A-2 Breakdown Price List

Weight(Kg) Fabr. & Insp. Site Assemly


Material Trans.
No Item Description Q'ty On workshop price3)
Unit Total Price Price4)
Price 2) (If any)

A Equipment

1 Ammonia Letdown Drum 1


2 Refrigerant Receiver 1
3 Synthesis Gas Compressor K.O Drum 1
4 Nitrogen Baffer Tank 1
5 HP Steam Blowdown Drum 1
6 Hydrogen Converter 1
7 HP Steam Saturator 1
8 MP Steam Saturator 1
9 Ammonia buffer Tank 1

B Special Tools *

C Spare Parts for erection, commissioning & performance test-run

1/4
A-2 Breakdown Price List
Weight(Kg) Fabr. & Insp. Site Assemly
Material Trans.
No Item Description Q'ty On workshop price3)
Unit Total Price Price4)
Price 2) (If any)

D Spare Parts for two years operation


E Site technical Service
Notes:
1) This list to be filled by Bidder, especially for the items marked with "*".
2) Price of statutory approvals (such as IBR, if any) included.
3) Site Assembly only for segment transportation equipment. Equipment shall be manufactured in workshop as far as possible.

Name of Bidder (signature and seal):

2/4
eakdown Price List
Appox.
Total: Lead
Remarks
Sum(I~M) time(month

* List * (if any)

3/4
eakdown Price List
Appox.
Total: Lead
Remarks
Sum(I~M) time(month

*
* * (if required)

ar as possible.

4/4