Anda di halaman 1dari 1

NOTA :

6 5 4 3 2 1
3115 2180 10970 3325
6575 4395 1575 1750
4900 1675 1325 1270 1800 TAJUK :

PERMOHONAN KELULUSAN MENDIRIKAN


BANGUNAN BAGI CADANGAN MEMBINA
LOCATION OF SITE
6000 SATU UNIT BANGLO 2 TINGKAT DI ATAS
3.925
IN RELATION TO EQUINE PARK DEVELOPMENT
1600
LOT PT 81040, MUKIM PETALING, 43300
2
86°26'40"15.69 86°26'88" PETALING, SELANGOR DARUL EHSAN

BOUNDARY LINE
WATER
UNTUK

BOUNDARY LINE
METER
)
TNB
RUBBISH
SETBAC K 6'6" ( 2048 mm
BIN
CARPORCH ROOF

gt
B EN. CHOO WEN HAUR

6609
'6" ( 5096 mm )
ROOF SETBACK 16
doted line indicate carporch
RC roof to engr's detail K 20' ( 6096 mm )
BUILDING SETBAC MH5 L STATUS LUKISAN
RWDP RWDP

1635
PRELIMINARY SUBMISSION - BP CONSTRUCTION

ROOF SETBACK 6'6" ( 2048 mm )


BOMBA TENDER DEMOLITION

3135
THIS DRAWING IS COPYRIGHT.
K

ROOF SETBACK 6'6" ( 2048 mm )

BUILDING SETBACK 10' ( 3048 mm )


RC column with brickwall Contractors must check all dimensions on site. Only figured dimensions are to
box-up to engr's detail CAR PORCH / DRIVEWAY be used.Discrepancies must be reported immediately to the architect before

1500
36.74 M²
proceeding.
FFL:33.80 W2 W2 W2
SK PP J TANDATANGAN PEMILIK:

BUILDING SETBACK 10' ( 3048 mm )


KEY PLAN "Saya/Kami sebagai pemilik/pemilik-pemilik kediaman ini mengaku akan mengambil segala tanggungjawab

1500
HT1 -
dp100 yang timbul akibat daripada kerja-kerja pengubahsesuaian ini, tidak akan melencong daripada pelan yang
diluluskan, bersetuju untuk dikenakan tindakan undang-undang termasuk merobohkan binaan itu jika gagal
NOT TO SCALE mematuhi, dan akan melepaskan Perbadanan Putrajaya dari sebarang liabiliti."
OFFICE
PC I

dp100
DB 19.12 M² PP
FFL:34.20

4350
W1 CT2 CT3
W2
D1

2850
FOYER
W2 28.93 M²
PC CT4 4.76 M²
FFL:34.20
CT1 -
FFL:34.20
PC PP D10
W2
CT2 CT3 NAMA: CHOO WEN HAUR
dp50 POWDER NO K/P: 831124-14-5197

1550
D11 ROOM NO HP: 012 317 8833
W2 wc
W7
b

H
ft
gt

b ft ft
sh

ALAMAT:
wc

179°59'30"37.440
1750
W3 W7

179°59'30"36.874
D11
NO. 13, JALAN PUTERI 11/3,
PT 81040 BATH 1
MH4
G BANDAR PUTERI PUCHONG,

dp50
D10 PC CT4 5.37 M²
PUCHONG, 47100 SELANGOR

729.00m² CT1 -
FFL:34.20

W9
TANDATANGAN ARKITEK:

6400
"Saya memperakui bahawa butiran-butiran dalam pelan-pelan ini adalah menurut kehendak-kehendak
GUEST ROOM Undang-Undang Kecil Bangunan 1986 (Selangor), serta bertanggungjawab ke atas apa-apa binaan struktur
LIVING 20.44 M² selain daripada struktur yang diperakukan oleh Jurutera Bertauliah, dan saya setuju terima tanggungjawab

4650
58.59 M² FFL:34.20 penuh dengan sewajarnya."
FFL:34.20
PC PP

27835
PC PP
CT2 CT3
CT2 CT3
W3
W9
D2

dp50
F
A SK
A

1720
6.59 M² PP
UTILITI 1 FFL:34.20 CR -
PATIO

3000
dp100 dp50
10.29 M²
FFL:34.20
Nora.idris ARCHITECT
W4 dp100 NO. 5 G, JALAN WANGSA DELIMA 1A, SEKSYEN 5,
SK PP
D4 WANGSA MAJU, 53300, KUALA LUMPUR.
R.C staircase to Engr's detail c/w 3/8" CT2 - TEL.: +603 4143 0093 FAX : +603 4142 0093
(thk) tempered glass railing and RWDP E EMAIL: nia.architect@gmail.com

1200

1200
dp50
900mm high Ø1 1/2" wooden handrail D3
ft

YARD / LAUNDRY gt

to manufs detail and arch's approval 14.50 M²


W13 D TAJUK LUKISAN:

dp50
FFL:34.20
R:175mm, T:270mm D2
PC PP MH3
SITE PLAN

2100
CT1 CT3
DINING dp50 D3
36.62 M² W9

dp50
rc sump to engr's detail c/w heavy W4
FFL:34.20
C

dp50
b
PC PP
duty ms grating cover to engr's detail PC PP
D12 D13 W7
CT2 CT3

2400
wc
CT2 CT3
ft gt Pindaan Tarikh Nota
6.23 M² MAID MAID

8200
FFL:34.20 ROOM BATH
sh

B
ft

110mm thk brickwall c/w DRY KITCHEN PC CT4 4.32 M² Dilukis oleh YOGA Skala seperti ditunjukkan
dp100
D3
24.33 M² FFL:34.20
20mm thk cement plaster FFL:34.20
CT1 -
Disemak oleh AR. NORA Tarikh NOVEMBER 2016
and paint on bothsides PC PP
b
Nombor Status Pindaan
W8

3700
WET Projek Lukisan
CT2 CT3 KITCHEN b
D3 PC
1500mm (H), anti climb mesh W5 16.26 M²
FFL:34.20
PP gt
Nombor
Lukisan
NIA/16010/BP/01
CT2 CT3
fencing to manuf's detail
W6
KEGUNAAN MPSJ :
RWDP A
W7 W7
mm )
BUILDING SETBACK 10' ( 3048
gt

doted line indicate Ø6inch pvc

2996
LOCATION PLAN parameter sub-drain pipe c/w 3/4" ROOF SETBACK 6'6" ( 2048 mm
)
NOT TO SCALE coarse gravel surround MH1 MH2
B

1.0 KELUASAN TAPAK BOUNDARY LINE 268°27'88"19.593


LUAS TAPAK KESELURUHAN 450.00 mp
JADUAL GUNATANAH
KEGUNAAN LUAS (M.P) % PERKARA CADANGAN
KAWASAN PLINTH 233.92 m.p
1. PLINTH
LUAS LANTAI TERBINA
BANGUNAN 233.92 32.09 BANGUNAN RUMAH KEDIAMAN 644.73 m.p
KEBUK UTILITI 3.35 0.46 BILANGAN TINGKAT 2 TINGKAT
JUMLAH KECIL 237.27 32.55 KETINGGIAN BANGUNAN RUMAH 9,960 m

2. KAWASAN TERBUKA
2.0 KELUASAN BANGUNAN
LANDSKAP KEJUR 64.09 8.79

380.61 52.21
PETUNJUK LUAS LANTAI KASAR (m.p)
LANDSKAP LEMBUT
10.29 1.41 TINGKAT BAWAH 345.04
TERES TERBUKA

ANJUNG KERETA 36.74 5.04 TINGKAT SATU 299.68 SITE PLAN


JUMLAH KECIL 491.73 67.45 SCALE : 1: 100
JUMLAH 644.73
JUMLAH KESELURUHAN 729.00 100.00

Anda mungkin juga menyukai