DIAMETER BERAT LUAS (CM2)

(MM) (KG/M) 1x 2x 3x 4x 5x 6x
6 0.222 0.283 0.566 0.849 1.132 1.415 1.698
8 0.395 0.503 1.006 1.509 2.012 2.515 3.018
9 0.499 0.636 1.272 1.908 2.544 3.180 3.816
10 0.617 0.786 1.572 2.358 3.144 3.930 4.716
12 0.888 1.131 2.262 3.393 4.524 5.655 6.786
13 1.040 1.328 2.656 3.984 5.312 6.640 7.968
14 1.210 1.540 3.080 4.620 6.160 7.700 9.240
16 1.580 2.011 4.022 6.033 8.044 10.055 12.066
18 2.000 2.546 5.092 7.638 10.184 12.730 15.276
19 2.230 2.836 5.672 8.508 11.344 14.180 17.016
20 2.470 3.143 6.286 9.429 12.572 15.715 18.858
22 2.980 3.803 7.606 11.409 15.212 19.015 22.818
25 3.850 4.911 9.822 14.733 19.644 24.555 29.466
28 4.830 6.160 12.320 18.480 24.640 30.800 36.960
29 5.190 6.608 13.216 19.824 26.432 33.040 39.648
32 6.310 8.046 16.092 24.138 32.184 40.230 48.276
36 7.990 10.183 20.366 30.549 40.732 50.915 61.098
40 9.870 12.571 25.142 37.713 50.284 62.855 75.426
50 15.400 19.643 39.286 58.929 78.572 98.215 117.858
LUAS (CM2)
7x 8x 9x 10 x 11 x
1.981 2.264 2.547 2.830 3.113
3.521 4.024 4.527 5.030 5.533
4.452 5.088 5.724 6.360 6.996
5.502 6.288 7.074 7.860 8.646
7.917 9.048 10.179 11.310 12.441
9.296 10.624 11.952 13.280 14.608
10.780 12.320 13.860 15.400 16.940
14.077 16.088 18.099 20.110 22.121
17.822 20.368 22.914 25.460 28.006
19.852 22.688 25.524 28.360 31.196
22.001 25.144 28.287 31.430 34.573
26.621 30.424 34.227 38.030 41.833
34.377 39.288 44.199 49.110 54.021
43.120 49.280 55.440 61.600 67.760
46.256 52.864 59.472 66.080 72.688
56.322 64.368 72.414 80.460 88.506
71.281 81.464 91.647 101.830 112.013
87.997 100.568 113.139 125.710 138.281
137.501 157.144 176.787 196.430 216.073
Bawplank 7.50 + 7.50 + 12.000 + 12.000 =
Galian pondasi 1.00 x 1.00 x 1.150 x 19 =
=
Pasir Alas 0.80 x 0.80 x 0.150 x 19 =
Lantai Kerja 0.80 x 0.80 x 0.050 x 19 =
Cerucuk Ø10-4m 5.00 x 19.00 =
Urug Kembali 1.00 x 1.00 x 0.800 x 19 =

Plat Pondasi (beton) 0.80 x 0.80 x 0.200 x 19 =


Tulangan 13.92 x 19 x 0.888 =
bekisting 0.20 x 0.80 x 4.000 x 19 =

Kolom Pondasi (beton) 0.20 x 0.20 x 0.800 x 19 =


Tulangan Pokok 2.88 x 19 x 0.888 =
Tulangan Begel 5.20 x 19 x 0.395 =
Jumlah Tulangan
bekisting 0.20 x 0.80 x 4.000 x 19 =

Balok Sloof 20/40 (beton) 0.20 x 0.40 x 67.000 =


Tulangan Pokok 6.00 x 67 x 0.888 =
Tulangan Begel 160.80 x 0.395 =
Jumlah Tulangan
bekisting 0.40 x 67.00 x 2.000 =

Balok Sloof 15/30 (beton) 0.15 x 0.30 x 4.000 =


Tulangan Pokok 4.00 x 4 x 0.888 =
Tulangan Begel 6.93 x 0.395 =
Jumlah Tulangan
bekisting 0.20 x 4.00 x 2.000 x =

kolom teras (beton) 0.10 x 0.50 x 3.500 x 2 =


Besi kolom teras 12.00 x 3.50 x 0.888 x = 74.59
Begel 3.50 / 0.15 x 1.000 x 0.395 9.21667 =
bekisting kolom 1.20 x 3.50 x 2.000 =

kolom praktis (beton) 0.10 x 0.10 x 3.500 x 25 =


tulangan pokok 4.00 x 3.50 x 25.000 x 0.395 138.25
begel 17.50 x 0.24 x 25.000 x 0.395 41.48 =
mal 0.30 x 3.50 x 25.000 x 50% =

balok ring 0.10 x 0.15 x 71.000 =


tulangan pokok 4.00 x 71.00 x 0.888 252.192
begel 71.00 / 0.15 x 0.480 x 0.395 89.74 =
mal 71.00 x 0.40 =

pasir urug lantai 86.50 x 0.42 =


Cor lantai 86.50 x 0.10 =
tulangan 86.50 / 0.15 x 2.000 x 0.395 =

dinding kotor 67.00 x 3.35 = 224.45


pintu 1 2.52 x 3.00 = 7.55
pintu 2 1.80 x 2.65 = 4.77
pintu 3 1.66 x 2.00 = 3.32
Jendela 2.61 x 5.00 = 13.05
ventilasi kaaca 0.80 x 2.00 = 1.595
kerawang 0.05 x 10.00 = 0.53
Luas dinding batako =

Keramik 40x40 cm 86.50 - 6.30 =


lantai keramik 20x20 7.00 - 0.70 =
keramik dinding 13.75 x 2.00 bak 8.000 =

plafond 129.50

kuda2 8/12 26.57 x 0.12 x 0.080 x 3 =


gording dan ikatan angin 81.00 x 0.10 x 0.050 =

kuda2 8/12 = 7.60 x 0.080 x 0.12


6/12 = 2.83 x 0.060 x 0.12
1.88 x 0.060 x 0.12 x
4.44 x 0.060 x 0.12 x
4/8 = 1.80 x 0.040 x 0.08 x

luas atap
tampak belakang 0.50 x 9.50 x 5.860 =
tampak depan 1.40 x 4.30 =
tampak kanan 3.90 x 5.86 =
1.40 x 5.86 =
4.33 x 2.00 =
4.33 x 3.40 x 0.500 =
kiri sama dengan kanan =

perabung dan jurai 17.58 1.50 1.400 5.4 4.3 =


lisplank 4.30 4.30 2.500 26 9 =

kosen jendela 88.60 x 0.050 x 0.1 =


kosen ventilasi 8.90 x 0.050 x 0.1 =
kosen pintu 29.70 x 0.050 x 0.1 =
39.00 m1
21.85 m3 86.00

1.82 m3
0.61 m3
95.00 Btg
15.20 m3

2.43 m3 0.74 x 8 x = 5.92


234.8582 Kg 0.26 0.74 1 x 8 x = 8
12.16 m2 13.92

0.61 m3 0.2 2.34 0.34 = 2.88


48.59136 Kg 0.68 0.1 = 0.78
39.026 Kg 1 / 0.15 = 7
87.617 Kg 5.2
12.16 m2

5.36 m3 67
356.976 Kg 0.66 0.26 0.1 = 0.36
63.516 Kg 67 / 0.15 = 447
420.492 Kg 160.8
53.60 m2

0.18 m3 4
14.208 Kg 0.26 0.16 0.1 = 0.26
2.739 Kg 4 / 0.15 = 27
16.947 Kg 6.9333
1.60 m2

0.35 m3

83.81 kg
8.40 m2

0.88 m3

179.73 kg
13.13 m2

1.07 m3

341.94 kg
28.40 m2

36.33 m3
8.65 m3
455.57 kg
193.64 m2

80.20 m2
6.30 m2
35.50 m2

0.77 m3
0.41 m3

= 0.073
= 0.0204
2.00 = 0.03
2.00 = 0.06
4.00 = 0.02
0.21 x 4 = 0.83
0.21 / 2 x 2 = 0.21
1.04

27.84 m2
6.02 m2
46.29 m2
8.20 m2
8.66 m2
7.36 m2
70.52 m2
183.89 m2
30.18 m1
48.10 m1

0.44 m3
0.04 m3
0.15 m3
0.64 m3
DAFTAR UPAH DAN MATERIAL
LOKASI : SAMBAS TAHUN ANGGARAN 2012
UPAH TERMASUK
NO TENAGA KERJA SATUAN KODE KEUNTUNGAN
( Rp. )
A. UPAH
1 Mandor Lapangan Org/hari 117,000.00
2 Mekanik Org/hari 118,100.00
4 Kepala Tukang Org/hari 123,500.00
5 Tukang Org/hari 88,600.00
6 Operator Org/hari 106,300.00
7 Operator Semi Terlatih Org/hari 82,700.00
8 Pembantu Operator Org/hari 82,700.00
9 Supir Org/hari 117,000.00
10 Pembantu Supir/Kenek Org/hari 82,700.00
11 Buruh Lapangan Tak Terlatih Org/hari 78,000.00
12 Buruh Lapangan Semi Terlatih Org/hari 81,900.00
UPAH TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
( Rp. )
B. BAHAN PENGISI
1 Batu Pecah 10/15 cm M3 517,000.00
2 Batu Pecah 5/7 cm M3 531,800.00
3 Batu Pecah 3/5 cm M3 541,500.00
4 Batu Pecah 2/3 cm M3 711,400.00
5 Batu Pecah 1/2 cm M3 777,900.00
6 Batu Pecah 0,5/1 cm M3 777,900.00
7 Stone Dust M3 659,800.00
8 Aspal Kg 16,600.00
9 Pasir Urug M3 180,900.00
10 Pasir Beton M3 199,300.00
11 Kerikil Sungai (tidak Tersaring) M3 251,800.00
12 Kerikil Sungai ( Tersaring) M3 263,600.00
13 Semen PC 50 Kg kg 1,974.00
14 Tanah Urug/ Tanah Datang M3 158,000.00
15 Batu Bata Buah 900.00
16 Bataco 15 x 30 x 7 cm Buah 2,900.00
17 Keramik 20 x 20 cm M2 67,000.00
18 Keramik 40 x 40 cm M2 102,900.00

C. BAHAN KAYU
1 Ky. Belian tdk Ketam uk 15/15 - 20/20 - 4m M3 16,809,200.00
2 Ky. Belian tdk Ketam uk 12/12 - 4m M3 14,665,000.00
3 Ky. Belian tdk Ketam uk 10/10 - 4m M3 14,109,100.00
4 Ky. Belian diketam uk 6/6 - 4m M3 13,828,600.00
5 Ky. Belian diketam uk 7/7 - 4m M3 16,383,700.00
6 Ky. Belian diketam uk 8/8 - 4m M3 16,631,900.00
7 Ky. Belian diketam uk 9/9 - 4m M3 15,364,900.00
8 Ky. Belian diketam uk 10/10 - 4m M3 14,069,400.00
9 Ky. Belian diketam uk 12/12 - 4m M3 14,665,000.00
10 Papan Belian tdk Ketam M3 16,661,100.00
11 Papan Belian Ketam M3 17,447,700.00
12 Balok Kayu Klas I Bengkirai (tdk Ketam) M3 4,270,900.00
13 Kayu Klas II 8/12 cm x 4m M3 3,604,500.00
14 Kayu Klas II 4/6 cm x 4m M3 2,800,900.00
15 Kayu Klas II 3/5 cm x 4m M3 3,190,900.00
16 Papan Kayu Klas I M3 11,916,300.00
17 Papan Kayu Klas II M3 3,840,900.00
18 Papan Mal Klas III M3 2,399,000.00
19 Kayu Kelas III M3 2,130,800.00
20 Kayu Cerucuk/Dolken 8/10 - 4 M Btg 14,100.00
21 Kayu Cerucuk/Dolken 10/12 - 4 M Btg 119,100.00
22 Kayu Bakar M3 117,000.00

HALAMAN : 7
UPAH TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
( Rp. )
D. BAHAN CAT
1 Amplas Lbr 2,700.00
2 Minyak Cat Kg 7,300.00
3 Cat Dasar Kg 32,600.00
4 Cat Kilat Kg 57,900.00
5 Plamur Kg 19,000.00
6 Cat Tembok Kg 20,900.00
7 Dempul Kg 21,200.00
8 Thiner Kg 9,500.00
9 Meni Kg 49,200.00
10 Oker Kg 74,400.00

E. BAHAN BESI
1 Besi tulangan Beton Ulir/ Polos Kg 23,900.00
2 Besi Wire Mesh M 5 m2 55,700.00
3 Kawat Baja/Bendrat Kg 23,400.00
4 Baut f 5/8"pf = 25 cm Btg 11,800.00
5 Beugel Plat L.3 cm Bh - 36,300.00

F. BAHAN PENGANTUNG
1 Kait Angin Bh - 13,800.00
2 Hendle jendela Bh - 8,100.00
3 Hendle pintu Bh - 248,100.00
4 Slot Pintu Bh - 3,000.00
5 Slot Jendela Bh - 2,300.00
6 Kunci Tanam 2 Slag Bh - 118,100.00
7 Kunci Tanam 1 Slag Bh - 45,400.00
8 Paku Seng Kg M.166.a 30,700.00
9 Paku Campuran 1"- 5" Kg M.166.b 23,600.00
10 Paku Atap Seng Kg M.166.c 36,800.00
11 Paku beton Kg - 38,800.00
12 Paku GRC Kg - 27,200.00

G. BAHAN ATAP
1 Atap Sirap Belian Keping - 2,200.00
2 Genteng Metal 0.25 Lbr 56,100.00
3 Genteng Metal 0.30 Lbr 89,000.00
4 Genteng Metal 0.35 Lbr - 115,800.00
5 Seng Gelombang BJLS 30 Lbr - 101,000.00
6 Seng Gelombang BJLS 20 Lbr - 66,100.00
7 Seng Plat BJLS 20 Lbr - 81,600.00
8 Seng Plat BJLS 30 Lbr - 103,600.00
9 Atap Zincalume Lbr - 169,000.00
Lbr -
H. BAHAN KACA
1 Kaca Polos t = 5 mm M2 - 152,900.00
2 Kaca Polos t = 3 mm M2 122,400.00

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr - 85,800.00
2 Triplek t = 4 mm Lbr - 109,200.00
3 Triplek t = 9 mm Lbr - 210,600.00
4 GRC board 9mm Lbr - 97,900.00

J. BAHAN SANITASI
1 Kloset Jongkok Bh - 177,200.00
2 Pipa Paralon 1" ( RT ) Btg - 44,500.00
3 Pipa Paralon 2" ( RT ) Btg - 77,200.00
4 Pipa Paralon 3" ( RT ) Btg - 162,000.00
5 Pipa Paralon 4" ( RT ) Btg - 235,900.00

K. BAHAN MINYAK
1 Minyak Solar Ltr M.183 7,200.00
2 Bensin Premium Ltr M.184 4,500.00

HALAMAN : 8
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

1m1 Pengukuran dan Pemasangan Bouwplank (P.Ps. 02) P.Ps.02


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Tukang Kayu OH #NAME? 0.100 #NAME?
2 Pekerja OH #NAME? 0.100 #NAME?
3 Kepala Tukang OH #NAME? 0.010 #NAME?
4 Mandor OH #NAME? 0.005 #NAME?
Jumlah #NAME?
B BAHAN
1 Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 14,100.00 1.000 14,100.000
2 Paku Kg 23,600.00 0.020 472.000
3 Papan Kayu Kelas III M3 2,399,000.00 0.007 16,793.000
Jumlah 31,365.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

1m3 Galian Tanah Biasa sedalam 1 meter (P.T. 01) P.T.01


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.400 #NAME?
2 Mandor OH #NAME? 0.040 #NAME?
Jumlah #NAME?
B BAHAN

Jumlah 0.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

Mengurug Kembali 1m³ Galian (P.T.06)


Mengurug Kembali 1m³ Galian dihitung dari 1/3 kali dari indeks pekerjaan galian P.T.06
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.192 #NAME?
2 Mandor OH #NAME? 0.019 #NAME?
Jumlah #NAME?
B BAHAN

Jumlah 0.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9

Mengurug 1m³ Pasir Urug (P.T. 11) P.T.11


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.300 #NAME?
2 Mandor OH #NAME? 0.010 #NAME?
Jumlah #NAME?
B BAHAN
1 Pasir Urug M3 #NAME? 1.200 #NAME?
Jumlah #NAME?
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - W. 1
Membuat 1m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB. 01) P.BB.01
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 1.200 #NAME?
2 Tukang Batu OH #NAME? 0.200 #NAME?
3 Kepala Tukang OH #NAME? 0.020 #NAME?
4 Mandor OH #NAME? 0.060 #NAME?
Jumlah #NAME?
B BAHAN
1 Semen Portland Kg 1,974.00 230.000 454,020.00
2 Pasir Kg 142.36 893.000 127,124.93
3 Batu pecah 1-2 cm (Kerikil) Kg 576.22 1,027.000 591,780.22
4 Air Liter 0.00 0.000 0.00
Jumlah 1,172,925.15
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 (P.BB. 03) P.BB.03
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 1.650 #NAME?
2 Tukang Batu OH #NAME? 0.275 #NAME?
3 Kepala Tukang OH #NAME? 0.028 #NAME?
4 Mandor OH #NAME? 0.083 #NAME?
Jumlah #NAME?
B BAHAN
1 Semen Portland Kg 1,974.00 326.000 643,524.00
2 Pasir Kg 142.36 760.000 108,191.43
3 Batu pecah 1-2 cm (Kerikil) Kg 576.22 1,029.000 592,932.67
4 Air Liter 0.00 0.000 0.00
Jumlah 1,344,648.10
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0008-2007

CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB. 04) P.BB.04
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 1.650 #NAME?
2 Tukang Batu OH #NAME? 0.275 #NAME?
3 Kepala Tukang OH #NAME? 0.028 #NAME?
4 Mandor OH #NAME? 0.083 #NAME?
Jumlah #NAME?
B BAHAN
1 Semen Portland Kg 1,974.00 371.000 732,354.00
2 Pasir Kg 142.36 698.000 99,365.29
3 Batu pecah 1-2 cm (Kerikil) Kg 576.22 1,047.000 603,304.67
4 Air Liter 0.00 0.000 0.00
Jumlah 1,435,023.95
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0008-2007

CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
1m3 Membuat Beton Tumbuk 1Pc : 3Ps : 5Kr (P.BB. 01) P.BB.01
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 1.650 #NAME?
2 Tukang Batu OH #NAME? 0.250 #NAME?
3 Kepala Tukang OH #NAME? 0.025 #NAME?
4 Mandor OH #NAME? 0.080 #NAME?
Jumlah #NAME?
B BAHAN
1 Semen Portland Kg 1,974.00 218.000 430,332.00
2 Pasir M3 142.36 0.520 74.03
3 Batu Belah 0,5 - 1 (Kerikil) M3 777,900.00 0.870 676,773.00
Jumlah 1,107,179.03
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

Pembesian 10Kg dengan Besi Polos atau Ulir (P.BB. 07) P.BB.07
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.070 #NAME?
2 Tukang Besi OH #NAME? 0.070 #NAME?
3 Kepala Tukang OH #NAME? 0.007 #NAME?
4 Mandor OH #NAME? 0.004 #NAME?
Jumlah #NAME?
B BAHAN
1 Besi Beton (polos/ulir) Kg 23,900.00 10.500 250,950.00
2 Kawat Ikat Beton (bendrat) Kg 23,400.00 0.150 3,510.00
Jumlah 254,460.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
E Harga Satuan per 1 Kg #NAME?
Acuan : SNI DT 91-0008-2007

Memasang 1Kg Jaring Kawat Baja/Wire Mesh (P.BB. 08) P.BB.08


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.0250 #NAME?
2 Tukang Besi OH #NAME? 0.0250 #NAME?
3 Kepala Tukang OH #NAME? 0.0250 #NAME?
4 Mandor OH #NAME? 0.0010 #NAME?
Jumlah #NAME?
B BAHAN
1 Besi Wire Mesh M 5 Kg 55,700.00 10.200 568,140.00
2 Kawat Ikat Beton (bendrat) Kg 23,400.00 0.050 1,170.00
Jumlah 569,310.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
E Harga Satuan per 1 Kg #NAME?
Acuan : SNI DT 91-0008-2007
Memasang 1m2 Bekisting untuk Pondasi (P.BB. 09.a) P.BB.09.a
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.520 #NAME?
2 Tukang Kayu OH #NAME? 0.260 #NAME?
3 Kepala Tukang OH #NAME? 0.026 #NAME?
4 Mandor OH #NAME? 0.026 #NAME?
Jumlah #NAME?
Jumlah Upah 50% #NAME?
B BAHAN
1 Papan Mal Kelas III M3 2,399,000.00 0.031 74,369.00
2 Paku 2" - 5" Kg 23,600.00 0.300 7,080.00
3 Minyak Bekisting Lt 7,200.00 0.000 0.00
Jumlah 81,449.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0008-2007

Memasang 1m2 Bekisting untuk Sloof (P.BB. 10) P.BB.10


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.520 #NAME?
2 Tukang Kayu OH #NAME? 0.260 #NAME?
3 Kepala Tukang OH #NAME? 0.026 #NAME?
4 Mandor OH #NAME? 0.026 #NAME?
Jumlah #NAME?
B BAHAN
1 Balok Kayu Kelas II uk. 4/6 M3 2,800,900.00 0.045 126,040.50
2 Paku 2" - 5" Kg 23,600.00 0.300 7,080.00
3 Minyak Bekisting Lt 7,200.00 0.100 720.00
Jumlah 133,840.50
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0008-2007

1m2 Pasang Bekisting untuk Kolom (P.BB. 11.a) P.BB.11.a


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.660 #NAME?
2 Tukang Kayu OH #NAME? 0.330 #NAME?
3 Kepala Tukang OH #NAME? 0.033 #NAME?
4 Mandor OH #NAME? 0.033 #NAME?
Jumlah #NAME?
B BAHAN
1 Kayu Kelas III M3 2,399,000.00 0.055 131,945.00
2 Paku 2" - 5" Kg 23,600.00 0.400 9,440.00
3 Papan Mal M3 2,130,800.00 0.022 46,877.60
Jumlah 188,262.60
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0008-2007
1m2 Pasang Bekisting untuk Balok (P.BB. 12.a) P.BB.12.a
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.660 #NAME?
2 Tukang Kayu OH #NAME? 0.330 #NAME?
3 Kepala Tukang OH #NAME? 0.033 #NAME?
4 Mandor OH #NAME? 0.033 #NAME?
Jumlah #NAME?
B BAHAN
1 Balok Kayu Kelas II uk. 4/6 Kg 2,800,900.00 0.055 154,049.50
2 Paku 2" - 5" Lt 23,600.00 0.400 9,440.00
3 Minyak Bekisting M3 7,200.00 0.000 0.00
4 Papan Mal M3 2,399,000.00 0.022 52,778.00
5 Cerucuk Ǿ 6 - 8cm / 4m Btg 14,100.00 2.000 28,200.00
Jumlah 244,467.50
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0008-2007

Memasang 1m2 Bekisting untuk Tangga (P.BB. 14) P.BB.14


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.660 #NAME?
2 Tukang Kayu OH #NAME? 0.330 #NAME?
3 Kepala Tukang OH #NAME? 0.033 #NAME?
4 Mandor OH #NAME? 0.033 #NAME?
Jumlah #NAME?
B BAHAN
1 Kayu Kelas III M3 2,130,800.00 0.030 63,924.00
2 Paku 2" - 5" Kg 23,600.00 0.400 9,440.00
3 Minyak Bekisting Lt 7,200.00 0.150 1,080.00
4 Balok Kayu Kelas II M3 2,800,900.00 0.015 42,013.50
5 Triplek t = 9mm Lbr 210,600.00 0.350 73,710.00
6 Cerucuk Ǿ 8 - 10cm / 4m Btg 14,100.00 2.000 28,200.00
Jumlah 218,367.50
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0008-2007
1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01) P.Dnd.01
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.32 #NAME?
2 Tukang Batu OH #NAME? 0.10 #NAME?
3 Kepala Tukang OH #NAME? 0.01 #NAME?
4 Mandor OH #NAME? 0.015 #NAME?
Jumlah #NAME?
B BAHAN
1 Batako 15/30/7 (cetak mesin) Bh 2,900.00 22.000 63,800.00
2 Semen Portland Zak 98,700.00 0.150 14,805.00
3 Pasir Beton / Pasang M3 142.36 0.027 3.84
Jumlah 78,608.84
C Jumlah A + B #NAME?
D Harga Satuan #NAME?

Memasang 1m2 Plesteran 1PC : 4PP, tebal 20 mm (P.Pls. 04) P.Pls.04


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.400 #NAME?
2 Tukang Batu OH #NAME? 0.200 #NAME?
3 Kepala Tukang OH #NAME? 0.020 #NAME?
4 Mandor OH #NAME? 0.022 #NAME?
Jumlah #NAME?
B BAHAN
1 Semen Portland Kg 1,974.00 8.320 16,423.68
2 Pasir M3 199,300.00 0.032 6,377.60
Jumlah 22,801.28
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0010-2007

1m2 Plasteran Acian (P.Pls. 27) P.Pls.27


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.150 #NAME?
2 Tukang Batu OH #NAME? 0.100 #NAME?
3 Kepala Tukang OH #NAME? 0.010 #NAME?
4 Mandor OH #NAME? 0.0080 #NAME?
Jumlah #NAME?
B BAHAN
1 Semen Portland Kg 1,974.00 3.250 6,415.50
Jumlah 6,415.50
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
1m3 Pasang Kusen Pintu dan Jendela Kayu Kelas I (P.K. 12) P.K.12
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 6.000 #NAME?
2 Tukang Kayu OH #NAME? 18.000 #NAME?
3 Kepala Tukang OH #NAME? 1.800 #NAME?
4 Mandor OH #NAME? 0.300 #NAME?
Jumlah #NAME?
B BAHAN
1 Kayu Kelas 1 uk. 5/10 (Ketam - utk Kusen) M³ 4,270,900.00 1.100 4,697,990.00
2 Paku 10 mm kg 23,600.00 1.250 29,500.00
3 Lem Kayu kg 22,400.00 1.000 22,400.00
Jumlah 4,749,890.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT-91-0011-2007

1m3 Pasang Konstruksi Kuda-kuda Kayu Kelas II (P.K. 25) P.K.25


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 4.000 #NAME?
2 Tukang Kayu OH #NAME? 12.000 #NAME?
3 Kepala Tukang OH #NAME? 1.200 #NAME?
4 Mandor OH #NAME? 0.200 #NAME?
Jumlah #NAME?
B BAHAN
1 Balok Kayu Kelas II ( Ketam) M³ 3,604,500.00 1.100 3,964,950.00
2 Besi Strip Btg 36,300.00 15.000 544,500.00
3 Paku Kg 23,600.00 0.800 18,880.00
Jumlah 4,528,330.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.27

1m3 Pasang Konstruksi Gording Kayu Kelas II (P.K. 27) P.K.27


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 2.400 #NAME?
2 Tukang Kayu OH #NAME? 7.000 #NAME?
3 Kepala Tukang OH #NAME? 0.720 #NAME?
4 Mandor OH #NAME? 0.120 #NAME?
Jumlah #NAME?
B BAHAN
1 Balok Kayu Kelas II ( Tidak Ketam) M³ 3,604,500.00 1.100 3,964,950.00
3 Paku Kg 23,600.00 3.000 70,800.00
Jumlah 4,035,750.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT-91-0011-2007
1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas I (P.K. 31) P.K.31
No. URAIAN PEKERJAAN SATUAN HARGA KUANTITAS BIAYA
SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.100 #NAME?
2 Tukang Kayu OH #NAME? 0.100 #NAME?
3 Kepala Tukang OH #NAME? 0.010 #NAME?
4 Mandor OH #NAME? 0.050 #NAME?
Jumlah #NAME?
B BAHAN
1 Papan Kayu Kelas I (Ketam) M³ 11,916,300.00 0.0088 104,863.44
2 Paku Kg 23,600.00 0.060 1,416.00
Jumlah 106,279.44
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53

1m2 Pasang Kasau + Reng Atap Genteng Metal Kayu Kelas II (P.K. 33) P.K.33
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.100 #NAME?
2 Tukang Kayu OH #NAME? 0.100 #NAME?
3 Kepala Tukang OH #NAME? 0.010 #NAME?
4 Mandor OH #NAME? 0.005 #NAME?
Jumlah #NAME?
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 3,604,500.00 0.014 50,463.00
2 Paku Kg 23,600.00 0.150 3,540.00
Jumlah 54,003.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.35

1m2 Pasang Rangka Langit-langit (60 x 60)cm Kayu Kelas II (P.K. 35) P.K.35
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.200 #NAME?
2 Mandor OH #NAME? 0.010 #NAME?
Jumlah #NAME?
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 3,604,500.00 0.014 50,463.00
2 Paku Kg 23,600.00 0.200 4,720.00
Jumlah 55,183.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT-91-0011-2007
1m2 Pasang Atap Genteng Metal (P.PA. 13) P.PA.13
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.150 #NAME?
2 Tukang kayu OH #NAME? 0.750 #NAME?
3 Kepala Tukang OH #NAME? 0.008 #NAME?
4 Mandor OH #NAME? 0.006 #NAME?
Jumlah #NAME?
B BAHAN
1 Genteng Metal Lbr 89,000.00 1.562 139,018.00
2 Paku Kg 30,700.00 0.020 614.00
Jumlah 139,632.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Langit-langit GRC (P.Pf. 05) P.Pf.05


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.100 #NAME?
2 Tukang Kayu OH #NAME? 0.050 #NAME?
3 Kepala Tukang OH #NAME? 0.005 #NAME?
4 Mandor OH #NAME? 0.005 #NAME?
Jumlah #NAME?
B BAHAN
1 GRC Board (120 x 240 x 9) Lbr 97,900.00 0.364 35,635.60
2 Paku GRC Kg 27,200.00 0.110 2,992.00
Jumlah 38,627.60
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.24

1m2 Pasang Lantai Keramik 40 x 40cm Anti Gores (P.LD. 04) P.LD.04
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.620 #NAME?
2 Tukang Batu OH #NAME? 0.350 #NAME?
3 Kepala Tukang OH #NAME? 0.035 #NAME?
4 Mandor OH #NAME? 0.030 #NAME?
Jumlah #NAME?
B BAHAN
1 Keramik 40 x 40cm Anti Gores Bh 17,150.00 6.250 107,187.50
2 Semen Portland Kg 1,974.00 11.380 22,464.12
3 Pasir Pasang M3 #NAME? 0.042 #NAME?
4 Semen Warna Kg 74,400.00 0.1500 11,160.00
#NAME?
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.47
1m2 Pasang Dinding Keramik 20 x 25cm (P.LD. 07) P.LD.07
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.600 #NAME?
2 Tukang Batu OH #NAME? 0.450 #NAME?
3 Kepala Tukang OH #NAME? 0.045 #NAME?
4 Mandor OH #NAME? 0.030 #NAME?
Jumlah #NAME?
B BAHAN
1 Keramik 20 x 25 cm Bh 3,350.00 20.000 67,000.00
2 Semen Kg 1,974.00 9.300 18,358.20
3 Pasir Pasang M3 #NAME? 0.018 #NAME?
4 Oker Pengisi Nat Keramik Kg 74,400.00 0.200 14,880.00
#NAME?
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.63

Memasang 1m2 Lantai Keramik ukuran (20 x 20) cm (P.LD. 01) P.LD.01
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.700 #NAME?
2 Tukang Batu OH #NAME? 0.350 #NAME?
3 Kepala Tukang OH #NAME? 0.035 #NAME?
4 Mandor OH #NAME? 0.035 #NAME?
Jumlah #NAME?
B BAHAN
1 Ubin keramik Bh 2,680.00 26.500 71,020.00
2 Portland Cement (PC) Kg 1,974.00 10.400 20,529.60
3 Pasir Pasang M3 #NAME? 0.045 #NAME?
4 Semen Warna Kg 74,400.00 0.1620 12,052.80
#NAME?
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : SNI DT 91-0012-2007

1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.050 #NAME?
2 Tukang Cat OH #NAME? 0.009 #NAME?
3 Kepala Tukang OH #NAME? 0.040 #NAME?
4 Mandor OH #NAME? 0.0025 #NAME?
Jumlah #NAME?
B BAHAN
1 Cat Meni Kg 49,200.00 0.200 9,840.00
2 Plamur Kg 19,000.00 0.150 2,850.00
3 Cat Dasar Kg 32,600.00 0.170 5,542.00
4 Cat Penutup 2 Kali Kg 57,900.00 0.260 15,054.00
33,286.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11) P.Ct.11
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH #NAME? 0.020 #NAME?
2 Tukang Cat OH #NAME? 0.063 #NAME?
3 Kepala Tukang OH #NAME? 0.0063 #NAME?
4 Mandor OH #NAME? 0.0025 #NAME?
Jumlah #NAME?
B BAHAN
1 Plamur Kg 19,000.00 0.100 1,900.00
2 Cat Dasar Kg 32,600.00 0.120 3,912.00
3 Cat Penutup 2 x Kg 20,900.00 0.260 5,434.00
11,246.00
C Jumlah A + B #NAME?
D Harga Satuan #NAME?
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
ENGINEERING ESTIMATE (EE)
Pekerjaan : Pembangunan Pos Pengawas Perikanan Sambas
Lokasi : Kabupaten Sambas
Tahun Anggaran : 2014

KODE HARGA SATUAN J U M L A H


NO JENIS PEKERJAAN VOLUME
ANALISA (Rp.) (Rp.)
1 2 3 4 5 6
A PEKERJAAN PENDAHULUAN
1 Pembersihan lokasi - 1.00 Ls 1,000,000.00 1,000,000.00
2 Pengukuran/pasang bouwplank P.Ps.02 39.00 M1 #NAME? #NAME?
3 Mobilasi Dan Demobilisasi Peralatan Kerja - 1.00 Ls 2,500,000.00 2,500,000.00
3 Papan Nama Proyek - 1.00 Ls 500,000.00 500,000.00
Sub Total A #NAME?
B PEKERJAAN PONDASI
1 Galian tanah P.T.01 21.85 M3 #NAME? #NAME?
2 Urugan Pasir Alas T = 10 cm P.T.11 1.82 M3 #NAME? #NAME?
3 Lantai Kerja T = 5 cm P.BB.01 0.61 M3 #NAME? #NAME?
4 Cerucuk Ø 10 - 4m Jarak 30 cm - 95.00 Btg 14,100.00 1,339,500.00
5 Urug Kembali P.T.06 15.20 M3 #NAME? #NAME?
6 Plat pondasi
- Beton K 225 P.BB.04 2.43 M3 #NAME? #NAME?
- Tulangan P.BB.07 234.86 M3 #NAME? #NAME?
- Bekisting P.BB.09.a 12.16 M3 #NAME? #NAME?
7 Kolom pondasi 20/20
- Beton k 225 P.BB.04 0.61 M3 #NAME? #NAME?
- Tulangan P.BB.07 87.62 Kg #NAME? #NAME?
- Bekisting P.BB.11.a 12.16 M2 #NAME? #NAME?
8 Balok Sloof 20/40
- Beton K 225 P.BB.04 5.36 M3 #NAME? #NAME?
- Tulangan P.BB.07 420.49 Kg #NAME? #NAME?
- Bekisting P.BB.10 53.60 M2 #NAME? #NAME?
9 Balok Sloof 15/20
- Beton K 225 P.BB.04 0.18 M3 #NAME? #NAME?
- Tulangan P.BB.07 16.95 Kg #NAME? #NAME?
- Bekisting P.BB.10 1.60 M2 #NAME? #NAME?
Sub Total B #NAME?
C PEKERJAAN STRUKTUR
1 Kolom Teras uk. 10/50 cm
- Beton K 225 P.BB.04 0.35 M3 #NAME? #NAME?
- Tulangan P.BB.07 83.81 Kg #NAME? #NAME?
- Bekisting kolom P.BB.11.a 8.40 M2 #NAME? #NAME?
2 Kolom Praktis uk. 10/10 cm
- Beton K 225 P.BB.04 0.88 M3 #NAME? #NAME?
- Tulangan P.BB.07 179.73 Kg #NAME? #NAME?
- Bekisting kolom P.BB.11.a 13.13 M2 #NAME? #NAME?
3 Balok Ring Uk. 10/15 cm
- Beton K 225 P.BB.04 1.07 M3 #NAME? #NAME?
- Tulangan P.BB.07 341.94 Kg #NAME? #NAME?
- Bekisting balok P.BB.12.a 28.40 M2 #NAME? #NAME?
Sub Total C #NAME?
D PEKERJAAN LANTAI, DINDING DAN PLESTERAN
1 Pasir urug P.T.11 36.33 M3 #NAME? #NAME?
2 Lantai beton tumbuk
- Beton Camp. 1Pc : 3Ps : 5Kr P.BB.01 8.65 M3 #NAME? #NAME?
- Tulangan diameter 6 - 20 cm P.BB.07 455.57 Kg #NAME? #NAME?
3 Dinding pasangan bataco uk. 15 x 30 x 7 cm P.Dnd.01 193.64 M2 #NAME? #NAME?
4 Plesteran dinding bataco tebal 1,5 cm P.Pls.04 387.29 M2 #NAME? #NAME?
5 Keramik Lantai uk. 40x40 cm P.LD.04 80.20 M2 #NAME? #NAME?
6 Lantai keramik ukuran 20 x 20 cm P.LD.01 6.30 M2 #NAME? #NAME?
7 Dinding keramik ukuran 20 x 25 cm (dinding) P.LD.07 35.50 M2 #NAME? #NAME?
Sub Total D #NAME?
KODE HARGA SATUAN J U M L A H
NO JENIS PEKERJAAN VOLUME
ANALISA (Rp.) (Rp.)
1 2 3 4 5 6
E PEKERJAAN ATAP
1 Konstruksi Kuda-Kuda dan Konsul kayu Klas II P.K.25 1.04 M3 #NAME? #NAME?
2 Gording dan Ikatan angin P.K.27 0.41 M3 #NAME? #NAME?
3 Kasau dan reng atap P.K.33 183.89 M2 #NAME? #NAME?
4 Penutup atap genteng metal 0.35 mm P.PA.13 183.89 M2 #NAME? #NAME?
5 Perabung atap/ jurai seng datar 0,30 mm - 30.18 M1 125,000.00 3,772,500.00
6 Lisplank Papan Klas I P.K.31 48.10 M1 #NAME? #NAME?
Sub Total E #NAME?
F PEKERJAAN KOSEN, PINTU, JENDELA DAN VENTILASI
1 Kusen Kayu Klas I + Pemasangan P.K.12 0.64 M3 #NAME? #NAME?
3 Pintu panil kayu klas I (dua daun) - 1.00 Unt 1,500,000.00 1,500,000.00
4 Pintu panil kayu klas I (satu daun) - 4.00 Unt 900,000.00 3,600,000.00
5 Pintu PVC + aksesoris lengkap (WC) - 2.00 Unt 800,000.00 1,600,000.00
6 Jendela kaca jungkit uk. 65x120 cm - 10.00 Unt 500,000.00 5,000,000.00
9 Pintu folding gate + aksesoris lengkap - 6.48 M2 820,000.00 5,313,600.00
10 Ventilasi Kayu 11.00 Unt 280,000.00 3,080,000.00
11 Ventilasi kaca 2.00 Unt 350,000.00 700,000.00
12 Ventilasi kerawang 10.00 Bh 15,000.00 150,000.00
13 Engsel pintu - 24.00 Bh 31,824.00 763,776.00
14 Engsel jendela - 20.00 Bh 22,464.00 449,280.00
15 Sloot pintu 8.00 Bh 3,000.00 24,000.00
16 Sloot jendela - 20.00 Bh 2,300.00 46,000.00
17 Handle pintu - 6.00 Bh 248,100.00 1,488,600.00
18 Handle jendela - 10.00 Bh 8,100.00 81,000.00
19 Kait angin - 10.00 Unt 13,800.00 138,000.00
20 Kunci tanam 2 slaag - 5.00 Bh 118,100.00 590,500.00
Sub Total F #NAME?
G PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II P.K.35 129.50 M2 #NAME? #NAME?
2 Plafond GRC Board 9 mm P.Pf.05 129.50 M2 #NAME? #NAME?
Sub Total G #NAME?
H PEKERJAAN MEKANIKAL/ELEKTRICAL
1 MCB - 1.00 Bh 70,000.00 70,000.00
2 Lampu SL 11 wat - 3.00 Bh 80,000.00 240,000.00
3 Lampu SL 22 wat - 7.00 Bh 120,000.00 840,000.00
4 Saklar double inbow - 1.00 Bh 60,000.00 60,000.00
5 Saklar tunggal inbow - 8.00 Bh 45,000.00 360,000.00
6 Stop kontak inbow - 3.00 Bh 45,000.00 135,000.00
7 Instalasi titik lampu dan stop kontak - 13.00 Ttk 150,000.00 1,950,000.00
Sub Total H 3,655,000.00
I PENGECATAN
1 Cat Tembok P.Ct.11 515.55 M2 #NAME? #NAME?
2 Cat Kilat P.Ct.04 17.65 M2 #NAME? #NAME?
Sub Total I #NAME?
KODE HARGA SATUAN J U M L A H
NO JENIS PEKERJAAN VOLUME
ANALISA (Rp.) (Rp.)
1 2 3 4 5 6
J PEKERJAAN SANITAIR
1 Instalasi Air bersih - 1.00 Ls 1,000,000.00 1,000,000.00
2 Instalasi Air Kotor - 1.00 Ls 750,000.00 750,000.00
3 Beerput - 1.00 Unt 3,000,000.00 3,000,000.00
4 Kran Air 1/2" - 3.00 Unt 16,000.00 48,000.00
5 Floor drain - 2.00 Unt 29,000.00 58,000.00
6 Lubang Penguras - 2.00 Unt 15,000.00 30,000.00
7 Bak Air beton 2.00 Unt 2,000,000.00 4,000,000.00
8 Kloset jongkok 2.00 Unt 177,200.00 354,400.00
Sub Total J 9,240,400.00
K PEKERJAAN LAIN-LAIN
1 Ornament Dinding (semen motiv timbul) - 1.00 Ls 2,000,000.00 2,000,000.00
2 Ornamen Kolom Teras (pasangan batako + plesteran motif) - 2.00 Unt 750,000.00 1,500,000.00
3 Ornament Tebing Layar (kaca warna) - 1.00 Unt 3,000,000.00 3,000,000.00
4 Tangga naik - 1.00 Bh 1,558,000.00 1,558,000.00
Sub Total K 8,058,000.00
Jumlah (A s/d K) #NAME?
PPN 10% #NAME?
JUMLAH TOTAL #NAME?
DIBULATKAN #NAME?
REKAPITULASI
HARGA PERKIRAAN SENDIRI

Pekerjaan : Pembangunan Pos Pengawas Perikanan Sambas


Lokasi : Kabupaten Sambas
Tahun Anggaran : 2014

JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp.)
1 2 3

A PEKERJAAN PENDAHULUAN #NAME?

B PEKERJAAN PONDASI #NAME?

C PEKERJAAN STRUKTUR #NAME?

D PEKERJAAN LANTAI, DINDING DAN PLESTERAN #NAME?

E PEKERJAAN ATAP #NAME?

F PEKERJAAN KOSEN, PINTU, JENDELA DAN VENTILASI #NAME?

G PEKERJAAN PLAFOND #NAME?

H PEKERJAAN MEKANIKAL/ELEKTRICAL 3,655,000.00

I PENGECATAN #NAME?

J PEKERJAAN SANITAIR 9,240,400.00

K PEKERJAAN LAIN-LAIN 8,058,000.00

JUMLAH #NAME?
PPN 10 % #NAME?
JUMLAH (A + B) #NAME?
DIBULATKAN #NAME?
Terbilang : Tiga Ratus Sembilan Puluh Delapan Juta Tujuh Ratus Delapan Puluh sembilan Ribu rupiah

Sambas, Mei 2014

PEJABAT PEMBUAT KOMITMEN

SURIAWAN, S.St, MT