PEMERINTAH KOTA TASIKMAL

DINAS PEKERJAAN UMUM DAN PEN


Jl. Noenoeng No.05 Telp. (0265) 342631 TASIKMALAYA

REKAPITULASI BIAYA
DAFTAR KUANTITAS DAN HARG

Kegiatan : PENINGKATAN JALAN DAN JEMBATAN DI WILAY


Sub Kegiatan : PENINGKATAN JALAN MANGKUBUMI - KARIKIL
Kecamatan : MANGKUBUMI

NO. DIVISI URAIAN PEKERJAAN

1 UMUM

2 DRAINASE

3 PEKERJAAN TANAH

4 PELEBARAN PERKERASAN DAN BAHU JALAN

6 PERKERASAN ASPAL

7 STRUKTUR

8 PENGEMBALIAN KONDISI

TOTAL FISIK
PPN 10 %
TOTAL
DIBULATKAN
Mengetahui KONSULTAN PENGAW
KEPALA DINAS .............
PEKERJAAN UMUM DAN PENATAAN RUANG

Drs. IVAN DICKSAN HASANNUDIN, M.Si Ir. RIDA HERYAN


NIP. 19660703 199603 1 002 Site Engineer
OTA TASIKMALAYA
N UMUM DAN PENATAAN RUANG

PITULASI BIAYA
UANTITAS DAN HARGA

DAN JEMBATAN DI WILAYAH KOTA TASIKMALAYA


MANGKUBUMI - KARIKIL KEC. MANGKUBUMI

JUMLAH
HARGA PEKERJAAN
( Rp )

16,220,000.00

114,580,453.76

60,536,118.66

380,419,604.19

1,474,021,719.38

127,385,381.95

20,905,625.00

2,194,068,902.94
219,406,890.29
2,413,475,793.23
2,413,475,000.00
KONSULTAN PENGAWAS KONTRAKTOR
............. ........

Ir. RIDA HERYANTO RULLY RISMAYADI ST.


Site Engineer Direktur Utama
DAFTAR KUANTITAS D

Kegiatan : PENINGKATAN JALAN DAN JEMB


Pekerjaan : PENINGKATAN JALAN MANGKUB

NO. URAIAN PEKERJAAN

DIVISI 1 - UMUM

1.2 Mobilisasi
1.8 Manajemen dan Keselamatan Lalu Lintas
1.8.(2) Jembatan Sementara

JUMLAH HARGA PEKERJAAN DIVISI 1

DIVISI 2 - DRAINASE

2.1(1ab) Pek. Galian Untuk Selokan Drainase Dan Saluran Air(Ma


2.3.(12) Beton K250 (fc’ 20) untuk struktur drainase beton mino
2.3.(13) Baja Tulangan untuk struktur drainase beton minor
2.3.(12) Anyaman
Beton Filter
K250 (fc’ 20)Plastik
untuk Penutup drainase (Jalan Masuk
2.3.(13) Pasang
Baja Grill untuk
Tulangan Jalan Masuk
Penutup drainase (Jalan Masuk)

JUMLAH HARGA PEKERJAAN DIVISI 2

DIVISI 3 - PEKERJAAN TANAH

3.1.(1ab) Galian Biasa (manual )


3.1.(1a) Galian Biasa (menggunakan Alat Berat )
3.2.(1a) Pengurugan
Timbunan Biasa1dari
m3 sumber
dengan galian
Sirtu
JUMLAH HARGA PEKERJAAN DIVISI 3

DIVISI 4 - PELEBARAN PERKERASAN DAN BAHU J

4.2.(2) Lapis Pondasi Agregat Kelas B


4.2.(16) Lapis Pondasi Bawah Beton Kurus
4.2.(14) Perkerasan Beton Semen

JUMLAH HARGA PEKERJAAN DIVISI 4

DIVISI 6 - PERKERASAN ASPAL

6.1 (1)(b) Lapis Resap Pengikat - Aspal Emulsi


6.1 (2)(b) Lapis Perekat - Aspal Emulsi
6.3(5c) Laston Lapis Aus Perata (AC-WC(L))

JUMLAH HARGA PEKERJAAN DIVISI 6

DIVISI 7 - STRUKTUR

7.1 (7) a Beton mutu sedang fc’20 MPa


7.1 (9) Beton Siklop fc’15 Mpa
7.1 (10) Beton mutu rendah fc’10 Mpa
7.3 (1) Baja Tulangan U 24 Polos
7.9.(1) Pasangan Batu
7.15.(1) Pembongkaran Pasangan Batu
7.13.(1) Sandaran (Railing)

JUMLAH HARGA PEKERJAAN DIVISI 7

DIVISI 8 - PENGEMBALIAN KONDISI

8.4.(1) Marka Jalan Termoplastik


JUMLAH HARGA PEKERJAAN DIVISI 8
R KUANTITAS DAN HARGA SATUAN

TAN JALAN DAN JEMBATAN DI WILAYAH KOTA TASIKMALAYA


TAN JALAN MANGKUBUMI - KARIKIL KEC. MANGKUBUMI

KONTRAK

ERJAAN SATUAN
HARGA SATUAN
KUANTITAS
(Rp)

m2 1.00 14,870,000.00
Ls 1.00 550,000.00
Ls 1.00 800,000.00

RJAAN DIVISI 1

nase Dan Saluran Air(Manual) m3 96.54 119,900.00


ktur drainase beton minor m3 48.89 1,021,200.00
drainase beton minor kg 3,304.49 13,100.00
p drainase (Jalan Masuk) m3 2.24 1,021,200.00
inase (Jalan Masuk) kg 572.88 13,100.00

RJAAN DIVISI 2

m3 74.04 119,900.00
m3 432.80 89,000.00
m3 45.84 286,670.07
RJAAN DIVISI 3

ERASAN DAN BAHU JALAN

m3 108.35 270,500.00
m3 108.20 973,217.83
m3 216.40 1,135,900.00

RJAAN DIVISI 4

Liter 865.60 12,400.00


Liter 3,044.60 7,400.00
Ton 989.06 1,456,700.00

RJAAN DIVISI 6

m3 3.72 1,135,900.00
m3 7.98 722,269.43
Kg 1.53 750,700.00
Kg 1,195.92 14,000.00
m3 161.07 609,100.00
m3 3.75 117,500.00
M' 12.00 79,804.25

RJAAN DIVISI 7

m2 128.65 162,500.00
RJAAN DIVISI 8
GA SATUAN

KONTRAK

JUMLAH HARGA
( Rp )

14,870,000.00
550,000.00
800,000.00

16,220,000.00

11,574,570.48
49,924,785.06
43,288,882.95
2,287,488.00
7,504,727.27

114,580,453.76

8,877,396.00
38,519,200.00
13,139,522.66
-
60,536,118.66
###

29,308,675.00
105,302,169.19
245,808,760.00

380,419,604.19

10,733,440.00
22,530,040.00
1,440,758,239.38

1,474,021,719.38

4,227,251.85
5,763,710.07
1,148,571.00
16,742,881.53
98,104,691.50
440,625.00
957,651.00
-
127,385,381.95
###

20,905,625.00
-
20,905,625.00
DAFTAR KUANTITAS DAN HARGA S
Nama Kegiata: PENINGKATAN JALAN DAN JEMBATAN DI WILAYAH KOTA TASIKMALAYA
Paket Kegiata : PENINGKATAN JALAN MANGKUBUMI - KARIKIL KEC. MANGKUBUMI
Kecamatan : MANGKUBUMI
Nilai Kontrak :
Sumber Dana : ..........
Waktu Pelaks : 90 Hari Kalender

No.mata Volume
Uraian Pekerjaan
pembayaran Pekerjaan
1 2 4

I PERSIAPAN
1.2 Mobilisasi 1,00 Ls
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1,00 Ls
1.8.(2) Jembatan Sementara 1.00 Ls
- - - Sewa

SUB JUMLAH

II PELAKSANAAN
A. Pekerjaan Perkerasan Jalan

3.1.(1a) Galian Biasa (menggunakan Alat Berat ) 432.80 M3


4.2.(2) Lapis Pondasi Agregat Kelas B 108.35 M3
4.2.(16) Lapis Pondasi Bawah Beton Kurus 108.20 M3
4.2.(14) Perkerasan Beton Semen 216.40 M3
6.1 (1)(b) Lapis Resap Pengikat - Aspal Emulsi 865.60 Lt
6.1 (2)(b) Lapis Perekat - Aspal Emulsi 3,044.60 Lt
3.1.(1ab) Laston Lapis Aus Perata (AC-WC(L)) 989.06 Ton
8.4.(1) Marka Jalan Termoplastik 128.65 M2

SUB JUMLAH
B. Pekerjaan TPT
3.1.(1ab) Galian Biasa (manual ) 50.80 M3
7.15.(1) Pembongkaran Pasangan Batu - M3
7.9.(1) Pasangan Batu 133.53 M3
7.1 (9) Pas.Guide Block (Beton Siklop fc’15 Mpa) 7.98 M3
7.3 (1) Pembesian Guide Block U 24 Polos 535.57 M3
3.2.(1a) Timbunan Biasa dari sumber galian 43.63

SUB JUMLAH
C. Pekerjaan Parit / Drainase
3.1.(1ab) Galian Biasa Manual 96.54 M3
2.3.(12) Beton K250 (fc’ 20) untuk struktur drainase beton minor 48.89 M3
2.3.(13) Baja Tulangan untuk struktur drainase beton minor 3,304.49 M3
2.3.(12) Beton K250 (fc’ 20) untuk Penutup drainase (Jalan Masuk) 2.24 M3
2.3.(13) Baja Tulangan untuk Penutup drainase (Jalan Masuk) 572.88 kg

SUB JUMLAH
D. Pekerjaan Pelebaran Jembatan
7.15.(1) Pembongkaran Pasangan Batu 3.75 M3
3.1.(1ab) Galian Biasa Manual 11.00 M3
7.9.(1) Pasangan Batu 19.50 M3
7.1 (10) Beton mutu rendah fc’10 Mpa 1.05 M3
7.1 (7) a Beton mutu sedang fc’20 MPa 2.52 M3
7.3 (1) Pembesian baja tulangan U 24 Polos 515.47 KG
3.2.(1a) Timbunan Biasa dari sumber galian 1.25 M3
7.13.(1) Sandaran (Railing) 12.00

SUB JUMLAH
E. Pekerjaan Plat Decker
7.15.(1) Pembongkaran Pasangan Batu M3
3.1.(1ab) Galian Biasa Manual 12.24 M3
7.9.(1) Pasangan Batu 8.04 M3
7.1 (10) Beton mutu rendah fc’10 Mpa 0.48 M3
7.1 (7) a Beton mutu sedang fc’20 MPa 1.20 M3
7.3 (1) Pembesian baja tulangan U 24 Polos 144.88 KG
3.2.(1a) Timbunan Biasa dari sumber galian 0.96 M3

SUB JUMLAH
E. Pekerjaan Guard Rail
8.4.(7) Rel Pengaman

SUB JUMLAH

Terbilang : Dua Miliyar Empat Ratus Tiga Belas Juta Empat Ratus Tujuh Puluh Lima Ribu Ru
UANTITAS DAN HARGA SATUAN
WILAYAH KOTA TASIKMALAYA

Harga Satuan Jumlah Harga Jumlah Biaya


Rp. Rp. Rp.
5 6 7

14,870,000.00 #VALUE!
550,000.00 #VALUE!
800,000.00 800,000.00
- -

#VALUE! #VALUE!

89,000.00 38,519,200.00
270,500.00 29,308,675.00
973,217.83 105,302,169.19
1,135,900.00 245,808,760.00
12,400.00 10,733,440.00
7,400.00 22,530,040.00
1,456,700.00 1,440,758,239.38
162,500.00 20,905,625.00

1,913,866,148.57 1,913,866,148.57

119,900.00 6,090,920.00
117,500.00 -
609,100.00 81,330,077.50
722,269.43 5,763,710.07
14,000.00 7,498,008.00
286,670.07 12,505,981.80

113,188,697.37 113,188,697.37

119,900.00 11,574,570.48
1,021,200.00 49,924,785.06
13,100.00 43,288,882.95
1,021,200.00 2,287,488.00
13,100.00 7,504,727.27

114,580,453.76 114,580,453.76

117,500.00 440,625.00
119,900.00 1,318,900.00
609,100.00 11,877,450.00
750,700.00 788,235.00
1,135,900.00 2,864,171.85
14,000.00 7,216,514.51
286,670.07 358,337.59
79,804.25 957,651.00

25,821,884.95 25,821,884.95

117,500.00 -
119,900.00 1,467,576.00
609,100.00 4,897,164.00
750,700.00 360,336.00
1,135,900.00 1,363,080.00
14,000.00 2,028,359.02
286,670.07 275,203.27

10,391,718.29 10,391,718.29
-
-

- -

JUMLAH TOTAL #VALUE!


PPn 10 % #VALUE!
pat Ratus Tujuh Puluh Lima Ribu Rupiah
TOTAL #VALUE!
DIBULATKAN #VALUE!

Tasikmalaya, September 2017


Dibauat Oleh
Konsultan Perencana
ARSILAND CONSULTANT, CV

BUDI MULYANA, Amd


Direktur Cabang
RENCANA ANGGARAN BIAYA (RAB)
Nama Kegiatan: REHABIITASI BANGUNAN PELENGKAP WILAYAH KOTA TASIKMALAYA
Paket Kegiatan: PEMBANGUNAN BATAS TANAH WISMA HAJI
Kecamatan : TAMANSARI
Nilai Kontrak :
Sumber Dana : ..........
Waktu Pelaksa : 60 Hari Kalender

No.mata Volume Harga Satuan


Uraian Pekerjaan
pembayaran Pekerjaan Rp.
1 2 4 5

I PERSIAPAN
Papan Nama Proyek ex Banner 1.00 Ls 300,000.00
Kantor Direksi Keet 1.00 Ls 850,000.00
1.2 Mobilisasi dan Demobilisasi 1.00 Ls 724,000.00

SUB JUMLAH

II PELAKSANAAN

A. Pekerjaan Pondasi

A.2.3.1.1. Galian Pondasi 244.34 M3 67,418.75


A.2.3.1.11. Pasir Urug 12.22 M3 146,337.50
A.3.2.1.9. Pas. Batu Kosong 36.65 M3 377,051.88
A.3.2.1.3. Pas. Pondasi batu kali 1pc : 5 ps 157.07 M3 711,344.00
A.2.3.1.9. Urugan Tanah Kembali 76.65 M3 48,587.50
A.4.4.2.5. Plesteran 314.15 M2 55,247.24
A.4.4.2.27. Acian 314.15 M2 33,467.01
SUB JUMLAH

Terbilang : Seratus Sembilan Puluh Sembilan Juta Seratu Tujuh Puluh Lima Ribu Rupiah

Tasikm

CV. A
NGGARAN BIAYA (RAB)

Jumlah Harga Jumlah Biaya


Rp. Rp.
6 7

300,000.00
850,000.00
724,000.00

1,874,000.00 1,874,000.00

16,472,996.25
1,787,794.26
13,819,243.62
111,734,180.96
3,724,182.68
17,355,892.01
10,513,645.24
175,407,935.02 175,407,935.02

JUMLAH TOTAL 177,281,935.02


PPn 10 % 17,728,193.50
TOTAL 195,010,128.52
DIBULATKAN 195,010,000.00

Tasikmalaya, .........., 2018


Dibuat Oleh
Konsultan Perencana
CV. ARSILAND CONSULTANT

Budi Mulyana
Direktur
RENCANA ANGGARAN BIAYA (
Nama Kegiatan: PEMBENTANGAN BATAS TANAH DAN PEMATANGAN LAHAN ASRAMA HAJI
Paket Kegiatan: JASA KONSULTASI PERENCANAAN REVIEW RAB PEMBENTANAGAN BATAS TA
Kecamatan : TAMANSARI
Nilai Kontrak :
Sumber Dana : ..........
Waktu Pelaksa : 45 Hari Kalender

No.mata Volume
Uraian Pekerjaan
pembayaran Pekerjaan
1 2 4

I PERSIAPAN
Papan Nama Proyek ex Banner 1.00 Ls
Kantor Direksi Keet 1.00 Ls
1.2 Mobilisasi dan Demobilisasi 1.00 Ls
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 Ls

SUB JUMLAH

II PELAKSANAAN

A. Pekerjaan Tanah (Pematangan Lahan)

16.1.5 Pek. Striping dengan alat berat 1,137.67 M2


Pengurugan lahan dgn SIRTU dipadatkan dengan alat 1,004.05 M3
16.7.1
berat jarak angkut 0,1 km-5 km

SUB JUMLAH

Terbilang : Dua Ratus Lima Puluh Juta Rupiah


NA ANGGARAN BIAYA (RAB)
ANGAN LAHAN ASRAMA HAJI
RAB PEMBENTANAGAN BATAS TANAH DAN PEMATANGAN LAHAN ASRAMA HAJI

Harga Satuan Jumlah Harga Jumlah Biaya


Rp. Rp. Rp.
5 6 7

300,000.00 300,000.00
1,500,000.00 1,500,000.00
5,595,000.00 5,595,000.00
615,000.00 615,000.00

8,010,000.00 8,010,000.00

8,045.24 9,152,856.02
209,262.36 210,109,873.06
-

219,262,729.08 219,262,729.08

JUMLAH TOTAL 227,272,729.08


PPn 10 % 22,727,272.91
h Juta Rupiah
TOTAL 250,000,001.98
DIBULATKAN 250,000,000.00

Tasikmalaya, .........., 2018


Dibuat Oleh
Konsultan Perencana
CV. ARSILAND CONSULTANT

Budi Mulyana
Direktur
1 Kode Peke : 16.7.1
1 m3 Timbunan Tanah/Sirtu dipadatkan
dengan menggunakan alat Berat,
Material dari Borrow Area ( Jarak Angkut
0,1 -5 km )

Bahan : Sirtu 1.2000 m3 82,500.00 99,000.00


Tenaga : Operator 0.0483 Jam 95,000.00 4,588.50
Mekanik 0.0097 Jam 85,000.00 824.50
Pengemudi 0.0394 Jam 85,000.00 3,349.00
Mandor 0.0048 Jam 95,000.00 456.00
Juru Ukur 0.0121 Jam 85,000.00 1,028.50
Juru Pengujian 0.0121 Jam 85,000.00 1,028.50
Peralatan Buldozer 0.0131 Jam 1,022,336.40 -
Wheel Excavator 0.0219 Jam 748,210.71 -
Vibration Roller 4 T 0.0133 Jam 392,766.81 -
Dump Truck 3,5 T / 145 HP 0.0394 Jam 342,302.66 -
Water Tank Truck 0.0750 Jam 309,377.74 -
Jumlah 110,275.00
Keuntungan 15 %
Jumlah Semua

6 Kode Peke : 16.1.5


1 m2 Stripping Permukaan Tanah dengan
Menggunakan Alat Berat.

Tenaga : Operator 0.0034 Jam 95,000.00 323.00


Mekanik 0.0007 Jam 85,000.00 59.50
Pengemudi 0.0123 Jam 85,000.00 1,045.50
Mandor 0.0003 Jam 95,000.00 28.50
Peralatan Buldozer 0.0013 Jam 1,022,336.40 -
Dump Truck 3,5 T / 145 HP 0.0123 Jam 342,302.66 -
Jumlah 1,456.50
Keuntungan 15 %
Jumlah Semua
-
-
-
-
-
-
13,392.61
16,385.81
5,223.80
13,486.72
23,203.33
71,692.27 181,967.27
27,295.09
209,262.36

-
-
-
-
1,329.04
4,210.32
5,539.36 6,995.86
1,049.38
8,045.24
DAFTAR BIAYA SEWA PERALATAN PER JAM

KAPASITAS
No. URAIAN KODE SATUAN HP
ALAT

1 ASPHALT MIXING PLANT E01 60 Ton/jam 294.0


2 ASPHALT FINISHER E02 10 ton 72.4
3 ASPHALT SPRAYER E03 850 4.0
4 BULLDOZER 100-150 HP E04 155.0
5 COMPRESSOR 4000-6500 L\M E05 5000 CPM(L/m) 60.0
6 CONCRETE MIXER 0.3-0.6 M3 E06 500 Liter 20.0
7 CRANE 10-15 TON E07 15 Ton 138.0
8 DUMP TRUCK 3.5 TON E08 3.5 Ton 100.0
9 DUMP TRUCK 10 TON E09 10 Ton 190.0
10 EXCAVATOR 80-140 HP E10 0.93 M3 133.0
11 FLAT BED TRUCK 3-4 M3 E11 10 ton 190.0
12 GENERATOR SET E12 100 KVA 180.0
13 MOTOR GRADER >100 HP E13 10800 - 135.0
14 TRACK LOADER 75-100 HP E14 0.8 M3 70.0
15 WHEEL LOADER 1.0-1.6 M3 E15 1.5 M3 96.0
16 THREE WHEEL ROLLER 6-8 T E16 8 Ton 55.0
17 TANDEM ROLLER 6-8 T. E17 8.1 Ton 82.0
18 TIRE ROLLER 8-10 T. E18 9 Ton 100.5
19 VIBRATORY ROLLER 5-8 T. E19 7.05 Ton 82.0
20 CONCRETE VIBRATOR E20 25 - 5.5
21 STONE CRUSHER E21 60 T/Jam 220.0
22 WATER PUMP 70-100 mm E22 - - 6.0
23 WATER TANKER 3000-4500 L. E23 4000 Liter 100.0
24 PEDESTRIAN ROLLER E24 835 Ton 8.8
25 TAMPER E25 121 Ton 4.7
26 JACK HAMMER E26 1330 - 0.0
27 FULVI MIXER E27 2005 - 345.0
28 CONCRETE PUMP E28 8 M3 100.0
29 TRAILER 20 TON E29 20 Ton 175.0
30 PILE DRIVER + HAMMER E30 2.5 Ton 25.0
31 CRANE ON TRACK 35 TON E31 35 Ton 125.0
32 WELDING SET E32 250 Amp 40.0
33 BORE PILE MACHINE E33 2000 Meter 150.0
34 ASPHALT LIQUID MIXER E34 1000 Liter 5.0
35 TRONTON E35 15 Ton 150.0
36 COLD MILLING E36 1000 m 248.0
37 ROCK DRILL BREAKER E37 - - 3.0
38 COLD RECYCLER E38 2200 M 900.0
39 HOT RECYCLER E39 3 M 400.0
40 AGGREGAT (CHIP) SPREADER E40 3.5 M 115.0
41 ASPHALT DISTRIBUTOR E41 4000 Liter 115.0
42 SLIP FORM PAVER E42 2.5 M 105.0
43 CONCRETE PAN MIXER E43 600 Liter 134.0
44 CONCRETE BREAKER E44 20 m3/jam 290.0
45 ASPAHLT TANKER E45 4000 liter 190.0
46 CEMENT TANKER E46 4000 liter 190.0
47 CONDRETE MIXER (350) E47 350 liter 20.0
48 VIBRATING RAMMER E48 80 KG 4.2
49 TRUK MIXER (AGITATOR) E49 5 M3 220.0
50 BORE PILE MACHINE E50 60 CM 125.0
51 CRANE ON TRACK 75-100 TON E51 75 Ton 200.0
52 BLENDING EQUIPMENT E52 30 Ton 50.0
53 ASPHALT LIQUID MIXER E34a 20000 Liter 40.0
54 BAR BENDER E53 0 0 3.0
55 BAR CUTTER E54 0 0 3.0
56 BREAKER E55 3 m3/jam 80.0
57 GROUTING PUMP E56 15 Ton 100.0
58 JACK HIDROLIC E57 150 Ton 3.0
59 MESIN LAS E58 0.17 Ton 3.0
60 PILE DRIVER LEADER, 75 kw E59 75 kw 70.0
61 PILE HAMMER E60 0 0 10.0
62 PILE HAMMER, 2,5 Ton E61 2.5 Ton 1.0
63 STRESSING JACK E62 15 Ton 89.0
64 BABY ROLLER
0 WELDING MACHINE, 300 A E63 5.0
IAYA SEWA PERALATAN PER JAM

BIAYA
SEWA
KETERANGAN
ALAT/JAM
( di luar PPN )

6,182,932.60 1
1,612,262.02 2
87,195.05 3
1,022,336.40 4
246,814.94 5
101,249.90 6
764,719.45 7
342,302.66 8
580,612.69 9
748,210.71 10
554,853.38 11
558,718.69 12
876,807.30 13
330,017.34 14
468,776.42 15
312,589.39 16
620,962.49 17
595,091.19 18
392,766.81 19
45,669.37 20
817,017.16 21
42,466.27 22
309,377.74 23
65,469.90 24
47,402.50 25
43,335.49 26
1,139,985.16 27
342,106.28 28
511,595.19 29
258,752.95 30
754,836.49 31
134,821.03 32
1,325,412.46 33
40,765.63 34
757,164.61 35
2,511,876.78 36
61,649.77 37
2,393,414.30 38
1,089,414.30 39
411,051.83 40
346,134.30 41
320,054.30 42
471,329.31 43
802,534.30 44
548,655.73 45
520,055.73 46
76,695.74 47
49,375.54 48
809,567.25 49
421,098.24 50
546,135.73 51
183,160.73 52
132,843.10 53
23,213.95 54
23,213.95 55
233,175.73 56
285,335.73 57
32,359.73 58
34,053.27 59
207,095.72 60
56,260.77 61
27,143.72 62
256,647.73 63
50,000.00 64
37,575.72 0
HARGA DASAR SATUAN UPAH
HARGA
No. URAIAN KODE SATUAN YG DIGUNAKAN
( Rp.)

1 Pekerja (L01) Jam 10,839.29


2 Tukang (L02) Jam 12,267.86
3 Mandor (L03) Jam 13,696.43
4 Operator (L04) Jam 13,696.43
5 Pembantu Operator (L05) Jam 10,839.29
6 Sopir / Driver (L06) Jam 12,267.86
7 Pembantu Sopir / Driver (L07) Jam 10,839.29
8 Mekanik (L08) Jam 12,267.86
9 Pembantu Mekanik (L09) Jam 10,839.29
10 Kepala Tukang (L10) Jam 13,696.43
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN Lansiran Total
( Rp.)

1 Pasir Pasang M01b M3 140,500.00 14,750.00 155,250.00


2 Pasir Beton M01a M3 177,000.00 14,750.00 191,750.00
3 Pasir Halus (untuk HRS) M01c M3 170,000.00
4 Pasir Urug (ada unsur lempung) M01d M3 82,500.00 10,350.00 92,850.00
5 Batu Kali M02 M3 142,500.00 14,750.00 157,250.00
6 Agregat Pecah Kasar M3 114,788.01
7 Agg. Halus LPA M3 97,647.40
8 Agregat Lolos # 1 " M3 125,550.68
9 Lolos screen2 ukuran ( 0 - 5) M3 147,076.02
10 Lolos screen2 ukuran ( 5 - 9,5) M3 125,550.68
11 Lolos screen2 ukuran ( 9.5 - 19,0) M3 108,330.41
12 Filler M05 Kg 1,084.00
13 Batu Belah / Kerakal M06 M3 142,500.00
14 Gravel M07 M3 78,700.00
15 Bahan Tanah Timbunan M08 M3 125,000.00
16 Bahan Pilihan M09 M3 25,000.00
17 Aspal M10 KG 9,048.39
18 Kerosen / Minyak Tanah M11 LITER 12,600.00
19 Semen / PC (50kg) M12 Zak 54,200.00 2,750.00 56,950.00
20 Semen / PC (kg) M12 Kg 1,084.00 1,139.00
21 Besi Beton M13 Kg 9,900.00
22 Kawat Beton M14 Kg 14,000.00
23 Kawat Bronjong M15 Kg 13,500.00
24 Sirtu M16 M3 82,500.00
25 Cat Marka (Non Thermoplas) M17a Kg 22,500.00
26 Cat Marka (Thermoplastic) M17b Kg 27,500.00
27 Paku M18 Kg 14,000.00
28 Kayu Perancah M19 M3 2,000,000.00
29 Bensin M20 LITER 7,800.00
30 Solar M21 LITER 7,700.00
31 Minyak Pelumas / Olie M22 LITER 70,000.00
32 Plastik Filter M23 M2 6,000.00
33 Pipa Galvanis Dia. 2.5" M24 Batang 280,000.00
34 Pipa Porus M25 M' 40,000.00
35 Agr.Base Kelas A M26 M3 138,337.01
36 Agr.Base Kelas B M27 M3 134,363.89
37 Agr.Base Kelas C M28 M3 151,151.91
38 Agr.Base Kelas C2 M29 M3 0.00
39 Geotextile M30 M2 27,500.00
40 Aspal Emulsi M31 Kg 10,250.00
41 Gebalan Rumput M32 M2 3,500.00
42 Thinner M33 LITER 21,300.00
43 Glass Bead M34 Kg 28,600.00
44 Pelat Rambu (Eng. Grade) M35a BH 176,000.00
45 Pelat Rambu (High I. Grade) M35b BH 216,500.00
46 Rel Pengaman M36 M' 412,500.00
47 Beton K-250 M37 M3 1,442,371.96
HARGA DASAR SATUAN UPAH
HARGA
SATUAN KETERANGAN
( Rp.)

75,000.00
85,000.00
95,000.00
95,000.00
75,000.00
85,000.00
75,000.00
85,000.00
75,000.00
95,000.00
DAFTAR
DASAR SATUAN BAHAN

KETERANGAN

Sudah termasuk Bekisting


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1m
No Uraian Kode Satuan Koefisien
1 2 3 4 5
A Tenaga Kerja
Pekerja L.001 OH 0.7500
Mandor L.016 OH 0.0250
Jumlah Harga Tenaga
B Bahan
Jumlah Harga B
C Peralatan
Jumlah Harga Pera
D Jumlah (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan Koefisien
1 2 3 4 5
A Tenaga Kerja
Pekerja L.001 OH 0.3000
Mandor L.016 OH 0.0100
Jumlah Harga Tenaga
B Bahan
Pasir urug M.01034 m3 1.2000
Jumlah Harga B
C Peralatan
Jumlah Harga Pera
D Jumlah (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)


No Uraian Kode Satuan Koefisien
1 2 3 4 5
A Tenaga Kerja
Pekerja L.001 OH 0.7800
Tukang Batu L.003 OH 0.3900
Kepala Tukang L.015 OH 0.0390
Mandor L.016 OH 0.0390
Jumlah Harga Tenaga
B Bahan
Batu belah M.01006 m3 1.2000
Pasir urug M.01034 m3 0.4320
Jumlah Harga B
C Peralatan
Jumlah Harga Pera
D Jumlah (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan (D+E)
A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien
1 2 3 4 5
A Tenaga Kerja
Pekerja L.001 OH 1.5000
Tukang Batu L.003 OH 0.7500
Kepala Tukang L.015 OH 0.0750
Mandor L.016 OH 0.0750
Jumlah Harga Tenaga
B Bahan
Batu belah M.01006 m3 1.2000
Semen Portland M.01039 kg 136.0000
Pasir pasang M.01033 m3 0.5440
Jumlah Harga B
C Peralatan
Jumlah Harga Pera
D Jumlah (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


No Uraian Kode Satuan Koefisien
1 2 3 4 5
A Tenaga Kerja
Pekerja L.001 OH 0.5000
Mandor L.016 OH 0.0500
Jumlah Harga Tenaga
B Bahan
Jumlah Harga B
C Peralatan
Jumlah Harga Pera
D Jumlah (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
No Uraian Kode Satuan Koefisien
1 2 3 4 5
A Tenaga Kerja
Pekerja L.001 OH 0.3000
Tukang Batu L.003 OH 0.1500
Kepala Tukang L.015 OH 0.0150
Mandor L.016 OH 0.0150
Jumlah Harga Tenaga
B Bahan
Semen Portland M.01039 kg 5.1840
Pasir pasang M.01033 m3 0.0260
Jumlah Harga B
C Peralatan
Jumlah Harga Pera
D Jumlah (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.27. Pemasangan 1 m2 acian


No Uraian Kode Satuan Koefisien
1 2 3 4 5
A Tenaga Kerja
Pekerja L.001 OH 0.2000
Tukang Batu L.003 OH 0.1000
Kepala Tukang L.015 OH 0.0100
Mandor L.016 OH 0.0100
Jumlah Harga Tenaga
B Bahan
Semen Portland M.01039 kg 3.2500
Jumlah Harga B
C Peralatan
Jumlah Harga Pera
D Jumlah (A+B+C)
E Overhead + Profit 15%
F Harga Satuan Pekerjaan (D+E)
67,418.75
Harga Satuan Jumlah
(Rp) (Rp)
6 7

75,000.00 56,250.00
95,000.00 2,375.00
Jumlah Harga Tenaga Kerja 58,625.00

Jumlah Harga Bahan -

Jumlah Harga Peralatan -


58,625.00
xD 8,793.75
67,418.75

146,337.50
Harga Satuan Jumlah
(Rp) (Rp)
6 7

75,000.00 22,500.00
95,000.00 950.00
Jumlah Harga Tenaga Kerja 23,450.00

86,500.00 103,800.00
Jumlah Harga Bahan 103,800.00

Jumlah Harga Peralatan -


127,250.00
xD 19,087.50
146,337.50

377,051.88
Harga Satuan Jumlah
(Rp) (Rp)
6 7

75,000.00 58,500.00
85,000.00 33,150.00
95,000.00 3,705.00
95,000.00 3,705.00
Jumlah Harga Tenaga Kerja 99,060.00

157,250.00 188,700.00
92,850.00 40,111.20
Jumlah Harga Bahan 228,811.20

Jumlah Harga Peralatan -


327,871.20
xD 49,180.68
377,051.88
711,344.00
Harga Satuan Jumlah
(Rp) (Rp)
6 7

75,000.00 112,500.00
85,000.00 63,750.00
95,000.00 7,125.00
95,000.00 7,125.00
Jumlah Harga Tenaga Kerja 190,500.00

157,250.00 188,700.00
1,139.00 154,904.00
155,250.00 84,456.00
Jumlah Harga Bahan 428,060.00

Jumlah Harga Peralatan -


618,560.00
xD 92,784.00
711,344.00

48,587.50
Harga Satuan Jumlah
(Rp) (Rp)
6 7

75,000.00 37,500.00
95,000.00 4,750.00
Jumlah Harga Tenaga Kerja 42,250.00

Jumlah Harga Bahan -

Jumlah Harga Peralatan -


42,250.00
xD 6,337.50
48,587.50
55,247.24
Harga Satuan Jumlah
(Rp) (Rp)
6 7

75,000.00 22,500.00
85,000.00 12,750.00
95,000.00 1,425.00
95,000.00 1,425.00
Jumlah Harga Tenaga Kerja 38,100.00

1,139.00 5,904.58
155,250.00 4,036.50
Jumlah Harga Bahan 9,941.08

Jumlah Harga Peralatan -


48,041.08
xD 7,206.16
55,247.24

33,467.01
Harga Satuan Jumlah
(Rp) (Rp)
6 7

75,000.00 15,000.00
85,000.00 8,500.00
95,000.00 950.00
95,000.00 950.00
Jumlah Harga Tenaga Kerja 25,400.00

1,139.00 3,701.75
Jumlah Harga Bahan 3,701.75

Jumlah Harga Peralatan -


29,101.75
xD 4,365.26
33,467.01
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.8.


JENIS PEKERJAAN : Manajemen dan Keselamatan Lalu Lintas
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN
No. URAIAN SATUAN KUANTITAS

A. DATA DAN ASUMSI


1 Panjang Lokasi Pekerjaan KM -
2 Total Masa Pelaksanaan Kegiatan Bulan 2.00
3 Masa Mobilisasi Bulan 2.00
4 Periode Pekerjaan Perkerasan Jalan Bulan
5 Panjang zona kerja Perkerasan Jalan M -

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shif
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. PERALATAN KESELAMATAN LALU LINTAS


2 Rambu suar berkedip portabel Buah 1.00
7 Rambu Peringatan Buah 2.00
8 Rambu Petunjuk Buah
9 Pagar jaring pengaman termasuk perlengkapannya M'
10 Marka jalan sementara (jika diperlukan) M2
11 Peralatan komunikasi dan Lainnya Set
12 Alat Bantu Ls

D. TENAGA / PERSONIL

1 Pekerja (Flagman) OH 2.00


2 Koordinator / Pengatur OH 1.00

E TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = #DIV/0! %

No. URAIAN SATUAN VOL.

A MOBILISASI PERALATAN
Periksa lembar 1.2-2 ls 1.00

B. MOBILISASI FASILITAS PENYEDIA JASA

C. MOBILISASI LAINNYA
LAIN-LAIN
1 Uitzet Pekerjaan ls 1.00

D. MOBILISASI FASILITAS LABORATORIUM set

E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT LS 1

F. Manajemen dan Keselamatan lalu lintas LS

D. DEMOBILISASI LS 1

Total Biaya Mobilisasi

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO. : 1.2


JENIS PEKERJAAN : MOBILISASI

KODE
No. JENIS ALAT ALAT SATUAN VOL.

B. PERALATAN

3 BULLDOZER 100-150 HP E04 Unit 1


5 DUMP TRUCK 3.5 TON E08 Unit 10
10 EXCAVATOR 80-140 HP E10 Unit 1
19 VIBRATORY ROLLER 5-8 T. E19 Unit 1
11 WATER TANKER 3000-4500 L. E23 Unit 1

Total untuk Item B pada Lembar 1


Analisa El - 18
FORMULIR STANDAR UNTUK
N ANALISA MASING-MASING HARGA SATUAN

HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)

125,000.00 125,000.00
140,000.00 280,000.00
140,000.00 -
12,000.00 -
9,000.00 -
1,500,000.00 -
0.00 -

60,000.00 120,000.00
90,000.00 90,000.00

615,000.00
Lembar 1.2-1
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)

3,150,000 3,150,000

1,500,000 1,500,000

945,000 945,000

5,595,000

Lembar 1.2-2
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)

500,000 500,000
150,000 1,500,000
500,000 500,000
500,000 500,000
150,000 150,000

3,150,000
HITUNGAN VOLUME CUT & FILL (FINAL)
Dengan Lebar Timbunan 10 m

NO F F.Rata rata Jarak Vol.CUT NO F F.Rata rata Jarak

A' 0.36 A' 0.25


1.00 25 25.12 0.13 25
A 1.65 A -
1.76 5 8.80 - 5
B 1.87 B -
1.68 20 33.50 1.49 20
C 1.48 C 2.97
1.20 20 23.90 3.13 20
D 0.91 D 3.28
0.46 5 2.28 5.22 5
E 0.00 E 7.16
0 25 - 7.82 25
F 0.00 F 8.47
0 25 - 8.56 25
G 0.00 G 8.65
0 25 - 9.23 25
H 0.00 H 9.81
0 25 - 9.70 25
I 0.00 I 9.59
0 3 - 10.00 0
J 0.00 J 10.40
0 22 - 10.48 0
K 0.00 K 10.56

Jumlah Cut 200 93.60 Jumlah Fill 175


Jumlah Total 93.60 Jumlah Total Fill

CATATAN :
Berdasarkan kondisi di Lapangan bahwa tinggi galian rata-rata adalah 18 cm maka galian ini termasuk ke
bagian pekerjaan Striping Lahan
NGAN VOLUME CUT & FILL (FINAL)

Vol.FILL

3.13

29.70

62.50

26.10

195.38

214.00

230.75

242.50

1,004.05
1,004.05

bahwa tinggi galian rata-rata adalah 18 cm maka galian ini termasuk ke


DATA HITUNG PEMBANGUNAN BATAS TANAH EISMA HAJI KOTA TASIKMALAYA

Dime
NO URAIAN
Panjang

PEK. PERSIAPAN
Pek. pengukuran /Uitzet dan pasangan bouwplank
Papan nama kegiatan

Sewa Los kerja /Gudang

A. Pekerjaan Pondasi
Galian Pondasi 349.06

Pasir Urug 349.06

Pas. Batu Kosong 349.06

Pas. Pondasi batu kali 1pc : 5 ps 349.06

tambahan atas 349.06

Plesteran 349.06

Acian

Urugan Tanah Kembali

-
A
Dimensi
F (m2) RAB sat KETERANGAN
Lebar tinggi qty

0.7 1 0.70 244.34 M3

0.7 0.05 0.04 12.22 M3

0.7 0.15 0.11 36.65 M3

0.45 0.8 0.36 125.66 M3

0.3 0.3 0.09 31.41 M3


157.07 M3

0.9 - 314.15 M2

314.15 M2

0.3137 76.65 M3
DAFTAR BIAYA ANGKUT (PIKUL) KE LOKASI PEKERJAAN
DENGAN JARAK ANGKUT RATA-RATA 330 m'.

Pekerjaan : PEMBANGUNAN BATAS TANAH WISMA HAJI


Lokasi : ............
Dinas : ..............
Bidang : ............
Tahun : 2018

Batu pecah Pasir


Batu belah Batu putih
No. Analisa Satuan 2-3 cm pasang
15-20 cm 15-20 cm
m3 m3 m3 m3

I ANGKUTAN KE LOKASI PEKERJAAN 1.00 - 1.00 1.00

1 Jarak Angkut (D) km 0.33 - 0.33 0.33

2 Kecepatan rata-rata angkut ( Va ) km/jam 4.000 - 4.000 4.000


3 Kecepatan rata-rata pulang ( Vp ) km/jam 5.000 - 5.000 5.000
4 Kapasitas Alat ( C ) m3, zak 0.400 - 0.400 0.400

5 Waktu Siklus
- Waktu muat ( Tm ) jam 0.030 - 0.030 0.030
- Waktu angkut ( Ta ) = ( D ) / ( Va ) jam 0.083 - 0.083 0.083
- Waktu pulang ( Tp ) = ( D ) / ( Vp ) jam 0.066 - 0.066 0.066
- Waktu percepatan ( Tg ) jam 0.010 - 0.010 0.010
- Waktu penurunan ( Tt ) jam 0.010 - 0.010 0.010
- Total Waktu Siklus ( T ) jam 0.199 - 0.199 0.199

6 Produksi alat per jam ( Pj ) = ( C ) / ( T ) m3, zak 2.01 - 2.01 2.01


7 Biaya produksi per jam ( Bj ) Rp. 29,688.00 - 29,688.00 29,688.00

8 Biaya angkut per m3, per zak = ( Bj ) / ( Pj ) Rp. 14,770.15 - 14,770.15 14,770.15
Dibulatkan Rp. 14,750.00 - 14,750.00 14,750.00

Asumsi :
* Angkutan Mengunakan Gerobak Kapasitas 0,5 x 0,8 x 1,25 m3
* Upah Pekerja Rp. 75,000 /Hari , per jam Rp. 9,375
* Pekerja yang dipakai 3 Orang
* Waktu kerja 8 jam/Hari
* Sewa Gerobak/ beli keranjang Rp. 12,500.00/Hari
* Biaya Produksi yang dibutuhkan per jam Rp. 29,688.00
Portland
Pasir beton Cement (PC)
50 kg.
m3 zak

1.00 1.00

0.33 0.33

4.000 4.000
5.000 5.000
0.400 2.000

0.030 0.030
0.083 0.083
0.066 0.066
0.010 0.010
0.010 0.010
0.199 0.199

2.01 10.05
29,688.00 28,125.00

14,770.15 2,798.51
14,750.00 2,750.00