Eastern or Tosiba)
100W Incandescent lamp (Phillips)
LED & XENON BULB, 1x4'-0" , 20 Watt T5AC LED Tub lamp
Items:
ply and installation of A.C. Capacitor type ceiling fan of sizes as mentioned in the bill of quantities complete ith 16mm dia 3.048m (or of required length) long M.S.
n rod, blades,
1400mm canopy,
Sweepcapacitory, regulator,
or Delux, GEC brandconnecting PVC
or equivalent wire etc.by
approved allEngineer-in-Charge
complete in all respect as per direction of the Engineer-in-Charge.
aust Fan Items:
ply and installation of following axial flpow A.C. Capacitor type wall mounted exhaust fan fan complete with blade, steel or plastic fram standard wall louver shutter
C insulated375connecting
mm exhaust wire
fanetc. complete
plastic icluding cutting
body approved wall and mending good the damages as per direction of the Engineer-in-Charge.
by Engineer-in-Charge
375 mm in-let fan plastic body approved by Engineer-in-Charge
box:
Providing fan box & fixing of U-type Fan clamp made of 16mm dia M.S. Rod hook.
ket Out-let (Concealed/Surface):
Supply and installation of 250 volts single phase 3-pin 16A combined switch socket outlet (MK England or equivalent product of Germany/ USA/UK/
France/Japan/Itally/ Sweden/ product
16A, 3-pin equivalent Switzerland/Australia) mounted on required size 18 SWG galvanized plain sheet box of 76.2mm depth etc. complete in all
like as (M.K. England)
6A, 3-pin equivalent product like as Local (Dymonic/MEP/SK/Metro)
20A, 3-pin equivalent product like as (M.K. England) (for AC)
hing System
hing the electrical installation with 40mm (1.5") dia G.I. pipe (Earth electrode) having 6.35mm dia hole across the pipe of 305mm interval securely bonded with 2
of Nos.Depth
2 SWG HDBC
of Main earth leads
Electrode with its protection
at 12192mm (40 ft) by 20mm (3/4") dia G.I. pipe up to pinth level run of a depth of 609.6mm (2 ft) below G.L. upto main board to
Earth inspection pit (sizes 600 x 600 x 600) including R.C.C. slab, top cover with hook).
rgy Meter
viding and fixing of following rating 230V, 50 Hz, single/ three phase electric energy meter (KWH meter) steel body with glass cover on prepared board.
10A to 40Amp (3-phase) Energy meter (PDB/REB approved).
Line connection PDB/REB charges including load security deposit.
C pipe
ply & Installaton of following size(s) of through minimum PVC pipe as per direction, in floor in walls and where necessary (including necessary groove cutting
mending good all20mm
Minimum damages done) work
& minimum wall required
thicknessto1.5mm
be done within such a time as not to retard the progress of civil works complete with all required accessories
Minimum 25mm & minimum wall thickness 1.5mm
Minimum 50mm & minimum wall thickness 2.5mm
ch Board
ply, fitting and fixing of 18 SWG G.P. sheet made switch board of the following size having threaded ears at the four corners for fixing the ebonite cover plate with
nter sunk galvanized machine screws & complete with necessary accessories etc.
76mm x 101mm x 50mm
101mm x 152mm x 50mm
203mm x 304mm x 76mm
304mm x 304mm x 76mm
ch Board
g Switch Supply, fitting and fixing of 18 SWG MK Back box. sheet made switch board of the following size having threaded ears at the four corners for fixing the
counter4 sunk
Ganggalvanized
Switch machine screws & complete with necessary accessories etc.
3 Gang Switch
2 Gang Switch
1 Gang Switch

o Transfer Switch
MCB of required rating for over load and instaneous short circuit release, auto start and auto change over to load within 10 secduring normal power failure and auto
aland
for auto change
Internal over toWorks
Electrical normal supply within 5 minites after restoration of normal power supply indicator for three phase ON-OFF - Trip etc complete.
Total Electric work including VAT (15%)
Total
Word: Eleven Lakh Forty Five Thousand Two Hundred Nine BDT Only.
EIMS) Limited
Bangladesh
m

nsion (Electrical Part)


Client: UNICEF Bangladesh
Date: 13/9/2018

Unit Quantity Rate Total Amount


in Taka in Taka

Point 115.00 1,080.00 124,200


Point 33.00 1,207.00 39,831
Point 1.00 1,258.00 1,258
Point 8.00 140.00 1,120

RM 500.00 191.00 95,500


RM 100.00 246.00 24,600
RM 80.00 310.00 24,800
RM 50.00 420.00 21,000
RM 100.00 475.00 47,500

Each 1.00 8,000.00 8,000


Each 2.00 3,100.00 6,200
0
0
Set 5.00 800.00 4,000

Each 32.00 370.00 11,840


Each 8.00 9,700.00 77,600
Each 2.00 1,000.00 2,000

Each 17.00 491.00 8,347

Each 4.00 1,057.00 4,228


Each 0.00 146.00 0
Each 0.00 30.00 0
Each 42.00 1,200.00 50,400

Each 33.00 3,310.00 109,230

Each 30.00 2,438.00 73,140


Each 22.00 2,438.00 53,636

Each 33.00 169.00 5,577

Each 28.00 584.00 16,352


Each 8.00 193.00 1,544
Each 10.00 584.00 5,840

Set 3.00 21,366.00 64,098


Set 3.00 5,576.00 16,728

Each 1.00 1,450.00 1,450


KW 12.00 5,000.00 60,000

RM 150.00 67.00 10,050


RM 120.00 60.00 7,200
RM 20.00 232.00 4,640

Each 5.00 50.00 250


Each 10.00 60.00 600
Each 5.00 130.00 650
Each 5.00 175.00 875

Each 10.00 600.0 6,000.00


Each 6.00 500.0 3,000.00
Each 6.00 300.0 1,800.00
Each 5.00 150.0 750.00

Each 0.00 25,000.00 0


995,834
149,375
1,145,209