Abbreviation: AD-architectural drawing | D-Door | DTL-Detail | ELE-Elevation | LVL-Level | TD-Tender drawing | V-Ventilator | W-Window | GFC- Good for Construction | FA - For Approval · The written Dimensions are to be referred.
The drawing is not to be scaled.
· Any discrepancy in the drawing should be
brought to the notice of Companys before
the commencement of the construction.
· Any addition or alteration to this drawing
should not be made without the written consent of
the Companys.
· All the works shall be executed in accordance with
best practice to relevant Indian Standard Codes of
practice.
· All the construction work should be carried out in
A
Drawing log
Issued to ------
AD | TD
B
Key Plan:
3000
1200
1200
1200
RHS (62x32x2)
W1 W1 W1
2100
2100
MD MD
900
900
900
C
WORKER CANTEEN
ELEVATION-A
E
Notes:
1200
1200
1200
RHS (62x32x2)
W1 W1 W1
F
900
900
900
3000 3000 3000 3000 3000 3000 3000 3000 3000
27000
G
Revision
2018-12-24 Second Submission R1
WORKER CANTEEN 2018-12-11 First Submission R0
ELEVATION-B Date Description Rev.
PURLINS 80x40x2.5
Job Title:
RIDGE COVER RIDGE COVER
H
590
RAFTER 96x48x3
See detail B
Sheet Title:
9°
9°
WORKER CANTEEN
3
500
500
3045 HDS SCREW 8MM BRACING 40x40x2
L-clit (Typ.)
(ELEVATIONS)
Bottom Plate 6mm Bottom Plate 6mm 1200 3045
3 3
3000
3
1200
RHS (62x32x2)
Column (Tube Column (Tube
70
I
90X90x3) 90X90x3)
Unit: North
40
900
Client:
6000 6000 W.B.H.D.C.L.
60
J
30
(Signature)
WORKER CANTEEN WORKER CANTEEN
(Signature)
CLEAT ELEVATION
Multi Decor India Pvt. Ltd.
K