U C CANAL PARK
SUMMARY OF COST
TOTAL Rs:20522300/-
Add 2% Contingency And Petty Establishment Charges
Rs:410446/-
Add 2% Consultency charges.
Rs:410446/-
Add 1% Harticulture Charges. Rs:205223/-
TOTAL Rs:21599920/-
SAY Rs:21600000/-
Rs:21.6 Millions
Total:- Rs:20522203/-
Say Rs:20522300/-
Carried over to the summary of cost.
RATE ANALYSIS FOR CONSTRUCTION OF
GULLY GRANTING CHAMBER WITH PREFORATE RCC SLAB SIZE 1'X1'
3 Pacca brick work in foundation and plinth in:- i) Cement, sand mortar:-
Ratio 1:3 (Ch:7-It:4-i)
TOTAL Rs:3722
RATE ANALYSIS FOR THE RISING OF EXISTING MANHOLE 22" DIA
(WITH COVER)
P%Cft
1x3.14x2.58x0.75x1.5 = 9.11 Cft @ Rs 18255.90 Rs:1663.11
3 Cement plaster 1:2 upto 20' (6.00 m) height:- ab) ½" (13 mm)
thick (Ch:11,It:9-b)
P%Sft
1x3.14x3.33x1.5 = 15.69 Sft @ Rs 1489.25 Rs:233.66
5 Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame weighing 37.324 Kg. or
one maund as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect. (Ch:21,It:15-A)
Total Rs:7021.32
RATE ANALYSIS FOR THE RISING OF EXISTING MANHOLE 22" DIA
(WITH OUT COVER)
3 Cement plaster 1:2 upto 20' (6.00 m) height:- ab) ½" (13 mm)
thick (Ch:11,It:9-b)
Total Rs:2311.06
LENGTH STATEMENT FOR ROUGH COST ESTIMATE FOR CONSTRUCTION OF PCC, TUFF TILE,SEWERAGE AND DRAINAGE SCHEME
MURIDKE PP-163 TEHSIL MURIDKE DISTRICT SHEIKHUPURA
A)
Rural U.C's
-
1 U.C Nangal Sadhan
1 A - A 1 510 1 X 510 = 510 12.0 6120 12 6120 300 7.5
2 A 2 - A 3 80 1 X 80 = 80 8.0 640 8 640
3 A 4 - A 5 80 1 X 80 = 80 8.0 640 8 640
4 A 6 - A 7 100 1 X 100 = 100 6.0 600 6 600 50 3
5 A 8 - A 9 800 1 X 800 = 800 18.0 14400 18 14400 550 10
6 A 10 - A 11 200 1 X 200 = 200 10.0 2000 10 2000
7 A 12 - A 13 120 1 X 120 = 120 10 1200 10 1200
8 A 14 - A 15 420 1 X 420 = 420 18.0 7560 18 7560 300 7
9 Side Street 50 1 X 50 = 50 7.0 350 7 350
10 A 16 - A 17 220 1 X 220 = 220 10.0 2200 10 2200
11 A 18 - A 19 50 7.0 350 7 350
12 A 20 - A 21 180 1 X 180 = 180 10.0 1800 10 1800
13 A 22 - A 23 300 1 X 300 = 300 10.0 3000 10 3000
14 A 24 - A 25 500 1 X 500 = 500 7.0 3500 7 3500 250 4
15 Side Street 80 1 X 80 = 80 6.0 480 6 480
16 Side Street 150 1 X 150 = 150 7.0 1050 7 1050 100 4
17 A 26 - A 27 220 1 X 220 = 220 9.0 1980 9 1980
18 A 28 - A 29 90 1 X 90 = 90 7.0 630 7 630
19 A 30 - A 31 80 1 7.0 560 7 560
20 A 32 - A 33 130 12.0 1560 12 1560
21 A 33 - A 34 270 1 X 270 = 270 10.0 2700 10 2700 190 7
22 A 35 - A 36 190 11.0 2090 11 2090
23 Side Street 120 1 X 120 = 120 9.0 1080 9 1080
24 A 36 - A 37 300 1 X 300 = 300 12.0 3600 12 3600 200 7
25 A 37 - A 38 200 1 X 200 = 200 5.0 1000 5 1000 100 3
26 A 37 - A 39 130 9.0 1170 9 1170
27 A 40 - A 41 300 1 X 300 = 300 5.0 1500 5 1500
28 A 41 - A 45 290 1 X 290 = 290 6.0 1740 6 1740
29 A 42 - A 43 330 1 X 330 = 330 7.0 2310 7 2310
LENGTH STATEMENT FOR ROUGH COST ESTIMATE FOR CONSTRUCTION OF PCC, TUFF TILE,SEWERAGE AND DRAINAGE SCHEME
MURIDKE PP-163 TEHSIL MURIDKE DISTRICT SHEIKHUPURA
KHUTIALA
VIRKAN
(A-A1) 400 (NOON) A50-A60 650
LENGTH STATEMENT FOR ROUGH COST ESTIMATE FOR CONSTRUCTION OF PCC, TUFF TILE,SEWERAGE AND DRAINAGE SCHEME
MURIDKE PP-163 TEHSIL MURIDKE DISTRICT SHEIKHUPURA
DERA
PATHANA FATEH PURI
(A35-A36) 550 (A -A 2) 910
FATEH PURI
(A10-A11) 250
FATEH PURI
(A11-A12) 200
FATEH PURI
(A11-A13) 200
FATEH PURI
(A6-A7) 760
Dismentling of Solling
AREA
2250
150
5500
2100
1000
400
1330
1400
300
ME
Dismentling of Solling
AREA
2500
6800
3500
4200
1500
1320
1500
750
1500
ME
Dismentling of Solling
AREA
1800
500
0
0
0
1250
41550
ME
Dismentling of Solling
AREA
1330
450
780
1820
ME
Dismentling of Solling
AREA
1120
1200
1360
1450
1250
1650
ME
Dismentling of Solling
AREA
12410
1400
ME
Dismentling of Solling
AREA
2800
2400
12000
600
ME
Dismentling of Solling
AREA
2100
1500
ME
Dismentling of Solling
AREA
22800
1200
ME
Dismentling of Solling
AREA
3000
ME
Dismentling of Solling
AREA
750
2100
ME
Dismentling of Solling
AREA
7050
6400
6400
1750
ME
Dismentling of Solling
AREA
2100
4800
7200
28650
ME
Dismentling of Solling
AREA
3600
1800
ME
Dismentling of Solling
AREA
5400
ME
Dismentling of Solling
AREA
0
ME
Dismentling of Solling
AREA
4000
ME
Dismentling of Solling
AREA
6750
10750