Anda di halaman 1dari 3

Name of Work:

Construction of Bagging building, Wagon Loading Platform, Conveyeor gantry, transfer tower and pipe
rack structure

Bidder may opt to submit quotes for any one site or both sites as per PQC

Type of Contract:

Percentage Contract

Scope of works:

1. Bagging bldg (RCC franed 26 m x 150m x 40 m ht), Wagon loading platform, conveyor gantry &
transfer tower
2. Pipe rack structure – 900 m long with road crossing and pipe sleeper

Schedule:

SIndri: 16 months from LOI

Barauni: 16 months from LOI

PQC – Technical
PQC- Financial

Anda mungkin juga menyukai