Anda di halaman 1dari 1

C

China Harbour Engineering Co.L.L.C. INSPECTION AND TESTING PLAN (ITP): PAINTING WORKS

Contractor: Date:
Contract No. & Location:
Description of Activity: PAINTING WORKS / INTERNAL AND EXTENAL AREAS OF THE WALLS AND CEILINGS Level : Ground Floor to Roof

SERIAL No.: PAGE NO.: 1 of 1


Legend for acceptance criteria: *AR = Approval *H = Hold Point *M = Monitoring *S = Surveillance *A = Actual Inspection *T/C = Test Certificate Reqd.

INSPECTION & ACCEPTANCE REMARKS/FORM


ITEM No. DESCRIPTION SPECSIFICATION
REPORT NO
HGC CHEC DORSCH
1.0 MATERIAL & DOCUMENT APPROVALS
Applicator &Material approvals for painting system for internal
Specification Section 09900 (Volume 2Part A)
1.1 and external walls and ceilings including manufacturer, color
Clause 1.1.1, Approved by engineer
shades and samples
Specification Section 09900 (Volume 2 Part A)
Method Statement, quality control procedure, ITP, check sheet,
1.2 & risk assessment approval
& Manufacturer method statement & product
technical data sheets / Approved by engineer
Material verification upon delivery and receipt of painting As per approved MAR’s and samples /
1.3 materials at site Acceptance by engineer
2.0 EXECUTION
Specification Section 09900 (Volume2 Part A)
2.1 Surface preparation prior to application of primer Clause 3.1 / Manufacturer method statement &
product technical data sheets
Manufacturer method statement & product
2.2 Primer application
technical data sheets
Manufacturer method statement & product
2.3 Application of stucco, filler coats
technical data sheets
Application of finish (top) coats of painting on applicable areas Manufacturer method statement & product
2.4 as per the approved painting system technical data sheets
2.5 Cleaning & protection of adjacent areas. As per approved method statement item 7.8
Contractor: (Name, Signature & Date) Consultant: Approved By (Name, Signature &
Date)

CC: PM, RE, QA/QC, RE/ARE

Anda mungkin juga menyukai