Construction of Bagging building, Wagon Loading Platform, Conveyeor gantry, transfer tower and pipe
rack structure
Type of Contract:
Percentage Contract
1. Bagging bldg (RCC franed 26 m x 150m x 40 m ht), Wagon loading platform, conveyor gantry &
transfer tower
2. Pipe rack structure – 900 m long with road crossing and pipe sleeper
Value of Works
Schedule of Rates ,
Total – INR
Schedule:
Financial Criteria