LABOR – FAMILY
PRESENTED 0
2. WALL FRAMING 70
HALVED BAMBOO 30 PC 0 0 0
LABOR-FAMILY PRESENTED
LABOR-FAMILY PRESENTED
1. COLUMNS 2,959.5
CONCRETING
CEMENT, 40 KGS., 2 BGS 260 520
PORTLAND
GRAVEL, 3/4" 1 CU.M 1,232 1232
SAND, WHITE 1 CU.M 1,207.5 1,207.5
LABOR: (FAMILY
PRESENTED)
C. ROOFING
WORKS
1. ROOF FRAMING 8
(BAMBOO AS
PURLINS 10-12 MM
DIA)
ROOF TRUSSES 9 PC 0 0 0
( BAMBOO 80-100 DIA)
0 0 0
ROOFING
HALVED CUM BAMBOO 30 PC 0 0 0
LABOR-ROOFING (FAMILY
PRESENTED)
2. CEILING WORKS 1000
1. INSULATION
FIBERGLASS INSULATION
GLASSS WOOL WITH FOIL 1 SHEET 1000 1000 1000
LABOR-INSULATION
(FAMILY PRESENTED)
2. INSECT SCREEN
WIRE MESH 1 SHEET 0 0
3. WALL FINISH 1260
HALVED BAMBOO 60 PC 0 0 0
LABOR-FAMILY PRESENTED
4. DOORS AND 860
WINDOWS
1. MAIN DOOR/EXIT 430
DOOR
RECYCLED COCO LUMBER 2 PC 0 0 0
(FRAMING)
HINGES
LOCKSET (BAMBOO) 0 0 0
LABOR-DOOR (FAMILY
PRESENTED)
2. WINDOWS 430
RECYCLED COCO LUMBER 12 PC 0 0 0
(FRAMING)
HINGES (STRING)
LABOR-WINDOW DESIGN
(FAMILY PRESENTED)
5. ELECTRICAL
WORKS
1. ALL ELECTRICAL 0 0 0
LINES, CIRCUITS,
SWITCHES AND
BREAKER WERE ALL
RETAINED AND
FURTHER CHANGES
WILL BE DONE BY
THE FAMILY
2. LIGHTING
FIXTURES
LED LIGHT 3 PC 0 0 0
6. PLUMBING 768
WORKS
1. WATER LINE 0
SYSTEM (ALL PVC
LINES WERE
RETAINED)
2. STORM DRAINAGE
AND SEWER
SYSTEM
BAMBOO (STORM PIPE 2 PC 0 0
DRAIN SYSTEM)
LABOR-STORM DRAINAGE 0 0 0 0
SYSTEM (FAMILY
PRESENTED)
3. PLUMBING
FIXTURES AND
ACCESSORIES
WATER CLOSET, PAIL
(RETAINED)
4. SEPTIC TANK 768
PIPE PVC ORANGE S 600 1 PCS 88
2”X3.0 M
CHB 6” 10 PC 16 160
CEMENT, 40 KGS.,
PORTLAND 2 BGS 260 520
LABOR-SEPTIC TANK
(FAMILY PRESENTED)
TOTAL DIRECT COST 7197.50