Anda di halaman 1dari 6

Curriculum Vitae (CV)

______________________________________________

Position applied : Position Project Manager.


Name of expert : Deepak Mysore Sripathy
Date of Birth : 10th Novermber 1969
Nationality: : Indian
Education : P G Diploma In International Business – Indian Institute of
Foreign Trade, New Delhi
Bachelor of Mechanical Engineering passed in First Class,
University of Mysore, India, 1991-92

Trainings : Construction Quality Control program for Contractors from US


Undertaken Army Corps of Engineers, for building base stations in
Afghanistan.

Employment record relevant to the assignment:

Period Employing organization and Country Summary of activities performed


title/position Contact info of relevant to the assignment
references
May 2017 to Punjab Biomass Power Limited India 12 MW Biomass Power Station –
till date Handling issues related to Operation
and maintenance and Funding related.
Reference:-
Name:- Mr. V Ahuja
Title:- Promoter.
September SNC-LAVALIN INC., Oakville, Bangladesh Natural Gas Compressor stations
2012 to April Ontario, Canada, project financed by Asian Development
2017 Bank. Team member in PMC team for
Reference:- design review, project execution, quality
Name:- Mr. Badrul Alam control, Commissioning and O&M of the
Title:- Project Director compressor stations.
Email:-
badrul.alam@snclavalin.com
Mar 2010 to T.B. Power Private Limited, India Green Energy from renewable energy
Sep 2012 Mumbai, India. sources. Handled all the issues related
to feasibility study, design review,
Reference:- construction, commissioning of power
Name:- Mr. Prashant Deshpande projects.
Title:- Director - Promoter
Email:-
parshansntdespnade@hotmail.co
m
Dec 2005- Punjab Biomass Power Limited, India 200 MW of Distributed power projects
March 2010 Mumbai, India. in the North India based. Handled all
the issues related to Procurement,
Reference:- Coordination, Construction,
Name:- Mr. Satnam Singh
Title:- General Manager Commissioning of power projects
Email:- including liaison with statutory
satnamsingh@bermacoenergy.co. authorities.
in
Sep- 2004 to Contrack International Inc, Afghanistan Diesel Based power plant for the US /
Oct-2005 ANA Army base station project and was
QA/QC team member for design review,
Reference:-
project execution, quality control,
Name:- Mr. Ashraf Shehata
Title:- QA /QC Manager Commissioning and Army Base Station
Email:- in Heart and Kabul.
ashraf.shehata@orascom.com
Sep 2003 to Al-Hammam Co, Rahima, Saudi Arabia 80 MW co-generation project with Gas
Sep 2004 Kingdom of Saudi Arabia turbines and heat recovery boilers and
was project team engineer for Erection,
Reference:- testing and commissioning co-
Name:- Mr. D.B. Nair
generation project.
Title:- QA /QC Manager
Email:- dbnair@alhammam.com
Oct 1996 to Bermaco Energy Systems India 175 MW combined Cycle Power plant at
Sep 2003 Limited, Mumbai, India Kochi, India. Handled all the issues as
project Manger – co-ordination related
Reference:- to Procurement, Coordination,
Name:- Mr. Satnam Singh Construction, Commissioning of power
Title:- General Manager projects including liaison with statutory
Email:- authorities.
satnamsingh@bermacoenergy.co.
in
Dec. 1995 – Lloyds Steel Industries Limited, India 88 MW power plant with heat recovery
Sep 1996 Mumbai, India. systems

Reference:- Assistant Manger – Feasibility study


Name:- Mr. Raman and Project execution.
Title:- General Manager
Email:-
Nov 1993 to Kirloskar Ferrous Industries India 20 MW Power plant with blast furnace
Dec 1995 Limited fired boilers.

Reference:- Senior Engineer :- Power Plant


Name:- Mr. Deodhar
Title:- Vice President
Email:-
Sep 1992 to Usha Ispat Industries Limited India GET / Engineer (Power Plant)
Nov 1993

Membership in Professional Associations and Publications: Project Management Institute, USA.


Membership Number - 658130
Language Skills (indicate only languages in which you can work):

Reading Writing Speaking


English Excellent Excellent Excellent
Hindi Basic Basic Excellent
Kannada Excellent Excellent Excellent

Adequacy for the Assignment:

Detailed Tasks Assigned Reference to Prior Work /Assignments that Best Illustrate
on Consultant's Team of Capability to Handle the Assigned Tasks
Experts
Name of Project: Natural Gas Compressor Station Project with Gas
turbines as Prime movers.
Year: Sep 2012 – Mar 2017
Location: Bangladesh
Client: Gas Transmission Company Limited
Financed by: Asian Development Bank
Description of Project: Design Build and Turnkey supply, Installation,
construction, Testing, commissioning and operation & maintenance of
Natural Gas Compressors Station Project funded by Asian Development
Bank.
Role Performed: Mechanical Engineer-II / Project Management
Consultant
Project Details: The plant consists of following equipments; Centrifugal
Compressors, Gas turbines, Air compressors, Condensate Tanks and
Pumps, Air Compressor and Receivers, Water Pumps, Fire water
pumps, Inlet Scrubbers, Filter Separators, High Pressure NG Piping.
Electrical Substation, Instrumentation and Control Systems.
Activities Performed: Job responsibilities include overseeing the
completion of all project activities performed by the EPC contractor. Job
involved, high pressure piping for Natural Gas at 1500 Design pressure
with pipe sizes range from 42 inch to 1 inch, Equipment such as
Compressors, Gas turbines, Inlet gas scrubbers, Filter separators,
condensate tanks, pumps, Air Compressors, Gas Engines, etc.
Review of the detailed design of Piping as per ASME 31.3, 31.4, 31.8
carried out by the EPC contractor.
Review and approval of design calculations, drawings and procedures
submitted by EPC Contractor in accordance with API, AGA, ASME,
ASTM and NFPA codes, Local Pollution control norms and Bangladesh
Building Codes. Evaluate technical amendments, modifications of
original design, if necessary, prepare recommendation and submit to
client for approval.
Review, evaluate and approval of factory testing procedures and test
reports of major equipment during manufacturing.
Assisting client in ensuring that all material procured for the installation
of the compressor station is in accordance with the bidding document
requirement and in good condition. Assist GTCL in ensuring that the
contractor executes the work satisfactorily maintaining proper quality
and workmanship including NDT, adhering to all safety norms and
taking required environmental mitigation measures.
Assisting Client to certify work progress, material consumption and
contractor payment.
Name of Company: T B power Private Limited
Year: Apr 2010 - Sep 2012
Location: India
Client: Company
Financed by: Public Sector Bank / State owned Enterprise.
Description of Project: Renewable Energy Project – Hydro based with Run off river type/ Biomass
Role Performed: Divisional Manager
Project Details: The Project consists of following equipments; Hydraulic Turbine
Generators, Pen Stock, Large dia water piping. For-Bay gate with valves, Air compressors, Water
Pumps, Fire water pumps, Plant utility piping systems, Electrical Substation, Instrumentation and Plant
Control Systems.

Activities Performed: Commissioned hydro power plant (Run-off River) in the Himalayas and
project development works for a total of 30 MW hydro power plants across the state of Himachal in
India.
Preparation of bids and joint venture association documents with Govt and Other JV companies.
Participated in development of solar power projects of 25 MW and 10 MW in reverse bidding.
Creating business and financial models for deriving optimum financial figures for new ventures.
Execution of small hydro power project, large scale solar power project bidding, and Biomass based
Power plants.
Co-ordination with international vendors from Japan, Germany, United States, China and others for the
supply of power block equipments for Hydro, Solar and Biomass Power plants.
Development of Indigenous vendor for the supply of balance of plant equipments for renewable energy
power projects.
Name of Company: Punjab Biomass Power Limited
Year: Dec 2005- March 2010
Location: India
Client: Company
Description of Project: Renewable Energy Project – Biomass Residues Based.
Financed by: Public Sector Bank / State owned Enterprise.
Role Performed: Head Contacts and Co-ordination
Project Details: The plant consists of following equipments; Biomass Fired Boilers, Steam
Turbine Generators, 8 stages Boiler Feed water pumps, Cooling towers pumps, Water Treatment plant
pumps, Raw water pumps, Chemical dosing pumps, Ash sludge pumps, Ash Handling plant, Fuel
Feeding Systems, Air compressors, Fire water pumps, Electrical Substation, Instrumentation and Plant
Control Systems. High pressure Steam piping. Cooling water piping works, Compressor Air piping etc.

Activities Performed: Concept to Commissioning of Biomass based power plant, Patiala


in the state of Punjab in India. Project development works for a total of 200 MW biomass power plants
at different locations across India. Procurement and awarding of contract for the power project including
of floating of tenders for power block equipments. Creating business and financial models for deriving
optimum financial figures for biomass based power plant ventures. Execution of Biomass based Power
plants, re-conditioning of old biomass power plants etc Co-ordination with international vendors from
Japan, Germany, United States, China and others for the supply of power block equipments for
Biomass Power plants and Biomass residues collecting equipments.
Developing of Indigenous vendor for the supply of balance of plant equipments for renewable energy
power projects.
Name of Project: Army base station project for US / ANA Army
Year: Sep 2004 – Sept 2005
Location: Herat, Afghanistan
Client: US Army Corps of Engineers
Financed by: US Defense Department.
Description of Project: Design Build and Turnkey supply, Installation, construction, Testing,
Commissioning and operation & maintenance of Army Base station.
Role Performed: Project Construction Engineer
Project Details: The project consists of following equipments; Army Barracks, Army Tank
Workshop, Building Systems, Electrical, and HVAC of base station.
Helicopter Pad, Waste Water Treatment System, and Water Treatment
plant. Plant utility piping systems, Diesel Power Plant with Diesel Engine
Generators. Cooling Towers.

Activities Performed: Directed the construction and erection activities of the Army Base station in the
Heart & Kabul locations in Afghanistan. Professionally interacted with the US Army Corps of Engineers
for the base station activities. Assessed all the incoming materials for the project and fabrication
materials at sub-vendors facilities. Examined all the factory testing processes and the major equipment
test reports during manufacturing procedure.
Name of Project: 80 MW Co-generation Project with Gas turbine and heat recovery
system.
Year: Sep 2003 – Sept 2004
Location: Riyadh, Saudi Arabia
Client: Saudi Aramco
Financed by: Saudi Aramco.
Description of Project: Design Build and Turnkey supply, Installation, construction, Testing,
Commissioning and operation & maintenance of 80 MW heat recovery
project.
Role Performed: Project Mechanical Engineer
Project Details: The project consists of following equipments;

Activities Performed: Support Project Manager to provide various Constructions related progress
report input on Mechanical systems of the plant for Monthly and Weekly meetings with the Saudi
Aramco, Review and monitor closely the contractual obligation of the contractor, Witness various FAT,
field tests, and member of Plant Performance Test team. Provide Job Training & Class room train for
HRSG. Acted as Procurement team member prepared the Procurement Plan, Qualification and Short
listing of vendors, Assistance during preparation & releasing of bid document, pre-bid conference and
responding to bidders' questions, bid opening, bid evaluation, contract negotiations and
recommendations to the client / end user. Supervision & Inspection of Equipment at OEM's shop before
delivery.
Name of Project: 175 MW combined cycle power plant.
Year: Oct 1996 – Aug 2003
Location: Kochi, India
Client: BSES Ltd, Mumbai
Description of Project: Design Build and Turnkey supply, Installation, construction, Testing,
commissioning of 175 MW Combined power project.
Financed by: Public Sector Banks Consortium.
Role Performed: Project Manager
Project Details: The plant consists of following equipments; Naptha Fired LM6000 PC Gas
Turbines generators of GE make, BHEL make Steam Turbine Generators, 12 stages Boiler Feed water
pumps, Cooling towers pumps, Water Treatment plant pumps, Raw water pumps, Chemical dosing
pumps, Ash sludge pumps, Fuel Tank Farm, Air compressors, Fire water pumps, Electrical Substation,
Instrumentation and Plant Control Systems.

Activities Performed: Day-to-day coordination with client, contactors and consultants for
the project. Site Supervision of construction and commissioning activities of Major Equipment. Systems
of Power Plant, transfer of technology and on site job Training. Coordinated with vendors GE as
consortium member for the project execution. Also responsible for coordination with local sub-
contractors-all during bidding stage including Design Review. Preparation of progress reports for client,
promoters and financial institutions. Responsible for overall profitability of operations and accountable
for strategic utilization and deployment of available resources to achieve organizational objectives.
Designing and executing systems and processes for enhanced monitoring and control of resources and
improved operational efficiency. Planning funds for diverse operations, ensuring adherence to the
allotted budgets. Handling project activities involving working out various requirements with respect to
utilities, machines, manpower & monitoring overall project operations for ensuring timely completion.
Ensuring that site operations are carried out smoothly with erection, commissioning & procurement
operations. Developing financial projections, preparing budgets and performing extensive project
costing. Managing resources to perform project activities in cost effective manner. Dealing with
consultants/ licensors/ statutory bodies for compliance of requirements. Preparing contract budgets &
ensuring that the cost budget is not exceeded. Preparation & floating of tenders to contractors,
evaluation of offers, techno-commercial discussion & finalization of contract in view of project schedule.
Settlement of techno-commercial disputes/ clarifications with clients during execution of project.
Name of Project: 88 MW Heat Recovery Power plant.
Year: Dec 1995 – Sep 1996
Location: Mumbai, India
Client: Llyods Steel Industries Limited
Description of Project: Design Build and Turnkey supply, Installation, construction, Testing,
commissioning of 88 MW heat recovery power project.
Role Performed: Assistant Manager

Support Project Manager to provide various Constructions related progress report input on Mechanical
systems of the plant for Monthly and Weekly meetings with the client. Involved with preliminary
engineering design and preparation of EPC bid package with 4 Heat Recovery Steam Generators.
Responsibilities included preparation and finalization of bid including specifications, preliminary costing,
scheduling, planning, and attending all technical clarifications and commercial queries and responding
to all suppliers.

Expert’s Contact Information: Email: deepakrao70@gmail.com Phone: +919619436585 (In India)

Certification:

I, the undersigned, certify to the best of my knowledge and belief that, this CV correctly describes myself,
my qualifications, and my experience, and I am available to undertake the assignment in case of an award.
I understand that any misstatement or misrepresentation described herein may lead to my disqualification
or dismissal by the Client, and/or sanctions by the Bank.

Deepak Mysore Sripathy 04th Sept 2018


Name of the Expert Signature Date

Name of Authorized Signature Date


Representative of the Consultant

Anda mungkin juga menyukai