Date: 08.07.2017
SARIAK INTEGRITY SOLUTIONS Client Inquiry No.: 4866-DD-00-00-REQ-HS-011-D0
Central Office: NO.24, 12TH St, Niloofar St, Khoramshahr Ave, Tehran, Iran
Vendor Job No.: SK95329
Tel: (+98-21) 88733812-3 Fax: (+98-21) 88764455 Website: www.sariak.com
Technical Contact Person: H.Asadi@Sariak.com
Revision No.: 04
Commercial Contact Person: M.BOROOMAND@Sariak.com
Client: Assalouyeh Green Tank Farm Petrochemical Co.
Reference No.: 96-M-95329-3631
Project: Assalouyeh Petrochemical-Phase II - Centralized Tank Farm
Sariak Integrity
Solutions PRICED QUOTATION Assalouyeh Green Tank
Farm Petrochemical Co.
FOR
FOAM SYSTEM
08.07.2017 ISSUED FOR APPROVAL 04 A.Mehri MS.Haghgooyan H.Ashkenani
Revision No.: 04
SYMBOLS, DEVIATIONS & SPECIAL NOTES
Reference No.: 96-M-95329-3631
1 SYMBOLS
BLUE GREEN
2 DEVIATIONS
3 SPECIAL NOTES
3.1 The material for Skid and Sun-shade will be considered painted carbon steel.
3.2 we did’nt consider foam chamber. Please clarify the quantity of them.
3.3 Body Material for 4" Y-Type Strainer has been considered Carbon Steel
Page 3
SARIAK INTEGRITY SOLUTIONS Client: Assalouyeh Green Tank Farm Petrochemical Co.
Date: 08.07.2017
Central Office: NO.24, 12TH St, Niloofar St, Khoramshahr Ave, Tehran, Iran Project: Assalouyeh Petrochemical-Phase II - Centralized Ta
Tel: (+98-21) 88733812-3 Fax: (+98-21) 88764455 Website: www.sariak.com
Client Inquiry No.: 4866-DD-00-00-REQ-HS-011-D0
Technical Contact Person: H.Asadi@Sariak.com
Commercial Contact Person: M.BOROOMAND@Sariak.com
Vendor Job No.: SK95329
MAIN MATERIALS Revision No.: 04
as per discussion
Foam Concentrate-FFFP-Alcohol Resistant
pH-value (20 °C) : 6.5 to 8.5 required sun shad for
1.3
Density kg/l (20°C) : 1.03~1.06 ± 0.02
Viscosity(20°C) : pseudoplastic, pump-assisted
Local Market Liter 2000 149,500 رﻳﺎل 299,000,000 رﻳﺎل TANK AND SKID WILL
proportioning may be required
Frost-resistance : -15°C ~ -10°C
YELLOW (REVISION) BE CONSIDERED BY
OWNER IN SITE
1.4 Firedose system Sun-shade, Carbon Steel Sariak No. 3 115,644,000 رﻳﺎل 346,932,000 رﻳﺎل
1.5 Skid for firedos and foam tank , Carbon Steel Sariak Set 3 192,050,000 رﻳﺎل 576,150,000 رﻳﺎل
1.6 Pipe & fitting for Skid, Carbon Steel Local Market Set 3 132,250,000 رﻳﺎل 396,750,000 رﻳﺎل
Page 4
SARIAK INTEGRITY SOLUTIONS Client: Assalouyeh Green Tank Farm Petrochemical Co.
Date: 08.07.2017
Central Office: NO.24, 12TH St, Niloofar St, Khoramshahr Ave, Tehran, Iran Project: Assalouyeh Petrochemical-Phase II - Centralized Ta
Tel: (+98-21) 88733812-3 Fax: (+98-21) 88764455 Website: www.sariak.com
Client Inquiry No.: 4866-DD-00-00-REQ-HS-011-D0
Technical Contact Person: H.Asadi@Sariak.com
Commercial Contact Person: M.BOROOMAND@Sariak.com
Vendor Job No.: SK95329
MAIN MATERIALS Revision No.: 04
instead of using a
SARIAK INTEGRITY SOLUTIONS manual release
Client: Assalouyeh Green Tank Farm Petrochemical Co.
Date: 08.07.2017
Central Office: NO.24, 12TH St, Niloofar St, Khoramshahr Ave, Tehran, Iran Project: Assalouyeh Petrochemical-Phase II - Centralized Ta
Tel: (+98-21) 88733812-3 Fax: (+98-21) 88764455 Website: www.sariak.com push bottom for this
Client Inquiry No.: 4866-DD-00-00-REQ-HS-011-D0
Technical Contact Person: H.Asadi@Sariak.com
Commercial Contact Person: M.BOROOMAND@Sariak.com skid a Manual alarm
Vendor Job No.: SK95329
MAIN MATERIALS call point Revision
usedNo.:by 04
FIREDOS SYSTEM
vendor.it Reference
shall be No.: 96-M-95329-3631
revised
ITEM MAKE & Submission Unit Rate in Submission Unit Rate
DESCRIPTION UNIT QTY PART NO. TOTAL in (RLS) TOTAL in (EUR)
NO. MODEL (RLS) in (EUR)
2.6 restricted orific on by pass line deluge valves Local Market No. 6 € 440.00 € 2,640.00
YELLOW (REVISION)
3.0 Cable
3.1 Fire Resistant Cable, 1P×1.5 mm2 Local Market m 800 74,750 رﻳﺎل 59,800,000 رﻳﺎل
Submission
ITEM Submission Unit
DESCRIPTION MAKE & MODEL UNIT QTY PART NO. TOTAL in (RLS) Unit Rate in TOTAL in (EUR)
NO. Rate in (RLS)
(EUR)
1.0 Spare Parts For Erection, Pre Commissioning, Commissioning & Start Up
Revision No.: 04
COMMERCIAL ASPECTS
Reference No.: 96-M-95329-3631
ITEM
DESCRIPTION Conditons
NO.
1.0 Grand Total Price For Main Material For Supply of Equipment (M) 3,065,417,000 رﻳﺎل € 107,276.40
2.0 Grand Total Price For Commisioning Spare Parts (c) 0 رﻳﺎل € 4,070.00
3.0 Grand Total Price For Two Years Spare Parts (T) 0 رﻳﺎل € 4,070.00
520 (EUR) / Engineer. Day On The Basis of an 8 Hours/Day And 48 Hours/Week. Accommodation And Travel
Supervision charges
11.0 Expenses by Purchaser
(Tax and Other duties exempt)
Extra Work: Will be Charged
Page 8
Revision No.: 04
COMMERCIAL ASPECTS
Reference No.: 96-M-95329-3631
ITEM
DESCRIPTION Conditons
NO.
12 Months After Start up or 24 Months After Delivery Whichever Expires First Provided That Supervison on
12.0 Guarantee
Erection is Done By Our Engineers
13.0 Test & Inspection Test And Inspection According To Agreed ITP Inspection & Inspector's Expenses by Purchaser
.هﺮ ﮔﻮﻧﻪ ﻓﻌﺎﻟﻴﺖ ﻧﻈﺎرت و ﻳﺎ راﻩ اﻧﺪازﯼ ﺳﻴﺴﺘﻤﻬﺎ و ﺗﺠﻬﻴﺰات ﭘﺲ از ﺗﺴﻮﻳﻪ ﺣﺴﺎب ﻧﻬﺎﻳﯽ و ﺁزاد ﺳﺎزﯼ ﮐﻠﻴﻪ ﺳﭙﺮدﻩ هﺎﯼ ﺷﺮﮐﺖ ﺻﻮرت ﻣﯽ ﭘﺬﻳﺮد
.* ﺷﺮاﻳﻂ ﺑﺎزرﮔﺎﻧﯽ ﻓﻮق در ﺻﻮرت ﻋﻘﺪ ﻗﺮارداد ﺑﺎ ﻃﺮﻓﻴﺖ ﺷﺮﮐﺖ ﺧﺎرﺟﯽ ﻣﺎ ﻣﯽ ﺑﺎﺷﺪ
DUE TO INTERNATIONAL REGULATIONS MANUFACTURER OR SUPPLIER OR SELLER MAY BE SUBJECT TO CHANGE WITH CLIENT APPROVAL