WBS Name Duration Start Finish

0 Tambak Lorok CCPP Block 3 Project (Civil Works) 980 days? 8/11/2017 4/16/2020

1 Piling BOP WTP 350mm dia 2 days 5/21/2018 5/22/2018

2 Finish Load Test BOP WTP 1 day 7/13/2018 7/13/2018

3 Finish Load Test BOP WTP 1 day 7/13/2018 7/13/2018

4 GENERAL LAYOUT / SITE PREPARATION 977 days 8/11/2017 4/13/2020

4.1 Civil Works Mobilisation 9 days 10/3/2018 10/11/2018

4.1.1 CIVIL CONTRACTOR MOBILIZATION 8 days 10/3/2018 10/11/2018

4.2 Roads and Parking Areas 218 days 6/28/2019 1/31/2020

4.2.1 ROADS AND PARKING AREAS - DTO 0 days 6/28/2019 6/28/2019

4.2.2 ROADS AND PARKING AREAS - Preliminary 93 days 7/29/2019 10/29/2019

4.2.3 ROADS AND PARKING AREAS - BOP Area - Civil Construction 0 days 1/10/2020 1/10/2020

4.2.4 ROADS AND PARKING AREAS - Civil Construction 124 days 9/30/2019 1/31/2020

ROADS AND PARKING AREAS - Fuel Gas Area - Civil


4.2.5 18 days 11/1/2019 11/18/2019
Construction

ROADS AND PARKING AREAS - Power Block Area - Civil


4.2.6 50 days 11/18/2019 1/6/2020
Construction

4.2.7 ROADS AND PARKING AREAS - Signs & Marking 19 days 1/13/2020 1/31/2020
4.2.8 ROADS AND PARKING AREAS - CTO 0 days 1/31/2020 1/31/2020

4.3 Drainages 1 day 1/30/2020 1/30/2020

UG SERVICES / DRAINAGES NETWORK - Interconnecting and


4.3.1 0 days 1/30/2020 1/30/2020
Power Island - Civil Construction

4.4 Deep Foundations (Piling) 239 days 11/16/2017 7/12/2018


4.4.1 PILING - Test Pile Production & Delivery to Site 35 days 11/16/2017 12/20/2017
4.4.2 PILING - Subcontractor Mobilisation 14 days 12/20/2017 1/2/2018
4.4.3 PILING - Test Piling, Initial Pile Test & Report BOP WTP 21 days 6/19/2018 7/9/2018
4.4.4 PILING - Test Piling, Initial Pile Test & Report (PI) 23 days 6/20/2018 7/12/2018
4.5 Deep Foundations (Piling) - Power Block 178 days 9/24/2018 3/20/2019
4.5.1 PILING PI - GT& ST Turbine Building (ID# 208) 141 days 10/17/2018 3/6/2019

4.5.2 PILING PI - GT& ST TURBOSET BLOCK (ID# 208) 144 days 10/14/2018 3/6/2019

4.5.3 PILING PI - Trenches And Tunnels Power Block (ID# 113) 60 days 11/13/2018 1/11/2019

4.5.4 PILING PI - Exhaust Diffuser (ID# 203) 87 days 12/13/2018 3/9/2019

4.5.5 PILING PI - HRSG (ID# 202) 87 days 12/13/2018 3/9/2019

4.5.6 PILING PI - Duct Bank Power Block (ID# 112) 81 days 11/11/2018 1/30/2019

4.5.7 PILING PI - Fuel Gas Conditioning Skid (ID# 207) 2 days 12/28/2018 12/29/2018

4.5.8 PILING PI - Exhaust Stack (ID# 201) 87 days 12/13/2018 3/9/2019

4.5.9 PILING PI - Dosing Skid (ID# 216) 2 days 1/9/2019 1/10/2019

4.5.10 PILING PI - VFD Transformer (ID# 256) 4 days 1/25/2019 1/28/2019

4.5.11 PILING PI - Hard Standing Area (ID# 260) 16 days 12/18/2018 1/2/2019

4.5.12 PILING PI - GT Enclosure Ventilation Exhaust (ID# 228) 98 days 11/20/2018 2/25/2019
4.5.13 PILING PI - GT Fire Fighting System (ID# 251) 14 days 10/14/2018 10/27/2018

4.5.14 PILING PI - Continuous Emission Monitoring System (ID# 204) 2 days 1/2/2019 1/3/2019

4.5.15 PILING PI - Sampling Container (ID# 215) 0 days 10/7/2018 1/9/2019

4.5.16 PILING PI - Electrical Manhole Power Block (ID# 111) 73 days 12/1/2018 2/11/2019

4.5.17 PILING PI - Air Intake Filter House (ID# 213) 2 days 1/4/2019 1/5/2019

4.5.18 PILING PI - Feed Water Pump (ID# 234) 107 days 10/7/2018 1/21/2019

4.5.19 PILING PI - Ultrapure Water Shelter (ID# 239) 71 days 12/11/2018 2/19/2019

4.5.20 PILING PI - Pipe Rack (ID# 244) 18 days 2/15/2019 3/4/2019

4.5.21 PILING PI - Feedwater Recirculation Pump (ID# 205) 107 days 11/10/2018 2/24/2019

4.5.22 PILING PI - Ultrapure Water Tank (ID# 257) 9 days 12/11/2018 12/19/2018

4.5.23 PILING PI - Blowdown Tank (ID# 217) 20 days 11/11/2018 11/30/2018

4.5.24 PILING PI - Excitation Transformer (ID# 221) 32 days 1/14/2019 2/14/2019

4.5.25 PILING PI - LCI & Excitation Module (ID# 232) 32 days 1/14/2019 2/14/2019

4.5.26 PILING PI - Generator Busduct (ID# 229) 5 days 3/12/2019 3/16/2019

4.5.27 PILING PI - Oil Sep Pit Incl. Oil Sludge Collector (ID# 235) 4 days 2/27/2019 3/2/2019

4.5.28 PILING PI - Generator Circuit Breaker (ID# 222) 3 days 3/7/2019 3/9/2019
4.5.29 PILING PI - Auxiliary Boiler (ID# 249) 3 days 12/30/2018 1/1/2019

4.6 Deep Foundations (Piling) - Rest of Plant (ROP) 333 days 9/3/2018 8/1/2019

4.6.1 PILING ROP Area - CW Piping From Intake Head (ID# 210) 129 days 9/16/2018 1/22/2019

PILING ROP Area - Waste Water & Water Treatment Plant (ID#
4.6.2 44 days 12/4/2018 1/16/2019
243)

PILING ROP Area - CW Discharge Piping From Condenser (ID#


4.6.3 54 days 12/11/2018 2/2/2019
101)

4.6.4 PILING ROP Area - CW Supply Piping to Condenser (ID# 305) 70 days 10/30/2018 1/7/2019

4.6.5 PILING ROP Area - Auxiliary Transformer (ID# 255) 2 days 1/2/2019 1/3/2019

4.6.6 PILING ROP Area - HV Cable Rack (ID# 258) 96 days 11/2/2018 2/5/2019

4.6.7 PILING ROP Area - Pipe Sleeper BOP Area (ID# 209) 23 days 12/1/2018 12/23/2018

4.6.8 PILING ROP Area - Grading Drainage (ID# 114) 21 days 11/13/2018 12/3/2018

4.6.9 PILING ROP Area - Sea Water Pipes (ID# 247) 30 days 11/13/2018 12/12/2018

4.6.10 PILING ROP Area - Circulating Water Pump Station (ID# 301) 77 days 11/4/2018 1/19/2019

4.6.11 PILING ROP Area - Gas Receiving Station (ID# 236) 6 days 12/27/2018 1/1/2019

4.6.12 PILING ROP Area - Secondary E Building (ID# 230) 93 days 10/14/2018 1/14/2019

4.6.13 PILING ROP Area -FG Electrical Building (ID# 261) 7 days 1/4/2019 1/10/2019

PILING ROP Area - Waste Water Central Monitoring Basin (ID#


4.6.14 5 days 2/24/2019 2/28/2019
225 )
4.6.15 PILING ROP Area - Fuel Gas Compressor Building (ID# 241) 8 days 1/11/2019 1/18/2019

4.6.16 PILING ROP Area - Chemical & Lube Oil Building (ID# 252) 4 days 2/27/2019 3/2/2019

4.6.17 PILING ROP Area - Demin Process Tank (ID# 226) 10 days 3/2/2019 3/11/2019

PILING ROP Area - Administration, Electrical & Control Building


4.6.18 57 days 12/3/2018 1/28/2019
(ID# 223 )

4.6.19 PILING ROP Area - Service/Fire Water Tank (ID# 231) 18 days 1/24/2019 2/10/2019

4.6.20 PILING ROP Area - Gas Compressor Air Coolers (ID# 242) 3 days 1/19/2019 1/21/2019

4.6.21 PILING ROP Area - Mobile Fire Fighting Building (ID# 253) 3 days 1/22/2019 1/24/2019

PILING ROP Area - H2 & N2 Gas Bottle Storage Compound (ID#


4.6.22 4 days 12/23/2018 12/26/2018
212)

4.6.23 PILING ROP Area - Potable Pump Skid Shelter (ID# 259) 82 days 12/4/2018 2/23/2019

4.6.24 PILING ROP Area - Intake Head Structure (ID# 307) 42 days 1/1/2019 2/11/2019

4.6.25 PILING ROP Area - (GE) HV Cable Trench(ID# 237) 96 days 11/2/2018 2/5/2019

4.6.26 PILING ROP Area - Potable Water Tank (ID# 218) 82 days 12/4/2018 2/23/2019

4.6.27 PILING ROP Area - Air Compressor Skid (ID# 227) 125 days 10/28/2018 3/1/2019

4.6.28 PILING ROP Area - Step Up Transformer (ID# 219) 25 days 1/29/2019 2/22/2019

4.6.29 PILING ROP Area - Utility Pump Building (ID# 206) 9 days 11/23/2018 12/1/2018

4.6.30 PILING ROP Area - Electro-Chlorination Building (ID# 303) 16 days 2/11/2019 2/26/2019
4.6.31 PILING ROP Area - Emergency Diesel Generator (ID# 224 ) 5 days 2/22/2019 2/26/2019

4.6.32 PILING ROP Area - Unit Auxiliary Transformer (ID# 220) 32 days 1/14/2019 2/14/2019

4.6.33 PILING ROP Area - Outfall Structurer (ID# 102) 14 days 2/3/2019 2/16/2019

4.6.34 PILING ROP Area - Warehouse & Workshop Building (ID# 264) 40 days 1/15/2019 2/23/2019

4.6.35 PILING ROP - Hard Standing Area (ID# 260) 16 days 5/1/2019 5/16/2019

4.6.36 PILING ROP Area - Fencing (ID# 116) 30 days 7/3/2019 8/1/2019

4.7 Boundary Fence 188 days 7/27/2019 1/31/2020

4.7.1 BOUNDARY FENCE - DTO 0 days 7/27/2019 7/27/2019

4.7.2 BOUNDARY FENCE - Procurement 90 days 8/2/2019 10/30/2019

4.7.3 BOUNDARY FENCE - Civil Construction 0 days 1/16/2020 1/16/2020

4.7.4 BOUNDARY FENCE - Installation 96 days 10/28/2019 1/31/2020

4.7.5 BOUNDARY FENCE - CTO 1 day 1/31/2020 1/31/2020

4.8 Landscaping 127 days 12/9/2019 4/13/2020

4.8.1 LANDSCAPING - Plant - DTO 0 days 12/9/2019 12/9/2019

4.8.2 LANDSCAPING - Execution 95 days 1/10/2020 4/13/2020

4.8.3 LANDSCAPING - Plant - CTO 0 days 4/13/2020 4/13/2020


4.9 General Levelling 243 days 8/11/2017 4/10/2018

4.9.1 SITE PREPARATION - Subcontractor Mobilization 5 days 8/11/2017 8/15/2017

4.9.2 SITE PREPARATION - Site Levelling & Tree Cutting 21 days 8/16/2017 9/5/2017

4.9.3 SITE PREPARATION - Demolition/Relocation Works 0 days 4/10/2018 4/10/2018

5 POWER BLOCK 471 days 10/23/2018 2/5/2020

5.1 Heat Recovery Steam Generator (HRSG) 163 days 12/13/2018 5/24/2019

5.1.1 HRSG - Foundation - DTO 0 days 12/13/2018 12/13/2018

5.1.2 HRSG - Foundation - Excavation & Pile Head Preparation 15 days 3/10/2019 3/24/2019

5.1.2.1 Excavation 15 days 3/10/2019 3/24/2019

5.1.2.2 Pile Head Cutting 10 days 3/15/2019 3/24/2019

5.1.3 HRSG - Foundation - Civil Construction 93 days 1/23/2019 4/25/2019

5.1.3.1 Footing Foundation 8 days 3/26/2019 4/2/2019

5.1.3.1.1 Leveling 1 day 3/26/2019 3/26/2019

5.1.3.1.2 Lean Concrete 1 day 3/26/2019 3/26/2019

5.1.3.1.3 Rebar 2 days 3/29/2019 3/30/2019

5.1.3.1.4 Formworks 2 days 3/31/2019 4/1/2019


5.1.3.1.5 Concrete Pouring 1 day 4/2/2019 4/2/2019

5.1.3.2 Pedestal Work 8 days 4/5/2019 4/12/2019

5.1.3.2.1 Leveling 1 day 4/5/2019 4/5/2019

5.1.3.2.2 Lean Concrete 1 day 4/5/2019 4/5/2019

5.1.3.2.3 Rebar 2 days 4/8/2019 4/9/2019

5.1.3.2.4 Anchor Bolt Installation 2 days 4/10/2019 4/11/2019

5.1.3.2.5 Formworks 2 days 4/10/2019 4/11/2019

5.1.3.2.6 Concrete Pouring 1 day 4/12/2019 4/12/2019

5.1.3.3 Tie Beam 8 days 4/8/2019 4/15/2019

5.1.3.3.1 Leveling 1 day 4/8/2019 4/8/2019

5.1.3.3.2 Lean Concrete 1 day 4/8/2019 4/8/2019

5.1.3.3.3 Rebar 2 days 4/11/2019 4/12/2019

5.1.3.3.4 Formworks 2 days 4/13/2019 4/14/2019

5.1.3.3.5 Concrete Pouring 1 day 4/15/2019 4/15/2019

5.1.3.4 Slab Work 8 days 4/18/2019 4/25/2019

5.1.3.4.1 Leveling 1 day 4/18/2019 4/18/2019


5.1.3.4.2 Lean Concrete 1 day 4/18/2019 4/18/2019

5.1.3.4.3 Rebar 2 days 4/21/2019 4/22/2019

5.1.3.4.4 Formworks 2 days 4/23/2019 4/24/2019

5.1.3.4.5 Concrete Pouring 1 day 4/25/2019 4/25/2019

5.1.3.5 Base Raft 93 days 1/23/2019 4/25/2019

5.1.3.5.1 Soil Replacement Backfill and Compaction 5 days 1/23/2019 1/27/2019

5.1.3.5.2 Leveling 1 day 4/18/2019 4/18/2019

5.1.3.5.3 Lean Concrete 1 day 4/19/2019 4/19/2019

5.1.3.5.4 Rebar 2 days 4/21/2019 4/22/2019

5.1.3.5.5 Formworks 2 days 4/23/2019 4/24/2019

5.1.3.5.6 Concrete Pouring 1 day 4/25/2019 4/25/2019

5.1.4 HRSG - Stack Foundation - Embedments MHO 0 days 1/16/2019 1/16/2019

5.1.5 HRSG - Foundation - Concrete of Upper Curb 24 days 4/30/2019 5/23/2019

5.1.5.1 Leveling 2 days 4/30/2019 5/1/2019

5.1.5.2 Lean Concrete 5 days 4/30/2019 5/4/2019

5.1.5.3 Rebar 14 days 5/7/2019 5/20/2019


5.1.5.4 Form Works 14 days 5/7/2019 5/20/2019

5.1.5.5 Concrete Pouring 3 days 5/21/2019 5/23/2019

5.1.6 HRSG - Main Foundation incl. Stack CTO 0 days 5/24/2019 5/24/2019

5.2 Auxilliary Boiler 79 days 2/28/2019 5/17/2019

5.2.1 AUXILIARY BOILER (ID# 249) - Foundation - DTO 0 days 2/28/2019 2/28/2019

AUXILIARY BOILER (ID# 249) - Foundation - Excavation & Pile


5.2.2 14 days 3/21/2019 4/3/2019
Head Preparation

5.2.2.1 Excavation 14 days 3/21/2019 4/3/2019

5.2.2.2 Pile Head Cutting 9 days 3/26/2019 4/3/2019

5.2.3 AUXILIARY BOILER (ID# 249) - Foundation - Civil Construction 43 days 4/5/2019 5/17/2019

5.2.3.1 Soil Replacement Backfill and Compaction 7 days 4/5/2019 4/11/2019

5.2.3.2 Leveling 2 days 4/12/2019 4/13/2019

5.2.3.3 Lean Concrete 7 days 4/14/2019 4/20/2019

5.2.3.4 Rebar 10 days 4/28/2019 5/7/2019

5.2.3.5 Formwork 10 days 5/1/2019 5/10/2019

5.2.3.6 Concrete Pouring 7 days 5/11/2019 5/17/2019

5.2.4 AUXILIARY BOILER (ID# 249) - Foundation - CTO 0 days 5/17/2019 5/17/2019
5.3 HRSG Blowdown Pit 175 days 12/10/2018 6/2/2019

5.3.1 HRSG - Blowdown Module - Steel Structure - DTO 0 days 12/10/2018 12/10/2018

5.3.2 HRSG - Blowdown Module - Foundation - DTO 0 days 12/13/2018 12/13/2018

5.3.3 HRSG - Blowdown Pit Sheet Piling 8 days 3/10/2019 3/17/2019

5.3.3.1 Sheet Piling 8 days 3/10/2019 3/17/2019

5.3.4 HRSG - Blowdown Pit Excavation & Pile Head Preparation 13 days 3/19/2019 3/31/2019

5.3.4.1 Excavation 13 days 3/19/2019 3/31/2019

5.3.4.2 Pile Head Cutting 10 days 3/22/2019 3/31/2019

5.3.5 HRSG - Blowdown Module - Base Slab 25 days 4/2/2019 4/26/2019

5.3.5.1 Soil Replacement, Backfill, and Compaction 14 days 4/2/2019 4/15/2019

5.3.5.2 Leveling 2 days 4/16/2019 4/17/2019

5.3.5.3 Lean Concrete 2 days 4/16/2019 4/17/2019

5.3.5.4 Rebar 3 days 4/20/2019 4/22/2019

5.3.5.5 Formworks 3 days 4/23/2019 4/25/2019

5.3.5.6 Concrete Pouring 1 day 4/26/2019 4/26/2019

5.3.6 HRSG - Blowdown Pit - Finishing Works 24 days 4/28/2019 5/21/2019


5.3.6.1 Finishing 24 days 4/28/2019 5/21/2019

5.3.7 HRSG - Blowdown Module - Install Misc. Steel Str. 7 days 5/23/2019 5/29/2019

5.3.7.1 Steel Structure Installation 7 days 5/23/2019 5/29/2019

5.3.8 HRSG - Blowdown Module - CTO (CTO_H_B) 0 days 6/2/2019 6/2/2019

5.4 Feed Water Pumps 314 days 3/29/2019 2/5/2020

5.4.1 FEEDWATER PUMPS (ID# 234) - Foundation - DTO 0 days 3/29/2019 3/29/2019

FEEDWATER PUMPS (ID# 234) - Excavation & Pile Head


5.4.2 14 days 4/24/2019 5/7/2019
Preparation

5.4.2.1 Excavation 14 days 4/24/2019 5/7/2019

5.4.2.2 Pile Head Cutting 9 days 4/29/2019 5/7/2019

5.4.3 FEEDWATER PUMPS (ID# 234) - Foundation Concrete Works 75 days 5/9/2019 7/22/2019

5.4.3.1 Footing Foundation 25 days 5/9/2019 6/2/2019

5.4.3.1.1 Leveling 2 days 5/9/2019 5/10/2019

5.4.3.1.2 Lean Concrete 4 days 5/9/2019 5/12/2019

5.4.3.1.3 Rebar 5 days 5/19/2019 5/23/2019

5.4.3.1.4 Formworks 5 days 5/24/2019 5/28/2019

5.4.3.1.5 Concrete Pouring 5 days 5/29/2019 6/2/2019


5.4.3.2 Pedestal Work 21 days 6/5/2019 6/25/2019

5.4.3.2.1 Leveling 3 days 6/5/2019 6/7/2019

5.4.3.2.2 Lean Concrete 3 days 6/5/2019 6/7/2019

5.4.3.2.3 Rebar 5 days 6/14/2019 6/18/2019

5.4.3.2.4 Anchor Bolt Installation 5 days 6/16/2019 6/20/2019

5.4.3.2.5 Formworks 5 days 6/16/2019 6/20/2019

5.4.3.2.6 Concrete Pouring 5 days 6/21/2019 6/25/2019

5.4.3.3 Tie Beam 21 days 6/10/2019 6/30/2019

5.4.3.3.1 Leveling 3 days 6/10/2019 6/12/2019

5.4.3.3.2 Lean Concrete 3 days 6/10/2019 6/12/2019

5.4.3.3.3 Rebar 5 days 6/19/2019 6/23/2019

5.4.3.3.4 Formworks 5 days 6/21/2019 6/25/2019

5.4.3.3.5 Concrete Pouring 5 days 6/26/2019 6/30/2019

5.4.3.4 Slab Work 20 days 7/3/2019 7/22/2019

5.4.3.4.1 Leveling 3 days 7/3/2019 7/5/2019

5.4.3.4.2 Lean Concrete 3 days 7/3/2019 7/5/2019


5.4.3.4.3 Rebar 3 days 7/12/2019 7/14/2019

5.4.3.4.4 Formworks 4 days 7/15/2019 7/18/2019

5.4.3.4.5 Concrete Pouring 4 days 7/19/2019 7/22/2019

5.4.4 FEEDWATER PUMPS (ID# 234) - Foundation CTO 0 days 7/23/2019 7/23/2019

FEEDWATER PUMPS (ID# 234) - Ready for Steel Erection (Pump


5.4.5 0 days 11/25/2019 11/25/2019
Installed)

5.4.6 FEEDWATER PUMPS (ID# 234) - Steel Erection 36 days 11/26/2019 12/31/2019

5.4.6.1 Steel Erection 36 days 11/26/2019 12/31/2019

5.4.7 FEEDWATER PUMPS (ID# 234) - Roofing & Cladding Erection 35 days 1/2/2020 2/5/2020

5.4.7.1 Roofing and Cladding Erection 35 days 1/2/2020 2/5/2020

5.5 Feed Water Recirculation Pumps 354 days 1/22/2019 1/10/2020

FEEDWATER RECIRCULATION PUMP (ID# 205) - Foundation -


5.5.1 0 days 1/22/2019 1/22/2019
DTO

FEEDWATER RECIRCULATION PUMP (ID# 205) - Excavation &


5.5.2 6 days 2/25/2019 3/2/2019
Pile Head Preparation

5.5.2.1 Excavation 6 days 2/25/2019 3/2/2019

5.5.2.2 Pile Head Cutting 5 days 2/26/2019 3/2/2019

FEEDWATER RECIRCULATION PUMP (ID# 205) - Foundation


5.5.3 39 days 3/5/2019 4/12/2019
Concrete Works

5.5.3.1 Footing Foundation 11 days 3/5/2019 3/15/2019


5.5.3.1.1 Leveling 1 day 3/5/2019 3/5/2019

5.5.3.1.2 Lean Concrete 1 day 3/5/2019 3/5/2019

5.5.3.1.3 Rebar 3 days 3/8/2019 3/10/2019

5.5.3.1.4 Formworks 3 days 3/11/2019 3/13/2019

5.5.3.1.5 Concrete Pouring 2 days 3/14/2019 3/15/2019

5.5.3.2 Pedestal Work 11 days 3/18/2019 3/28/2019

5.5.3.2.1 Leveling 2 days 3/18/2019 3/19/2019

5.5.3.2.2 Lean Concrete 2 days 3/18/2019 3/19/2019

5.5.3.2.3 Rebar 3 days 3/22/2019 3/24/2019

5.5.3.2.4 Anchor Bolt Installation 3 days 3/24/2019 3/26/2019

5.5.3.2.5 Formworks 3 days 3/24/2019 3/26/2019

5.5.3.2.6 Concrete Pouring 2 days 3/27/2019 3/28/2019

5.5.3.3 Tie Beam 10 days 3/22/2019 3/31/2019

5.5.3.3.1 Leveling 2 days 3/22/2019 3/23/2019

5.5.3.3.2 Lean Concrete 2 days 3/22/2019 3/23/2019

5.5.3.3.3 Rebar 3 days 3/26/2019 3/28/2019


5.5.3.3.4 Formworks 2 days 3/28/2019 3/29/2019

5.5.3.3.5 Concrete Pouring 2 days 3/30/2019 3/31/2019

5.5.3.4 Slab Work 10 days 4/3/2019 4/12/2019

5.5.3.4.1 Leveling 2 days 4/3/2019 4/4/2019

5.5.3.4.2 Lean Concrete 2 days 4/3/2019 4/4/2019

5.5.3.4.3 Rebar 3 days 4/7/2019 4/9/2019

5.5.3.4.4 Formworks 2 days 4/10/2019 4/11/2019

5.5.3.4.5 Concrete Pouring 1 day 4/12/2019 4/12/2019

5.5.4 FEEDWATER RECIRCULATION PUMP (ID# 205) - Foundation CTO 0 days 4/13/2019 4/13/2019

FEEDWATER RECIRCULATION PUMP (ID# 205) - Ready for Steel


5.5.5 0 days 11/20/2019 11/20/2019
Erection if Required (Pump Installed)

FEEDWATER RECIRCULATION PUMP (ID# 205) - Steel Erection (If


5.5.6 17 days 12/6/2019 12/22/2019
Required)

5.5.6.1 Steel Erection 17 days 12/6/2019 12/22/2019

FEEDWATER RECIRCULATION PUMP (ID# 205) - Roofing &


5.5.7 17 days 12/25/2019 1/10/2020
Cladding Erection (If Required)

5.5.7.1 Roofing and Cladding Erection 17 days 12/25/2019 1/10/2020

5.6 Fuel Gas Monitoring 150 days 2/4/2019 7/3/2019

5.6.1 FUEL GAS MONITORING (CEMS) - Foundation - DTO 0 days 2/4/2019 2/4/2019
FUEL GAS MONITORING (CEMS) - Foundation - Excavation &
5.6.2 7 days 5/16/2019 5/22/2019
Pile Head Preparation

5.6.2.1 Excavation 7 days 5/16/2019 5/22/2019

5.6.2.2 Pile Head Cutting 5 days 5/18/2019 5/22/2019

5.6.3 FUEL GAS MONITORING (CEMS) - Foundation - Concrete 40 days 5/24/2019 7/2/2019

5.6.3.1 Footing Foundation 10 days 5/24/2019 6/2/2019

5.6.3.1.1 Leveling 1 day 5/24/2019 5/24/2019

5.6.3.1.2 Lean Concrete 1 day 5/24/2019 5/24/2019

5.6.3.1.3 Rebar 3 days 5/27/2019 5/29/2019

5.6.3.1.4 Formworks 3 days 5/30/2019 6/1/2019

5.6.3.1.5 Concrete Pouring 1 day 6/2/2019 6/2/2019

5.6.3.2 Pedestal Work 9 days 6/5/2019 6/13/2019

5.6.3.2.1 Leveling 1 day 6/5/2019 6/5/2019

5.6.3.2.2 Lean Concrete 2 days 6/5/2019 6/6/2019

5.6.3.2.3 Rebar 3 days 6/9/2019 6/11/2019

5.6.3.2.4 Anchor Bolt Installation 3 days 6/9/2019 6/11/2019

5.6.3.2.5 Formworks 3 days 6/9/2019 6/11/2019


5.6.3.2.6 Concrete Pouring 2 days 6/12/2019 6/13/2019

5.6.3.3 Tie Beam 11 days 6/8/2019 6/18/2019

5.6.3.3.1 Leveling 2 days 6/8/2019 6/9/2019

5.6.3.3.2 Lean Concrete 2 days 6/8/2019 6/9/2019

5.6.3.3.3 Rebar 3 days 6/12/2019 6/14/2019

5.6.3.3.4 Formworks 3 days 6/14/2019 6/16/2019

5.6.3.3.5 Concrete Pouring 2 days 6/17/2019 6/18/2019

5.6.3.4 Slab Work 12 days 6/21/2019 7/2/2019

5.6.3.4.1 Leveling 2 days 6/21/2019 6/22/2019

5.6.3.4.2 Lean Concrete 2 days 6/23/2019 6/24/2019

5.6.3.4.3 Rebar 2 days 6/27/2019 6/28/2019

5.6.3.4.4 Formworks 2 days 6/29/2019 6/30/2019

5.6.3.4.5 Concrete Pouring 2 days 7/1/2019 7/2/2019

5.6.4 FUEL GAS MONITORING (CEMS) - Foundation - CTO 0 days 7/3/2019 7/3/2019

5.7 Single Shaft Turbine Hall 398 days 10/23/2018 11/24/2019

5.7.1 Foundation 235 days 10/23/2018 6/14/2019


5.7.1.1 TURBINE HALL - Building Foundation Bolts - MHO 0 days 10/23/2018 10/23/2018

5.7.1.2 TURBINE HALL - Underground Services - DTO 0 days 1/9/2019 1/9/2019

5.7.1.3 TURBINE HALL - Building Foundation - DTO 0 days 1/9/2019 1/9/2019

TURBINE HALL - Building Foundation - Excavation and Pile


5.7.1.4 28 days 3/7/2019 4/3/2019
Head Preparation

5.7.1.4.1 Excavation 28 days 3/7/2019 4/3/2019

5.7.1.4.2 Pile Head Cutting 14 days 3/21/2019 4/3/2019

TURBINE HALL - Building Foundation - Formworks & Concrete


5.7.1.5 65 days 4/11/2019 6/14/2019
Works

5.7.1.5.1 Footing Foundation 39 days 4/11/2019 5/19/2019

5.7.1.5.1.1 Leveling 2 days 4/11/2019 4/12/2019

5.7.1.5.1.2 Lean Concrete 5 days 4/12/2019 4/16/2019

5.7.1.5.1.3 Rebar 9 days 4/24/2019 5/2/2019

5.7.1.5.1.4 Formworks 9 days 5/3/2019 5/11/2019

5.7.1.5.1.5 Concrete Pouring 8 days 5/12/2019 5/19/2019

5.7.1.5.2 Pedestal Work 33 days 5/12/2019 6/13/2019

5.7.1.5.2.1 Leveling 2 days 5/12/2019 5/13/2019

5.7.1.5.2.2 Lean Concrete 5 days 5/14/2019 5/18/2019


5.7.1.5.2.3 Rebar 9 days 5/26/2019 6/3/2019

5.7.1.5.2.4 Anchor Bolt Installation 9 days 5/28/2019 6/5/2019

5.7.1.5.2.5 Formworks 9 days 5/28/2019 6/5/2019

5.7.1.5.2.6 Concrete Pouring 8 days 6/6/2019 6/13/2019

5.7.1.5.3 Tie Beam 34 days 5/12/2019 6/14/2019

5.7.1.5.3.1 Leveling 2 days 5/12/2019 5/13/2019

5.7.1.5.3.2 Lean Concrete 5 days 5/14/2019 5/18/2019

5.7.1.5.3.3 Rebar 9 days 5/26/2019 6/3/2019

5.7.1.5.3.4 Formworks 9 days 5/28/2019 6/5/2019

5.7.1.5.3.5 Concrete Pouring 9 days 6/6/2019 6/14/2019

5.7.1.6 TURBINE HALL - Ground Floor Slab - DTO 0 days 2/26/2019 2/26/2019

5.7.1.7 TURBINE HALL - Floor Slab - Excavation & U/G Installation 47 days 2/27/2019 4/14/2019

5.7.1.7.1 Excavation 21 days 2/27/2019 3/19/2019

5.7.1.7.2 U/G Installation 28 days 3/18/2019 4/14/2019

TURBINE HALL - Floor Slab - Building Foundation - Concrete


5.7.1.8 65 days 3/8/2019 5/11/2019
Beam Works

5.7.1.8.1 Slab 33 days 3/8/2019 4/9/2019


5.7.1.8.1.1 Leveling 2 days 3/8/2019 3/9/2019

5.7.1.8.1.2 Lean Concrete 7 days 3/10/2019 3/16/2019

5.7.1.8.1.3 Rebar 7 days 3/22/2019 3/28/2019

5.7.1.8.1.4 Formworks 7 days 3/29/2019 4/4/2019

5.7.1.8.1.5 Concrete Pouring 5 days 4/5/2019 4/9/2019

5.7.1.8.2 Equipments Plinths 25 days 4/17/2019 5/11/2019

5.7.1.8.2.1 Rebar 7 days 4/17/2019 4/23/2019

5.7.1.8.2.2 Anchor Bolt Installation 7 days 4/24/2019 4/30/2019

5.7.1.8.2.3 Formworks 6 days 5/1/2019 5/6/2019

5.7.1.8.2.4 Concrete Pouring 5 days 5/7/2019 5/11/2019

TURBINE HALL - Building Foundation - Release for Steel


5.7.1.9 0 days 4/11/2019 4/11/2019
Structure Erection

TURBINE HALL - Floor Slab - CTO (Including Duct Banks &


5.7.1.10 0 days 5/9/2019 5/9/2019
Pits)

5.7.2 Structural Steel 275 days 10/25/2018 7/26/2019

TURBINE HALL - Main/Sec. Steel Structure - MTO for Steel


5.7.2.1 0 days 10/25/2018 10/25/2018
Manufacturing (incl. shop design)

TURBINE HALL - Main/Sec. Steel Structure - Procurement


5.7.2.2 186 days 10/26/2018 4/29/2019
Manufacture / Delivery (incl. shop design)

5.7.2.2.1 Manufacturing 150 days 10/26/2018 3/24/2019


5.7.2.2.2 Delivery 36 days 3/25/2019 4/29/2019

5.7.2.3 TURBINE HALL - Sec. Steel Str. & Platforms - DTO 0 days 4/16/2019 4/16/2019

5.7.2.4 TURBINE HALL - Building Steel Structure - DTO 0 days 4/16/2019 4/16/2019

5.7.2.5 TURBINE HALL - Internal Platform 66 days 4/24/2019 6/28/2019

5.7.2.5.1 Internal Platform Installation 66 days 4/24/2019 6/28/2019

5.7.2.6 TURBINE HALL - Main Steel Structure - Erection 61 days 5/1/2019 6/30/2019

5.7.2.6.1 Main Steel Structure Erection 61 days 5/1/2019 6/30/2019

5.7.2.7 TURBINE HALL - Sec. Steel Structure (for Roof) - Erection 36 days 6/21/2019 7/26/2019

5.7.2.7.1 Roof Steel Structure Erection 36 days 6/21/2019 7/26/2019

5.7.2.8 TURBINE HALL - Platforms - CTO (CTO_P_F) 0 days 6/20/2019 6/20/2019

TURBINE HALL - Building Steel Structure (For Overhead Crane


5.7.2.9 0 days 6/22/2019 6/22/2019
Erection) - CTO (CTO_P_D1)

5.7.2.10 TURBINE HALL - Air Intake Support - Steel Structure Erection 16 days 7/3/2019 7/18/2019

5.7.2.10.1 Steel Structure Erection 16 days 7/3/2019 7/18/2019

TURBINE HALL - Building Steel Structure (For Air Intake Filter


5.7.2.11 0 days 7/9/2019 7/9/2019
House) - CTO

5.7.3 Roofing and Cladding 233 days 4/6/2019 11/24/2019

5.7.3.1 TURBINE HALL - Roofing & Cladding - Manufacture / Delivery 95 days 4/6/2019 7/9/2019
5.7.3.1.1 Manufacturing 65 days 4/6/2019 6/9/2019

5.7.3.1.2 Delivery 30 days 6/10/2019 7/9/2019

TURBINE HALL - Sec. Steel Structure Doors - Manuf. /


5.7.3.2 159 days 4/26/2019 10/1/2019
Transport to Site

5.7.3.2.1 Manufacturing 127 days 4/26/2019 8/30/2019

5.7.3.2.2 Delivery 32 days 8/31/2019 10/1/2019

5.7.3.3 TURBINE HALL - Architectural Drawings & Details - DTO 0 days 5/29/2019 5/29/2019

5.7.3.4 TURBINE HALL - Building Roofing/Cladding - DTO 0 days 5/29/2019 5/29/2019

5.7.3.5 TURBINE HALL - Roofing - Erection (ST/ Condenser) 23 days 7/17/2019 8/8/2019

5.7.3.5.1 ST Roofing Erection 23 days 7/17/2019 8/8/2019

5.7.3.6 TURBINE HALL - Roofing - Erection (GT/ Geno) 17 days 7/23/2019 8/8/2019

5.7.3.6.1 GT/Generator Roofing Erection 17 days 7/23/2019 8/8/2019

5.7.3.7 TURBINE HALL - Roofing - CTO (ST/ Condenser) 0 days 8/3/2019 8/3/2019

5.7.3.8 TURBINE HALL - Roofing - CTO (GT/ Geno) 0 days 8/3/2019 8/3/2019

5.7.3.9 TURBINE HALL - Cladding - Erection 41 days 8/11/2019 9/20/2019

5.7.3.9.1 Erection 41 days 8/11/2019 9/20/2019

5.7.3.10 TURBINE HALL - Wall Finishing Works & Doors Installation 17 days 10/3/2019 10/19/2019
5.7.3.10.1 Wall Finishing 13 days 10/3/2019 10/15/2019

5.7.3.10.2 Doors Installation 10 days 10/10/2019 10/19/2019

TURBINE HALL - Turn Over from Erection to Civil to finalize the


5.7.3.11 0 days 10/11/2019 10/11/2019
Job

5.7.3.12 TURBINE HALL - Sealing of roof and façade penetrations 33 days 10/23/2019 11/24/2019

5.7.3.12.1 Roof Sealing and Façade Penetration 33 days 10/23/2019 11/24/2019

5.7.3.13 TURBINE HALL - Complete - CTO (CTO_P_D2) 0 days 11/15/2019 11/15/2019

5.8 Single Shaft Foundation Block 319 days 11/12/2018 9/26/2019

5.8.1 CONDENSER PIT - Concrete Wall & Plinth - DTO 0 days 11/12/2018 11/12/2018

5.8.2 CONDENSER PIT - DTO 0 days 11/12/2018 11/12/2018

5.8.3 POWER TRAIN FOUNDATION - DTO 0 days 11/30/2018 11/30/2018

POWER TRAIN FOUNDATION - Excavation & Pile Head


5.8.4 12 days 3/7/2019 3/18/2019
Preparation

5.8.4.1 Excavation 12 days 3/7/2019 3/18/2019

5.8.4.2 Pile Head Cutting 10 days 3/9/2019 3/18/2019

5.8.5 POWER TRAIN FOUNDATION - Embedments - MHO 0 days 1/22/2019 1/22/2019

5.8.6 POWER TRAIN FOUNDATION - Construct Base Raft 58 days 3/24/2019 5/20/2019

5.8.6.1 Soil Replacement Backfill and Compaction 12 days 3/24/2019 4/4/2019


5.8.6.2 Leveling 5 days 4/5/2019 4/9/2019

5.8.6.3 Lean Concrete 7 days 4/6/2019 4/12/2019

5.8.6.4 Rebar 12 days 4/20/2019 5/1/2019

5.8.6.5 Formworks 12 days 5/2/2019 5/13/2019

5.8.6.6 Concrete Pouring 7 days 5/14/2019 5/20/2019

5.8.7 POWER TRAIN FOUNDATION - Construct Pillars 40 days 5/24/2019 7/2/2019

5.8.7.1 Rebar 12 days 5/24/2019 6/4/2019

5.8.7.2 Anchor Bolt Installation 12 days 6/5/2019 6/16/2019

5.8.7.3 Formworks 12 days 6/17/2019 6/28/2019

5.8.7.4 Concrete Pouring 4 days 6/29/2019 7/2/2019

5.8.8 POWER TRAIN FOUNDATION - Construct ST Table Top (1D) 79 days 7/10/2019 9/26/2019

5.8.8.1 Rebar 21 days 7/10/2019 7/30/2019

5.8.8.2 Anchor Bolt Installation 21 days 7/31/2019 8/20/2019

5.8.8.3 Formworks 21 days 8/21/2019 9/10/2019

5.8.8.4 Concrete Pouring 16 days 9/11/2019 9/26/2019

CONDENSER PIT - Condensate Pump Pits and ADV -


5.8.9 12 days 4/13/2019 4/24/2019
Construction
5.8.9.1 Leveling 1 day 4/13/2019 4/13/2019

5.8.9.2 Lean Concrete 2 days 4/13/2019 4/14/2019

5.8.9.3 Rebar 6 days 4/17/2019 4/22/2019

5.8.9.4 Form Works 6 days 4/17/2019 4/22/2019

5.8.9.5 Concrete Pouring 2 days 4/23/2019 4/24/2019

5.8.10 CONDENSER PIT - Concrete Base Mat Condenser -3.5 22 days 4/20/2019 5/11/2019

5.8.10.1 Sand Replacement 5 days 4/20/2019 4/24/2019

5.8.10.2 Lean Concrete 2 days 4/25/2019 4/26/2019

5.8.10.3 Rebar 9 days 4/29/2019 5/7/2019

5.8.10.4 Form Works 9 days 4/29/2019 5/7/2019

5.8.10.5 Concrete Pouring 4 days 5/8/2019 5/11/2019

5.8.11 CONDENSER PIT - Condenser Plinths & Supports - Construction 11 days 5/19/2019 5/29/2019

5.8.11.1 Rebar 7 days 5/19/2019 5/25/2019

5.8.11.2 Anchor Bolt 7 days 5/21/2019 5/27/2019

5.8.11.3 Form Works 7 days 5/21/2019 5/27/2019

5.8.11.4 Concrete Pouring 2 days 5/28/2019 5/29/2019


5.8.12 POWER TRAIN FOUNDATION - GT-Generator - CTO (CTO_P_A1) 0 days 3/28/2019 3/28/2019

CONDENSER PIT - Condenser & ADV Pit - Steel Structure


5.8.13 16 days 6/2/2019 6/17/2019
Erection

5.8.13.1 Erection 16 days 6/2/2019 6/17/2019

POWER TRAIN FOUNDATION - Concrete Base Mat Between


5.8.14 0 days 5/4/2019 5/4/2019
ST/Generator

5.8.15 POWER TRAIN FOUNDATION - Steam Turbine - CTO (CTO_P_A2) 0 days 7/22/2019 7/22/2019

CONDENSER PIT - ADV Pit and Condenser - CTO_P_C (in Case


5.8.16 0 days 7/22/2019 7/22/2019
of ADV Module)

5.8.17 CONDENSER PIT - CTO 0 days 7/22/2019 7/22/2019

5.9 Gas Turbine Exhaust Diffuser 156 days 1/9/2019 6/13/2019

5.9.1 GT EXHAUST FOUNDATION - DTO 0 days 1/9/2019 1/9/2019

5.9.2 GT EXHAUST FOUNDATION - Excavation & Pile Head Preparation 7 days 3/28/2019 4/3/2019

5.9.2.1 Excavation 7 days 3/28/2019 4/3/2019

5.9.2.2 Pile Head Cutting 5 days 3/30/2019 4/3/2019

5.9.3 GT EXHAUST FOUNDATION - Concrete Work 36 days 5/5/2019 6/9/2019

5.9.3.1 Footing Foundation 13 days 5/5/2019 5/17/2019

5.9.3.1.1 Leveling 1 day 5/5/2019 5/5/2019

5.9.3.1.2 Lean Concrete 2 days 5/5/2019 5/6/2019


5.9.3.1.3 Rebar 3 days 5/9/2019 5/11/2019

5.9.3.1.4 Formworks 3 days 5/12/2019 5/14/2019

5.9.3.1.5 Concrete Pouring 3 days 5/15/2019 5/17/2019

5.9.3.2 Pedestal Work 10 days 5/20/2019 5/29/2019

5.9.3.2.1 Leveling 1 day 5/20/2019 5/20/2019

5.9.3.2.2 Lean Concrete 2 days 5/20/2019 5/21/2019

5.9.3.2.3 Rebar 3 days 5/24/2019 5/26/2019

5.9.3.2.4 Anchor Bolt Installation 3 days 5/24/2019 5/26/2019

5.9.3.2.5 Formworks 3 days 5/24/2019 5/26/2019

5.9.3.2.6 Concrete Pouring 3 days 5/27/2019 5/29/2019

5.9.3.3 Tie Beam 7 days 5/23/2019 5/29/2019

5.9.3.3.1 Leveling 1 day 5/23/2019 5/23/2019

5.9.3.3.2 Lean Concrete 2 days 5/23/2019 5/24/2019

5.9.3.3.3 Rebar 2 days 5/27/2019 5/28/2019

5.9.3.3.4 Formworks 2 days 5/27/2019 5/28/2019

5.9.3.3.5 Concrete Pouring 1 day 5/29/2019 5/29/2019


5.9.3.4 Slab Work 9 days 6/1/2019 6/9/2019

5.9.3.4.1 Leveling 1 day 6/1/2019 6/1/2019

5.9.3.4.2 Lean Concrete 2 days 6/1/2019 6/2/2019

5.9.3.4.3 Rebar 2 days 6/5/2019 6/6/2019

5.9.3.4.4 Formworks 2 days 6/7/2019 6/8/2019

5.9.3.4.5 Concrete Pouring 1 day 6/9/2019 6/9/2019

5.9.4 GT EXHAUST FOUNDATION - CTO 4 days 6/10/2019 6/13/2019

5.10 Gas Turbine Auxiliaries 106 days 2/26/2019 6/11/2019

GT INDOOR AUXILIARIES - GT Lube Oil Module (AM60) -


5.10.1 0 days 2/26/2019 2/26/2019
Foundation - DTO

GT INDOOR AUXILIARIES - GT Lube Oil Module (AM60) -


5.10.2 32 days 5/10/2019 6/10/2019
Concrete Works

5.10.2.1 Footing Foundation 8 days 5/10/2019 5/17/2019

5.10.2.1.1 Leveling 1 day 5/10/2019 5/10/2019

5.10.2.1.2 Lean Concrete 1 day 5/10/2019 5/10/2019

5.10.2.1.3 Rebar 2 days 5/13/2019 5/14/2019

5.10.2.1.4 Formworks 2 days 5/15/2019 5/16/2019

5.10.2.1.5 Concrete Pouring 1 day 5/17/2019 5/17/2019


5.10.2.2 Pedestal Work 6 days 5/20/2019 5/25/2019

5.10.2.2.1 Leveling 1 day 5/20/2019 5/20/2019

5.10.2.2.2 Lean Concrete 1 day 5/20/2019 5/20/2019

5.10.2.2.3 Rebar 2 days 5/23/2019 5/24/2019

5.10.2.2.4 Anchor Bolt Installation 2 days 5/23/2019 5/24/2019

5.10.2.2.5 Formworks 2 days 5/23/2019 5/24/2019

5.10.2.2.6 Concrete Pouring 1 day 5/25/2019 5/25/2019

5.10.2.3 Tie Beam 8 days 5/23/2019 5/30/2019

5.10.2.3.1 Leveling 1 day 5/23/2019 5/23/2019

5.10.2.3.2 Lean Concrete 2 days 5/23/2019 5/24/2019

5.10.2.3.3 Rebar 2 days 5/27/2019 5/28/2019

5.10.2.3.4 Formworks 2 days 5/27/2019 5/28/2019

5.10.2.3.5 Concrete Pouring 2 days 5/29/2019 5/30/2019

5.10.2.4 Slab Work 9 days 6/2/2019 6/10/2019

5.10.2.4.1 Leveling 1 day 6/2/2019 6/2/2019

5.10.2.4.2 Lean Concrete 2 days 6/2/2019 6/3/2019


5.10.2.4.3 Rebar 2 days 6/6/2019 6/7/2019

5.10.2.4.4 Formworks 2 days 6/8/2019 6/9/2019

5.10.2.4.5 Concrete Pouring 1 day 6/10/2019 6/10/2019

5.10.3 GT INDOOR AUXILIARIES - GT Lube Oil Module (AM60) - CTO 0 days 6/11/2019 6/11/2019

5.11 Air Intake Filter House 92 days 3/15/2019 6/14/2019

5.11.1 AIR INTAKE FILTERHOUSE (ID# 213) - Foundation - DTO 0 days 3/15/2019 3/15/2019

AIR INTAKE FILTERHOUSE (ID# 213) - Excavation & Pile Head


5.11.2 12 days 4/15/2019 4/26/2019
Preparation

5.11.2.1 Excavation 12 days 4/15/2019 4/26/2019

5.11.2.2 Pile Head Cutting 8 days 4/19/2019 4/26/2019

5.11.3 AIR INTAKE FILTERHOUSE (ID# 213) - Concrete Works 45 days 4/30/2019 6/13/2019

5.11.3.1 Footing Foundation 12 days 4/30/2019 5/11/2019

5.11.3.1.1 Leveling 1 day 4/30/2019 4/30/2019

5.11.3.1.2 Lean Concrete 2 days 4/30/2019 5/1/2019

5.11.3.1.3 Rebar 3 days 5/4/2019 5/6/2019

5.11.3.1.4 Formworks 3 days 5/7/2019 5/9/2019

5.11.3.1.5 Concrete Pouring 2 days 5/10/2019 5/11/2019


5.11.3.2 Pedestal Work 12 days 5/14/2019 5/25/2019

5.11.3.2.1 Leveling 1 day 5/14/2019 5/14/2019

5.11.3.2.2 Lean Concrete 2 days 5/14/2019 5/15/2019

5.11.3.2.3 Rebar 3 days 5/18/2019 5/20/2019

5.11.3.2.4 Anchor Bolt Installation 3 days 5/20/2019 5/22/2019

5.11.3.2.5 Formworks 3 days 5/20/2019 5/22/2019

5.11.3.2.6 Concrete Pouring 3 days 5/23/2019 5/25/2019

5.11.3.3 Tie Beam 13 days 5/17/2019 5/29/2019

5.11.3.3.1 Leveling 1 day 5/17/2019 5/17/2019

5.11.3.3.2 Lean Concrete 3 days 5/17/2019 5/19/2019

5.11.3.3.3 Rebar 3 days 5/22/2019 5/24/2019

5.11.3.3.4 Formworks 3 days 5/24/2019 5/26/2019

5.11.3.3.5 Concrete Pouring 3 days 5/27/2019 5/29/2019

5.11.3.4 Slab Work 13 days 6/1/2019 6/13/2019

5.11.3.4.1 Leveling 1 day 6/1/2019 6/1/2019

5.11.3.4.2 Lean Concrete 3 days 6/1/2019 6/3/2019


5.11.3.4.3 Rebar 3 days 6/6/2019 6/8/2019

5.11.3.4.4 Formworks 3 days 6/9/2019 6/11/2019

5.11.3.4.5 Concrete Pouring 2 days 6/12/2019 6/13/2019

5.11.4 AIR INTAKE FILTERHOUSE (ID# 213) - CTO 0 days 6/14/2019 6/14/2019

5.12 GT Fire Fighting System 162 days 12/14/2018 5/24/2019

5.12.1 GT FIRE FIGHTING SYSTEM (ID# 251) - Foundation - DTO 0 days 12/14/2018 12/14/2018

GT FIRE FIGHTING SYSTEM (ID# 251) - Foundation - Excavation


5.12.2 28 days 3/23/2019 4/19/2019
& Pile Head Preparation

5.12.2.1 Excavation 18 days 3/23/2019 4/9/2019

5.12.2.2 Pile Head Cutting 10 days 4/10/2019 4/19/2019

GT FIRE FIGHTING SYSTEM (ID# 251) - Foundation -


5.12.3 14 days 4/19/2019 5/2/2019
Underground Works

5.12.3.1 Trenching 14 days 4/19/2019 5/2/2019

GT FIRE FIGHTING SYSTEM (ID# 251) - Foundation - Concrete


5.12.4 20 days 5/4/2019 5/23/2019
Works

5.12.4.1 Footing Foundation 20 days 5/4/2019 5/23/2019

5.12.4.1.1 Leveling 1 day 5/4/2019 5/4/2019

5.12.4.1.2 Lean Concrete 1 day 5/4/2019 5/4/2019

5.12.4.1.3 Rebar 10 days 5/7/2019 5/16/2019


5.12.4.1.4 Formworks 6 days 5/17/2019 5/22/2019

5.12.4.1.5 Concrete Pouring 1 day 5/23/2019 5/23/2019

5.12.5 GT FIRE FIGHTING SYSTEM (ID# 251) - Foundation - CTO 0 days 5/24/2019 5/24/2019

5.13 Chemical & Lube Oil Building 188 days 1/29/2019 8/4/2019

5.13.1 CHEMICAL & LUBE OIL BLDG (ID# 252) - Foundation - DTO 0 days 1/29/2019 1/29/2019

CHEMICAL & LUBE OIL BLDG (ID# 252) - Foundation -


5.13.2 14 days 3/3/2019 3/16/2019
Excavation & Pile Head Prepation

5.13.2.1 Excavation 14 days 3/3/2019 3/16/2019

5.13.2.2 Pile Head Cutting 10 days 3/7/2019 3/16/2019

CHEMICAL & LUBE OIL BLDG (ID# 252) - Foundation - Under


5.13.3 13 days 3/25/2019 4/6/2019
Ground Works

5.13.3.1 Trenching 13 days 3/25/2019 4/6/2019

CHEMICAL & LUBE OIL BLDG (ID# 252) - Foundation - Concrete


5.13.4 32 days 4/8/2019 5/9/2019
Works

5.13.4.1 Footing Foundation 10 days 4/8/2019 4/17/2019

5.13.4.1.1 Leveling 1 day 4/8/2019 4/8/2019

5.13.4.1.2 Lean Concrete 1 day 4/8/2019 4/8/2019

5.13.4.1.3 Rebar 3 days 4/11/2019 4/13/2019

5.13.4.1.4 Formworks 3 days 4/14/2019 4/16/2019


5.13.4.1.5 Concrete Pouring 1 day 4/17/2019 4/17/2019

5.13.4.2 Pedestal Work 8 days 4/18/2019 4/25/2019

5.13.4.2.1 Leveling 1 day 4/18/2019 4/18/2019

5.13.4.2.2 Lean Concrete 1 day 4/18/2019 4/18/2019

5.13.4.2.3 Rebar 3 days 4/21/2019 4/23/2019

5.13.4.2.4 Anchor Bolt Installation 3 days 4/23/2019 4/25/2019

5.13.4.2.5 Formworks 2 days 4/23/2019 4/24/2019

5.13.4.2.6 Concrete Pouring 1 day 4/25/2019 4/25/2019

5.13.4.3 Tie Beam 8 days 4/21/2019 4/28/2019

5.13.4.3.1 Leveling 1 day 4/21/2019 4/21/2019

5.13.4.3.2 Lean Concrete 1 day 4/21/2019 4/21/2019

5.13.4.3.3 Rebar 2 days 4/24/2019 4/25/2019

5.13.4.3.4 Formworks 2 days 4/26/2019 4/27/2019

5.13.4.3.5 Concrete Pouring 1 day 4/28/2019 4/28/2019

5.13.4.4 Slab Work 9 days 5/1/2019 5/9/2019

5.13.4.4.1 Leveling 1 day 5/1/2019 5/1/2019


5.13.4.4.2 Lean Concrete 1 day 5/1/2019 5/1/2019

5.13.4.4.3 Rebar 2 days 5/4/2019 5/5/2019

5.13.4.4.4 Formworks 3 days 5/6/2019 5/8/2019

5.13.4.4.5 Concrete Pouring 1 day 5/9/2019 5/9/2019

CHEMICAL & LUBE OIL BLDG (ID# 252) - Superstructure &


5.13.5 84 days 5/12/2019 8/3/2019
Architectural Works

5.13.5.1 Concrete/Steel Strcuture Work 34 days 5/12/2019 6/14/2019

5.13.5.1.1 Column 20 days 5/12/2019 5/31/2019

5.13.5.1.2 Beam 20 days 5/26/2019 6/14/2019

5.13.5.2 Architectural Work 43 days 6/22/2019 8/3/2019

5.13.5.2.1 Wall Installation 25 days 6/22/2019 7/16/2019

5.13.5.2.2 Roofing 25 days 7/5/2019 7/29/2019

5.13.5.2.3 Painting 5 days 7/30/2019 8/3/2019

5.13.6 CHEMICAL & LUBE OIL BLDG (ID# 252) - BUILDING CTO 0 days 8/4/2019 8/4/2019

5.14 Mobile Fire Fighting Building 163 days 1/29/2019 7/10/2019

5.14.1 MOBILE FIRE FIGHTING BLDG (ID# 253) - Foundation - DTO 0 days 1/29/2019 1/29/2019

MOBILE FIRE FIGHTING BLDG (ID# 253) - Foundation -


5.14.2 14 days 2/6/2019 2/19/2019
Excavation & Pile Head Prepation
5.14.2.1 Excavation 14 days 2/6/2019 2/19/2019

5.14.2.2 Pile Head Cutting 10 days 2/10/2019 2/19/2019

MOBILE FIRE FIGHTING BLDG (ID# 253) - Foundation - Under


5.14.3 13 days 2/28/2019 3/12/2019
Ground Works

5.14.3.1 Trenching 13 days 2/28/2019 3/12/2019

MOBILE FIRE FIGHTING BLDG (ID# 253) - Foundation - Concrete


5.14.4 32 days 3/14/2019 4/14/2019
Works

5.14.4.1 Footing Foundation 8 days 3/14/2019 3/21/2019

5.14.4.1.1 Leveling 1 day 3/14/2019 3/14/2019

5.14.4.1.2 Lean Concrete 1 day 3/14/2019 3/14/2019

5.14.4.1.3 Rebar 2 days 3/17/2019 3/18/2019

5.14.4.1.4 Formworks 2 days 3/19/2019 3/20/2019

5.14.4.1.5 Concrete Pouring 1 day 3/21/2019 3/21/2019

5.14.4.2 Pedestal Work 8 days 3/24/2019 3/31/2019

5.14.4.2.1 Leveling 1 day 3/24/2019 3/24/2019

5.14.4.2.2 Lean Concrete 1 day 3/24/2019 3/24/2019

5.14.4.2.3 Rebar 2 days 3/27/2019 3/28/2019

5.14.4.2.4 Anchor Bolt Installation 2 days 3/29/2019 3/30/2019


5.14.4.2.5 Formworks 2 days 3/29/2019 3/30/2019

5.14.4.2.6 Concrete Pouring 1 day 3/31/2019 3/31/2019

5.14.4.3 Tie Beam 8 days 3/27/2019 4/3/2019

5.14.4.3.1 Leveling 1 day 3/27/2019 3/27/2019

5.14.4.3.2 Lean Concrete 1 day 3/27/2019 3/27/2019

5.14.4.3.3 Rebar 2 days 3/30/2019 3/31/2019

5.14.4.3.4 Formworks 2 days 4/1/2019 4/2/2019

5.14.4.3.5 Concrete Pouring 1 day 4/3/2019 4/3/2019

5.14.4.4 Slab Work 9 days 4/6/2019 4/14/2019

5.14.4.4.1 Leveling 1 day 4/6/2019 4/6/2019

5.14.4.4.2 Lean Concrete 1 day 4/7/2019 4/7/2019

5.14.4.4.3 Rebar 2 days 4/10/2019 4/11/2019

5.14.4.4.4 Formworks 2 days 4/12/2019 4/13/2019

5.14.4.4.5 Concrete Pouring 1 day 4/14/2019 4/14/2019

MOBILE FIRE FIGHTING BLDG (ID# 253) - Superstructure &


5.14.5 84 days 4/17/2019 7/9/2019
Architectural Works

5.14.5.1 Concrete/Steel Strcuture Work 34 days 4/17/2019 5/20/2019


5.14.5.1.1 Column 20 days 4/17/2019 5/6/2019

5.14.5.1.2 Beam 20 days 5/1/2019 5/20/2019

5.14.5.2 Architectural Work 43 days 5/28/2019 7/9/2019

5.14.5.2.1 Wall Installation 25 days 5/28/2019 6/21/2019

5.14.5.2.2 Roofing 25 days 6/10/2019 7/4/2019

5.14.5.2.3 Painting 5 days 7/5/2019 7/9/2019

5.14.6 MOBILE FIRE FIGHTING BLDG (ID# 253) - Building CTO 0 days 7/10/2019 7/10/2019

5.15 Transformer Area 316 days 12/13/2018 10/24/2019

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Walls Above


5.15.1 0 days 12/13/2018 12/13/2018
Grade - DTO

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Foundation -


5.15.2 0 days 12/13/2018 12/13/2018
DTO

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Steel Str. &


5.15.3 0 days 12/13/2018 12/13/2018
Finishing - DTO

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Foundation -


5.15.4 8 days 1/18/2019 1/25/2019
Excavation & Pile Head Preparation

5.15.4.1 Excavation 8 days 1/18/2019 1/25/2019

5.15.4.2 Pile Head Cutting 5 days 1/21/2019 1/25/2019

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Foundation - U/G


5.15.5 5 days 1/29/2019 2/2/2019
Installation and Leveling

5.15.5.1 Leveling 1 day 1/29/2019 1/29/2019


5.15.5.2 U/G Installation 4 days 1/30/2019 2/2/2019

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Foundation -


5.15.6 31 days 2/5/2019 3/7/2019
Concrete Works Bottom Slab

5.15.6.1 Footing Foundation 8 days 2/5/2019 2/12/2019

5.15.6.1.1 Leveling 1 day 2/5/2019 2/5/2019

5.15.6.1.2 Lean Concrete 1 day 2/5/2019 2/5/2019

5.15.6.1.3 Rebar 2 days 2/8/2019 2/9/2019

5.15.6.1.4 Formworks 2 days 2/10/2019 2/11/2019

5.15.6.1.5 Concrete Pouring 1 day 2/12/2019 2/12/2019

5.15.6.2 Tie Beam 8 days 2/15/2019 2/22/2019

5.15.6.2.1 Leveling 1 day 2/15/2019 2/15/2019

5.15.6.2.2 Lean Concrete 1 day 2/15/2019 2/15/2019

5.15.6.2.3 Rebar 2 days 2/18/2019 2/19/2019

5.15.6.2.4 Formworks 2 days 2/20/2019 2/21/2019

5.15.6.2.5 Concrete Pouring 1 day 2/22/2019 2/22/2019

5.15.6.3 Slab Work 11 days 2/25/2019 3/7/2019

5.15.6.3.1 Leveling 1 day 2/25/2019 2/25/2019


5.15.6.3.2 Lean Concrete 1 day 2/26/2019 2/26/2019

5.15.6.3.3 Rebar 3 days 3/1/2019 3/3/2019

5.15.6.3.4 Formworks 3 days 3/4/2019 3/6/2019

5.15.6.3.5 Concrete Pouring 1 day 3/7/2019 3/7/2019

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Concrete Works


5.15.7 21 days 3/9/2019 3/29/2019
Pedestals and Walls

5.15.7.1 Pedestal Work 21 days 3/9/2019 3/29/2019

5.15.7.1.1 Leveling 2 days 3/9/2019 3/10/2019

5.15.7.1.2 Lean Concrete 2 days 3/9/2019 3/10/2019

5.15.7.1.3 Rebar 6 days 3/13/2019 3/18/2019

5.15.7.1.4 Anchor Bolt Installation 6 days 3/17/2019 3/22/2019

5.15.7.1.5 Formworks 6 days 3/21/2019 3/26/2019

5.15.7.1.6 Concrete Pouring 3 days 3/27/2019 3/29/2019

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Foundation -


5.15.8 0 days 4/27/2019 4/27/2019
CTO FOR TRANSFORMER ERECTION

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Turn Over from


5.15.9 0 days 10/14/2019 10/14/2019
Erection to install Steel Structure and Fence

TRANSFORMER AREA - GSU/UAT (ID# 219/220) Secondary Steel


5.15.10 5 days 10/15/2019 10/19/2019
Structure & Grating - Erection

5.15.10.1 Erection 5 days 10/15/2019 10/19/2019


5.15.11 TRANSFORMER AREA - GSU/UAT (ID# 219/220) Finishing Works 6 days 10/15/2019 10/20/2019

5.15.11.1 Finishing Works 6 days 10/15/2019 10/20/2019

5.15.12 TRANSFORMER AREA - GSU/UAT (ID# 219/220) Fence - Erection 5 days 10/17/2019 10/21/2019

5.15.12.1 Erection 5 days 10/17/2019 10/21/2019

5.15.13 TRANSFORMER AREA - GSU/UAT (ID# 219/220) Gravel Fill 2 days 10/22/2019 10/23/2019

5.15.13.1 Gravel Filling 2 days 10/22/2019 10/23/2019

5.15.14 TRANSFORMER AREA - GSU/UAT (ID# 219/220) Complete - CTO 0 days 10/24/2019 10/24/2019

5.16 Excitation Transformer 93 days 1/30/2019 5/2/2019

EXCITATION (& ISOLATION) TRANSFORMER (ID# 221) -


5.16.1 0 days 1/30/2019 1/30/2019
Foundation - DTO

EXCITATION (& ISOLATION) TRANSFORMER (ID# 221) -


5.16.2 7 days 2/28/2019 3/6/2019
Foundation - Excavation & Pile Head Preparation

5.16.2.1 Excavation 7 days 2/28/2019 3/6/2019

5.16.2.2 Pile Head Cutting 5 days 3/2/2019 3/6/2019

EXCITATION (& ISOLATION) TRANSFORMER (ID# 221) -


5.16.3 34 days 3/7/2019 4/9/2019
Foundation - Concrete Works Bottom Slab

5.16.3.1 Footing Foundation 10 days 3/7/2019 3/16/2019

5.16.3.1.1 Leveling 1 day 3/7/2019 3/7/2019

5.16.3.1.2 Lean Concrete 1 day 3/7/2019 3/7/2019


5.16.3.1.3 Rebar 3 days 3/10/2019 3/12/2019

5.16.3.1.4 Formworks 3 days 3/13/2019 3/15/2019

5.16.3.1.5 Concrete Pouring 1 day 3/16/2019 3/16/2019

5.16.3.2 Tie Beam 9 days 3/19/2019 3/27/2019

5.16.3.2.1 Leveling 1 day 3/19/2019 3/19/2019

5.16.3.2.2 Lean Concrete 1 day 3/19/2019 3/19/2019

5.16.3.2.3 Rebar 3 days 3/22/2019 3/24/2019

5.16.3.2.4 Formworks 3 days 3/24/2019 3/26/2019

5.16.3.2.5 Concrete Pouring 1 day 3/27/2019 3/27/2019

5.16.3.3 Slab Work 11 days 3/30/2019 4/9/2019

5.16.3.3.1 Leveling 1 day 3/30/2019 3/30/2019

5.16.3.3.2 Lean Concrete 1 day 3/31/2019 3/31/2019

5.16.3.3.3 Rebar 3 days 4/3/2019 4/5/2019

5.16.3.3.4 Formworks 3 days 4/6/2019 4/8/2019

5.16.3.3.5 Concrete Pouring 1 day 4/9/2019 4/9/2019

EXCITATION (& ISOLATION) TRANSFORMER (ID# 221) - Concrete


5.16.4 22 days 4/11/2019 5/2/2019
Works Pedestals
5.16.4.1 Leveling 2 days 4/11/2019 4/12/2019

5.16.4.2 Lean Concrete 3 days 4/11/2019 4/13/2019

5.16.4.3 Rebar 5 days 4/16/2019 4/20/2019

5.16.4.4 Anchor Bolt Installation 5 days 4/20/2019 4/24/2019

5.16.4.5 Formworks 5 days 4/24/2019 4/28/2019

5.16.4.6 Concrete Pouring 4 days 4/29/2019 5/2/2019

EXCITATION (& ISOLATION) TRANSFORMER (ID# 221) -


5.16.5 0 days 5/2/2019 5/2/2019
Foundation - CTO FOR TRANSFORMER ERECTION

5.17 Auxilliary Transformer 78 days 5/30/2019 8/15/2019

AUXILIARY TRANSFORMER (ID# 255) & VFD TRANSFORMERS


5.17.1 0 days 5/30/2019 5/30/2019
(ID# 256) - Foundation - DTO

AUXILIARY TRANSFORMER (ID# 255) & VFD TRANSFORMERS


5.17.2 5 days 6/18/2019 6/22/2019
(ID# 256) - Foundation - Excavation & Pile Head Preparation

5.17.2.1 Excavation 5 days 6/18/2019 6/22/2019

5.17.2.2 Pile Head Cutting 3 days 6/20/2019 6/22/2019

AUXILIARY TRANSFORMER (ID# 255) & VFD TRANSFORMERS


5.17.3 33 days 6/24/2019 7/26/2019
(ID# 256) - Foundation - Concrete Works Bottom Slab

5.17.3.1 Footing Foundation 10 days 6/24/2019 7/3/2019

5.17.3.1.1 Leveling 1 day 6/24/2019 6/24/2019

5.17.3.1.2 Lean Concrete 1 day 6/24/2019 6/24/2019


5.17.3.1.3 Rebar 3 days 6/27/2019 6/29/2019

5.17.3.1.4 Formworks 3 days 6/30/2019 7/2/2019

5.17.3.1.5 Concrete Pouring 1 day 7/3/2019 7/3/2019

5.17.3.2 Tie Beam 10 days 7/4/2019 7/13/2019

5.17.3.2.1 Leveling 1 day 7/4/2019 7/4/2019

5.17.3.2.2 Lean Concrete 1 day 7/4/2019 7/4/2019

5.17.3.2.3 Rebar 3 days 7/7/2019 7/9/2019

5.17.3.2.4 Formworks 3 days 7/9/2019 7/11/2019

5.17.3.2.5 Concrete Pouring 2 days 7/12/2019 7/13/2019

5.17.3.3 Slab Work 11 days 7/16/2019 7/26/2019

5.17.3.3.1 Leveling 1 day 7/16/2019 7/16/2019

5.17.3.3.2 Lean Concrete 1 day 7/16/2019 7/16/2019

5.17.3.3.3 Rebar 3 days 7/19/2019 7/21/2019

5.17.3.3.4 Formworks 3 days 7/22/2019 7/24/2019

5.17.3.3.5 Concrete Pouring 2 days 7/25/2019 7/26/2019

AUXILIARY TRANSFORMER (ID# 255) & VFD TRANSFORMERS


5.17.4 20 days 7/27/2019 8/15/2019
(ID# 256) - Concrete Works Pedestals
5.17.4.1 Leveling 1 day 7/27/2019 7/27/2019

5.17.4.2 Lean Concrete 2 days 7/27/2019 7/28/2019

5.17.4.3 Rebar 5 days 8/2/2019 8/6/2019

5.17.4.4 Anchor Bolt Installation 5 days 8/6/2019 8/10/2019

5.17.4.5 Formworks 4 days 8/10/2019 8/13/2019

5.17.4.6 Concrete Pouring 2 days 8/14/2019 8/15/2019

AUXILIARY TRANSFORMER (ID# 255) & VFD TRANSFORMERS


5.17.5 0 days 8/15/2019 8/15/2019
(ID# 256) - Foundation - CTO FOR TRANSFORMER ERECTION

5.18 Generator Circuit Breaker 259 days 2/20/2019 11/5/2019

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.1 95 days 2/20/2019 5/25/2019
- Steel Structure - Manufacture / Delivery

5.18.1.1 Manufacturing 70 days 2/20/2019 4/30/2019

5.18.1.2 Delivery 25 days 5/1/2019 5/25/2019

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.2 0 days 3/28/2019 3/28/2019
- Foundation - DTO

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.3 7 days 4/11/2019 4/17/2019
- Excavation & Pile head preparation

5.18.3.1 Excavation 7 days 4/11/2019 4/17/2019

5.18.3.2 Pile Head Cutting 5 days 4/13/2019 4/17/2019

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.4 35 days 4/18/2019 5/22/2019
- Foundation Concrete Works
5.18.4.1 Footing Foundation 13 days 4/18/2019 4/30/2019

5.18.4.1.1 Leveling 1 day 4/18/2019 4/18/2019

5.18.4.1.2 Lean Concrete 1 day 4/18/2019 4/18/2019

5.18.4.1.3 Rebar 4 days 4/21/2019 4/24/2019

5.18.4.1.4 Formworks 4 days 4/25/2019 4/28/2019

5.18.4.1.5 Concrete Pouring 2 days 4/29/2019 4/30/2019

5.18.4.2 Pedestal Work 11 days 4/29/2019 5/9/2019

5.18.4.2.1 Leveling 1 day 4/29/2019 4/29/2019

5.18.4.2.2 Lean Concrete 1 day 4/29/2019 4/29/2019

5.18.4.2.3 Rebar 4 days 5/2/2019 5/5/2019

5.18.4.2.4 Anchor Bolt Installation 4 days 5/4/2019 5/7/2019

5.18.4.2.5 Formworks 4 days 5/4/2019 5/7/2019

5.18.4.2.6 Concrete Pouring 2 days 5/8/2019 5/9/2019

5.18.4.3 Tie Beam 11 days 4/29/2019 5/9/2019

5.18.4.3.1 Leveling 1 day 4/29/2019 4/29/2019

5.18.4.3.2 Lean Concrete 1 day 4/29/2019 4/29/2019


5.18.4.3.3 Rebar 4 days 5/2/2019 5/5/2019

5.18.4.3.4 Formworks 4 days 5/4/2019 5/7/2019

5.18.4.3.5 Concrete Pouring 2 days 5/8/2019 5/9/2019

5.18.4.4 Slab Work 11 days 5/12/2019 5/22/2019

5.18.4.4.1 Leveling 1 day 5/12/2019 5/12/2019

5.18.4.4.2 Lean Concrete 1 day 5/12/2019 5/12/2019

5.18.4.4.3 Rebar 4 days 5/15/2019 5/18/2019

5.18.4.4.4 Formworks 2 days 5/19/2019 5/20/2019

5.18.4.4.5 Concrete Pouring 2 days 5/21/2019 5/22/2019

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.5 0 days 5/22/2019 5/22/2019
- Foundation CTO for Steel Erection

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.6 0 days 5/30/2019 5/30/2019
- Steel Structure - DTO

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.7 12 days 6/7/2019 6/18/2019
- Steel Structure - Erection

5.18.7.1 Steel Structure Erection 12 days 6/7/2019 6/18/2019

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.8 0 days 6/19/2019 6/19/2019
- CTO for GCB and LCI/EXC Module Erection

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.9 4 days 7/1/2019 7/4/2019
- Shelter - Erection

5.18.9.1 Shelter Erection 4 days 7/1/2019 7/4/2019


GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)
5.18.10 10 days 10/27/2019 11/5/2019
- Steel Structure above LCI/EXC Module - Erection

5.18.10.1 Steel Structure above LCI/EXC Module Erection 10 days 10/27/2019 11/5/2019

GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222)


5.18.11 0 days 11/5/2019 11/5/2019
- Civil Erection Complete CTO

5.19 Generator Bus Duct 222 days 1/28/2019 9/6/2019

GENERATOR BUS DUCT (ID# 229) - Steel Structure & Platforms -


5.19.1 84 days 1/28/2019 4/21/2019
Manufacture / Delivery

5.19.1.1 Manufacture 60 days 1/28/2019 3/28/2019

5.19.1.2 Delivery 24 days 3/29/2019 4/21/2019

5.19.2 GENERATOR BUS DUCT (ID# 229) - Foundation & U/G - DTO 0 days 5/1/2019 5/1/2019

GENERATOR BUS DUCT (ID# 229) - Foundation - Excavation &


5.19.3 9 days 5/16/2019 5/24/2019
Pile Head Preparation

5.19.3.1 Excavation 9 days 5/16/2019 5/24/2019

5.19.3.2 Pile Head Cutting 7 days 5/18/2019 5/24/2019

GENERATOR BUS DUCT (ID# 229) - Excavation & Precast


5.19.4 3 days 5/28/2019 5/30/2019
Concrete Electrical Pit Installation

5.19.4.1 Excavation 3 days 5/28/2019 5/30/2019

5.19.4.2 Precast Concrete Electrical Pit Installation 2 days 5/29/2019 5/30/2019

5.19.5 GENERATOR BUS DUCT (ID# 229) - Foundation Concrete Works 46 days 5/28/2019 7/12/2019

5.19.5.1 Footing Foundation 15 days 5/28/2019 6/11/2019


5.19.5.1.1 Leveling 1 day 5/28/2019 5/28/2019

5.19.5.1.2 Lean Concrete 2 days 5/28/2019 5/29/2019

5.19.5.1.3 Rebar 4 days 6/1/2019 6/4/2019

5.19.5.1.4 Formworks 4 days 6/5/2019 6/8/2019

5.19.5.1.5 Concrete Pouring 3 days 6/9/2019 6/11/2019

5.19.5.2 Pedestal Work 11 days 6/14/2019 6/24/2019

5.19.5.2.1 Leveling 1 day 6/14/2019 6/14/2019

5.19.5.2.2 Lean Concrete 2 days 6/14/2019 6/15/2019

5.19.5.2.3 Rebar 4 days 6/18/2019 6/21/2019

5.19.5.2.4 Anchor Bolt Installation 4 days 6/18/2019 6/21/2019

5.19.5.2.5 Formworks 4 days 6/18/2019 6/21/2019

5.19.5.2.6 Concrete Pouring 3 days 6/22/2019 6/24/2019

5.19.5.3 Tie Beam 11 days 6/17/2019 6/27/2019

5.19.5.3.1 Leveling 1 day 6/17/2019 6/17/2019

5.19.5.3.2 Lean Concrete 2 days 6/17/2019 6/18/2019

5.19.5.3.3 Rebar 4 days 6/21/2019 6/24/2019


5.19.5.3.4 Formworks 4 days 6/21/2019 6/24/2019

5.19.5.3.5 Concrete Pouring 3 days 6/25/2019 6/27/2019

5.19.5.4 Slab Work 13 days 6/30/2019 7/12/2019

5.19.5.4.1 Leveling 1 day 6/30/2019 6/30/2019

5.19.5.4.2 Lean Concrete 2 days 6/30/2019 7/1/2019

5.19.5.4.3 Rebar 4 days 7/2/2019 7/5/2019

5.19.5.4.4 Formworks 4 days 7/6/2019 7/9/2019

5.19.5.4.5 Concrete Pouring 3 days 7/10/2019 7/12/2019

5.19.6 GENERATOR BUS DUCT (ID# 229) - Structures & Platforms - DTO 0 days 5/29/2019 5/29/2019

GENERATOR BUS DUCT (ID# 229) - Foundation - CTO for Main


5.19.7 0 days 7/12/2019 7/12/2019
Steel Erection

5.19.8 GENERATOR BUS DUCT (ID# 229) - Main Steel Structure Erection 30 days 7/16/2019 8/14/2019

5.19.8.1 Main Steel Structure Erection 30 days 7/16/2019 8/14/2019

GENERATOR BUS DUCT (ID# 229) - Steel Structure & Platforms -


5.19.9 33 days 8/5/2019 9/6/2019
Erection

5.19.9.1 Steel Structure and Platform Erection 33 days 8/5/2019 9/6/2019

GENERATOR BUS DUCT (ID# 229) - Main Steel Structure - CTO


5.19.10 0 days 8/14/2019 8/14/2019
for Bus Duct Erection

GENERATOR BUS DUCT (ID# 229) - Turn Over from Erection to


5.19.11 0 days 8/28/2019 8/28/2019
Complete Platforms (After Lifting)
5.19.12 GENERATOR BUS DUCT (ID# 229) - CTO 0 days 9/6/2019 9/6/2019

5.20 Secondary Electrical Building 277 days 11/28/2018 8/31/2019

5.20.1 SECONDARY E-BUILDING (ID# 230) - Foundation Drawings - DTO 0 days 11/28/2018 11/28/2018

5.20.2 SECONDARY E-BUILDING (ID# 230) - Superstructure - DTO 0 days 12/26/2018 12/26/2018

SECONDARY E-BUILDING (ID# 230) - Foundation Excavation &


5.20.3 13 days 1/15/2019 1/27/2019
Pile Head Cut Preparation

5.20.3.1 Excavation 13 days 1/15/2019 1/27/2019

5.20.3.2 Pile Head Cutting 10 days 1/18/2019 1/27/2019

5.20.4 SECONDARY E-BUILDING (ID# 230) - Civil Construction 133 days 2/28/2019 7/11/2019

5.20.5 SECONDARY E-BUILDING (ID# 230) - Foundations - Concrete 48 days 1/30/2019 3/18/2019

5.20.5.1 Footing Foundation 14 days 1/30/2019 2/12/2019

5.20.5.1.1 Leveling 1 day 1/30/2019 1/30/2019

5.20.5.1.2 Lean Concrete 2 days 1/30/2019 1/31/2019

5.20.5.1.3 Rebar 4 days 2/3/2019 2/6/2019

5.20.5.1.4 Formworks 4 days 2/7/2019 2/10/2019

5.20.5.1.5 Concrete Pouring 2 days 2/11/2019 2/12/2019

5.20.5.2 Pedestal Work 12 days 2/15/2019 2/26/2019


5.20.5.2.1 Leveling 1 day 2/15/2019 2/15/2019

5.20.5.2.2 Lean Concrete 2 days 2/15/2019 2/16/2019

5.20.5.2.3 Rebar 5 days 2/19/2019 2/23/2019

5.20.5.2.4 Anchor Bolt Installation 5 days 2/20/2019 2/24/2019

5.20.5.2.5 Formworks 5 days 2/20/2019 2/24/2019

5.20.5.2.6 Concrete Pouring 2 days 2/25/2019 2/26/2019

5.20.5.3 Tie Beam 12 days 2/18/2019 3/1/2019

5.20.5.3.1 Leveling 1 day 2/18/2019 2/18/2019

5.20.5.3.2 Lean Concrete 2 days 2/18/2019 2/19/2019

5.20.5.3.3 Rebar 5 days 2/22/2019 2/26/2019

5.20.5.3.4 Formworks 5 days 2/23/2019 2/27/2019

5.20.5.3.5 Concrete Pouring 2 days 2/28/2019 3/1/2019

5.20.5.4 Slab Work 15 days 3/4/2019 3/18/2019

5.20.5.4.1 Leveling 1 day 3/4/2019 3/4/2019

5.20.5.4.2 Lean Concrete 2 days 3/4/2019 3/5/2019

5.20.5.4.3 Rebar 5 days 3/7/2019 3/11/2019


5.20.5.4.4 Formworks 5 days 3/12/2019 3/16/2019

5.20.5.4.5 Concrete Pouring 2 days 3/17/2019 3/18/2019

SECONDARY E-BUILDING (ID# 230) - Superstructure


5.20.6 107 days 3/21/2019 7/5/2019
Construction

5.20.6.1 Concrete/Steel Strcuture Work 107 days 3/21/2019 7/5/2019

5.20.6.1.1 Column 75 days 3/21/2019 6/3/2019

5.20.6.1.2 Beam 75 days 4/22/2019 7/5/2019

5.20.7 SECONDARY E-BUILDING (ID# 230) - Architectural Dwgs. - DTO 0 days 5/16/2019 5/16/2019

5.20.8 SECONDARY E-BUILDING (ID# 230) - Finishing Work 37 days 6/13/2019 7/19/2019

5.20.8.1 Wall Installation 25 days 6/13/2019 7/7/2019

5.20.8.2 Roofing 27 days 6/19/2019 7/15/2019

5.20.8.3 Painting 4 days 7/16/2019 7/19/2019

5.20.9 SECONDARY E-BUILDING (ID# 230) - Access for Erection - CTO 0 days 7/19/2019 7/19/2019

SECONDARY E-BUILDING (ID# 230) - Complete Remaining


5.20.10 43 days 7/20/2019 8/31/2019
Finishing Work

5.20.10.1 Finishing Work 43 days 7/20/2019 8/31/2019

5.21 Chemical Dosing 130 days 2/13/2019 6/22/2019

5.21.1 DOSING SKID (ID# 216) - Foundation - DTO 0 days 2/13/2019 2/13/2019
DOSING SKID (ID# 216) - Foundation - Excavation & Pile Head
5.21.2 4 days 5/6/2019 5/9/2019
Preparation

5.21.2.1 Excavation 4 days 5/6/2019 5/9/2019

5.21.2.2 Pile Head Cutting 3 days 5/7/2019 5/9/2019

5.21.3 DOSING SKID (ID# 216) - Foundation - Under Ground Works 7 days 5/10/2019 5/16/2019

5.21.3.1 Trenching 7 days 5/10/2019 5/16/2019

5.21.4 DOSING SKID (ID# 216) - Foundation - Concrete Works 36 days 5/18/2019 6/22/2019

5.21.4.1 Footing Foundation 12 days 5/18/2019 5/29/2019

5.21.4.1.1 Leveling 1 day 5/18/2019 5/18/2019

5.21.4.1.2 Lean Concrete 2 days 5/18/2019 5/19/2019

5.21.4.1.3 Rebar 3 days 5/22/2019 5/24/2019

5.21.4.1.4 Formworks 3 days 5/25/2019 5/27/2019

5.21.4.1.5 Concrete Pouring 2 days 5/28/2019 5/29/2019

5.21.4.2 Pedestal Work 12 days 5/28/2019 6/8/2019

5.21.4.2.1 Leveling 1 day 5/28/2019 5/28/2019

5.21.4.2.2 Lean Concrete 2 days 5/28/2019 5/29/2019

5.21.4.2.3 Rebar 4 days 6/1/2019 6/4/2019


5.21.4.2.4 Anchor Bolt Installation 4 days 6/3/2019 6/6/2019

5.21.4.2.5 Formworks 4 days 6/3/2019 6/6/2019

5.21.4.2.6 Concrete Pouring 2 days 6/7/2019 6/8/2019

5.21.4.3 Tie Beam 12 days 5/28/2019 6/8/2019

5.21.4.3.1 Leveling 1 day 5/28/2019 5/28/2019

5.21.4.3.2 Lean Concrete 2 days 5/28/2019 5/29/2019

5.21.4.3.3 Rebar 4 days 6/1/2019 6/4/2019

5.21.4.3.4 Formworks 4 days 6/3/2019 6/6/2019

5.21.4.3.5 Concrete Pouring 2 days 6/7/2019 6/8/2019

5.21.4.4 Slab Work 12 days 6/11/2019 6/22/2019

5.21.4.4.1 Leveling 1 day 6/11/2019 6/11/2019

5.21.4.4.2 Lean Concrete 2 days 6/11/2019 6/12/2019

5.21.4.4.3 Rebar 3 days 6/15/2019 6/17/2019

5.21.4.4.4 Formworks 3 days 6/18/2019 6/20/2019

5.21.4.4.5 Concrete Pouring 2 days 6/21/2019 6/22/2019

5.21.5 DOSING SKID (ID# 216) - Foundation - CTO 0 days 6/22/2019 6/22/2019
5.22 Chemical Sampling 160 days 2/13/2019 7/22/2019

5.22.1 SAMPLING CONTAINER (ID# 215) - Foundation - DTO 0 days 2/13/2019 2/13/2019

SAMPLING CONTAINER (ID# 215) - Foundation - Excavation &


5.22.2 7 days 5/31/2019 6/6/2019
Pile Head Preparation

5.22.2.1 Excavation 7 days 5/31/2019 6/6/2019

5.22.2.2 Pile Head Cutting 5 days 6/2/2019 6/6/2019

SAMPLING CONTAINER (ID# 215) - Foundation - Underground


5.22.3 1 day 6/15/2019 6/15/2019
Works

5.22.3.1 Trenching 1 day 6/15/2019 6/15/2019

5.22.4 SAMPLING CONTAINER (ID# 215) - Foundation - Concrete Works 38 days 6/15/2019 7/22/2019

5.22.4.1 Footing Foundation 8 days 6/15/2019 6/22/2019

5.22.4.1.1 Leveling 1 day 6/15/2019 6/15/2019

5.22.4.1.2 Lean Concrete 1 day 6/15/2019 6/15/2019

5.22.4.1.3 Rebar 2 days 6/18/2019 6/19/2019

5.22.4.1.4 Formworks 2 days 6/20/2019 6/21/2019

5.22.4.1.5 Concrete Pouring 1 day 6/22/2019 6/22/2019

5.22.4.2 Pedestal Work 7 days 6/25/2019 7/1/2019

5.22.4.2.1 Leveling 1 day 6/25/2019 6/25/2019


5.22.4.2.2 Lean Concrete 2 days 6/25/2019 6/26/2019

5.22.4.2.3 Rebar 2 days 6/29/2019 6/30/2019

5.22.4.2.4 Anchor Bolt Installation 2 days 6/29/2019 6/30/2019

5.22.4.2.5 Formworks 2 days 6/29/2019 6/30/2019

5.22.4.2.6 Concrete Pouring 1 day 7/1/2019 7/1/2019

5.22.4.3 Tie Beam 8 days 7/4/2019 7/11/2019

5.22.4.3.1 Leveling 1 day 7/4/2019 7/4/2019

5.22.4.3.2 Lean Concrete 2 days 7/4/2019 7/5/2019

5.22.4.3.3 Rebar 2 days 7/8/2019 7/9/2019

5.22.4.3.4 Formworks 2 days 7/8/2019 7/9/2019

5.22.4.3.5 Concrete Pouring 2 days 7/10/2019 7/11/2019

5.22.4.4 Slab Work 9 days 7/14/2019 7/22/2019

5.22.4.4.1 Leveling 1 day 7/14/2019 7/14/2019

5.22.4.4.2 Lean Concrete 1 day 7/14/2019 7/14/2019

5.22.4.4.3 Rebar 2 days 7/17/2019 7/18/2019

5.22.4.4.4 Formworks 2 days 7/19/2019 7/20/2019


5.22.4.4.5 Concrete Pouring 2 days 7/21/2019 7/22/2019

5.22.5 SAMPLING CONTAINER (ID# 215) - Foundation - CTO 0 days 7/22/2019 7/22/2019

6 FUEL AREA 313 days 12/14/2018 10/22/2019

6.1 Fuel Gas Treatment Area 113 days 1/29/2019 5/21/2019

FUEL GAS CONDITIONING SKID (ID# 207) - Fence - Outline &


6.1.1 0 days 1/29/2019 1/29/2019
Details - DTO

FUEL GAS CONDITIONING SKID (ID# 207) - Plinth & Sleepers -


6.1.2 0 days 1/29/2019 1/29/2019
DTO

FUEL GAS CONDITIONING SKID (ID# 207) - Equipment


6.1.3 0 days 1/29/2019 1/29/2019
Foundation Outline & Details - DTO

FUEL GAS CONDITIONING SKID (ID# 207) - Foundation, Plinth &


6.1.4 7 days 2/27/2019 3/5/2019
Sleepers - Excavation & Pile Head Prep

6.1.4.1 Excavation 7 days 2/27/2019 3/5/2019

6.1.4.2 Pile Head Cutting 5 days 3/1/2019 3/5/2019

6.1.5 FUEL GAS CONDITIONING SKID (ID# 207) - Civil Construction 59 days 3/23/2019 5/21/2019

FUEL GAS CONDITIONING SKID (ID# 207) - Plinth & Sleepers -


6.1.6 24 days 3/6/2019 3/29/2019
Concrete Works

6.1.6.1 Rebar 7 days 3/6/2019 3/12/2019

6.1.6.2 Anchor Bolts 8 days 3/11/2019 3/18/2019

6.1.6.3 Formworks 8 days 3/16/2019 3/23/2019

6.1.6.4 Concrete Pouring 6 days 3/24/2019 3/29/2019


FUEL GAS CONDITIONING SKID (ID# 207) - Equipment
6.1.7 33 days 3/6/2019 4/7/2019
Foundation - Concrete Works

6.1.7.1 Footing Foundation 8 days 3/6/2019 3/13/2019

6.1.7.1.1 Leveling 1 day 3/6/2019 3/6/2019

6.1.7.1.2 Lean Concrete 1 day 3/6/2019 3/6/2019

6.1.7.1.3 Rebar 2 days 3/9/2019 3/10/2019

6.1.7.1.4 Formworks 2 days 3/11/2019 3/12/2019

6.1.7.1.5 Concrete Pouring 1 day 3/13/2019 3/13/2019

6.1.7.2 Pedestal Work 8 days 3/16/2019 3/23/2019

6.1.7.2.1 Leveling 1 day 3/16/2019 3/16/2019

6.1.7.2.2 Lean Concrete 1 day 3/16/2019 3/16/2019

6.1.7.2.3 Rebar 2 days 3/19/2019 3/20/2019

6.1.7.2.4 Anchor Bolt Installation 2 days 3/21/2019 3/22/2019

6.1.7.2.5 Formworks 2 days 3/21/2019 3/22/2019

6.1.7.2.6 Concrete Pouring 1 day 3/23/2019 3/23/2019

6.1.7.3 Tie Beam 8 days 3/19/2019 3/26/2019

6.1.7.3.1 Leveling 1 day 3/19/2019 3/19/2019


6.1.7.3.2 Lean Concrete 1 day 3/19/2019 3/19/2019

6.1.7.3.3 Rebar 2 days 3/22/2019 3/23/2019

6.1.7.3.4 Formworks 2 days 3/24/2019 3/25/2019

6.1.7.3.5 Concrete Pouring 1 day 3/26/2019 3/26/2019

6.1.7.4 Slab Work 10 days 3/29/2019 4/7/2019

6.1.7.4.1 Leveling 1 day 3/29/2019 3/29/2019

6.1.7.4.2 Lean Concrete 1 day 3/30/2019 3/30/2019

6.1.7.4.3 Rebar 2 days 4/2/2019 4/3/2019

6.1.7.4.4 Formworks 2 days 4/4/2019 4/5/2019

6.1.7.4.5 Concrete Pouring 2 days 4/6/2019 4/7/2019

6.1.8 FUEL GAS CONDITIONING SKID (ID# 207) - Fence - Excavation 4 days 3/26/2019 3/29/2019

6.1.8.1 Excavation 4 days 3/26/2019 3/29/2019

FUEL GAS CONDITIONING SKID (ID# 207) - Fence - Concrete


6.1.9 23 days 4/2/2019 4/24/2019
Works

6.1.9.1 Concrete Works 23 days 4/2/2019 4/24/2019

FUEL GAS CONDITIONING SKID (ID# 207) - Backfill and


6.1.10 6 days 5/1/2019 5/6/2019
Preparation

6.1.10.1 Backfill and Preparation 6 days 5/1/2019 5/6/2019


FUEL GAS CONDITIONING SKID (ID# 207) - Access for Erection -
6.1.11 0 days 5/4/2019 5/4/2019
CTO

6.1.12 FUEL GAS CONDITIONING SKID (ID# 207) - Install Fence 9 days 5/13/2019 5/21/2019

6.1.12.1 Fence Installation 9 days 5/13/2019 5/21/2019

6.1.13 FUEL GAS CONDITIONING SKID (ID# 207) - CTO 0 days 5/21/2019 5/21/2019

6.2 Fuel Gas Receiving Station 159 days 1/28/2019 7/5/2019

GAS RECEIVING STATION (ID# 236) - Equipment Foundation


6.2.1 0 days 1/28/2019 1/28/2019
Outline & Details - DTO

GAS RECEIVING STATION (ID# 236) - Equipment Foundation -


6.2.2 8 days 2/26/2019 3/5/2019
Excavation & Pile Head Prep

6.2.2.1 Excavation 8 days 2/26/2019 3/5/2019

6.2.2.2 Pile Head Cutting 5 days 3/1/2019 3/5/2019

GAS RECEIVING STATION (ID# 236) - Equipment Foundation -


6.2.3 34 days 3/7/2019 4/9/2019
Concrete Works

6.2.3.1 Footing Foundation 8 days 3/7/2019 3/14/2019

6.2.3.1.1 Leveling 1 day 3/7/2019 3/7/2019

6.2.3.1.2 Lean Concrete 1 day 3/7/2019 3/7/2019

6.2.3.1.3 Rebar 2 days 3/10/2019 3/11/2019

6.2.3.1.4 Formworks 2 days 3/12/2019 3/13/2019

6.2.3.1.5 Concrete Pouring 1 day 3/14/2019 3/14/2019


6.2.3.2 Pedestal Work 8 days 3/17/2019 3/24/2019

6.2.3.2.1 Leveling 1 day 3/17/2019 3/17/2019

6.2.3.2.2 Lean Concrete 1 day 3/17/2019 3/17/2019

6.2.3.2.3 Rebar 2 days 3/20/2019 3/21/2019

6.2.3.2.4 Anchor Bolt Installation 2 days 3/22/2019 3/23/2019

6.2.3.2.5 Formworks 2 days 3/22/2019 3/23/2019

6.2.3.2.6 Concrete Pouring 1 day 3/24/2019 3/24/2019

6.2.3.3 Tie Beam 8 days 3/20/2019 3/27/2019

6.2.3.3.1 Leveling 1 day 3/20/2019 3/20/2019

6.2.3.3.2 Lean Concrete 1 day 3/20/2019 3/20/2019

6.2.3.3.3 Rebar 2 days 3/23/2019 3/24/2019

6.2.3.3.4 Formworks 2 days 3/25/2019 3/26/2019

6.2.3.3.5 Concrete Pouring 1 day 3/27/2019 3/27/2019

6.2.3.4 Slab Work 11 days 3/30/2019 4/9/2019

6.2.3.4.1 Leveling 1 day 3/30/2019 3/30/2019

6.2.3.4.2 Lean Concrete 1 day 3/30/2019 3/30/2019


6.2.3.4.3 Rebar 2 days 4/4/2019 4/5/2019

6.2.3.4.4 Formworks 2 days 4/6/2019 4/7/2019

6.2.3.4.5 Concrete Pouring 2 days 4/8/2019 4/9/2019

6.2.4 GAS RECEIVING STATION (ID# 236) - Steel Structure - DTO 0 days 3/29/2019 3/29/2019

6.2.5 GAS RECEIVING STATION (ID# 236) - Steel Structure Erection 32 days 4/12/2019 5/13/2019

6.2.5.1 Erection 32 days 4/12/2019 5/13/2019

6.2.6 GAS RECEIVING STATION (ID# 236) - Roofing/Cladding - DTO 0 days 5/6/2019 5/6/2019

GAS RECEIVING STATION (ID# 236) - Roofing/Cladding


6.2.7 15 days 5/16/2019 5/30/2019
Installation

6.2.7.1 Roofing/Cladding Installation 15 days 5/16/2019 5/30/2019

6.2.8 GAS RECEIVING STATION (ID# 236) - Access for Erection - CTO 0 days 5/30/2019 5/30/2019

6.2.9 GAS RECEIVING STATION (ID# 236) - Architectural - DTO 0 days 5/30/2019 5/30/2019

6.2.10 GAS RECEIVING STATION (ID# 236) - Architectural Finishes 17 days 6/19/2019 7/5/2019

6.2.10.1 Wall Installation 12 days 6/19/2019 6/30/2019

6.2.10.2 Painting 5 days 7/1/2019 7/5/2019

6.2.11 GAS RECEIVING STATION (ID# 236) - CTO 0 days 7/5/2019 7/5/2019

6.3 Fuel Gas Compressor Building 245 days 12/14/2018 8/16/2019


FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -
6.3.1 116 days 12/14/2018 4/8/2019
Steel Structure - Manufacture / Delivery

6.3.1.1 Manufacturing 90 days 12/14/2018 3/13/2019

6.3.1.2 Delivery 26 days 3/14/2019 4/8/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.2 115 days 12/29/2018 4/22/2019
Roofing/Cladding - Manufacture / Delivery

6.3.2.1 Manufacturing 90 days 12/29/2018 3/28/2019

6.3.2.2 Delivery 25 days 3/29/2019 4/22/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.3 0 days 1/28/2019 1/28/2019
Underground Works - DTO

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.4 0 days 1/28/2019 1/28/2019
Concrete Outline& Detail - DTO

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.5 12 days 2/8/2019 2/19/2019
Excavation & Pile Head Preparation

6.3.5.1 Excavation 12 days 2/8/2019 2/19/2019

6.3.5.2 Pile Head Cutting 10 days 2/10/2019 2/19/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.6 53 days 2/20/2019 4/13/2019
Concrete Works

6.3.6.1 Footing Foundation 16 days 2/20/2019 3/7/2019

6.3.6.1.1 Leveling 1 day 2/20/2019 2/20/2019

6.3.6.1.2 Lean Concrete 2 days 2/20/2019 2/21/2019

6.3.6.1.3 Rebar 5 days 2/24/2019 2/28/2019


6.3.6.1.4 Formworks 5 days 3/1/2019 3/5/2019

6.3.6.1.5 Concrete Pouring 2 days 3/6/2019 3/7/2019

6.3.6.2 Pedestal Work 12 days 3/10/2019 3/21/2019

6.3.6.2.1 Leveling 1 day 3/10/2019 3/10/2019

6.3.6.2.2 Lean Concrete 1 day 3/10/2019 3/10/2019

6.3.6.2.3 Rebar 5 days 3/13/2019 3/17/2019

6.3.6.2.4 Anchor Bolt Installation 5 days 3/15/2019 3/19/2019

6.3.6.2.5 Formworks 5 days 3/15/2019 3/19/2019

6.3.6.2.6 Concrete Pouring 2 days 3/20/2019 3/21/2019

6.3.6.3 Tie Beam 13 days 3/13/2019 3/25/2019

6.3.6.3.1 Leveling 1 day 3/13/2019 3/13/2019

6.3.6.3.2 Lean Concrete 2 days 3/13/2019 3/14/2019

6.3.6.3.3 Rebar 5 days 3/17/2019 3/21/2019

6.3.6.3.4 Formworks 5 days 3/19/2019 3/23/2019

6.3.6.3.5 Concrete Pouring 2 days 3/24/2019 3/25/2019

6.3.6.4 Slab Work 17 days 3/28/2019 4/13/2019


6.3.6.4.1 Leveling 1 day 3/28/2019 3/28/2019

6.3.6.4.2 Lean Concrete 2 days 3/28/2019 3/29/2019

6.3.6.4.3 Rebar 5 days 4/1/2019 4/5/2019

6.3.6.4.4 Formworks 5 days 4/6/2019 4/10/2019

6.3.6.4.5 Concrete Pouring 3 days 4/11/2019 4/13/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.7 0 days 3/29/2019 3/29/2019
Steel Structure - DTO

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.8 10 days 4/3/2019 4/12/2019
Underground Works

6.3.8.1 Trenching 10 days 4/3/2019 4/12/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.9 16 days 4/16/2019 5/1/2019
External Equipment Foundations - Civil Construction

6.3.9.1 Footing Foundation 6 days 4/16/2019 4/21/2019

6.3.9.1.1 Leveling 1 day 4/16/2019 4/16/2019

6.3.9.1.2 Lean Concrete 1 day 4/16/2019 4/16/2019

6.3.9.1.3 Rebar 1 day 4/19/2019 4/19/2019

6.3.9.1.4 Formworks 1 day 4/20/2019 4/20/2019

6.3.9.1.5 Concrete Pouring 1 day 4/21/2019 4/21/2019

6.3.9.2 Pedestal Work 7 days 4/24/2019 4/30/2019


6.3.9.2.1 Leveling 1 day 4/24/2019 4/24/2019

6.3.9.2.2 Lean Concrete 1 day 4/24/2019 4/24/2019

6.3.9.2.3 Rebar 1 day 4/27/2019 4/27/2019

6.3.9.2.4 Anchor Bolt Installation 1 day 4/29/2019 4/29/2019

6.3.9.2.5 Formworks 1 day 4/29/2019 4/29/2019

6.3.9.2.6 Concrete Pouring 1 day 4/30/2019 4/30/2019

6.3.9.3 Tie Beam 7 days 4/25/2019 5/1/2019

6.3.9.3.1 Leveling 1 day 4/25/2019 4/25/2019

6.3.9.3.2 Lean Concrete 1 day 4/25/2019 4/25/2019

6.3.9.3.3 Rebar 1 day 4/28/2019 4/28/2019

6.3.9.3.4 Formworks 1 day 4/30/2019 4/30/2019

6.3.9.3.5 Concrete Pouring 1 day 5/1/2019 5/1/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.10 10 days 4/16/2019 4/25/2019
Floor Slab

6.3.10.1 Slab Work 10 days 4/16/2019 4/25/2019

6.3.10.1.1 Leveling 1 day 4/16/2019 4/16/2019

6.3.10.1.2 Lean Concrete 1 day 4/16/2019 4/16/2019


6.3.10.1.3 Rebar 3 days 4/19/2019 4/21/2019

6.3.10.1.4 Formworks 3 days 4/22/2019 4/24/2019

6.3.10.1.5 Concrete Pouring 1 day 4/25/2019 4/25/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.11 21 days 4/26/2019 5/16/2019
Steel Structure - Erection

6.3.11.1 Erection 21 days 4/26/2019 5/16/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.12 0 days 5/6/2019 5/6/2019
Roofing/Cladding - DTO

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.13 16 days 5/18/2019 6/2/2019
Masonary Work

6.3.13.1 Masonry Work 16 days 5/18/2019 6/2/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.14 0 days 5/25/2019 5/25/2019
Access for FG Compressor Erection - CTO

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.15 0 days 5/30/2019 5/30/2019
Arch. & Finishing Works - DTO

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.16 11 days 6/6/2019 6/16/2019
Roofing / Cladding

6.3.16.1 Roofing/Cladding Installation 11 days 6/6/2019 6/16/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) - FG


6.3.17 0 days 6/14/2019 6/14/2019
Comp Aux. Equip Fdns (Coolers etc) - CTO

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.18 16 days 6/20/2019 7/5/2019
Finishing Works

6.3.18.1 Finishing 16 days 6/20/2019 7/5/2019

FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -


6.3.19 0 days 7/5/2019 7/5/2019
CTO
FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) -
6.3.20 29 days 7/18/2019 8/16/2019
Complete Remaining Finishing Works

6.4 Fuel Gas Electrical Building 268 days 1/28/2019 10/22/2019

FG ELECTRICAL BUILDING (ID# 261) - Foundation Drawings -


6.4.1 0 days 1/28/2019 1/28/2019
DTO

FG ELECTRICAL BUILDING (ID# 261) - Foundation Excavation &


6.4.2 14 days 3/8/2019 3/21/2019
Pile Head Preparation

6.4.2.1 Excavation 14 days 3/8/2019 3/21/2019

6.4.2.2 Pile Head Cutting 10 days 3/12/2019 3/21/2019

6.4.3 FG ELECTRICAL BUILDING (ID# 261) - Foundations - Concrete 50 days 3/22/2019 5/10/2019

6.4.3.1 Footing Foundation 16 days 3/22/2019 4/6/2019

6.4.3.1.1 Leveling 1 day 3/22/2019 3/22/2019

6.4.3.1.2 Lean Concrete 2 days 3/22/2019 3/23/2019

6.4.3.1.3 Rebar 5 days 3/26/2019 3/30/2019

6.4.3.1.4 Formworks 5 days 3/31/2019 4/4/2019

6.4.3.1.5 Concrete Pouring 2 days 4/5/2019 4/6/2019

6.4.3.2 Pedestal Work 13 days 4/9/2019 4/21/2019

6.4.3.2.1 Leveling 1 day 4/9/2019 4/9/2019

6.4.3.2.2 Lean Concrete 2 days 4/9/2019 4/10/2019


6.4.3.2.3 Rebar 5 days 4/13/2019 4/17/2019

6.4.3.2.4 Anchor Bolt Installation 5 days 4/15/2019 4/19/2019

6.4.3.2.5 Formworks 5 days 4/15/2019 4/19/2019

6.4.3.2.6 Concrete Pouring 2 days 4/20/2019 4/21/2019

6.4.3.3 Tie Beam 12 days 4/12/2019 4/23/2019

6.4.3.3.1 Leveling 1 day 4/12/2019 4/12/2019

6.4.3.3.2 Lean Concrete 2 days 4/12/2019 4/13/2019

6.4.3.3.3 Rebar 5 days 4/16/2019 4/20/2019

6.4.3.3.4 Formworks 5 days 4/17/2019 4/21/2019

6.4.3.3.5 Concrete Pouring 2 days 4/22/2019 4/23/2019

6.4.3.4 Slab Work 15 days 4/26/2019 5/10/2019

6.4.3.4.1 Leveling 1 day 4/26/2019 4/26/2019

6.4.3.4.2 Lean Concrete 2 days 4/26/2019 4/27/2019

6.4.3.4.3 Rebar 5 days 4/29/2019 5/3/2019

6.4.3.4.4 Formworks 5 days 5/4/2019 5/8/2019

6.4.3.4.5 Concrete Pouring 2 days 5/9/2019 5/10/2019


6.4.4 FG ELECTRICAL BUILDING (ID# 261) - Superstructure - DTO 0 days 3/29/2019 3/29/2019

FG ELECTRICAL BUILDING (ID# 261) - Superstructure


6.4.5 108 days 5/12/2019 8/27/2019
Construction

6.4.5.1 Concrete/Steel Strcuture Work 108 days 5/12/2019 8/27/2019

6.4.5.1.1 Column 76 days 5/12/2019 7/26/2019

6.4.5.1.2 Beam 76 days 6/13/2019 8/27/2019

6.4.6 FG ELECTRICAL BUILDING (ID# 261) - Architectural Dwgs. - DTO 0 days 5/30/2019 5/30/2019

6.4.7 FG ELECTRICAL BUILDING (ID# 261) - Finishing Work 83 days 6/20/2019 9/10/2019

6.4.7.1 Wall Installation 60 days 6/20/2019 8/18/2019

6.4.7.2 Roofing 60 days 6/30/2019 8/28/2019

6.4.7.3 Painting 13 days 8/29/2019 9/10/2019

6.4.8 FG ELECTRICAL BUILDING (ID# 261) - Access for Erection - CTO 0 days 9/10/2019 9/10/2019

FG ELECTRICAL BUILDING (ID# 261) - Complete Remaining


6.4.9 42 days 9/11/2019 10/22/2019
Finishing Work

6.4.9.1 Finishing Works 42 days 9/11/2019 10/22/2019

7 MAIN COOLING WATER AREA (DIRECT COOLING) 974 days 8/17/2017 4/16/2020

7.1 Electro-Chlorination Building 163 days 1/28/2019 7/9/2019

ELECTRO-CHLORINATION BLDG (ID# 303) - Concrete Outline&


7.1.1 0 days 1/28/2019 1/28/2019
Details - DTO
ELECTRO-CHLORINATION BLDG (ID# 303) - Roofing/Cladding -
7.1.2 87 days 1/29/2019 4/25/2019
Manufacture / Delivery

7.1.2.1 Manufacturing 60 days 1/29/2019 3/29/2019

7.1.2.2 Delivery 27 days 3/30/2019 4/25/2019

ELECTRO-CHLORINATION BLDG (ID# 303) - Steel Structure -


7.1.3 87 days 1/29/2019 4/25/2019
Procurement/Fabrication/ Delivery

7.1.3.1 Manufacturing 60 days 1/29/2019 3/29/2019

7.1.3.2 Delivery 27 days 3/30/2019 4/25/2019

ELECTRO-CHLORINATION BLDG (ID# 303) - Excavation & Pile


7.1.4 9 days 2/27/2019 3/7/2019
Head Preparation

7.1.4.1 Excavation 9 days 2/27/2019 3/7/2019

7.1.4.2 Pile Head Cutting 7 days 3/1/2019 3/7/2019

ELECTRO-CHLORINATION BLDG (ID# 303) - Steel Structure -


7.1.5 0 days 2/20/2019 2/20/2019
DTO

7.1.6 ELECTRO-CHLORINATION BLDG (ID# 303) - Foundations 43 days 3/8/2019 4/19/2019

7.1.6.1 Footing Foundation 12 days 3/8/2019 3/19/2019

7.1.6.1.1 Leveling 1 day 3/8/2019 3/8/2019

7.1.6.1.2 Lean Concrete 2 days 3/8/2019 3/9/2019

7.1.6.1.3 Rebar 3 days 3/12/2019 3/14/2019

7.1.6.1.4 Formworks 3 days 3/15/2019 3/17/2019


7.1.6.1.5 Concrete Pouring 2 days 3/18/2019 3/19/2019

7.1.6.2 Pedestal Work 11 days 3/22/2019 4/1/2019

7.1.6.2.1 Leveling 1 day 3/22/2019 3/22/2019

7.1.6.2.2 Lean Concrete 2 days 3/22/2019 3/23/2019

7.1.6.2.3 Rebar 3 days 3/26/2019 3/28/2019

7.1.6.2.4 Anchor Bolt Installation 3 days 3/28/2019 3/30/2019

7.1.6.2.5 Formworks 3 days 3/28/2019 3/30/2019

7.1.6.2.6 Concrete Pouring 2 days 3/31/2019 4/1/2019

7.1.6.3 Tie Beam 11 days 3/25/2019 4/4/2019

7.1.6.3.1 Leveling 1 day 3/25/2019 3/25/2019

7.1.6.3.2 Lean Concrete 2 days 3/25/2019 3/26/2019

7.1.6.3.3 Rebar 3 days 3/29/2019 3/31/2019

7.1.6.3.4 Formworks 3 days 3/31/2019 4/2/2019

7.1.6.3.5 Concrete Pouring 2 days 4/3/2019 4/4/2019

7.1.6.4 Slab Work 13 days 4/7/2019 4/19/2019

7.1.6.4.1 Leveling 1 day 4/7/2019 4/7/2019


7.1.6.4.2 Lean Concrete 2 days 4/7/2019 4/8/2019

7.1.6.4.3 Rebar 3 days 4/11/2019 4/13/2019

7.1.6.4.4 Formworks 3 days 4/14/2019 4/16/2019

7.1.6.4.5 Concrete Pouring 3 days 4/17/2019 4/19/2019

ELECTRO-CHLORINATION BLDG (ID# 303) - Roofing/Cladding


7.1.7 0 days 3/28/2019 3/28/2019
Dwgs (Erection) - DTO

ELECTRO-CHLORINATION BLDG (ID# 303) - Arch. & Finishing -


7.1.8 0 days 3/28/2019 3/28/2019
DTO

7.1.9 ELECTRO-CHLORINATION BLDG (ID# 303) - U/G Works 21 days 4/7/2019 4/27/2019

7.1.9.1 Trenching 21 days 4/7/2019 4/27/2019

ELECTRO-CHLORINATION BLDG (ID# 303) - Foundation - CTO


7.1.10 0 days 4/10/2019 4/10/2019
for Steel Erection

7.1.11 ELECTRO-CHLORINATION BLDG (ID# 303) - Floor Slab 21 days 4/29/2019 5/19/2019

7.1.11.1 Slab Work 21 days 4/29/2019 5/19/2019

7.1.11.1.1 Leveling 1 day 4/29/2019 4/29/2019

7.1.11.1.2 Lean Concrete 3 days 4/29/2019 5/1/2019

7.1.11.1.3 Rebar 6 days 5/4/2019 5/9/2019

7.1.11.1.4 Formworks 6 days 5/10/2019 5/15/2019

7.1.11.1.5 Concrete Pouring 4 days 5/16/2019 5/19/2019


ELECTRO-CHLORINATION BLDG (ID# 303) - Steel Structure -
7.1.12 17 days 5/3/2019 5/19/2019
Erection

7.1.12.1 Steel Structure Erection 17 days 5/3/2019 5/19/2019

ELECTRO-CHLORINATION BLDG (ID# 303) - Masonary Partial


7.1.13 18 days 5/21/2019 6/7/2019
finishing Works

7.1.13.1 Masonry Partial Finishing Works 18 days 5/21/2019 6/7/2019

ELECTRO-CHLORINATION BLDG (ID# 303) - Steel Str. Roofing -


7.1.14 7 days 5/21/2019 5/27/2019
Erection

7.1.14.1 Steel Structure Roofing Erection 7 days 5/21/2019 5/27/2019

7.1.15 ELECTRO-CHLORINATION BLDG (ID# 303) - Equipment Plinths 14 days 5/21/2019 6/3/2019

7.1.15.1 Rebar 7 days 5/21/2019 5/27/2019

7.1.15.2 Anchor Bolt Installation 7 days 5/22/2019 5/28/2019

7.1.15.3 Formworks 7 days 5/25/2019 5/31/2019

7.1.15.4 Concrete Pouring 3 days 6/1/2019 6/3/2019

ELECTRO-CHLORINATION BLDG (ID# 303) - Access for M&E


7.1.16 0 days 5/23/2019 5/23/2019
Erection - CTO

7.1.17 ELECTRO-CHLORINATION BLDG (ID# 303) - Cladding 9 days 6/9/2019 6/17/2019

7.1.17.1 Cladding 9 days 6/9/2019 6/17/2019

7.1.18 ELECTRO-CHLORINATION BLDG (ID# 303) - Finishing Works 19 days 6/21/2019 7/9/2019

7.1.18.1 Finishing Work 19 days 6/21/2019 7/9/2019


ELECTRO-CHLORINATION BLDG (ID# 303) - Complete - CTO for
7.1.19 0 days 7/9/2019 7/9/2019
Building Services

7.2 Cooling Water Filtration & Pump Station 974 days 8/17/2017 4/16/2020

7.2.1 Cooling Water Filtration & Pump Station - Piling 82 days 10/20/2018 1/9/2019

7.2.1.1 Sheet Pile Coverdam Design 43 days 10/20/2018 12/1/2018

7.2.1.2 Piling Works 51 days 11/2/2018 12/22/2018

7.2.1.3 Sheet Piling 40 days 12/1/2018 1/9/2019

Cooling Water Filtration & Pump Station - Excavation &


7.2.2 136 days 1/10/2019 5/25/2019
Dewatering

7.2.2.1 Excavation First Layer- 2meters 3 days 1/10/2019 1/12/2019

7.2.2.2 Struting First Layer 11 days 1/13/2019 1/23/2019

7.2.2.3 Excavation Second Layer with dewatering 7 days 1/24/2019 1/30/2019

7.2.2.4 Pile Head First Cutting (-1meter) 6 days 1/31/2019 2/5/2019

7.2.2.5 Struting Second Layer 14 days 2/6/2019 2/19/2019

7.2.2.6 Excavation Third Layer with dewatering 11 days 2/20/2019 3/2/2019

7.2.2.7 Struting Third Layer 17 days 3/3/2019 3/19/2019

7.2.2.8 Excavation Fourth Layer with dewatering 16 days 3/20/2019 4/4/2019

7.2.2.9 Struting Fourth Layer 19 days 4/5/2019 4/23/2019


7.2.2.10 Excavation Final Layer with dewatering 23 days 4/24/2019 5/16/2019

7.2.2.11 Pile Head Second Cutting(-5 meter) 9 days 5/17/2019 5/25/2019

Cooling Water Filtration & Pump Station - Basemat Foundation


7.2.3 75 days 5/5/2019 7/18/2019
Concrete

7.2.3.1 Section 1 - Stop Log, Bar screen& Pump Section 54 days 5/26/2019 7/18/2019

7.2.3.1.1 First Casting - Lean Concrete 4 days 5/26/2019 5/29/2019

7.2.3.1.2 First Casting - Slab Rebar and wall starter bar 28 days 5/30/2019 6/26/2019

7.2.3.1.3 First Casting - Formworks, Kicker& Waterstop 18 days 6/21/2019 7/8/2019

7.2.3.1.4 First Casting - Foundation Concrete 1 day 7/9/2019 7/9/2019

7.2.3.1.5 First Casting Curing 2 days 7/10/2019 7/11/2019

7.2.3.1.6 First Casting - Formwork Removal& Bitumin Application 7 days 7/12/2019 7/18/2019

7.2.3.2 Section 2 - CW Pipe to Stop Log 69 days 5/5/2019 7/12/2019

7.2.3.2.1 Second Casting - Lean Concrete 4 days 7/9/2019 7/12/2019

7.2.3.2.2 Second Casting - Pile Head Cutting and plugging 4 days 7/9/2019 7/12/2019

7.2.3.2.3 Second Casting - Slab Rebar and wall starter bar 12 days 5/5/2019 5/16/2019

7.2.3.2.4 Second Casting - Formworks, Kicker& Waterstop 18 days 5/22/2019 6/8/2019

7.2.3.2.5 Cleaning& Inspection 1 day 6/9/2019 6/9/2019


7.2.3.2.6 Second Casting - Foundation Concrete 1 day 6/10/2019 6/10/2019

7.2.3.2.7 Second Casting Curing 3 days 6/11/2019 6/13/2019

7.2.3.2.8 Second Casting - Formwork Removal& Bitumin Application 7 days 6/14/2019 6/20/2019

7.2.4 Cooling Water Filtration & Pump Station - Walls 974 days 8/17/2017 4/16/2020

7.2.4.1 Exterior Wall - R&L Side, Length 66m (Sect. 1.1) 105 days 7/13/2018 10/25/2018

7.2.4.2 Exterior Wall - Back Side 115 days 11/14/2018 3/8/2019

7.2.4.2.1 Construction Joint Preparation - Chipping 5 days 1/2/2019 1/6/2019

7.2.4.2.2 First Lift Scaffold 15 days 12/4/2018 12/18/2018

7.2.4.2.3 First Lift Rebar 21 days 11/14/2018 12/4/2018

7.2.4.2.4 First Lift Formworks 28 days 11/14/2018 12/11/2018

7.2.4.2.5 Construction Joint - Waterstop 7 days 1/13/2019 1/19/2019

7.2.4.2.6 Cleaning& Inspection 2 days 1/3/2019 1/4/2019

7.2.4.2.7 Concrete Pouring 2 days 1/16/2019 1/17/2019

7.2.4.2.8 Curing 5 days 1/11/2019 1/15/2019

7.2.4.2.9 Formworks removal 7 days 3/2/2019 3/8/2019

7.2.4.2.10 Surface Preparation& Repairs 7 days 1/15/2019 1/21/2019


7.2.4.2.11 Bitumin Application 5 days 2/26/2019 3/2/2019

7.2.4.2.12 Construction Joint Preparation - Chipping 5 days 3/2/2019 3/6/2019

7.2.4.2.13 Second Lift - Scaffold 12 days 12/7/2018 12/18/2018

7.2.4.2.14 Second Lift Rebar 18 days 1/25/2019 2/11/2019

7.2.4.2.15 Second Lift Formworks 28 days 1/20/2019 2/16/2019

7.2.4.2.16 Construction Joint - Waterstop 3 days 1/22/2019 1/24/2019

7.2.4.2.17 Cleaning& Inspection 2 days 12/28/2018 12/29/2018

7.2.4.2.18 Concrete Pouring 1 day 2/25/2019 2/25/2019

7.2.4.2.19 Curing 5 days 2/12/2019 2/16/2019

7.2.4.2.20 Formworks removal 10 days 2/7/2019 2/16/2019

7.2.4.2.21 Surface Preparation& Repairs 7 days 12/8/2018 12/14/2018

7.2.4.2.22 Bitumin Application 5 days 2/25/2019 3/1/2019

7.2.4.3 Exterior Wall - Front Side 974 days 8/17/2017 4/16/2020

7.2.4.3.1 Construction Joint Preparation - Chipping 5 days 1/24/2019 1/28/2019

7.2.4.3.2 First Lift Scaffold 15 days 2/14/2019 2/28/2019

7.2.4.3.3 First Lift Rebar 21 days 2/23/2019 3/15/2019


7.2.4.3.4 First Lift Formworks 28 days 1/15/2019 2/11/2019

7.2.4.3.5 Construction Joint - Waterstop 7 days 2/10/2019 2/16/2019

7.2.4.3.6 Cleaning& Inspection 2 days 2/25/2019 2/26/2019

7.2.4.3.7 Concrete Pouring 2 days 5/18/2019 5/19/2019

7.2.4.3.8 Curing 5 days 8/2/2019 8/6/2019

7.2.4.3.9 Formworks removal 7 days 2/2/2020 2/8/2020

7.2.4.3.10 Surface Preparation& Repairs 7 days 8/1/2019 8/7/2019

7.2.4.3.11 Bitumin Application 5 days 10/26/2019 10/30/2019

7.2.4.3.12 Construction Joint Preparation - Chipping 5 days 1/17/2020 1/21/2020

7.2.4.3.13 Second Lift - Scaffold 12 days 11/1/2019 11/12/2019

7.2.4.3.14 Second Lift Rebar 18 days 2/1/2020 2/18/2020

7.2.4.3.15 Second Lift Formworks 28 days 12/10/2019 1/6/2020

7.2.4.3.16 Construction Joint - Waterstop 3 days 12/6/2019 12/9/2019

7.2.4.3.17 Cleaning& Inspection 2 days 4/15/2020 4/16/2020

7.2.4.3.18 Concrete Pouring 1 day 4/14/2020 4/14/2020

7.2.4.3.19 Curing 5 days 4/11/2018 4/15/2018


7.2.4.3.20 Formworks removal 10 days 8/17/2017 8/26/2017

7.2.4.3.21 Surface Preparation& Repairs 7 days 8/20/2017 8/26/2017

7.2.4.3.22 Bitumin Application 5 days 7/13/2018 7/17/2018

7.2.4.4 Exterior Wall - Holes Side, length 14.00 M 94 days 3/11/2019 6/12/2019

7.2.4.4.1 Construction Joint Preparation - Chipping 3 days 6/10/2019 6/12/2019

7.2.4.4.2 First Lift Scaffold 5 days 4/4/2019 4/8/2019

7.2.4.4.3 First Lift Rebar 7 days 3/11/2019 3/17/2019

7.2.4.4.4 Preparation Head Bonapipe 7 days 3/26/2019 4/1/2019

7.2.4.4.5 Head Bonapipe Installation 3 days 3/26/2019 3/28/2019

7.2.4.4.6 Formworks 7 days 4/27/2019 5/3/2019

7.2.4.4.7 Construction Joint - Waterstop 3 days 3/31/2019 4/2/2019

7.2.4.4.8 Cleaning& Inspection 2 days 3/28/2019 3/29/2019

7.2.4.4.9 Concrete Pouring 1 day 3/28/2019 3/28/2019

7.2.4.4.10 Curing 5 days 3/31/2019 4/4/2019

7.2.4.4.11 Formworks removal 3 days 4/3/2019 4/5/2019

7.2.4.4.12 Surface Preparation& Repairs 3 days 3/31/2019 4/2/2019


7.2.4.4.13 Bitumin Application 3 days 4/10/2019 4/12/2019

7.2.4.4.14 Construction Joint Preparation - Chipping 3 days 4/5/2019 4/7/2019

7.2.4.4.15 Second Lift - Scaffold 7 days 4/8/2019 4/14/2019

7.2.4.4.16 Second Lift Rebar 4 days 4/9/2019 4/12/2019

7.2.4.4.17 Second Lift Formworks 7 days 4/11/2019 4/17/2019

7.2.4.4.18 Construction Joint - Waterstop 2 days 4/10/2019 4/11/2019

7.2.4.4.19 Cleaning& Inspection 1 day 4/14/2019 4/14/2019

7.2.4.4.20 Concrete Pouring 1 day 4/17/2019 4/17/2019

7.2.4.4.21 Curing 5 days 4/9/2019 4/13/2019

7.2.4.4.22 Formworks removal 3 days 4/10/2019 4/12/2019

7.2.4.4.23 Surface Preparation& Repairs 3 days 4/10/2019 4/12/2019

7.2.4.4.24 Bitumin Application 3 days 4/12/2019 4/14/2019

7.2.4.5 Inside Section,Horizontal 135 days 1/17/2019 5/31/2019

7.2.4.5.1 Construction Joint Preparation - Chipping 5 days 2/6/2019 2/10/2019

7.2.4.5.2 Scaffold 10 days 4/21/2019 4/30/2019

7.2.4.5.3 Rebar 14 days 4/19/2019 5/2/2019


7.2.4.5.4 Formworks 21 days 4/22/2019 5/12/2019

7.2.4.5.5 Construction Joint - Waterstop 7 days 4/18/2019 4/24/2019

7.2.4.5.6 Cleaning& Inspection 2 days 4/27/2019 4/28/2019

7.2.4.5.7 Concrete Pouring 2 days 4/27/2019 4/28/2019

7.2.4.5.8 Curing 5 days 1/28/2019 2/1/2019

7.2.4.5.9 Formworks removal 7 days 4/20/2019 4/26/2019

7.2.4.5.10 Surface Preparation& Repairs 5 days 4/23/2019 4/27/2019

7.2.4.5.11 Construction Joint Preparation - Chipping 5 days 4/21/2019 4/25/2019

7.2.4.5.12 Second Lift - Scaffold 12 days 4/26/2019 5/7/2019

7.2.4.5.13 Second Lift Rebar 14 days 4/26/2019 5/9/2019

7.2.4.5.14 Second Lift Formworks 21 days 1/17/2019 2/6/2019

7.2.4.5.15 Construction Joint - Waterstop 7 days 5/17/2019 5/23/2019

7.2.4.5.16 Cleaning& Inspection 2 days 5/3/2019 5/4/2019

7.2.4.5.17 Concrete Pouring 1 day 5/6/2019 5/6/2019

7.2.4.5.18 Curing 5 days 5/21/2019 5/25/2019

7.2.4.5.19 Formworks removal 10 days 5/22/2019 5/31/2019


7.2.4.5.20 Surface Preparation& Repairs 5 days 5/25/2019 5/29/2019

7.2.4.6 Inside Section, Vertical 237 days 12/11/2018 8/4/2019

7.2.4.6.1 Pump Area 171 days 12/11/2018 5/30/2019

7.2.4.6.1.1 Construction Joint Preparation - Chipping 5 days 1/29/2019 2/2/2019

7.2.4.6.1.2 Scaffold 7 days 3/24/2019 3/30/2019

7.2.4.6.1.3 Rebar 10 days 3/22/2019 3/31/2019

7.2.4.6.1.4 Formworks 14 days 3/27/2019 4/9/2019

7.2.4.6.1.5 Construction Joint - Waterstop 2 days 5/16/2019 5/17/2019

7.2.4.6.1.6 Cleaning& Inspection 2 days 4/13/2019 4/14/2019

7.2.4.6.1.7 Concrete Pouring 1 day 4/15/2019 4/15/2019

7.2.4.6.1.8 Curing 5 days 4/21/2019 4/25/2019

7.2.4.6.1.9 Formworks removal 7 days 5/9/2019 5/15/2019

7.2.4.6.1.10 Surface Preparation& Repairs 5 days 5/5/2019 5/9/2019

7.2.4.6.1.11 Construction Joint Preparation - Chipping 5 days 5/11/2019 5/15/2019

7.2.4.6.1.12 Second Lift - Scaffold 10 days 5/21/2019 5/30/2019

7.2.4.6.1.13 Second Lift Rebar 12 days 12/11/2018 12/22/2018


7.2.4.6.1.14 Second Lift Formworks 14 days 12/11/2018 12/24/2018

7.2.4.6.1.15 Cleaning& Inspection 2 days 12/14/2018 12/15/2018

7.2.4.6.1.16 Concrete Pouring 1 day 3/19/2019 3/19/2019

7.2.4.6.1.17 Curing 5 days 3/18/2019 3/22/2019

7.2.4.6.1.18 Formworks and Scaffold removal 12 days 4/2/2019 4/13/2019

7.2.4.6.1.19 Surface Preparation& Repairs 5 days 3/23/2019 3/27/2019

7.2.4.6.2 Elevator Area 188 days 1/29/2019 8/4/2019

7.2.4.6.2.1 Construction Joint Preparation - Chipping 5 days 1/29/2019 2/2/2019

7.2.4.6.2.2 Scaffold 7 days 4/5/2019 4/11/2019

7.2.4.6.2.3 Rebar 10 days 4/17/2019 4/26/2019

7.2.4.6.2.4 Formworks 14 days 4/17/2019 4/30/2019

7.2.4.6.2.5 Construction Joint - Waterstop 2 days 4/21/2019 4/22/2019

7.2.4.6.2.6 Cleaning& Inspection 2 days 4/27/2019 4/28/2019

7.2.4.6.2.7 Concrete Pouring 1 day 4/28/2019 4/28/2019

7.2.4.6.2.8 Curing 5 days 5/22/2019 5/26/2019

7.2.4.6.2.9 Formworks removal 7 days 5/23/2019 5/29/2019


7.2.4.6.2.10 Surface Preparation& Repairs 5 days 5/27/2019 5/31/2019

7.2.4.6.2.11 Construction Joint Preparation - Chipping 5 days 5/23/2019 5/27/2019

7.2.4.6.2.12 Second Lift - Scaffold 10 days 6/6/2019 6/15/2019

7.2.4.6.2.13 Second Lift Rebar 12 days 3/30/2019 4/10/2019

7.2.4.6.2.14 Second Lift Formworks 14 days 3/30/2019 4/12/2019

7.2.4.6.2.15 Cleaning& Inspection 2 days 5/9/2019 5/10/2019

7.2.4.6.2.16 Concrete Pouring 1 day 5/9/2019 5/9/2019

7.2.4.6.2.17 Curing 5 days 5/8/2019 5/12/2019

7.2.4.6.2.18 Formworks and Scaffold removal 12 days 7/24/2019 8/4/2019

7.2.4.6.2.19 Surface Preparation& Repairs 5 days 5/13/2019 5/17/2019

7.2.4.6.3 Top Slab 62 days 5/12/2019 7/12/2019

7.2.4.6.3.1 Construction Joint Preparation - Chipping 7 days 5/12/2019 5/18/2019

7.2.4.6.3.2 Exterior Scaffold 5 days 5/25/2019 5/29/2019

7.2.4.6.3.3 Support and H-Beam Platform 15 days 5/24/2019 6/7/2019

7.2.4.6.3.4 Formworks slab, and Manhole (el.+1.2 and el. +3.8) 21 days 5/30/2019 6/19/2019

7.2.4.6.3.5 Rebar 21 days 6/6/2019 6/26/2019


7.2.4.6.3.6 Formworks exterior 14 days 6/3/2019 6/16/2019

7.2.4.6.3.7 Embedded and Anchor 14 days 5/25/2019 6/7/2019

7.2.4.6.3.8 Cleaning& Inspection 7 days 6/20/2019 6/26/2019

7.2.4.6.3.9 Concrete Pouring (el.+1.2) 1 day 6/22/2019 6/22/2019

7.2.4.6.3.10 Concrete Pouring (el.+3.8) 2 days 6/22/2019 6/23/2019

7.2.4.6.3.11 Curing 7 days 6/26/2019 7/2/2019

7.2.4.6.3.12 Formworks exterior removal 3 days 7/2/2019 7/4/2019

7.2.4.6.3.13 Formworks slab removal 30 days 6/13/2019 7/12/2019

7.2.4.6.3.14 Surface Preparation& Repairs 15 days 5/29/2019 6/12/2019

Cooling Water Filtration & Pump Station - Conecting to Railway


7.2.5 350 days 1/23/2019 1/7/2020
Section

7.2.5.1 Foundation Works 110 days 4/9/2019 7/27/2019

7.2.5.1.1 Excavation 3 days 4/9/2019 4/11/2019

7.2.5.1.2 Lean Concrete 1 day 7/24/2019 7/24/2019

7.2.5.1.3 Pile Head Final Cutting and Plugging 2 days 7/7/2019 7/8/2019

7.2.5.1.4 Slab Rebar and wall starter bar 5 days 7/7/2019 7/11/2019

7.2.5.1.5 Formworks 5 days 7/16/2019 7/20/2019


7.2.5.1.6 Foundation Concrete 1 day 7/20/2019 7/20/2019

7.2.5.1.7 Curing 5 days 7/23/2019 7/27/2019

7.2.5.1.8 Formwork Removal& Bitumin Application 3 days 7/25/2019 7/27/2019

7.2.5.2 Second Lift-Wall and Bonapipe Instalation 350 days 1/23/2019 1/7/2020

7.2.5.2.1 Install Bonapipe 5 days 11/26/2019 11/30/2019

7.2.5.2.2 Construction Joint Preparation - Chipping 5 days 1/2/2020 1/6/2020

7.2.5.2.3 Scaffold 3 days 1/5/2020 1/7/2020

7.2.5.2.4 Rebar 3 days 7/24/2019 7/26/2019

7.2.5.2.5 Formworks 5 days 1/23/2019 1/27/2019

7.2.5.2.6 Cleaning& Inspection 1 day 1/23/2019 1/23/2019

7.2.5.2.7 Pouring Concrete 1 day 3/4/2019 3/4/2019

7.2.5.2.8 Curing 5 days 3/3/2019 3/7/2019

7.2.5.2.9 Formworks removal 3 days 3/4/2019 3/6/2019

7.2.5.2.10 Surface Preparation& Repairs 1 day 4/12/2019 4/12/2019

7.2.5.2.11 Bitumin Application 1 day 3/17/2019 3/17/2019

7.2.5.3 Third Lift-Wall and Top Slab 28 days 3/3/2019 3/30/2019


7.2.5.3.1 Construction Joint Preparation - Chipping 5 days 3/3/2019 3/7/2019

7.2.5.3.2 Scaffold 2 days 3/11/2019 3/12/2019

7.2.5.3.3 Rebar 5 days 3/12/2019 3/16/2019

7.2.5.3.4 Formworks 6 days 3/15/2019 3/20/2019

7.2.5.3.5 Cleaning& Inspection 1 day 3/30/2019 3/30/2019

7.2.5.3.6 Pouring Concrete 1 day 3/21/2019 3/21/2019

7.2.5.3.7 Curing 5 days 3/20/2019 3/24/2019

7.2.5.3.8 Formworks and Scafolld removal 3 days 3/26/2019 3/28/2019

7.2.5.3.9 Surface Preparation& Repairs 1 day 3/26/2019 3/26/2019

7.2.5.3.10 Bitumin Application 1 day 3/26/2019 3/26/2019

7.2.6 COOLING WATER PUMP STATION - Metal Cladding 18 days 7/19/2019 8/5/2019

7.2.6.1 Metal Cladding 18 days 7/19/2019 8/5/2019

7.2.7 COOLING WATER PUMP STATION - Building Finishing Works 44 days 8/6/2019 9/18/2019

7.2.7.1 Finishing Work 44 days 8/6/2019 9/18/2019

COOLING WATER PUMP STATION - CTO (Complete)


7.2.7.2 0 days 9/18/2019 9/18/2019
(CTO_C_B1)

7.3 Outfall Structure 186 days 2/25/2019 8/29/2019


OUTFALL STRUCTURE (ID# 102) - Concrete Outline & Details -
7.3.1 0 days 2/25/2019 2/25/2019
DTO

7.3.2 OUTFALL STRUCTURE (ID# 102) - Sheet Piling (If Required) 14 days 3/26/2019 4/8/2019

7.3.2.1 Sheet Piling 14 days 3/26/2019 4/8/2019

OUTFALL STRUCTURE (ID# 102) - Excavation & Pile Head


7.3.3 24 days 4/10/2019 5/3/2019
Preparation

7.3.3.1 Excavation 24 days 4/10/2019 5/3/2019

7.3.3.2 Pile Head Cutting 21 days 4/13/2019 5/3/2019

7.3.4 OUTFALL STRUCTURE (ID# 102) - Concreting 111 days 5/5/2019 8/23/2019

7.3.4.1 Concrete Foundation 57 days 5/5/2019 6/30/2019

7.3.4.1.1 Leveling 2 days 5/5/2019 5/6/2019

7.3.4.1.2 Lean Concrete 7 days 5/5/2019 5/11/2019

7.3.4.1.3 Rebar 18 days 5/19/2019 6/5/2019

7.3.4.1.4 Formworks 18 days 6/6/2019 6/23/2019

7.3.4.1.5 Concrete Pouring 7 days 6/24/2019 6/30/2019

7.3.4.2 Slab Work 47 days 7/8/2019 8/23/2019

7.3.4.2.1 Leveling 2 days 7/8/2019 7/9/2019

7.3.4.2.2 Lean Concrete 5 days 7/8/2019 7/12/2019


7.3.4.2.3 Rebar 14 days 7/20/2019 8/2/2019

7.3.4.2.4 Formworks 14 days 8/3/2019 8/16/2019

7.3.4.2.5 Concrete Pouring 7 days 8/17/2019 8/23/2019

7.3.5 OUTFALL STRUCTURE (ID# 102) - Finishing Works 5 days 8/25/2019 8/29/2019

7.3.5.1 Finishing Work 5 days 8/25/2019 8/29/2019

7.3.6 OUTFALL STRUCTURE (ID# 102) - Access for M&E Erection CTO 0 days 8/29/2019 8/29/2019

7.4 Intake Head Structure 193 days 1/25/2019 8/5/2019

INTAKE HEAD STRUCTURE (ID# 307) - Concrete Outline &


7.4.1 0 days 1/25/2019 1/25/2019
Details - DTO

7.4.2 INTAKE HEAD STRUCTURE (ID# 307) - Coffer Dam 18 days 2/27/2019 3/16/2019

7.4.2.1 Sheet Piling 9 days 2/27/2019 3/7/2019

7.4.2.2 Dewatering 9 days 3/8/2019 3/16/2019

INTAKE HEAD STRUCTURE (ID# 307) - Dewatering/Excavation &


7.4.3 16 days 3/20/2019 4/4/2019
Pile Head Preparation

7.4.3.1 Excavation 14 days 3/20/2019 4/2/2019

7.4.3.2 Pile Head Cutting 10 days 3/26/2019 4/4/2019

7.4.4 INTAKE HEAD STRUCTURE (ID# 307) - Concreting 115 days 4/6/2019 7/29/2019

7.4.4.1 Concrete Foundation 31 days 4/6/2019 5/6/2019


7.4.4.1.1 Lean Concrete 3 days 4/6/2019 4/8/2019

7.4.4.1.2 Rebar 14 days 4/16/2019 4/29/2019

7.4.4.1.3 Form Works 14 days 4/16/2019 4/29/2019

7.4.4.1.4 Concrete Pouring 7 days 4/30/2019 5/6/2019

7.4.4.2 Concrete Slab 35 days 5/14/2019 6/17/2019

7.4.4.2.1 Rebar 14 days 5/14/2019 5/27/2019

7.4.4.2.2 Form Works 14 days 5/28/2019 6/10/2019

7.4.4.2.3 Concrete Pouring 7 days 6/11/2019 6/17/2019

7.4.4.3 Wall Installation 35 days 6/25/2019 7/29/2019

7.4.4.3.1 Rebar 14 days 6/25/2019 7/8/2019

7.4.4.3.2 Form Works 14 days 7/9/2019 7/22/2019

7.4.4.3.3 Concrete Pouring 7 days 7/23/2019 7/29/2019

7.4.5 INTAKE HEAD STRUCTURE (ID# 307) - Finishing Works 6 days 7/31/2019 8/5/2019

7.4.5.1 Finishing Works 6 days 7/31/2019 8/5/2019

INTAKE HEAD STRUCTURE (ID# 307) - Access for M&E Erection


7.4.6 0 days 7/30/2019 7/30/2019
CTO

7.5 Cooling Water Piping From Intake Head 362 days 7/13/2018 7/9/2019
7.5.1 CW PIPING STRUCTURE (ID# 210) - DTO 0 days 9/13/2018 9/13/2018

7.5.2 CW Pipe (Boundary-Road Crossing) 334 days 7/13/2018 6/11/2019

7.5.2.1 Permit release from KSOP 0 days 7/13/2018 7/13/2018

7.5.2.2 Piling 108 days 9/16/2018 1/1/2019

7.5.2.2.1 Piling Works 30 days 9/16/2018 10/15/2018

7.5.2.2.2 Sheet Piling 45 days 10/16/2018 11/29/2018

7.5.2.2.3 Excavation First Layer 6 days 11/30/2018 12/5/2018

7.5.2.2.4 Struting First Layer 5 days 12/6/2018 12/10/2018

7.5.2.2.5 Excavation Second Layer with dewatering 6 days 12/11/2018 12/16/2018

7.5.2.2.6 Struting Second Layer 5 days 12/17/2018 12/21/2018

7.5.2.2.7 Excavation Final Layer with dewatering 6 days 12/22/2018 12/27/2018

7.5.2.2.8 Pile Head Cutting and Plugging 5 days 12/28/2018 1/1/2019

7.5.2.3 First Lift - Basemat Foundation Concrete 25 days 1/2/2019 1/26/2019

7.5.2.3.1 Lean Concrete 1 day 1/2/2019 1/2/2019

7.5.2.3.2 Rebar 7 days 1/3/2019 1/9/2019

7.5.2.3.3 Formwork Installation 7 days 1/7/2019 1/13/2019


7.5.2.3.4 Cleaning and Inspection 2 days 1/14/2019 1/15/2019

7.5.2.3.5 Pouring Concrete 1 day 1/16/2019 1/16/2019

7.5.2.3.6 Curing 5 days 1/17/2019 1/21/2019

7.5.2.3.7 Bitumin Application 5 days 1/22/2019 1/26/2019

7.5.2.4 Colomn Works 69 days 1/27/2019 4/5/2019

7.5.2.4.1 Rebar 21 days 1/27/2019 2/16/2019

7.5.2.4.2 Formwork Installation 21 days 2/17/2019 3/9/2019

7.5.2.4.3 Cleaning and Inspection 6 days 3/10/2019 3/15/2019

7.5.2.4.4 Pouring Concrete 6 days 3/16/2019 3/21/2019

7.5.2.4.5 Curing 5 days 3/22/2019 3/26/2019

7.5.2.4.6 Bitumin Application 10 days 3/27/2019 4/5/2019

7.5.2.5 Partial Access-Pipe Installation CTO 1 day 3/26/2019 3/26/2019

7.5.2.6 Second Lift - Wall and Bona pipe Installation 32 days 4/6/2019 5/7/2019

7.5.2.6.1 Bonapipe Installation 6 days 4/6/2019 4/11/2019

7.5.2.6.2 Construction Joint Preparation - Chipping 3 days 4/12/2019 4/14/2019

7.5.2.6.3 Scaffold 7 days 4/15/2019 4/21/2019


7.5.2.6.4 Rebar 4 days 4/15/2019 4/18/2019

7.5.2.6.5 Formwork Installation 7 days 4/19/2019 4/25/2019

7.5.2.6.6 Cleaning& Inspection 2 days 4/26/2019 4/27/2019

7.5.2.6.7 Pouring Concrete 1 day 4/28/2019 4/28/2019

7.5.2.6.8 Curing 5 days 4/29/2019 5/3/2019

7.5.2.6.9 Formworks removal 4 days 5/4/2019 5/7/2019

7.5.2.6.10 Surface Preparation& Repairs 4 days 5/4/2019 5/7/2019

7.5.2.6.11 Bitumin Application 4 days 5/4/2019 5/7/2019

7.5.2.7 Third Lift-Wall and Top Slab 35 days 5/8/2019 6/11/2019

7.5.2.7.1 Construction Joint Preparation - Chipping 3 days 5/8/2019 5/10/2019

7.5.2.7.2 Scaffold 7 days 5/11/2019 5/17/2019

7.5.2.7.3 Rebar 5 days 5/13/2019 5/17/2019

7.5.2.7.4 Formwork Installation 10 days 5/18/2019 5/27/2019

7.5.2.7.5 Cleaning& Inspection 2 days 5/28/2019 5/29/2019

7.5.2.7.6 Pouring Concrete 1 day 5/30/2019 5/30/2019

7.5.2.7.7 Curing 5 days 5/31/2019 6/4/2019


7.5.2.7.8 Formworks and Scafolld removal 4 days 6/5/2019 6/8/2019

7.5.2.7.9 Surface Preparation& Repairs 4 days 6/5/2019 6/8/2019

7.5.2.7.10 Bitumin Application 4 days 6/5/2019 6/8/2019

7.5.2.7.11 Backfilling 3 days 6/9/2019 6/11/2019

7.5.2.8 CTO for Boundary Wall - Road Crossing 0 days 6/11/2019 6/11/2019

7.5.3 CW Pipe (Intake - Boundary) 362 days 7/13/2018 7/9/2019

7.5.3.1 Permit release from KSOP 0 days 7/13/2018 7/13/2018

7.5.3.2 Piling 152 days 10/16/2018 3/16/2019

7.5.3.2.1 Piling Works 45 days 10/16/2018 11/29/2018

7.5.3.2.2 Sheet Piling 45 days 11/30/2018 1/13/2019

7.5.3.2.3 Excavation First Layer 7 days 1/14/2019 1/20/2019

7.5.3.2.4 Struting First Layer 7 days 1/21/2019 1/27/2019

7.5.3.2.5 Excavation Second Layer with dewatering 10 days 1/28/2019 2/6/2019

7.5.3.2.6 Struting Second Layer 10 days 2/7/2019 2/16/2019

7.5.3.2.7 Excavation Final Layer with dewatering 14 days 2/17/2019 3/2/2019

7.5.3.2.8 Pile Head Cutting and Plugging 14 days 3/3/2019 3/16/2019


7.5.3.3 First Lift - Basemat Foundation Concrete 57 days 3/17/2019 5/12/2019

7.5.3.3.1 Lean Concrete 2 days 3/17/2019 3/18/2019

7.5.3.3.2 Rebar 21 days 3/19/2019 4/8/2019

7.5.3.3.3 Formwork Installation 14 days 4/9/2019 4/22/2019

7.5.3.3.4 Cleaning and Inspection 2 days 4/23/2019 4/24/2019

7.5.3.3.5 Pouring Concrete 3 days 4/25/2019 4/27/2019

7.5.3.3.6 Curing 5 days 4/28/2019 5/2/2019

7.5.3.3.7 Bitumin Application 10 days 5/3/2019 5/12/2019

7.5.3.4 Colomn Works 41 days 5/13/2019 6/22/2019

7.5.3.4.1 Rebar 14 days 5/13/2019 5/26/2019

7.5.3.4.2 Formwork Installation 14 days 5/27/2019 6/9/2019

7.5.3.4.3 Cleaning and Inspection 2 days 6/10/2019 6/11/2019

7.5.3.4.4 Pouring Concrete 1 day 6/12/2019 6/12/2019

7.5.3.4.5 Curing 5 days 6/13/2019 6/17/2019

7.5.3.4.6 Bitumin Application 5 days 6/18/2019 6/22/2019

7.5.3.5 Partial Access-Pipe Installation CTO 0 days 6/22/2019 6/22/2019


7.5.3.6 Second Lift - Bonapipe Installation 17 days 6/23/2019 7/9/2019

7.5.3.6.1 Bonapipe Installation 14 days 6/23/2019 7/6/2019

7.5.3.6.2 Backfilling 3 days 7/7/2019 7/9/2019

7.5.3.7 CTO Piping for Intake - Boundary 0 days 7/9/2019 7/9/2019

7.5.4 CW Pipe (Boundary-Road Crossing) 162 days 7/13/2018 12/21/2018

7.5.4.1 Permit Release from Railway Authority 0 days 7/13/2018 7/13/2018

7.5.4.2 Piling 71 days 8/4/2018 10/13/2018

7.5.4.2.1 Remove railway facility 7 days 8/4/2018 8/10/2018

7.5.4.2.2 Piling Works 12 days 8/25/2018 9/5/2018

7.5.4.2.3 Sheet Piling 14 days 9/6/2018 9/19/2018

7.5.4.2.4 Excavation and Struting First Layer 4 days 9/20/2018 9/23/2018

7.5.4.2.5 Excavation and Struting Second Layer 9 days 9/24/2018 10/2/2018

7.5.4.2.6 Final Excavation 4 days 10/3/2018 10/6/2018

7.5.4.2.7 Pile Head Cutting and Plugging 10 days 10/4/2018 10/13/2018

7.5.4.3 First Lift - Basemat Foundation Concrete 27 days 10/6/2018 11/1/2018

7.5.4.3.1 Lean Concrete 17 days 10/6/2018 10/22/2018


7.5.4.3.2 Rebar 18 days 10/6/2018 10/23/2018

7.5.4.3.3 Formwork Installation 18 days 10/7/2018 10/24/2018

7.5.4.3.4 Pouring Concrete 2 days 10/25/2018 10/26/2018

7.5.4.3.5 Curing 7 days 10/26/2018 11/1/2018

7.5.4.4 Remove second struting 4 days 11/1/2018 11/4/2018

7.5.4.5 Pipe Installation 10 days 11/3/2018 11/12/2018

7.5.4.6 Pipe End Cap Installation 5 days 11/12/2018 11/16/2018

7.5.4.7 Phase 1-Wall Concrete 16 days 11/10/2018 11/25/2018

7.5.4.7.1 Reinforcement Works 8 days 11/10/2018 11/17/2018

7.5.4.7.2 Formwork 6 days 11/13/2018 11/18/2018

7.5.4.7.3 Pouring Concrete 4 days 11/19/2018 11/22/2018

7.5.4.7.4 Backfill 3 days 11/23/2018 11/25/2018

7.5.4.8 Phase 2-Wall Concrete 14 days 11/21/2018 12/4/2018

7.5.4.8.1 Reinforcement Works 7 days 11/21/2018 11/27/2018

7.5.4.8.2 Formwork 6 days 11/22/2018 11/27/2018

7.5.4.8.3 Pouring Concrete 4 days 11/28/2018 12/1/2018


7.5.4.8.4 Backfill 3 days 12/2/2018 12/4/2018

7.5.4.9 Phase 3-Top Slab 14 days 11/30/2018 12/13/2018

7.5.4.9.1 Reinforcement Works 7 days 11/30/2018 12/6/2018

7.5.4.9.2 Formwork 7 days 12/1/2018 12/7/2018

7.5.4.9.3 Pouring Concrete 4 days 12/7/2018 12/10/2018

7.5.4.9.4 Backfill 3 days 12/11/2018 12/13/2018

7.5.4.10 Remove first struting 1 day 12/14/2018 12/14/2018

7.5.4.11 Full Backfill 2 days 12/15/2018 12/16/2018

7.5.4.12 Remove Sheet Pile 5 days 12/17/2018 12/21/2018

7.5.4.13 CTO for Boundary Wall - Road Crossing 0 days 12/21/2018 12/21/2018

7.6 Cooling Water Discharge Piping From Condenser 379 days 8/29/2018 9/11/2019

7.6.1 CW PIPING STRUCTURE (ID# 101) - DTO 0 days 8/29/2018 8/29/2018

7.6.2 CW Discharge Outfall-Pond (above Ground) 75 days 12/11/2018 2/23/2019

7.6.2.1 Piling 44 days 12/11/2018 1/23/2019

7.6.2.1.1 Piling Works 6 days 12/11/2018 12/16/2018

7.6.2.1.2 Sheet Piling 14 days 12/17/2018 12/30/2018


7.6.2.1.3 Excavation First Layer 3 days 12/31/2018 1/2/2019

7.6.2.1.4 Struting First Layer 3 days 1/3/2019 1/5/2019

7.6.2.1.5 Excavation Second Layer with dewatering 4 days 1/6/2019 1/9/2019

7.6.2.1.6 Struting Second Layer 4 days 1/10/2019 1/13/2019

7.6.2.1.7 Excavation Final Layer with dewatering 5 days 1/14/2019 1/18/2019

7.6.2.1.8 Pile Head Cutting and Plugging 5 days 1/19/2019 1/23/2019

7.6.2.2 First Lift - Basemat Foundation Concrete 21 days 1/24/2019 2/13/2019

7.6.2.2.1 Lean Concrete 1 day 1/24/2019 1/24/2019

7.6.2.2.2 Rebar 5 days 1/25/2019 1/29/2019

7.6.2.2.3 Formwork Installation 5 days 1/27/2019 1/31/2019

7.6.2.2.4 Cleaning and Inspection 2 days 2/1/2019 2/2/2019

7.6.2.2.5 Pouring Concrete 1 day 2/3/2019 2/3/2019

7.6.2.2.6 Curing 5 days 2/4/2019 2/8/2019

7.6.2.2.7 Bitumin Application 5 days 2/9/2019 2/13/2019

7.6.2.3 Partial Access-Pipe Installation CTO 0 days 2/8/2019 2/8/2019

7.6.2.4 Second Lift - Bona pipe Installation 15 days 2/9/2019 2/23/2019


7.6.2.4.1 Stringing 6 days 2/9/2019 2/14/2019

7.6.2.4.2 Fit up 6 days 2/12/2019 2/17/2019

7.6.2.4.3 Welding 4 days 2/18/2019 2/21/2019

7.6.2.4.4 Final Check 2 days 2/22/2019 2/23/2019

7.6.2.5 CTO Piping for Outfall-Pond Section 0 days 2/23/2019 2/23/2019

7.6.3 CW Discharge Pond-STA 0+100 (above Ground) 135 days 12/17/2018 4/30/2019

7.6.3.1 Piling 69 days 12/17/2018 2/23/2019

7.6.3.1.1 Piling Works 14 days 12/17/2018 12/30/2018

7.6.3.1.2 Sheet Piling 18 days 12/31/2018 1/17/2019

7.6.3.1.3 Excavation First Layer 5 days 1/18/2019 1/22/2019

7.6.3.1.4 Struting First Layer 5 days 1/23/2019 1/27/2019

7.6.3.1.5 Excavation Second Layer with dewatering 7 days 1/28/2019 2/3/2019

7.6.3.1.6 Struting Second Layer 7 days 2/4/2019 2/10/2019

7.6.3.1.7 Excavation Final Layer with dewatering 8 days 2/11/2019 2/18/2019

7.6.3.1.8 Pile Head Cutting and Plugging 5 days 2/19/2019 2/23/2019

7.6.3.2 First Lift - Basemat Foundation Concrete 43 days 2/24/2019 4/7/2019


7.6.3.2.1 Lean Concrete 1 day 2/24/2019 2/24/2019

7.6.3.2.2 Rebar 14 days 2/25/2019 3/10/2019

7.6.3.2.3 Formwork Installation 14 days 3/8/2019 3/21/2019

7.6.3.2.4 Cleaning and Inspection 2 days 3/22/2019 3/23/2019

7.6.3.2.5 Pouring Concrete 2 days 3/24/2019 3/25/2019

7.6.3.2.6 Curing 5 days 3/26/2019 3/30/2019

7.6.3.2.7 Bitumin Application 8 days 3/31/2019 4/7/2019

7.6.3.3 Partial Access-Pipe Installation CTO 1 day 4/8/2019 4/8/2019

7.6.3.4 Second Lift - Bona pipe Installation 22 days 4/9/2019 4/30/2019

7.6.3.4.1 Stringing 4 days 4/9/2019 4/12/2019

7.6.3.4.2 Fit up 7 days 4/12/2019 4/18/2019

7.6.3.4.3 Welding 10 days 4/19/2019 4/28/2019

7.6.3.4.4 Final Check 2 days 4/29/2019 4/30/2019

7.6.3.5 CTO Piping for Pond-STA 0+100 (above ground) 0 days 4/30/2019 4/30/2019

7.6.4 CW Discharge STA 0+100-STA 0+200 (above Ground) 138 days 12/31/2018 5/17/2019

7.6.4.1 Piling 73 days 12/31/2018 3/13/2019


7.6.4.1.1 Piling Works 14 days 12/31/2018 1/13/2019

7.6.4.1.2 Sheet Piling 18 days 1/18/2019 2/4/2019

7.6.4.1.3 Excavation First Layer 5 days 2/5/2019 2/9/2019

7.6.4.1.4 Struting First Layer 5 days 2/10/2019 2/14/2019

7.6.4.1.5 Excavation Second Layer with dewatering 7 days 2/15/2019 2/21/2019

7.6.4.1.6 Struting Second Layer 7 days 2/22/2019 2/28/2019

7.6.4.1.7 Excavation Final Layer with dewatering 8 days 3/1/2019 3/8/2019

7.6.4.1.8 Pile Head Cutting and Plugging 5 days 3/9/2019 3/13/2019

7.6.4.2 First Lift - Basemat Foundation Concrete 43 days 3/14/2019 4/25/2019

7.6.4.2.1 Lean Concrete 1 day 3/14/2019 3/14/2019

7.6.4.2.2 Rebar 14 days 3/15/2019 3/28/2019

7.6.4.2.3 Formwork Installation 14 days 3/26/2019 4/8/2019

7.6.4.2.4 Cleaning and Inspection 2 days 4/9/2019 4/10/2019

7.6.4.2.5 Pouring Concrete 2 days 4/11/2019 4/12/2019

7.6.4.2.6 Curing 5 days 4/13/2019 4/17/2019

7.6.4.2.7 Bitumin Application 8 days 4/18/2019 4/25/2019


7.6.4.3 Partial Access-Pipe Installation CTO 1 day 4/25/2019 4/25/2019

7.6.4.4 Second Lift - Bona pipe Installation 22 days 4/26/2019 5/17/2019

7.6.4.4.1 Stringing 4 days 4/26/2019 4/29/2019

7.6.4.4.2 Fit up 7 days 4/29/2019 5/5/2019

7.6.4.4.3 Welding 10 days 5/6/2019 5/15/2019

7.6.4.4.4 Final Check 2 days 5/16/2019 5/17/2019

7.6.4.5 CTO Piping for STA 0+100 - STA 0+200 (above ground) 0 days 5/17/2019 5/17/2019

7.6.5 CW Discharge STA 0+200-STA 0+300 (above Ground) 142 days 1/14/2019 6/4/2019

7.6.5.1 Piling 77 days 1/14/2019 3/31/2019

7.6.5.1.1 Piling Works 14 days 1/14/2019 1/27/2019

7.6.5.1.2 Sheet Piling 18 days 2/5/2019 2/22/2019

7.6.5.1.3 Excavation First Layer 5 days 2/23/2019 2/27/2019

7.6.5.1.4 Struting First Layer 5 days 2/28/2019 3/4/2019

7.6.5.1.5 Excavation Second Layer with dewatering 7 days 3/5/2019 3/11/2019

7.6.5.1.6 Struting Second Layer 7 days 3/12/2019 3/18/2019

7.6.5.1.7 Excavation Final Layer with dewatering 8 days 3/19/2019 3/26/2019


7.6.5.1.8 Pile Head Cutting and Plugging 5 days 3/27/2019 3/31/2019

7.6.5.2 First Lift - Basemat Foundation Concrete 43 days 4/1/2019 5/13/2019

7.6.5.2.1 Lean Concrete 1 day 4/1/2019 4/1/2019

7.6.5.2.2 Rebar 14 days 4/2/2019 4/15/2019

7.6.5.2.3 Formwork Installation 14 days 4/13/2019 4/26/2019

7.6.5.2.4 Cleaning and Inspection 2 days 4/27/2019 4/28/2019

7.6.5.2.5 Pouring Concrete 2 days 4/29/2019 4/30/2019

7.6.5.2.6 Curing 5 days 5/1/2019 5/5/2019

7.6.5.2.7 Bitumin Application 8 days 5/6/2019 5/13/2019

7.6.5.3 Partial Access-Pipe Installation CTO 1 day 5/13/2019 5/13/2019

7.6.5.4 Second Lift - Bona pipe Installation 22 days 5/14/2019 6/4/2019

7.6.5.4.1 Stringing 4 days 5/14/2019 5/17/2019

7.6.5.4.2 Fit up 7 days 5/17/2019 5/23/2019

7.6.5.4.3 Welding 10 days 5/24/2019 6/2/2019

7.6.5.4.4 Final Check 2 days 6/3/2019 6/4/2019

7.6.5.5 CTO Piping for STA 0+200 - STA 0+300 (above ground) 0 days 6/4/2019 6/4/2019
7.6.6 CW Discharge STA 0+300-STA 0+400 (under Ground) 227 days 1/28/2019 9/11/2019

7.6.6.1 Piling 81 days 1/28/2019 4/18/2019

7.6.6.1.1 Piling Works 14 days 1/28/2019 2/10/2019

7.6.6.1.2 Sheet Piling 18 days 2/23/2019 3/12/2019

7.6.6.1.3 Excavation First Layer 5 days 3/13/2019 3/17/2019

7.6.6.1.4 Struting First Layer 5 days 3/18/2019 3/22/2019

7.6.6.1.5 Excavation Second Layer with dewatering 7 days 3/23/2019 3/29/2019

7.6.6.1.6 Struting Second Layer 7 days 3/30/2019 4/5/2019

7.6.6.1.7 Excavation Final Layer with dewatering 8 days 4/6/2019 4/13/2019

7.6.6.1.8 Pile Head Cutting and Plugging 5 days 4/14/2019 4/18/2019

7.6.6.2 First Lift - Basemat Foundation Concrete 25 days 4/19/2019 5/13/2019

7.6.6.2.1 Lean Concrete 1 day 4/19/2019 4/19/2019

7.6.6.2.2 Rebar 7 days 4/20/2019 4/26/2019

7.6.6.2.3 Formwork Installation 7 days 4/24/2019 4/30/2019

7.6.6.2.4 Cleaning and Inspection 2 days 5/1/2019 5/2/2019

7.6.6.2.5 Pouring Concrete 1 day 5/3/2019 5/3/2019


7.6.6.2.6 Curing 5 days 5/4/2019 5/8/2019

7.6.6.2.7 Bitumin Application 5 days 5/9/2019 5/13/2019

7.6.6.3 Colomn Works 66 days 5/14/2019 7/18/2019

7.6.6.3.1 Rebar 21 days 5/14/2019 6/3/2019

7.6.6.3.2 Formwork Installation 21 days 6/1/2019 6/21/2019

7.6.6.3.3 Cleaning and Inspection 6 days 6/22/2019 6/27/2019

7.6.6.3.4 Pouring Concrete 6 days 6/28/2019 7/3/2019

7.6.6.3.5 Curing 5 days 7/4/2019 7/8/2019

7.6.6.3.6 Bitumin Application 10 days 7/9/2019 7/18/2019

7.6.6.4 Partial Access-Pipe Installation CTO 1 day 7/18/2019 7/18/2019

7.6.6.5 Second Lift - Wall and Bona pipe Installation 30 days 7/19/2019 8/17/2019

7.6.6.5.1 Bonapipe Installation 6 days 7/19/2019 7/24/2019

7.6.6.5.2 Construction Joint Preparation - Chipping 3 days 7/22/2019 7/24/2019

7.6.6.5.3 Scaffold 7 days 7/22/2019 7/28/2019

7.6.6.5.4 Rebar 4 days 7/22/2019 7/25/2019

7.6.6.5.5 Formwork Installation 7 days 7/26/2019 8/1/2019


7.6.6.5.6 Cleaning& Inspection 2 days 8/2/2019 8/3/2019

7.6.6.5.7 Pouring Concrete 1 day 8/4/2019 8/4/2019

7.6.6.5.8 Curing 5 days 8/5/2019 8/9/2019

7.6.6.5.9 Formworks removal 4 days 8/10/2019 8/13/2019

7.6.6.5.10 Surface Preparation& Repairs 4 days 8/10/2019 8/13/2019

7.6.6.5.11 Bitumin Application 4 days 8/14/2019 8/17/2019

7.6.6.6 Third Lift-Wall and Top Slab 34 days 8/9/2019 9/11/2019

7.6.6.6.1 Construction Joint Preparation - Chipping 3 days 8/9/2019 8/11/2019

7.6.6.6.2 Scaffold 7 days 8/9/2019 8/15/2019

7.6.6.6.3 Rebar 5 days 8/14/2019 8/18/2019

7.6.6.6.4 Formwork Installation 10 days 8/18/2019 8/27/2019

7.6.6.6.5 Cleaning& Inspection 2 days 8/28/2019 8/29/2019

7.6.6.6.6 Pouring Concrete 1 day 8/30/2019 8/30/2019

7.6.6.6.7 Curing 5 days 8/31/2019 9/4/2019

7.6.6.6.8 Formworks and Scafolld removal 4 days 9/5/2019 9/8/2019

7.6.6.6.9 Surface Preparation& Repairs 4 days 9/5/2019 9/8/2019


7.6.6.6.10 Bitumin Application 4 days 9/5/2019 9/8/2019

7.6.6.6.11 Backfilling 3 days 9/9/2019 9/11/2019

7.6.6.7 CTO Piping for STA 0+300 - STA 0+400 (Condensor) 0 days 9/11/2019 9/11/2019

7.7 Cooling Water Supply to Condenser 426 days 7/13/2018 9/11/2019

7.7.1 CW PIPING STRUCTURE (ID# 305) - DTO 1 day 9/27/2018 9/27/2018

7.7.2 CW Pipe (WWTP Section) 190 days 10/30/2018 5/7/2019

7.7.2.1 Piling 137 days 10/30/2018 3/15/2019

7.7.2.1.1 Piling Works 59 days 10/30/2018 12/27/2018

7.7.2.1.2 Sheet Piling 45 days 12/28/2018 2/10/2019

7.7.2.1.3 Excavation First Layer 6 days 2/11/2019 2/16/2019

7.7.2.1.4 Struting First Layer 5 days 2/17/2019 2/21/2019

7.7.2.1.5 Excavation Second Layer with dewatering 6 days 2/22/2019 2/27/2019

7.7.2.1.6 Struting Second Layer 5 days 2/28/2019 3/4/2019

7.7.2.1.7 Excavation Final Layer with dewatering 6 days 3/5/2019 3/10/2019

7.7.2.1.8 Pile Head Cutting and Plugging 5 days 3/11/2019 3/15/2019

7.7.2.2 First Lift - Basemat Foundation Concrete 20 days 3/16/2019 4/4/2019


7.7.2.2.1 Lean Concrete 1 day 3/16/2019 3/16/2019

7.7.2.2.2 Rebar 7 days 3/17/2019 3/23/2019

7.7.2.2.3 Formwork Installation 7 days 3/21/2019 3/27/2019

7.7.2.2.4 Cleaning and Inspection 2 days 3/28/2019 3/29/2019

7.7.2.2.5 Pouring Concrete 1 day 3/30/2019 3/30/2019

7.7.2.2.6 Curing 5 days 3/31/2019 4/4/2019

7.7.2.2.7 Bitumin Application 5 days 3/31/2019 4/4/2019

7.7.2.3 Colomn Works 24 days 4/5/2019 4/28/2019

7.7.2.3.1 Rebar 7 days 4/5/2019 4/11/2019

7.7.2.3.2 Formwork Installation 7 days 4/10/2019 4/16/2019

7.7.2.3.3 Cleaning and Inspection 2 days 4/17/2019 4/18/2019

7.7.2.3.4 Pouring Concrete 2 days 4/19/2019 4/20/2019

7.7.2.3.5 Curing 5 days 4/21/2019 4/25/2019

7.7.2.3.6 Bitumin Application 5 days 4/24/2019 4/28/2019

7.7.2.4 Partial Access-Pipe Installation CTO 1 day 4/28/2019 4/28/2019

7.7.2.5 Second Lift - Bonapipe Installation 9 days 4/29/2019 5/7/2019


7.7.2.5.1 Bonapipe Installation 6 days 4/29/2019 5/4/2019

7.7.2.5.2 Backfilling 3 days 5/5/2019 5/7/2019

7.7.2.6 CTO Piping for WWTP Section 0 days 5/7/2019 5/7/2019

7.7.3 CW Pipe (Pump Station-Pipe Sleeper Section) 243 days 11/15/2018 7/15/2019

7.7.3.1 Piling 166 days 11/15/2018 4/29/2019

7.7.3.1.1 Piling Works 25 days 11/15/2018 12/9/2018

7.7.3.1.2 Sheet Piling 70 days 12/10/2018 2/17/2019

7.7.3.1.3 Excavation First Layer 13 days 2/18/2019 3/2/2019

7.7.3.1.4 Struting First Layer 10 days 3/3/2019 3/12/2019

7.7.3.1.5 Excavation Second Layer with dewatering 14 days 3/13/2019 3/26/2019

7.7.3.1.6 Struting Second Layer 10 days 3/27/2019 4/5/2019

7.7.3.1.7 Excavation Final Layer with dewatering 14 days 4/6/2019 4/19/2019

7.7.3.1.8 Pile Head Cutting and Plugging 10 days 4/20/2019 4/29/2019

7.7.3.2 First Lift - Basemat Foundation Concrete 20 days 4/30/2019 5/19/2019

7.7.3.2.1 Lean Concrete 1 day 4/30/2019 4/30/2019

7.7.3.2.2 Rebar 7 days 5/1/2019 5/7/2019


7.7.3.2.3 Formwork Installation 7 days 5/5/2019 5/11/2019

7.7.3.2.4 Cleaning and Inspection 2 days 5/12/2019 5/13/2019

7.7.3.2.5 Pouring Concrete 1 day 5/14/2019 5/14/2019

7.7.3.2.6 Curing 5 days 5/15/2019 5/19/2019

7.7.3.2.7 Bitumin Application 5 days 5/15/2019 5/19/2019

7.7.3.3 Colomn Works 48 days 5/20/2019 7/6/2019

7.7.3.3.1 Rebar 14 days 5/20/2019 6/2/2019

7.7.3.3.2 Formwork Installation 20 days 6/1/2019 6/20/2019

7.7.3.3.3 Cleaning and Inspection 2 days 6/21/2019 6/22/2019

7.7.3.3.4 Pouring Concrete 4 days 6/23/2019 6/26/2019

7.7.3.3.5 Curing 5 days 6/27/2019 7/1/2019

7.7.3.3.6 Bitumin Application 7 days 6/30/2019 7/6/2019

7.7.3.4 Partial Access-Pipe Installation CTO 1 day 7/6/2019 7/6/2019

7.7.3.5 Second Lift - Bona pipe Installation 9 days 7/7/2019 7/15/2019

7.7.3.5.1 Bonapipe Installation 6 days 7/7/2019 7/12/2019

7.7.3.5.2 Backfilling 3 days 7/13/2019 7/15/2019


7.7.3.6 CTO Piping for Pump Station - Pipe Sleeper Section 0 days 7/15/2019 7/15/2019

7.7.4 CW Pipe (Demin Water Tank-Condensor) 426 days 7/13/2018 9/11/2019

7.7.4.1 Piling 106 days 1/28/2019 5/13/2019

7.7.4.1.1 Piling Works 28 days 1/28/2019 2/24/2019

7.7.4.1.2 Sheet Piling 45 days 2/25/2019 4/10/2019

7.7.4.1.3 Excavation First Layer 6 days 4/11/2019 4/16/2019

7.7.4.1.4 Struting First Layer 5 days 4/17/2019 4/21/2019

7.7.4.1.5 Excavation Second Layer with dewatering 6 days 4/22/2019 4/27/2019

7.7.4.1.6 Struting Second Layer 5 days 4/28/2019 5/2/2019

7.7.4.1.7 Excavation Final Layer with dewatering 6 days 5/3/2019 5/8/2019

7.7.4.1.8 Pile Head Cutting and Plugging 5 days 5/9/2019 5/13/2019

7.7.4.2 First Lift - Basemat Foundation Concrete 25 days 4/19/2019 5/13/2019

7.7.4.2.1 Lean Concrete 1 day 4/19/2019 4/19/2019

7.7.4.2.2 Rebar 7 days 4/20/2019 4/26/2019

7.7.4.2.3 Formwork Installation 7 days 4/24/2019 4/30/2019

7.7.4.2.4 Cleaning and Inspection 2 days 5/1/2019 5/2/2019


7.7.4.2.5 Pouring Concrete 1 day 5/3/2019 5/3/2019

7.7.4.2.6 Curing 5 days 5/4/2019 5/8/2019

7.7.4.2.7 Bitumin Application 5 days 5/9/2019 5/13/2019

7.7.4.3 Colomn Works 52 days 5/28/2019 7/18/2019

7.7.4.3.1 Rebar 7 days 5/28/2019 6/3/2019

7.7.4.3.2 Formwork Installation 7 days 6/15/2019 6/21/2019

7.7.4.3.3 Cleaning and Inspection 2 days 6/26/2019 6/27/2019

7.7.4.3.4 Pouring Concrete 2 days 7/2/2019 7/3/2019

7.7.4.3.5 Curing 5 days 7/4/2019 7/8/2019

7.7.4.3.6 Bitumin Application 5 days 7/14/2019 7/18/2019

7.7.4.4 Partial Access-Pipe Installation CTO 1 day 7/18/2019 7/18/2019

7.7.4.5 Second Lift - Bona pipe Installation 30 days 7/19/2019 8/17/2019

7.7.4.5.1 Bonapipe Installation 6 days 7/19/2019 7/24/2019

7.7.4.5.2 Construction Joint Preparation - Chipping 3 days 7/22/2019 7/24/2019

7.7.4.5.3 Scaffold 7 days 7/22/2019 7/28/2019

7.7.4.5.4 Rebar 4 days 7/22/2019 7/25/2019


7.7.4.5.5 Formwork Installation 7 days 7/26/2019 8/1/2019

7.7.4.5.6 Cleaning& Inspection 2 days 8/2/2019 8/3/2019

7.7.4.5.7 Pouring Concrete 1 day 8/4/2019 8/4/2019

7.7.4.5.8 Curing 5 days 8/5/2019 8/9/2019

7.7.4.5.9 Formworks removal 4 days 8/10/2019 8/13/2019

7.7.4.5.10 Surface Preparation& Repairs 4 days 8/10/2019 8/13/2019

7.7.4.5.11 Bitumin Application 4 days 8/14/2019 8/17/2019

7.7.4.6 Third Lift-Wall and Top Slab 4 days 7/13/2018 7/16/2018

7.7.4.6.1 Construction Joint Preparation - Chipping 3 days 8/9/2019 8/11/2019

7.7.4.6.2 Scaffold 7 days 8/9/2019 8/15/2019

7.7.4.6.3 Rebar 5 days 8/14/2019 8/18/2019

7.7.4.6.4 Formwork Installation 10 days 8/18/2019 8/27/2019

7.7.4.6.5 Cleaning& Inspection 2 days 8/28/2019 8/29/2019

7.7.4.6.6 Pouring Concrete 1 day 8/30/2019 8/30/2019

7.7.4.6.7 Curing 5 days 8/31/2019 9/4/2019

7.7.4.6.8 Formworks and Scafolld removal 4 days 9/5/2019 9/8/2019


7.7.4.6.9 Surface Preparation& Repairs 4 days 9/5/2019 9/8/2019

7.7.4.6.10 Bitumin Application 4 days 9/5/2019 9/8/2019

7.7.4.6.11 Backfilling 3 days 9/9/2019 9/11/2019

7.7.4.7 CTO Piping for Demin Water Tank - Condensor 0 days 9/11/2019 9/11/2019

8 UTILITIES 436 days? 7/13/2018 9/21/2019

8.1 Raw Water Storage 168 days 12/11/2018 5/27/2019

SERVICE & FIRE WATER TANK (ID# 231) - Concrete Outline &
8.1.1 0 days 12/11/2018 12/11/2018
Details - DTO

SERVICE & FIRE WATER TANK (ID# 231) - Excavation & Pile Head
8.1.2 13 days 2/11/2019 2/23/2019
Preparation

8.1.2.1 Excavation 13 days 2/11/2019 2/23/2019

8.1.2.2 Pile Head Cutting 10 days 2/14/2019 2/23/2019

8.1.3 SERVICE & FIRE WATER TANK (ID# 231) - Concrete Works 58 days 2/26/2019 4/24/2019

8.1.3.1 Footing Foundation 18 days 2/26/2019 3/15/2019

8.1.3.1.1 Leveling 1 day 2/26/2019 2/26/2019

8.1.3.1.2 Lean Concrete 2 days 2/26/2019 2/27/2019

8.1.3.1.3 Rebar 6 days 3/2/2019 3/7/2019

8.1.3.1.4 Formworks 6 days 3/8/2019 3/13/2019


8.1.3.1.5 Concrete Pouring 2 days 3/14/2019 3/15/2019

8.1.3.2 Pedestal Work 13 days 3/18/2019 3/30/2019

8.1.3.2.1 Leveling 1 day 3/18/2019 3/18/2019

8.1.3.2.2 Lean Concrete 1 day 3/18/2019 3/18/2019

8.1.3.2.3 Rebar 6 days 3/21/2019 3/26/2019

8.1.3.2.4 Anchor Bolt Installation 6 days 3/23/2019 3/28/2019

8.1.3.2.5 Formworks 6 days 3/23/2019 3/28/2019

8.1.3.2.6 Concrete Pouring 2 days 3/29/2019 3/30/2019

8.1.3.3 Tie Beam 17 days 3/21/2019 4/6/2019

8.1.3.3.1 Leveling 1 day 3/21/2019 3/21/2019

8.1.3.3.2 Lean Concrete 1 day 3/21/2019 3/21/2019

8.1.3.3.3 Rebar 6 days 3/24/2019 3/29/2019

8.1.3.3.4 Formworks 6 days 3/26/2019 3/31/2019

8.1.3.3.5 Concrete Pouring 6 days 4/1/2019 4/6/2019

8.1.3.4 Slab Work 16 days 4/9/2019 4/24/2019

8.1.3.4.1 Leveling 1 day 4/9/2019 4/9/2019


8.1.3.4.2 Lean Concrete 1 day 4/9/2019 4/9/2019

8.1.3.4.3 Rebar 6 days 4/12/2019 4/17/2019

8.1.3.4.4 Formworks 5 days 4/18/2019 4/22/2019

8.1.3.4.5 Concrete Pouring 2 days 4/23/2019 4/24/2019

8.1.4 SERVICE & FIRE WATER TANK (ID# 231) - Internal Backfill 2 days 4/26/2019 4/27/2019

8.1.4.1 Backfilling 2 days 4/26/2019 4/27/2019

8.1.5 SERVICE & FIRE WATER TANK (ID# 231) - Asphalt - Sand Layer 7 days 4/29/2019 5/5/2019

8.1.5.1 Sand Layering 7 days 4/29/2019 5/5/2019

SERVICE & FIRE WATER TANK (ID# 231) - U/G, Pits & Aux
8.1.6 20 days 4/29/2019 5/18/2019
Foundation

8.1.6.1 U/G, Pits & Aux. Foundation 20 days 4/29/2019 5/18/2019

SERVICE & FIRE WATER TANK (ID# 231) - CTO (Access for Tank
8.1.7 0 days 4/5/2019 4/5/2019
Erection)

8.1.8 SERVICE & FIRE WATER TANK (ID# 231) - Backfill & Preparation 8 days 5/20/2019 5/27/2019

8.1.8.1 Backfilling and Preparation 8 days 5/20/2019 5/27/2019

8.1.9 SERVICE & FIRE WATER TANK (ID# 231) - CTO (CTO_W_B) 0 days 4/26/2019 4/26/2019

8.2 Demineralized Water Production 344 days? 7/13/2018 6/21/2019

DESAL/DEMIN WATER TREATMENT PLANT - Concrete Outline &


8.2.1 0 days 9/13/2018 9/13/2018
Details - DTO
DESAL/DEMIN WATER TREATMENT PLANT - Underground &
8.2.2 0 days 9/13/2018 9/13/2018
Floor Slab - DTO

DESAL/DEMIN WATER TREATMENT PLANT - Steel Str. -


8.2.3 87 days 10/21/2018 1/15/2019
Manufacture / Delivery

8.2.3.1 Manufacturing 60 days 10/21/2018 12/19/2018

8.2.3.2 Delivery 27 days 12/20/2018 1/15/2019

8.2.4 Piling 45 days 5/8/2019 6/21/2019

8.2.4.1 Piling Works 45 days 5/8/2019 6/21/2019

8.2.5 Basemat Foundation 14 days 7/13/2018 7/26/2018

8.2.5.1 First Casting - Excavation 1 day 7/13/2018 7/13/2018

8.2.5.2 First Casting - Lean Concrete 1 day 7/13/2018 7/13/2018

8.2.5.3 First Casting - Rebar 14 days 7/13/2018 7/26/2018

8.2.5.4 First Casting - Formwork Install 5 days 7/13/2018 7/17/2018

8.2.5.5 First Casting - Cleaning and Inspection 2 days 7/13/2018 7/14/2018

8.2.5.6 First Casting - Pouring Concrete 2 days 7/13/2018 7/14/2018

8.2.5.7 First Casting - Curing 5 days 7/13/2018 7/17/2018

8.2.5.8 First Casting - Formwork Removal 3 days 7/13/2018 7/15/2018

8.2.5.9 First Casting - Bitumin Aplication 3 days 7/13/2018 7/15/2018


8.2.5.10 Second Casting - Excavation 1 day 7/13/2018 7/13/2018

8.2.5.11 Second Casting - Lean Concrete 1 day 7/13/2018 7/13/2018

8.2.5.12 Second Casting - Rebar 14 days 7/13/2018 7/26/2018

8.2.5.13 Second Casting - Formwork Install 5 days 7/13/2018 7/17/2018

8.2.5.14 Second Casting - Cleaning and Inspection 2 days 7/13/2018 7/14/2018

8.2.5.15 Second Casting - Pouring Concrete 2 days 7/13/2018 7/14/2018

8.2.5.16 Second Casting - Curing 5 days 7/13/2018 7/17/2018

8.2.5.17 Second Casting - Formwork Removal 3 days 7/13/2018 7/15/2018

8.2.5.18 Second Casting - Bitumin Aplication 3 days 7/13/2018 7/15/2018

8.2.6 Underground Works 5 days 7/13/2018 7/17/2018

8.2.6.1 First Casting - Rebar 5 days 7/13/2018 7/17/2018

8.2.6.2 First Casting - Formwork Install 1 day 7/13/2018 7/13/2018

8.2.6.3 First Casting - Cleaning and Inspection 2 days 7/13/2018 7/14/2018

8.2.6.4 First Casting - Pouring Concrete 1 day 7/13/2018 7/13/2018

8.2.6.5 First Casting - Curing 5 days 7/13/2018 7/17/2018

8.2.6.6 First Casting - Formwork Removal 1 day 7/13/2018 7/13/2018


8.2.6.7 First Casting - Bitumin Aplication 1 day 7/13/2018 7/13/2018

8.2.6.8 Second Casting - Rebar 5 days 7/13/2018 7/17/2018

8.2.6.9 Second Casting - Formwork Install 1 day 7/13/2018 7/13/2018

8.2.6.10 Second Casting - Cleaning and Inspection 2 days 7/13/2018 7/14/2018

8.2.6.11 Second Casting - Pouring Concrete 1 day 7/13/2018 7/13/2018

8.2.6.12 Second Casting - Curing 5 days 7/13/2018 7/17/2018

8.2.6.13 Second Casting - Formwork Removal 1 day 7/13/2018 7/13/2018

8.2.6.14 Second Casting - Bitumin Aplication 1 day 7/13/2018 7/13/2018

8.2.7 Access for M&E (CTO) 1 day 7/13/2018 7/13/2018

8.2.8 Pedestal 5 days 7/13/2018 7/17/2018

8.2.8.1 First Casting - Rebar 5 days 7/13/2018 7/17/2018

8.2.8.2 First Casting - Formwork Install 2 days 7/13/2018 7/14/2018

8.2.8.3 First Casting - Cleaning and Inspection 2 days 7/13/2018 7/14/2018

8.2.8.4 First Casting - Pouring Concrete 1 day 7/13/2018 7/13/2018

8.2.8.5 First Casting - Curing 5 days 7/13/2018 7/17/2018

8.2.8.6 First Casting - Formwork Removal 1 day 7/13/2018 7/13/2018


8.2.8.7 Second Casting - Rebar 5 days 7/13/2018 7/17/2018

8.2.8.8 Second Casting - Formwork Install 2 days 7/13/2018 7/14/2018

8.2.8.9 Second Casting - Cleaning and Inspection 2 days 7/13/2018 7/14/2018

8.2.8.10 Second Casting - Pouring Concrete 1 day 7/13/2018 7/13/2018

8.2.8.11 Second Casting - Curing 5 days 7/13/2018 7/17/2018

8.2.8.12 Second Casting - Formwork Removal 1 day 7/13/2018 7/13/2018

8.2.9 Top Slab 5 days? 7/13/2018 7/17/2018

8.2.9.1 First Casting - Rebar 5 days 7/13/2018 7/17/2018

8.2.9.2 First Casting - Formwork Install 2 days 7/13/2018 7/14/2018

8.2.9.3 First Casting - Cleaning and Inspection 2 days 7/13/2018 7/14/2018

8.2.9.4 First Casting - Pouring Concrete 1 day 7/13/2018 7/13/2018

8.2.9.5 First Casting - Curing 5 days 7/13/2018 7/17/2018

8.2.9.6 First Casting - Formwork Removal 1 day 7/13/2018 7/13/2018

8.2.9.7 Second Casting - Rebar 5 days 7/13/2018 7/17/2018

8.2.9.8 Second Casting - Formwork Install 2 days 7/13/2018 7/14/2018

8.2.9.9 Second Casting - Cleaning and Inspection 2 days 7/13/2018 7/14/2018


8.2.9.10 Second Casting - Pouring Concrete 1 day 7/13/2018 7/13/2018

8.2.9.11 Second Casting - Curing 5 days 7/13/2018 7/17/2018

8.2.9.12 Second Casting - Formwork Removal 1 day 7/13/2018 7/13/2018

8.2.9.13 <New Task> 1 day? 7/13/2018 7/13/2018

8.2.9.14 <New Task> 1 day? 7/13/2018 7/13/2018

DESAL/DEMIN WATER TREATMENT PLANT - Excavation & Pile


8.2.10 18 days 1/7/2019 1/24/2019
Head Preparation

8.2.10.1 Excavation 18 days 1/7/2019 1/24/2019

8.2.10.2 Pile Head Preparation 14 days 1/11/2019 1/24/2019

DESAL/DEMIN WATER TREATMENT PLANT - Foundations&


8.2.11 26 days 1/28/2019 2/22/2019
Substructure Concrete

8.2.11.1 Footing Foundation 7 days 1/28/2019 2/3/2019

8.2.11.1.1 Leveling 1 day 1/28/2019 1/28/2019

8.2.11.1.2 Lean Concrete 1 day 1/28/2019 1/28/2019

8.2.11.1.3 Rebar 1 day 1/31/2019 1/31/2019

8.2.11.1.4 Formworks 2 days 2/1/2019 2/2/2019

8.2.11.1.5 Concrete Pouring 1 day 2/3/2019 2/3/2019

8.2.11.2 Pedestal Work 5 days 2/6/2019 2/10/2019


8.2.11.2.1 Leveling 1 day 2/6/2019 2/6/2019

8.2.11.2.2 Lean Concrete 1 day 2/6/2019 2/6/2019

8.2.11.2.3 Rebar 1 day 2/9/2019 2/9/2019

8.2.11.2.4 Anchor Bolt Installation 1 day 2/9/2019 2/9/2019

8.2.11.2.5 Formworks 1 day 2/9/2019 2/9/2019

8.2.11.2.6 Concrete Pouring 1 day 2/10/2019 2/10/2019

8.2.11.3 Tie Beam 5 days 2/9/2019 2/13/2019

8.2.11.3.1 Leveling 1 day 2/9/2019 2/9/2019

8.2.11.3.2 Lean Concrete 1 day 2/9/2019 2/9/2019

8.2.11.3.3 Rebar 1 day 2/12/2019 2/12/2019

8.2.11.3.4 Formworks 1 day 2/12/2019 2/12/2019

8.2.11.3.5 Concrete Pouring 1 day 2/13/2019 2/13/2019

8.2.11.4 Slab Work 7 days 2/16/2019 2/22/2019

8.2.11.4.1 Leveling 1 day 2/16/2019 2/16/2019

8.2.11.4.2 Lean Concrete 1 day 2/16/2019 2/16/2019

8.2.11.4.3 Rebar 2 days 2/18/2019 2/19/2019


8.2.11.4.4 Formworks 2 days 2/20/2019 2/21/2019

8.2.11.4.5 Concrete Pouring 1 day 2/22/2019 2/22/2019

DESAL/MIN WATER TREATMENT PLANT - Roofing/Cladding -


8.2.12 86 days 1/29/2019 4/24/2019
Manufacture / Delivery

8.2.12.1 Manufacturing 60 days 1/29/2019 3/29/2019

8.2.12.2 Delivery 26 days 3/30/2019 4/24/2019

DESAL/DEMIN WATER TREATMENT PLANT - Arch. & Finishing


8.2.13 0 days 11/19/2018 11/19/2018
Works - DTO

DESAL/DEMIN WATER TREATMENT PLANT - Underground


8.2.14 11 days 2/19/2019 3/1/2019
Works

8.2.14.1 Trenching 11 days 2/19/2019 3/1/2019

8.2.15 DESAL/DEMIN WATER TREATMENT PLANT - Backfill 1 day 3/5/2019 3/5/2019

8.2.15.1 Backfilling 1 day 3/5/2019 3/5/2019

DESAL/DEMIN WATER TREATMENT PLANT - Floor Trenches &


8.2.16 17 days 3/7/2019 3/23/2019
Ground Floor slab

8.2.16.1 Floor Trenches 10 days 3/7/2019 3/16/2019

8.2.16.2 Ground Floor Slab 14 days 3/10/2019 3/23/2019

DESAL/DEMIN WATER TREATMENT PLANT - Steel Structure -


8.2.17 0 days 12/24/2018 12/24/2018
DTO

8.2.18 DESAL/DEMIN WATER TREATMENT PLANT - Equipment Plinths 3 days 3/27/2019 3/29/2019

8.2.18.1 Rebar 1 day 3/27/2019 3/27/2019


8.2.18.2 Anchor Bolt Installation 2 days 3/27/2019 3/28/2019

8.2.18.3 Form Works 2 days 3/27/2019 3/28/2019

8.2.18.4 Concrete Pouring 1 day 3/29/2019 3/29/2019

8.2.19 DESAL/DEMIN WATER TREATMENT PLANT - Steel Str. - Erection 23 days 3/31/2019 4/22/2019

8.2.19.1 Erection 23 days 3/31/2019 4/22/2019

DESAL/DEMIN WATER TREATMENT PLANT - Roofing/Cladding -


8.2.20 0 days 1/21/2019 1/21/2019
DTO

8.2.21 DESAL/DEMIN WATER TREATMENT PLANT - Cladding 12 days 4/25/2019 5/6/2019

8.2.21.1 Cladding 12 days 4/25/2019 5/6/2019

8.2.22 DESAL/DEMIN WATER TREATMENT PLANT - Masonary Work 16 days 4/25/2019 5/10/2019

8.2.22.1 Masonry Work 16 days 4/25/2019 5/10/2019

DESAL/DEMIN WATER TREATMENT PLANT - Chem. Storage Area


8.2.23 16 days 4/25/2019 5/10/2019
Walls

8.2.23.1 Wall Installation 16 days 4/25/2019 5/10/2019

8.2.24 DESAL/DEMIN WATER TREATMENT PLANT - Roofing - Erection 10 days 4/26/2019 5/5/2019

8.2.24.1 Roof Erection 10 days 4/26/2019 5/5/2019

DESAL/DEMIN WATER TREATMENT PLANT - Access for M&E


8.2.25 0 days 2/8/2019 2/8/2019
Erection CTO

DESAL/MIN WATER TREATMENT PLANT - Chemical Storage Area


8.2.26 16 days 5/12/2019 5/27/2019
- Finishing Works
8.2.26.1 Finishing Work 16 days 5/12/2019 5/27/2019

8.2.27 DESAL/DEMIN WATER TREATMENT PLANT - Finishing Works 17 days 5/12/2019 5/28/2019

8.2.27.1 Finishing Work 17 days 5/12/2019 5/28/2019

DESAL/EMIN WATER TREATMENT PLANT - Chemical Storage


8.2.28 9 days 5/31/2019 6/8/2019
Area - Misc. Steel Str.

8.2.28.1 Erection 9 days 5/31/2019 6/8/2019

8.2.29 DESALDEMIN WATER TREATMENT PLANT - CTO (CTO_W_A) 0 days 3/2/2019 3/2/2019

8.3 Ultra Pure Water Shelter 186 days 1/11/2019 7/15/2019

ULTRAPURE WATER SHELTER & TANK (ID# 239 7 257) -


8.3.1 0 days 1/11/2019 1/11/2019
Foundation - DTO

ULTRAPURE WATER SHELTER & TANK (ID# 239 7 257) -


8.3.2 12 days 2/20/2019 3/3/2019
Foundation - Excavation & Pile Head Prepation

8.3.2.1 Excavation 12 days 2/20/2019 3/3/2019

8.3.2.2 Pile Head Cutting 10 days 2/22/2019 3/3/2019

ULTRAPURE WATER SHELTER & TANK (ID# 239 7 257) -


8.3.3 11 days 3/7/2019 3/17/2019
Foundation - Under Ground Works

8.3.3.1 Trenching 11 days 3/7/2019 3/17/2019

ULTRAPURE WATER SHELTER & TANK (ID# 239 7 257) -


8.3.4 31 days 3/21/2019 4/20/2019
Foundation - Concrete Works

8.3.4.1 Footing Foundation 8 days 3/21/2019 3/28/2019

8.3.4.1.1 Leveling 1 day 3/21/2019 3/21/2019


8.3.4.1.2 Lean Concrete 1 day 3/21/2019 3/21/2019

8.3.4.1.3 Rebar 2 days 3/24/2019 3/25/2019

8.3.4.1.4 Formworks 2 days 3/26/2019 3/27/2019

8.3.4.1.5 Concrete Pouring 1 day 3/28/2019 3/28/2019

8.3.4.2 Pedestal Work 8 days 3/31/2019 4/7/2019

8.3.4.2.1 Leveling 1 day 3/31/2019 3/31/2019

8.3.4.2.2 Lean Concrete 1 day 3/31/2019 3/31/2019

8.3.4.2.3 Rebar 2 days 4/3/2019 4/4/2019

8.3.4.2.4 Anchor Bolt Installation 2 days 4/5/2019 4/6/2019

8.3.4.2.5 Formworks 2 days 4/5/2019 4/6/2019

8.3.4.2.6 Concrete Pouring 1 day 4/7/2019 4/7/2019

8.3.4.3 Tie Beam 8 days 4/3/2019 4/10/2019

8.3.4.3.1 Leveling 1 day 4/3/2019 4/3/2019

8.3.4.3.2 Lean Concrete 1 day 4/3/2019 4/3/2019

8.3.4.3.3 Rebar 2 days 4/6/2019 4/7/2019

8.3.4.3.4 Formworks 2 days 4/8/2019 4/9/2019


8.3.4.3.5 Concrete Pouring 1 day 4/10/2019 4/10/2019

8.3.4.4 Slab Work 8 days 4/13/2019 4/20/2019

8.3.4.4.1 Leveling 1 day 4/13/2019 4/13/2019

8.3.4.4.2 Lean Concrete 1 day 4/13/2019 4/13/2019

8.3.4.4.3 Rebar 2 days 4/16/2019 4/17/2019

8.3.4.4.4 Formworks 2 days 4/18/2019 4/19/2019

8.3.4.4.5 Concrete Pouring 1 day 4/20/2019 4/20/2019

ULTRAPURE WATER SHELTER & TANK (ID# 239 7 257) -


8.3.5 85 days 4/22/2019 7/15/2019
Superstructure & Architectural Works

8.3.5.1 Concrete/Steel Strcuture Work 53 days 4/22/2019 6/13/2019

8.3.5.1.1 Column 21 days 4/22/2019 5/12/2019

8.3.5.1.2 Beam 21 days 5/24/2019 6/13/2019

8.3.5.2 Architectural 32 days 6/14/2019 7/15/2019

8.3.5.2.1 Wall Installation 20 days 6/14/2019 7/3/2019

8.3.5.2.2 Roofing 18 days 6/24/2019 7/11/2019

8.3.5.2.3 Painting 4 days 7/12/2019 7/15/2019

ULTRAPURE WATER SHELTER & TANK (ID# 239 7 257) - Building


8.3.6 0 days 7/15/2019 7/15/2019
CTO
8.4 Demineralized Water Storage 167 days 12/11/2018 5/26/2019

DEMIN WATER TANK - Foundation - Concrete Outline & Details -


8.4.1 0 days 12/11/2018 12/11/2018
DTO

DEMIN WATER TANK - Foundation - Excavation & Pile Head


8.4.2 7 days 3/12/2019 3/18/2019
Preparation

8.4.2.1 Excavation 7 days 3/12/2019 3/18/2019

8.4.2.2 Pile Head Cutting 5 days 3/14/2019 3/18/2019

8.4.3 DEMIN WATER TANK - Foundation - Concrete Works 43 days 3/19/2019 4/30/2019

8.4.3.1 Footing Foundation 12 days 3/19/2019 3/30/2019

8.4.3.1.1 Leveling 1 day 3/19/2019 3/19/2019

8.4.3.1.2 Lean Concrete 2 days 3/19/2019 3/20/2019

8.4.3.1.3 Rebar 3 days 3/23/2019 3/25/2019

8.4.3.1.4 Formworks 3 days 3/26/2019 3/28/2019

8.4.3.1.5 Concrete Pouring 2 days 3/29/2019 3/30/2019

8.4.3.2 Pedestal Work 11 days 4/2/2019 4/12/2019

8.4.3.2.1 Leveling 1 day 4/2/2019 4/2/2019

8.4.3.2.2 Lean Concrete 2 days 4/2/2019 4/3/2019

8.4.3.2.3 Rebar 3 days 4/6/2019 4/8/2019


8.4.3.2.4 Anchor Bolt Installation 3 days 4/8/2019 4/10/2019

8.4.3.2.5 Formworks 3 days 4/8/2019 4/10/2019

8.4.3.2.6 Concrete Pouring 2 days 4/11/2019 4/12/2019

8.4.3.3 Tie Beam 11 days 4/5/2019 4/15/2019

8.4.3.3.1 Leveling 1 day 4/5/2019 4/5/2019

8.4.3.3.2 Lean Concrete 2 days 4/5/2019 4/6/2019

8.4.3.3.3 Rebar 3 days 4/9/2019 4/11/2019

8.4.3.3.4 Formworks 3 days 4/11/2019 4/13/2019

8.4.3.3.5 Concrete Pouring 2 days 4/14/2019 4/15/2019

8.4.3.4 Slab Work 13 days 4/18/2019 4/30/2019

8.4.3.4.1 Leveling 1 day 4/18/2019 4/18/2019

8.4.3.4.2 Lean Concrete 2 days 4/18/2019 4/19/2019

8.4.3.4.3 Rebar 3 days 4/22/2019 4/24/2019

8.4.3.4.4 Formworks 4 days 4/25/2019 4/28/2019

8.4.3.4.5 Concrete Pouring 2 days 4/29/2019 4/30/2019

8.4.4 DEMIN WATER TANK - Foundation - Internal Backfill 3 days 5/2/2019 5/4/2019
8.4.4.1 Backfilling 3 days 5/2/2019 5/4/2019

8.4.5 DEMIN WATER TANK AREA - U/G, Pits & Auxiliary Foundations 16 days 5/7/2019 5/22/2019

8.4.5.1 U/G, Pits & Aux. Foundation 16 days 5/7/2019 5/22/2019

8.4.6 DEMIN WATER TANK - Foundation - Asphalt - Sand Layer 6 days 5/7/2019 5/12/2019

8.4.6.1 Sand Layering 6 days 5/7/2019 5/12/2019

DEMIN WATER TANK - Foundation - CTO Access for Tank


8.4.7 0 days 5/12/2019 5/12/2019
Erection

8.4.8 DEMIN WATER TANK AREA - Backfill & Preparation 3 days 5/24/2019 5/26/2019

8.4.8.1 Backfilling and Preparation 3 days 5/24/2019 5/26/2019

8.4.9 DEMIN WATER TANK AREA - Complete Civil Works - CTO 0 days 5/26/2019 5/26/2019

8.5 Compressed Air Production 214 days 12/12/2018 7/13/2019

COMPRESSED AIR PRODUCTION - Roffing & Cladding -


8.5.1 116 days 12/12/2018 4/6/2019
Manufacture / Delivery

8.5.1.1 Manufacturing 90 days 12/12/2018 3/11/2019

8.5.1.2 Delivery 26 days 3/12/2019 4/6/2019

COMPRESSED AIR PRODUCTION - Steel Structure - Manufacture


8.5.2 115 days 1/2/2019 4/26/2019
/ Delivery

8.5.2.1 Manufacturing 90 days 1/2/2019 4/1/2019

8.5.2.2 Delivery 25 days 4/2/2019 4/26/2019


8.5.3 COMPRESSED AIR PRODUCTION - Foundations - DTO 0 days 1/29/2019 1/29/2019

8.5.4 COMPRESSED AIR PRODUCTION - Steel Structure - DTO 0 days 2/28/2019 2/28/2019

COMPRESSED AIR PRODUCTION - Foundations - Excavation &


8.5.5 13 days 3/4/2019 3/16/2019
Pile Head Preparation

8.5.5.1 Excavation 13 days 3/4/2019 3/16/2019

8.5.5.2 Pile Head Cutting 10 days 3/7/2019 3/16/2019

COMPRESSED AIR PRODUCTION - Foundations - Concrete


8.5.6 41 days 3/19/2019 4/28/2019
Works

8.5.6.1 Footing Foundation 11 days 3/19/2019 3/29/2019

8.5.6.1.1 Leveling 1 day 3/19/2019 3/19/2019

8.5.6.1.2 Lean Concrete 1 day 3/19/2019 3/19/2019

8.5.6.1.3 Rebar 3 days 3/22/2019 3/24/2019

8.5.6.1.4 Formworks 3 days 3/25/2019 3/27/2019

8.5.6.1.5 Concrete Pouring 2 days 3/28/2019 3/29/2019

8.5.6.2 Pedestal Work 11 days 4/1/2019 4/11/2019

8.5.6.2.1 Leveling 1 day 4/1/2019 4/1/2019

8.5.6.2.2 Lean Concrete 2 days 4/1/2019 4/2/2019

8.5.6.2.3 Rebar 3 days 4/5/2019 4/7/2019


8.5.6.2.4 Anchor Bolt Installation 3 days 4/7/2019 4/9/2019

8.5.6.2.5 Formworks 3 days 4/7/2019 4/9/2019

8.5.6.2.6 Concrete Pouring 2 days 4/10/2019 4/11/2019

8.5.6.3 Tie Beam 11 days 4/4/2019 4/14/2019

8.5.6.3.1 Leveling 1 day 4/4/2019 4/4/2019

8.5.6.3.2 Lean Concrete 2 days 4/4/2019 4/5/2019

8.5.6.3.3 Rebar 3 days 4/8/2019 4/10/2019

8.5.6.3.4 Formworks 3 days 4/10/2019 4/12/2019

8.5.6.3.5 Concrete Pouring 2 days 4/13/2019 4/14/2019

8.5.6.4 Slab Work 12 days 4/17/2019 4/28/2019

8.5.6.4.1 Leveling 1 day 4/17/2019 4/17/2019

8.5.6.4.2 Lean Concrete 2 days 4/17/2019 4/18/2019

8.5.6.4.3 Rebar 3 days 4/21/2019 4/23/2019

8.5.6.4.4 Formworks 3 days 4/24/2019 4/26/2019

8.5.6.4.5 Concrete Pouring 2 days 4/27/2019 4/28/2019

COMPRESSED AIR PRODUCTION - Underground Works & Floor


8.5.7 27 days 5/1/2019 5/27/2019
Slab
8.5.7.1 Underground Work 14 days 5/1/2019 5/14/2019

8.5.7.1.1 Trenching 14 days 5/1/2019 5/14/2019

8.5.7.2 Slab Work 13 days 5/15/2019 5/27/2019

8.5.7.2.1 Leveling 1 day 5/15/2019 5/15/2019

8.5.7.2.2 Lean Concrete 2 days 5/15/2019 5/16/2019

8.5.7.2.3 Rebar 3 days 5/19/2019 5/21/2019

8.5.7.2.4 Formworks 4 days 5/22/2019 5/25/2019

8.5.7.2.5 Concrete Pouring 2 days 5/26/2019 5/27/2019

8.5.8 COMPRESSED AIR PRODUCTION - Steel Structure - Erection 27 days 5/1/2019 5/27/2019

8.5.8.1 Erection 27 days 5/1/2019 5/27/2019

8.5.9 COMPRESSED AIR PRODUCTION - Roffing & Cladding - DTO 0 days 5/1/2019 5/1/2019

COMPRESSED AIR PRODUCTION - Roffing/Cladding and


8.5.10 45 days 5/30/2019 7/13/2019
Finishing - Erection

8.5.10.1 Roofing/Cladding Erecetion 45 days 5/30/2019 7/13/2019

COMPRESSED AIR PRODUCTION - Access for M&E Erection -


8.5.11 0 days 6/22/2019 6/22/2019
CTO

8.5.12 COMPRESSED AIR PRODUCTION - CTO Complete 0 days 7/13/2019 7/13/2019

8.6 H2 & N2 Gas Bottle Storage Compound 295 days 10/26/2018 8/16/2019
GAS STORAGE COMPUND (ID# 212) - Steel Structure - 104,25
8.6.1 10/26/2018 2/7/2019
Manufacture / Delivery days

8.6.1.1 Manufacturing 80 days 10/26/2018 1/13/2019

8.6.1.2 Delivery 28 days 1/14/2019 2/10/2019

GAS STORAGE COMPUND (ID# 212) - Concrete Outline & Details


8.6.2 0 days 1/11/2019 1/11/2019
- DTO

GAS STORAGE COMPUND (ID# 212) - Arch. & Finishing Works -


8.6.3 0 days 2/26/2019 2/26/2019
DTO

8.6.4 GAS STORAGE COMPUND (ID# 212) - Roofing & Clading - DTO 0 days 2/26/2019 2/26/2019

GAS STORAGE COMPUND (ID# 212) - Excavation & Pile Head


8.6.5 8 days 3/27/2019 4/3/2019
Preparation

8.6.5.1 Excavation 8 days 3/27/2019 4/3/2019

8.6.5.2 Pile Head Cutting 7 days 3/28/2019 4/3/2019

8.6.6 GAS STORAGE COMPUND (ID# 212) - Steel Structure - DTO 0 days 3/28/2019 3/28/2019

8.6.7 GAS STORAGE COMPUND (ID# 212) - Concrete Bottom Slab 42 days 4/4/2019 5/15/2019

8.6.7.1 Slab Work 42 days 4/4/2019 5/15/2019

8.6.7.1.1 Leveling 2 days 4/4/2019 4/5/2019

8.6.7.1.2 Lean Concrete 5 days 4/4/2019 4/8/2019

8.6.7.1.3 Rebar 14 days 4/11/2019 4/24/2019

8.6.7.1.4 Formworks 14 days 4/25/2019 5/8/2019


8.6.7.1.5 Concrete Pouring 7 days 5/9/2019 5/15/2019

8.6.8 GAS STORAGE COMPUND (ID# 212) - Concrete Walls 42 days 5/17/2019 6/27/2019

8.6.8.1 Rebar 18 days 5/17/2019 6/3/2019

8.6.8.2 Formworks 18 days 6/4/2019 6/21/2019

8.6.8.3 Concrete Pouring 6 days 6/22/2019 6/27/2019

8.6.9 GAS STORAGE COMPUND (ID# 212) - Steel Structure - Roofing 10 days 7/5/2019 7/14/2019

8.6.9.1 Roofing Erection 10 days 7/5/2019 7/14/2019

8.6.10 GAS STORAGE COMPUND (ID# 212) - Roof Cladding Installation 7 days 7/16/2019 7/22/2019

8.6.10.1 Roof Cladding Installation 7 days 7/16/2019 7/22/2019

GAS STORAGE COMPUND (ID# 212) - Architectural Finishing


8.6.11 32 days 7/16/2019 8/16/2019
Works

8.6.11.1 Wall Installation 25 days 7/16/2019 8/9/2019

8.6.11.2 Painting 7 days 8/10/2019 8/16/2019

8.6.12 GAS STORAGE COMPUND (ID# 212) - CTO 0 days 7/29/2019 7/29/2019

8.7 Emergency Diesel Generator 88 days 6/26/2019 9/21/2019

EMERGENCY DIESEL GENERATOR AREA - Foundation -


8.7.1 0 days 6/26/2019 6/26/2019
Concrete Outline & Details - DTO

EMERGENCY DIESEL GENERATOR AREA - Excavation U/G


8.7.2 9 days 7/25/2019 8/2/2019
Installation & Pile Head Preparation
8.7.2.1 Excavation 9 days 7/25/2019 8/2/2019

8.7.2.2 Pile Head Cutting 7 days 7/27/2019 8/2/2019

8.7.2.3 U/G Installation 5 days 7/29/2019 8/2/2019

8.7.3 EMERGENCY DIESEL GENERATOR - Concrete Works 47 days 8/6/2019 9/21/2019

8.7.3.1 Footing Foundation 12 days 8/6/2019 8/17/2019

8.7.3.1.1 Leveling 1 day 8/6/2019 8/6/2019

8.7.3.1.2 Lean Concrete 2 days 8/6/2019 8/7/2019

8.7.3.1.3 Rebar 3 days 8/10/2019 8/12/2019

8.7.3.1.4 Formworks 3 days 8/13/2019 8/15/2019

8.7.3.1.5 Concrete Pouring 2 days 8/16/2019 8/17/2019

8.7.3.2 Pedestal Work 10 days 8/20/2019 8/29/2019

8.7.3.2.1 Leveling 1 day 8/20/2019 8/20/2019

8.7.3.2.2 Lean Concrete 2 days 8/20/2019 8/21/2019

8.7.3.2.3 Rebar 3 days 8/24/2019 8/26/2019

8.7.3.2.4 Anchor Bolt Installation 3 days 8/26/2019 8/28/2019

8.7.3.2.5 Formworks 3 days 8/26/2019 8/28/2019


8.7.3.2.6 Concrete Pouring 1 day 8/29/2019 8/29/2019

8.7.3.3 Tie Beam 11 days 8/23/2019 9/2/2019

8.7.3.3.1 Leveling 1 day 8/23/2019 8/23/2019

8.7.3.3.2 Lean Concrete 2 days 8/23/2019 8/24/2019

8.7.3.3.3 Rebar 3 days 8/27/2019 8/29/2019

8.7.3.3.4 Formworks 3 days 8/29/2019 8/31/2019

8.7.3.3.5 Concrete Pouring 2 days 9/1/2019 9/2/2019

8.7.3.4 Slab Work 18 days 9/4/2019 9/21/2019

8.7.3.4.1 Leveling 1 day 9/4/2019 9/4/2019

8.7.3.4.2 Lean Concrete 4 days 9/4/2019 9/7/2019

8.7.3.4.3 Rebar 4 days 9/10/2019 9/13/2019

8.7.3.4.4 Formworks 5 days 9/14/2019 9/18/2019

8.7.3.4.5 Concrete Pouring 3 days 9/19/2019 9/21/2019

EMERGENCY DIESEL GENERATOR - Foundation - CTO


8.7.4 0 days 9/21/2019 9/21/2019
(CTO_T_E)

8.8 Utility Pump Building 241 days 12/12/2018 8/9/2019

8.8.1 UTILITY PUMP BLDG (ID# 206) - Concrete Outline & Details - DTO 0 days 12/12/2018 12/12/2018
UTILITY PUMP BLDG (ID# 206) - Excavation & Pile Head
8.8.2 8 days 1/29/2019 2/5/2019
Preparation

8.8.2.1 Excavation 8 days 1/29/2019 2/5/2019

8.8.2.2 Pile Head Cutting 5 days 2/1/2019 2/5/2019

8.8.3 UTILITY PUMP BLDG (ID# 206) - Concrete Works 37 days 2/7/2019 3/15/2019

8.8.3.1 Footing Foundation 12 days 2/7/2019 2/18/2019

8.8.3.1.1 Leveling 1 day 2/7/2019 2/7/2019

8.8.3.1.2 Lean Concrete 3 days 2/7/2019 2/9/2019

8.8.3.1.3 Rebar 3 days 2/12/2019 2/14/2019

8.8.3.1.4 Formworks 3 days 2/15/2019 2/17/2019

8.8.3.1.5 Concrete Pouring 1 day 2/18/2019 2/18/2019

8.8.3.2 Pedestal Work 8 days 2/21/2019 2/28/2019

8.8.3.2.1 Leveling 1 day 2/21/2019 2/21/2019

8.8.3.2.2 Lean Concrete 1 day 2/21/2019 2/21/2019

8.8.3.2.3 Rebar 2 days 2/24/2019 2/25/2019

8.8.3.2.4 Anchor Bolt Installation 2 days 2/26/2019 2/27/2019

8.8.3.2.5 Formworks 2 days 2/26/2019 2/27/2019


8.8.3.2.6 Concrete Pouring 1 day 2/28/2019 2/28/2019

8.8.3.3 Tie Beam 8 days 2/24/2019 3/3/2019

8.8.3.3.1 Leveling 1 day 2/24/2019 2/24/2019

8.8.3.3.2 Lean Concrete 1 day 2/24/2019 2/24/2019

8.8.3.3.3 Rebar 2 days 2/27/2019 2/28/2019

8.8.3.3.4 Formworks 2 days 3/1/2019 3/2/2019

8.8.3.3.5 Concrete Pouring 1 day 3/3/2019 3/3/2019

8.8.3.4 Slab Work 10 days 3/6/2019 3/15/2019

8.8.3.4.1 Leveling 1 day 3/6/2019 3/6/2019

8.8.3.4.2 Lean Concrete 1 day 3/6/2019 3/6/2019

8.8.3.4.3 Rebar 3 days 3/9/2019 3/11/2019

8.8.3.4.4 Formworks 3 days 3/12/2019 3/14/2019

8.8.3.4.5 Concrete Pouring 1 day 3/15/2019 3/15/2019

UTILITY PUMP BLDG (ID# 206) - Roofing/Cladding - Manufacture /


8.8.4 99 days 2/12/2019 5/21/2019
Delivery

8.8.4.1 Manufacturing 65 days 2/12/2019 4/17/2019

8.8.4.2 Delivery 34 days 4/18/2019 5/21/2019


UTILITY PUMP BLDG (ID# 206) - Steel Structure - Manufacture /
8.8.5 106 days 2/12/2019 5/28/2019
Delivery

8.8.5.1 Manufacturing 75 days 2/12/2019 4/27/2019

8.8.5.2 Delivery 31 days 4/28/2019 5/28/2019

8.8.6 UTILITY PUMP BLDG (ID# 206) - Foundation for Erection - CTO 0 days 3/14/2019 3/14/2019

8.8.7 UTILITY PUMP BLDG (ID# 206) - Steel Structure - Erection 26 days 6/18/2019 7/13/2019

8.8.7.1 Erection 26 days 6/18/2019 7/13/2019

8.8.8 UTILITY PUMP BLDG (ID# 206) - Roofing & Finishing Works 27 days 7/14/2019 8/9/2019

8.8.8.1 Roofing 14 days 7/14/2019 7/27/2019

8.8.8.2 Finishing Work 13 days 7/28/2019 8/9/2019

8.8.9 UTILITY PUMP BLDG (ID# 206) - CTO (Complete) 0 days 8/9/2019 8/9/2019

8.9 Potable Water Storage 154 days 12/11/2018 5/13/2019

POTABLE WATER TANK (ID# 218) - Concrete Outline & Details -


8.9.1 0 days 12/11/2018 12/11/2018
DTO

POTABLE WATER TANK (ID# 218) - Excavation & Pile Head


8.9.2 8 days 2/24/2019 3/3/2019
Preparation

8.9.2.1 Excavation 8 days 2/24/2019 3/3/2019

8.9.2.2 Pile Head Cutting 5 days 2/27/2019 3/3/2019

8.9.3 POTABLE WATER TANK (ID# 218) - Concrete Works 37 days 3/12/2019 4/17/2019
8.9.3.1 Footing Foundation 10 days 3/12/2019 3/21/2019

8.9.3.1.1 Leveling 1 day 3/12/2019 3/12/2019

8.9.3.1.2 Lean Concrete 1 day 3/12/2019 3/12/2019

8.9.3.1.3 Rebar 3 days 3/15/2019 3/17/2019

8.9.3.1.4 Formworks 3 days 3/18/2019 3/20/2019

8.9.3.1.5 Concrete Pouring 1 day 3/21/2019 3/21/2019

8.9.3.2 Pedestal Work 9 days 3/24/2019 4/1/2019

8.9.3.2.1 Leveling 1 day 3/24/2019 3/24/2019

8.9.3.2.2 Lean Concrete 1 day 3/24/2019 3/24/2019

8.9.3.2.3 Rebar 3 days 3/27/2019 3/29/2019

8.9.3.2.4 Anchor Bolt Installation 3 days 3/29/2019 3/31/2019

8.9.3.2.5 Formworks 3 days 3/29/2019 3/31/2019

8.9.3.2.6 Concrete Pouring 1 day 4/1/2019 4/1/2019

8.9.3.3 Tie Beam 9 days 3/27/2019 4/4/2019

8.9.3.3.1 Leveling 1 day 3/27/2019 3/27/2019

8.9.3.3.2 Lean Concrete 1 day 3/27/2019 3/27/2019


8.9.3.3.3 Rebar 3 days 3/30/2019 4/1/2019

8.9.3.3.4 Formworks 3 days 4/1/2019 4/3/2019

8.9.3.3.5 Concrete Pouring 1 day 4/4/2019 4/4/2019

8.9.3.4 Slab Work 11 days 4/7/2019 4/17/2019

8.9.3.4.1 Leveling 1 day 4/7/2019 4/7/2019

8.9.3.4.2 Lean Concrete 1 day 4/7/2019 4/7/2019

8.9.3.4.3 Rebar 3 days 4/10/2019 4/12/2019

8.9.3.4.4 Formworks 3 days 4/13/2019 4/15/2019

8.9.3.4.5 Concrete Pouring 2 days 4/16/2019 4/17/2019

8.9.4 POTABLE WATER TANK (ID# 218) - Backfill 4 days 4/19/2019 4/22/2019

8.9.4.1 Backfilling 4 days 4/19/2019 4/22/2019

8.9.5 POTABLE WATER TANK AREA - U/G, Pits& Aux Foundations 17 days 4/23/2019 5/9/2019

8.9.5.1 Leveling 1 day 4/23/2019 4/23/2019

8.9.5.2 Lean Concrete 2 days 4/23/2019 4/24/2019

8.9.5.3 Rebar 5 days 4/28/2019 5/2/2019

8.9.5.4 Formworks 5 days 5/3/2019 5/7/2019


8.9.5.5 Concrete Pouring 2 days 5/8/2019 5/9/2019

8.9.6 POTABLE WATER TANK - Asphalt - Sand Layer 8 days 4/24/2019 5/1/2019

8.9.6.1 Sand Layering 8 days 4/24/2019 5/1/2019

POTABLE WATER TANK (ID# 218) - Foundation - CTO Access for


8.9.7 0 days 3/27/2019 3/27/2019
Tank Erection

8.9.8 POTABLE WATER TANK AREA - Backfill & Preparation 3 days 5/11/2019 5/13/2019

8.9.8.1 Backfilling and Preparation 3 days 5/11/2019 5/13/2019

8.9.9 POTABLE WATER TANK (ID# 218) - Foundation - CTO 0 days 5/13/2019 5/13/2019

8.10 Potable Pump Skid Shelter 268 days 12/12/2018 9/5/2019

POTABLE WATER PUMP SKID SHELTER (ID# 259) - Concrete


8.10.1 0 days 12/12/2018 12/12/2018
Outline & Details - DTO

POTABLE WATER PUMP SKID SHELTER (ID# 259) - Excavation &


8.10.2 8 days 2/24/2019 3/3/2019
Pile Head Preparation

8.10.2.1 Excavation 8 days 2/24/2019 3/3/2019

8.10.2.2 Pile Head Cutting 5 days 2/27/2019 3/3/2019

POTABLE WATER PUMP SKID SHELTER (ID# 259) -


8.10.3 100 days 2/28/2019 6/7/2019
Roofing/Cladding - Manufacture / Delivery

8.10.3.1 Manufacturing 70 days 2/28/2019 5/8/2019

8.10.3.2 Delivery 30 days 5/9/2019 6/7/2019

POTABLE WATER PUMP SKID SHELTER (ID# 259) - Steel


8.10.4 106 days 2/28/2019 6/13/2019
Structure - Manufacture / Delivery
8.10.4.1 Manufacturing 76 days 2/28/2019 5/14/2019

8.10.4.2 Delivery 30 days 5/15/2019 6/13/2019

POTABLE WATER PUMP SKID SHELTER (ID# 259) - Concrete


8.10.5 37 days 3/4/2019 4/9/2019
Works

8.10.5.1 Footing Foundation 10 days 3/4/2019 3/13/2019

8.10.5.1.1 Leveling 1 day 3/4/2019 3/4/2019

8.10.5.1.2 Lean Concrete 1 day 3/4/2019 3/4/2019

8.10.5.1.3 Rebar 3 days 3/7/2019 3/9/2019

8.10.5.1.4 Formworks 3 days 3/10/2019 3/12/2019

8.10.5.1.5 Concrete Pouring 1 day 3/13/2019 3/13/2019

8.10.5.2 Pedestal Work 10 days 3/16/2019 3/25/2019

8.10.5.2.1 Leveling 1 day 3/16/2019 3/16/2019

8.10.5.2.2 Lean Concrete 1 day 3/16/2019 3/16/2019

8.10.5.2.3 Rebar 3 days 3/19/2019 3/21/2019

8.10.5.2.4 Anchor Bolt Installation 3 days 3/21/2019 3/23/2019

8.10.5.2.5 Formworks 3 days 3/21/2019 3/23/2019

8.10.5.2.6 Concrete Pouring 2 days 3/24/2019 3/25/2019


8.10.5.3 Tie Beam 10 days 3/19/2019 3/28/2019

8.10.5.3.1 Leveling 1 day 3/19/2019 3/19/2019

8.10.5.3.2 Lean Concrete 1 day 3/19/2019 3/19/2019

8.10.5.3.3 Rebar 3 days 3/22/2019 3/24/2019

8.10.5.3.4 Formworks 3 days 3/24/2019 3/26/2019

8.10.5.3.5 Concrete Pouring 2 days 3/27/2019 3/28/2019

8.10.5.4 Slab Work 10 days 3/31/2019 4/9/2019

8.10.5.4.1 Leveling 1 day 3/31/2019 3/31/2019

8.10.5.4.2 Lean Concrete 1 day 3/31/2019 3/31/2019

8.10.5.4.3 Rebar 3 days 4/3/2019 4/5/2019

8.10.5.4.4 Formworks 3 days 4/6/2019 4/8/2019

8.10.5.4.5 Concrete Pouring 1 day 4/9/2019 4/9/2019

POTABLE WATER PUMP SKID SHELTER (ID# 259) - Foundation


8.10.6 0 days 4/9/2019 4/9/2019
Access for Erection - CTO

POTABLE WATER PUMP SKID SHELTER (ID# 259) - Steel


8.10.7 27 days 7/11/2019 8/6/2019
Structure - Erection

8.10.7.1 Erection 27 days 7/11/2019 8/6/2019

POTABLE WATER PUMP SKID SHELTER (ID# 259) - Roofing &


8.10.8 29 days 8/8/2019 9/5/2019
Finishing Works
8.10.8.1 Roofing 15 days 8/8/2019 8/22/2019

8.10.8.2 Finishing Work 14 days 8/23/2019 9/5/2019

POTABLE WATER PUMP SKID SHELTER (ID# 259) - CTO


8.10.9 0 days 9/5/2019 9/5/2019
(Complete) (CTO_C_B1)

8.11 Hard Standing Area 192 days 12/27/2018 7/6/2019

8.11.1 HARD STANDING (ID# 260 PI) - Foundation - DTO 0 days 12/27/2018 12/27/2018

8.11.2 HARD STANDING (ID# 260 ROP) - Foundation - DTO 0 days 12/27/2018 12/27/2018

HARD STANDING (ID# 260 PI) - Foundation - Excavation & Pile


8.11.3 6 days 4/10/2019 4/15/2019
Head Preparation

8.11.3.1 Excavation 6 days 4/10/2019 4/15/2019

8.11.3.2 Pile Head Cutting 4 days 4/12/2019 4/15/2019

8.11.4 HARD STANDING (ID# 260 PI) - Foundation - Underground Works 7 days 4/17/2019 4/23/2019

8.11.4.1 Trenching 7 days 4/17/2019 4/23/2019

8.11.5 HARD STANDING (ID# 260 PI) - Foundation - Concrete Works 37 days 4/25/2019 5/31/2019

8.11.5.1 Footing Foundation 10 days 4/25/2019 5/4/2019

8.11.5.1.1 Leveling 1 day 4/25/2019 4/25/2019

8.11.5.1.2 Lean Concrete 1 day 4/25/2019 4/25/2019

8.11.5.1.3 Rebar 3 days 4/28/2019 4/30/2019


8.11.5.1.4 Formworks 3 days 5/1/2019 5/3/2019

8.11.5.1.5 Concrete Pouring 1 day 5/4/2019 5/4/2019

8.11.5.2 Pedestal Work 9 days 5/7/2019 5/15/2019

8.11.5.2.1 Leveling 1 day 5/7/2019 5/7/2019

8.11.5.2.2 Lean Concrete 1 day 5/7/2019 5/7/2019

8.11.5.2.3 Rebar 3 days 5/10/2019 5/12/2019

8.11.5.2.4 Anchor Bolt Installation 3 days 5/12/2019 5/14/2019

8.11.5.2.5 Formworks 3 days 5/12/2019 5/14/2019

8.11.5.2.6 Concrete Pouring 1 day 5/15/2019 5/15/2019

8.11.5.3 Tie Beam 9 days 5/10/2019 5/18/2019

8.11.5.3.1 Leveling 1 day 5/10/2019 5/10/2019

8.11.5.3.2 Lean Concrete 1 day 5/10/2019 5/10/2019

8.11.5.3.3 Rebar 3 days 5/13/2019 5/15/2019

8.11.5.3.4 Formworks 3 days 5/15/2019 5/17/2019

8.11.5.3.5 Concrete Pouring 1 day 5/18/2019 5/18/2019

8.11.5.4 Slab Work 11 days 5/21/2019 5/31/2019


8.11.5.4.1 Leveling 1 day 5/21/2019 5/21/2019

8.11.5.4.2 Lean Concrete 1 day 5/21/2019 5/21/2019

8.11.5.4.3 Rebar 3 days 5/24/2019 5/26/2019

8.11.5.4.4 Formworks 3 days 5/27/2019 5/29/2019

8.11.5.4.5 Concrete Pouring 2 days 5/30/2019 5/31/2019

HARD STANDING (ID# 260 ROP) - Foundation - Excavation & Pile


8.11.6 6 days 5/18/2019 5/23/2019
Head Preparation

8.11.6.1 Excavation 6 days 5/18/2019 5/23/2019

8.11.6.2 Pile Head Cutting 5 days 5/19/2019 5/23/2019

HARD STANDING (ID# 260 ROP) - Foundation - Underground


8.11.7 5 days 5/26/2019 5/30/2019
Works

8.11.7.1 Trenching 5 days 5/26/2019 5/30/2019

8.11.8 HARD STANDING (ID# 260 PI) - Foundation - CTO 0 days 5/30/2019 5/30/2019

8.11.9 HARD STANDING (ID# 260 ROP) - Foundation - Concrete Works 36 days 6/1/2019 7/6/2019

8.11.9.1 Footing Foundation 10 days 6/1/2019 6/10/2019

8.11.9.1.1 Leveling 1 day 6/1/2019 6/1/2019

8.11.9.1.2 Lean Concrete 1 day 6/1/2019 6/1/2019

8.11.9.1.3 Rebar 3 days 6/4/2019 6/6/2019


8.11.9.1.4 Formworks 3 days 6/7/2019 6/9/2019

8.11.9.1.5 Concrete Pouring 1 day 6/10/2019 6/10/2019

8.11.9.2 Pedestal Work 9 days 6/13/2019 6/21/2019

8.11.9.2.1 Leveling 1 day 6/13/2019 6/13/2019

8.11.9.2.2 Lean Concrete 1 day 6/13/2019 6/13/2019

8.11.9.2.3 Rebar 3 days 6/16/2019 6/18/2019

8.11.9.2.4 Anchor Bolt Installation 3 days 6/18/2019 6/20/2019

8.11.9.2.5 Formworks 3 days 6/18/2019 6/20/2019

8.11.9.2.6 Concrete Pouring 1 day 6/21/2019 6/21/2019

8.11.9.3 Tie Beam 9 days 6/16/2019 6/24/2019

8.11.9.3.1 Leveling 1 day 6/16/2019 6/16/2019

8.11.9.3.2 Lean Concrete 1 day 6/16/2019 6/16/2019

8.11.9.3.3 Rebar 3 days 6/19/2019 6/21/2019

8.11.9.3.4 Formworks 3 days 6/21/2019 6/23/2019

8.11.9.3.5 Concrete Pouring 1 day 6/24/2019 6/24/2019

8.11.9.4 Slab Work 10 days 6/27/2019 7/6/2019


8.11.9.4.1 Leveling 1 day 6/27/2019 6/27/2019

8.11.9.4.2 Lean Concrete 1 day 6/27/2019 6/27/2019

8.11.9.4.3 Rebar 3 days 6/30/2019 7/2/2019

8.11.9.4.4 Formworks 3 days 7/3/2019 7/5/2019

8.11.9.4.5 Concrete Pouring 1 day 7/6/2019 7/6/2019

8.11.10 HARD STANDING (ID# 260 ROP) - Foundation - CTO 0 days 7/6/2019 7/6/2019

8.12 Oil Separator Pit incl. Oil Sludge Collector 154 days 2/6/2019 7/9/2019

8.12.1 OIL SEPARATOR PIT (ID# 235) - DTO 0 days 2/6/2019 2/6/2019

OIL SEPARATOR PIT (ID# 235) - Sheet Piling/Excavation & Pile


8.12.2 21 days 3/20/2019 4/9/2019
Head Preparation

8.12.2.1 Sheet Piling 21 days 3/20/2019 4/9/2019

8.12.2.2 Excavation 12 days 3/29/2019 4/9/2019

8.12.2.3 Pile Head Cutting 10 days 3/31/2019 4/9/2019

8.12.3 OIL SEPARATOR PIT (ID# 235) - Concrete Structure 91 days 4/10/2019 7/9/2019

8.12.3.1 Footing Foundation 22 days 4/10/2019 5/1/2019

8.12.3.1.1 Leveling 2 days 4/10/2019 4/11/2019

8.12.3.1.2 Lean Concrete 3 days 4/10/2019 4/12/2019


8.12.3.1.3 Rebar 7 days 4/15/2019 4/21/2019

8.12.3.1.4 Formworks 7 days 4/22/2019 4/28/2019

8.12.3.1.5 Concrete Pouring 3 days 4/29/2019 5/1/2019

8.12.3.2 Pedestal Work 17 days 5/4/2019 5/20/2019

8.12.3.2.1 Leveling 2 days 5/4/2019 5/5/2019

8.12.3.2.2 Lean Concrete 3 days 5/4/2019 5/6/2019

8.12.3.2.3 Rebar 7 days 5/9/2019 5/15/2019

8.12.3.2.4 Anchor Bolt Installation 7 days 5/11/2019 5/17/2019

8.12.3.2.5 Formworks 7 days 5/11/2019 5/17/2019

8.12.3.2.6 Concrete Pouring 3 days 5/18/2019 5/20/2019

8.12.3.3 Tie Beam 18 days 5/8/2019 5/25/2019

8.12.3.3.1 Leveling 2 days 5/8/2019 5/9/2019

8.12.3.3.2 Lean Concrete 3 days 5/8/2019 5/10/2019

8.12.3.3.3 Rebar 7 days 5/13/2019 5/19/2019

8.12.3.3.4 Formworks 8 days 5/15/2019 5/22/2019

8.12.3.3.5 Concrete Pouring 3 days 5/23/2019 5/25/2019


8.12.3.4 Slab Work 43 days 5/28/2019 7/9/2019

8.12.3.4.1 Leveling 2 days 5/28/2019 5/29/2019

8.12.3.4.2 Lean Concrete 3 days 5/28/2019 5/30/2019

8.12.3.4.3 Rebar 17 days 6/2/2019 6/18/2019

8.12.3.4.4 Formworks 17 days 6/19/2019 7/5/2019

8.12.3.4.5 Concrete Pouring 4 days 7/6/2019 7/9/2019

8.12.4 OIL SEPARATOR PIT (ID# 235) - Access for M&E Erection CTO 0 days 7/9/2019 7/9/2019

9 NETWORKS 398 days 8/28/2018 9/29/2019

9.1 Mechanical Systems Network 289 days 8/28/2018 6/12/2019

PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block


9.1.1 0 days 8/28/2018 8/28/2018
- DTO (ROP)

PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block


9.1.2 0 days 12/14/2018 12/14/2018
- DTO (PI)

PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block


9.1.3 32 days 12/23/2018 1/23/2019
- Excavation & Pile Head Preparation (PI)

9.1.3.1 Excavation 32 days 12/23/2018 1/23/2019

9.1.3.2 Pile Head Cutting 28 days 12/27/2018 1/23/2019

PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block


9.1.4 32 days 12/31/2018 1/31/2019
- Excavation & Pile Head Preparation (ROP)

9.1.4.1 Excavation 32 days 12/31/2018 1/31/2019


9.1.4.2 Pile Head Cutting 28 days 1/4/2019 1/31/2019

PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block


9.1.5 131 days 1/1/2019 5/11/2019
- Concrete (PI)

9.1.5.1 Concrete Foundation 63 days 1/1/2019 3/4/2019

9.1.5.1.1 Leveling 2 days 1/1/2019 1/2/2019

9.1.5.1.2 Lean Concrete 7 days 1/1/2019 1/7/2019

9.1.5.1.3 Rebar 21 days 1/15/2019 2/4/2019

9.1.5.1.4 Formworks 21 days 2/5/2019 2/25/2019

9.1.5.1.5 Concrete Pouring 7 days 2/26/2019 3/4/2019

9.1.5.2 Slab Work 61 days 3/12/2019 5/11/2019

9.1.5.2.1 Leveling 2 days 3/12/2019 3/13/2019

9.1.5.2.2 Lean Concrete 7 days 3/12/2019 3/18/2019

9.1.5.2.3 Rebar 21 days 3/24/2019 4/13/2019

9.1.5.2.4 Formworks 21 days 4/14/2019 5/4/2019

9.1.5.2.5 Concrete Pouring 7 days 5/5/2019 5/11/2019

PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block


9.1.6 131 days 2/2/2019 6/12/2019
- Concrete (ROP)

9.1.6.1 Concrete Foundation 62 days 2/2/2019 4/4/2019


9.1.6.1.1 Leveling 2 days 2/2/2019 2/3/2019

9.1.6.1.2 Lean Concrete 6 days 2/2/2019 2/7/2019

9.1.6.1.3 Rebar 21 days 2/15/2019 3/7/2019

9.1.6.1.4 Formworks 21 days 3/8/2019 3/28/2019

9.1.6.1.5 Concrete Pouring 7 days 3/29/2019 4/4/2019

9.1.6.2 Slab Work 62 days 4/12/2019 6/12/2019

9.1.6.2.1 Leveling 2 days 4/12/2019 4/13/2019

9.1.6.2.2 Lean Concrete 6 days 4/12/2019 4/17/2019

9.1.6.2.3 Rebar 21 days 4/25/2019 5/15/2019

9.1.6.2.4 Formworks 21 days 5/16/2019 6/5/2019

9.1.6.2.5 Concrete Pouring 7 days 6/6/2019 6/12/2019

PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block


9.1.7 0 days 5/8/2019 5/8/2019
- CTO (PI)

PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block


9.1.8 0 days 6/8/2019 6/8/2019
- CTO (ROP)

9.2 Pipe Rack 329 days 11/5/2018 9/29/2019

9.2.1 PIPE RACK (ID# 244) - Steel Structure - MTO for Procurement 0 days 11/5/2018 11/5/2018

9.2.2 PIPE RACK (ID# 244) - Steel Structure - Procurement 39 days 11/22/2018 12/31/2018
9.2.3 PIPE RACK (ID# 244) - Steel Structure - Fabrication/ Delivery 153 days 1/1/2019 6/2/2019

9.2.3.1 Manufacturing 120 days 1/1/2019 4/30/2019

9.2.3.2 Delivery 33 days 5/1/2019 6/2/2019

9.2.4 PIPE RACK (ID# 244) - Steel Structure - DTO 0 days 1/8/2019 1/8/2019

PIPE RACK (ID# 244) - Foundations - Concrete Outline & Details -


9.2.5 0 days 3/8/2019 3/8/2019
DTO

PIPE RACK (ID# 244) - Foundations - Excavation, Pile Head Prep


9.2.6 43 days 4/16/2019 5/28/2019
& U/G Installation

9.2.6.1 Excavation 22 days 4/16/2019 5/7/2019

9.2.6.2 Pile Head Cutting 14 days 4/24/2019 5/7/2019

9.2.6.3 U/G Installation 21 days 5/8/2019 5/28/2019

9.2.7 PIPE RACK (ID# 244) - Foundations - Concrete Works 57 days 5/3/2019 6/28/2019

9.2.7.1 Footing Foundation 18 days 5/3/2019 5/20/2019

9.2.7.1.1 Leveling 1 day 5/3/2019 5/3/2019

9.2.7.1.2 Lean Concrete 2 days 5/3/2019 5/4/2019

9.2.7.1.3 Rebar 6 days 5/7/2019 5/12/2019

9.2.7.1.4 Formworks 6 days 5/13/2019 5/18/2019

9.2.7.1.5 Concrete Pouring 2 days 5/19/2019 5/20/2019


9.2.7.2 Pedestal Work 14 days 5/23/2019 6/5/2019

9.2.7.2.1 Leveling 1 day 5/23/2019 5/23/2019

9.2.7.2.2 Lean Concrete 2 days 5/23/2019 5/24/2019

9.2.7.2.3 Rebar 6 days 5/27/2019 6/1/2019

9.2.7.2.4 Anchor Bolt Installation 6 days 5/29/2019 6/3/2019

9.2.7.2.5 Formworks 6 days 5/29/2019 6/3/2019

9.2.7.2.6 Concrete Pouring 2 days 6/4/2019 6/5/2019

9.2.7.3 Tie Beam 13 days 5/26/2019 6/7/2019

9.2.7.3.1 Leveling 1 day 5/26/2019 5/26/2019

9.2.7.3.2 Lean Concrete 2 days 5/26/2019 5/27/2019

9.2.7.3.3 Rebar 6 days 5/30/2019 6/4/2019

9.2.7.3.4 Formworks 6 days 6/1/2019 6/6/2019

9.2.7.3.5 Concrete Pouring 1 day 6/7/2019 6/7/2019

9.2.7.4 Slab Work 19 days 6/10/2019 6/28/2019

9.2.7.4.1 Leveling 1 day 6/10/2019 6/10/2019

9.2.7.4.2 Lean Concrete 2 days 6/10/2019 6/11/2019


9.2.7.4.3 Rebar 6 days 6/14/2019 6/19/2019

9.2.7.4.4 Formworks 6 days 6/20/2019 6/25/2019

9.2.7.4.5 Concrete Pouring 3 days 6/26/2019 6/28/2019

9.2.8 PIPE RACK (ID# 244) - Steel Structure - Erection 92 days 6/30/2019 9/29/2019

9.2.8.1 Erection 92 days 6/30/2019 9/29/2019

9.2.9 PIPE RACK (ID# 244) - Steel Structure - CTO 0 days 9/29/2019 9/29/2019

9.3 Waste Water Central Monitoring Basin 257 days 11/9/2018 7/23/2019

WASTE WATER CENTRAL MONITORING BASIN (ID#225) -


9.3.1 0 days 11/9/2018 11/9/2018
Effluent Finishing Works - DTO

WASTE WATER CENTRAL MONITORING BASIN (ID#225) -


9.3.2 0 days 11/9/2018 11/9/2018
Effluent - DTO

WASTE WATER CENTRAL MONITORING BASIN (ID#225) -


9.3.3 8 days 3/1/2019 3/8/2019
Excavation & Pile Head Preparation

9.3.3.1 Excavation 8 days 3/1/2019 3/8/2019

9.3.3.2 Pile Head Cutting 5 days 3/4/2019 3/8/2019

WASTE WATER CENTRAL MONITORING BASIN (ID#225) - Base


9.3.4 33 days 3/9/2019 4/10/2019
Slab

9.3.4.1 Concrete Foundation 13 days 3/9/2019 3/21/2019

9.3.4.1.1 Leveling 1 day 3/9/2019 3/9/2019

9.3.4.1.2 Lean Concrete 1 day 3/9/2019 3/9/2019


9.3.4.1.3 Rebar 2 days 3/17/2019 3/18/2019

9.3.4.1.4 Formworks 2 days 3/19/2019 3/20/2019

9.3.4.1.5 Concrete Pouring 1 day 3/21/2019 3/21/2019

9.3.4.2 Slab Work 13 days 3/29/2019 4/10/2019

9.3.4.2.1 Leveling 1 day 3/29/2019 3/29/2019

9.3.4.2.2 Lean Concrete 1 day 3/29/2019 3/29/2019

9.3.4.2.3 Rebar 2 days 4/5/2019 4/6/2019

9.3.4.2.4 Formworks 2 days 4/7/2019 4/8/2019

9.3.4.2.5 Concrete Pouring 2 days 4/9/2019 4/10/2019

9.3.5 WASTE WATER CENTRAL MONITORING BASIN (ID#225) - Walls 63 days 4/13/2019 6/14/2019

9.3.5.1 Wall Installation 45 days 4/13/2019 5/27/2019

9.3.5.2 Plastering 33 days 5/13/2019 6/14/2019

9.3.6 WASTE WATER CENTRAL MONITORING BASIN (ID#225) - Backfill 4 days 6/20/2019 6/23/2019

9.3.6.1 Backfilling 4 days 6/20/2019 6/23/2019

WASTE WATER CENTRAL MONITORING BASIN (ID#225) - Top


9.3.7 21 days 6/25/2019 7/15/2019
Slab

9.3.7.1 Concrete Foundation 8 days 6/25/2019 7/2/2019


9.3.7.1.1 Leveling 1 day 6/25/2019 6/25/2019

9.3.7.1.2 Lean Concrete 1 day 6/25/2019 6/25/2019

9.3.7.1.3 Rebar 2 days 6/28/2019 6/29/2019

9.3.7.1.4 Formworks 2 days 6/30/2019 7/1/2019

9.3.7.1.5 Concrete Pouring 1 day 7/2/2019 7/2/2019

9.3.7.2 Slab Work 6 days 7/10/2019 7/15/2019

9.3.7.2.1 Leveling 1 day 7/10/2019 7/10/2019

9.3.7.2.2 Lean Concrete 1 day 7/10/2019 7/10/2019

9.3.7.2.3 Rebar 2 days 7/11/2019 7/12/2019

9.3.7.2.4 Formworks 2 days 7/13/2019 7/14/2019

9.3.7.2.5 Concrete Pouring 1 day 7/15/2019 7/15/2019

WASTE WATER CENTRAL MONITORING BASIN (ID#225) -


9.3.8 7 days 7/17/2019 7/23/2019
Surface Protection & Finishing

9.3.8.1 Surface Protection and Finishing 7 days 7/17/2019 7/23/2019

9.3.9 WASTE WATER CENTRAL MONITORING BASIN (ID#225) - CTO 0 days 7/19/2019 7/19/2019

9.4 Sanitary / Sewage Water System 84 days 3/7/2019 5/29/2019

9.4.1 SANITARY WATER - To Logistic Buildings - DTO 0 days 3/7/2019 3/7/2019


9.4.2 SANITARY WATER - To Logistic Buildings - Excavation 36 days 3/15/2019 4/19/2019

9.4.2.1 Excavation 36 days 3/15/2019 4/19/2019

9.4.3 SANITARY WATER - To Logistic Buildings - Concreting 53 days 3/22/2019 5/13/2019

9.4.3.1 Footing Foundation 16 days 3/22/2019 4/6/2019

9.4.3.1.1 Leveling 1 day 3/22/2019 3/22/2019

9.4.3.1.2 Lean Concrete 2 days 3/22/2019 3/23/2019

9.4.3.1.3 Rebar 5 days 3/26/2019 3/30/2019

9.4.3.1.4 Formworks 5 days 3/31/2019 4/4/2019

9.4.3.1.5 Concrete Pouring 2 days 4/5/2019 4/6/2019

9.4.3.2 Pedestal Work 13 days 4/9/2019 4/21/2019

9.4.3.2.1 Leveling 1 day 4/9/2019 4/9/2019

9.4.3.2.2 Lean Concrete 2 days 4/9/2019 4/10/2019

9.4.3.2.3 Rebar 5 days 4/13/2019 4/17/2019

9.4.3.2.4 Anchor Bolt Installation 5 days 4/15/2019 4/19/2019

9.4.3.2.5 Formworks 5 days 4/15/2019 4/19/2019

9.4.3.2.6 Concrete Pouring 2 days 4/20/2019 4/21/2019


9.4.3.3 Tie Beam 13 days 4/12/2019 4/24/2019

9.4.3.3.1 Leveling 1 day 4/12/2019 4/12/2019

9.4.3.3.2 Lean Concrete 2 days 4/12/2019 4/13/2019

9.4.3.3.3 Rebar 5 days 4/16/2019 4/20/2019

9.4.3.3.4 Formworks 5 days 4/18/2019 4/22/2019

9.4.3.3.5 Concrete Pouring 2 days 4/23/2019 4/24/2019

9.4.3.4 Slab Work 17 days 4/27/2019 5/13/2019

9.4.3.4.1 Leveling 1 day 4/27/2019 4/27/2019

9.4.3.4.2 Lean Concrete 2 days 4/27/2019 4/28/2019

9.4.3.4.3 Rebar 5 days 5/1/2019 5/5/2019

9.4.3.4.4 Formworks 5 days 5/6/2019 5/10/2019

9.4.3.4.5 Concrete Pouring 3 days 5/11/2019 5/13/2019

9.4.4 SANITARY WATER - To Logistic Buildings - Piping 51 days 4/9/2019 5/29/2019

9.4.4.1 Piping Installation 51 days 4/9/2019 5/29/2019

9.4.5 SANITARY WATER - To Logistic Buildings - CTO 0 days 5/29/2019 5/29/2019

9.5 Fuel Gas System 187 days 8/28/2018 3/2/2019


9.5.1 PIPE SLEEPERS/TRENCHES - Fuel Gas Line - DTO 0 days 8/28/2018 8/28/2018

PIPE SLEEPERS/TRENCHES - Fuel Gas Line - Excavation & Pile


9.5.2 38 days 10/11/2018 11/17/2018
Head Preparation

9.5.2.1 Excavation 36 days 10/11/2018 11/15/2018

9.5.2.2 Pile Head Preparation 28 days 10/21/2018 11/17/2018

9.5.3 PIPE SLEEPERS/TRENCHES - Fuel Gas Line - Concrete Work 128 days 10/26/2018 3/2/2019

9.5.3.1 ConcreteFoundation 63 days 10/26/2018 12/27/2018

9.5.3.1.1 Leveling 2 days 10/26/2018 10/27/2018

9.5.3.1.2 Lean Concrete 7 days 10/26/2018 11/1/2018

9.5.3.1.3 Rebar 21 days 11/9/2018 11/29/2018

9.5.3.1.4 Formworks 21 days 11/30/2018 12/20/2018

9.5.3.1.5 Concrete Pouring 7 days 12/21/2018 12/27/2018

9.5.3.2 Slab Work 58 days 1/4/2019 3/2/2019

9.5.3.2.1 Leveling 2 days 1/4/2019 1/5/2019

9.5.3.2.2 Lean Concrete 6 days 1/4/2019 1/9/2019

9.5.3.2.3 Rebar 21 days 1/16/2019 2/5/2019

9.5.3.2.4 Formworks 21 days 2/6/2019 2/26/2019


9.5.3.2.5 Concrete Pouring 4 days 2/27/2019 3/2/2019

9.5.4 PIPE SLEEPERS/TRENCHES - Fuel Gas Line - CTO 0 days 3/2/2019 3/2/2019

9.6 Electrical Cabling Network 132 days 12/14/2018 4/24/2019

9.6.1 CABLE PULL PITS & DUCT BANKS BOP Area - DTO 0 days 12/14/2018 12/14/2018

CABLE PULL PITS & DUCT BANKS Power Island (ID# 111 & 112) -
9.6.2 0 days 12/14/2018 12/14/2018
DTO

9.6.3 CABLE PULL PITS & DUCT BANKS BOP Area - Civil Construction 75 days 12/26/2018 3/10/2019

9.6.3.1 Concrete Foundation 34 days 12/26/2018 1/28/2019

9.6.3.1.1 Leveling 1 day 12/26/2018 12/26/2018

9.6.3.1.2 Lean Concrete 3 days 12/26/2018 12/28/2018

9.6.3.1.3 Rebar 10 days 1/5/2019 1/14/2019

9.6.3.1.4 Formworks 10 days 1/15/2019 1/24/2019

9.6.3.1.5 Concrete Pouring 4 days 1/25/2019 1/28/2019

9.6.3.2 Slab Work 34 days 2/5/2019 3/10/2019

9.6.3.2.1 Leveling 1 day 2/5/2019 2/5/2019

9.6.3.2.2 Lean Concrete 3 days 2/5/2019 2/7/2019

9.6.3.2.3 Rebar 10 days 2/15/2019 2/24/2019


9.6.3.2.4 Formworks 10 days 2/25/2019 3/6/2019

9.6.3.2.5 Concrete Pouring 4 days 3/7/2019 3/10/2019

CABLE PULL PITS & DUCT BANKS Power Island (ID# 111 & 112) -
9.6.4 73 days 12/26/2018 3/8/2019
Civil Construction

9.6.4.1 Concrete Foundation 34 days 12/26/2018 1/28/2019

9.6.4.1.1 Leveling 1 day 12/26/2018 12/26/2018

9.6.4.1.2 Lean Concrete 4 days 12/26/2018 12/29/2018

9.6.4.1.3 Rebar 12 days 1/1/2019 1/12/2019

9.6.4.1.4 Formworks 12 days 1/13/2019 1/24/2019

9.6.4.1.5 Concrete Pouring 4 days 1/25/2019 1/28/2019

9.6.4.2 Slab Work 32 days 2/5/2019 3/8/2019

9.6.4.2.1 Leveling 1 day 2/5/2019 2/5/2019

9.6.4.2.2 Lean Concrete 4 days 2/5/2019 2/8/2019

9.6.4.2.3 Rebar 12 days 2/11/2019 2/22/2019

9.6.4.2.4 Formworks 10 days 2/23/2019 3/4/2019

9.6.4.2.5 Concrete Pouring 4 days 3/5/2019 3/8/2019

CABLE PULL PITS & DUCT BANKS Power Island (ID# 111 & 112) -
9.6.5 0 days 3/8/2019 3/8/2019
CTO
9.6.6 CABLE PULL PITS & DUCT BANKS BOP Area - CTO 0 days 4/24/2019 4/24/2019

9.7 HV Cable Trench 88 days 1/28/2019 4/25/2019

CABLE TRENCH (ID# 237) - HV Cable Interconnection SY to Main


9.7.1 0 days 1/28/2019 1/28/2019
Trafo - DTO

CABLE TRENCH (ID# 237) - HV Cable Interconnection SY to Main


9.7.2 29 days 2/6/2019 3/6/2019
Trafo - Excavation & Pile Head Preparation

9.7.2.1 Excavation 29 days 2/6/2019 3/6/2019

9.7.2.2 Pile Head Cutting 21 days 2/14/2019 3/6/2019

CABLE TRENCH (ID# 237) - HV Cable Interconnection SY to Main


9.7.3 64 days 2/21/2019 4/25/2019
Trafo - Concreting

9.7.3.1 Concrete Foundation 29 days 2/21/2019 3/21/2019

9.7.3.1.1 Leveling 1 day 2/21/2019 2/21/2019

9.7.3.1.2 Lean Concrete 3 days 2/21/2019 2/23/2019

9.7.3.1.3 Rebar 10 days 2/26/2019 3/7/2019

9.7.3.1.4 Formworks 10 days 3/8/2019 3/17/2019

9.7.3.1.5 Concrete Pouring 4 days 3/18/2019 3/21/2019

9.7.3.2 Slab Work 28 days 3/29/2019 4/25/2019

9.7.3.2.1 Leveling 1 day 3/29/2019 3/29/2019

9.7.3.2.2 Lean Concrete 2 days 3/29/2019 3/30/2019


9.7.3.2.3 Rebar 10 days 4/4/2019 4/13/2019

9.7.3.2.4 Formworks 10 days 4/14/2019 4/23/2019

9.7.3.2.5 Concrete Pouring 2 days 4/24/2019 4/25/2019

CABLE TRENCH (ID# 237) - HV Cable Interconnection SY to Main


9.7.4 0 days 4/25/2019 4/25/2019
Trafo - CTO

9.8 HV Cable Rack 169 days 12/11/2018 5/28/2019

HV CABLE RACK (ID# 258) - Cable Rack Steel Structure


9.8.1 108 days 12/11/2018 3/28/2019
Procurment/Fabrication/Delivery

9.8.1.1 Manufacturing 75 days 12/11/2018 2/23/2019

9.8.1.2 Delivery 33 days 2/24/2019 3/28/2019

9.8.2 HV CABLE RACK (ID# 258) - DTO 0 days 12/31/2018 12/31/2018

9.8.3 HV CABLE RACK (ID# 258) - Excavation & Pile Head Preparation 14 days 2/6/2019 2/19/2019

9.8.3.1 Excavation 14 days 2/6/2019 2/19/2019

9.8.3.2 Pile Head Cutting 10 days 2/10/2019 2/19/2019

9.8.4 HV CABLE RACK (ID# 258) - Foundation Concreting 54 days 2/20/2019 4/14/2019

9.8.4.1 Footing Foundation 16 days 2/20/2019 3/7/2019

9.8.4.1.1 Leveling 1 day 2/20/2019 2/20/2019

9.8.4.1.2 Lean Concrete 2 days 2/20/2019 2/21/2019


9.8.4.1.3 Rebar 5 days 2/24/2019 2/28/2019

9.8.4.1.4 Formworks 5 days 3/1/2019 3/5/2019

9.8.4.1.5 Concrete Pouring 2 days 3/6/2019 3/7/2019

9.8.4.2 Pedestal Work 13 days 3/10/2019 3/22/2019

9.8.4.2.1 Leveling 1 day 3/10/2019 3/10/2019

9.8.4.2.2 Lean Concrete 2 days 3/10/2019 3/11/2019

9.8.4.2.3 Rebar 5 days 3/14/2019 3/18/2019

9.8.4.2.4 Anchor Bolt Installation 5 days 3/16/2019 3/20/2019

9.8.4.2.5 Formworks 5 days 3/16/2019 3/20/2019

9.8.4.2.6 Concrete Pouring 2 days 3/21/2019 3/22/2019

9.8.4.3 Tie Beam 13 days 3/13/2019 3/25/2019

9.8.4.3.1 Leveling 1 day 3/13/2019 3/13/2019

9.8.4.3.2 Lean Concrete 2 days 3/13/2019 3/14/2019

9.8.4.3.3 Rebar 5 days 3/17/2019 3/21/2019

9.8.4.3.4 Formworks 5 days 3/19/2019 3/23/2019

9.8.4.3.5 Concrete Pouring 2 days 3/24/2019 3/25/2019


9.8.4.4 Slab Work 18 days 3/28/2019 4/14/2019

9.8.4.4.1 Leveling 1 day 3/28/2019 3/28/2019

9.8.4.4.2 Lean Concrete 3 days 3/28/2019 3/30/2019

9.8.4.4.3 Rebar 5 days 4/2/2019 4/6/2019

9.8.4.4.4 Formworks 5 days 4/7/2019 4/11/2019

9.8.4.4.5 Concrete Pouring 3 days 4/12/2019 4/14/2019

HV CABLE RACK (ID# 258) - Foundation Access for Steel


9.8.5 0 days 4/12/2019 4/12/2019
Erection - CTO

9.8.6 HV CABLE RACK (ID# 258) Cable Rack Steel Structure Erection 41 days 4/18/2019 5/28/2019

9.8.6.1 Erection 41 days 4/18/2019 5/28/2019

HV CABLE RACK (ID# 258) - Cable Rack Access for Electrical


9.8.7 0 days 5/28/2019 5/28/2019
Erection - CTO

10 LOGISTICS BUILDINGS 407 days 12/27/2018 2/6/2020

10.1 Gatehouse 142 days 5/7/2019 9/25/2019

10.1.1 GATE HOUSE (FUEL GAS) - Concrete Outline & Details - DTO 0 days 5/7/2019 5/7/2019

10.1.2 GATE HOUSE (FUEL GAS) - Finishing Works - DTO 0 days 5/25/2019 5/25/2019

10.1.3 GATE HOUSE (FUEL GAS) - Excavation 11 days 6/5/2019 6/15/2019

10.1.3.1 Excavation 11 days 6/5/2019 6/15/2019


10.1.4 GATE HOUSE (FUEL GAS) - Super Structure - DTO 0 days 6/12/2019 6/12/2019

10.1.5 GATE HOUSE (FUEL GAS) - Foundations/Substructure 24 days 6/18/2019 7/11/2019

10.1.5.1 Footing Foundation 6 days 6/18/2019 6/23/2019

10.1.5.1.1 Leveling 1 day 6/18/2019 6/18/2019

10.1.5.1.2 Lean Concrete 1 day 6/18/2019 6/18/2019

10.1.5.1.3 Rebar 1 day 6/21/2019 6/21/2019

10.1.5.1.4 Formworks 1 day 6/22/2019 6/22/2019

10.1.5.1.5 Concrete Pouring 1 day 6/23/2019 6/23/2019

10.1.5.2 Pedestal Work 7 days 6/26/2019 7/2/2019

10.1.5.2.1 Leveling 1 day 6/26/2019 6/26/2019

10.1.5.2.2 Lean Concrete 1 day 6/26/2019 6/26/2019

10.1.5.2.3 Rebar 1 day 6/29/2019 6/29/2019

10.1.5.2.4 Anchor Bolt Installation 1 day 7/1/2019 7/1/2019

10.1.5.2.5 Formworks 1 day 7/1/2019 7/1/2019

10.1.5.2.6 Concrete Pouring 1 day 7/2/2019 7/2/2019

10.1.5.3 Tie Beam 6 days 6/29/2019 7/4/2019


10.1.5.3.1 Leveling 1 day 6/29/2019 6/29/2019

10.1.5.3.2 Lean Concrete 1 day 6/29/2019 6/29/2019

10.1.5.3.3 Rebar 1 day 7/2/2019 7/2/2019

10.1.5.3.4 Formworks 1 day 7/3/2019 7/3/2019

10.1.5.3.5 Concrete Pouring 1 day 7/4/2019 7/4/2019

10.1.5.4 Slab Work 5 days 7/7/2019 7/11/2019

10.1.5.4.1 Leveling 1 day 7/7/2019 7/7/2019

10.1.5.4.2 Lean Concrete 1 day 7/7/2019 7/7/2019

10.1.5.4.3 Rebar 1 day 7/9/2019 7/9/2019

10.1.5.4.4 Formworks 1 day 7/10/2019 7/10/2019

10.1.5.4.5 Concrete Pouring 1 day 7/11/2019 7/11/2019

10.1.6 GATE HOUSE (FUEL GAS) - Superstructure 42 days 7/13/2019 8/23/2019

10.1.6.1 Column 21 days 7/13/2019 8/2/2019

10.1.6.2 Beam 21 days 7/15/2019 8/4/2019

10.1.6.3 Ladder 14 days 8/10/2019 8/23/2019

10.1.7 GATE HOUSE (FUEL GAS) - Masonary Works 17 days 8/25/2019 9/10/2019
10.1.7.1 Masonry Work 17 days 8/25/2019 9/10/2019

10.1.8 GATE HOUSE (FUEL GAS) - Finishing Works 13 days 9/13/2019 9/25/2019

10.1.8.1 Finishing Work 13 days 9/13/2019 9/25/2019

10.1.9 GATE HOUSE (FUEL GAS) - CTO (CTO_N_G) 0 days 9/25/2019 9/25/2019

10.2 Sanitary/Foul Water Treatment 101 days 1/15/2019 4/25/2019

10.2.1 SANITARY WASTE WATER TREATMENT - Foundations - DTO 0 days 1/15/2019 1/15/2019

10.2.2 SANITARY WASTE WATER TREATMENT - Excavation 6 days 1/23/2019 1/28/2019

10.2.2.1 Excavation 6 days 1/23/2019 1/28/2019

10.2.3 SANITARY WASTE WATER TREATMENT - Base Slab 10 days 1/30/2019 2/8/2019

10.2.3.1 Slab Work 10 days 1/30/2019 2/8/2019

10.2.3.1.1 Leveling 1 day 1/30/2019 1/30/2019

10.2.3.1.2 Lean Concrete 2 days 1/30/2019 1/31/2019

10.2.3.1.3 Rebar 2 days 2/3/2019 2/4/2019

10.2.3.1.4 Formworks 3 days 2/5/2019 2/7/2019

10.2.3.1.5 Concrete Pouring 1 day 2/8/2019 2/8/2019

10.2.4 SANITARY WASTE WATER TREATMENT - Side Walls 16 days 2/12/2019 2/27/2019
10.2.4.1 Wall Installation 10 days 2/12/2019 2/21/2019

10.2.4.2 Plastering 7 days 2/21/2019 2/27/2019

10.2.5 SANITARY WASTE WATER TREATMENT - Intermediate Walls 10 days 3/1/2019 3/10/2019

10.2.5.1 Wall Installation 7 days 3/1/2019 3/7/2019

10.2.5.2 Plastering 5 days 3/6/2019 3/10/2019

10.2.6 SANITARY WASTE WATER TREATMENT - Roof Slab 17 days 3/13/2019 3/29/2019

10.2.6.1 Slab Work 17 days 3/13/2019 3/29/2019

10.2.6.1.1 Leveling 1 day 3/13/2019 3/13/2019

10.2.6.1.2 Lean Concrete 2 days 3/13/2019 3/14/2019

10.2.6.1.3 Rebar 5 days 3/17/2019 3/21/2019

10.2.6.1.4 Formworks 5 days 3/22/2019 3/26/2019

10.2.6.1.5 Concrete Pouring 3 days 3/27/2019 3/29/2019

10.2.7 SANITARY WASTE WATER TREATMENT - Backfill 6 days 4/6/2019 4/11/2019

10.2.7.1 Backfilling 6 days 4/6/2019 4/11/2019

10.2.8 SANITARY WASTE WATER TREATMENT - Finishing Works 5 days 4/21/2019 4/25/2019

10.2.8.1 Finishing Work 5 days 4/21/2019 4/25/2019


10.2.9 SANITARY WASTE WATER TREATMENT - CTO (CTO_W_G) 0 days 4/25/2019 4/25/2019

10.3 Workshop and Warehouse 243 days 2/19/2019 10/19/2019

WORKSHOP / WAREHOUSE (ID# 264) - Roofing/Cladding -


10.3.1 116 days 2/19/2019 6/14/2019
Manufacture / Delivery

10.3.1.1 Manufacturing 90 days 2/19/2019 5/19/2019

10.3.1.2 Delivery 26 days 5/20/2019 6/14/2019

WORKSHOP / WAREHOUSE (ID# 264) - Steel Structure -


10.3.2 116 days 2/19/2019 6/14/2019
Manufacture / Delivery

10.3.2.1 Manufacturing 90 days 2/19/2019 5/19/2019

10.3.2.2 Delivery 26 days 5/20/2019 6/14/2019

WORKSHOP / WAREHOUSE (ID# 264) - Concrete Outline &


10.3.3 0 days 4/15/2019 4/15/2019
Details - DTO

WORKSHOP / WAREHOUSE (ID# 264) - Excavation & Pile Head


10.3.4 11 days 5/1/2019 5/11/2019
Preparation

10.3.4.1 Excavation 11 days 5/1/2019 5/11/2019

10.3.4.2 Pile Head Cutting 8 days 5/4/2019 5/11/2019

10.3.5 WORKSHOP / WAREHOUSE (ID# 264) - Civil Construction 123 days 6/18/2019 10/19/2019

WORKSHOP / WAREHOUSE (ID# 264) - Concrete Work


10.3.6 42 days 5/8/2019 6/18/2019
Foundations

10.3.6.1 Footing Foundation 22 days 5/8/2019 5/29/2019

10.3.6.1.1 Leveling 1 day 5/8/2019 5/8/2019


10.3.6.1.2 Lean Concrete 2 days 5/8/2019 5/9/2019

10.3.6.1.3 Rebar 8 days 5/12/2019 5/19/2019

10.3.6.1.4 Formworks 8 days 5/20/2019 5/27/2019

10.3.6.1.5 Concrete Pouring 2 days 5/28/2019 5/29/2019

10.3.6.2 Pedestal Work 16 days 6/1/2019 6/16/2019

10.3.6.2.1 Leveling 1 day 6/1/2019 6/1/2019

10.3.6.2.2 Lean Concrete 2 days 6/1/2019 6/2/2019

10.3.6.2.3 Rebar 8 days 6/5/2019 6/12/2019

10.3.6.2.4 Anchor Bolt Installation 8 days 6/7/2019 6/14/2019

10.3.6.2.5 Formworks 8 days 6/7/2019 6/14/2019

10.3.6.2.6 Concrete Pouring 2 days 6/15/2019 6/16/2019

10.3.6.3 Tie Beam 15 days 6/4/2019 6/18/2019

10.3.6.3.1 Leveling 1 day 6/4/2019 6/4/2019

10.3.6.3.2 Lean Concrete 2 days 6/4/2019 6/5/2019

10.3.6.3.3 Rebar 8 days 6/8/2019 6/15/2019

10.3.6.3.4 Formworks 7 days 6/10/2019 6/16/2019


10.3.6.3.5 Concrete Pouring 2 days 6/17/2019 6/18/2019

10.3.7 WORKSHOP / WAREHOUSE (ID# 264) - Finishing Works - DTO 0 days 5/20/2019 5/20/2019

10.3.8 WORKSHOP / WAREHOUSE (ID# 264) - Steel Structure - DTO 0 days 5/20/2019 5/20/2019

10.3.9 WORKSHOP / WAREHOUSE (ID# 264) - Underground Works 16 days 6/14/2019 6/29/2019

10.3.9.1 Trenching 16 days 6/14/2019 6/29/2019

10.3.10 WORKSHOP / WAREHOUSE (ID# 264) - Ground Floor Slab 19 days 7/3/2019 7/21/2019

10.3.10.1 Slab Work 19 days 7/3/2019 7/21/2019

10.3.10.1.1 Leveling 1 day 7/3/2019 7/3/2019

10.3.10.1.2 Lean Concrete 2 days 7/3/2019 7/4/2019

10.3.10.1.3 Rebar 6 days 7/7/2019 7/12/2019

10.3.10.1.4 Formworks 6 days 7/13/2019 7/18/2019

10.3.10.1.5 Concrete Pouring 3 days 7/19/2019 7/21/2019

10.3.11 WORKSHOP / WAREHOUSE (ID# 264) - Steel Structure - Erection 22 days 7/3/2019 7/24/2019

10.3.11.1 Erection 22 days 7/3/2019 7/24/2019

10.3.12 WORKSHOP / WAREHOUSE (ID# 264) - Masonary Works 40 days 7/26/2019 9/3/2019

10.3.12.1 Masonry Work 40 days 7/26/2019 9/3/2019


10.3.13 WORKSHOP / WAREHOUSE (ID# 264) - Access for Erection - CTO 0 days 7/31/2019 7/31/2019

10.3.14 WORKSHOP / WAREHOUSE (ID# 264) - Roofing/Cladding 46 days 8/9/2019 9/23/2019

10.3.14.1 Roofing/Cladding Installation 46 days 8/9/2019 9/23/2019

10.3.15 WORKSHOP / WAREHOUSE (ID# 264) - Finishing Works 30 days 9/20/2019 10/19/2019

10.3.15.1 Finishing Work 30 days 9/20/2019 10/19/2019

10.3.16 WORKSHOP / WAREHOUSE (ID# 264) - CTO 0 days 10/19/2019 10/19/2019

10.4 Administration, Electrical and Control Building 407 days 12/27/2018 2/6/2020

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.1 0 days 12/27/2018 12/27/2018
Foundation & 1st Lift Column - DTO

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.2 6 days 12/28/2018 1/2/2019
Excavation

10.4.2.1 Excavation 6 days 12/28/2018 1/2/2019

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING - Civil


10.4.3 279 days 4/19/2019 1/23/2020
Construction

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING - Pile


10.4.4 12 days 1/30/2019 2/10/2019
Head Preparation

10.4.4.1 Pile Head Cutting 12 days 1/30/2019 2/10/2019

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.5 0 days 1/28/2019 1/28/2019
Superstructure Concrete Work - DTO

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.6 71 days 2/13/2019 4/24/2019
Foundation & Substructure Concrete

10.4.6.1 Footing Foundation 24 days 2/13/2019 3/8/2019


10.4.6.1.1 Leveling 1 day 2/13/2019 2/13/2019

10.4.6.1.2 Lean Concrete 3 days 2/13/2019 2/15/2019

10.4.6.1.3 Rebar 8 days 2/18/2019 2/25/2019

10.4.6.1.4 Formworks 8 days 2/26/2019 3/5/2019

10.4.6.1.5 Concrete Pouring 3 days 3/6/2019 3/8/2019

10.4.6.2 Pedestal Work 18 days 3/11/2019 3/28/2019

10.4.6.2.1 Leveling 1 day 3/11/2019 3/11/2019

10.4.6.2.2 Lean Concrete 3 days 3/11/2019 3/13/2019

10.4.6.2.3 Rebar 8 days 3/16/2019 3/23/2019

10.4.6.2.4 Anchor Bolt Installation 8 days 3/18/2019 3/25/2019

10.4.6.2.5 Formworks 8 days 3/18/2019 3/25/2019

10.4.6.2.6 Concrete Pouring 3 days 3/26/2019 3/28/2019

10.4.6.3 Tie Beam 18 days 3/14/2019 3/31/2019

10.4.6.3.1 Leveling 1 day 3/14/2019 3/14/2019

10.4.6.3.2 Lean Concrete 3 days 3/14/2019 3/16/2019

10.4.6.3.3 Rebar 8 days 3/19/2019 3/26/2019


10.4.6.3.4 Formworks 8 days 3/21/2019 3/28/2019

10.4.6.3.5 Concrete Pouring 3 days 3/29/2019 3/31/2019

10.4.6.4 Slab Work 22 days 4/3/2019 4/24/2019

10.4.6.4.1 Leveling 1 day 4/3/2019 4/3/2019

10.4.6.4.2 Lean Concrete 3 days 4/3/2019 4/5/2019

10.4.6.4.3 Rebar 7 days 4/8/2019 4/14/2019

10.4.6.4.4 Formworks 7 days 4/15/2019 4/21/2019

10.4.6.4.5 Concrete Pouring 3 days 4/22/2019 4/24/2019

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.7 24 days 4/1/2019 4/24/2019
Underground Works

10.4.7.1 Trenching 24 days 4/1/2019 4/24/2019

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING - Arch. &


10.4.8 0 days 4/2/2019 4/2/2019
Finishing Work - DTO

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.9 119 days 4/27/2019 8/23/2019
Superstructure - Concrete Work

10.4.9.1 Column 45 days 4/27/2019 6/10/2019

10.4.9.2 Beam 45 days 5/18/2019 7/1/2019

10.4.9.3 Ladder 32 days 7/23/2019 8/23/2019

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.10 66 days 7/5/2019 9/8/2019
Masonary Work
10.4.10.1 Masonry Work 66 days 7/5/2019 9/8/2019

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.11 50 days 8/14/2019 10/2/2019
Ground & 2nd Floor Partial Finishing Works

10.4.11.1 Finishing Work 50 days 8/14/2019 10/2/2019

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING - Roof


10.4.12 35 days 8/25/2019 9/28/2019
Slab

10.4.12.1 Slab Work 35 days 8/25/2019 9/28/2019

10.4.12.1.1 Leveling 1 day 8/25/2019 8/25/2019

10.4.12.1.2 Lean Concrete 5 days 8/25/2019 8/29/2019

10.4.12.1.3 Rebar 12 days 9/1/2019 9/12/2019

10.4.12.1.4 Formworks 11 days 9/13/2019 9/23/2019

10.4.12.1.5 Concrete Pouring 5 days 9/24/2019 9/28/2019

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING - Access


10.4.13 0 days 8/31/2019 8/31/2019
for Erection for Cable Cellar - CTO

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.14 24 days 9/22/2019 10/15/2019
Control Room - Masonary Works

10.4.14.1 Masonry Work 24 days 9/22/2019 10/15/2019

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING - Access


10.4.15 0 days 9/26/2019 9/26/2019
for Erection for Switchgear Room - CTO

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.16 24 days 10/18/2019 11/10/2019
Control Room - Partial Finishing Works

10.4.16.1 Finishing Work 24 days 10/18/2019 11/10/2019


ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -
10.4.17 0 days 10/31/2019 10/31/2019
Control Room - CTO

ADMINISTRATION, ELECTRICAL & CONTROL BUILDING -


10.4.18 87 days 11/12/2019 2/6/2020
Complete Remaining Finishing Works

10.4.18.1 Complete Remaining Works 87 days 11/12/2019 2/6/2020


Actual Start Actual Base Line Base Line Predecesso
Piling Finish Piling Start Finish rs

8/11/2017 4/16/2020 8/11/2017 4/16/2020

5/21/2018 5/22/2018 5/21/2018 5/22/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

8/11/2017 4/13/2020 8/11/2017 4/13/2020

10/3/2018 10/11/2018 10/3/2018 10/11/2018

10/3/2018 10/11/2018 10/3/2018 10/11/2018

6/28/2019 1/31/2020 6/28/2019 1/31/2020

6/28/2019 6/28/2019 6/28/2019 6/28/2019

7/29/2019 10/29/2019 7/29/2019 10/29/2019

1/10/2020 1/10/2020 1/10/2020 1/10/2020

9/30/2019 1/31/2020 9/30/2019 1/31/2020

11/1/2019 11/18/2019 11/1/2019 11/18/2019

11/18/2019 1/6/2020 11/18/2019 1/6/2020

1/13/2020 1/31/2020 1/13/2020 1/31/2020


1/31/2020 1/31/2020 1/31/2020 1/31/2020

1/30/2020 1/30/2020 1/30/2020 1/30/2020

1/30/2020 1/30/2020 1/30/2020 1/30/2020

11/16/2017 7/12/2018 11/16/2017 7/12/2018


11/16/2017 12/20/2017 11/16/2017 12/20/2017
12/20/2017 1/2/2018 12/20/2017 1/2/2018
6/19/2018 7/9/2018 6/19/2018 7/9/2018
6/20/2018 7/12/2018 6/20/2018 7/12/2018
9/24/2018 3/20/2019 9/24/2018 3/20/2019
10/17/2018 3/6/2019 9/22/2018 11/30/2018

10/14/2018 3/6/2019 9/26/2018 11/9/2018

11/13/2018 1/11/2019 10/27/2018 12/14/2018

12/13/2018 3/9/2019 10/30/2018 11/5/2018

12/13/2018 3/9/2019 11/6/2018 12/3/2018

11/11/2018 1/30/2019 11/10/2018 12/25/2018

12/28/2018 12/29/2018 12/4/2018 12/13/2018

12/13/2018 3/9/2019 12/4/2018 12/17/2018

1/9/2019 1/10/2019 12/14/2018 12/20/2018

1/25/2019 1/28/2019 12/15/2018 12/25/2018

12/18/2018 1/2/2019 12/18/2018 1/2/2019

11/20/2018 2/25/2019 12/21/2018 1/3/2019


10/14/2018 10/27/2018 12/26/2018 1/8/2019

1/2/2019 1/3/2019 1/3/2019 1/9/2019

10/7/2018 1/9/2019 1/3/2019 1/9/2019

12/1/2018 2/11/2019 1/4/2019 2/18/2019 46

1/4/2019 1/5/2019 1/9/2019 1/22/2019

10/7/2018 1/21/2019 1/10/2019 1/23/2019

12/11/2018 2/19/2019 1/10/2019 1/30/2019

2/15/2019 3/4/2019 1/23/2019 3/5/2019

11/10/2018 2/24/2019 1/24/2019 2/13/2019

12/11/2018 12/19/2018 1/31/2019 2/6/2019

11/11/2018 11/30/2018 2/7/2019 2/20/2019

1/14/2019 2/14/2019 2/14/2019 2/25/2019

1/14/2019 2/14/2019 2/19/2019 3/4/2019

3/12/2019 3/16/2019 2/21/2019 3/20/2019 48

2/27/2019 3/2/2019 2/26/2019 3/11/2019 35

3/7/2019 3/9/2019 3/6/2019 3/16/2019


12/30/2018 1/1/2019 3/6/2019 3/20/2019

9/3/2018 8/1/2019 9/3/2018 8/1/2019

9/16/2018 1/22/2019 9/1/2018 10/30/2018

12/4/2018 1/16/2019 9/10/2018 10/24/2018

12/11/2018 2/2/2019 9/15/2018 11/13/2018

10/30/2018 1/7/2019 10/15/2018 12/12/2018

1/2/2019 1/3/2019 10/23/2018 11/12/2018

11/2/2018 2/5/2019 10/24/2018 11/16/2018

12/1/2018 12/23/2018 11/1/2018 12/29/2018

11/13/2018 12/3/2018 11/13/2018 12/3/2018

11/13/2018 12/12/2018 11/13/2018 12/12/2018

11/4/2018 1/19/2019 11/14/2018 12/13/2018

12/27/2018 1/1/2019 11/15/2018 11/26/2018

10/14/2018 1/14/2019 11/17/2018 12/7/2018

1/4/2019 1/10/2019 11/27/2018 12/7/2018

2/24/2019 2/28/2019 12/4/2018 12/10/2018


1/11/2019 1/18/2019 12/8/2018 12/19/2018

2/27/2019 3/2/2019 12/8/2018 12/21/2018

3/2/2019 3/11/2019 12/11/2018 12/31/2018

12/3/2018 1/28/2019 12/13/2018 1/26/2019

1/24/2019 2/10/2019 12/14/2018 1/12/2019

1/19/2019 1/21/2019 12/20/2018 12/31/2018

1/22/2019 1/24/2019 12/22/2018 1/4/2019

12/23/2018 12/26/2018 12/31/2018 1/12/2019

12/4/2018 2/23/2019 1/1/2019 1/7/2019

1/1/2019 2/11/2019 1/1/2019 2/11/2019

11/2/2018 2/5/2019 1/5/2019 2/4/2019

12/4/2018 2/23/2019 1/8/2019 1/21/2019

10/28/2018 3/1/2019 1/14/2019 2/2/2019

1/29/2019 2/22/2019 1/19/2019 2/5/2019

11/23/2018 12/1/2018 1/22/2019 1/28/2019

2/11/2019 2/26/2019 1/28/2019 2/16/2019


2/22/2019 2/26/2019 2/5/2019 2/18/2019

1/14/2019 2/14/2019 2/6/2019 2/22/2019

2/3/2019 2/16/2019 2/23/2019 3/25/2019

1/15/2019 2/23/2019 4/10/2019 4/30/2019

5/1/2019 5/16/2019 5/1/2019 5/16/2019

7/3/2019 8/1/2019 7/3/2019 8/1/2019

7/27/2019 1/31/2020 7/27/2019 1/31/2020

7/27/2019 7/27/2019

8/2/2019 10/30/2019

1/16/2020 1/16/2020

10/28/2019 1/31/2020

1/31/2020 1/31/2020

12/9/2019 4/13/2020 12/9/2019 4/13/2020

12/9/2019 12/9/2019

1/10/2020 4/13/2020

4/13/2020 4/13/2020
8/11/2017 4/10/2018 8/11/2017 4/10/2018

8/11/2017 8/15/2017

8/16/2017 9/5/2017

4/10/2018 4/10/2018

10/23/2018 2/5/2020 10/23/2018 2/5/2020

12/13/2018 5/24/2019 12/13/2018 3/6/2019

12/13/2018 12/13/2018 12/13/2018 12/13/2018

3/10/2019 3/24/2019 12/21/2018 1/4/2019

3/10/2019 3/24/2019 12/21/2018 1/4/2019 28;27;31

3/15/2019 3/24/2019 12/26/2018 1/4/2019 108FF

1/23/2019 4/25/2019 1/6/2019 2/5/2019

3/26/2019 4/2/2019 1/6/2019 1/13/2019

109FS+1
3/26/2019 3/26/2019 1/6/2019 1/6/2019
day

3/26/2019 3/26/2019 1/6/2019 1/6/2019 112SS

113FS+2
3/29/2019 3/30/2019 1/9/2019 1/10/2019
days

3/31/2019 4/1/2019 1/11/2019 1/12/2019 114


4/2/2019 4/2/2019 1/13/2019 1/13/2019 115

4/5/2019 4/12/2019 1/16/2019 1/23/2019

116FS+2
4/5/2019 4/5/2019 1/16/2019 1/16/2019
days

4/5/2019 4/5/2019 1/16/2019 1/16/2019 118SS

119FS+2
4/8/2019 4/9/2019 1/19/2019 1/20/2019
days

120SS+2
4/10/2019 4/11/2019 1/21/2019 1/22/2019
days

4/10/2019 4/11/2019 1/21/2019 1/22/2019 121SS

4/12/2019 4/12/2019 1/23/2019 1/23/2019 122

4/8/2019 4/15/2019 1/19/2019 1/26/2019

118FS+2
4/8/2019 4/8/2019 1/19/2019 1/19/2019
days

4/8/2019 4/8/2019 1/19/2019 1/19/2019 125SS

126FS+2
4/11/2019 4/12/2019 1/22/2019 1/23/2019
days

127SS+2
4/13/2019 4/14/2019 1/24/2019 1/25/2019
days

4/15/2019 4/15/2019 1/26/2019 1/26/2019 128

4/18/2019 4/25/2019 1/29/2019 2/5/2019

129FS+2
4/18/2019 4/18/2019 1/29/2019 1/29/2019
days
4/18/2019 4/18/2019 1/29/2019 1/29/2019 131SS

132FS+2
4/21/2019 4/22/2019 2/1/2019 2/2/2019
days

4/23/2019 4/24/2019 2/3/2019 2/4/2019 133

4/25/2019 4/25/2019 2/5/2019 2/5/2019 134

1/23/2019 4/25/2019 1/23/2019 2/5/2019

1/23/2019 1/27/2019 1/23/2019 1/27/2019

4/18/2019 4/18/2019 1/29/2019 1/29/2019 131SS

138SS+1
4/19/2019 4/19/2019 1/30/2019 1/30/2019
day

139FS+1
4/21/2019 4/22/2019 2/1/2019 2/2/2019
day

4/23/2019 4/24/2019 2/3/2019 2/4/2019 140

4/25/2019 4/25/2019 2/5/2019 2/5/2019 141

1/16/2019 1/16/2019 1/16/2019 1/16/2019

4/30/2019 5/23/2019 2/10/2019 3/5/2019

142FS+4
4/30/2019 5/1/2019 2/10/2019 2/11/2019
days

4/30/2019 5/4/2019 2/10/2019 2/14/2019 145SS

146FS+2
5/7/2019 5/20/2019 2/17/2019 3/2/2019
days
5/7/2019 5/20/2019 2/17/2019 3/2/2019 147SS

5/21/2019 5/23/2019 3/3/2019 3/5/2019 148

149FS+1
5/24/2019 5/24/2019 3/6/2019 3/6/2019
day

2/28/2019 5/17/2019 2/28/2019 5/17/2019

2/28/2019 2/28/2019 2/28/2019 2/28/2019

3/21/2019 4/3/2019 3/21/2019 4/3/2019

3/21/2019 4/3/2019 3/21/2019 4/3/2019 52

3/26/2019 4/3/2019 3/26/2019 4/3/2019 154FF

4/5/2019 5/17/2019 4/5/2019 5/17/2019

155FS+1
4/5/2019 4/11/2019 4/5/2019 4/11/2019
day

4/12/2019 4/13/2019 4/12/2019 4/13/2019 157

4/14/2019 4/20/2019 4/14/2019 4/20/2019 158

159FS+7
4/28/2019 5/7/2019 4/28/2019 5/7/2019
days

160SS+3
5/1/2019 5/10/2019 5/1/2019 5/10/2019
days

5/11/2019 5/17/2019 5/11/2019 5/17/2019 161

5/17/2019 5/17/2019 5/17/2019 5/17/2019 162FF


12/10/2018 6/2/2019 12/10/2018 5/16/2019

12/10/2018 12/10/2018 12/10/2018 12/10/2018

12/13/2018 12/13/2018 12/13/2018 12/13/2018

3/10/2019 3/17/2019 2/21/2019 2/28/2019

3/10/2019 3/17/2019 2/21/2019 2/28/2019 28

3/19/2019 3/31/2019 3/2/2019 3/14/2019

168FS+1
3/19/2019 3/31/2019 3/2/2019 3/14/2019
day

3/22/2019 3/31/2019 3/5/2019 3/14/2019 170FF

4/2/2019 4/26/2019 3/16/2019 4/9/2019

171FS+1
4/2/2019 4/15/2019 3/16/2019 3/29/2019
day

4/16/2019 4/17/2019 3/30/2019 3/31/2019 173

4/16/2019 4/17/2019 3/30/2019 3/31/2019 174SS

175FS+2
4/20/2019 4/22/2019 4/3/2019 4/5/2019
days

4/23/2019 4/25/2019 4/6/2019 4/8/2019 176

4/26/2019 4/26/2019 4/9/2019 4/9/2019 177

4/28/2019 5/21/2019 4/11/2019 5/4/2019


178FS+1
4/28/2019 5/21/2019 4/11/2019 5/4/2019
day

5/23/2019 5/29/2019 5/6/2019 5/12/2019

180FS+1
5/23/2019 5/29/2019 5/6/2019 5/12/2019
day

182FS+4
6/2/2019 6/2/2019 5/16/2019 5/16/2019
days

3/29/2019 2/5/2020 3/29/2019 2/5/2020

3/29/2019 3/29/2019 3/29/2019 3/29/2019

4/24/2019 5/7/2019 4/24/2019 5/7/2019

4/24/2019 5/7/2019 4/24/2019 5/7/2019 41

4/29/2019 5/7/2019 4/29/2019 5/7/2019 187FF

5/9/2019 7/22/2019 5/9/2019 7/22/2019

5/9/2019 6/2/2019 5/9/2019 6/2/2019

188FS+1
5/9/2019 5/10/2019 5/9/2019 5/10/2019
day

5/9/2019 5/12/2019 5/9/2019 5/12/2019 191SS

192FS+6
5/19/2019 5/23/2019 5/19/2019 5/23/2019
days

5/24/2019 5/28/2019 5/24/2019 5/28/2019 193

5/29/2019 6/2/2019 5/29/2019 6/2/2019 194


6/5/2019 6/25/2019 6/5/2019 6/25/2019

195FS+2
6/5/2019 6/7/2019 6/5/2019 6/7/2019
days

6/5/2019 6/7/2019 6/5/2019 6/7/2019 197SS

198FS+6
6/14/2019 6/18/2019 6/14/2019 6/18/2019
days

199SS+2
6/16/2019 6/20/2019 6/16/2019 6/20/2019
days

6/16/2019 6/20/2019 6/16/2019 6/20/2019 200SS

6/21/2019 6/25/2019 6/21/2019 6/25/2019 201

6/10/2019 6/30/2019 6/10/2019 6/30/2019

197FS+2
6/10/2019 6/12/2019 6/10/2019 6/12/2019
days

6/10/2019 6/12/2019 6/10/2019 6/12/2019 204SS

205FS+6
6/19/2019 6/23/2019 6/19/2019 6/23/2019
days

206SS+2
6/21/2019 6/25/2019 6/21/2019 6/25/2019
days

6/26/2019 6/30/2019 6/26/2019 6/30/2019 207

7/3/2019 7/22/2019 7/3/2019 7/22/2019

208FS+2
7/3/2019 7/5/2019 7/3/2019 7/5/2019
days

7/3/2019 7/5/2019 7/3/2019 7/5/2019 210SS


211FS+6
7/12/2019 7/14/2019 7/12/2019 7/14/2019
days

7/15/2019 7/18/2019 7/15/2019 7/18/2019 212

7/19/2019 7/22/2019 7/19/2019 7/22/2019 213

214FS+1
7/23/2019 7/23/2019 7/23/2019 7/23/2019
day

11/25/2019 11/25/2019 11/25/2019 11/25/2019

11/26/2019 12/31/2019 11/26/2019 12/31/2019

216FS+1
11/26/2019 12/31/2019 11/26/2019 12/31/2019
day

1/2/2020 2/5/2020 1/2/2020 2/5/2020

218FS+1
1/2/2020 2/5/2020 1/2/2020 2/5/2020
day

1/22/2019 1/10/2020 1/22/2019 1/3/2020

1/22/2019 1/22/2019 1/22/2019 1/22/2019

2/25/2019 3/2/2019 2/18/2019 2/23/2019

2/25/2019 3/2/2019 2/18/2019 2/23/2019 44

2/26/2019 3/2/2019 2/19/2019 2/23/2019 224FF

3/5/2019 4/12/2019 2/26/2019 4/5/2019

3/5/2019 3/15/2019 2/26/2019 3/8/2019


225FS+2
3/5/2019 3/5/2019 2/26/2019 2/26/2019
days

3/5/2019 3/5/2019 2/26/2019 2/26/2019 228SS

229FS+2
3/8/2019 3/10/2019 3/1/2019 3/3/2019
days

3/11/2019 3/13/2019 3/4/2019 3/6/2019 230

3/14/2019 3/15/2019 3/7/2019 3/8/2019 231

3/18/2019 3/28/2019 3/11/2019 3/21/2019

232FS+2
3/18/2019 3/19/2019 3/11/2019 3/12/2019
days

3/18/2019 3/19/2019 3/11/2019 3/12/2019 234SS

235FS+2
3/22/2019 3/24/2019 3/15/2019 3/17/2019
days

236SS+2
3/24/2019 3/26/2019 3/17/2019 3/19/2019
days

3/24/2019 3/26/2019 3/17/2019 3/19/2019 237SS

3/27/2019 3/28/2019 3/20/2019 3/21/2019 238

3/22/2019 3/31/2019 3/15/2019 3/24/2019

234FS+2
3/22/2019 3/23/2019 3/15/2019 3/16/2019
days

3/22/2019 3/23/2019 3/15/2019 3/16/2019 241SS

242FS+2
3/26/2019 3/28/2019 3/19/2019 3/21/2019
days
243SS+2
3/28/2019 3/29/2019 3/21/2019 3/22/2019
days

3/30/2019 3/31/2019 3/23/2019 3/24/2019 244

4/3/2019 4/12/2019 3/27/2019 4/5/2019

245FS+2
4/3/2019 4/4/2019 3/27/2019 3/28/2019
days

4/3/2019 4/4/2019 3/27/2019 3/28/2019 247SS

248FS+2
4/7/2019 4/9/2019 3/31/2019 4/2/2019
days

4/10/2019 4/11/2019 4/3/2019 4/4/2019 249

4/12/2019 4/12/2019 4/5/2019 4/5/2019 250

251FS+1
4/13/2019 4/13/2019 4/6/2019 4/6/2019
day

11/20/2019 11/20/2019 11/20/2019 11/20/2019

12/6/2019 12/22/2019 11/29/2019 12/15/2019

251FS+237
12/6/2019 12/22/2019 11/29/2019 12/15/2019
days

12/25/2019 1/10/2020 12/18/2019 1/3/2020

255FS+2
12/25/2019 1/10/2020 12/18/2019 1/3/2020
days

2/4/2019 7/3/2019 2/4/2019 7/3/2019

2/4/2019 2/4/2019 2/4/2019 2/4/2019


5/16/2019 5/22/2019 5/16/2019 5/22/2019

5/16/2019 5/22/2019 5/16/2019 5/22/2019 37

5/18/2019 5/22/2019 5/18/2019 5/22/2019 261FF

5/24/2019 7/2/2019 5/24/2019 7/2/2019

5/24/2019 6/2/2019 5/24/2019 6/2/2019

262FS+1
5/24/2019 5/24/2019 5/24/2019 5/24/2019
day

5/24/2019 5/24/2019 5/24/2019 5/24/2019 265SS

266FS+2
5/27/2019 5/29/2019 5/27/2019 5/29/2019
days

5/30/2019 6/1/2019 5/30/2019 6/1/2019 267

6/2/2019 6/2/2019 6/2/2019 6/2/2019 268

6/5/2019 6/13/2019 6/5/2019 6/13/2019

269FS+2
6/5/2019 6/5/2019 6/5/2019 6/5/2019
days

6/5/2019 6/6/2019 6/5/2019 6/6/2019 271SS

272FS+2
6/9/2019 6/11/2019 6/9/2019 6/11/2019
days

6/9/2019 6/11/2019 6/9/2019 6/11/2019 273SS

6/9/2019 6/11/2019 6/9/2019 6/11/2019 274SS


6/12/2019 6/13/2019 6/12/2019 6/13/2019 275

6/8/2019 6/18/2019 6/8/2019 6/18/2019

271FS+2
6/8/2019 6/9/2019 6/8/2019 6/9/2019
days

6/8/2019 6/9/2019 6/8/2019 6/9/2019 278SS

279FS+2
6/12/2019 6/14/2019 6/12/2019 6/14/2019
days

280SS+2
6/14/2019 6/16/2019 6/14/2019 6/16/2019
days

6/17/2019 6/18/2019 6/17/2019 6/18/2019 281

6/21/2019 7/2/2019 6/21/2019 7/2/2019

282FS+2
6/21/2019 6/22/2019 6/21/2019 6/22/2019
days

6/23/2019 6/24/2019 6/23/2019 6/24/2019 284

285FS+2
6/27/2019 6/28/2019 6/27/2019 6/28/2019
days

6/29/2019 6/30/2019 6/29/2019 6/30/2019 286

7/1/2019 7/2/2019 7/1/2019 7/2/2019 287

288FS+1
7/3/2019 7/3/2019 7/3/2019 7/3/2019
day

10/23/2018 11/24/2019 10/23/2018 11/24/2019

10/23/2018 6/14/2019 10/23/2018 6/14/2019


10/23/2018 10/23/2018 10/23/2018 10/23/2018

1/9/2019 1/9/2019 1/9/2019 1/9/2019

1/9/2019 1/9/2019 1/9/2019 1/9/2019

3/7/2019 4/3/2019 1/16/2019 2/12/2019

3/7/2019 4/3/2019 1/16/2019 2/12/2019 24

3/21/2019 4/3/2019 1/30/2019 2/12/2019 296FF

4/11/2019 6/14/2019 4/11/2019 6/14/2019

4/11/2019 5/19/2019 4/11/2019 5/19/2019

297FS-4
days;321FS
-4
4/11/2019 4/12/2019 4/11/2019 4/12/2019 days;384FS
-4
days;431FS
-4 days
300SS+1
4/12/2019 4/16/2019 4/12/2019 4/16/2019
day

301FS+7
4/24/2019 5/2/2019 4/24/2019 5/2/2019
days

5/3/2019 5/11/2019 5/3/2019 5/11/2019 302

5/12/2019 5/19/2019 5/12/2019 5/19/2019 303

5/12/2019 6/13/2019 5/12/2019 6/13/2019

5/12/2019 5/13/2019 5/12/2019 5/13/2019 304SS

5/14/2019 5/18/2019 5/14/2019 5/18/2019 306


307FS+7
5/26/2019 6/3/2019 5/26/2019 6/3/2019
days

308SS+2
5/28/2019 6/5/2019 5/28/2019 6/5/2019
days

5/28/2019 6/5/2019 5/28/2019 6/5/2019 309SS

6/6/2019 6/13/2019 6/6/2019 6/13/2019 310

5/12/2019 6/14/2019 5/12/2019 6/14/2019

5/12/2019 5/13/2019 5/12/2019 5/13/2019 306SS

5/14/2019 5/18/2019 5/14/2019 5/18/2019 313

314FS+7
5/26/2019 6/3/2019 5/26/2019 6/3/2019
days

315SS+2
5/28/2019 6/5/2019 5/28/2019 6/5/2019
days

6/6/2019 6/14/2019 6/6/2019 6/14/2019 316

2/26/2019 2/26/2019 2/26/2019 2/26/2019

2/27/2019 4/14/2019 2/27/2019 4/14/2019

2/27/2019 3/19/2019 2/27/2019 3/19/2019

320FS-2
3/18/2019 4/14/2019 3/18/2019 4/14/2019
days

3/8/2019 5/11/2019 3/8/2019 5/11/2019

3/8/2019 4/9/2019 3/8/2019 4/9/2019


321SS-10
3/8/2019 3/9/2019 3/8/2019 3/9/2019
days

3/10/2019 3/16/2019 3/10/2019 3/16/2019 324

325FS+5
3/22/2019 3/28/2019 3/22/2019 3/28/2019
days

3/29/2019 4/4/2019 3/29/2019 4/4/2019 326

4/5/2019 4/9/2019 4/5/2019 4/9/2019 327

4/17/2019 5/11/2019 4/17/2019 5/11/2019

328FS+7
4/17/2019 4/23/2019 4/17/2019 4/23/2019
days

4/24/2019 4/30/2019 4/24/2019 4/30/2019 330

5/1/2019 5/6/2019 5/1/2019 5/6/2019 331

5/7/2019 5/11/2019 5/7/2019 5/11/2019 332

4/11/2019 4/11/2019 4/11/2019 4/11/2019

5/9/2019 5/9/2019 5/9/2019 5/9/2019

10/25/2018 7/26/2019 10/25/2018 7/26/2019

10/25/2018 10/25/2018 10/25/2018 10/25/2018

10/26/2018 4/29/2019 10/26/2018 4/29/2019

292SS+3
10/26/2018 3/24/2019 10/26/2018 3/24/2019
days
3/25/2019 4/29/2019 3/25/2019 4/29/2019 339

4/16/2019 4/16/2019 4/16/2019 4/16/2019

4/16/2019 4/16/2019 4/16/2019 4/16/2019

4/24/2019 6/28/2019 4/24/2019 6/28/2019

340FS-6
4/24/2019 6/28/2019 4/24/2019 6/28/2019
days

5/1/2019 6/30/2019 5/1/2019 6/30/2019

344SS+7
5/1/2019 6/30/2019 5/1/2019 6/30/2019
days

6/21/2019 7/26/2019 6/21/2019 7/26/2019

346FS-10
6/21/2019 7/26/2019 6/21/2019 7/26/2019
days

6/20/2019 6/20/2019 6/20/2019 6/20/2019

6/22/2019 6/22/2019 6/22/2019 6/22/2019

7/3/2019 7/18/2019 7/3/2019 7/18/2019

346FS+2
7/3/2019 7/18/2019 7/3/2019 7/18/2019
days

7/9/2019 7/9/2019 7/9/2019 7/9/2019

4/6/2019 11/24/2019 4/6/2019 11/24/2019

4/6/2019 7/9/2019 4/6/2019 7/9/2019


323FS-4
4/6/2019 6/9/2019 4/6/2019 6/9/2019
days

6/10/2019 7/9/2019 6/10/2019 7/9/2019 356

4/26/2019 10/1/2019 4/26/2019 10/1/2019

356SS+20
4/26/2019 8/30/2019 4/26/2019 8/30/2019
days

8/31/2019 10/1/2019 8/31/2019 10/1/2019 359

5/29/2019 5/29/2019 5/29/2019 5/29/2019

5/29/2019 5/29/2019 5/29/2019 5/29/2019

7/17/2019 8/8/2019 7/17/2019 8/8/2019

357FS+7
7/17/2019 8/8/2019 7/17/2019 8/8/2019
days

7/23/2019 8/8/2019 7/23/2019 8/8/2019

364SS+6
7/23/2019 8/8/2019 7/23/2019 8/8/2019
days

8/3/2019 8/3/2019 8/3/2019 8/3/2019

8/3/2019 8/3/2019 8/3/2019 8/3/2019

8/11/2019 9/20/2019 8/11/2019 9/20/2019

366FS+2
8/11/2019 9/20/2019 8/11/2019 9/20/2019
days

10/3/2019 10/19/2019 10/3/2019 10/19/2019


370FS+12
10/3/2019 10/15/2019 10/3/2019 10/15/2019
days

372FS-6
10/10/2019 10/19/2019 10/10/2019 10/19/2019
days

10/11/2019 10/11/2019 10/11/2019 10/11/2019

10/23/2019 11/24/2019 10/23/2019 11/24/2019

373FS+3
10/23/2019 11/24/2019 10/23/2019 11/24/2019
days

11/15/2019 11/15/2019 11/15/2019 11/15/2019

11/12/2018 9/26/2019 11/12/2018 7/29/2019

11/12/2018 11/12/2018 11/12/2018 11/12/2018

11/12/2018 11/12/2018 11/12/2018 11/12/2018

11/30/2018 11/30/2018 11/30/2018 11/30/2018

3/7/2019 3/18/2019 1/7/2019 1/18/2019

3/7/2019 3/18/2019 1/7/2019 1/18/2019 25

3/9/2019 3/18/2019 1/9/2019 1/18/2019 383FF

1/22/2019 1/22/2019 1/22/2019 1/22/2019

3/24/2019 5/20/2019 1/24/2019 3/22/2019

384FS+5
3/24/2019 4/4/2019 1/24/2019 2/4/2019
days
4/5/2019 4/9/2019 2/5/2019 2/9/2019 387

388SS+1
4/6/2019 4/12/2019 2/6/2019 2/12/2019
day

389FS+7
4/20/2019 5/1/2019 2/20/2019 3/3/2019
days

5/2/2019 5/13/2019 3/4/2019 3/15/2019 390

5/14/2019 5/20/2019 3/16/2019 3/22/2019 391

5/24/2019 7/2/2019 3/26/2019 5/4/2019

392FS+3
5/24/2019 6/4/2019 3/26/2019 4/6/2019
days

6/5/2019 6/16/2019 4/7/2019 4/18/2019 394

6/17/2019 6/28/2019 4/19/2019 4/30/2019 395

6/29/2019 7/2/2019 5/1/2019 5/4/2019 396

7/10/2019 9/26/2019 5/12/2019 7/29/2019

397FS+7
7/10/2019 7/30/2019 5/12/2019 6/1/2019
days

7/31/2019 8/20/2019 6/2/2019 6/22/2019 399

8/21/2019 9/10/2019 6/23/2019 7/13/2019 400

9/11/2019 9/26/2019 7/14/2019 7/29/2019 401

4/13/2019 4/24/2019 2/13/2019 2/24/2019


384FS+25
4/13/2019 4/13/2019 2/13/2019 2/13/2019
days

4/13/2019 4/14/2019 2/13/2019 2/14/2019 404SS

405FS+2
4/17/2019 4/22/2019 2/17/2019 2/22/2019
days

4/17/2019 4/22/2019 2/17/2019 2/22/2019 406SS

4/23/2019 4/24/2019 2/23/2019 2/24/2019 407

4/20/2019 5/11/2019 2/20/2019 3/13/2019

408FS-5
4/20/2019 4/24/2019 2/20/2019 2/24/2019
days

4/25/2019 4/26/2019 2/25/2019 2/26/2019 410

411FS+2
4/29/2019 5/7/2019 3/1/2019 3/9/2019
days

4/29/2019 5/7/2019 3/1/2019 3/9/2019 412SS

5/8/2019 5/11/2019 3/10/2019 3/13/2019 413

5/19/2019 5/29/2019 3/21/2019 3/31/2019

414FS+7
5/19/2019 5/25/2019 3/21/2019 3/27/2019
days

416SS+2
5/21/2019 5/27/2019 3/23/2019 3/29/2019
days

5/21/2019 5/27/2019 3/23/2019 3/29/2019 417SS

5/28/2019 5/29/2019 3/30/2019 3/31/2019 418


3/28/2019 3/28/2019 3/28/2019 3/28/2019

6/2/2019 6/17/2019 4/4/2019 4/19/2019

419FS+3
6/2/2019 6/17/2019 4/4/2019 4/19/2019
days

5/4/2019 5/4/2019 5/4/2019 5/4/2019

7/22/2019 7/22/2019 7/22/2019 7/22/2019

7/22/2019 7/22/2019 7/22/2019 7/22/2019

7/22/2019 7/22/2019 7/22/2019 7/22/2019

1/9/2019 6/13/2019 1/9/2019 6/13/2019

1/9/2019 1/9/2019 1/9/2019 1/9/2019

3/28/2019 4/3/2019 3/28/2019 4/3/2019

3/28/2019 4/3/2019 3/28/2019 4/3/2019 25

3/30/2019 4/3/2019 3/30/2019 4/3/2019 430FF

5/5/2019 6/9/2019 5/5/2019 6/9/2019

5/5/2019 5/17/2019 5/5/2019 5/17/2019

431FS+31
5/5/2019 5/5/2019 5/5/2019 5/5/2019
days

5/5/2019 5/6/2019 5/5/2019 5/6/2019 434SS


435FS+2
5/9/2019 5/11/2019 5/9/2019 5/11/2019
days

5/12/2019 5/14/2019 5/12/2019 5/14/2019 436

5/15/2019 5/17/2019 5/15/2019 5/17/2019 437

5/20/2019 5/29/2019 5/20/2019 5/29/2019

438FS+2
5/20/2019 5/20/2019 5/20/2019 5/20/2019
days

5/20/2019 5/21/2019 5/20/2019 5/21/2019 440SS

441FS+2
5/24/2019 5/26/2019 5/24/2019 5/26/2019
days

5/24/2019 5/26/2019 5/24/2019 5/26/2019 442SS

5/24/2019 5/26/2019 5/24/2019 5/26/2019 443SS

5/27/2019 5/29/2019 5/27/2019 5/29/2019 444

5/23/2019 5/29/2019 5/23/2019 5/29/2019

440FS+2
5/23/2019 5/23/2019 5/23/2019 5/23/2019
days

5/23/2019 5/24/2019 5/23/2019 5/24/2019 447SS

448FS+2
5/27/2019 5/28/2019 5/27/2019 5/28/2019
days

5/27/2019 5/28/2019 5/27/2019 5/28/2019 449SS

5/29/2019 5/29/2019 5/29/2019 5/29/2019 450


6/1/2019 6/9/2019 6/1/2019 6/9/2019

451FS+2
6/1/2019 6/1/2019 6/1/2019 6/1/2019
days

6/1/2019 6/2/2019 6/1/2019 6/2/2019 453SS

454FS+2
6/5/2019 6/6/2019 6/5/2019 6/6/2019
days

6/7/2019 6/8/2019 6/7/2019 6/8/2019 455

6/9/2019 6/9/2019 6/9/2019 6/9/2019 456

6/10/2019 6/13/2019 6/10/2019 6/13/2019 457

2/26/2019 6/11/2019 2/26/2019 6/11/2019

2/26/2019 2/26/2019 2/26/2019 2/26/2019

5/10/2019 6/10/2019 5/10/2019 6/10/2019

5/10/2019 5/17/2019 5/10/2019 5/17/2019

431FS+1
5/10/2019 5/10/2019 5/10/2019 5/10/2019
day

5/10/2019 5/10/2019 5/10/2019 5/10/2019 463SS

464FS+2
5/13/2019 5/14/2019 5/13/2019 5/14/2019
days

5/15/2019 5/16/2019 5/15/2019 5/16/2019 465

5/17/2019 5/17/2019 5/17/2019 5/17/2019 466


5/20/2019 5/25/2019 5/20/2019 5/25/2019

467FS+2
5/20/2019 5/20/2019 5/20/2019 5/20/2019
days

5/20/2019 5/20/2019 5/20/2019 5/20/2019 469SS

470FS+2
5/23/2019 5/24/2019 5/23/2019 5/24/2019
days

5/23/2019 5/24/2019 5/23/2019 5/24/2019 471SS

5/23/2019 5/24/2019 5/23/2019 5/24/2019 472SS

5/25/2019 5/25/2019 5/25/2019 5/25/2019 473

5/23/2019 5/30/2019 5/23/2019 5/30/2019

469FS+2
5/23/2019 5/23/2019 5/23/2019 5/23/2019
days

5/23/2019 5/24/2019 5/23/2019 5/24/2019 476SS

477FS+2
5/27/2019 5/28/2019 5/27/2019 5/28/2019
days

5/27/2019 5/28/2019 5/27/2019 5/28/2019 478SS

5/29/2019 5/30/2019 5/29/2019 5/30/2019 479

6/2/2019 6/10/2019 6/2/2019 6/10/2019

480FS+2
6/2/2019 6/2/2019 6/2/2019 6/2/2019
days

6/2/2019 6/3/2019 6/2/2019 6/3/2019 482SS


483FS+2
6/6/2019 6/7/2019 6/6/2019 6/7/2019
days

6/8/2019 6/9/2019 6/8/2019 6/9/2019 484

6/10/2019 6/10/2019 6/10/2019 6/10/2019 485

486FS+1
6/11/2019 6/11/2019 6/11/2019 6/11/2019
day

3/15/2019 6/14/2019 3/15/2019 6/14/2019

3/15/2019 3/15/2019 3/15/2019 3/15/2019

4/15/2019 4/26/2019 4/15/2019 4/26/2019

4/15/2019 4/26/2019 4/15/2019 4/26/2019 40

4/19/2019 4/26/2019 4/19/2019 4/26/2019 491FF

4/30/2019 6/13/2019 4/30/2019 6/13/2019

4/30/2019 5/11/2019 4/30/2019 5/11/2019

492FS+3
4/30/2019 4/30/2019 4/30/2019 4/30/2019
days

4/30/2019 5/1/2019 4/30/2019 5/1/2019 495SS

496FS+2
5/4/2019 5/6/2019 5/4/2019 5/6/2019
days

5/7/2019 5/9/2019 5/7/2019 5/9/2019 497

5/10/2019 5/11/2019 5/10/2019 5/11/2019 498


5/14/2019 5/25/2019 5/14/2019 5/25/2019

499FS+2
5/14/2019 5/14/2019 5/14/2019 5/14/2019
days

5/14/2019 5/15/2019 5/14/2019 5/15/2019 501SS

502FS+2
5/18/2019 5/20/2019 5/18/2019 5/20/2019
days

503SS+2
5/20/2019 5/22/2019 5/20/2019 5/22/2019
days

5/20/2019 5/22/2019 5/20/2019 5/22/2019 504SS

5/23/2019 5/25/2019 5/23/2019 5/25/2019 505

5/17/2019 5/29/2019 5/17/2019 5/29/2019

501FS+2
5/17/2019 5/17/2019 5/17/2019 5/17/2019
days

5/17/2019 5/19/2019 5/17/2019 5/19/2019 508SS

509FS+2
5/22/2019 5/24/2019 5/22/2019 5/24/2019
days

510SS+2
5/24/2019 5/26/2019 5/24/2019 5/26/2019
days

5/27/2019 5/29/2019 5/27/2019 5/29/2019 511

6/1/2019 6/13/2019 6/1/2019 6/13/2019

512FS+2
6/1/2019 6/1/2019 6/1/2019 6/1/2019
days

6/1/2019 6/3/2019 6/1/2019 6/3/2019 514SS


515FS+2
6/6/2019 6/8/2019 6/6/2019 6/8/2019
days

6/9/2019 6/11/2019 6/9/2019 6/11/2019 516

6/12/2019 6/13/2019 6/12/2019 6/13/2019 517

518FS+1
6/14/2019 6/14/2019 6/14/2019 6/14/2019
day

12/14/2018 5/24/2019 12/14/2018 5/24/2019

12/14/2018 12/14/2018 12/14/2018 12/14/2018

3/23/2019 4/19/2019 3/23/2019 4/19/2019

3/23/2019 4/9/2019 3/23/2019 4/9/2019 36

4/10/2019 4/19/2019 4/10/2019 4/19/2019 523

4/19/2019 5/2/2019 4/19/2019 5/2/2019

524FS-1
4/19/2019 5/2/2019 4/19/2019 5/2/2019
day

5/4/2019 5/23/2019 5/4/2019 5/23/2019

5/4/2019 5/23/2019 5/4/2019 5/23/2019

526FS+1
5/4/2019 5/4/2019
day

5/4/2019 5/4/2019 529SS

530FS+2
5/7/2019 5/16/2019
days
5/17/2019 5/22/2019 531

5/23/2019 5/23/2019 532

533FS+1
5/24/2019 5/24/2019 5/24/2019 5/24/2019
day

1/29/2019 8/4/2019 1/29/2019 7/10/2019

1/29/2019 1/29/2019 1/29/2019 1/29/2019

3/3/2019 3/16/2019 2/6/2019 2/19/2019

3/3/2019 3/16/2019 2/6/2019 2/19/2019 69

3/7/2019 3/16/2019 2/10/2019 2/19/2019 538FF

3/25/2019 4/6/2019 2/28/2019 3/12/2019

539FS+8
3/25/2019 4/6/2019 2/28/2019 3/12/2019
days

4/8/2019 5/9/2019 3/14/2019 4/14/2019

4/8/2019 4/17/2019 3/14/2019 3/23/2019

541FS+1
4/8/2019 4/8/2019 3/14/2019 3/14/2019
day

4/8/2019 4/8/2019 3/14/2019 3/14/2019 544SS

545FS+2
4/11/2019 4/13/2019 3/17/2019 3/19/2019
days

4/14/2019 4/16/2019 3/20/2019 3/22/2019 546


4/17/2019 4/17/2019 3/23/2019 3/23/2019 547

4/18/2019 4/25/2019 3/24/2019 3/31/2019

4/18/2019 4/18/2019 3/24/2019 3/24/2019 548

4/18/2019 4/18/2019 3/24/2019 3/24/2019 550SS

551FS+2
4/21/2019 4/23/2019 3/27/2019 3/29/2019
days

552SS+2
4/23/2019 4/25/2019 3/29/2019 3/31/2019
days

4/23/2019 4/24/2019 3/29/2019 3/30/2019 553SS

4/25/2019 4/25/2019 3/31/2019 3/31/2019 554

4/21/2019 4/28/2019 3/27/2019 4/3/2019

550FS+2
4/21/2019 4/21/2019 3/27/2019 3/27/2019
days

4/21/2019 4/21/2019 3/27/2019 3/27/2019 557SS

558FS+2
4/24/2019 4/25/2019 3/30/2019 3/31/2019
days

559SS+2
4/26/2019 4/27/2019 4/1/2019 4/2/2019
days

4/28/2019 4/28/2019 4/3/2019 4/3/2019 560

5/1/2019 5/9/2019 4/6/2019 4/14/2019

561FS+2
5/1/2019 5/1/2019 4/6/2019 4/6/2019
days
5/1/2019 5/1/2019 4/6/2019 4/6/2019 563SS

564FS+2
5/4/2019 5/5/2019 4/9/2019 4/10/2019
days

5/6/2019 5/8/2019 4/11/2019 4/13/2019 565

5/9/2019 5/9/2019 4/14/2019 4/14/2019 566

5/12/2019 8/3/2019 4/17/2019 7/9/2019

5/12/2019 6/14/2019 4/17/2019 5/20/2019

567FS+2
5/12/2019 5/31/2019 4/17/2019 5/6/2019
days

570SS+14
5/26/2019 6/14/2019 5/1/2019 5/20/2019
days

6/22/2019 8/3/2019 5/28/2019 7/9/2019

571FS+7
6/22/2019 7/16/2019 5/28/2019 6/21/2019
days

573SS+13
7/5/2019 7/29/2019 6/10/2019 7/4/2019
days

7/30/2019 8/3/2019 7/5/2019 7/9/2019 574

575FS+1
8/4/2019 8/4/2019 7/10/2019 7/10/2019
day

1/29/2019 7/10/2019 1/29/2019 7/10/2019

1/29/2019 1/29/2019 1/29/2019 1/29/2019

2/6/2019 2/19/2019 2/6/2019 2/19/2019


2/6/2019 2/19/2019 2/6/2019 2/19/2019 74

2/10/2019 2/19/2019 2/10/2019 2/19/2019 580FF

2/28/2019 3/12/2019 2/28/2019 3/12/2019

581FS+8
2/28/2019 3/12/2019 2/28/2019 3/12/2019
days

3/14/2019 4/14/2019 3/14/2019 4/14/2019

3/14/2019 3/21/2019 3/14/2019 3/21/2019

583FS+1
3/14/2019 3/14/2019 3/14/2019 3/14/2019
day

3/14/2019 3/14/2019 3/14/2019 3/14/2019 586SS

587FS+2
3/17/2019 3/18/2019 3/17/2019 3/18/2019
days

3/19/2019 3/20/2019 3/19/2019 3/20/2019 588

3/21/2019 3/21/2019 3/21/2019 3/21/2019 589

3/24/2019 3/31/2019 3/24/2019 3/31/2019

590FS+2
3/24/2019 3/24/2019 3/24/2019 3/24/2019
days

3/24/2019 3/24/2019 3/24/2019 3/24/2019 592SS

593FS+2
3/27/2019 3/28/2019 3/27/2019 3/28/2019
days

594SS+2
3/29/2019 3/30/2019 3/29/2019 3/30/2019
days
3/29/2019 3/30/2019 3/29/2019 3/30/2019 595SS

3/31/2019 3/31/2019 3/31/2019 3/31/2019 596

3/27/2019 4/3/2019 3/27/2019 4/3/2019

592FS+2
3/27/2019 3/27/2019 3/27/2019 3/27/2019
days

3/27/2019 3/27/2019 3/27/2019 3/27/2019 599SS

600FS+2
3/30/2019 3/31/2019 3/30/2019 3/31/2019
days

601SS+2
4/1/2019 4/2/2019 4/1/2019 4/2/2019
days

4/3/2019 4/3/2019 4/3/2019 4/3/2019 602

4/6/2019 4/14/2019 4/6/2019 4/14/2019

603FS+2
4/6/2019 4/6/2019 4/6/2019 4/6/2019
days

4/7/2019 4/7/2019 4/7/2019 4/7/2019 605

606FS+2
4/10/2019 4/11/2019 4/10/2019 4/11/2019
days

4/12/2019 4/13/2019 4/12/2019 4/13/2019 607

4/14/2019 4/14/2019 4/14/2019 4/14/2019 608

4/17/2019 7/9/2019 4/17/2019 7/9/2019

4/17/2019 5/20/2019 4/17/2019 5/20/2019


609FS+2
4/17/2019 5/6/2019 4/17/2019 5/6/2019
days

612SS+14
5/1/2019 5/20/2019 5/1/2019 5/20/2019
days

5/28/2019 7/9/2019 5/28/2019 7/9/2019

613FS+7
5/28/2019 6/21/2019 5/28/2019 6/21/2019
days

615SS+13
6/10/2019 7/4/2019 6/10/2019 7/4/2019
days

7/5/2019 7/9/2019 7/5/2019 7/9/2019 616

617FS+1
7/10/2019 7/10/2019 7/10/2019 7/10/2019
day

12/13/2018 10/24/2019 12/13/2018 10/17/2019

12/13/2018 12/13/2018 12/13/2018 12/13/2018

12/13/2018 12/13/2018 12/13/2018 12/13/2018

12/13/2018 12/13/2018 12/13/2018 12/13/2018

1/18/2019 1/25/2019 1/11/2019 1/18/2019

81SS-11
1/18/2019 1/25/2019 1/11/2019 1/18/2019 days;85SS-
45 days

1/21/2019 1/25/2019 1/14/2019 1/18/2019 624FF

1/29/2019 2/2/2019 1/22/2019 1/26/2019

625FS+3
1/29/2019 1/29/2019 1/22/2019 1/22/2019
days
1/30/2019 2/2/2019 1/23/2019 1/26/2019 627

2/5/2019 3/7/2019 1/29/2019 2/28/2019

2/5/2019 2/12/2019 1/29/2019 2/5/2019

628FS+2
2/5/2019 2/5/2019 1/29/2019 1/29/2019
days

2/5/2019 2/5/2019 1/29/2019 1/29/2019 631SS

632FS+2
2/8/2019 2/9/2019 2/1/2019 2/2/2019
days

2/10/2019 2/11/2019 2/3/2019 2/4/2019 633

2/12/2019 2/12/2019 2/5/2019 2/5/2019 634

2/15/2019 2/22/2019 2/8/2019 2/15/2019

635FS+2
2/15/2019 2/15/2019 2/8/2019 2/8/2019
days

2/15/2019 2/15/2019 2/8/2019 2/8/2019 637SS

638FS+2
2/18/2019 2/19/2019 2/11/2019 2/12/2019
days

639SS+2
2/20/2019 2/21/2019 2/13/2019 2/14/2019
days

2/22/2019 2/22/2019 2/15/2019 2/15/2019 640

2/25/2019 3/7/2019 2/18/2019 2/28/2019

641FS+2
2/25/2019 2/25/2019 2/18/2019 2/18/2019
days
2/26/2019 2/26/2019 2/19/2019 2/19/2019 643

644FS+2
3/1/2019 3/3/2019 2/22/2019 2/24/2019
days

3/4/2019 3/6/2019 2/25/2019 2/27/2019 645

3/7/2019 3/7/2019 2/28/2019 2/28/2019 646

3/9/2019 3/29/2019 3/2/2019 3/22/2019

3/9/2019 3/29/2019 3/2/2019 3/22/2019

647FS+1
3/9/2019 3/10/2019 3/2/2019 3/3/2019
day

3/9/2019 3/10/2019 3/2/2019 3/3/2019 650SS

651FS+2
3/13/2019 3/18/2019 3/6/2019 3/11/2019
days

652SS+4
3/17/2019 3/22/2019 3/10/2019 3/15/2019
days

653SS+4
3/21/2019 3/26/2019 3/14/2019 3/19/2019
days

3/27/2019 3/29/2019 3/20/2019 3/22/2019 654

655FS+29
4/27/2019 4/27/2019 4/20/2019 4/20/2019
days

656FS+170
10/14/2019 10/14/2019 10/7/2019 10/7/2019
days

10/15/2019 10/19/2019 10/8/2019 10/12/2019

655FS+100
10/15/2019 10/19/2019 10/8/2019 10/12/2019 days;656;65
7
10/15/2019 10/20/2019 10/8/2019 10/13/2019

10/15/2019 10/20/2019 10/8/2019 10/13/2019 659SS

10/17/2019 10/21/2019 10/10/2019 10/14/2019

661SS+2
10/17/2019 10/21/2019 10/10/2019 10/14/2019
days

10/22/2019 10/23/2019 10/15/2019 10/16/2019

663SS+5
10/22/2019 10/23/2019 10/15/2019 10/16/2019
days

665FS+1
10/24/2019 10/24/2019 10/17/2019 10/17/2019
day

1/30/2019 5/2/2019 1/30/2019 5/2/2019

1/30/2019 1/30/2019 1/30/2019 1/30/2019

2/28/2019 3/6/2019 2/28/2019 3/6/2019

2/28/2019 3/6/2019 2/28/2019 3/6/2019 47

3/2/2019 3/6/2019 3/2/2019 3/6/2019 670FF

3/7/2019 4/9/2019 3/7/2019 4/9/2019

3/7/2019 3/16/2019 3/7/2019 3/16/2019

3/7/2019 3/7/2019 3/7/2019 3/7/2019 671

3/7/2019 3/7/2019 3/7/2019 3/7/2019 674SS


675FS+2
3/10/2019 3/12/2019 3/10/2019 3/12/2019
days

3/13/2019 3/15/2019 3/13/2019 3/15/2019 676

3/16/2019 3/16/2019 3/16/2019 3/16/2019 677

3/19/2019 3/27/2019 3/19/2019 3/27/2019

678FS+2
3/19/2019 3/19/2019 3/19/2019 3/19/2019
days

3/19/2019 3/19/2019 3/19/2019 3/19/2019 680SS

681FS+2
3/22/2019 3/24/2019 3/22/2019 3/24/2019
days

682SS+2
3/24/2019 3/26/2019 3/24/2019 3/26/2019
days

3/27/2019 3/27/2019 3/27/2019 3/27/2019 683

3/30/2019 4/9/2019 3/30/2019 4/9/2019

684FS+2
3/30/2019 3/30/2019 3/30/2019 3/30/2019
days

3/31/2019 3/31/2019 3/31/2019 3/31/2019 686

687FS+2
4/3/2019 4/5/2019 4/3/2019 4/5/2019
days

4/6/2019 4/8/2019 4/6/2019 4/8/2019 688

4/9/2019 4/9/2019 4/9/2019 4/9/2019 689

4/11/2019 5/2/2019 4/11/2019 5/2/2019


690FS+1
4/11/2019 4/12/2019 4/11/2019 4/12/2019 day;647FS+
1 day

4/11/2019 4/13/2019 4/11/2019 4/13/2019 692SS

693FS+2
4/16/2019 4/20/2019 4/16/2019 4/20/2019
days

694SS+4
4/20/2019 4/24/2019 4/20/2019 4/24/2019
days

695SS+4
4/24/2019 4/28/2019 4/24/2019 4/28/2019
days

4/29/2019 5/2/2019 4/29/2019 5/2/2019 696

5/2/2019 5/2/2019 5/2/2019 5/2/2019 697

5/30/2019 8/15/2019 5/30/2019 8/15/2019

5/30/2019 5/30/2019 5/30/2019 5/30/2019

6/18/2019 6/22/2019 6/18/2019 6/22/2019

6/18/2019 6/22/2019 6/18/2019 6/22/2019 33;58

6/20/2019 6/22/2019 6/20/2019 6/22/2019 702FF

6/24/2019 7/26/2019 6/24/2019 7/26/2019

6/24/2019 7/3/2019 6/24/2019 7/3/2019

703FS+1
6/24/2019 6/24/2019 6/24/2019 6/24/2019
day

6/24/2019 6/24/2019 6/24/2019 6/24/2019 706SS


707FS+2
6/27/2019 6/29/2019 6/27/2019 6/29/2019
days

6/30/2019 7/2/2019 6/30/2019 7/2/2019 708

7/3/2019 7/3/2019 7/3/2019 7/3/2019 709

7/4/2019 7/13/2019 7/4/2019 7/13/2019

7/4/2019 7/4/2019 7/4/2019 7/4/2019 710

7/4/2019 7/4/2019 7/4/2019 7/4/2019 712SS

713FS+2
7/7/2019 7/9/2019 7/7/2019 7/9/2019
days

714SS+2
7/9/2019 7/11/2019 7/9/2019 7/11/2019
days

7/12/2019 7/13/2019 7/12/2019 7/13/2019 715

7/16/2019 7/26/2019 7/16/2019 7/26/2019

716FS+2
7/16/2019 7/16/2019 7/16/2019 7/16/2019
days

7/16/2019 7/16/2019 7/16/2019 7/16/2019 718SS

719FS+2
7/19/2019 7/21/2019 7/19/2019 7/21/2019
days

7/22/2019 7/24/2019 7/22/2019 7/24/2019 720

7/25/2019 7/26/2019 7/25/2019 7/26/2019 721

7/27/2019 8/15/2019 7/27/2019 8/15/2019


7/27/2019 7/27/2019 7/27/2019 7/27/2019 722

7/27/2019 7/28/2019 7/27/2019 7/28/2019 724SS

725FS+4
8/2/2019 8/6/2019 8/2/2019 8/6/2019
days

726SS+4
8/6/2019 8/10/2019 8/6/2019 8/10/2019
days

727SS+4
8/10/2019 8/13/2019 8/10/2019 8/13/2019
days

8/14/2019 8/15/2019 8/14/2019 8/15/2019 728

8/15/2019 8/15/2019 8/15/2019 8/15/2019 729

2/20/2019 11/5/2019 2/20/2019 11/5/2019

2/20/2019 5/25/2019 2/20/2019 5/25/2019

2/20/2019 4/30/2019 2/20/2019 4/30/2019

5/1/2019 5/25/2019 5/1/2019 5/25/2019 733

3/28/2019 3/28/2019 3/28/2019 3/28/2019

4/11/2019 4/17/2019 4/11/2019 4/17/2019

4/11/2019 4/17/2019 4/11/2019 4/17/2019 51

4/13/2019 4/17/2019 4/13/2019 4/17/2019 737FF

4/18/2019 5/22/2019 4/18/2019 5/22/2019


4/18/2019 4/30/2019 4/18/2019 4/30/2019

4/18/2019 4/18/2019 4/18/2019 4/18/2019 738

4/18/2019 4/18/2019 4/18/2019 4/18/2019 741SS

742FS+2
4/21/2019 4/24/2019 4/21/2019 4/24/2019
days

4/25/2019 4/28/2019 4/25/2019 4/28/2019 743

4/29/2019 4/30/2019 4/29/2019 4/30/2019 744

4/29/2019 5/9/2019 4/29/2019 5/9/2019

4/29/2019 4/29/2019 4/29/2019 4/29/2019 745SS

4/29/2019 4/29/2019 4/29/2019 4/29/2019 747SS

748FS+2
5/2/2019 5/5/2019 5/2/2019 5/5/2019
days

749SS+2
5/4/2019 5/7/2019 5/4/2019 5/7/2019
days

5/4/2019 5/7/2019 5/4/2019 5/7/2019 750SS

5/8/2019 5/9/2019 5/8/2019 5/9/2019 751

4/29/2019 5/9/2019 4/29/2019 5/9/2019

4/29/2019 4/29/2019 4/29/2019 4/29/2019 747SS

4/29/2019 4/29/2019 4/29/2019 4/29/2019 754SS


755FS+2
5/2/2019 5/5/2019 5/2/2019 5/5/2019
days

756SS+2
5/4/2019 5/7/2019 5/4/2019 5/7/2019
days

5/8/2019 5/9/2019 5/8/2019 5/9/2019 757

5/12/2019 5/22/2019 5/12/2019 5/22/2019

758FS+2
5/12/2019 5/12/2019 5/12/2019 5/12/2019
days

5/12/2019 5/12/2019 5/12/2019 5/12/2019 760SS

761FS+2
5/15/2019 5/18/2019 5/15/2019 5/18/2019
days

5/19/2019 5/20/2019 5/19/2019 5/20/2019 762

5/21/2019 5/22/2019 5/21/2019 5/22/2019 763

5/22/2019 5/22/2019 5/22/2019 5/22/2019 764

5/30/2019 5/30/2019 5/30/2019 5/30/2019

6/7/2019 6/18/2019 6/7/2019 6/18/2019

764FS+15
6/7/2019 6/18/2019 6/7/2019 6/18/2019
days;766

6/19/2019 6/19/2019 6/19/2019 6/19/2019 768

7/1/2019 7/4/2019 7/1/2019 7/4/2019

768FS+12
7/1/2019 7/4/2019 7/1/2019 7/4/2019
days;766
10/27/2019 11/5/2019 10/27/2019 11/5/2019

771FS+114
10/27/2019 11/5/2019 10/27/2019 11/5/2019
days

11/5/2019 11/5/2019 11/5/2019 11/5/2019 773

1/28/2019 9/6/2019 1/28/2019 9/6/2019

1/28/2019 4/21/2019 1/28/2019 4/21/2019

1/28/2019 3/28/2019 1/28/2019 3/28/2019

3/29/2019 4/21/2019 3/29/2019 4/21/2019 777

5/1/2019 5/1/2019 5/1/2019 5/1/2019

5/16/2019 5/24/2019 5/16/2019 5/24/2019

5/16/2019 5/24/2019 5/16/2019 5/24/2019 49;779

5/18/2019 5/24/2019 5/18/2019 5/24/2019 781FF

5/28/2019 5/30/2019 5/28/2019 5/30/2019

782FS+3
5/28/2019 5/30/2019 5/28/2019 5/30/2019
days

5/29/2019 5/30/2019 5/29/2019 5/30/2019 784FF

5/28/2019 7/12/2019 5/28/2019 7/12/2019

5/28/2019 6/11/2019 5/28/2019 6/11/2019


5/28/2019 5/28/2019 5/28/2019 5/28/2019 784SS

5/28/2019 5/29/2019 5/28/2019 5/29/2019 788SS

789FS+2
6/1/2019 6/4/2019 6/1/2019 6/4/2019
days

6/5/2019 6/8/2019 6/5/2019 6/8/2019 790

6/9/2019 6/11/2019 6/9/2019 6/11/2019 791

6/14/2019 6/24/2019 6/14/2019 6/24/2019

792FS+2
6/14/2019 6/14/2019 6/14/2019 6/14/2019
days

6/14/2019 6/15/2019 6/14/2019 6/15/2019 794SS

795FS+2
6/18/2019 6/21/2019 6/18/2019 6/21/2019
days

6/18/2019 6/21/2019 6/18/2019 6/21/2019 796SS

6/18/2019 6/21/2019 6/18/2019 6/21/2019 797SS

6/22/2019 6/24/2019 6/22/2019 6/24/2019 798

6/17/2019 6/27/2019 6/17/2019 6/27/2019

794FS+2
6/17/2019 6/17/2019 6/17/2019 6/17/2019
days

6/17/2019 6/18/2019 6/17/2019 6/18/2019 801SS

802FS+2
6/21/2019 6/24/2019 6/21/2019 6/24/2019
days
6/21/2019 6/24/2019 6/21/2019 6/24/2019 803SS

6/25/2019 6/27/2019 6/25/2019 6/27/2019 804

6/30/2019 7/12/2019 6/30/2019 7/12/2019

805FS+2
6/30/2019 6/30/2019 6/30/2019 6/30/2019
days

6/30/2019 7/1/2019 6/30/2019 7/1/2019 807SS

7/2/2019 7/5/2019 7/2/2019 7/5/2019 808

7/6/2019 7/9/2019 7/6/2019 7/9/2019 809

7/10/2019 7/12/2019 7/10/2019 7/12/2019 810

5/29/2019 5/29/2019 5/29/2019 5/29/2019

7/12/2019 7/12/2019 7/12/2019 7/12/2019 811;812

7/16/2019 8/14/2019 7/16/2019 8/14/2019

811FS+3
7/16/2019 8/14/2019 7/16/2019 8/14/2019
days

8/5/2019 9/6/2019 8/5/2019 9/6/2019

815FS-10
8/5/2019 9/6/2019 8/5/2019 9/6/2019
days

8/14/2019 8/14/2019 8/14/2019 8/14/2019 815

818FS+14
8/28/2019 8/28/2019 8/28/2019 8/28/2019
days
9/6/2019 9/6/2019 9/6/2019 9/6/2019 817

11/28/2018 8/31/2019 11/28/2018 8/23/2019

11/28/2018 11/28/2018 11/28/2018 11/28/2018

12/26/2018 12/26/2018 12/26/2018 12/26/2018

1/15/2019 1/27/2019 1/7/2019 1/19/2019

1/15/2019 1/27/2019 1/7/2019 1/19/2019 65

1/18/2019 1/27/2019 1/10/2019 1/19/2019 825FF

2/28/2019 7/11/2019 2/28/2019 7/11/2019

1/30/2019 3/18/2019 1/22/2019 3/10/2019

1/30/2019 2/12/2019 1/22/2019 2/4/2019

826FS+2
1/30/2019 1/30/2019 1/22/2019 1/22/2019
days

1/30/2019 1/31/2019 1/22/2019 1/23/2019 830SS

831FS+2
2/3/2019 2/6/2019 1/26/2019 1/29/2019
days

2/7/2019 2/10/2019 1/30/2019 2/2/2019 832

2/11/2019 2/12/2019 2/3/2019 2/4/2019 833

2/15/2019 2/26/2019 2/7/2019 2/18/2019


834FS+2
2/15/2019 2/15/2019 2/7/2019 2/7/2019
days

2/15/2019 2/16/2019 2/7/2019 2/8/2019 836SS

837FS+2
2/19/2019 2/23/2019 2/11/2019 2/15/2019
days

838SS+1
2/20/2019 2/24/2019 2/12/2019 2/16/2019
day

2/20/2019 2/24/2019 2/12/2019 2/16/2019 839SS

2/25/2019 2/26/2019 2/17/2019 2/18/2019 840

2/18/2019 3/1/2019 2/10/2019 2/21/2019

836FS+2
2/18/2019 2/18/2019 2/10/2019 2/10/2019
days

2/18/2019 2/19/2019 2/10/2019 2/11/2019 843SS

844FS+2
2/22/2019 2/26/2019 2/14/2019 2/18/2019
days

845SS+1
2/23/2019 2/27/2019 2/15/2019 2/19/2019
day

2/28/2019 3/1/2019 2/20/2019 2/21/2019 846

3/4/2019 3/18/2019 2/24/2019 3/10/2019

847FS+2
3/4/2019 3/4/2019 2/24/2019 2/24/2019
days

3/4/2019 3/5/2019 2/24/2019 2/25/2019 849SS

850FS+1
3/7/2019 3/11/2019 2/27/2019 3/3/2019
day
3/12/2019 3/16/2019 3/4/2019 3/8/2019 851

3/17/2019 3/18/2019 3/9/2019 3/10/2019 852

3/21/2019 7/5/2019 3/13/2019 6/27/2019

3/21/2019 7/5/2019 3/13/2019 6/27/2019

853FS+2
3/21/2019 6/3/2019 3/13/2019 5/26/2019
days

856SS+32
4/22/2019 7/5/2019 4/14/2019 6/27/2019
days

5/16/2019 5/16/2019 5/16/2019 5/16/2019

6/13/2019 7/19/2019 6/5/2019 7/11/2019

857FS-23
6/13/2019 7/7/2019 6/5/2019 6/29/2019
days

860SS+6
6/19/2019 7/15/2019 6/11/2019 7/7/2019
days

7/16/2019 7/19/2019 7/8/2019 7/11/2019 861

7/19/2019 7/19/2019 7/11/2019 7/11/2019 862

7/20/2019 8/31/2019 7/12/2019 8/23/2019

7/20/2019 8/31/2019 7/12/2019 8/23/2019 862

2/13/2019 6/22/2019 2/13/2019 6/22/2019

2/13/2019 2/13/2019 2/13/2019 2/13/2019


5/6/2019 5/9/2019 5/6/2019 5/9/2019

5/6/2019 5/9/2019 5/6/2019 5/9/2019 32

5/7/2019 5/9/2019 5/7/2019 5/9/2019 869FF

5/10/2019 5/16/2019 5/10/2019 5/16/2019

5/10/2019 5/16/2019 5/10/2019 5/16/2019 870

5/18/2019 6/22/2019 5/18/2019 6/22/2019

5/18/2019 5/29/2019 5/18/2019 5/29/2019

872FS+1
5/18/2019 5/18/2019 5/18/2019 5/18/2019
day

5/18/2019 5/19/2019 5/18/2019 5/19/2019 875SS

876FS+2
5/22/2019 5/24/2019 5/22/2019 5/24/2019
days

5/25/2019 5/27/2019 5/25/2019 5/27/2019 877

5/28/2019 5/29/2019 5/28/2019 5/29/2019 878

5/28/2019 6/8/2019 5/28/2019 6/8/2019

5/28/2019 5/28/2019 5/28/2019 5/28/2019 879SS

5/28/2019 5/29/2019 5/28/2019 5/29/2019 881SS

882FS+2
6/1/2019 6/4/2019 6/1/2019 6/4/2019
days
883SS+2
6/3/2019 6/6/2019 6/3/2019 6/6/2019
days

6/3/2019 6/6/2019 6/3/2019 6/6/2019 884SS

6/7/2019 6/8/2019 6/7/2019 6/8/2019 885

5/28/2019 6/8/2019 5/28/2019 6/8/2019

5/28/2019 5/28/2019 5/28/2019 5/28/2019 881SS

5/28/2019 5/29/2019 5/28/2019 5/29/2019 888SS

889FS+2
6/1/2019 6/4/2019 6/1/2019 6/4/2019
days

890SS+2
6/3/2019 6/6/2019 6/3/2019 6/6/2019
days

6/7/2019 6/8/2019 6/7/2019 6/8/2019 891

6/11/2019 6/22/2019 6/11/2019 6/22/2019

892FS+2
6/11/2019 6/11/2019 6/11/2019 6/11/2019
days

6/11/2019 6/12/2019 6/11/2019 6/12/2019 894SS

895FS+2
6/15/2019 6/17/2019 6/15/2019 6/17/2019
days

6/18/2019 6/20/2019 6/18/2019 6/20/2019 896

6/21/2019 6/22/2019 6/21/2019 6/22/2019 897

6/22/2019 6/22/2019 6/22/2019 6/22/2019 898


2/13/2019 7/22/2019 2/13/2019 7/22/2019

2/13/2019 2/13/2019 2/13/2019 2/13/2019

5/31/2019 6/6/2019 5/31/2019 6/6/2019

5/31/2019 6/6/2019 5/31/2019 6/6/2019 38

6/2/2019 6/6/2019 6/2/2019 6/6/2019 903FF

6/15/2019 6/15/2019 6/15/2019 6/15/2019

904FS+8
6/15/2019 6/15/2019 6/15/2019 6/15/2019
days

6/15/2019 7/22/2019 6/15/2019 7/22/2019

6/15/2019 6/22/2019 6/15/2019 6/22/2019

904FS+8
6/15/2019 6/15/2019 6/15/2019 6/15/2019
days

6/15/2019 6/15/2019 6/15/2019 6/15/2019 909SS

910FS+2
6/18/2019 6/19/2019 6/18/2019 6/19/2019
days

6/20/2019 6/21/2019 6/20/2019 6/21/2019 911

6/22/2019 6/22/2019 6/22/2019 6/22/2019 912

6/25/2019 7/1/2019 6/25/2019 7/1/2019

913FS+2
6/25/2019 6/25/2019 6/25/2019 6/25/2019
days
6/25/2019 6/26/2019 6/25/2019 6/26/2019 915SS

916FS+2
6/29/2019 6/30/2019 6/29/2019 6/30/2019
days

6/29/2019 6/30/2019 6/29/2019 6/30/2019 917SS

6/29/2019 6/30/2019 6/29/2019 6/30/2019 918SS

7/1/2019 7/1/2019 7/1/2019 7/1/2019 919

7/4/2019 7/11/2019 7/4/2019 7/11/2019

920FS+2
7/4/2019 7/4/2019 7/4/2019 7/4/2019
days

7/4/2019 7/5/2019 7/4/2019 7/5/2019 922SS

923FS+2
7/8/2019 7/9/2019 7/8/2019 7/9/2019
days

7/8/2019 7/9/2019 7/8/2019 7/9/2019 924SS

7/10/2019 7/11/2019 7/10/2019 7/11/2019 925

7/14/2019 7/22/2019 7/14/2019 7/22/2019

926FS+2
7/14/2019 7/14/2019 7/14/2019 7/14/2019
days

7/14/2019 7/14/2019 7/14/2019 7/14/2019 928SS

929FS+2
7/17/2019 7/18/2019 7/17/2019 7/18/2019
days

930SS+2
7/19/2019 7/20/2019 7/19/2019 7/20/2019
days
7/21/2019 7/22/2019 7/21/2019 7/22/2019 931

7/22/2019 7/22/2019 7/22/2019 7/22/2019 932

12/14/2018 10/22/2019 12/14/2018 10/22/2019

1/29/2019 5/21/2019 1/29/2019 5/21/2019

1/29/2019 1/29/2019 1/29/2019 1/29/2019

1/29/2019 1/29/2019 1/29/2019 1/29/2019

1/29/2019 1/29/2019 1/29/2019 1/29/2019

2/27/2019 3/5/2019 2/27/2019 3/5/2019

2/27/2019 3/5/2019 2/27/2019 3/5/2019 30

3/1/2019 3/5/2019 3/1/2019 3/5/2019 940FF

3/23/2019 5/21/2019 3/23/2019 5/21/2019

3/6/2019 3/29/2019 3/6/2019 3/29/2019

3/6/2019 3/12/2019 3/6/2019 3/12/2019 941

944SS+5
3/11/2019 3/18/2019 3/11/2019 3/18/2019
days

945SS+5
3/16/2019 3/23/2019 3/16/2019 3/23/2019
days

3/24/2019 3/29/2019 3/24/2019 3/29/2019 946


3/6/2019 4/7/2019 3/6/2019 4/7/2019

3/6/2019 3/13/2019 3/6/2019 3/13/2019

3/6/2019 3/6/2019 3/6/2019 3/6/2019 944SS

3/6/2019 3/6/2019 3/6/2019 3/6/2019 950SS

951FS+2
3/9/2019 3/10/2019 3/9/2019 3/10/2019
days

3/11/2019 3/12/2019 3/11/2019 3/12/2019 952

3/13/2019 3/13/2019 3/13/2019 3/13/2019 953

3/16/2019 3/23/2019 3/16/2019 3/23/2019

954FS+2
3/16/2019 3/16/2019 3/16/2019 3/16/2019
days

3/16/2019 3/16/2019 3/16/2019 3/16/2019 956SS

957FS+2
3/19/2019 3/20/2019 3/19/2019 3/20/2019
days

958SS+2
3/21/2019 3/22/2019 3/21/2019 3/22/2019
days

3/21/2019 3/22/2019 3/21/2019 3/22/2019 959SS

3/23/2019 3/23/2019 3/23/2019 3/23/2019 960

3/19/2019 3/26/2019 3/19/2019 3/26/2019

956FS+2
3/19/2019 3/19/2019 3/19/2019 3/19/2019
days
3/19/2019 3/19/2019 3/19/2019 3/19/2019 963SS

964FS+2
3/22/2019 3/23/2019 3/22/2019 3/23/2019
days

965SS+2
3/24/2019 3/25/2019 3/24/2019 3/25/2019
days

3/26/2019 3/26/2019 3/26/2019 3/26/2019 966

3/29/2019 4/7/2019 3/29/2019 4/7/2019

967FS+2
3/29/2019 3/29/2019 3/29/2019 3/29/2019
days

3/30/2019 3/30/2019 3/30/2019 3/30/2019 969

970FS+2
4/2/2019 4/3/2019 4/2/2019 4/3/2019
days

4/4/2019 4/5/2019 4/4/2019 4/5/2019 971

4/6/2019 4/7/2019 4/6/2019 4/7/2019 972

3/26/2019 3/29/2019 3/26/2019 3/29/2019

949SS+20
3/26/2019 3/29/2019 3/26/2019 3/29/2019
days

4/2/2019 4/24/2019 4/2/2019 4/24/2019

975FS+3
4/2/2019 4/24/2019 4/2/2019 4/24/2019
days

5/1/2019 5/6/2019 5/1/2019 5/6/2019

977FS+6
5/1/2019 5/6/2019 5/1/2019 5/6/2019
days
5/4/2019 5/4/2019 5/4/2019 5/4/2019

5/13/2019 5/21/2019 5/13/2019 5/21/2019

979FS+6
5/13/2019 5/21/2019 5/13/2019 5/21/2019
days

5/21/2019 5/21/2019 5/21/2019 5/21/2019 982

1/28/2019 7/5/2019 1/28/2019 7/5/2019

1/28/2019 1/28/2019 1/28/2019 1/28/2019

2/26/2019 3/5/2019 2/26/2019 3/5/2019

2/26/2019 3/5/2019 2/26/2019 3/5/2019 64

3/1/2019 3/5/2019 3/1/2019 3/5/2019 987FF

3/7/2019 4/9/2019 3/7/2019 4/9/2019

3/7/2019 3/14/2019 3/7/2019 3/14/2019

988FS+1
3/7/2019 3/7/2019 3/7/2019 3/7/2019
day

3/7/2019 3/7/2019 3/7/2019 3/7/2019 991SS

992FS+2
3/10/2019 3/11/2019 3/10/2019 3/11/2019
days

3/12/2019 3/13/2019 3/12/2019 3/13/2019 993

3/14/2019 3/14/2019 3/14/2019 3/14/2019 994


3/17/2019 3/24/2019 3/17/2019 3/24/2019

995FS+2
3/17/2019 3/17/2019 3/17/2019 3/17/2019
days

3/17/2019 3/17/2019 3/17/2019 3/17/2019 997SS

998FS+2
3/20/2019 3/21/2019 3/20/2019 3/21/2019
days

999SS+2
3/22/2019 3/23/2019 3/22/2019 3/23/2019
days

3/22/2019 3/23/2019 3/22/2019 3/23/2019 1000SS

3/24/2019 3/24/2019 3/24/2019 3/24/2019 1001

3/20/2019 3/27/2019 3/20/2019 3/27/2019

997FS+2
3/20/2019 3/20/2019 3/20/2019 3/20/2019
days

3/20/2019 3/20/2019 3/20/2019 3/20/2019 1004SS

1005FS+2
3/23/2019 3/24/2019 3/23/2019 3/24/2019
days

1006SS+2
3/25/2019 3/26/2019 3/25/2019 3/26/2019
days

3/27/2019 3/27/2019 3/27/2019 3/27/2019 1007

3/30/2019 4/9/2019 3/30/2019 4/9/2019

1008FS+2
3/30/2019 3/30/2019 3/30/2019 3/30/2019
days

3/30/2019 3/30/2019 3/30/2019 3/30/2019 1010SS


1011FS+4
4/4/2019 4/5/2019 4/4/2019 4/5/2019
days

4/6/2019 4/7/2019 4/6/2019 4/7/2019 1012

4/8/2019 4/9/2019 4/8/2019 4/9/2019 1013

3/29/2019 3/29/2019 3/29/2019 3/29/2019

4/12/2019 5/13/2019 4/12/2019 5/13/2019

1014FS+2
4/12/2019 5/13/2019 4/12/2019 5/13/2019
days

5/6/2019 5/6/2019 5/6/2019 5/6/2019

5/16/2019 5/30/2019 5/16/2019 5/30/2019

1017FS+2
5/16/2019 5/30/2019 5/16/2019 5/30/2019
days

5/30/2019 5/30/2019 5/30/2019 5/30/2019 1020

5/30/2019 5/30/2019 5/30/2019 5/30/2019 1021SS

6/19/2019 7/5/2019 6/19/2019 7/5/2019

1020FS+19
6/19/2019 6/30/2019 6/19/2019 6/30/2019
days

7/1/2019 7/5/2019 7/1/2019 7/5/2019 1024

7/5/2019 7/5/2019 7/5/2019 7/5/2019 1025

12/14/2018 8/16/2019 12/14/2018 8/16/2019


12/14/2018 4/8/2019 12/14/2018 4/8/2019

12/14/2018 3/13/2019 12/14/2018 3/13/2019

3/14/2019 4/8/2019 3/14/2019 4/8/2019 1029

12/29/2018 4/22/2019 12/29/2018 4/22/2019

1029SS+15
12/29/2018 3/28/2019 12/29/2018 3/28/2019
days

3/29/2019 4/22/2019 3/29/2019 4/22/2019 1032

1/28/2019 1/28/2019 1/28/2019 1/28/2019

1/28/2019 1/28/2019 1/28/2019 1/28/2019

2/8/2019 2/19/2019 2/8/2019 2/19/2019

2/8/2019 2/19/2019 2/8/2019 2/19/2019 68;73

2/10/2019 2/19/2019 2/10/2019 2/19/2019 1037FF

2/20/2019 4/13/2019 2/20/2019 4/13/2019

2/20/2019 3/7/2019 2/20/2019 3/7/2019

2/20/2019 2/20/2019 2/20/2019 2/20/2019 1038

2/20/2019 2/21/2019 2/20/2019 2/21/2019 1041SS

1042FS+2
2/24/2019 2/28/2019 2/24/2019 2/28/2019
days
3/1/2019 3/5/2019 3/1/2019 3/5/2019 1043

3/6/2019 3/7/2019 3/6/2019 3/7/2019 1044

3/10/2019 3/21/2019 3/10/2019 3/21/2019

1045FS+2
3/10/2019 3/10/2019 3/10/2019 3/10/2019
days

3/10/2019 3/10/2019 3/10/2019 3/10/2019 1047SS

1048FS+2
3/13/2019 3/17/2019 3/13/2019 3/17/2019
days

1049SS+2
3/15/2019 3/19/2019 3/15/2019 3/19/2019
days

3/15/2019 3/19/2019 3/15/2019 3/19/2019 1050SS

3/20/2019 3/21/2019 3/20/2019 3/21/2019 1051

3/13/2019 3/25/2019 3/13/2019 3/25/2019

1047FS+2
3/13/2019 3/13/2019 3/13/2019 3/13/2019
days

3/13/2019 3/14/2019 3/13/2019 3/14/2019 1054SS

1055FS+2
3/17/2019 3/21/2019 3/17/2019 3/21/2019
days

1056SS+2
3/19/2019 3/23/2019 3/19/2019 3/23/2019
days

3/24/2019 3/25/2019 3/24/2019 3/25/2019 1057

3/28/2019 4/13/2019 3/28/2019 4/13/2019


1058FS+2
3/28/2019 3/28/2019 3/28/2019 3/28/2019
days

3/28/2019 3/29/2019 3/28/2019 3/29/2019 1060SS

1061FS+2
4/1/2019 4/5/2019 4/1/2019 4/5/2019
days

4/6/2019 4/10/2019 4/6/2019 4/10/2019 1062

4/11/2019 4/13/2019 4/11/2019 4/13/2019 1063

3/29/2019 3/29/2019 3/29/2019 3/29/2019

4/3/2019 4/12/2019 4/3/2019 4/12/2019

1065FS+5
4/3/2019 4/12/2019 4/3/2019 4/12/2019
days

4/16/2019 5/1/2019 4/16/2019 5/1/2019

4/16/2019 4/21/2019 4/16/2019 4/21/2019

1067FS+3
4/16/2019 4/16/2019 4/16/2019 4/16/2019
days

4/16/2019 4/16/2019 4/16/2019 4/16/2019 1070SS

1071FS+2
4/19/2019 4/19/2019 4/19/2019 4/19/2019
days

4/20/2019 4/20/2019 4/20/2019 4/20/2019 1072

4/21/2019 4/21/2019 4/21/2019 4/21/2019 1073

4/24/2019 4/30/2019 4/24/2019 4/30/2019


1074FS+2
4/24/2019 4/24/2019 4/24/2019 4/24/2019
days

4/24/2019 4/24/2019 4/24/2019 4/24/2019 1076SS

1077FS+2
4/27/2019 4/27/2019 4/27/2019 4/27/2019
days

1078SS+2
4/29/2019 4/29/2019 4/29/2019 4/29/2019
days

4/29/2019 4/29/2019 4/29/2019 4/29/2019 1079SS

4/30/2019 4/30/2019 4/30/2019 4/30/2019 1080

4/25/2019 5/1/2019 4/25/2019 5/1/2019

4/25/2019 4/25/2019 4/25/2019 4/25/2019 1076

4/25/2019 4/25/2019 4/25/2019 4/25/2019 1083SS

1084FS+2
4/28/2019 4/28/2019 4/28/2019 4/28/2019
days

1085SS+2
4/30/2019 4/30/2019 4/30/2019 4/30/2019
days

5/1/2019 5/1/2019 5/1/2019 5/1/2019 1086

4/16/2019 4/25/2019 4/16/2019 4/25/2019

4/16/2019 4/25/2019 4/16/2019 4/25/2019

4/16/2019 4/16/2019 4/16/2019 4/16/2019 1070SS

4/16/2019 4/16/2019 4/16/2019 4/16/2019 1090SS


1091FS+2
4/19/2019 4/21/2019 4/19/2019 4/21/2019
days

4/22/2019 4/24/2019 4/22/2019 4/24/2019 1092

4/25/2019 4/25/2019 4/25/2019 4/25/2019 1093

4/26/2019 5/16/2019 4/26/2019 5/16/2019

4/26/2019 5/16/2019 4/26/2019 5/16/2019 1094

5/6/2019 5/6/2019 5/6/2019 5/6/2019

5/18/2019 6/2/2019 5/18/2019 6/2/2019

1096FS+1
5/18/2019 6/2/2019 5/18/2019 6/2/2019
day

5/25/2019 5/25/2019 5/25/2019 5/25/2019

5/30/2019 5/30/2019 5/30/2019 5/30/2019

6/6/2019 6/16/2019 6/6/2019 6/16/2019

1099FS+3
6/6/2019 6/16/2019 6/6/2019 6/16/2019
days

6/14/2019 6/14/2019 6/14/2019 6/14/2019

6/20/2019 7/5/2019 6/20/2019 7/5/2019

1103FS+3
6/20/2019 7/5/2019 6/20/2019 7/5/2019
days

7/5/2019 7/5/2019 7/5/2019 7/5/2019 1106


1107FS+12
7/18/2019 8/16/2019 7/18/2019 8/16/2019
days

1/28/2019 10/22/2019 1/28/2019 10/22/2019

1/28/2019 1/28/2019 1/28/2019 1/28/2019

3/8/2019 3/21/2019 3/8/2019 3/21/2019

3/8/2019 3/21/2019 3/8/2019 3/21/2019 66

3/12/2019 3/21/2019 3/12/2019 3/21/2019 1112FF

3/22/2019 5/10/2019 3/22/2019 5/10/2019

3/22/2019 4/6/2019 3/22/2019 4/6/2019

3/22/2019 3/22/2019 3/22/2019 3/22/2019 1113

3/22/2019 3/23/2019 3/22/2019 3/23/2019 1116SS

1117FS+2
3/26/2019 3/30/2019 3/26/2019 3/30/2019
days

3/31/2019 4/4/2019 3/31/2019 4/4/2019 1118

4/5/2019 4/6/2019 4/5/2019 4/6/2019 1119

4/9/2019 4/21/2019 4/9/2019 4/21/2019

1120FS+2
4/9/2019 4/9/2019 4/9/2019 4/9/2019
days

4/9/2019 4/10/2019 4/9/2019 4/10/2019 1122SS


1123FS+2
4/13/2019 4/17/2019 4/13/2019 4/17/2019
days

1124SS+2
4/15/2019 4/19/2019 4/15/2019 4/19/2019
days

4/15/2019 4/19/2019 4/15/2019 4/19/2019 1125SS

4/20/2019 4/21/2019 4/20/2019 4/21/2019 1126

4/12/2019 4/23/2019 4/12/2019 4/23/2019

1122FS+2
4/12/2019 4/12/2019 4/12/2019 4/12/2019
days

4/12/2019 4/13/2019 4/12/2019 4/13/2019 1129SS

1130FS+2
4/16/2019 4/20/2019 4/16/2019 4/20/2019
days

1131SS+1
4/17/2019 4/21/2019 4/17/2019 4/21/2019
day

4/22/2019 4/23/2019 4/22/2019 4/23/2019 1132

4/26/2019 5/10/2019 4/26/2019 5/10/2019

1133FS+2
4/26/2019 4/26/2019 4/26/2019 4/26/2019
days

4/26/2019 4/27/2019 4/26/2019 4/27/2019 1135SS

1136FS+1
4/29/2019 5/3/2019 4/29/2019 5/3/2019
day

5/4/2019 5/8/2019 5/4/2019 5/8/2019 1137

5/9/2019 5/10/2019 5/9/2019 5/10/2019 1138


3/29/2019 3/29/2019 3/29/2019 3/29/2019

5/12/2019 8/27/2019 5/12/2019 8/27/2019

5/12/2019 8/27/2019 5/12/2019 8/27/2019

1139FS+1
5/12/2019 7/26/2019 5/12/2019 7/26/2019 day;2021FS
+1 day

1143SS+32
6/13/2019 8/27/2019 6/13/2019 8/27/2019
days

5/30/2019 5/30/2019 5/30/2019 5/30/2019

6/20/2019 9/10/2019 6/20/2019 9/10/2019

1142SS+39
6/20/2019 8/18/2019 6/20/2019 8/18/2019
days

1147SS+10
6/30/2019 8/28/2019 6/30/2019 8/28/2019
days

8/29/2019 9/10/2019 8/29/2019 9/10/2019 1148

9/10/2019 9/10/2019 9/10/2019 9/10/2019 1149

9/11/2019 10/22/2019 9/11/2019 10/22/2019

9/11/2019 10/22/2019 9/11/2019 10/22/2019 1149

8/17/2017 4/16/2020 8/17/2017 4/16/2020

1/28/2019 7/9/2019 1/28/2019 7/1/2019

1/28/2019 1/28/2019 1/28/2019 1/28/2019


1/29/2019 4/25/2019 1/29/2019 4/25/2019

1/29/2019 3/29/2019 1/29/2019 3/29/2019

3/30/2019 4/25/2019 3/30/2019 4/25/2019 1157

1/29/2019 4/25/2019 1/29/2019 4/25/2019

1/29/2019 3/29/2019 1/29/2019 3/29/2019 1157SS

3/30/2019 4/25/2019 3/30/2019 4/25/2019 1160

2/27/2019 3/7/2019 2/19/2019 2/27/2019

2/27/2019 3/7/2019 2/19/2019 2/27/2019 83

3/1/2019 3/7/2019 2/21/2019 2/27/2019 1163FF

2/20/2019 2/20/2019 2/20/2019 2/20/2019

3/8/2019 4/19/2019 2/28/2019 4/11/2019

3/8/2019 3/19/2019 2/28/2019 3/11/2019

3/8/2019 3/8/2019 2/28/2019 2/28/2019 1164

3/8/2019 3/9/2019 2/28/2019 3/1/2019 1168SS

1169FS+2
3/12/2019 3/14/2019 3/4/2019 3/6/2019
days

3/15/2019 3/17/2019 3/7/2019 3/9/2019 1170


3/18/2019 3/19/2019 3/10/2019 3/11/2019 1171

3/22/2019 4/1/2019 3/14/2019 3/24/2019

1172FS+2
3/22/2019 3/22/2019 3/14/2019 3/14/2019
days

3/22/2019 3/23/2019 3/14/2019 3/15/2019 1174SS

1175FS+2
3/26/2019 3/28/2019 3/18/2019 3/20/2019
days

1176SS+2
3/28/2019 3/30/2019 3/20/2019 3/22/2019
days

3/28/2019 3/30/2019 3/20/2019 3/22/2019 1177SS

3/31/2019 4/1/2019 3/23/2019 3/24/2019 1178

3/25/2019 4/4/2019 3/17/2019 3/27/2019

1174FS+2
3/25/2019 3/25/2019 3/17/2019 3/17/2019
days

3/25/2019 3/26/2019 3/17/2019 3/18/2019 1181SS

1182FS+2
3/29/2019 3/31/2019 3/21/2019 3/23/2019
days

1183SS+2
3/31/2019 4/2/2019 3/23/2019 3/25/2019
days

4/3/2019 4/4/2019 3/26/2019 3/27/2019 1184

4/7/2019 4/19/2019 3/30/2019 4/11/2019

1185FS+2
4/7/2019 4/7/2019 3/30/2019 3/30/2019
days
4/7/2019 4/8/2019 3/30/2019 3/31/2019 1187SS

1188FS+2
4/11/2019 4/13/2019 4/3/2019 4/5/2019
days

4/14/2019 4/16/2019 4/6/2019 4/8/2019 1189

4/17/2019 4/19/2019 4/9/2019 4/11/2019 1190

3/28/2019 3/28/2019 3/28/2019 3/28/2019

3/28/2019 3/28/2019 3/28/2019 3/28/2019

4/7/2019 4/27/2019 3/30/2019 4/19/2019

1191FS-13
4/7/2019 4/27/2019 3/30/2019 4/19/2019
days

4/10/2019 4/10/2019 4/10/2019 4/10/2019

4/29/2019 5/19/2019 4/21/2019 5/11/2019

4/29/2019 5/19/2019 4/21/2019 5/11/2019

1195FS+1
4/29/2019 4/29/2019 4/21/2019 4/21/2019
day

4/29/2019 5/1/2019 4/21/2019 4/23/2019 1199SS

1200FS+2
5/4/2019 5/9/2019 4/26/2019 5/1/2019
days

5/10/2019 5/15/2019 5/2/2019 5/7/2019 1201

5/16/2019 5/19/2019 5/8/2019 5/11/2019 1202


5/3/2019 5/19/2019 4/25/2019 5/11/2019

1195FS+5
5/3/2019 5/19/2019 4/25/2019 5/11/2019
days

5/21/2019 6/7/2019 5/13/2019 5/30/2019

1205FS+1
5/21/2019 6/7/2019 5/13/2019 5/30/2019
day

5/21/2019 5/27/2019 5/13/2019 5/19/2019

5/21/2019 5/27/2019 5/13/2019 5/19/2019 1207SS

5/21/2019 6/3/2019 5/13/2019 5/26/2019

5/21/2019 5/27/2019 5/13/2019 5/19/2019 1209SS

1211SS+1
5/22/2019 5/28/2019 5/14/2019 5/20/2019
day

1212SS+3
5/25/2019 5/31/2019 5/17/2019 5/23/2019
days

6/1/2019 6/3/2019 5/24/2019 5/26/2019 1213

5/23/2019 5/23/2019 5/23/2019 5/23/2019

6/9/2019 6/17/2019 6/1/2019 6/9/2019

1207FS+1
6/9/2019 6/17/2019 6/1/2019 6/9/2019
day

6/21/2019 7/9/2019 6/13/2019 7/1/2019

1217FS+3
6/21/2019 7/9/2019 6/13/2019 7/1/2019
days
7/9/2019 7/9/2019 7/1/2019 7/1/2019 1219

8/17/2017 4/16/2020 8/17/2017 4/16/2020

10/20/2018 1/9/2019 10/20/2018 1/9/2019

10/20/2018 12/1/2018 10/20/2018 12/1/2018

1223SS+13
11/2/2018 12/22/2018 11/2/2018 12/22/2018
days

1224SS+29
12/1/2018 1/9/2019 12/1/2018 1/9/2019
days

1/10/2019 5/25/2019 1/10/2019 5/25/2019

1/10/2019 1/12/2019 1/10/2019 1/12/2019 1225

1/13/2019 1/23/2019 1/13/2019 1/23/2019 1227

1/24/2019 1/30/2019 1/24/2019 1/30/2019 1228

1/31/2019 2/5/2019 1/31/2019 2/5/2019 1229

2/6/2019 2/19/2019 2/6/2019 2/19/2019 1230

2/20/2019 3/2/2019 2/20/2019 3/2/2019 1231

3/3/2019 3/19/2019 3/3/2019 3/19/2019 1232

3/20/2019 4/4/2019 3/20/2019 4/4/2019 1233

4/5/2019 4/23/2019 4/5/2019 4/23/2019 1234


4/24/2019 5/16/2019 4/24/2019 5/16/2019 1235

5/17/2019 5/25/2019 5/17/2019 5/25/2019 1236

5/5/2019 7/18/2019 5/5/2019 7/18/2019

5/26/2019 7/18/2019 5/26/2019 7/18/2019

5/26/2019 5/29/2019 5/26/2019 5/29/2019 1237

5/30/2019 6/26/2019 5/30/2019 6/26/2019 1240

1241SS+22
6/21/2019 7/8/2019 6/21/2019 7/8/2019
days

7/9/2019 7/9/2019 7/9/2019 7/9/2019 1242

7/10/2019 7/11/2019 7/10/2019 7/11/2019 1243

7/12/2019 7/18/2019 7/12/2019 7/18/2019 1244

5/5/2019 7/12/2019 5/5/2019 7/12/2019

7/9/2019 7/12/2019 7/9/2019 7/12/2019 20;1243SS

7/9/2019 7/12/2019 7/9/2019 7/12/2019 1247SS

5/5/2019 5/16/2019 5/5/2019 5/16/2019 1236FF

1249SS+17
5/22/2019 6/8/2019 5/22/2019 6/8/2019
days

6/9/2019 6/9/2019 6/9/2019 6/9/2019 1250


6/10/2019 6/10/2019 6/10/2019 6/10/2019 1251

6/11/2019 6/13/2019 6/11/2019 6/13/2019 1252

6/14/2019 6/20/2019 6/14/2019 6/20/2019 1253

8/17/2017 4/16/2020 8/17/2017 4/16/2020

7/13/2018 10/25/2018 7/13/2018 10/25/2018

11/14/2018 3/8/2019 11/4/2018 2/16/2019

1/2/2019 1/6/2019 1/3/2019 1/7/2019 37SS

60SS+3
12/4/2018 12/18/2018 11/4/2018 11/18/2018
days

11/14/2018 12/4/2018 11/14/2018 12/4/2018 61SS+1 day

11/14/2018 12/11/2018 11/14/2018 12/11/2018 62SS+1 day

1/13/2019 1/19/2019 12/7/2018 12/13/2018 63FF

1/3/2019 1/4/2019 11/28/2018 11/29/2018 64FS+1 day

1/16/2019 1/17/2019 12/9/2018 12/10/2018 65FS+1 day

1/11/2019 1/15/2019 12/8/2018 12/12/2018 66

3/2/2019 3/8/2019 12/12/2018 12/18/2018 67FS+1 day

68SS+4
1/15/2019 1/21/2019 12/12/2018 12/18/2018
days
2/26/2019 3/2/2019 12/17/2018 12/21/2018 69FF

3/2/2019 3/6/2019 12/11/2018 12/15/2018 70SS

71SS+4
12/7/2018 12/18/2018 12/17/2018 12/28/2018
days

1/25/2019 2/11/2019 12/15/2018 1/1/2019 72SS+1 day

1/20/2019 2/16/2019 12/21/2018 1/17/2019 73SS+1 day

1/22/2019 1/24/2019 1/2/2019 1/4/2019 74FF

12/28/2018 12/29/2018 1/14/2019 1/15/2019 75FS+1 day

2/25/2019 2/25/2019 1/9/2019 1/9/2019 76FS+1 day

2/12/2019 2/16/2019 2/12/2019 2/16/2019 77

2/7/2019 2/16/2019 2/6/2019 2/15/2019 78FS+1 day

79SS+4
12/8/2018 12/14/2018 1/12/2019 1/18/2019
days

2/25/2019 3/1/2019 1/29/2019 2/2/2019 80FF

8/17/2017 4/16/2020 8/17/2017 4/16/2020

1/24/2019 1/28/2019 12/14/2018 12/18/2018 72SS

83SS+3
2/14/2019 2/28/2019 1/31/2019 2/14/2019
days

2/23/2019 3/15/2019 2/6/2019 2/26/2019 84SS+1 day


1/15/2019 2/11/2019 2/7/2019 3/6/2019 85SS+1 day

2/10/2019 2/16/2019 3/19/2019 3/25/2019 86FF

2/25/2019 2/26/2019 5/2/2019 5/3/2019 87FS+1 day

5/18/2019 5/19/2019 5/18/2019 5/19/2019 88FS+1 day

8/2/2019 8/6/2019 8/2/2019 8/6/2019 89

2/2/2020 2/8/2020 2/2/2020 2/8/2020 90FS+1 day

91SS+4
8/1/2019 8/7/2019 8/1/2019 8/7/2019
days

10/26/2019 10/30/2019 10/26/2019 10/30/2019 92FF

1/17/2020 1/21/2020 1/17/2020 1/21/2020 93SS

94SS+4
11/1/2019 11/12/2019 11/1/2019 11/12/2019
days

2/1/2020 2/18/2020 2/1/2020 2/18/2020 95SS+1 day

12/10/2019 1/6/2020 12/10/2019 1/6/2020 96SS+1 day

12/6/2019 12/9/2019 12/6/2019 12/9/2019 97FF

4/15/2020 4/16/2020 4/15/2020 4/16/2020 98FS+1 day

4/14/2020 4/14/2020 4/14/2020 4/14/2020 99FS+1 day

4/11/2018 4/15/2018 4/11/2018 4/15/2018 100


101FS+1
8/17/2017 8/26/2017 8/17/2017 8/26/2017
day

102SS+4
8/20/2017 8/26/2017 8/20/2017 8/26/2017
days

7/13/2018 7/17/2018 7/13/2018 7/17/2018 103FF

3/11/2019 6/12/2019 12/22/2018 6/12/2019

6/10/2019 6/12/2019 6/10/2019 6/12/2019 205SS

170FS+3
4/4/2019 4/8/2019 3/18/2019 3/22/2019
days

107SS+1
3/11/2019 3/17/2019 12/22/2018 12/28/2018
day

108FS+1
3/26/2019 4/1/2019 1/6/2019 1/12/2019
day

109FS+1
3/26/2019 3/28/2019 1/6/2019 1/8/2019
day

110FS+1
4/27/2019 5/3/2019 2/7/2019 2/13/2019
day

3/31/2019 4/2/2019 1/11/2019 1/13/2019 111FF

112FS+1
3/28/2019 3/29/2019 1/8/2019 1/9/2019
day

113FS+1
3/28/2019 3/28/2019 1/8/2019 1/8/2019
day

3/31/2019 4/4/2019 1/11/2019 1/15/2019 114

115FS+1
4/3/2019 4/5/2019 1/14/2019 1/16/2019
day

3/31/2019 4/2/2019 1/11/2019 1/13/2019 116FF


4/10/2019 4/12/2019 1/21/2019 1/23/2019 117FF

4/5/2019 4/7/2019 1/16/2019 1/18/2019 118SS

119SS+3
4/8/2019 4/14/2019 1/19/2019 1/25/2019
days

120SS+1
4/9/2019 4/12/2019 1/20/2019 1/23/2019
day

121SS+1
4/11/2019 4/17/2019 1/22/2019 1/28/2019
day

4/10/2019 4/11/2019 1/21/2019 1/22/2019 122FF

123FS+1
4/14/2019 4/14/2019 1/25/2019 1/25/2019
day

124FS+1
4/17/2019 4/17/2019 1/28/2019 1/28/2019
day

4/9/2019 4/13/2019 1/20/2019 1/24/2019 125

126FS+1
4/10/2019 4/12/2019 1/21/2019 1/23/2019
day

4/10/2019 4/12/2019 1/21/2019 1/23/2019 127FF

4/12/2019 4/14/2019 1/23/2019 1/25/2019 128FF

1/17/2019 5/31/2019 1/17/2019 3/13/2019

2/6/2019 2/10/2019 2/5/2019 2/9/2019 78

131SS+3
4/21/2019 4/30/2019 2/1/2019 2/10/2019
days

132SS+1
4/19/2019 5/2/2019 1/30/2019 2/12/2019
day
133SS+1
4/22/2019 5/12/2019 2/2/2019 2/22/2019
day

4/18/2019 4/24/2019 1/29/2019 2/4/2019 134FF

135FS+1
4/27/2019 4/28/2019 2/7/2019 2/8/2019
day

136FS+1
4/27/2019 4/28/2019 2/7/2019 2/8/2019
day

1/28/2019 2/1/2019 1/28/2019 2/1/2019 137

138FS+1
4/20/2019 4/26/2019 1/31/2019 2/6/2019
day

139SS+4
4/23/2019 4/27/2019 2/3/2019 2/7/2019
days

4/21/2019 4/25/2019 2/1/2019 2/5/2019 140SS

141SS+3
4/26/2019 5/7/2019 2/6/2019 2/17/2019
days

142SS+1
4/26/2019 5/9/2019 2/6/2019 2/19/2019
day

143SS+1
1/17/2019 2/6/2019 1/17/2019 2/6/2019
day

5/17/2019 5/23/2019 2/27/2019 3/5/2019 144FF

145FS+1
5/3/2019 5/4/2019 2/13/2019 2/14/2019
day

146FS+1
5/6/2019 5/6/2019 2/16/2019 2/16/2019
day

5/21/2019 5/25/2019 3/3/2019 3/7/2019 147

148FS+1
5/22/2019 5/31/2019 3/4/2019 3/13/2019
day
149SS+4
5/25/2019 5/29/2019 3/7/2019 3/11/2019
days

12/11/2018 8/4/2019 12/11/2018 8/4/2019

12/11/2018 5/30/2019 12/11/2018 5/30/2019

81SS;104S
1/29/2019 2/2/2019 1/19/2019 1/23/2019
S

153SS+3
3/24/2019 3/30/2019 3/24/2019 3/30/2019
days

154SS+1
3/22/2019 3/31/2019 3/22/2019 3/31/2019
day

155SS+1
3/27/2019 4/9/2019 3/27/2019 4/9/2019
day

5/16/2019 5/17/2019 5/16/2019 5/17/2019 156FF

157FS+1
4/13/2019 4/14/2019 4/13/2019 4/14/2019
day

158FS+1
4/15/2019 4/15/2019 4/15/2019 4/15/2019
day

4/21/2019 4/25/2019 4/21/2019 4/25/2019 159

160FS+1
5/9/2019 5/15/2019 5/9/2019 5/15/2019
day

161SS+4
5/5/2019 5/9/2019 5/5/2019 5/9/2019
days

5/11/2019 5/15/2019 5/11/2019 5/15/2019 162SS

163SS+3
5/21/2019 5/30/2019 5/21/2019 5/30/2019
days

164SS+1
12/11/2018 12/22/2018 12/11/2018 12/22/2018
day
165SS+1
12/11/2018 12/24/2018 12/11/2018 12/24/2018
day

166FS+1
12/14/2018 12/15/2018 12/14/2018 12/15/2018
day

167FS+1
3/19/2019 3/19/2019 3/2/2019 3/2/2019
day

3/18/2019 3/22/2019 3/1/2019 3/5/2019 168

169FS+1
4/2/2019 4/13/2019 3/16/2019 3/27/2019
day

170SS+4
3/23/2019 3/27/2019 3/6/2019 3/10/2019
days

1/29/2019 8/4/2019 1/19/2019 8/4/2019

81SS;104S
1/29/2019 2/2/2019 1/19/2019 1/23/2019
S

173SS+3
4/5/2019 4/11/2019 3/19/2019 3/25/2019
days

174SS+1
4/17/2019 4/26/2019 3/31/2019 4/9/2019
day

175SS+1
4/17/2019 4/30/2019 3/31/2019 4/13/2019
day

4/21/2019 4/22/2019 4/4/2019 4/5/2019 176FF

177FS+1
4/27/2019 4/28/2019 4/10/2019 4/11/2019
day

178FS+1
4/28/2019 4/28/2019 4/11/2019 4/11/2019
day

5/22/2019 5/26/2019 5/5/2019 5/9/2019 179

180FS+1
5/23/2019 5/29/2019 5/6/2019 5/12/2019
day
181SS+4
5/27/2019 5/31/2019 5/10/2019 5/14/2019
days

5/23/2019 5/27/2019 5/6/2019 5/10/2019 182SS

183SS+3
6/6/2019 6/15/2019 5/20/2019 5/29/2019
days

184SS+1
3/30/2019 4/10/2019 3/30/2019 4/10/2019
day

185SS+1
3/30/2019 4/12/2019 3/30/2019 4/12/2019
day

186FS+1
5/9/2019 5/10/2019 5/9/2019 5/10/2019
day

187FS+1
5/9/2019 5/9/2019 5/9/2019 5/9/2019
day

5/8/2019 5/12/2019 5/8/2019 5/12/2019 188

189FS+1
7/24/2019 8/4/2019 7/24/2019 8/4/2019
day

190SS+4
5/13/2019 5/17/2019 5/13/2019 5/17/2019
days

5/12/2019 7/12/2019 5/12/2019 7/12/2019

191FS+1
5/12/2019 5/18/2019 5/12/2019 5/18/2019
day

193FS+1
5/25/2019 5/29/2019 5/25/2019 5/29/2019
day

5/24/2019 6/7/2019 5/24/2019 6/7/2019 194SS

195SS+1
5/30/2019 6/19/2019 5/30/2019 6/19/2019
day

196SS+1
6/6/2019 6/26/2019 6/6/2019 6/26/2019
day
197FS-5
6/3/2019 6/16/2019 6/3/2019 6/16/2019
days

5/25/2019 6/7/2019 5/25/2019 6/7/2019 197FF

199FS+1
6/20/2019 6/26/2019 6/20/2019 6/26/2019
day

200FS+1
6/22/2019 6/22/2019 6/22/2019 6/22/2019
day

201FS+1
6/22/2019 6/23/2019 6/22/2019 6/23/2019
day

6/26/2019 7/2/2019 6/26/2019 7/2/2019 202

203FS+1
7/2/2019 7/4/2019 7/2/2019 7/4/2019
day

204SS+3
6/13/2019 7/12/2019 6/13/2019 7/12/2019
days

5/29/2019 6/12/2019 5/29/2019 6/12/2019 205FF

1/23/2019 1/7/2020 1/20/2019 1/7/2020

4/9/2019 7/27/2019 1/20/2019 7/27/2019

4/9/2019 4/11/2019 1/20/2019 1/22/2019 126

209FS+1
7/24/2019 7/24/2019 7/24/2019 7/24/2019
day

210FS+1
7/7/2019 7/8/2019 7/7/2019 7/8/2019
day

211FS+1
7/7/2019 7/11/2019 7/7/2019 7/11/2019
day

212FS+1
7/16/2019 7/20/2019 7/16/2019 7/20/2019
day
213FS+1
7/20/2019 7/20/2019 7/20/2019 7/20/2019
day

7/23/2019 7/27/2019 7/23/2019 7/27/2019 214

215FS+1
7/25/2019 7/27/2019 7/25/2019 7/27/2019
day

1/23/2019 1/7/2020 1/23/2019 1/7/2020

216FS+1
11/26/2019 11/30/2019 11/26/2019 11/30/2019
day

218FS+1
1/2/2020 1/6/2020 1/2/2020 1/6/2020
day

219SS+3
1/5/2020 1/7/2020 1/5/2020 1/7/2020
days

7/24/2019 7/26/2019 7/24/2019 7/26/2019 215

221SS+1
1/23/2019 1/27/2019 1/23/2019 1/27/2019
day

222FS+1
1/23/2019 1/23/2019 1/23/2019 1/23/2019
day

223FS+1
3/4/2019 3/4/2019 2/25/2019 2/25/2019
day

3/3/2019 3/7/2019 2/24/2019 2/28/2019 224

225FS+1
3/4/2019 3/6/2019 2/25/2019 2/27/2019
day

4/12/2019 4/12/2019 4/5/2019 4/5/2019 226FF

227FS+1
3/17/2019 3/17/2019 3/10/2019 3/10/2019
day

3/3/2019 3/30/2019 2/24/2019 3/23/2019


3/3/2019 3/7/2019 2/24/2019 2/28/2019 225

230SS+3
3/11/2019 3/12/2019 3/4/2019 3/5/2019
days

231SS+1
3/12/2019 3/16/2019 3/5/2019 3/9/2019
day

232SS+1
3/15/2019 3/20/2019 3/8/2019 3/13/2019
day

233FS+1
3/30/2019 3/30/2019 3/23/2019 3/23/2019
day

234FS+1
3/21/2019 3/21/2019 3/14/2019 3/14/2019
day

3/20/2019 3/24/2019 3/13/2019 3/17/2019 235

236FS+1
3/26/2019 3/28/2019 3/19/2019 3/21/2019
day

3/26/2019 3/26/2019 3/19/2019 3/19/2019 237FF

3/26/2019 3/26/2019 3/19/2019 3/19/2019 238FF

7/19/2019 8/5/2019 7/19/2019 8/5/2019

7/19/2019 8/5/2019 7/19/2019 8/5/2019 1245

8/6/2019 9/18/2019 8/6/2019 9/18/2019

8/6/2019 9/18/2019 8/6/2019 9/18/2019 1439

9/18/2019 9/18/2019 9/18/2019 9/18/2019 1441

2/25/2019 8/29/2019 2/25/2019 8/29/2019


2/25/2019 2/25/2019 2/25/2019 2/25/2019

3/26/2019 4/8/2019 3/26/2019 4/8/2019

3/26/2019 4/8/2019 3/26/2019 4/8/2019

4/10/2019 5/3/2019 4/10/2019 5/3/2019

1446FS+1
4/10/2019 5/3/2019 4/10/2019 5/3/2019
day;86

4/13/2019 5/3/2019 4/13/2019 5/3/2019 1448FF

5/5/2019 8/23/2019 5/5/2019 8/23/2019

5/5/2019 6/30/2019 5/5/2019 6/30/2019

1449FS+1
5/5/2019 5/6/2019 5/5/2019 5/6/2019
day

5/5/2019 5/11/2019 5/5/2019 5/11/2019 1452SS

1453FS+7
5/19/2019 6/5/2019 5/19/2019 6/5/2019
days

6/6/2019 6/23/2019 6/6/2019 6/23/2019 1454

6/24/2019 6/30/2019 6/24/2019 6/30/2019 1455

7/8/2019 8/23/2019 7/8/2019 8/23/2019

1456FS+7
7/8/2019 7/9/2019 7/8/2019 7/9/2019
days

7/8/2019 7/12/2019 7/8/2019 7/12/2019 1458SS


1459FS+7
7/20/2019 8/2/2019 7/20/2019 8/2/2019
days

8/3/2019 8/16/2019 8/3/2019 8/16/2019 1460

8/17/2019 8/23/2019 8/17/2019 8/23/2019 1461

8/25/2019 8/29/2019 8/25/2019 8/29/2019

1462FS+1
8/25/2019 8/29/2019 8/25/2019 8/29/2019
day

8/29/2019 8/29/2019 8/29/2019 8/29/2019 1464

1/25/2019 8/5/2019 1/25/2019 8/5/2019

1/25/2019 1/25/2019 1/25/2019 1/25/2019

2/27/2019 3/16/2019 2/27/2019 3/16/2019

1467FS+33
2/27/2019 3/7/2019 2/27/2019 3/7/2019
days;77

3/8/2019 3/16/2019 3/8/2019 3/16/2019 1469

3/20/2019 4/4/2019 3/20/2019 4/4/2019

1470FS+3
3/20/2019 4/2/2019 3/20/2019 4/2/2019
days

1472FS-8
3/26/2019 4/4/2019 3/26/2019 4/4/2019
days

4/6/2019 7/29/2019 4/6/2019 7/29/2019

4/6/2019 5/6/2019 4/6/2019 5/6/2019


1473FS+1
4/6/2019 4/8/2019 4/6/2019 4/8/2019
day

1476FS+7
4/16/2019 4/29/2019 4/16/2019 4/29/2019
days

4/16/2019 4/29/2019 4/16/2019 4/29/2019 1477SS

4/30/2019 5/6/2019 4/30/2019 5/6/2019 1478

5/14/2019 6/17/2019 5/14/2019 6/17/2019

1479FS+7
5/14/2019 5/27/2019 5/14/2019 5/27/2019
days

5/28/2019 6/10/2019 5/28/2019 6/10/2019 1481

6/11/2019 6/17/2019 6/11/2019 6/17/2019 1482

6/25/2019 7/29/2019 6/25/2019 7/29/2019

1483FS+7
6/25/2019 7/8/2019 6/25/2019 7/8/2019
days

7/9/2019 7/22/2019 7/9/2019 7/22/2019 1485

7/23/2019 7/29/2019 7/23/2019 7/29/2019 1486

7/31/2019 8/5/2019 7/31/2019 8/5/2019

1487FS+1
7/31/2019 8/5/2019 7/31/2019 8/5/2019
day

1487FS+1
7/30/2019 7/30/2019 7/30/2019 7/30/2019
day

7/13/2018 7/9/2019 7/13/2018 6/24/2019


54SS-3
9/13/2018 9/13/2018 8/29/2018 8/29/2018
days

7/13/2018 6/11/2019 7/13/2018 5/27/2019

7/13/2018 7/13/2018 7/13/2018 7/13/2018

9/16/2018 1/1/2019 9/1/2018 12/17/2018

1492;54SS;
9/16/2018 10/15/2018 9/1/2018 9/30/2018
1494

10/16/2018 11/29/2018 10/1/2018 11/14/2018 1496

11/30/2018 12/5/2018 11/15/2018 11/20/2018 1497

12/6/2018 12/10/2018 11/21/2018 11/25/2018 1498

12/11/2018 12/16/2018 11/26/2018 12/1/2018 1499

12/17/2018 12/21/2018 12/2/2018 12/6/2018 1500

12/22/2018 12/27/2018 12/7/2018 12/12/2018 1501

12/28/2018 1/1/2019 12/13/2018 12/17/2018 1502

1/2/2019 1/26/2019 12/18/2018 1/11/2019

1/2/2019 1/2/2019 12/18/2018 12/18/2018 1503

1/3/2019 1/9/2019 12/19/2018 12/25/2018 1505

1506FS-3
1/7/2019 1/13/2019 12/23/2018 12/29/2018
days
1/14/2019 1/15/2019 12/30/2018 12/31/2018 1507

1/16/2019 1/16/2019 1/1/2019 1/1/2019 1508

1/17/2019 1/21/2019 1/2/2019 1/6/2019 1509

1/22/2019 1/26/2019 1/7/2019 1/11/2019 1510

1/27/2019 4/5/2019 1/12/2019 3/21/2019

1/27/2019 2/16/2019 1/12/2019 2/1/2019 1511

2/17/2019 3/9/2019 2/2/2019 2/22/2019 1513

3/10/2019 3/15/2019 2/23/2019 2/28/2019 1514

3/16/2019 3/21/2019 3/1/2019 3/6/2019 1515

3/22/2019 3/26/2019 3/7/2019 3/11/2019 1516

3/27/2019 4/5/2019 3/12/2019 3/21/2019 1517

3/26/2019 3/26/2019 3/11/2019 3/11/2019 1517FF

4/6/2019 5/7/2019 3/22/2019 4/22/2019

1510;1518;1
4/6/2019 4/11/2019 3/22/2019 3/27/2019
519

4/12/2019 4/14/2019 3/28/2019 3/30/2019 1521

4/15/2019 4/21/2019 3/31/2019 4/6/2019 1522


4/15/2019 4/18/2019 3/31/2019 4/3/2019 1523SS

4/19/2019 4/25/2019 4/4/2019 4/10/2019 1524

4/26/2019 4/27/2019 4/11/2019 4/12/2019 1525

4/28/2019 4/28/2019 4/13/2019 4/13/2019 1526

4/29/2019 5/3/2019 4/14/2019 4/18/2019 1527

5/4/2019 5/7/2019 4/19/2019 4/22/2019 1528

5/4/2019 5/7/2019 4/19/2019 4/22/2019 1529SS

5/4/2019 5/7/2019 4/19/2019 4/22/2019 1530SS

5/8/2019 6/11/2019 4/23/2019 5/27/2019

5/8/2019 5/10/2019 4/23/2019 4/25/2019 1531

5/11/2019 5/17/2019 4/26/2019 5/2/2019 1533

5/13/2019 5/17/2019 4/28/2019 5/2/2019 1534FF

5/18/2019 5/27/2019 5/3/2019 5/12/2019 1535

5/28/2019 5/29/2019 5/13/2019 5/14/2019 1536

5/30/2019 5/30/2019 5/15/2019 5/15/2019 1537

5/31/2019 6/4/2019 5/16/2019 5/20/2019 1538


6/5/2019 6/8/2019 5/21/2019 5/24/2019 1539

6/5/2019 6/8/2019 5/21/2019 5/24/2019 1540SS

6/5/2019 6/8/2019 5/21/2019 5/24/2019 1541SS

6/9/2019 6/11/2019 5/25/2019 5/27/2019 1542

6/11/2019 6/11/2019 5/27/2019 5/27/2019 1543

7/13/2018 7/9/2019 7/13/2018 6/24/2019

7/13/2018 7/13/2018 7/13/2018 7/13/2018

10/16/2018 3/16/2019 10/1/2018 3/1/2019

10/16/2018 11/29/2018 10/1/2018 11/14/2018 1496;1546

11/30/2018 1/13/2019 11/15/2018 12/29/2018 1548

1/14/2019 1/20/2019 12/30/2018 1/5/2019 1549

1/21/2019 1/27/2019 1/6/2019 1/12/2019 1550

1/28/2019 2/6/2019 1/13/2019 1/22/2019 1551

2/7/2019 2/16/2019 1/23/2019 2/1/2019 1552

2/17/2019 3/2/2019 2/2/2019 2/15/2019 1553

3/3/2019 3/16/2019 2/16/2019 3/1/2019 1554


3/17/2019 5/12/2019 3/2/2019 4/27/2019

3/17/2019 3/18/2019 3/2/2019 3/3/2019 1555

3/19/2019 4/8/2019 3/4/2019 3/24/2019 1557

4/9/2019 4/22/2019 3/25/2019 4/7/2019 1558

4/23/2019 4/24/2019 4/8/2019 4/9/2019 1559

4/25/2019 4/27/2019 4/10/2019 4/12/2019 1560

4/28/2019 5/2/2019 4/13/2019 4/17/2019 1561

5/3/2019 5/12/2019 4/18/2019 4/27/2019 1562

5/13/2019 6/22/2019 4/28/2019 6/7/2019

5/13/2019 5/26/2019 4/28/2019 5/11/2019 1563

5/27/2019 6/9/2019 5/12/2019 5/25/2019 1565

6/10/2019 6/11/2019 5/26/2019 5/27/2019 1566

6/12/2019 6/12/2019 5/28/2019 5/28/2019 1567

6/13/2019 6/17/2019 5/29/2019 6/2/2019 1568

6/18/2019 6/22/2019 6/3/2019 6/7/2019 1569

6/22/2019 6/22/2019 6/7/2019 6/7/2019 1570


6/23/2019 7/9/2019 6/8/2019 6/24/2019

6/23/2019 7/6/2019 6/8/2019 6/21/2019 1571

7/7/2019 7/9/2019 6/22/2019 6/24/2019 1573

7/9/2019 7/9/2019 6/24/2019 6/24/2019 1574

7/13/2018 12/21/2018 7/13/2018 12/21/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

8/4/2018 10/13/2018 8/4/2018 10/13/2018

1577FS+22
8/4/2018 8/10/2018 8/4/2018 8/10/2018
days

1579FS+14
8/25/2018 9/5/2018 8/25/2018 9/5/2018
days

9/6/2018 9/19/2018 9/6/2018 9/19/2018 1580

9/20/2018 9/23/2018 9/20/2018 9/23/2018 1581

9/24/2018 10/2/2018 9/24/2018 10/2/2018 1582

10/3/2018 10/6/2018 10/3/2018 10/6/2018 1583

1584FS-3
10/4/2018 10/13/2018 10/4/2018 10/13/2018
days

10/6/2018 11/1/2018 10/6/2018 11/1/2018

1585SS+2
10/6/2018 10/22/2018 10/6/2018 10/22/2018
days
10/6/2018 10/23/2018 10/6/2018 10/23/2018 1587SS

1588SS+1
10/7/2018 10/24/2018 10/7/2018 10/24/2018
day

10/25/2018 10/26/2018 10/25/2018 10/26/2018 1589

1590FS-1
10/26/2018 11/1/2018 10/26/2018 11/1/2018
day

1591FS-1
11/1/2018 11/4/2018 11/1/2018 11/4/2018
day

1592SS+2
11/3/2018 11/12/2018 11/3/2018 11/12/2018
days

1593FS-1
11/12/2018 11/16/2018 11/12/2018 11/16/2018
day

11/10/2018 11/25/2018 11/10/2018 11/25/2018

1593FS-3
11/10/2018 11/17/2018 11/10/2018 11/17/2018
days

1596SS+3
11/13/2018 11/18/2018 11/13/2018 11/18/2018
days

11/19/2018 11/22/2018 11/19/2018 11/22/2018 1597

11/23/2018 11/25/2018 11/23/2018 11/25/2018 1598

11/21/2018 12/4/2018 11/21/2018 12/4/2018

1598FS-2
11/21/2018 11/27/2018 11/21/2018 11/27/2018
days

1601SS+1
11/22/2018 11/27/2018 11/22/2018 11/27/2018
day

11/28/2018 12/1/2018 11/28/2018 12/1/2018 1602


12/2/2018 12/4/2018 12/2/2018 12/4/2018 1603

11/30/2018 12/13/2018 11/30/2018 12/13/2018

1603FS-2
NA NA 11/30/2018 12/6/2018
days

1606SS+1
NA NA 12/1/2018 12/7/2018
day

1607FS-1
NA NA 12/7/2018 12/10/2018
day

NA NA 12/11/2018 12/13/2018 1608

12/14/2018 12/14/2018 12/14/2018 12/14/2018 1609

12/15/2018 12/16/2018 12/15/2018 12/16/2018 1610

12/17/2018 12/21/2018 12/17/2018 12/21/2018 1611

12/21/2018 12/21/2018 12/21/2018 12/21/2018 1612

8/29/2018 9/11/2019 8/29/2018 6/16/2019

8/29/2018 8/29/2018 8/29/2018 8/29/2018

12/11/2018 2/23/2019 9/15/2018 11/28/2018

12/11/2018 1/23/2019 9/15/2018 10/28/2018

1615FS+17
12/11/2018 12/16/2018 9/15/2018 9/20/2018
days;56SS

12/17/2018 12/30/2018 9/21/2018 10/4/2018 1618


12/31/2018 1/2/2019 10/5/2018 10/7/2018 1619

1/3/2019 1/5/2019 10/8/2018 10/10/2018 1620

1/6/2019 1/9/2019 10/11/2018 10/14/2018 1621

1/10/2019 1/13/2019 10/15/2018 10/18/2018 1622

1/14/2019 1/18/2019 10/19/2018 10/23/2018 1623

1/19/2019 1/23/2019 10/24/2018 10/28/2018 1624

1/24/2019 2/13/2019 10/29/2018 11/18/2018

1/24/2019 1/24/2019 10/29/2018 10/29/2018 1625

1/25/2019 1/29/2019 10/30/2018 11/3/2018 1627

1628FS-3
1/27/2019 1/31/2019 11/1/2018 11/5/2018
days

2/1/2019 2/2/2019 11/6/2018 11/7/2018 1629

2/3/2019 2/3/2019 11/8/2018 11/8/2018 1630

2/4/2019 2/8/2019 11/9/2018 11/13/2018 1631

2/9/2019 2/13/2019 11/14/2018 11/18/2018 1632

2/8/2019 2/8/2019 11/13/2018 11/13/2018 1632FF

2/9/2019 2/23/2019 11/14/2018 11/28/2018


2/9/2019 2/14/2019 11/14/2018 11/19/2018 1634

1636SS+3
2/12/2019 2/17/2019 11/17/2018 11/22/2018
days

2/18/2019 2/21/2019 11/23/2018 11/26/2018 1637

2/22/2019 2/23/2019 11/27/2018 11/28/2018 1638

2/23/2019 2/23/2019 11/28/2018 11/28/2018 1639

12/17/2018 4/30/2019 9/21/2018 2/2/2019

12/17/2018 2/23/2019 9/21/2018 11/28/2018

12/17/2018 12/30/2018 9/21/2018 10/4/2018 1618;1615

12/31/2018 1/17/2019 10/5/2018 10/22/2018 1618;1643

1/18/2019 1/22/2019 10/23/2018 10/27/2018 1644

1/23/2019 1/27/2019 10/28/2018 11/1/2018 1645

1/28/2019 2/3/2019 11/2/2018 11/8/2018 1646

2/4/2019 2/10/2019 11/9/2018 11/15/2018 1647

2/11/2019 2/18/2019 11/16/2018 11/23/2018 1648

2/19/2019 2/23/2019 11/24/2018 11/28/2018 1649

2/24/2019 4/7/2019 11/29/2018 1/10/2019


2/24/2019 2/24/2019 11/29/2018 11/29/2018 1650;1627

2/25/2019 3/10/2019 11/30/2018 12/13/2018 1652

1653FS-3
3/8/2019 3/21/2019 12/11/2018 12/24/2018
days

3/22/2019 3/23/2019 12/25/2018 12/26/2018 1654

3/24/2019 3/25/2019 12/27/2018 12/28/2018 1655

3/26/2019 3/30/2019 12/29/2018 1/2/2019 1656

3/31/2019 4/7/2019 1/3/2019 1/10/2019 1657

4/8/2019 4/8/2019 1/11/2019 1/11/2019 1658

4/9/2019 4/30/2019 1/12/2019 2/2/2019

1658;1659;1
4/9/2019 4/12/2019 1/12/2019 1/15/2019
636

1661SS+3
4/12/2019 4/18/2019 1/15/2019 1/21/2019
days

4/19/2019 4/28/2019 1/22/2019 1/31/2019 1662

4/29/2019 4/30/2019 2/1/2019 2/2/2019 1663

4/30/2019 4/30/2019 2/2/2019 2/2/2019 1664

12/31/2018 5/17/2019 10/5/2018 2/19/2019

12/31/2018 3/13/2019 10/5/2018 12/16/2018


12/31/2018 1/13/2019 10/5/2018 10/18/2018 1643;1615

1/18/2019 2/4/2019 10/23/2018 11/9/2018 1644;1668

2/5/2019 2/9/2019 11/10/2018 11/14/2018 1669

2/10/2019 2/14/2019 11/15/2018 11/19/2018 1670

2/15/2019 2/21/2019 11/20/2018 11/26/2018 1671

2/22/2019 2/28/2019 11/27/2018 12/3/2018 1672

3/1/2019 3/8/2019 12/4/2018 12/11/2018 1673

3/9/2019 3/13/2019 12/12/2018 12/16/2018 1674

3/14/2019 4/25/2019 12/17/2018 1/28/2019

3/14/2019 3/14/2019 12/17/2018 12/17/2018 1675;1652

3/15/2019 3/28/2019 12/18/2018 12/31/2018 1677

1678FS-3
3/26/2019 4/8/2019 12/29/2018 1/11/2019
days

4/9/2019 4/10/2019 1/12/2019 1/13/2019 1679

4/11/2019 4/12/2019 1/14/2019 1/15/2019 1680

4/13/2019 4/17/2019 1/16/2019 1/20/2019 1681

4/18/2019 4/25/2019 1/21/2019 1/28/2019 1682


4/25/2019 4/25/2019 1/28/2019 1/28/2019 1683FF

4/26/2019 5/17/2019 1/29/2019 2/19/2019

4/26/2019 4/29/2019 1/29/2019 2/1/2019 1683;1684

1686SS+3
4/29/2019 5/5/2019 2/1/2019 2/7/2019
days

5/6/2019 5/15/2019 2/8/2019 2/17/2019 1687

5/16/2019 5/17/2019 2/18/2019 2/19/2019 1688

5/17/2019 5/17/2019 2/19/2019 2/19/2019 1689

1/14/2019 6/4/2019 10/19/2018 3/9/2019

1/14/2019 3/31/2019 10/19/2018 1/3/2019

1/14/2019 1/27/2019 10/19/2018 11/1/2018 1615;1668

2/5/2019 2/22/2019 11/10/2018 11/27/2018 1669;1693

2/23/2019 2/27/2019 11/28/2018 12/2/2018 1694

2/28/2019 3/4/2019 12/3/2018 12/7/2018 1695

3/5/2019 3/11/2019 12/8/2018 12/14/2018 1696

3/12/2019 3/18/2019 12/15/2018 12/21/2018 1697

3/19/2019 3/26/2019 12/22/2018 12/29/2018 1698


3/27/2019 3/31/2019 12/30/2018 1/3/2019 1699

4/1/2019 5/13/2019 1/4/2019 2/15/2019

4/1/2019 4/1/2019 1/4/2019 1/4/2019 1700

4/2/2019 4/15/2019 1/5/2019 1/18/2019 1702

1703FS-3
4/13/2019 4/26/2019 1/16/2019 1/29/2019
days

4/27/2019 4/28/2019 1/30/2019 1/31/2019 1704

4/29/2019 4/30/2019 2/1/2019 2/2/2019 1705

5/1/2019 5/5/2019 2/3/2019 2/7/2019 1706

5/6/2019 5/13/2019 2/8/2019 2/15/2019 1707

5/13/2019 5/13/2019 2/15/2019 2/15/2019 1708FF

5/14/2019 6/4/2019 2/16/2019 3/9/2019

5/14/2019 5/17/2019 2/16/2019 2/19/2019 1708;1709

1711SS+3
5/17/2019 5/23/2019 2/19/2019 2/25/2019
days

5/24/2019 6/2/2019 2/26/2019 3/7/2019 1712

6/3/2019 6/4/2019 3/8/2019 3/9/2019 1713

6/4/2019 6/4/2019 3/9/2019 3/9/2019 1714


1/28/2019 9/11/2019 11/2/2018 6/16/2019

1/28/2019 4/18/2019 11/2/2018 1/21/2019

1/28/2019 2/10/2019 11/2/2018 11/15/2018 1615;1693

2/23/2019 3/12/2019 11/28/2018 12/15/2018 1694;1718

3/13/2019 3/17/2019 12/16/2018 12/20/2018 1719

3/18/2019 3/22/2019 12/21/2018 12/25/2018 1720

3/23/2019 3/29/2019 12/26/2018 1/1/2019 1721

3/30/2019 4/5/2019 1/2/2019 1/8/2019 1722

4/6/2019 4/13/2019 1/9/2019 1/16/2019 1723

4/14/2019 4/18/2019 1/17/2019 1/21/2019 1724

4/19/2019 5/13/2019 1/22/2019 2/15/2019

4/19/2019 4/19/2019 1/22/2019 1/22/2019 1725

4/20/2019 4/26/2019 1/23/2019 1/29/2019 1727

1728FS-3
4/24/2019 4/30/2019 1/27/2019 2/2/2019
days

5/1/2019 5/2/2019 2/3/2019 2/4/2019 1729

5/3/2019 5/3/2019 2/5/2019 2/5/2019 1730


5/4/2019 5/8/2019 2/6/2019 2/10/2019 1731

5/9/2019 5/13/2019 2/11/2019 2/15/2019 1732

5/14/2019 7/18/2019 2/16/2019 4/22/2019

5/14/2019 6/3/2019 2/16/2019 3/8/2019 1733

1735FS-3
6/1/2019 6/21/2019 3/6/2019 3/26/2019
days

6/22/2019 6/27/2019 3/27/2019 4/1/2019 1736

6/28/2019 7/3/2019 4/2/2019 4/7/2019 1737

7/4/2019 7/8/2019 4/8/2019 4/12/2019 1738

7/9/2019 7/18/2019 4/13/2019 4/22/2019 1739

7/18/2019 7/18/2019 4/22/2019 4/22/2019 1740FF

7/19/2019 8/17/2019 4/23/2019 5/22/2019

1732;1740;1
7/19/2019 7/24/2019 4/23/2019 4/28/2019
741

1743FS-3
7/22/2019 7/24/2019 4/26/2019 4/28/2019
days

7/22/2019 7/28/2019 4/26/2019 5/2/2019 1744SS

7/22/2019 7/25/2019 4/26/2019 4/29/2019 1745SS

7/26/2019 8/1/2019 4/30/2019 5/6/2019 1746


8/2/2019 8/3/2019 5/7/2019 5/8/2019 1747

8/4/2019 8/4/2019 5/9/2019 5/9/2019 1748

8/5/2019 8/9/2019 5/10/2019 5/14/2019 1749

8/10/2019 8/13/2019 5/15/2019 5/18/2019 1750

8/10/2019 8/13/2019 5/15/2019 5/18/2019 1751SS

8/14/2019 8/17/2019 5/19/2019 5/22/2019 1752

8/9/2019 9/11/2019 5/14/2019 6/16/2019

1750FS-1
8/9/2019 8/11/2019 5/14/2019 5/16/2019
day

8/9/2019 8/15/2019 5/14/2019 5/20/2019 1755SS

1756FS-2
8/14/2019 8/18/2019 5/19/2019 5/23/2019
days

1757FS-1
8/18/2019 8/27/2019 5/23/2019 6/1/2019
day

8/28/2019 8/29/2019 6/2/2019 6/3/2019 1758

8/30/2019 8/30/2019 6/4/2019 6/4/2019 1759

8/31/2019 9/4/2019 6/5/2019 6/9/2019 1760

9/5/2019 9/8/2019 6/10/2019 6/13/2019 1761

9/5/2019 9/8/2019 6/10/2019 6/13/2019 1762SS


9/5/2019 9/8/2019 6/10/2019 6/13/2019 1763SS

9/9/2019 9/11/2019 6/14/2019 6/16/2019 1764

9/11/2019 9/11/2019 6/16/2019 6/16/2019 1765

7/13/2018 9/11/2019 7/13/2018 7/15/2019

57SS-77
9/27/2018 9/27/2018 9/27/2018 9/27/2018
days

10/30/2018 5/7/2019 10/15/2018 4/22/2019

10/30/2018 3/15/2019 10/15/2018 2/28/2019

1768FS+17
10/30/2018 12/27/2018 10/15/2018 12/12/2018
days;57SS

12/28/2018 2/10/2019 12/13/2018 1/26/2019 1771

2/11/2019 2/16/2019 1/27/2019 2/1/2019 1772

2/17/2019 2/21/2019 2/2/2019 2/6/2019 1773

2/22/2019 2/27/2019 2/7/2019 2/12/2019 1774

2/28/2019 3/4/2019 2/13/2019 2/17/2019 1775

3/5/2019 3/10/2019 2/18/2019 2/23/2019 1776

3/11/2019 3/15/2019 2/24/2019 2/28/2019 1777

3/16/2019 4/4/2019 3/1/2019 3/20/2019


3/16/2019 3/16/2019 3/1/2019 3/1/2019 1778

3/17/2019 3/23/2019 3/2/2019 3/8/2019 1780

1781SS+4
3/21/2019 3/27/2019 3/6/2019 3/12/2019
days

3/28/2019 3/29/2019 3/13/2019 3/14/2019 1782

3/30/2019 3/30/2019 3/15/2019 3/15/2019 1783

3/31/2019 4/4/2019 3/16/2019 3/20/2019 1784

3/31/2019 4/4/2019 3/16/2019 3/20/2019 1785FF

4/5/2019 4/28/2019 3/21/2019 4/13/2019

4/5/2019 4/11/2019 3/21/2019 3/27/2019 1785

1788FS-2
4/10/2019 4/16/2019 3/26/2019 4/1/2019
days

4/17/2019 4/18/2019 4/2/2019 4/3/2019 1789

4/19/2019 4/20/2019 4/4/2019 4/5/2019 1790

4/21/2019 4/25/2019 4/6/2019 4/10/2019 1791

1792FS-2
4/24/2019 4/28/2019 4/9/2019 4/13/2019
days

4/28/2019 4/28/2019 4/13/2019 4/13/2019 1793FF

4/29/2019 5/7/2019 4/14/2019 4/22/2019


1786;1792;1
4/29/2019 5/4/2019 4/14/2019 4/19/2019
794

5/5/2019 5/7/2019 4/20/2019 4/22/2019 1796

5/7/2019 5/7/2019 4/22/2019 4/22/2019 1797

11/15/2018 7/15/2019 11/15/2018 7/15/2019

11/15/2018 4/29/2019 11/15/2018 4/29/2019

1768FS+48
11/15/2018 12/9/2018 11/15/2018 12/9/2018
days

12/10/2018 2/17/2019 12/10/2018 2/17/2019 1801

2/18/2019 3/2/2019 2/18/2019 3/2/2019 1802

3/3/2019 3/12/2019 3/3/2019 3/12/2019 1803

3/13/2019 3/26/2019 3/13/2019 3/26/2019 1804

3/27/2019 4/5/2019 3/27/2019 4/5/2019 1805

4/6/2019 4/19/2019 4/6/2019 4/19/2019 1806

4/20/2019 4/29/2019 4/20/2019 4/29/2019 1807

4/30/2019 5/19/2019 4/30/2019 5/19/2019

4/30/2019 4/30/2019 4/30/2019 4/30/2019 1808

5/1/2019 5/7/2019 5/1/2019 5/7/2019 1810


1811FS-3
5/5/2019 5/11/2019 5/5/2019 5/11/2019
days

5/12/2019 5/13/2019 5/12/2019 5/13/2019 1812

5/14/2019 5/14/2019 5/14/2019 5/14/2019 1813

5/15/2019 5/19/2019 5/15/2019 5/19/2019 1814

5/15/2019 5/19/2019 5/15/2019 5/19/2019 1815SS

5/20/2019 7/6/2019 5/20/2019 7/6/2019

5/20/2019 6/2/2019 5/20/2019 6/2/2019 1815

1818FS-2
6/1/2019 6/20/2019 6/1/2019 6/20/2019
days

6/21/2019 6/22/2019 6/21/2019 6/22/2019 1819

6/23/2019 6/26/2019 6/23/2019 6/26/2019 1820

6/27/2019 7/1/2019 6/27/2019 7/1/2019 1821

1822FS-2
6/30/2019 7/6/2019 6/30/2019 7/6/2019
days

7/6/2019 7/6/2019 7/6/2019 7/6/2019 1823FF

7/7/2019 7/15/2019 7/7/2019 7/15/2019

1816;1822;1
7/7/2019 7/12/2019 7/7/2019 7/12/2019
824

7/13/2019 7/15/2019 7/13/2019 7/15/2019 1826


7/15/2019 7/15/2019 7/15/2019 7/15/2019 1827

7/13/2018 9/11/2019 7/13/2018 6/16/2019

1/28/2019 5/13/2019 11/15/2018 2/28/2019

1801SS;171
1/28/2019 2/24/2019 11/15/2018 12/12/2018
8SS

1831;1719F
2/25/2019 4/10/2019 12/13/2018 1/26/2019
F

1832;1720F
4/11/2019 4/16/2019 1/27/2019 2/1/2019
F

1833;1721F
4/17/2019 4/21/2019 2/2/2019 2/6/2019
F

1834;1722F
4/22/2019 4/27/2019 2/7/2019 2/12/2019
F

1835;1723F
4/28/2019 5/2/2019 2/13/2019 2/17/2019
F

1836;1724F
5/3/2019 5/8/2019 2/18/2019 2/23/2019
F

1837;1725F
5/9/2019 5/13/2019 2/24/2019 2/28/2019
F

4/19/2019 5/13/2019 1/22/2019 2/15/2019

1831;1727F
4/19/2019 4/19/2019 1/22/2019 1/22/2019
F

1840;1728F
4/20/2019 4/26/2019 1/23/2019 1/29/2019
F

1841FS-3
4/24/2019 4/30/2019 1/27/2019 2/2/2019 days;1729F
F

1842;1730F
5/1/2019 5/2/2019 2/3/2019 2/4/2019
F
1843;1731F
5/3/2019 5/3/2019 2/5/2019 2/5/2019
F

1844;1732F
5/4/2019 5/8/2019 2/6/2019 2/10/2019
F

1845SS;173
5/9/2019 5/13/2019 2/11/2019 2/15/2019
3FF

5/28/2019 7/18/2019 3/2/2019 4/22/2019

1845;1735F
5/28/2019 6/3/2019 3/2/2019 3/8/2019
F

1848FS-2
6/15/2019 6/21/2019 3/20/2019 3/26/2019 days;1736F
F

1849;1737F
6/26/2019 6/27/2019 3/31/2019 4/1/2019
F

1850;1738F
7/2/2019 7/3/2019 4/6/2019 4/7/2019
F

1851;1739F
7/4/2019 7/8/2019 4/8/2019 4/12/2019
F

1851FS-2
7/14/2019 7/18/2019 4/18/2019 4/22/2019 days;1740F
F

1853FF;174
7/18/2019 7/18/2019 4/22/2019 4/22/2019
1FF

7/19/2019 8/17/2019 4/23/2019 5/22/2019

1846;1852;1
7/19/2019 7/24/2019 4/23/2019 4/28/2019
854

1856SS;174
7/22/2019 7/24/2019 4/26/2019 4/28/2019
4FF

1857SS;174
7/22/2019 7/28/2019 4/26/2019 5/2/2019
5FF

1858SS;174
7/22/2019 7/25/2019 4/26/2019 4/29/2019
6FF
1859;1747F
7/26/2019 8/1/2019 4/30/2019 5/6/2019
F

1860;1748F
8/2/2019 8/3/2019 5/7/2019 5/8/2019
F

1861;1749F
8/4/2019 8/4/2019 5/9/2019 5/9/2019
F

1862;1750F
8/5/2019 8/9/2019 5/10/2019 5/14/2019
F

1863;1751F
8/10/2019 8/13/2019 5/15/2019 5/18/2019
F

1864SS;175
8/10/2019 8/13/2019 5/15/2019 5/18/2019
2FF

1865SS;175
8/14/2019 8/17/2019 5/19/2019 5/22/2019
3FF

7/13/2018 7/16/2018 7/13/2018 7/16/2018

1863FS-1
8/9/2019 8/11/2019 5/14/2019 5/16/2019
day;1755FF

1868SS;175
8/9/2019 8/15/2019 5/14/2019 5/20/2019
6FF

1869FS-2
8/14/2019 8/18/2019 5/19/2019 5/23/2019 days;1757F
F

1870FS-1
8/18/2019 8/27/2019 5/23/2019 6/1/2019
day;1758FF

1871;1759F
8/28/2019 8/29/2019 6/2/2019 6/3/2019
F

1872;1760F
8/30/2019 8/30/2019 6/4/2019 6/4/2019
F

1873;1761F
8/31/2019 9/4/2019 6/5/2019 6/9/2019
F

1874;1762F
9/5/2019 9/8/2019 6/10/2019 6/13/2019
F
1875SS;176
9/5/2019 9/8/2019 6/10/2019 6/13/2019
3FF

1876SS;176
9/5/2019 9/8/2019 6/10/2019 6/13/2019
4FF

1877;1765F
9/9/2019 9/11/2019 6/14/2019 6/16/2019
F

9/11/2019 9/11/2019 6/16/2019 6/16/2019 1878

7/13/2018 9/21/2019 7/13/2018 9/21/2019

12/11/2018 5/27/2019 12/11/2018 4/29/2019

12/11/2018 12/11/2018 12/11/2018 12/11/2018

2/11/2019 2/23/2019 1/14/2019 1/26/2019

2/11/2019 2/23/2019 1/14/2019 1/26/2019 72

2/14/2019 2/23/2019 1/17/2019 1/26/2019 1884FF

2/26/2019 4/24/2019 1/29/2019 3/27/2019

2/26/2019 3/15/2019 1/29/2019 2/15/2019

1885FS+2
2/26/2019 2/26/2019 1/29/2019 1/29/2019
days

2/26/2019 2/27/2019 1/29/2019 1/30/2019 1888SS

1889FS+2
3/2/2019 3/7/2019 2/2/2019 2/7/2019
days

3/8/2019 3/13/2019 2/8/2019 2/13/2019 1890


3/14/2019 3/15/2019 2/14/2019 2/15/2019 1891

3/18/2019 3/30/2019 2/18/2019 3/2/2019

1892FS+2
3/18/2019 3/18/2019 2/18/2019 2/18/2019
days

3/18/2019 3/18/2019 2/18/2019 2/18/2019 1894SS

1895FS+2
3/21/2019 3/26/2019 2/21/2019 2/26/2019
days

1896SS+2
3/23/2019 3/28/2019 2/23/2019 2/28/2019
days

3/23/2019 3/28/2019 2/23/2019 2/28/2019 1897SS

3/29/2019 3/30/2019 3/1/2019 3/2/2019 1898

3/21/2019 4/6/2019 2/21/2019 3/9/2019

1894FS+2
3/21/2019 3/21/2019 2/21/2019 2/21/2019
days

3/21/2019 3/21/2019 2/21/2019 2/21/2019 1901SS

1902FS+2
3/24/2019 3/29/2019 2/24/2019 3/1/2019
days

1903SS+2
3/26/2019 3/31/2019 2/26/2019 3/3/2019
days

4/1/2019 4/6/2019 3/4/2019 3/9/2019 1904

4/9/2019 4/24/2019 3/12/2019 3/27/2019

1905FS+2
4/9/2019 4/9/2019 3/12/2019 3/12/2019
days
4/9/2019 4/9/2019 3/12/2019 3/12/2019 1907SS

1908FS+2
4/12/2019 4/17/2019 3/15/2019 3/20/2019
days

4/18/2019 4/22/2019 3/21/2019 3/25/2019 1909

4/23/2019 4/24/2019 3/26/2019 3/27/2019 1910

4/26/2019 4/27/2019 3/29/2019 3/30/2019

1911FS+1
4/26/2019 4/27/2019 3/29/2019 3/30/2019
day

4/29/2019 5/5/2019 4/1/2019 4/7/2019

1913FS+1
4/29/2019 5/5/2019 4/1/2019 4/7/2019
day

4/29/2019 5/18/2019 4/1/2019 4/20/2019

4/29/2019 5/18/2019 4/1/2019 4/20/2019 1915SS

4/5/2019 4/5/2019 4/5/2019 4/5/2019

5/20/2019 5/27/2019 4/22/2019 4/29/2019

1917FS+1
5/20/2019 5/27/2019 4/22/2019 4/29/2019
day

4/26/2019 4/26/2019 4/26/2019 4/26/2019

7/13/2018 6/21/2019 7/13/2018 6/6/2019

9/13/2018 9/13/2018 9/13/2018 9/13/2018


9/13/2018 9/13/2018 9/13/2018 9/13/2018

10/21/2018 1/15/2019 10/21/2018 1/15/2019

10/21/2018 12/19/2018 10/21/2018 12/19/2018

12/20/2018 1/15/2019 12/20/2018 1/15/2019 1926

5/8/2019 6/21/2019 4/23/2019 6/6/2019

5/8/2019 6/21/2019 4/23/2019 6/6/2019 1798

7/13/2018 7/26/2018 7/13/2018 7/26/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/26/2018 7/13/2018 7/26/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/15/2018 7/13/2018 7/15/2018

7/13/2018 7/15/2018 7/13/2018 7/15/2018


7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/26/2018 7/13/2018 7/26/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/15/2018 7/13/2018 7/15/2018

7/13/2018 7/15/2018 7/13/2018 7/15/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018


7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018


7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018

7/13/2018 7/14/2018 7/13/2018 7/14/2018


7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/17/2018 7/13/2018 7/17/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

7/13/2018 7/13/2018 7/13/2018 7/13/2018

1/7/2019 1/24/2019 10/16/2018 11/3/2018

55FS-10
1/7/2019 1/24/2019 10/16/2018 11/2/2018
days

1/11/2019 1/24/2019 10/21/2018 11/3/2018 1994FF

1/28/2019 2/22/2019 11/7/2018 12/2/2018

1/28/2019 2/3/2019 11/7/2018 11/13/2018

1995FS+3
1/28/2019 1/28/2019 11/7/2018 11/7/2018
days

1/28/2019 1/28/2019 11/7/2018 11/7/2018 1998SS

1999FS+2
1/31/2019 1/31/2019 11/10/2018 11/10/2018
days

2/1/2019 2/2/2019 11/11/2018 11/12/2018 2000

2/3/2019 2/3/2019 11/13/2018 11/13/2018 2001

2/6/2019 2/10/2019 11/16/2018 11/20/2018


2002FS+2
2/6/2019 2/6/2019 11/16/2018 11/16/2018
days

2/6/2019 2/6/2019 11/16/2018 11/16/2018 2004SS

2005FS+2
2/9/2019 2/9/2019 11/19/2018 11/19/2018
days

2/9/2019 2/9/2019 11/19/2018 11/19/2018 2006SS

2/9/2019 2/9/2019 11/19/2018 11/19/2018 2007SS

2/10/2019 2/10/2019 11/20/2018 11/20/2018 2008

2/9/2019 2/13/2019 11/19/2018 11/23/2018

2004FS+2
2/9/2019 2/9/2019 11/19/2018 11/19/2018
days

2/9/2019 2/9/2019 11/19/2018 11/19/2018 2011SS

2012FS+2
2/12/2019 2/12/2019 11/22/2018 11/22/2018
days

2/12/2019 2/12/2019 11/22/2018 11/22/2018 2013SS

2/13/2019 2/13/2019 11/23/2018 11/23/2018 2014

2/16/2019 2/22/2019 11/26/2018 12/2/2018

2015FS+2
2/16/2019 2/16/2019 11/26/2018 11/26/2018
days

2/16/2019 2/16/2019 11/26/2018 11/26/2018 2017SS

2018FS+1
2/18/2019 2/19/2019 11/28/2018 11/29/2018
day
2/20/2019 2/21/2019 11/30/2018 12/1/2018 2019

2/22/2019 2/22/2019 12/2/2018 12/2/2018 2020

1/29/2019 4/24/2019 11/8/2018 2/1/2019

1/29/2019 3/29/2019 11/8/2018 1/6/2019 1998

3/30/2019 4/24/2019 1/7/2019 2/1/2019 2023

11/19/2018 11/19/2018 11/19/2018 11/19/2018

2/19/2019 3/1/2019 11/29/2018 12/9/2018

1996FS-4
2/19/2019 3/1/2019 11/29/2018 12/9/2018
days

3/5/2019 3/5/2019 12/13/2018 12/13/2018

2027FS+3
3/5/2019 3/5/2019 12/13/2018 12/13/2018
days

3/7/2019 3/23/2019 12/15/2018 12/31/2018

2029FS+1
3/7/2019 3/16/2019 12/15/2018 12/24/2018
day

2031FS-7
3/10/2019 3/23/2019 12/18/2018 12/31/2018
days

12/24/2018 12/24/2018 12/24/2018 12/24/2018

3/27/2019 3/29/2019 1/4/2019 1/6/2019

2032FS+3
3/27/2019 3/27/2019 1/4/2019 1/4/2019
days
3/27/2019 3/28/2019 1/4/2019 1/5/2019 2035SS

3/27/2019 3/28/2019 1/4/2019 1/5/2019 2036SS

3/29/2019 3/29/2019 1/6/2019 1/6/2019 2037

3/31/2019 4/22/2019 1/8/2019 1/30/2019

2038FS+1
3/31/2019 4/22/2019 1/8/2019 1/30/2019
day

1/21/2019 1/21/2019 1/21/2019 1/21/2019

4/25/2019 5/6/2019 2/2/2019 2/13/2019

2040FS+2
4/25/2019 5/6/2019 2/2/2019 2/13/2019
days

4/25/2019 5/10/2019 2/2/2019 2/17/2019

4/25/2019 5/10/2019 2/2/2019 2/17/2019 2043SS

4/25/2019 5/10/2019 2/2/2019 2/17/2019

4/25/2019 5/10/2019 2/2/2019 2/17/2019 2045SS

4/26/2019 5/5/2019 2/3/2019 2/12/2019

2047SS+1
4/26/2019 5/5/2019 2/3/2019 2/12/2019
day

2/8/2019 2/8/2019 2/8/2019 2/8/2019

5/12/2019 5/27/2019 2/19/2019 3/6/2019


2049FS+6
5/12/2019 5/27/2019 2/19/2019 3/6/2019
days

5/12/2019 5/28/2019 2/19/2019 3/7/2019

5/12/2019 5/28/2019 2/19/2019 3/7/2019 2052SS

5/31/2019 6/8/2019 3/10/2019 3/18/2019

2054FS+2
5/31/2019 6/8/2019 3/10/2019 3/18/2019
days

3/2/2019 3/2/2019 3/2/2019 3/2/2019

1/11/2019 7/15/2019 1/11/2019 7/6/2019

1/11/2019 1/11/2019 1/11/2019 1/11/2019

2/20/2019 3/3/2019 2/11/2019 2/22/2019

2/20/2019 3/3/2019 2/11/2019 2/22/2019 42;45

2/22/2019 3/3/2019 2/13/2019 2/22/2019 2061FF

3/7/2019 3/17/2019 2/26/2019 3/8/2019

2062FS+3
3/7/2019 3/17/2019 2/26/2019 3/8/2019
days

3/21/2019 4/20/2019 3/12/2019 4/11/2019

3/21/2019 3/28/2019 3/12/2019 3/19/2019

2064FS+3
3/21/2019 3/21/2019 3/12/2019 3/12/2019
days
3/21/2019 3/21/2019 3/12/2019 3/12/2019 2067SS

2068FS+2
3/24/2019 3/25/2019 3/15/2019 3/16/2019
days

3/26/2019 3/27/2019 3/17/2019 3/18/2019 2069

3/28/2019 3/28/2019 3/19/2019 3/19/2019 2070

3/31/2019 4/7/2019 3/22/2019 3/29/2019

2071FS+2
3/31/2019 3/31/2019 3/22/2019 3/22/2019
days

3/31/2019 3/31/2019 3/22/2019 3/22/2019 2073SS

2074FS+2
4/3/2019 4/4/2019 3/25/2019 3/26/2019
days

2075SS+2
4/5/2019 4/6/2019 3/27/2019 3/28/2019
days

4/5/2019 4/6/2019 3/27/2019 3/28/2019 2076SS

4/7/2019 4/7/2019 3/29/2019 3/29/2019 2077

4/3/2019 4/10/2019 3/25/2019 4/1/2019

2073FS+2
4/3/2019 4/3/2019 3/25/2019 3/25/2019
days

4/3/2019 4/3/2019 3/25/2019 3/25/2019 2080SS

2081FS+2
4/6/2019 4/7/2019 3/28/2019 3/29/2019
days

2082SS+2
4/8/2019 4/9/2019 3/30/2019 3/31/2019
days
4/10/2019 4/10/2019 4/1/2019 4/1/2019 2083

4/13/2019 4/20/2019 4/4/2019 4/11/2019

2084FS+2
4/13/2019 4/13/2019 4/4/2019 4/4/2019
days

4/13/2019 4/13/2019 4/4/2019 4/4/2019 2086SS

2087FS+2
4/16/2019 4/17/2019 4/7/2019 4/8/2019
days

4/18/2019 4/19/2019 4/9/2019 4/10/2019 2088

4/20/2019 4/20/2019 4/11/2019 4/11/2019 2089

4/22/2019 7/15/2019 4/13/2019 7/6/2019

4/22/2019 6/13/2019 4/13/2019 6/4/2019

2090FS+1
4/22/2019 5/12/2019 4/13/2019 5/3/2019
day

2093SS+32
5/24/2019 6/13/2019 5/15/2019 6/4/2019
days

6/14/2019 7/15/2019 6/5/2019 7/6/2019

6/14/2019 7/3/2019 6/5/2019 6/24/2019 2094

2096SS+10
6/24/2019 7/11/2019 6/15/2019 7/2/2019
days

7/12/2019 7/15/2019 7/3/2019 7/6/2019 2097

7/15/2019 7/15/2019 7/6/2019 7/6/2019 2098


12/11/2018 5/26/2019 12/11/2018 3/18/2019

12/11/2018 12/11/2018 12/11/2018 12/11/2018

3/12/2019 3/18/2019 1/2/2019 1/8/2019

3/12/2019 3/18/2019 1/2/2019 1/8/2019 70

3/14/2019 3/18/2019 1/4/2019 1/8/2019 2103FF

3/19/2019 4/30/2019 1/9/2019 2/20/2019

3/19/2019 3/30/2019 1/9/2019 1/20/2019

3/19/2019 3/19/2019 1/9/2019 1/9/2019 2104

3/19/2019 3/20/2019 1/9/2019 1/10/2019 2107SS

2108FS+2
3/23/2019 3/25/2019 1/13/2019 1/15/2019
days

3/26/2019 3/28/2019 1/16/2019 1/18/2019 2109

3/29/2019 3/30/2019 1/19/2019 1/20/2019 2110

4/2/2019 4/12/2019 1/23/2019 2/2/2019

2111FS+2
4/2/2019 4/2/2019 1/23/2019 1/23/2019
days

4/2/2019 4/3/2019 1/23/2019 1/24/2019 2113SS

2114FS+2
4/6/2019 4/8/2019 1/27/2019 1/29/2019
days
2115SS+2
4/8/2019 4/10/2019 1/29/2019 1/31/2019
days

4/8/2019 4/10/2019 1/29/2019 1/31/2019 2116SS

4/11/2019 4/12/2019 2/1/2019 2/2/2019 2117

4/5/2019 4/15/2019 1/26/2019 2/5/2019

2113FS+2
4/5/2019 4/5/2019 1/26/2019 1/26/2019
days

4/5/2019 4/6/2019 1/26/2019 1/27/2019 2120SS

2121FS+2
4/9/2019 4/11/2019 1/30/2019 2/1/2019
days

2122SS+2
4/11/2019 4/13/2019 2/1/2019 2/3/2019
days

4/14/2019 4/15/2019 2/4/2019 2/5/2019 2123

4/18/2019 4/30/2019 2/8/2019 2/20/2019

2124FS+2
4/18/2019 4/18/2019 2/8/2019 2/8/2019
days

4/18/2019 4/19/2019 2/8/2019 2/9/2019 2126SS

2127FS+2
4/22/2019 4/24/2019 2/12/2019 2/14/2019
days

4/25/2019 4/28/2019 2/15/2019 2/18/2019 2128

4/29/2019 4/30/2019 2/19/2019 2/20/2019 2129

5/2/2019 5/4/2019 2/22/2019 2/24/2019


2130FS+1
5/2/2019 5/4/2019 2/22/2019 2/24/2019
day

5/7/2019 5/22/2019 2/27/2019 3/14/2019

2132FS+2
5/7/2019 5/22/2019 2/27/2019 3/14/2019
days

5/7/2019 5/12/2019 2/27/2019 3/4/2019

5/7/2019 5/12/2019 2/27/2019 3/4/2019 2134SS

5/12/2019 5/12/2019 3/4/2019 3/4/2019 2136

5/24/2019 5/26/2019 3/16/2019 3/18/2019

2134FS+1
5/24/2019 5/26/2019 3/16/2019 3/18/2019
day

5/26/2019 5/26/2019 3/18/2019 3/18/2019 2139

12/12/2018 7/13/2019 12/12/2018 7/13/2019

12/12/2018 4/6/2019 12/12/2018 4/6/2019

12/12/2018 3/11/2019 12/12/2018 3/11/2019

3/12/2019 4/6/2019 3/12/2019 4/6/2019 2143

1/2/2019 4/26/2019 1/2/2019 4/26/2019

2143SS+21
1/2/2019 4/1/2019 1/2/2019 4/1/2019
days

4/2/2019 4/26/2019 4/2/2019 4/26/2019 2146


1/29/2019 1/29/2019 1/29/2019 1/29/2019

2/28/2019 2/28/2019 2/28/2019 2/28/2019

3/4/2019 3/16/2019 3/4/2019 3/16/2019

3/4/2019 3/16/2019 3/4/2019 3/16/2019 80

3/7/2019 3/16/2019 3/7/2019 3/16/2019 2151FF

3/19/2019 4/28/2019 3/19/2019 4/28/2019

3/19/2019 3/29/2019 3/19/2019 3/29/2019

2152FS+2
3/19/2019 3/19/2019 3/19/2019 3/19/2019
days

3/19/2019 3/19/2019 3/19/2019 3/19/2019 2155SS

2156FS+2
3/22/2019 3/24/2019 3/22/2019 3/24/2019
days

3/25/2019 3/27/2019 3/25/2019 3/27/2019 2157

3/28/2019 3/29/2019 3/28/2019 3/29/2019 2158

4/1/2019 4/11/2019 4/1/2019 4/11/2019

2159FS+2
4/1/2019 4/1/2019 4/1/2019 4/1/2019
days

4/1/2019 4/2/2019 4/1/2019 4/2/2019 2161SS

2162FS+2
4/5/2019 4/7/2019 4/5/2019 4/7/2019
days
2163SS+2
4/7/2019 4/9/2019 4/7/2019 4/9/2019
days

4/7/2019 4/9/2019 4/7/2019 4/9/2019 2164SS

4/10/2019 4/11/2019 4/10/2019 4/11/2019 2165

4/4/2019 4/14/2019 4/4/2019 4/14/2019

2161FS+2
4/4/2019 4/4/2019 4/4/2019 4/4/2019
days

4/4/2019 4/5/2019 4/4/2019 4/5/2019 2168SS

2169FS+2
4/8/2019 4/10/2019 4/8/2019 4/10/2019
days

2170SS+2
4/10/2019 4/12/2019 4/10/2019 4/12/2019
days

4/13/2019 4/14/2019 4/13/2019 4/14/2019 2171

4/17/2019 4/28/2019 4/17/2019 4/28/2019

2172FS+2
4/17/2019 4/17/2019 4/17/2019 4/17/2019
days

4/17/2019 4/18/2019 4/17/2019 4/18/2019 2174SS

2175FS+2
4/21/2019 4/23/2019 4/21/2019 4/23/2019
days

4/24/2019 4/26/2019 4/24/2019 4/26/2019 2176

4/27/2019 4/28/2019 4/27/2019 4/28/2019 2177

5/1/2019 5/27/2019 5/1/2019 5/27/2019


5/1/2019 5/14/2019 5/1/2019 5/14/2019

2178FS+2
5/1/2019 5/14/2019 5/1/2019 5/14/2019
days

5/15/2019 5/27/2019 5/15/2019 5/27/2019

5/15/2019 5/15/2019 5/15/2019 5/15/2019 2181

5/15/2019 5/16/2019 5/15/2019 5/16/2019 2183SS

2184FS+2
5/19/2019 5/21/2019 5/19/2019 5/21/2019
days

5/22/2019 5/25/2019 5/22/2019 5/25/2019 2185

5/26/2019 5/27/2019 5/26/2019 5/27/2019 2186

5/1/2019 5/27/2019 5/1/2019 5/27/2019

5/1/2019 5/27/2019 5/1/2019 5/27/2019 2180SS

5/1/2019 5/1/2019 5/1/2019 5/1/2019

5/30/2019 7/13/2019 5/30/2019 7/13/2019

2189FS+2
5/30/2019 7/13/2019 5/30/2019 7/13/2019
days;2190

6/22/2019 6/22/2019 6/22/2019 6/22/2019

7/13/2019 7/13/2019 7/13/2019 7/13/2019 2192

10/26/2018 8/16/2019 10/26/2018 8/16/2019


10/26/2018 2/7/2019 10/26/2018 2/7/2019

10/26/2018 1/13/2019 10/26/2018 1/13/2019

1/14/2019 2/10/2019 1/14/2019 2/10/2019 2197

1/11/2019 1/11/2019 1/11/2019 1/11/2019

2/26/2019 2/26/2019 2/26/2019 2/26/2019

2/26/2019 2/26/2019 2/26/2019 2/26/2019

3/27/2019 4/3/2019 3/27/2019 4/3/2019

3/27/2019 4/3/2019 3/27/2019 4/3/2019 75

3/28/2019 4/3/2019 3/28/2019 4/3/2019 2203FF

3/28/2019 3/28/2019 3/28/2019 3/28/2019

4/4/2019 5/15/2019 4/4/2019 5/15/2019

4/4/2019 5/15/2019 4/4/2019 5/15/2019

4/4/2019 4/5/2019 4/4/2019 4/5/2019 2204

4/4/2019 4/8/2019 4/4/2019 4/8/2019 2208SS

2209FS+2
4/11/2019 4/24/2019 4/11/2019 4/24/2019
days

4/25/2019 5/8/2019 4/25/2019 5/8/2019 2210


5/9/2019 5/15/2019 5/9/2019 5/15/2019 2211

5/17/2019 6/27/2019 5/17/2019 6/27/2019

2212FS+1
5/17/2019 6/3/2019 5/17/2019 6/3/2019
day

6/4/2019 6/21/2019 6/4/2019 6/21/2019 2214

6/22/2019 6/27/2019 6/22/2019 6/27/2019 2215

7/5/2019 7/14/2019 7/5/2019 7/14/2019

2216FS+7
7/5/2019 7/14/2019 7/5/2019 7/14/2019
days

7/16/2019 7/22/2019 7/16/2019 7/22/2019

2218FS+1
7/16/2019 7/22/2019 7/16/2019 7/22/2019
day

7/16/2019 8/16/2019 7/16/2019 8/16/2019

7/16/2019 8/9/2019 7/16/2019 8/9/2019 2219SS

8/10/2019 8/16/2019 8/10/2019 8/16/2019 2222

7/29/2019 7/29/2019 7/29/2019 7/29/2019

6/26/2019 9/21/2019 6/26/2019 9/21/2019

6/26/2019 6/26/2019 6/26/2019 6/26/2019

7/25/2019 8/2/2019 7/25/2019 8/2/2019


7/25/2019 8/2/2019 7/25/2019 8/2/2019 84

7/27/2019 8/2/2019 7/27/2019 8/2/2019 2228FF

7/29/2019 8/2/2019 7/29/2019 8/2/2019 2229FF

8/6/2019 9/21/2019 8/6/2019 9/21/2019

8/6/2019 8/17/2019 8/6/2019 8/17/2019

2230FS+3
8/6/2019 8/6/2019 8/6/2019 8/6/2019
days

8/6/2019 8/7/2019 8/6/2019 8/7/2019 2233SS

2234FS+2
8/10/2019 8/12/2019 8/10/2019 8/12/2019
days

8/13/2019 8/15/2019 8/13/2019 8/15/2019 2235

8/16/2019 8/17/2019 8/16/2019 8/17/2019 2236

8/20/2019 8/29/2019 8/20/2019 8/29/2019

2237FS+2
8/20/2019 8/20/2019 8/20/2019 8/20/2019
days

8/20/2019 8/21/2019 8/20/2019 8/21/2019 2239SS

2240FS+2
8/24/2019 8/26/2019 8/24/2019 8/26/2019
days

2241SS+2
8/26/2019 8/28/2019 8/26/2019 8/28/2019
days

8/26/2019 8/28/2019 8/26/2019 8/28/2019 2242SS


8/29/2019 8/29/2019 8/29/2019 8/29/2019 2243

8/23/2019 9/2/2019 8/23/2019 9/2/2019

2239FS+2
8/23/2019 8/23/2019 8/23/2019 8/23/2019
days

8/23/2019 8/24/2019 8/23/2019 8/24/2019 2246SS

2247FS+2
8/27/2019 8/29/2019 8/27/2019 8/29/2019
days

2248SS+2
8/29/2019 8/31/2019 8/29/2019 8/31/2019
days

9/1/2019 9/2/2019 9/1/2019 9/2/2019 2249

9/4/2019 9/21/2019 9/4/2019 9/21/2019

2250FS+1
9/4/2019 9/4/2019 9/4/2019 9/4/2019
day

9/4/2019 9/7/2019 9/4/2019 9/7/2019 2252SS

2253FS+2
9/10/2019 9/13/2019 9/10/2019 9/13/2019
days

9/14/2019 9/18/2019 9/14/2019 9/18/2019 2254

9/19/2019 9/21/2019 9/19/2019 9/21/2019 2255

9/21/2019 9/21/2019 9/21/2019 9/21/2019 2256

12/12/2018 8/9/2019 12/12/2018 8/9/2019

12/12/2018 12/12/2018 12/12/2018 12/12/2018


1/29/2019 2/5/2019 1/29/2019 2/5/2019

1/29/2019 2/5/2019 1/29/2019 2/5/2019 82

2/1/2019 2/5/2019 2/1/2019 2/5/2019 2261FF

2/7/2019 3/15/2019 2/7/2019 3/15/2019

2/7/2019 2/18/2019 2/7/2019 2/18/2019

2262FS+1
2/7/2019 2/7/2019 2/7/2019 2/7/2019
day

2/7/2019 2/9/2019 2/7/2019 2/9/2019 2265SS

2266FS+2
2/12/2019 2/14/2019 2/12/2019 2/14/2019
days

2/15/2019 2/17/2019 2/15/2019 2/17/2019 2267

2/18/2019 2/18/2019 2/18/2019 2/18/2019 2268

2/21/2019 2/28/2019 2/21/2019 2/28/2019

2269FS+2
2/21/2019 2/21/2019 2/21/2019 2/21/2019
days

2/21/2019 2/21/2019 2/21/2019 2/21/2019 2271SS

2272FS+2
2/24/2019 2/25/2019 2/24/2019 2/25/2019
days

2273SS+2
2/26/2019 2/27/2019 2/26/2019 2/27/2019
days

2/26/2019 2/27/2019 2/26/2019 2/27/2019 2274SS


2/28/2019 2/28/2019 2/28/2019 2/28/2019 2275

2/24/2019 3/3/2019 2/24/2019 3/3/2019

2271FS+2
2/24/2019 2/24/2019 2/24/2019 2/24/2019
days

2/24/2019 2/24/2019 2/24/2019 2/24/2019 2278SS

2279FS+2
2/27/2019 2/28/2019 2/27/2019 2/28/2019
days

2280SS+2
3/1/2019 3/2/2019 3/1/2019 3/2/2019
days

3/3/2019 3/3/2019 3/3/2019 3/3/2019 2281

3/6/2019 3/15/2019 3/6/2019 3/15/2019

2282FS+2
3/6/2019 3/6/2019 3/6/2019 3/6/2019
days

3/6/2019 3/6/2019 3/6/2019 3/6/2019 2284SS

2285FS+2
3/9/2019 3/11/2019 3/9/2019 3/11/2019
days

3/12/2019 3/14/2019 3/12/2019 3/14/2019 2286

3/15/2019 3/15/2019 3/15/2019 3/15/2019 2287

2/12/2019 5/21/2019 2/12/2019 5/21/2019

2264SS+5
2/12/2019 4/17/2019 2/12/2019 4/17/2019
days

4/18/2019 5/21/2019 4/18/2019 5/21/2019 2290


2/12/2019 5/28/2019 2/12/2019 5/28/2019

2/12/2019 4/27/2019 2/12/2019 4/27/2019 2289SS

4/28/2019 5/28/2019 4/28/2019 5/28/2019 2293

3/14/2019 3/14/2019 3/14/2019 3/14/2019

6/18/2019 7/13/2019 6/18/2019 7/13/2019

2288FS+94
6/18/2019 7/13/2019 6/18/2019 7/13/2019
days

7/14/2019 8/9/2019 7/14/2019 8/9/2019

7/14/2019 7/27/2019 7/14/2019 7/27/2019 2297

7/28/2019 8/9/2019 7/28/2019 8/9/2019 2299

8/9/2019 8/9/2019 8/9/2019 8/9/2019 2300

12/11/2018 5/13/2019 12/11/2018 4/10/2019

12/11/2018 12/11/2018 12/11/2018 12/11/2018

2/24/2019 3/3/2019 1/22/2019 1/29/2019

2/24/2019 3/3/2019 1/22/2019 1/29/2019 79

2/27/2019 3/3/2019 1/25/2019 1/29/2019 2305FF

3/12/2019 4/17/2019 2/7/2019 3/15/2019


3/12/2019 3/21/2019 2/7/2019 2/16/2019

2306FS+8
3/12/2019 3/12/2019 2/7/2019 2/7/2019
days

3/12/2019 3/12/2019 2/7/2019 2/7/2019 2309SS

2310FS+2
3/15/2019 3/17/2019 2/10/2019 2/12/2019
days

3/18/2019 3/20/2019 2/13/2019 2/15/2019 2311

3/21/2019 3/21/2019 2/16/2019 2/16/2019 2312

3/24/2019 4/1/2019 2/19/2019 2/27/2019

2313FS+2
3/24/2019 3/24/2019 2/19/2019 2/19/2019
days

3/24/2019 3/24/2019 2/19/2019 2/19/2019 2315SS

2316FS+2
3/27/2019 3/29/2019 2/22/2019 2/24/2019
days

2317SS+2
3/29/2019 3/31/2019 2/24/2019 2/26/2019
days

3/29/2019 3/31/2019 2/24/2019 2/26/2019 2318SS

4/1/2019 4/1/2019 2/27/2019 2/27/2019 2319

3/27/2019 4/4/2019 2/22/2019 3/2/2019

2315FS+2
3/27/2019 3/27/2019 2/22/2019 2/22/2019
days

3/27/2019 3/27/2019 2/22/2019 2/22/2019 2322SS


2323FS+2
3/30/2019 4/1/2019 2/25/2019 2/27/2019
days

2324SS+2
4/1/2019 4/3/2019 2/27/2019 3/1/2019
days

4/4/2019 4/4/2019 3/2/2019 3/2/2019 2325

4/7/2019 4/17/2019 3/5/2019 3/15/2019

2326FS+2
4/7/2019 4/7/2019 3/5/2019 3/5/2019
days

4/7/2019 4/7/2019 3/5/2019 3/5/2019 2328SS

2329FS+2
4/10/2019 4/12/2019 3/8/2019 3/10/2019
days

4/13/2019 4/15/2019 3/11/2019 3/13/2019 2330

4/16/2019 4/17/2019 3/14/2019 3/15/2019 2331

4/19/2019 4/22/2019 3/17/2019 3/20/2019

2332FS+1
4/19/2019 4/22/2019 3/17/2019 3/20/2019
day

4/23/2019 5/9/2019 3/21/2019 4/6/2019

4/23/2019 4/23/2019 3/21/2019 3/21/2019 2334

4/23/2019 4/24/2019 3/21/2019 3/22/2019 2336SS

2337FS+3
4/28/2019 5/2/2019 3/26/2019 3/30/2019
days

5/3/2019 5/7/2019 3/31/2019 4/4/2019 2338


5/8/2019 5/9/2019 4/5/2019 4/6/2019 2339

4/24/2019 5/1/2019 3/22/2019 3/29/2019

2334FS+1
4/24/2019 5/1/2019 3/22/2019 3/29/2019
day

3/27/2019 3/27/2019 3/27/2019 3/27/2019

5/11/2019 5/13/2019 4/8/2019 4/10/2019

2342FS+9
5/11/2019 5/13/2019 4/8/2019 4/10/2019
days

5/13/2019 5/13/2019 4/10/2019 4/10/2019 2345

12/12/2018 9/5/2019 12/12/2018 8/19/2019

12/12/2018 12/12/2018 12/12/2018 12/12/2018

2/24/2019 3/3/2019 2/7/2019 2/14/2019

2/24/2019 3/3/2019 2/7/2019 2/14/2019 76

2/27/2019 3/3/2019 2/10/2019 2/14/2019 2350FF

2/28/2019 6/7/2019 2/11/2019 5/21/2019

2351FS-4
2/28/2019 5/8/2019 2/11/2019 4/21/2019
days

5/9/2019 6/7/2019 4/22/2019 5/21/2019 2353

2/28/2019 6/13/2019 2/11/2019 5/27/2019


2/28/2019 5/14/2019 2/11/2019 4/27/2019 2353SS

5/15/2019 6/13/2019 4/28/2019 5/27/2019 2356

3/4/2019 4/9/2019 2/15/2019 3/23/2019

3/4/2019 3/13/2019 2/15/2019 2/24/2019

3/4/2019 3/4/2019 2/15/2019 2/15/2019 2351

3/4/2019 3/4/2019 2/15/2019 2/15/2019 2360SS

2361FS+2
3/7/2019 3/9/2019 2/18/2019 2/20/2019
days

3/10/2019 3/12/2019 2/21/2019 2/23/2019 2362

3/13/2019 3/13/2019 2/24/2019 2/24/2019 2363

3/16/2019 3/25/2019 2/27/2019 3/8/2019

2364FS+2
3/16/2019 3/16/2019 2/27/2019 2/27/2019
days

3/16/2019 3/16/2019 2/27/2019 2/27/2019 2366SS

2367FS+2
3/19/2019 3/21/2019 3/2/2019 3/4/2019
days

2368SS+2
3/21/2019 3/23/2019 3/4/2019 3/6/2019
days

3/21/2019 3/23/2019 3/4/2019 3/6/2019 2369SS

3/24/2019 3/25/2019 3/7/2019 3/8/2019 2370


3/19/2019 3/28/2019 3/2/2019 3/11/2019

2366FS+2
3/19/2019 3/19/2019 3/2/2019 3/2/2019
days

3/19/2019 3/19/2019 3/2/2019 3/2/2019 2373SS

2374FS+2
3/22/2019 3/24/2019 3/5/2019 3/7/2019
days

2375SS+2
3/24/2019 3/26/2019 3/7/2019 3/9/2019
days

3/27/2019 3/28/2019 3/10/2019 3/11/2019 2376

3/31/2019 4/9/2019 3/14/2019 3/23/2019

2377FS+2
3/31/2019 3/31/2019 3/14/2019 3/14/2019
days

3/31/2019 3/31/2019 3/14/2019 3/14/2019 2379SS

2380FS+2
4/3/2019 4/5/2019 3/17/2019 3/19/2019
days

4/6/2019 4/8/2019 3/20/2019 3/22/2019 2381

4/9/2019 4/9/2019 3/23/2019 3/23/2019 2382

4/9/2019 4/9/2019 3/23/2019 3/23/2019 2383

7/11/2019 8/6/2019 6/24/2019 7/20/2019

2383FS+92
7/11/2019 8/6/2019 6/24/2019 7/20/2019
days

8/8/2019 9/5/2019 7/22/2019 8/19/2019


2386FS+1
8/8/2019 8/22/2019 7/22/2019 8/5/2019
day

8/23/2019 9/5/2019 8/6/2019 8/19/2019 2388

9/5/2019 9/5/2019 8/19/2019 8/19/2019 2389

12/27/2018 7/6/2019 12/27/2018 7/6/2019

12/27/2018 12/27/2018 12/27/2018 12/27/2018

12/27/2018 12/27/2018 12/27/2018 12/27/2018

4/10/2019 4/15/2019 4/10/2019 4/15/2019

88SS-40
4/10/2019 4/15/2019 4/10/2019 4/15/2019
days

4/12/2019 4/15/2019 4/12/2019 4/15/2019 2395FF

4/17/2019 4/23/2019 4/17/2019 4/23/2019

2396FS+1
4/17/2019 4/23/2019 4/17/2019 4/23/2019
day

4/25/2019 5/31/2019 4/25/2019 5/31/2019

4/25/2019 5/4/2019 4/25/2019 5/4/2019

2398FS+1
4/25/2019 4/25/2019 4/25/2019 4/25/2019
day

4/25/2019 4/25/2019 4/25/2019 4/25/2019 2401SS

2402FS+2
4/28/2019 4/30/2019 4/28/2019 4/30/2019
days
5/1/2019 5/3/2019 5/1/2019 5/3/2019 2403

5/4/2019 5/4/2019 5/4/2019 5/4/2019 2404

5/7/2019 5/15/2019 5/7/2019 5/15/2019

2405FS+2
5/7/2019 5/7/2019 5/7/2019 5/7/2019
days

5/7/2019 5/7/2019 5/7/2019 5/7/2019 2407SS

2408FS+2
5/10/2019 5/12/2019 5/10/2019 5/12/2019
days

2409SS+2
5/12/2019 5/14/2019 5/12/2019 5/14/2019
days

5/12/2019 5/14/2019 5/12/2019 5/14/2019 2410SS

5/15/2019 5/15/2019 5/15/2019 5/15/2019 2411

5/10/2019 5/18/2019 5/10/2019 5/18/2019

2407FS+2
5/10/2019 5/10/2019 5/10/2019 5/10/2019
days

5/10/2019 5/10/2019 5/10/2019 5/10/2019 2414SS

2415FS+2
5/13/2019 5/15/2019 5/13/2019 5/15/2019
days

2416SS+2
5/15/2019 5/17/2019 5/15/2019 5/17/2019
days

5/18/2019 5/18/2019 5/18/2019 5/18/2019 2417

5/21/2019 5/31/2019 5/21/2019 5/31/2019


2418FS+2
5/21/2019 5/21/2019 5/21/2019 5/21/2019
days

5/21/2019 5/21/2019 5/21/2019 5/21/2019 2420SS

2421FS+2
5/24/2019 5/26/2019 5/24/2019 5/26/2019
days

5/27/2019 5/29/2019 5/27/2019 5/29/2019 2422

5/30/2019 5/31/2019 5/30/2019 5/31/2019 2423

5/18/2019 5/23/2019 5/18/2019 5/23/2019

2424FS-14
5/18/2019 5/23/2019 5/18/2019 5/23/2019
days

5/19/2019 5/23/2019 5/19/2019 5/23/2019 2426FF

5/26/2019 5/30/2019 5/26/2019 5/30/2019

2427FS+2
5/26/2019 5/30/2019 5/26/2019 5/30/2019
days

5/30/2019 5/30/2019 5/30/2019 5/30/2019 2429

6/1/2019 7/6/2019 6/1/2019 7/6/2019

6/1/2019 6/10/2019 6/1/2019 6/10/2019

2429FS+1
6/1/2019 6/1/2019 6/1/2019 6/1/2019
day

6/1/2019 6/1/2019 6/1/2019 6/1/2019 2433SS

2434FS+2
6/4/2019 6/6/2019 6/4/2019 6/6/2019
days
6/7/2019 6/9/2019 6/7/2019 6/9/2019 2435

6/10/2019 6/10/2019 6/10/2019 6/10/2019 2436

6/13/2019 6/21/2019 6/13/2019 6/21/2019

2437FS+2
6/13/2019 6/13/2019 6/13/2019 6/13/2019
days

6/13/2019 6/13/2019 6/13/2019 6/13/2019 2439SS

2440FS+2
6/16/2019 6/18/2019 6/16/2019 6/18/2019
days

2441SS+2
6/18/2019 6/20/2019 6/18/2019 6/20/2019
days

6/18/2019 6/20/2019 6/18/2019 6/20/2019 2442SS

6/21/2019 6/21/2019 6/21/2019 6/21/2019 2443

6/16/2019 6/24/2019 6/16/2019 6/24/2019

2439FS+2
6/16/2019 6/16/2019 6/16/2019 6/16/2019
days

6/16/2019 6/16/2019 6/16/2019 6/16/2019 2446SS

2447FS+2
6/19/2019 6/21/2019 6/19/2019 6/21/2019
days

2448SS+2
6/21/2019 6/23/2019 6/21/2019 6/23/2019
days

6/24/2019 6/24/2019 6/24/2019 6/24/2019 2449

6/27/2019 7/6/2019 6/27/2019 7/6/2019


2450FS+2
6/27/2019 6/27/2019 6/27/2019 6/27/2019
days

6/27/2019 6/27/2019 6/27/2019 6/27/2019 2452SS

2453FS+2
6/30/2019 7/2/2019 6/30/2019 7/2/2019
days

7/3/2019 7/5/2019 7/3/2019 7/5/2019 2454

7/6/2019 7/6/2019 7/6/2019 7/6/2019 2455

7/6/2019 7/6/2019 7/6/2019 7/6/2019 2456

2/6/2019 7/9/2019 2/6/2019 7/9/2019

2/6/2019 2/6/2019 2/6/2019 2/6/2019

3/20/2019 4/9/2019 3/20/2019 4/9/2019

3/20/2019 4/9/2019 3/20/2019 4/9/2019 50

3/29/2019 4/9/2019 3/29/2019 4/9/2019 2461FF

3/31/2019 4/9/2019 3/31/2019 4/9/2019 2462FF

4/10/2019 7/9/2019 4/10/2019 7/9/2019

4/10/2019 5/1/2019 4/10/2019 5/1/2019

4/10/2019 4/11/2019 4/10/2019 4/11/2019 2463

4/10/2019 4/12/2019 4/10/2019 4/12/2019 2466SS


2467FS+2
4/15/2019 4/21/2019 4/15/2019 4/21/2019
days

4/22/2019 4/28/2019 4/22/2019 4/28/2019 2468

4/29/2019 5/1/2019 4/29/2019 5/1/2019 2469

5/4/2019 5/20/2019 5/4/2019 5/20/2019

2470FS+2
5/4/2019 5/5/2019 5/4/2019 5/5/2019
days

5/4/2019 5/6/2019 5/4/2019 5/6/2019 2472SS

2473FS+2
5/9/2019 5/15/2019 5/9/2019 5/15/2019
days

2474SS+2
5/11/2019 5/17/2019 5/11/2019 5/17/2019
days

5/11/2019 5/17/2019 5/11/2019 5/17/2019 2475SS

5/18/2019 5/20/2019 5/18/2019 5/20/2019 2476

5/8/2019 5/25/2019 5/8/2019 5/25/2019

2472FS+2
5/8/2019 5/9/2019 5/8/2019 5/9/2019
days

5/8/2019 5/10/2019 5/8/2019 5/10/2019 2479SS

2480FS+2
5/13/2019 5/19/2019 5/13/2019 5/19/2019
days

2481SS+2
5/15/2019 5/22/2019 5/15/2019 5/22/2019
days

5/23/2019 5/25/2019 5/23/2019 5/25/2019 2482


5/28/2019 7/9/2019 5/28/2019 7/9/2019

2483FS+2
5/28/2019 5/29/2019 5/28/2019 5/29/2019
days

5/28/2019 5/30/2019 5/28/2019 5/30/2019 2485SS

2486FS+2
6/2/2019 6/18/2019 6/2/2019 6/18/2019
days

6/19/2019 7/5/2019 6/19/2019 7/5/2019 2487

7/6/2019 7/9/2019 7/6/2019 7/9/2019 2488

7/9/2019 7/9/2019 7/9/2019 7/9/2019 2489

8/28/2018 9/29/2019 8/28/2018 9/29/2019

8/28/2018 6/12/2019 8/28/2018 6/12/2019

8/28/2018 8/28/2018 8/28/2018 8/28/2018

12/14/2018 12/14/2018 12/14/2018 12/14/2018

12/23/2018 1/23/2019 12/23/2018 1/23/2019

60FS-15
12/23/2018 1/23/2019 12/23/2018 1/23/2019
days

12/27/2018 1/23/2019 12/27/2018 1/23/2019 2496FF

12/31/2018 1/31/2019 12/31/2018 1/31/2019

2496SS+8
12/31/2018 1/31/2019 12/31/2018 1/31/2019
days
1/4/2019 1/31/2019 1/4/2019 1/31/2019 2499FF

1/1/2019 5/11/2019 1/1/2019 5/11/2019

1/1/2019 3/4/2019 1/1/2019 3/4/2019

2495SS+9
1/1/2019 1/2/2019 1/1/2019 1/2/2019
days

1/1/2019 1/7/2019 1/1/2019 1/7/2019 2503SS

2504FS+7
1/15/2019 2/4/2019 1/15/2019 2/4/2019
days

2/5/2019 2/25/2019 2/5/2019 2/25/2019 2505

2/26/2019 3/4/2019 2/26/2019 3/4/2019 2506

3/12/2019 5/11/2019 3/12/2019 5/11/2019

2507FS+7
3/12/2019 3/13/2019 3/12/2019 3/13/2019
days

3/12/2019 3/18/2019 3/12/2019 3/18/2019 2509SS

2510FS+5
3/24/2019 4/13/2019 3/24/2019 4/13/2019
days

4/14/2019 5/4/2019 4/14/2019 5/4/2019 2511

5/5/2019 5/11/2019 5/5/2019 5/11/2019 2512

2/2/2019 6/12/2019 2/2/2019 6/12/2019

2/2/2019 4/4/2019 2/2/2019 4/4/2019


2500FS+1
2/2/2019 2/3/2019 2/2/2019 2/3/2019
day

2/2/2019 2/7/2019 2/2/2019 2/7/2019 2516SS

2517FS+7
2/15/2019 3/7/2019 2/15/2019 3/7/2019
days

3/8/2019 3/28/2019 3/8/2019 3/28/2019 2518

3/29/2019 4/4/2019 3/29/2019 4/4/2019 2519

4/12/2019 6/12/2019 4/12/2019 6/12/2019

2520FS+7
4/12/2019 4/13/2019 4/12/2019 4/13/2019
days

4/12/2019 4/17/2019 4/12/2019 4/17/2019 2522SS

2523FS+7
4/25/2019 5/15/2019 4/25/2019 5/15/2019
days

5/16/2019 6/5/2019 5/16/2019 6/5/2019 2524

6/6/2019 6/12/2019 6/6/2019 6/12/2019 2525

5/8/2019 5/8/2019 5/8/2019 5/8/2019

6/8/2019 6/8/2019 6/8/2019 6/8/2019

11/5/2018 9/29/2019 11/5/2018 9/29/2019

11/5/2018 11/5/2018 11/5/2018 11/5/2018

11/22/2018 12/31/2018 11/22/2018 12/31/2018


1/1/2019 6/2/2019 1/1/2019 6/2/2019

1/1/2019 4/30/2019 1/1/2019 4/30/2019

5/1/2019 6/2/2019 5/1/2019 6/2/2019 2533

1/8/2019 1/8/2019 1/8/2019 1/8/2019

3/8/2019 3/8/2019 3/8/2019 3/8/2019

4/16/2019 5/28/2019 4/16/2019 5/28/2019

4/16/2019 5/7/2019 4/16/2019 5/7/2019 43

4/24/2019 5/7/2019 4/24/2019 5/7/2019 2538FF

5/8/2019 5/28/2019 5/8/2019 5/28/2019 2539

5/3/2019 6/28/2019 5/3/2019 6/28/2019

5/3/2019 5/20/2019 5/3/2019 5/20/2019

2538SS+17
5/3/2019 5/3/2019 5/3/2019 5/3/2019
days

5/3/2019 5/4/2019 5/3/2019 5/4/2019 2543SS

2544FS+2
5/7/2019 5/12/2019 5/7/2019 5/12/2019
days

5/13/2019 5/18/2019 5/13/2019 5/18/2019 2545

5/19/2019 5/20/2019 5/19/2019 5/20/2019 2546


5/23/2019 6/5/2019 5/23/2019 6/5/2019

2547FS+2
5/23/2019 5/23/2019 5/23/2019 5/23/2019
days

5/23/2019 5/24/2019 5/23/2019 5/24/2019 2549SS

2550FS+2
5/27/2019 6/1/2019 5/27/2019 6/1/2019
days

2551SS+2
5/29/2019 6/3/2019 5/29/2019 6/3/2019
days

5/29/2019 6/3/2019 5/29/2019 6/3/2019 2552SS

6/4/2019 6/5/2019 6/4/2019 6/5/2019 2553

5/26/2019 6/7/2019 5/26/2019 6/7/2019

2549FS+2
5/26/2019 5/26/2019 5/26/2019 5/26/2019
days

5/26/2019 5/27/2019 5/26/2019 5/27/2019 2556SS

2557FS+2
5/30/2019 6/4/2019 5/30/2019 6/4/2019
days

2558SS+2
6/1/2019 6/6/2019 6/1/2019 6/6/2019
days

6/7/2019 6/7/2019 6/7/2019 6/7/2019 2559

6/10/2019 6/28/2019 6/10/2019 6/28/2019

2560FS+2
6/10/2019 6/10/2019 6/10/2019 6/10/2019
days

6/10/2019 6/11/2019 6/10/2019 6/11/2019 2562SS


2563FS+2
6/14/2019 6/19/2019 6/14/2019 6/19/2019
days

6/20/2019 6/25/2019 6/20/2019 6/25/2019 2564

6/26/2019 6/28/2019 6/26/2019 6/28/2019 2565

6/30/2019 9/29/2019 6/30/2019 9/29/2019

2566FS+1
6/30/2019 9/29/2019 6/30/2019 9/29/2019
day

9/29/2019 9/29/2019 9/29/2019 9/29/2019 2568FF

11/9/2018 7/23/2019 11/9/2018 5/4/2019

11/9/2018 11/9/2018 11/9/2018 11/9/2018

11/9/2018 11/9/2018 11/9/2018 11/9/2018

3/1/2019 3/8/2019 12/11/2018 12/18/2018

3/1/2019 3/8/2019 12/11/2018 12/18/2018 67

3/4/2019 3/8/2019 12/14/2018 12/18/2018 2574FF

3/9/2019 4/10/2019 12/19/2018 1/20/2019

3/9/2019 3/21/2019 12/19/2018 12/31/2018

3/9/2019 3/9/2019 12/19/2018 12/19/2018 2575

3/9/2019 3/9/2019 12/19/2018 12/19/2018 2578SS


2579FS+7
3/17/2019 3/18/2019 12/27/2018 12/28/2018
days

3/19/2019 3/20/2019 12/29/2018 12/30/2018 2580

3/21/2019 3/21/2019 12/31/2018 12/31/2018 2581

3/29/2019 4/10/2019 1/8/2019 1/20/2019

2582FS+7
3/29/2019 3/29/2019 1/8/2019 1/8/2019
days

3/29/2019 3/29/2019 1/8/2019 1/8/2019 2584SS

2585FS+6
4/5/2019 4/6/2019 1/15/2019 1/16/2019
days

4/7/2019 4/8/2019 1/17/2019 1/18/2019 2586

4/9/2019 4/10/2019 1/19/2019 1/20/2019 2587

4/13/2019 6/14/2019 1/23/2019 3/26/2019

2588FS+2
4/13/2019 5/27/2019 1/23/2019 3/8/2019
days

2590FS-15
5/13/2019 6/14/2019 2/22/2019 3/26/2019
days

6/20/2019 6/23/2019 4/1/2019 4/4/2019

2591FS+5
6/20/2019 6/23/2019 4/1/2019 4/4/2019
days

6/25/2019 7/15/2019 4/6/2019 4/26/2019

6/25/2019 7/2/2019 4/6/2019 4/13/2019


2593FS+1
6/25/2019 6/25/2019 4/6/2019 4/6/2019
day

6/25/2019 6/25/2019 4/6/2019 4/6/2019 2596SS

2597FS+2
6/28/2019 6/29/2019 4/9/2019 4/10/2019
days

6/30/2019 7/1/2019 4/11/2019 4/12/2019 2598

7/2/2019 7/2/2019 4/13/2019 4/13/2019 2599

7/10/2019 7/15/2019 4/21/2019 4/26/2019

2600FS+7
7/10/2019 7/10/2019 4/21/2019 4/21/2019
days

7/10/2019 7/10/2019 4/21/2019 4/21/2019 2602SS

7/11/2019 7/12/2019 4/22/2019 4/23/2019 2603

7/13/2019 7/14/2019 4/24/2019 4/25/2019 2604

7/15/2019 7/15/2019 4/26/2019 4/26/2019 2605

7/17/2019 7/23/2019 4/28/2019 5/4/2019

2606FS+1
7/17/2019 7/23/2019 4/28/2019 5/4/2019
day

2606FS+4
7/19/2019 7/19/2019 4/30/2019 4/30/2019
days

3/7/2019 5/29/2019 3/7/2019 5/29/2019

3/7/2019 3/7/2019 3/7/2019 3/7/2019


3/15/2019 4/19/2019 3/15/2019 4/19/2019

1020FS-90
3/15/2019 4/19/2019 3/15/2019 4/19/2019
days

3/22/2019 5/13/2019 3/22/2019 5/13/2019

3/22/2019 4/6/2019 3/22/2019 4/6/2019

2613SS+7
3/22/2019 3/22/2019 3/22/2019 3/22/2019
days

3/22/2019 3/23/2019 3/22/2019 3/23/2019 2616SS

2617FS+2
3/26/2019 3/30/2019 3/26/2019 3/30/2019
days

3/31/2019 4/4/2019 3/31/2019 4/4/2019 2618

4/5/2019 4/6/2019 4/5/2019 4/6/2019 2619

4/9/2019 4/21/2019 4/9/2019 4/21/2019

2620FS+2
4/9/2019 4/9/2019 4/9/2019 4/9/2019
days

4/9/2019 4/10/2019 4/9/2019 4/10/2019 2622SS

2623FS+2
4/13/2019 4/17/2019 4/13/2019 4/17/2019
days

2624SS+2
4/15/2019 4/19/2019 4/15/2019 4/19/2019
days

4/15/2019 4/19/2019 4/15/2019 4/19/2019 2625SS

4/20/2019 4/21/2019 4/20/2019 4/21/2019 2626


4/12/2019 4/24/2019 4/12/2019 4/24/2019

2622FS+2
4/12/2019 4/12/2019 4/12/2019 4/12/2019
days

4/12/2019 4/13/2019 4/12/2019 4/13/2019 2629SS

2630FS+2
4/16/2019 4/20/2019 4/16/2019 4/20/2019
days

2631SS+2
4/18/2019 4/22/2019 4/18/2019 4/22/2019
days

4/23/2019 4/24/2019 4/23/2019 4/24/2019 2632

4/27/2019 5/13/2019 4/27/2019 5/13/2019

2633FS+2
4/27/2019 4/27/2019 4/27/2019 4/27/2019
days

4/27/2019 4/28/2019 4/27/2019 4/28/2019 2635SS

2636FS+2
5/1/2019 5/5/2019 5/1/2019 5/5/2019
days

5/6/2019 5/10/2019 5/6/2019 5/10/2019 2637

5/11/2019 5/13/2019 5/11/2019 5/13/2019 2638

4/9/2019 5/29/2019 4/9/2019 5/29/2019

2615SS+18
4/9/2019 5/29/2019 4/9/2019 5/29/2019
days

5/29/2019 5/29/2019 5/29/2019 5/29/2019 2641

8/28/2018 3/2/2019 8/28/2018 3/2/2019


8/28/2018 8/28/2018 8/28/2018 8/28/2018

10/11/2018 11/17/2018 10/11/2018 11/17/2018

10/11/2018 11/15/2018 10/11/2018 11/15/2018

10/21/2018 11/17/2018 10/21/2018 11/17/2018 2646FF

10/26/2018 3/2/2019 10/26/2018 3/2/2019

10/26/2018 12/27/2018 10/26/2018 12/27/2018

2646SS+15
10/26/2018 10/27/2018 10/26/2018 10/27/2018
days

10/26/2018 11/1/2018 10/26/2018 11/1/2018 2650SS

2651FS+7
11/9/2018 11/29/2018 11/9/2018 11/29/2018
days

11/30/2018 12/20/2018 11/30/2018 12/20/2018 2652

12/21/2018 12/27/2018 12/21/2018 12/27/2018 2653

1/4/2019 3/2/2019 1/4/2019 3/2/2019

2654FS+7
1/4/2019 1/5/2019 1/4/2019 1/5/2019
days

1/4/2019 1/9/2019 1/4/2019 1/9/2019 2656SS

2657FS+6
1/16/2019 2/5/2019 1/16/2019 2/5/2019
days

2/6/2019 2/26/2019 2/6/2019 2/26/2019 2658


2/27/2019 3/2/2019 2/27/2019 3/2/2019 2659

3/2/2019 3/2/2019 3/2/2019 3/2/2019 2660

12/14/2018 4/24/2019 12/14/2018 4/24/2019

12/14/2018 12/14/2018 12/14/2018 12/14/2018

12/14/2018 12/14/2018 12/14/2018 12/14/2018

12/26/2018 3/10/2019 12/26/2018 3/10/2019

12/26/2018 1/28/2019 12/26/2018 1/28/2019

29SS;39SS-
12/26/2018 12/26/2018 12/26/2018 12/26/2018
30 days

12/26/2018 12/28/2018 12/26/2018 12/28/2018 2667SS

2668FS+7
1/5/2019 1/14/2019 1/5/2019 1/14/2019
days

1/15/2019 1/24/2019 1/15/2019 1/24/2019 2669

1/25/2019 1/28/2019 1/25/2019 1/28/2019 2670

2/5/2019 3/10/2019 2/5/2019 3/10/2019

2671FS+7
2/5/2019 2/5/2019 2/5/2019 2/5/2019
days

2/5/2019 2/7/2019 2/5/2019 2/7/2019 2673SS

2674FS+7
2/15/2019 2/24/2019 2/15/2019 2/24/2019
days
2/25/2019 3/6/2019 2/25/2019 3/6/2019 2675

3/7/2019 3/10/2019 3/7/2019 3/10/2019 2676

12/26/2018 3/8/2019 12/26/2018 3/8/2019

12/26/2018 1/28/2019 12/26/2018 1/28/2019

12/26/2018 12/26/2018 12/26/2018 12/26/2018 2666SS

12/26/2018 12/29/2018 12/26/2018 12/29/2018 2680SS

2681FS+2
1/1/2019 1/12/2019 1/1/2019 1/12/2019
days

1/13/2019 1/24/2019 1/13/2019 1/24/2019 2682

1/25/2019 1/28/2019 1/25/2019 1/28/2019 2683

2/5/2019 3/8/2019 2/5/2019 3/8/2019

2684FS+7
2/5/2019 2/5/2019 2/5/2019 2/5/2019
days

2/5/2019 2/8/2019 2/5/2019 2/8/2019 2686SS

2687FS+2
2/11/2019 2/22/2019 2/11/2019 2/22/2019
days

2/23/2019 3/4/2019 2/23/2019 3/4/2019 2688

3/5/2019 3/8/2019 3/5/2019 3/8/2019 2689

3/8/2019 3/8/2019 3/8/2019 3/8/2019 2690


2691FS+47
4/24/2019 4/24/2019 4/24/2019 4/24/2019
days

1/28/2019 4/25/2019 1/28/2019 4/24/2019

1/28/2019 1/28/2019 1/28/2019 1/28/2019

2/6/2019 3/6/2019 2/5/2019 3/5/2019

2/6/2019 3/6/2019 2/5/2019 3/5/2019 78

2/14/2019 3/6/2019 2/13/2019 3/5/2019 2696FF

2/21/2019 4/25/2019 2/20/2019 4/24/2019

2/21/2019 3/21/2019 2/20/2019 3/20/2019

2696SS+15
2/21/2019 2/21/2019 2/20/2019 2/20/2019
days

2/21/2019 2/23/2019 2/20/2019 2/22/2019 2700SS

2701FS+2
2/26/2019 3/7/2019 2/25/2019 3/6/2019
days

3/8/2019 3/17/2019 3/7/2019 3/16/2019 2702

3/18/2019 3/21/2019 3/17/2019 3/20/2019 2703

3/29/2019 4/25/2019 3/28/2019 4/24/2019

2704FS+7
3/29/2019 3/29/2019 3/28/2019 3/28/2019
days

3/29/2019 3/30/2019 3/28/2019 3/29/2019 2706SS


2707FS+4
4/4/2019 4/13/2019 4/3/2019 4/12/2019
days

4/14/2019 4/23/2019 4/13/2019 4/22/2019 2708

4/24/2019 4/25/2019 4/23/2019 4/24/2019 2709

4/25/2019 4/25/2019 4/24/2019 4/24/2019 2710

12/11/2018 5/28/2019 12/11/2018 5/13/2019

12/11/2018 3/28/2019 12/11/2018 3/28/2019

12/11/2018 2/23/2019 12/11/2018 2/23/2019

2/24/2019 3/28/2019 2/24/2019 3/28/2019 2714

12/31/2018 12/31/2018 12/31/2018 12/31/2018

2/6/2019 2/19/2019 1/22/2019 2/4/2019

2/6/2019 2/19/2019 1/22/2019 2/4/2019 59

2/10/2019 2/19/2019 1/26/2019 2/4/2019 2718FF

2/20/2019 4/14/2019 2/5/2019 3/30/2019

2/20/2019 3/7/2019 2/5/2019 2/20/2019

2/20/2019 2/20/2019 2/5/2019 2/5/2019 2719

2/20/2019 2/21/2019 2/5/2019 2/6/2019 2722SS


2723FS+2
2/24/2019 2/28/2019 2/9/2019 2/13/2019
days

3/1/2019 3/5/2019 2/14/2019 2/18/2019 2724

3/6/2019 3/7/2019 2/19/2019 2/20/2019 2725

3/10/2019 3/22/2019 2/23/2019 3/7/2019

2726FS+2
3/10/2019 3/10/2019 2/23/2019 2/23/2019
days

3/10/2019 3/11/2019 2/23/2019 2/24/2019 2728SS

2729FS+2
3/14/2019 3/18/2019 2/27/2019 3/3/2019
days

2730SS+2
3/16/2019 3/20/2019 3/1/2019 3/5/2019
days

3/16/2019 3/20/2019 3/1/2019 3/5/2019 2731SS

3/21/2019 3/22/2019 3/6/2019 3/7/2019 2732

3/13/2019 3/25/2019 2/26/2019 3/10/2019

2728FS+2
3/13/2019 3/13/2019 2/26/2019 2/26/2019
days

3/13/2019 3/14/2019 2/26/2019 2/27/2019 2735SS

2736FS+2
3/17/2019 3/21/2019 3/2/2019 3/6/2019
days

2737SS+2
3/19/2019 3/23/2019 3/4/2019 3/8/2019
days

3/24/2019 3/25/2019 3/9/2019 3/10/2019 2738


3/28/2019 4/14/2019 3/13/2019 3/30/2019

2739FS+2
3/28/2019 3/28/2019 3/13/2019 3/13/2019
days

3/28/2019 3/30/2019 3/13/2019 3/15/2019 2741SS

2742FS+2
4/2/2019 4/6/2019 3/18/2019 3/22/2019
days

4/7/2019 4/11/2019 3/23/2019 3/27/2019 2743

4/12/2019 4/14/2019 3/28/2019 3/30/2019 2744

2745SS+1
4/12/2019 4/12/2019 3/29/2019 3/29/2019
day

4/18/2019 5/28/2019 4/3/2019 5/13/2019

2745FS+3
4/18/2019 5/28/2019 4/3/2019 5/13/2019
days

5/28/2019 5/28/2019 5/13/2019 5/13/2019 2748

12/27/2018 2/6/2020 12/27/2018 2/6/2020

5/7/2019 9/25/2019 5/7/2019 9/25/2019

5/7/2019 5/7/2019 5/7/2019 5/7/2019

5/25/2019 5/25/2019 5/25/2019 5/25/2019

6/5/2019 6/15/2019 6/5/2019 6/15/2019

6/5/2019 6/15/2019 6/5/2019 6/15/2019


6/12/2019 6/12/2019 6/12/2019 6/12/2019

6/18/2019 7/11/2019 6/18/2019 7/11/2019

6/18/2019 6/23/2019 6/18/2019 6/23/2019

2755FS+2
6/18/2019 6/18/2019 6/18/2019 6/18/2019
days

6/18/2019 6/18/2019 6/18/2019 6/18/2019 2759SS

2760FS+2
6/21/2019 6/21/2019 6/21/2019 6/21/2019
days

6/22/2019 6/22/2019 6/22/2019 6/22/2019 2761

6/23/2019 6/23/2019 6/23/2019 6/23/2019 2762

6/26/2019 7/2/2019 6/26/2019 7/2/2019

2763FS+2
6/26/2019 6/26/2019 6/26/2019 6/26/2019
days

6/26/2019 6/26/2019 6/26/2019 6/26/2019 2765SS

2766FS+2
6/29/2019 6/29/2019 6/29/2019 6/29/2019
days

2767SS+2
7/1/2019 7/1/2019 7/1/2019 7/1/2019
days

7/1/2019 7/1/2019 7/1/2019 7/1/2019 2768SS

7/2/2019 7/2/2019 7/2/2019 7/2/2019 2769

6/29/2019 7/4/2019 6/29/2019 7/4/2019


2765FS+2
6/29/2019 6/29/2019 6/29/2019 6/29/2019
days

6/29/2019 6/29/2019 6/29/2019 6/29/2019 2772SS

2773FS+2
7/2/2019 7/2/2019 7/2/2019 7/2/2019
days

2774SS+1
7/3/2019 7/3/2019 7/3/2019 7/3/2019
day

7/4/2019 7/4/2019 7/4/2019 7/4/2019 2775

7/7/2019 7/11/2019 7/7/2019 7/11/2019

2776FS+2
7/7/2019 7/7/2019 7/7/2019 7/7/2019
days

7/7/2019 7/7/2019 7/7/2019 7/7/2019 2778SS

2779FS+1
7/9/2019 7/9/2019 7/9/2019 7/9/2019
day

7/10/2019 7/10/2019 7/10/2019 7/10/2019 2780

7/11/2019 7/11/2019 7/11/2019 7/11/2019 2781

7/13/2019 8/23/2019 7/13/2019 8/23/2019

2782FS+1
7/13/2019 8/2/2019 7/13/2019 8/2/2019
day

2784SS+2
7/15/2019 8/4/2019 7/15/2019 8/4/2019
days

2785FS+5
8/10/2019 8/23/2019 8/10/2019 8/23/2019
days

8/25/2019 9/10/2019 8/25/2019 9/10/2019


2786FS+1
8/25/2019 9/10/2019 8/25/2019 9/10/2019
day

9/13/2019 9/25/2019 9/13/2019 9/25/2019

2788FS+2
9/13/2019 9/25/2019 9/13/2019 9/25/2019
days

9/25/2019 9/25/2019 9/25/2019 9/25/2019 2790

1/15/2019 4/25/2019 1/15/2019 4/25/2019

1/15/2019 1/15/2019 1/15/2019 1/15/2019

1/23/2019 1/28/2019 1/23/2019 1/28/2019

1/23/2019 1/28/2019 1/23/2019 1/28/2019

1/30/2019 2/8/2019 1/30/2019 2/8/2019

1/30/2019 2/8/2019 1/30/2019 2/8/2019

2795FS+1
1/30/2019 1/30/2019 1/30/2019 1/30/2019
day

1/30/2019 1/31/2019 1/30/2019 1/31/2019 2798SS

2799FS+2
2/3/2019 2/4/2019 2/3/2019 2/4/2019
days

2/5/2019 2/7/2019 2/5/2019 2/7/2019 2800

2/8/2019 2/8/2019 2/8/2019 2/8/2019 2801

2/12/2019 2/27/2019 2/12/2019 2/27/2019


2802FS+3
2/12/2019 2/21/2019 2/12/2019 2/21/2019
days

2804FS-1
2/21/2019 2/27/2019 2/21/2019 2/27/2019
day

3/1/2019 3/10/2019 3/1/2019 3/10/2019

2805FS+1
3/1/2019 3/7/2019 3/1/2019 3/7/2019
day

2807FS-2
3/6/2019 3/10/2019 3/6/2019 3/10/2019
days

3/13/2019 3/29/2019 3/13/2019 3/29/2019

3/13/2019 3/29/2019 3/13/2019 3/29/2019

2808FS+2
3/13/2019 3/13/2019 3/13/2019 3/13/2019
days

3/13/2019 3/14/2019 3/13/2019 3/14/2019 2811SS

2812FS+2
3/17/2019 3/21/2019 3/17/2019 3/21/2019
days

3/22/2019 3/26/2019 3/22/2019 3/26/2019 2813

3/27/2019 3/29/2019 3/27/2019 3/29/2019 2814

4/6/2019 4/11/2019 4/6/2019 4/11/2019

2815FS+7
4/6/2019 4/11/2019 4/6/2019 4/11/2019
days

4/21/2019 4/25/2019 4/21/2019 4/25/2019

2817FS+9
4/21/2019 4/25/2019 4/21/2019 4/25/2019
days
4/25/2019 4/25/2019 4/25/2019 4/25/2019 2819

2/19/2019 10/19/2019 2/19/2019 10/19/2019

2/19/2019 6/14/2019 2/19/2019 6/14/2019

2/19/2019 5/19/2019 2/19/2019 5/19/2019

5/20/2019 6/14/2019 5/20/2019 6/14/2019 2823

2/19/2019 6/14/2019 2/19/2019 6/14/2019

2/19/2019 5/19/2019 2/19/2019 5/19/2019 2823SS

5/20/2019 6/14/2019 5/20/2019 6/14/2019 2826

4/15/2019 4/15/2019 4/15/2019 4/15/2019

5/1/2019 5/11/2019 5/1/2019 5/11/2019

5/1/2019 5/11/2019 5/1/2019 5/11/2019 87

5/4/2019 5/11/2019 5/4/2019 5/11/2019 2830FF

6/18/2019 10/19/2019 6/18/2019 10/19/2019

5/8/2019 6/18/2019 5/8/2019 6/18/2019

5/8/2019 5/29/2019 5/8/2019 5/29/2019

2831FS-4
5/8/2019 5/8/2019 5/8/2019 5/8/2019
days
5/8/2019 5/9/2019 5/8/2019 5/9/2019 2835SS

2836FS+2
5/12/2019 5/19/2019 5/12/2019 5/19/2019
days

5/20/2019 5/27/2019 5/20/2019 5/27/2019 2837

5/28/2019 5/29/2019 5/28/2019 5/29/2019 2838

6/1/2019 6/16/2019 6/1/2019 6/16/2019

2839FS+2
6/1/2019 6/1/2019 6/1/2019 6/1/2019
days

6/1/2019 6/2/2019 6/1/2019 6/2/2019 2841SS

2842FS+2
6/5/2019 6/12/2019 6/5/2019 6/12/2019
days

2843SS+2
6/7/2019 6/14/2019 6/7/2019 6/14/2019
days

6/7/2019 6/14/2019 6/7/2019 6/14/2019 2844SS

6/15/2019 6/16/2019 6/15/2019 6/16/2019 2845

6/4/2019 6/18/2019 6/4/2019 6/18/2019

2841FS+2
6/4/2019 6/4/2019 6/4/2019 6/4/2019
days

6/4/2019 6/5/2019 6/4/2019 6/5/2019 2848SS

2849FS+2
6/8/2019 6/15/2019 6/8/2019 6/15/2019
days

2850SS+2
6/10/2019 6/16/2019 6/10/2019 6/16/2019
days
6/17/2019 6/18/2019 6/17/2019 6/18/2019 2851

5/20/2019 5/20/2019 5/20/2019 5/20/2019

5/20/2019 5/20/2019 5/20/2019 5/20/2019

6/14/2019 6/29/2019 6/14/2019 6/29/2019

2852FS-5
6/14/2019 6/29/2019 6/14/2019 6/29/2019
days

7/3/2019 7/21/2019 7/3/2019 7/21/2019

7/3/2019 7/21/2019 7/3/2019 7/21/2019

2856FS+3
7/3/2019 7/3/2019 7/3/2019 7/3/2019
days

7/3/2019 7/4/2019 7/3/2019 7/4/2019 2859SS

2860FS+2
7/7/2019 7/12/2019 7/7/2019 7/12/2019
days

7/13/2019 7/18/2019 7/13/2019 7/18/2019 2861

7/19/2019 7/21/2019 7/19/2019 7/21/2019 2862

7/3/2019 7/24/2019 7/3/2019 7/24/2019

7/3/2019 7/24/2019 7/3/2019 7/24/2019 2858SS

7/26/2019 9/3/2019 7/26/2019 9/3/2019

2865FS+1
7/26/2019 9/3/2019 7/26/2019 9/3/2019
day
2867SS+5
7/31/2019 7/31/2019 7/31/2019 7/31/2019
days

8/9/2019 9/23/2019 8/9/2019 9/23/2019

2867FS-26
8/9/2019 9/23/2019 8/9/2019 9/23/2019
days

9/20/2019 10/19/2019 9/20/2019 10/19/2019

2870FS-4
9/20/2019 10/19/2019 9/20/2019 10/19/2019
days

10/19/2019 10/19/2019 10/19/2019 10/19/2019 2872

12/27/2018 2/6/2020 12/27/2018 2/6/2020

12/27/2018 12/27/2018 12/27/2018 12/27/2018

12/28/2018 1/2/2019 12/28/2018 1/2/2019

71SS-90
12/28/2018 1/2/2019 12/28/2018 1/2/2019
days

4/19/2019 1/23/2020 4/19/2019 1/23/2020

1/30/2019 2/10/2019 1/30/2019 2/10/2019

2877FS+27
1/30/2019 2/10/2019 1/30/2019 2/10/2019
days

1/28/2019 1/28/2019 1/28/2019 1/28/2019

2/13/2019 4/24/2019 2/13/2019 4/24/2019

2/13/2019 3/8/2019 2/13/2019 3/8/2019


2880FS+2
2/13/2019 2/13/2019 2/13/2019 2/13/2019
days

2/13/2019 2/15/2019 2/13/2019 2/15/2019 2884SS

2885FS+2
2/18/2019 2/25/2019 2/18/2019 2/25/2019
days

2/26/2019 3/5/2019 2/26/2019 3/5/2019 2886

3/6/2019 3/8/2019 3/6/2019 3/8/2019 2887

3/11/2019 3/28/2019 3/11/2019 3/28/2019

2888FS+2
3/11/2019 3/11/2019 3/11/2019 3/11/2019
days

3/11/2019 3/13/2019 3/11/2019 3/13/2019 2890SS

2891FS+2
3/16/2019 3/23/2019 3/16/2019 3/23/2019
days

2892SS+2
3/18/2019 3/25/2019 3/18/2019 3/25/2019
days

3/18/2019 3/25/2019 3/18/2019 3/25/2019 2893SS

3/26/2019 3/28/2019 3/26/2019 3/28/2019 2894

3/14/2019 3/31/2019 3/14/2019 3/31/2019

2890FS+2
3/14/2019 3/14/2019 3/14/2019 3/14/2019
days

3/14/2019 3/16/2019 3/14/2019 3/16/2019 2897SS

2898FS+2
3/19/2019 3/26/2019 3/19/2019 3/26/2019
days
2899SS+2
3/21/2019 3/28/2019 3/21/2019 3/28/2019
days

3/29/2019 3/31/2019 3/29/2019 3/31/2019 2900

4/3/2019 4/24/2019 4/3/2019 4/24/2019

2901FS+2
4/3/2019 4/3/2019 4/3/2019 4/3/2019
days

4/3/2019 4/5/2019 4/3/2019 4/5/2019 2903SS

2904FS+2
4/8/2019 4/14/2019 4/8/2019 4/14/2019
days

4/15/2019 4/21/2019 4/15/2019 4/21/2019 2905

4/22/2019 4/24/2019 4/22/2019 4/24/2019 2906

4/1/2019 4/24/2019 4/1/2019 4/24/2019

2907FS-24
4/1/2019 4/24/2019 4/1/2019 4/24/2019
days

4/2/2019 4/2/2019 4/2/2019 4/2/2019

4/27/2019 8/23/2019 4/27/2019 8/23/2019

2907FS+2
4/27/2019 6/10/2019 4/27/2019 6/10/2019
days

2912SS+21
5/18/2019 7/1/2019 5/18/2019 7/1/2019
days

2913FS+21
7/23/2019 8/23/2019 7/23/2019 8/23/2019
days

7/5/2019 9/8/2019 7/5/2019 9/8/2019


2911SS+69
7/5/2019 9/8/2019 7/5/2019 9/8/2019
days

8/14/2019 10/2/2019 8/14/2019 10/2/2019

2916FS-26
8/14/2019 10/2/2019 8/14/2019 10/2/2019
days

8/25/2019 9/28/2019 8/25/2019 9/28/2019

8/25/2019 9/28/2019 8/25/2019 9/28/2019

2914FS+1
8/25/2019 8/25/2019 8/25/2019 8/25/2019
day

8/25/2019 8/29/2019 8/25/2019 8/29/2019 2921SS

2922FS+2
9/1/2019 9/12/2019 9/1/2019 9/12/2019
days

9/13/2019 9/23/2019 9/13/2019 9/23/2019 2923

9/24/2019 9/28/2019 9/24/2019 9/28/2019 2924

8/31/2019 8/31/2019 8/31/2019 8/31/2019

9/22/2019 10/15/2019 9/22/2019 10/15/2019

2925FS-7
days;2802F
9/22/2019 10/15/2019 9/22/2019 10/15/2019 S-7
days;2815F
S-7 days

9/26/2019 9/26/2019 9/26/2019 9/26/2019

10/18/2019 11/10/2019 10/18/2019 11/10/2019

2928FS+2
10/18/2019 11/10/2019 10/18/2019 11/10/2019
days
10/31/2019 10/31/2019 10/31/2019 10/31/2019

11/12/2019 2/6/2020 11/12/2019 2/6/2020

2931FS+1
11/12/2019 2/6/2020 11/12/2019 2/6/2020
day
WBS

5
5.1
5.1.6
5.2
5.2.4
5.3
5.3.8
5.4
5.5.4
5.6
5.6.4

5.7

5.7.1.10
5.7.2.8
5.7.2.9
5.7.3.7
5.7.3.8
5.8.12
5.8.15
5.8.16
5.8.17
5.9
5.9.4
5.10
5.10.3
5.11
5.11.4
5.12
5.12.5
5.13
5.13.6
5.14
5.14.6
5.15
5.15.14
5.16
5.16.5
5.17
5.17.5
5.18
5.18.5
5.18.8
5.18.11
5.19
5.19.10
5.19.11
5.19.12
5.20
5.20.9
5.21
5.21.5
5.22
5.22.5
6
6.1
6.1.11
6.1.13
6.2
6.2.8
6.2.11
6.3
6.3.14
6.3.17
6.3.19
6.3.20
6.4
6.4.8
7
7.1
7.1.10
7.1.16
7.1.19
7.2
7.2.7.2
7.3
7.3.6
7.4
7.4.6
7.5
7.5.1
7.5.2
7.5.2.8
7.5.3
7.5.3.7
7.5.4
7.5.4.13
7.6
7.6.2
7.6.2.5
7.6.3
7.6.3.5
7.6.4
7.6.4.5
7.6.5
7.6.5.3
7.6.5.5
7.6.6
7.6.6.4
7.6.6.7
7.7
7.7.2
7.7.2.4
7.7.2.6
7.7.3
7.7.3.4
7.7.3.6
7.7.4
7.7.4.4
7.7.4.7
8
8.1
8.1.7
8.1.9
8.2
8.2.25
8.2.29
8.3
8.3.6
8.4
8.4.7
8.4.9
8.5
8.5.11
8.5.12
8.6
8.6.12
8.7
8.7.4
8.8
8.8.6
8.8.9
8.9
8.9.7
8.9.9
8.10
8.10.6
8.10.9
8.11
8.11.8
8.11.10
8.12
8.12.4
9
9.1
9.1.7
9.1.8
9.2
9.2.9
9.3
9.3.9
9.4
9.4.5
9.5
9.5.4
9.6
9.6.5
9.6.6
9.7
9.7.4
9.8
9.8.5
9.8.7
10
10.1
10.1.9
10.2
10.2.9
10.3
10.3.13
10.3.16
10.4
10.4.13
10.4.15
10.4.17
Name

POWER BLOCK
Heat Recovery Steam Generator (HRSG)
HRSG - Main Foundation incl. Stack CTO
Auxilliary Boiler
AUXILIARY BOILER (ID# 249) - Foundation - CTO
HRSG Blowdown Pit
HRSG - Blowdown Module - CTO (CTO_H_B)
Feed Water Pumps
FEEDWATER RECIRCULATION PUMP (ID# 205) - Foundation CTO
Fuel Gas Monitoring
FUEL GAS MONITORING (CEMS) - Foundation - CTO

Single Shaft Turbine Hall

TURBINE HALL - Floor Slab - CTO (Including Duct Banks & Pits)
TURBINE HALL - Platforms - CTO (CTO_P_F)
TURBINE HALL - Building Steel Structure (For Overhead Crane Erection) - CTO (CTO_P_D1)
TURBINE HALL - Roofing - CTO (ST/ Condenser)
TURBINE HALL - Roofing - CTO (GT/ Geno)
POWER TRAIN FOUNDATION - GT-Generator - CTO (CTO_P_A1)
POWER TRAIN FOUNDATION - Steam Turbine - CTO (CTO_P_A2)
CONDENSER PIT - ADV Pit and Condenser - CTO_P_C (in Case of ADV Module)
CONDENSER PIT - CTO
Gas Turbine Exhaust Diffuser
GT EXHAUST FOUNDATION - CTO
Gas Turbine Auxiliaries
GT INDOOR AUXILIARIES - GT Lube Oil Module (AM60) - CTO
Air Intake Filter House
AIR INTAKE FILTERHOUSE (ID# 213) - CTO
GT Fire Fighting System
GT FIRE FIGHTING SYSTEM (ID# 251) - Foundation - CTO
Chemical & Lube Oil Building
CHEMICAL & LUBE OIL BLDG (ID# 252) - BUILDING CTO
Mobile Fire Fighting Building
MOBILE FIRE FIGHTING BLDG (ID# 253) - Building CTO
Transformer Area
TRANSFORMER AREA - GSU/UAT (ID# 219/220) Complete - CTO
Excitation Transformer
EXCITATION (& ISOLATION) TRANSFORMER (ID# 221) - Foundation - CTO FOR TRANSFORMER ERECTION
Auxilliary Transformer
AUXILIARY TRANSFORMER (ID# 255) & VFD TRANSFORMERS (ID# 256) - Foundation - CTO FOR TRANSFORMER ERECTION
Generator Circuit Breaker
GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222) - Foundation CTO for Steel Erection
GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222) - CTO for GCB and LCI/EXC Module Erection
GENERATOR CIRCUIT BREAKER / LCI & EXC MODULE (ID# 222) - Civil Erection Complete CTO
Generator Bus Duct
GENERATOR BUS DUCT (ID# 229) - Main Steel Structure - CTO for Bus Duct Erection
GENERATOR BUS DUCT (ID# 229) - Turn Over from Erection to Complete Platforms (After Lifting)
GENERATOR BUS DUCT (ID# 229) - CTO
Secondary Electrical Building
SECONDARY E-BUILDING (ID# 230) - Access for Erection - CTO
Chemical Dosing
DOSING SKID (ID# 216) - Foundation - CTO
Chemical Sampling
SAMPLING CONTAINER (ID# 215) - Foundation - CTO
FUEL AREA
Fuel Gas Treatment Area
FUEL GAS CONDITIONING SKID (ID# 207) - Access for Erection - CTO
FUEL GAS CONDITIONING SKID (ID# 207) - CTO
Fuel Gas Receiving Station
GAS RECEIVING STATION (ID# 236) - Access for Erection - CTO
GAS RECEIVING STATION (ID# 236) - CTO
Fuel Gas Compressor Building
FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) - Access for FG Compressor Erection - CTO
FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) - FG Comp Aux. Equip Fdns (Coolers etc) - CTO
FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) - CTO
FG COMPRESSOR BLDG (ID# 241) & AIR COOLER (ID# 242) - Complete Remaining Finishing Works
Fuel Gas Electrical Building
FG ELECTRICAL BUILDING (ID# 261) - Access for Erection - CTO
MAIN COOLING WATER AREA (DIRECT COOLING)
Electro-Chlorination Building
ELECTRO-CHLORINATION BLDG (ID# 303) - Foundation - CTO for Steel Erection
ELECTRO-CHLORINATION BLDG (ID# 303) - Access for M&E Erection - CTO
ELECTRO-CHLORINATION BLDG (ID# 303) - Complete - CTO for Building Services
Cooling Water Filtration & Pump Station
COOLING WATER PUMP STATION - CTO (Complete) (CTO_C_B1)
Outfall Structure
OUTFALL STRUCTURE (ID# 102) - Access for M&E Erection CTO
Intake Head Structure
INTAKE HEAD STRUCTURE (ID# 307) - Access for M&E Erection CTO
Cooling Water Piping From Intake Head
CW PIPING STRUCTURE (ID# 210) - DTO
CW Pipe (Boundary-Road Crossing)
CTO for Boundary Wall - Road Crossing
CW Pipe (Intake - Boundary)
CTO Piping for Intake - Boundary
CW Pipe (Boundary-Road Crossing)
CTO for Boundary Wall - Road Crossing
Cooling Water Discharge Piping From Condenser
CW Discharge Outfall-Pond (above Ground)
CTO Piping for Outfall-Pond Section
CW Discharge Pond-STA 0+100 (above Ground)
CTO Piping for Pond-STA 0+100 (above ground)
CW Discharge STA 0+100-STA 0+200 (above Ground)
CTO Piping for STA 0+100 - STA 0+200 (above ground)
CW Discharge STA 0+200-STA 0+300 (above Ground)
Partial Access-Pipe Installation CTO
CTO Piping for STA 0+200 - STA 0+300 (above ground)
CW Discharge STA 0+300-STA 0+400 (under Ground)
Partial Access-Pipe Installation CTO
CTO Piping for STA 0+300 - STA 0+400 (Condensor)
Cooling Water Supply to Condenser
CW Pipe (WWTP Section)
Partial Access-Pipe Installation CTO
CTO Piping for WWTP Section
CW Pipe (Pump Station-Pipe Sleeper Section)
Partial Access-Pipe Installation CTO
CTO Piping for Pump Station - Pipe Sleeper Section
CW Pipe (Demin Water Tank-Condensor)
Partial Access-Pipe Installation CTO
CTO Piping for Demin Water Tank - Condensor
UTILITIES
Raw Water Storage
SERVICE & FIRE WATER TANK (ID# 231) - CTO (Access for Tank Erection)
SERVICE & FIRE WATER TANK (ID# 231) - CTO (CTO_W_B)
Demineralized Water Production
DESAL/DEMIN WATER TREATMENT PLANT - Access for M&E Erection CTO
DESALDEMIN WATER TREATMENT PLANT - CTO (CTO_W_A)
Ultra Pure Water Shelter
ULTRAPURE WATER SHELTER & TANK (ID# 239 7 257) - Building CTO
Demineralized Water Storage
DEMIN WATER TANK - Foundation - CTO Access for Tank Erection
DEMIN WATER TANK AREA - Complete Civil Works - CTO
Compressed Air Production
COMPRESSED AIR PRODUCTION - Access for M&E Erection - CTO
COMPRESSED AIR PRODUCTION - CTO Complete
H2 & N2 Gas Bottle Storage Compound
GAS STORAGE COMPUND (ID# 212) - CTO
Emergency Diesel Generator
EMERGENCY DIESEL GENERATOR - Foundation - CTO (CTO_T_E)
Utility Pump Building
UTILITY PUMP BLDG (ID# 206) - Foundation for Erection - CTO
UTILITY PUMP BLDG (ID# 206) - CTO (Complete)
Potable Water Storage
POTABLE WATER TANK (ID# 218) - Foundation - CTO Access for Tank Erection
POTABLE WATER TANK (ID# 218) - Foundation - CTO
Potable Pump Skid Shelter
POTABLE WATER PUMP SKID SHELTER (ID# 259) - Foundation Access for Erection - CTO
POTABLE WATER PUMP SKID SHELTER (ID# 259) - CTO (Complete) (CTO_C_B1)
Hard Standing Area
HARD STANDING (ID# 260 PI) - Foundation - CTO
HARD STANDING (ID# 260 ROP) - Foundation - CTO
Oil Separator Pit incl. Oil Sludge Collector
OIL SEPARATOR PIT (ID# 235) - Access for M&E Erection CTO
NETWORKS
Mechanical Systems Network
PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block - CTO (PI)
PIPE SLEEPERS/TRENCHES - Water Distribution To Power Block - CTO (ROP)
Pipe Rack
PIPE RACK (ID# 244) - Steel Structure - CTO
Waste Water Central Monitoring Basin
WASTE WATER CENTRAL MONITORING BASIN (ID#225) - CTO
Sanitary / Sewage Water System
SANITARY WATER - To Logistic Buildings - CTO
Fuel Gas System
PIPE SLEEPERS/TRENCHES - Fuel Gas Line - CTO
Electrical Cabling Network
CABLE PULL PITS & DUCT BANKS Power Island (ID# 111 & 112) - CTO
CABLE PULL PITS & DUCT BANKS BOP Area - CTO
HV Cable Trench
CABLE TRENCH (ID# 237) - HV Cable Interconnection SY to Main Trafo - CTO
HV Cable Rack
HV CABLE RACK (ID# 258) - Foundation Access for Steel Erection - CTO
HV CABLE RACK (ID# 258) - Cable Rack Access for Electrical Erection - CTO
LOGISTICS BUILDINGS
Gatehouse
GATE HOUSE (FUEL GAS) - CTO (CTO_N_G)
Sanitary/Foul Water Treatment
SANITARY WASTE WATER TREATMENT - CTO (CTO_W_G)
Workshop and Warehouse
WORKSHOP / WAREHOUSE (ID# 264) - Access for Erection - CTO
WORKSHOP / WAREHOUSE (ID# 264) - CTO
Administration, Electrical and Control Building
ADMINISTRATION, ELECTRICAL & CONTROL BUILDING - Access for Erection for Cable Cellar - CTO
ADMINISTRATION, ELECTRICAL & CONTROL BUILDING - Access for Erection for Switchgear Room - CTO
ADMINISTRATION, ELECTRICAL & CONTROL BUILDING - Control Room - CTO
CTO
Duration Actual Finish Piling Base Line Finish

471 days 2/5/2020 2/5/2020


163 days 5/24/2019 3/6/2019
0 days 5/24/2019 3/6/2019 - 79
79 days 5/17/2019 5/17/2019
0 days 5/17/2019 5/17/2019 -
175 days 6/2/2019 5/16/2019
0 days 6/2/2019 5/16/2019 - 17
314 days 2/5/2020 2/5/2020
0 days 4/13/2019 4/6/2019 - 7
150 days 7/3/2019 7/3/2019
0 days 7/3/2019 7/3/2019 -

398 days 11/24/2019 11/24/2019

0 days 5/9/2019 5/9/2019 -


0 days 6/20/2019 6/20/2019 -
0 days 6/22/2019 6/22/2019 -
0 days 8/3/2019 8/3/2019 -
0 days 8/3/2019 8/3/2019 -
0 days 3/28/2019 3/28/2019 -
0 days 7/22/2019 7/22/2019 -
0 days 7/22/2019 7/22/2019 -
0 days 7/22/2019 7/22/2019 -
156 days 6/13/2019 6/13/2019
4 days 6/13/2019 6/13/2019 -
106 days 6/11/2019 6/11/2019
0 days 6/11/2019 6/11/2019 -
92 days 6/14/2019 6/14/2019
0 days 6/14/2019 6/14/2019 -
162 days 5/24/2019 5/24/2019
0 days 5/24/2019 5/24/2019 -
188 days 8/4/2019 7/10/2019
0 days 8/4/2019 7/10/2019 - 25
163 days 7/10/2019 7/10/2019
0 days 7/10/2019 7/10/2019 -
316 days 10/24/2019 10/17/2019
0 days 10/24/2019 10/17/2019 - 7
93 days 5/2/2019 5/2/2019
0 days 5/2/2019 5/2/2019 -
78 days 8/15/2019 8/15/2019
0 days 8/15/2019 8/15/2019 -
259 days 11/5/2019 11/5/2019
0 days 5/22/2019 5/22/2019 -
0 days 6/19/2019 6/19/2019 -
0 days 11/5/2019 11/5/2019 -
222 days 9/6/2019 9/6/2019
0 days 8/14/2019 8/14/2019 -
0 days 8/28/2019 8/28/2019 -
0 days 9/6/2019 9/6/2019 -
277 days 8/31/2019 8/23/2019
0 days 7/19/2019 7/11/2019 - 8
130 days 6/22/2019 6/22/2019
0 days 6/22/2019 6/22/2019 -
160 days 7/22/2019 7/22/2019
0 days 7/22/2019 7/22/2019 -
313 days 10/22/2019 10/22/2019
113 days 5/21/2019 5/21/2019
0 days 5/4/2019 5/4/2019 -
0 days 5/21/2019 5/21/2019 -
159 days 7/5/2019 7/5/2019
0 days 5/30/2019 5/30/2019 -
0 days 7/5/2019 7/5/2019 -
245 days 8/16/2019 8/16/2019
0 days 5/25/2019 5/25/2019 -
0 days 6/14/2019 6/14/2019 -
0 days 7/5/2019 7/5/2019 -
29 days 8/16/2019 8/16/2019 -
268 days 10/22/2019 10/22/2019
0 days 9/10/2019 9/10/2019 -
974 days 4/16/2020 4/16/2020
163 days 7/9/2019 7/1/2019
0 days 4/10/2019 4/10/2019 -
0 days 5/23/2019 5/23/2019 -
0 days 7/9/2019 7/1/2019 - 8
974 days 4/16/2020 4/16/2020
0 days 9/18/2019 9/18/2019 -
186 days 8/29/2019 8/29/2019
0 days 8/29/2019 8/29/2019 -
193 days 8/5/2019 8/5/2019
0 days 7/30/2019 7/30/2019 -
362 days 7/9/2019 6/24/2019
0 days 9/13/2018 8/29/2018
334 days 6/11/2019 5/27/2019
0 days 6/11/2019 5/27/2019
362 days 7/9/2019 6/24/2019
0 days 7/9/2019 6/24/2019
162 days 12/21/2018 12/21/2018
0 days 12/21/2018 12/21/2018
379 days 9/11/2019 6/16/2019
75 days 2/23/2019 11/28/2018
0 days 2/23/2019 11/28/2018
135 days 4/30/2019 2/2/2019
0 days 4/30/2019 2/2/2019
138 days 5/17/2019 2/19/2019
0 days 5/17/2019 2/19/2019
142 days 6/4/2019 3/9/2019
1 day 5/13/2019 2/15/2019
0 days 6/4/2019 3/9/2019
227 days 9/11/2019 6/16/2019
1 day 7/18/2019 4/22/2019
0 days 9/11/2019 6/16/2019
426 days 9/11/2019 7/15/2019
190 days 5/7/2019 4/22/2019
1 day 4/28/2019 4/13/2019
0 days 5/7/2019 4/22/2019
243 days 7/15/2019 7/15/2019
1 day 7/6/2019 7/6/2019
0 days 7/15/2019 7/15/2019
426 days 9/11/2019 6/16/2019
1 day 7/18/2019 4/22/2019
0 days 9/11/2019 6/16/2019
436 days? 9/21/2019 9/21/2019
168 days 5/27/2019 4/29/2019
0 days 4/5/2019 4/5/2019
0 days 4/26/2019 4/26/2019
344 days? 6/21/2019 6/6/2019
0 days 2/8/2019 2/8/2019
0 days 3/2/2019 3/2/2019
186 days 7/15/2019 7/6/2019
0 days 7/15/2019 7/6/2019
167 days 5/26/2019 3/18/2019
0 days 5/12/2019 3/4/2019
0 days 5/26/2019 3/18/2019
214 days 7/13/2019 7/13/2019
0 days 6/22/2019 6/22/2019
0 days 7/13/2019 7/13/2019
295 days 8/16/2019 8/16/2019
0 days 7/29/2019 7/29/2019
88 days 9/21/2019 9/21/2019
0 days 9/21/2019 9/21/2019
241 days 8/9/2019 8/9/2019
0 days 3/14/2019 3/14/2019
0 days 8/9/2019 8/9/2019
154 days 5/13/2019 4/10/2019
0 days 3/27/2019 3/27/2019
0 days 5/13/2019 4/10/2019
268 days 9/5/2019 8/19/2019
0 days 4/9/2019 3/23/2019
0 days 9/5/2019 8/19/2019
192 days 7/6/2019 7/6/2019
0 days 5/30/2019 5/30/2019
0 days 7/6/2019 7/6/2019
154 days 7/9/2019 7/9/2019
0 days 7/9/2019 7/9/2019
398 days 9/29/2019 9/29/2019
289 days 6/12/2019 6/12/2019
0 days 5/8/2019 5/8/2019
0 days 6/8/2019 6/8/2019
329 days 9/29/2019 9/29/2019
0 days 9/29/2019 9/29/2019
257 days 7/23/2019 5/4/2019
0 days 7/19/2019 4/30/2019
84 days 5/29/2019 5/29/2019
0 days 5/29/2019 5/29/2019
187 days 3/2/2019 3/2/2019
0 days 3/2/2019 3/2/2019
132 days 4/24/2019 4/24/2019
0 days 3/8/2019 3/8/2019
0 days 4/24/2019 4/24/2019
88 days 4/25/2019 4/24/2019
0 days 4/25/2019 4/24/2019
169 days 5/28/2019 5/13/2019
0 days 4/12/2019 3/29/2019
0 days 5/28/2019 5/13/2019
407 days 2/6/2020 2/6/2020
142 days 9/25/2019 9/25/2019
0 days 9/25/2019 9/25/2019
101 days 4/25/2019 4/25/2019
0 days 4/25/2019 4/25/2019
243 days 10/19/2019 10/19/2019
0 days 7/31/2019 7/31/2019
0 days 10/19/2019 10/19/2019
407 days 2/6/2020 2/6/2020
0 days 8/31/2019 8/31/2019
0 days 9/26/2019 9/26/2019
0 days 10/31/2019 10/31/2019
CTO
Baseline Piling Impact
Heat Recovery Steam Generator (HRSG) 3/6/2019 5/24/2019