Anda di halaman 1dari 265

TANTRANSCO

FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.20/15 Dated 04.05.16.
Sir,

Sub:-Apprentice- Engineering Diploma Apprentice –Trainee


Thiru S.Raja prabhakaran –Progress report of April 2016-sub of
Reg.
########
I here with submit the progress report received from Thiru
S.Rajaprabhakaran ,Engineering Diploma Apprentice for the month of
April 2016 period from 01.4.16 to 24.4.16 and relived from his training
on 25.4.16 fore noon for favor of further action please.

Encl:-Progress Report:-4 Nos.


And reliving order-4 sets
Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to The superintending Engineer/GCC/Trichy. For kind


information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.20/15 Dated 04.05.16.
Sir,

Sub:-Apprentice- Engineering Diploma Apprentice –Trainee


Thiru S.Raja prabhakaran –Progress report of April 2016-sub of
Reg.
########
I here with submit the progress report received from Thiru
S.Rajaprabhakaran ,Engineering Diploma Apprentice for the month of
April 2016 period from 01.4.16 to 24.4.16 and relived from his training
on 25.4.16 fore noon for favor of further action please.
Encl:-Progress Report:-4 Nos.
And reliving order-4 sets
Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to The superintending Engineer/GCC/Trichy. For kind


information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Lines/Pudukkottai.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. LC/D. 19/16 Dated 03.5.16.
Sir,
Sub:-Works-110 KV DC line from Pudukottai-Aadhanakottai-
karambakudi
To proposed Gandharvakottai 110 KV SS –Line clear
Requested –reg.
Ref:- (Per)FB TANTRANSCO Proceeding No.115 Dated 18.07.2014.
#######
I request that the Line clear may please be issue @ 09.00 Hrs to 17.00Hrs
on 07.5.2016 for carry out the following works .

1) Erection one number New KCR tower for newly formed LILO line to
proposed Gandharvakottai 110 KV SS in section between Exg loc 49&49 of
Aadhanakottai-Karambakudi for the safty purpose .

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy


Copy submitted to the Superintending Engineer/operation /Trichy
Copy submitted to the Superintending Engineer/PEDC/Pudukkottai
Copy submitted to the Executive Engineer/TLC/Trichy
Copy submitted to the Executive Engineer/Operation/Pudukkottai
Copy submitted to the Executive Engineer/O &M/Pudukkottai & Aranthangi
Copy to the Assistant Executive Engineer/O&M/Gandharvakottai &Rural
/Aranthangi
Copy to the Assistant Engineer/Lines/230 KV SS/Pudukottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC /Trichy
Transmission Line Construction . .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F Progress week book/D.No:-18/16 Date:- 035.16.
Sir,

Sub:- Progress of weekbook –Sub of–Requested-Reg.

#######
I here with submit the progress of week book for the month of April 201
respect of
Assitant Executive Engineer/TLC/Pudukottai in Duplicate for favor of further action
please.

Encl:- Report in duplicate :- 1 No.

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC /Trichy
Transmission Line Construction . .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F Progress week book/D.No:-18/16 Date:- 035.16.
Sir,

Sub:- Progress of weekbook –Sub of–Requested-Reg.

#######
I here with submit the progress of week book for the month of April 201
respect of
Assitant Executive Engineer/TLC/Pudukottai in Duplicate for favor of further action
please.

Encl:- Report in duplicate :- 1 No.

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. PDKT-ALUDY/Estimates/D.225 /15 Dated 29.2.16.
Sir,
Sub:- Estimates-Pudukottai-Alaungudy 110 KV SC Line on DC
towers-Estimates-
Submission of –Reg.
Ref:- (Per)FB TANTRANSCO Proceding No.91 Dated 04.10.2014.
######
I here with submit the estimates for the above line in duplicate ,for
favour of further action please.

Encl:- Estimates in Duplicate-1 Set


(Reach I-IX)&main materials)
Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. PDKT-ALUDY/Estimates/D.225 /15 Dated 29.2.16.
Sir,
Sub:- Estimates-Pudukottai-Alaungudy 110 KV SC Line on DC
towers-Estimates-
Submission of –Reg.
Ref:- (Per)FB TANTRANSCO Proceding No.91 Dated 04.10.2014.
######
I here with submit the estimates for the above line in duplicate ,for
favour of further action please.

Encl:- Estimates in Duplicate-1 Set


(Reach I-IX)&main materials)

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Estt-Class II service /D.227 /15 Dated 29.2.16.
Sir,
Sub:-Estt-Class II- Service-Thiru. R.CHERAN,(D.O.B 26.09.1991)
Assistant Engineer/ Civil by Internal selection-Joining Report-
Sub of –Reg.
Ref:-Memo .No.; 101/ADM-I/JA/F.Assistant Engineer/Civil/2016/
Dt.25.02.16.
######
Thiru, R.Cheran (DOB 26.09.1991) Joint as Assistant Engineer/Civil
in TLC Sub- Division /Pudukottai 0n 26.02.2016 F.N.
The joining Report along with Medical fitness Certificate in
original,copy of Degree certificate,Mark sheets,Community Certificate and
transfer certificate obtain from college .

Encl:- Joining report, Medical Fittness certicate, :


Copy of Community,Educational certificate -1 set
Along with mark sheets. :

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy (ADM-I)


TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Lines/Pudukkottai.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. LC/D. 219/15 Dated 24.2.16.
Sir,
Sub:-Works-110 KV DC line from Pudukottai-Aadhanakottai-
karambakudi
To proposed Gandharvakottai 110 KV SS –Line clear
Requested –reg.
Ref:- (Per)FB TANTRANSCO Proceeding No.115 Dated 18.07.2014.
#######
I request that the Line clear may please be issue @ 09.00 Hrs to 17.00Hrs
on 07.5.2016 for carry out the following works .

2) Erection one number New KCR tower for newly formed LILO line to
proposed Gandharvakottai 110 KV SS in section between Exg loc 49&49 of
Aadhanakottai-Karambakudi for the safty purpose .

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy


Copy submitted to the Superintending Engineer/operation /Trichy
Copy submitted to the Superintending Engineer/PEDC/Pudukkottai
Copy submitted to the Executive Engineer/TLC/Trichy
Copy submitted to the Executive Engineer/Operation/Pudukkottai
Copy submitted to the Executive Engineer/O &M/Pudukkottai & Aranthangi
Copy to the Assistant Executive Engineer/O&M/Gandharvakottai &Rural
/Aranthangi
Copy to the Assistant Engineer/Lines/230 KV SS/Pudukottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, Operation/230
KV SS/Pudukkottai.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.110 KV Line Inspn /D. 220/15 Dated 24.2.16.
Sir,
Sub-Newly Erected 110 KV LILO Line from Pudukottai-Thirumayam110
KV feeder to
Proposed Pudukottai 110/22 KV Urban SS-Inspection Report-
Replay –sub of –Reg.

Ref:-Lr.No. EE/O/PDKT/F.INS/D.43/16 Dt.05.2.16.


#######

With reference to the above ,rectified the remarks as called for in the
above reference details as follows.,
1) Loc 2 Jamber will be provided under LC ,LC proposed on 27.2.16.
2) Loc 16,20,&23 Earth bond jumbers will be provided on 27.2.16.
3) Namber plate,Phase plate & Danger Board are provided .
4) Span14-15 bottom conductor damages will be rectify before
26.2.16.

This is for fovour of further action please.

+Assistant
Executive Engineer,
TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy


Copy submitted to the Superintending Engineer/operation /Trichy
Copy submitted to the Executive Engineer/TLC/Trichy
Copy to Assistant Executive Engineer/Lines/230 KV SS/Pudukottai.

TANTRANSCO

Handing over Report

I) Name of Sub Division :- TLC/Pudukottai.


a) Name of the Assistant Executive Engineer:- K.SRINIVASAN,B.E.,
b) Name of the Assistant Engineer I :- Vacant
c) Name of the Assistant Engineer II :- Vacant
d) List of RWE staffs.
1. Thiru A.Nagarajan, Spl. Gr Driver,
2. Thiru T.Rajendran, Forman II Gr
3. Thiru K.Subramani, Fitter II Gr
4. Thiru K. Alagar, Fitter II Gr.
5. Thiru S.Rajaprabhakarn, Diploma Apperentice

II ) Lorry Asoke Leyland Reg. No. TN 45 F.8341


a) RC book
b) Permit Expiry on : 03-2017.
c) Insurance Expiry on 24.04.16
d) Fitness Certificate Expiry on 19.09.16.
III). List of on Going works.
A) SUB STATIONS:-
1) Proposed 110/22 KV Urban SS @ Pudukottai.
All the works are completed and final bill paid.
2) Proposed 110/33 KV SS @ Gandharvakottai
All the works are completed and final bill submitted
3) Bay Extension @ Nagudy 110 KV SS
Work Under progress.
4) Bay Extension @ Konnaiyur 110 KV SS
Estimate has already submitted to SE/GCC/Trichy for floating tender.
5) 400/230/110 KV Sub Station @ Vellalaveduthi(Gandharvakottai)
Estimates under preparation.(Sub Station)

B) LINE WORKS
1) Proposed 110 KV LILO line from Thirumayam-Pudukottai 110 KV feeder to
proposed 110/22 KV SS @Pudukottai Urban;
Works are completed and final bill submitted, Awaiting for Safety certificate
from Railway@ Madurai for line charging.
2) Proposed 110 KV DC Line from 230 KV SS to Pudukottai sipcot 110 KV SS
a) Stub setting :- 11 Locs out of 12 locs (1 Loc to be concrete very soon)
b) Tower Erection :-9 Locns out of 12 Locns
c) Stringing of conductor & Earth wire :- NIL Due to want of 120 KN
Insulators(1300 Nos)
d) Tower Erection :- 2 Locns located in the existing corridor it can be erected at
the time of stringing.under LC condition.
3) Proposed 110 KV LILO line from the existing Aadhanakottai-Karambakudy 110
KV feeder to proposed 110/33 KV SS @ Gandharvakottai.
a) Work Awarded, work to be taken up very soon.
4) 400/230/110 KV LINE
a) 400 KV LILO line from Existing Karaikudy-Pugalur feeder to proposed 400 KV
SS @ vellalaveduthi
Estimate under preparation.
b) 230 KV Line from vellalaveduthi toKarambiyam,
c) 230 KV Line from vellalaveduthi to Pudukottai
d) 230 KV Line from vellalaveduthi toThuvakudy,
e) 230 KV Line from vellalaveduthi to TNPL Manapparai,
The Estimates are under preparation and also related 110 KV line Estimates
are under preparation.

5) Proposed 110 KV SC line on DC towers from Pudukottai 230 KV SS to Alangudy


110 KV SS(Non bussing arrangements)
a) Recost the Estimates under preparation will be submitted to
Superintending Engineer/GCC/Trichy within a week.

Assistant Executive
Engineer,

TLC/Pudukottai

Er.K.SRINIVASAN,B.E., The Sr.Divisional Electrical


Engineer
Assistant Executive Engineer, Southern Railway
Transmission Line Construction .Madurai-16.
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F OH line crossing/D.No:-210/2015 Date:- 28.01.16.
Sir,

Sub:-Granting Way leave facilities to proposed 110 KV .HT..D/C.over he


power line
crossing ,across the Rail way track at Km 456/600-700 between
PDKT and VEL
Railway stations-for Tantransco/Trichy –Form C –Sub of–Requested
Reg.

Ref:-1. Lr .No.U/E/PLX/04-2015 dated 04.8.2015


2.Cash receipt No.944605/ Dt.03.9.2015.

#######
I here with submit Work completed certificate along with Form ‘C’ with
copy of cash remitted receipt for favor of further action please.

Encl:- Form C,complection certificate & copy of cash receipt-1 Set

Assistant Executive
Engineer,

TLC/Pudukkottai.

ANNEXURE-II

FORM C’

STATION:-Pudukottai.

DATE:- 28.01.2016.

TO,
1. Sr.Divisional Electrical Engineer/G.Southern
Railway,Madurai-625016
2. Divisional Engineer/North/Southern Railway, Madurai.
3. Assistant Divisional Engineer/southern Railway. Karaikudi.
4. Senior Section Engineer/Permanent Way/Southern Rail
Way/Pudukottai
5. Senior Section Engineer/Electrical/Southern Railway,
Manamadurai.

Name of work:- Granting way leave facilities to proposed


110 KV .HT.D/C. over
head,power line crossing, across the
Railway track at
Km 456/600-700 between PDKT and VEL
Railway stations.-for
Tantransco/Trichy approval-reg.
######
Approval in the Sr. Divisional electrical Engineer,
Southern Railway, Madurai Notification No. U/E/PLX/04-
2015 Dated 04.8.2015.

Please notice that the above work has been


completed on 25 Day of January 2016 .
A certificate that the works have been constructed
in full compliance with the ‘Regulations for Electrical
crossings of Railway tracks -1987” and in conformity with
the design and drawings approved by the railways in the
form given in annexure – III of the ‘regulations for
electrical crossings of railway tracks-1987 is enclosed.
Early approval for the energization of the newly
constructed power line crossing may be communicated

ANNEXURE-III
CERTIFICATE OF COMPLIANCE

It is hereby certified that the electrical overhead line crossing


at km 456/600-700 between Pudukottai & Vellanur Railway
stations and in Pudukottai Section
of the Madurai Division of the southern railway has been
constructed in compliance with Indian Electricity Act 1910 and
Indian Railways Act 1890 and the Rules made there-under and
as amended from time to time and the regulations for power
line crossings of railway tracks-1987 . the crossing has also
been constructed in accordance with the drawings approved by
the Southern Railway and the Electrical inspector of the
southern railway, the reference of which are the given below
Sl.No Drawing Title of Locatio Reference Approving
. No. Drawing n of under authority
crossin which
g Drawing is
approved
U/E/PLE/ Erection of KM U/E/PLX/ DRM/Madur
04-2015 110 kv DC 456/60 04-2015. ai
1 line on DC 0-700
towers from
Pudukottai to
Thirumayam
Feeder at
proposed
Pudukottai
Urban 110 KV
SS (Via
Thiruvapur
110 KV SS )
for crossing at
Km 456/600-
700 in
between
Pdukottai
Railway
station and
Vellanur
Railway
station.
Along with a reproducible print , eight copies of the drawings
showing the completed power line crossing is / are enclosed

Place ;
Date ;
TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC /Trichy
Transmission Line Construction . .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F Progress week book/D.No:-18/16 Date:- 035.16.
Sir,

Sub:- Progress of weekbook –Sub of–Requested-Reg.

#######
I here with submit the progress of week book for the month of April 201
respect of
Assitant Executive Engineer/TLC/Pudukottai in Duplicate for favor of further action
please.

Encl:- Report in duplicate :- 1 No.

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC /Trichy
Transmission Line Construction . .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F Progress week book/D.No:-18/16 Date:- 035.16.
Sir,

Sub:- Progress of weekbook –Sub of–Requested-Reg.

#######
I here with submit the progress of week book for the month of April 201
respect of
Assitant Executive Engineer/TLC/Pudukottai in Duplicate for favor of further action
please.

Encl:- Report in duplicate :- 1 No.

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC /Trichy
Transmission Line Construction . .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F works bills/D.No:-215/2015 Date:- 30.1.16.
Sir,

Sub:- Expenditure-T&D program –Expenditure statement –Sub of–


Requested-Reg.

#######
I here with submit the expenditure statement in respect of this sub
Division in
Duplicate for favor of further action please.

Encl:- statement in duplicate-1 Set

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Assistant Executive
Engineer
Assistant Executive Engineer, Lines/230 KV SS
Transmission Line Construction Pudukottai .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F works bills/D.No:-217/2015 Date:- 30.1.16.
Sir,

Sub:- Inspection-110 KV LILO line from Pudukottai-Thirumayam 110 KV


feeder to
Proposed Pudukottai 110/22 KV Urban ss-Line Works-completed-
Inspection
Of line-requested-Reg.

Ref:- (Per) FB.TANGEDCO proceeding No.09 Dated 10.01.2014


#######
I here with enclosed tower schedule for the above line ,I may kindly be
requested to
inspect the line and any defect may please be communicated to this office , the defec
will be rectify
at our end as early please.
Encl:- Tower Schedule – 1 No.

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy submitted to The Executive Engineer/Operation/230 KV


SS/Pudukottai.
TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC /Trichy
Transmission Line Construction . .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F works bills/D.No:-213/2015 Date:- 29.1.16.
Sir,

Sub:- Works-Final bill sub –Sub of–Requested-Reg.

Ref:- K2 Agt. No.039 SE/15-16


#######
I here with submit the Final bill for the Work of EWE,conc,erection of
towers in loc 19-20
and stringing of conductor in loc 19-21 of 110 KV LILO line from Pudukottai-Thirumayam
feeder to proposed Pudukottai Urban 110/22 KV SS along with Mbk 9091 &9552 with bi
copy and statement in triplicate
for favor of further action please.

Encl:- Mbks 9091 &9552with bill copy and statement in triplicate;-1Set

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC /Trichy
Transmission Line Construction . .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F works bills/D.No:-213/2015 Date:- 29.1.16.
Sir,

Sub:- Works-Final bill sub –Sub of–Requested-Reg.


Ref:- K2 Agt. No.039 SE/15-16
#######
I here with submit the Final bill for the Work of EWE,conc,erection of
towers in loc 19-20
and stringing of conductor in loc 19-21 of 110 KV LILO line from Pudukottai-Thirumayam
feeder to proposed Pudukottai Urban 110/22 KV SS along with Mbk 9091 &9552 with bi
copy and statement in triplicate
for favor of further action please.

Encl:- Mbks 9091 &9552with bill copy and statement in triplicate;-1Set

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC /Trichy
Transmission Line Construction . .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F G Kottai works bills/D.No:-213/2015 Date:- 25.1.16.
Sir,

Sub:- Works-Gandharvakottai Sub Station-works Bills –Sub of–Requeste


Reg.

Ref:- K2 Agt. No.21,22,23,24,25 &69 SE/GCC/Try/2015-16


#######
I here with submit the works bills (6 Nos) for the above reference work
along with M Books,
Statements in triplicate for favor of further action please.
Encl:- Mbks with bill copy and statement in triplicate;-6 Sets

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy Submitted to The Executive Engineer/O&M/Pudukottai.

Copy Submitted to The Executive Engineer/TLC/Trichy.


Copy to Assistant Engineer/O&M/Town /Pudukottai

SOUTHERN RAIWAY

No U/PLX/04-2015
FORM B’

STATION:-Pudukottai.

DATE:- 18 .01.2016.

TO,
6. Sr.Divisional Electrical Engineer/G.Southern
Railway,Madurai-625016

7. Divisional Engineer/North/Southern Railway, Madurai.


8. Assistant Divisional Engineer/southern Railway. Karaikudi.
9. Senior Section Engineer/Permanent Way/Southern Rail
Way/Pudukottai
10. Senior Section Engineer/Electrical/Southern Railway,
Manamadurai.
Name of work:- Granting way leave facilities to proposed
110 KV .HT.D/C. over
head,power line crossing, across the
Railway track at
Km 456/600-700 between PDKT and VEL
Railway stations.-for
Tantransco/Trichy approval-reg.
######
Approval in the Sr. Divisional electrical Engineer,
Southern Railway, Madurai Notification No. U/E/PLX/04-
2015 Dated 04.8.2015.

Please take notice that the above work will be


commenced on the _ Day of-January-
2016 at—09.00hrs to 17.00 hrs. Please arrange for
your representative to be present.

(K.SRINIVASAN)

Cell No.9442502244

Works bills in respect of TLC/Sub Division/Pudukottai (12/2015)

1. Construction of control room building

@ Gandharvakottai 110/33 KV SS 9.25

Laksh
2. Construction of control room building

@ Gandharvakottai 33/11 KV SS 16.75

Laksh

3. Providing structure plinth @ G.Kottai 12.10

Laksh

4. Construction of Cableduct @G Kottai 42.25

Laksh

5. Providing fencing @ G Kottai 44.00

Laksh

6. Providing fire protection wall @ G.Kottai 20.35

Laksh

7. Lilo line from Thirumayam –Pudukottai feeder

To pudukottai urban ss Reach (IV) 4.86

Laksh

8. Lilo line from Thirumayam –Pudukottai feeder

To pudukottai urban ss Reach (V) 42.42

Laksh

Assistant Executive
Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. face value k2 Agt.No.046 SE/15-16/D.204 /15 Dated


23.12.15.
Sir,
Sub :- Earth work execavation, stub setting, concreting ,Supply and
erection of GI towers
And stringing of conductor and earth wire from loc 21-22 of
110KV DC line from
Pudukkottai- Thirumayam feeder to proposed Pudukottai urban
110 KV SS-
Face value proposal –sub of-regarding.
Ref:- K2 Agt. No.046 Se/15-16.
#######
I submit herewith the face value proposal for the above work
.for the following reasons ,
The above work was award to M/s Teems Engineering
Construction, Chennai.
The tower location 22 (KCR Type tower) the land owner object to provide
tower in his land and make discursion several time between officials and
owner and finally the land owner accept to provide tower in the edge of
boundary of his land

Additionally two sets of special type cross arm is essentially


required at locations 22 &23 (Each one set) to provided for stringing the
conductors between cross arms .so has
to enhance the spans and hoisting of insulators in the locations.

The above reasons quantum of work increased based on that


the value of work has enhanced to Rs. 4241949/-from the original face value
of Rs.40,43,930/- the excess of Rs. 198019/-(ie 4.9%)

Necessary comparative statement is enclosed here with for the


face value proposal, for the above work.
Hence I request that the face value proposal may please be
got approval from the competitive authority and communicate as early
please.

Encl :- Comparative statement in duplicate—1 set.

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy submitted to The Superintending Engineer/GCC/Trichy for kind information


please.

TANTRANSCO

FROM, TO,
Er.K.Srinivasan,B.E., The Superintending
Engineer,
Assistant Executive Engineer, (MM)GCC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Budget16-17 /D.203/15 Dated 19.12.15.

Sir,’\
Sub :-Budget-BE -2016-17& RE 2015-16-proposal for revenue
Expense,Revenue
Receipts,Capital Expenditure ,Debts & Deposits,Funds and
Loans & Advancea-
called for-particulars sub of –Reg.
Ref:-Endt. No. AAO/GCC/TRY/A.S/F. BE 2016-17 RE 2015-16 /D. /2015

Dt.14.12.15.
#########
I here with submit the statement regarding Budget BE 2016-17 &
RE 2015-16 particulars in the prescribed performa as called or in the
above cited reference for favor of further action please.

Encl ;-Per forma statements 3to 11—1 Set.


Assistant Executive
Engineer,

TLC/Pudukkottai.
Copy submitted to, The Executive Engineer/TLC/Tricy.(w.e)

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Superintending
Engineer,
Assistant Executive Engineer, (MM)GCC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Budget16-17 /D.203/15 Dated 19.12.15.

Sir,’\
Sub :-Budget-BE -2016-17& RE 2015-16-proposal for revenue
Expense,Revenue
Receipts,Capital Expenditure ,Debts & Deposits,Funds and
Loans & Advancea-
called for-particulars sub of –Reg.
Ref:-Endt. No. AAO/GCC/TRY/A.S/F. BE 2016-17 RE 2015-16 /D. /2015

Dt.14.12.15.
#########
I here with submit the statement regarding Budget BE 2016-17 &
RE 2015-16 particulars in the prescribed performa as called or in the
above cited reference for favor of further action please.

Encl ;-Per forma statements 3to 11—1 Set.


Assistant Executive
Engineer
TLC/Pudukkottai
.Copy submitted to, The Executive Engineer/TLC/Tricy.(w.e)

TANTRANSCO
FROM, TO,
Er. K.Srinivasan,B.E., The Assistant
Executive Engineer,
` Assistant Executive Engineer, O&M/Rural/Aranthangi
Transmission Line Construction .
Pudukkottai.(9442502244).

Lr. No. AEE/TLC/Pdkt/F.New SS/D.110-1/15 Dated 11.12.15.


Sir,
Sub:- Elecy-DDUEJY scheme-Establishment of New 33/11 KV SS at Vallavari
Village,
Aranthangi Taluk-Site handed over –Reg.
Ref:- Lr.No. AEE/Rural/Atg/F.New SS/D.231/15-16/date 04.12.15.
#######
Proposal for the establishment of new 33/11 KV SS at vallavari,Aranthan

Taluk, has received ved under cited reference above,and return the same with enclosur

for the following reasons.

1) Now the Integrated Power Development Scheme(IPDS) site to be taken over t

instructions

Received from the Head Quartersvide Lr.No.CE/R-APDRP/SE-I/E

(IPDS)/AEE.4/F.Tr.works/

D.480/15 dt.30.11.015.

2) This works are carryout under Deenadayalan Scheme.

3) The tenders are floated from Head Quarters (Bulk) under Turnkey Basis.

4) Pending for finalization at Head Quarters for Weather the works are carry out b

TANGEDCO or TANTRANSCO.

Awaiting orders from Head Quarters ,After getting the orders the land will

handed over

to suitable wing.

Encl:- As received

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy submitted to,


The Superintending Engineer/GCC/Trichy
The Superintending Engineer/PEDC/Pdukkottai.
The Executive Engineer/TLC/Tricy.
The Executive Engineer/O&M/Aranthangi
TANTRANSCO
FROM, TO,
Er. K.Srinivasan,B.E., The Assistant
Executive Engineer,
` Assistant Executive Engineer, O&M/Rural/Pudukottai.
Transmission Line Construction .
Pudukkottai.(9442502244).

Lr. No. AEE/TLC/Pdkt/F.New SS/D.202/15 Dated 11.12.15.


Sir,
Sub:- Elecy-110/22 KV SS-Land SF No. 752,Vadavalam Village,Chinnaiah
Chathiram,
Pudukottai taluk, Pudukottai Dist-Handing over the land Report- Reg.
.
Ref:- Lr.No. AEE/Rural/PDKT/F.110/22 Kv/Land Handing over/D.716/15date
02.12.15.
#######
Proposal for the establishment of new110/22K SS at Vadavala

village,Chinnaiahchathiram

Pudukottai Taluk & Dist., has received under cited reference above, and return the sam

with enclosures for the following reasons.

1) Now the Integrated Power Development Scheme(IPDS) site to taken over the

per the

instructions rceived from theHeadQuartersvideLr.No.CE/R-APDRP/SE-I/E

(IPDS)/AEE.4/

F.Tr.works/D.480/15 dt.30.11.015

2) The above sub Station proposal are not covered in T&D for the year 2015-2016.

3) The Proposed Sub Station not obtained Board Proceedings and Technical sancti

so for.

4) The land Transfer certificate not obtain so for

The above proposal may please be resent after getting B.P & Administrati

approval from
Compantative authority along with Land Transfer Certificate.

Encl:- As received

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy submitted to,


The Superintending Engineer/GCC/Trichy
The Superintending Engineer/PEDC/Pdukkottai.
The Executive Engineer/TLC/Tricy.
The Executive Engineer/O&M/Pudukottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Controller,,
Assistant Executive Engineer, CS/GCC/Trichy-
1.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Issue of materials/D.182/14 Dated


26..11.15.
Sir,
Sub :- Issuing of Materials-Requested –Reg.
Ref :- Req No.024608 dated 13.03.15.
######
Please issue ACSR panther conductor Mts. And
empty wooden drum 01(One) No. has already booked Req.No.
024608 dated 13.03.15.

I deputy Thiru ,K.Subramani, staff of this Sub Division , to


lift the above materials from the store and specimen Signature
duly attested by me.

Assistant
Executive Engineer
TLC /
Pudukkottai
Specimen signature
1)

2)

Attested

Assistant Executive Engineer,


TLC / Pudukkottai

I here with submit the 30 Nos. of closed M Books of this sub


Division ,The M Book Numbers are furnished below for favor of
further action please.

Sl. No M Book No Sl. No M


Book No,
1) SECA- 7111 21)
SECA- 7503
2) SECA- 7254 22)
SECA- 7502
3) SECA- 7255 23)
SECA- 8304
4) SECA- 7253 24) SECA-
8307
5) SECA- 7252 25)
SECA- 8308
6) SECA- 7259 26)
SECA- 8296
7) SECA- 7186 27)
SECA- 8295
8) SECA- 7187 28)
SECA- 8293
9) SECA- 7188 29)
SECA- 8495
10) SECA- 7189 30)
SECA- 8292
11) SECA- 7505
12) SECA- 7415
13) SECA- 7416
14) SECA- 7417
15) SECA- 7418
16) SECA- 7511
17) SECA- 7397
18) SECA- 7261
19) SECA- 7393
20) SECA- 8303

Encl ; closed M.Books -30 nos


Assistant
Executive Engineer
TLC /
Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. T&D (Budget)/D.196 /15 Dated 07.12.15.


Sir,
Sub:-TANTRANSCO- RAPDRP/-Disbursement claim details
particulars
- sub of-Reg.
#########

I here with submit the particulars regarding RAPDRP


disbursement particulars 17 in respect AEE/TLC/Pudukkottai in the
prescribed format in triplicate as called for in the reference cited above
,for favor of further action please.

Encl:- Format in triplicate-1 Set.

Assistant
Executive Engineer,

TLC/Pudukkottai

Copy Submitted to The Superintending Engineer/GCC/Trichy.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. T&D (Budget)/D.196 /15 Dated 07.12.15.


Sir,
Sub:-TANTRANSCO- RAPDRP/-Disbursement claim details
particulars
- sub of-Reg.
#########

I here with submit the particulars regarding RAPDRP


disbursement particulars 17 in respect AEE/TLC/Pudukkottai in the
prescribed format in triplicate as called for in the reference cited above
,for favor of further action please.

Encl:- Format in triplicate-1 Set.

Assistant
Executive Engineer,

TLC/Pudukkottai
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. T&D (Budget)/D.189 /15 Dated 02.12.15.


Sir,
Sub:-TANTRANSCO- Preparation of capital investment plan and
Transmission
Budget for 2016-17 - particulars- sub of-Reg.
Ref:- Memo No. CE/TP II/Try/EE/AEE//Elecl/F T&D/D.506/2015
dt.09.11.15
#########
I here with submit the particulars regarding Budget for 2016-
17 in respect AEE/TLC/Pudukkottai in the prescribed format in triplicate
as called for in the reference cited above ,for favor of further action
please.

Encl:- Format in triplicate-1 Set.

Assistant
Executive Engineer,

TLC/Pudukkottai

Copy Submitted to The Superintending Engineer/GCC/Trichy.


TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Superintending
Engineer,
Assistant Executive Engineer, (ADM2)GCC/Trichy-
20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. IT return 15-16/D.198 /15 Dated 08.12.15.

Sir,
Sub :- Income Tax return for the year 2015-16-Sub of –Reg.
Ref :- 1) Endt. No.364/Adm2/A2/F.I.T/2015/Dt.04.9.15.
2 ) Endt No.EE/TLC/TRY/A1/F.I.T/PR /15 Dt 27.11.15.
###############
I here with submit the Income Tax return for the year 2015-15 of
Thiru, K.Srinivasan, AEE/TLC / Pudukkottai for favor of further action
please.

Encl :-IT return 2015-16-1 No.

Assistant
Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Superintending
Engineer,
Assistant Executive Engineer, (ADM2)GCC/Trichy-
20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. IT return 15-16/D.198 /15 Dated 08.12.15.


Sir,
Sub :- Income Tax return for the year 2015-16-Sub of –Reg.
Ref :- 1) Endt. No.364/Adm2/A2/F.I.T/2015/Dt.04.9.15.
2 ) Endt No.EE/TLC/TRY/A1/F.I.T/PR /15 Dt 27.11.15.
###############
I here with submit the Income Tax return for the year 2015-15 of
Thiru, K.Srinivasan, AEE/TLC / Pudukkottai for favor of further action
please.

Encl :-IT return 2015-16-1 No.

Assistant
Executive Engineer,

TLC/Pudukkottai

`
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Superintending
Engineer,
Assistant Executive Engineer, (MM)GCC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. /D.19/15 Dated 01.12.15.

Sir,’\
Sub:-

The agreement period of K2 Agreement No.SE/GCC/Try

57/2014-15 for the work of providing one No. diesel driven TATA SUMO on

hire basis for the official use of Assistant Executive

Engineer/TLC/Pudukkottai is ending on 16.12.2015.


Hence I request that necessary tender may please be

arranged to floated to fix the New Agency for the above work with effect

from 17.12.2015. as the vehicle is essentially required for attending the

ongoing T&D works for favor of further action please

Assistant
Executive Engineer,

TLC/Pudukkottai

Copy Submitted to The Superintending Engineer/GCC/Trichy.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.178/15 Dated 23.11.15.
Sir,
Sub:- Progress for the month of October 2015-Sub of –Reg.
########
I here with submit the progress of month of October 2015 as follows
in respect of this sub division for favor of further action please.
I . 110 Kv Urban line
a) Stringing of panther conductor and earth wire between span 24 -26
& Take off at urban ss.
II ) 110/33-11 KV SS @ Gandharvakkottai

a) Construction of control room building in 110 KV side fully


completed

b) Construction of control room building in 33 KV side fully


completed

c) Construction of Cable duct in 110 KV Yard 95% completed.

d) Construction of Cable duct in 33 KV Yard 95% completed.

e) Construction of plinth in 110 KV & 33 KV yard 95 % completed

f) Providing fencing at Gandharvakkottai foundation laid and


provided retaining wall two sides of the boundary of the SS.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to The Executive Engineer/TLC/Trichy. For kind


information please

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
superintending Engineer Assistant Executive
Engineer, GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.progress/D.218/15 Dated 2.2.16.
Sir,

Sub:-Fortnight dairy period from 16.1.16 to 31.1.16-Sub of –Reg.


########
I here with submit the fortnight dairy period from 16.1.16 to 31.1.16
in respect of Assistant Executive Engineer/TLC/Pudukkottai for favor of
further action please.

Encl:- 1 No..
Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to The Executive Engineer/TLC/Trichy. For kind


information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
superintending Engineer Assistant Executive
Engineer, GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.progress/D.218/15 Dated 2.2.16.
Sir,

Sub:-Fortnight dairy period from 16.1.16 to 31.1.16-Sub of –Reg.


########
I here with submit the fortnight dairy period from 16.1.16 to 31.1.16
in respect of Assistant Executive Engineer/TLC/Pudukkottai for favor of
further action please.

Encl:- 1 No..
Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to The Executive Engineer/TLC/Trichy. For kind


information please.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
superintending Engineer Assistant Executive Engineer,
GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.209/15 Dated 2.1.16.
Sir,

Sub:-Fortnight dairy period from 16.12.15 to 31.12.15-Sub of –Reg.


########
I here with submit the fortnight dairy period from 16.11.15 to
30.11.15 in respect of Assistant Executive Engineer/TLC/Pudukkottai for
favor of further action please.

Encl:- 1 No..
Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to The Executive Engineer/TLC/Trichy. For kind


information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.190/15 Dated 24.11.15.
Sir,

Sub:-Fortnight dairy period from 16.11.15 to 30.11.15-Sub of –Reg.


########
I here with submit the fortnight dairy period from 16.11.15 to
30.11.15 in respect of Assistant Executive Engineer/TLC/Pudukkottai for
favor of further action please.

Encl:- 1 No..
Assistant
Executive Engineer,
TLC/Pudukkottai.

Copy submitted to The superintending Engineer/GCC/Trichy. For kind


information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.226/15 Dated 29.2.16.
Sir,

Sub:-Apprentice- Engineering Diploma Apprentice –Trainee


Thiru S.Raja prabhakaran –Progress report of Febuary 2016-sub
of Reg.
########
I here with submit the progress report received from Thiru
S.Rajaprabhakaran ,Engineering Diploma Apprentice for the month of
Febuary 2016 for favor of further action please.

Encl:-Progress Report:-4 Nos.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to The superintending Engineer/GCC/Trichy. For kind


information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.226/15 Dated 29.2.16.
Sir,

Sub:-Apprentice- Engineering Diploma Apprentice –Trainee


Thiru S.Raja prabhakaran –Progress report of Febuary 2016-sub
of Reg.
########
I here with submit the progress report received from Thiru
S.Rajaprabhakaran ,Engineering Diploma Apprentice for the month of
Febuary 2016 for favor of further action please.

Encl:-Progress Report:-4 Nos.


Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy submitted to The superintending Engineer/GCC/Trichy. For kind
information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.191/15 Dated 24.11.15.
Sir,

Sub:-Apprentice- Engineering Diploma Apprentice –Trainee


Thiru S.Rajaprabhakaran –Progress report of November 2015-
sub of Reg.
########
I here with submit the progress report received from Thiru
S.Rajaprabhakaran ,Engineering Diploma Apprentice for the month of
November 2015 for favor of further action please.

Encl:-Progress Report:-4 Nos.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to The superintending Engineer/GCC/Trichy. For kind


information please.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.176/15 Dated 18.11.15.
Sir,

Sub:-Estt-RWE Staff -TAbills.-Sub of- Reg.


########
I here with submit the TA bill for the month of 09/15 &10/15 in respect
of this sub division for favour of further action please.

Encl:-TA bills :-4 Nos.


Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.178/15 Dated 20.11.15.
Sir,

Sub:-Advance Payment for Augmentation of 230/110 KV


transformation capacity at six
Nos existing 230/110 KV substations by supply ,erection,testing
& commissioning
Of 17 Nos.160 MVA,230/110 KV Auto Tranformer bay works on
total turnkey
basis against specification T-1875 under funding by KFW -
Advance payment –
Bill –sub of –Reg.
Ref:- Lr.No.CE/TR/SE?TR IV/EE3/AEE I/F.T.1875/LOA No.2721/15dated
25.8.15.
########
I herewith submit the bill for 10% advance payment for civil portion
of the above work along with MBook 9575 with performa invoice in
triplicate for favor of further action please.
Encl:-Mbook 9575 with Performa in triplicate:-1 No.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.178/15 Dated 20.11.15.
Sir,

Sub:-Advance Payment for Augmentation of 230/110 KV


transformation capacity at six
Nos existing 230/110 KV substations by supply ,erection,testing
& commissioning
Of 17 Nos.160 MVA,230/110 KV Auto Tranformer bay works on
total turnkey
basis against specification T-1875 under funding by KFW -
Advance payment –
Bill –sub of –Reg.
Ref:- Lr.No.CE/TR/SE?TR IV/EE3/AEE I/F.T.1875/LOA No.2721/15dated
25.8.15.
########
I herewith submit the bill for 10% advance payment for civil portion
of the above work along with MBook 9575 with performa invoice in
triplicate for favor of further action please.

Encl:-Mbook 9575 with Performa in triplicate:-1 No.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Through EE/TLC/Trichy
Lr.No.AEE/TLC/PDKT/F.work/D.179/15 Dated 20.11.15.
Sir,

Sub:-. Work order- Augmentation of 230/110 KV transformation


capacity at six
Nos existing 230/110 KV substations by supply ,erection,testing
& commissioning
Of 17 Nos.160 MVA,230/110 KV Auto Tranformer bay works on
total turnkey
basis against specification T-1875 under funding by KFW – Work
order application
- For civil portion-Sub of-Reg.
Ref:- Lr.No.CE/TR/SE?TR IV/EE3/AEE I/F.T.1875/LOA No.2721/15dated
25.8.15.

########
I here with submit the work order application No.095027 Dt.20.11.15.
for the above work , for favour of further action please.

Encl:-W.o.appln with copy of award -1 no.


Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
superintending Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Through EE/TLC/Trichy
Lr.No.AEE/TLC/PDKT/F.work/D.179/15 Dated 20.11.15.
Sir,

Sub:-. Work order- Augmentation of 230/110 KV transformation


capacity at six
Nos existing 230/110 KV substations by supply ,erection,testing
& commissioning
Of 17 Nos.160 MVA,230/110 KV Auto Tranformer bay works on
total turnkey
basis against specification T-1875 under funding by KFW – Work
order application
- For civil portion-Sub of-Reg.
Ref:- Lr.No.CE/TR/SE?TR IV/EE3/AEE I/F.T.1875/LOA No.2721/15dated
25.8.15.
########
I here with submit the work order application No.095027 Dt.20.11.15.
for the above work , for favour of further action please.

Encl:-W.o.appln with copy of award -1 no.


Assistant
Executive Engineer,
TLC/Pu
dukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.174/15 Dated 17.11.15.
Sir,

Sub: Estimate-Providing plinth for structure and equipment plinth for


bay extension
@ Konnaiyur 110/11 KV SS-Estimate -Sub of- Reg.

Ref:- (Per)FB.TANTRANSCO Proceeding No.162 Dated 12.9.14.


########
I here with submit an estimate for the above work in duplicate for an
amt of Rs.316600/-for favour of further action please.

Encl:Estimate in duplicate-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy for kind


information please
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.174/15 Dated 17.11.15.
Sir,

Sub: Estimate-Providing plinth for structure and equipment plinth for


bay extension
@ Konnaiyur 110/11 KV SS-Estimate -Sub of- Reg.

Ref:- (Per)FB.TANTRANSCO Proceeding No.162 Dated 12.9.14.


########
I here with submit an estimate for the above work in duplicate for an
amt of Rs.316600/-for favour of further action please.

Encl:Estimate in duplicate-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy for kind


information please

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.14/15 Dated 23.04.16.
Sir,
SUB :- Works- CC Ist & Part bill- Sub of –Reg.
Ref:- K2 Agt. No.273,274&275 / SE/15-16
#######
I herewith submit CC I st & part bill for the following works along
with M Book sand statement in triplicate

1) EWE,SS,Conc,supply and erection of towers from loc 1-3 and


stringing of conductor and earth wire from loc 1-3 from LILO of
Pudukottai-Adhanakottai-Karambakudy to proposed
Gandharvakottai 110/33-11 KV SS
(Reach-I)
2) EWE,SS,Conc,supply and erection of towers from loc 4-10and
stringing of
conductor and earth wire from loc 3-10 from LILO of
Pudukottai-Adhanakottai-Karambakudy to proposed
Gandharvakottai 110/33-11 KV SS
(Reach-II)
3) EWE,SS,Conc,supply and erection of towers from loc 11-17
and stringing of conductor and earth wire from loc 10-17 from
LILO of Pudukottai-Adhanakottai-Karambakudy to proposed
Gandharvakottai 110/33-11 KV SS
(Reach-III)

This is for favor of further action please.

Encl;- Mbook 9020,9423,10037 -3Nos }


Bill coy and statement in triplicate } 3 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.12/15 Dated 23.04.16.
Sir,
SUB :- Works- CC I st & Part bill- Sub of –Reg.
Ref:- K2 Agt. No.78/ SE/15-16
#######
I herewith submit CC I st & part bill for the Hired vehicle bearing
Regn.No. TN 55 V 2603 for the month of March 2016 ., along with M Book
and statement in triplicate
This is for favor of further action please.

Encl;- Mbook 9409 -1Nos }


Bill coy and statement in triplicate } 1 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.192/15 Dated 03.12.15.
Sir,
SUB :- Works- CC XII st & Part bill- Sub of –Reg.
Ref:- K2 Agt. No.57/ SE/14-15
#######
I herewith submit CC XII & part bill for the Hired vehicle bearing
Regn.No. TN 55 V 2603 for the month of November 2015 ., along with M
Book and statement in triplicate
This is for favor of further action please.

Encl;- Mbook 9171 -1Nos }


Bill coy and statement in triplicate } 1 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.165/15 Dated 02.11.15.
Sir,
SUB :- Works- CC XI st & Part bill- Sub of –Reg.
Ref:- K2 Agt. No.57/ SE/14-15
#######
I herewith submit CC XI & part bill for the Hired vehicle bearing
Regn.No. TN 55 V 2603 for the month of October 2015 ., along with M
Book and statement in triplicate
This is for favor of further action please.

Encl;- Mbook 9174 -1Nos }


Bill coy and statement in triplicate } 1 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.142/15 Dated 25.9.15.
Sir,
SUB :- Works- CC I st & Part bill- Sub of –Reg.
Ref:- K2 Agt. No.116 SE/15-16
#######
I herewith submit CC I & part bill for the construction of retaining
wall around the tower location of 110 KV LILO line of Nagudy- peraurani
110 KV lineto Keeramangalam 110 KV SS., along with M Book and
statement in triplicate
This is for favor of further action please.

Encl;- Mbook 9427-1Nos }


Bill coy and statement in triplicate } 1 set
. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D. /15 Dated .12.15.
Sir,
SUB :- Works- CC II st & Final bill- Earth work excavation , stub
setting, supply and
erection of towers and stringing of conductor and earth wire
loc 22-26 LILO of
Thirumayam-Pudukkottai sipcot 110 KV SC line to proposed
Pudukkottai urban
110/22 KV SS Sub of –Reg.
Ref:- K2 Agt. No.047 SE/15-16
#######
I herewith submit CC II nd & Final bill for the above work , along
with M Books and statement in triplicate . This is for favor of further action
please.

Encl;- Mbooks 9407,9423 &9571-3Nos }


Bill coy and statement in triplicate } 1 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D. /15 Dated .12.15.
Sir,
SUB :- Works- CC II st & Final bill- Earth work excavation , stub
setting, supply and
erection of towers and stringing of conductor and earth wire
loc 22-26 LILO of
Thirumayam-Pudukkottai sipcot 110 KV SC line to proposed
Pudukkottai urban
110/22 KV SS Sub of –Reg.
Ref:- K2 Agt. No.047 SE/15-16
#######
I herewith submit CC II nd & Final bill for the above work , along
with M Books and statement in triplicate . This is for favor of further action
please.

Encl;- Mbooks 9407,9423 &9571-3Nos }


Bill coy and statement in triplicate } 1 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.128/15 Dated 24.8.15.
Sir,
SUB :- Works- CC I st & Part bill- Sub of –Reg.
Ref:- K2 Agt. No.069 SE/14-15
#######
I herewith submit CC I & part bill for the construction of Control
room building with electrical arrangements in 33/11 KV SS @
Gandharvakkottai , along with M Books and statement in triplicate
This is for favor of further action please.

Encl;- Mbooks 8291 &10037-2Nos }


Bill coy and statement in triplicate } 1 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Arimalam 33/11 KVSS/D.137/15 Dated
08.9.15
Sir,
Sub:-Construction of control room building and providing
Electrification and water
Supply arrangements at Arimalam 33/11 KV works-report
sub of –Reg

Ref:- 1) Award Lr.No. SE/GCC/TRY/AEE/GL/DB/JEC/F.GCC 101/GL-


58/11-12/
D.1075/11 dated 30.12.11.
2) This office Lr.No. AEE/TLC/PDKT/F.DOC/.Arimalam/D.No
14/
Dt.13.1.2012.
#####

The above work was awarded to M/s Maha Foundations

PVT,LTD,No 5/754,Sabari street,Madipakkam,Chennai-91,vide Lr cited in

the above ref 1.and intimate to take over the site for execution of work

vide this office letter cited in the ref 2.

But the firm has not turned up to take over the work,

and also it is know that the firm had not remitted the security deposit and

the necessary agreement is not executed till date (More than 3 years).
In this regards , it is recommended to cancel the work

with forfeit of EMD, from competitive authority approval may please be

got obtained for preparation of fresh estimate for this work.

This is for favor of further action please.

Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy submitted to the Superintending Engineer/GCC/Trichy. **

Copy submitted to the Superintending Engineer/PEDC/Pudukkottai. **

Copy to Assistant Executive Engineer /Civil/PEDC/Pudukkottai.**

** for kind information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Lorry TN 45 F 8341/D.137/15 Dated 08.9.15
Sir,
Sub:- Lorry TN 45 F.8341-FC Repair works-Approval-Requested-
Reg.
#############
1) The FC for the Departmental Lorry TN 45 F-8341 is Expiring on
18.9.2015..
2) To carry out the painting etc., and Three Firms have quotedtheir
lowest rates.
3) Comparative statement has been prepared from the comparative
statement it is seen that M/s Sri purpannaiyan Auto Mobiles,
Pudukkottai have quoted the lowest rate out of three firms.
4) This Painting works is essentially required to be carried out in
order to get the FC from the Concened Department and make the
vehicle road worthy.
5) Also this lorry is essentially required for the ongoing works
6) Under the above circumstances , it is requested that approval may
please be accorded to carry out the FC (paid painting works for an
amount of Rs.7,800/(Rupees seven thousand and eight hundred
only) to M/s Sri Porpaniyan Automobiles,Pudukkottai.
7) The Quatations as received and comparative statement are
submitted here with for kind perusal and approval please.

Encl :- Qutation-3 Nos.


With comparative statement-1 set.
.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., Thiru
S.Ranganathan,
Assistant Executive Engineer, M/S India Electro
Power controls,
TLC/Pudukkottai A,39,Ganesh
complex,.
. 6a,2nd floor
,Madurai road,
Trichy 620008.
Lr.No.AEE/TLC/PDKT/F. works /D.136/15 Dated 03.9.15
.
Sir,
SUB :- Works-Construction of control room Building with
electrification arrangements
At Mazaiur 110/22 KV SS-Refund of EMD,SD & RA –
Regarding
Ref:- 1) K2 Agt. No.101/SE/2013-2014.
######
With reference to the above, the refund proposal received form your
firm,During inspection by me on 28.8.15 and find out the following
remarks.
1) Cracks were developed several places in superstructures such as in
between verandah lintel and roof, front & rear side wall of control
room,ete.,
2) Painting not done so for in the steel window in store room
3) Water staganised in the passage in front of toilet and bath room
4) During the rainy seasons rain water enter into the control room via
door opening
5) Inside the store room store your materials stored to clear
materials and clean the
room make as good.

Your are requested to rectify the above said remarks as early ,the
fact may please be intimated to this office ,after verify that ,the
refund proposal will be submit to the higher officials.

The receipt of the letter will be acknowledged.


.

Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy submitted to the Superintending Engineer/GCC/Trichy}:
Copy submitted to the Executive Engineer/TLC/Trichy } for kind
information please.

TANTRANSCO
FROM, TO,
Er. K.Srinivasan,B.E., The Assistant
Executive Engineer,
` Assistant Executive Engineer, O&M/Rural/Aranthangi
Transmission Line Construction .
Pudukkottai.(9442502244).

Lr. No. AEE/TLC/Pdkt/F.New SS/D.110/15 Dated 21.8.15.


Sir,
Sub:- Elecy-DDUEJY scheme-Establishment of New 33/11 KV SS at Vallavari
Village,
Aranthangi Taluk-Site handed over –Reg.
Ref:- Lr.No. AEE/Rural/Atg/F.New SS/D.137/15-16/date 19.8.15.
#######
Proposal for the establishment of new 33/11 KV SS at vallavari,Aranthan

Taluk, has received ved under cited reference above,and return the same with enclosur

for the following reasons.

5) The works are carryout under Deenadayalan Scheme.

6) The tenders are floated from Head Quarters (Bulk) under Turnkey Basis.

7) Pending for finalization at Head Quarters for Weather the works are carry out b

TANGEDCO or TANTRANSCO.

Awaiting orders from Head Quarters ,After getting the orders the land will

handed over

to suitable wing.

Encl:- As received
Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy submitted to,


The Superintending Engineer/GCC/Trichy
The Superintending Engineer/PEDC/Pdukkottai.
The Executive Engineer/TLC/Tricy.
The Executive Engineer/O&M/Aranthangi

SOUTHERN RAIWAY

No U/PLX/04-2015
FORM ‘B’

STATION:-

DATE:-

TO,
11. Sr.Divisional Electrical Engineer/G.Southern
Railway,Madurai-625016

12. Divisional Engineer/North/Southern Railway,Madurai.


13. Assistant Divisional Engineer/southern
Railway.Karaikudi.
14. Senior Section Engineer,Permanent way,Souther
Railway,Pudukkottai.
15. Senior Section Engineer/Electrical/Southern
Railway,Manamadurai.

Name of work:- Granting way leave facilities to proposed


110 KV .HT.D/C. over
head,power line crossing, across the
Railway track at
Km 456/600-700 between PDKT and VEL
Railway stations.-for
Tantransco/Trichy approval-reg.
######
Approval in the Sr. Divisional electrical
Engineer,Southern Railway,Madurai Notification No.
U/E/PLX/04-2015 Dated 04.8.2015.

Please take notice that the above work will be


commenced on the --------------Day of-------------------2015
at-----------hrs. Please arrange for your representative to be
present.

Note:- Not less than 14 days notice of the licensees


intention to commence the work must be given B&C form.

Signed
By
competent authority.

TANTRANSCO
FROM, TO,
Er. K.Srinivasan,B.E., The Assistant
Executive Engineer,
` Assistant Executive Engineer, O&M/Rural/Aranthangi
Transmission Line Construction .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F 110 KV Thiruvappur 110KV SS Handing over/D.No
100/2015
Dat
06..08.2015
Sir,
Sub:-TLC Division –Trichy-Bay Extension works at Thiruvappur 110/22
11 KV SS-
Slow progress of civil works –Re-work allocation - Files Handed
Over to
AEE /TLC III/Trichy- Reg.
Ref:- EE/TLC/Try’s Memo No. EE/TLC/TRY/HD/F.Thiruvappur 110 KV
SS/D.406/15
Dated 29.6..2015.
###########
As per the orders issued by the Executive Engineer/TLC/Trichy under
cited above
reference I handed over the relavent files regarding Thiruvappur 110/22 KV SS .
1) Providing plinth for various structures and equipment plinth ,bay extension at
Thiruvappur 110/22
KV Sub station in Pudukkottai Dist.
K2 Agt. No.248 Se/14-15 Rs,31,22,660/-
Work order No.53.4/S.229/01/(14-15) 2015-16 Dt.08.7.15. (BWO) for RS.21,83,15
CC I st & part bill paid MBK 9167 available @ SE/GCC/Try for another work bill.
2) Construction of cable duct works in bay extension at Thiruvappur 110/22 KV SSi
Pudukkottai Dt.
K2 Agt No.249 SE/2014-15 for Rs.33,03,090/-
Work yet to started
Work order No.53.4/S.230/02/(14-15)2015-16 dated 10.07.15 (BWO) for
Rs.34,37,000/-

I request that the above files are may please be taken over and the
taken over and
copy sent to this office as early please.

Encl:- List of Handing over along with files.

Assistant Executive
Engineer,

TLC/Pudukkottai.
Copy submitted to The Superintending Engineer/GCC/Trichy } *
Copy submitted to The Executive Engineer/TLC/Trichy. }*

*For kind information please.


LIST OF FILES HANDED OVER REGARDING BAY EXTENSION AT THIRUVAPPUR 110/22
SS
SUB STATION.

1) Providing plinth for various structures and equipment plinth ,bay extension at
Thiruvappur 110/22
KV Sub station in Pudukkottai Dist.
K2 Agt. No.248 Se/14-15 Rs,31,22,660/-
Work order No.53.4/S.229/01/(14-15) 2015-16 Dt.08.7.15. (BWO) for RS.21,83,15
CC I st & part bill paid MBK 9167 available @ SE/GCC/Try for another work bill.
2) Construction of cable duct works in bay extension at Thiruvappur 110/22 KV SSi
Pudukkottai Dt.
K2 Agt No.249 SE/2014-15 for Rs.33,03,090/-
Work yet to started
Work order No.53.4/S.230/02/(14-15)2015-16 dated 10.07.15 (BWO) for
Rs.34,37,000/-

Taken over Handed over

(K.Srinivasan)
Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.works/D.123/15 Dated 26.8.15.
Sir,
SUB :- Estt- RWE staff-Statement of contributory pension scheme
Account slip-
Issuing –acknowledgement – Submission of-Reg.
Ref:- Account slip for the year 2013-14 &2014-15.
#######
I here with submit the acknowledgement of receipt of
Account slip for the following staff of this Sub Division
Signature of
Acknowledgement
1) Thiru , K.Subramani, Fitter II Grade

2) Thiru, K. Alagar, Fitter II Grade

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.works/D.123/15 Dated 26.8.15.
Sir,
SUB :- Estt- RWE staff-Statement of contributory pension scheme
Account slip-
Issuing –acknowledgement – Submission of-Reg.
Ref:- Account slip for the year 2013-14 &2014-15.
#######
I here with submit the acknowledgement of receipt of
Account slip for the following staff of this Sub Division
Signature of
Acknowledgement
1) Thiru , K.Subramani, Fitter II Grade

2) Thiru, K. Alagar, Fitter II Grade

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.works/D.105/15 Dated 12.8.15.
Sir,
SUB :- Works- TLC Division –Trichy- The angle Deviation at location
No.2 KCR –
Report submission of Reg.
Ref:- 1 Memo No EE/TLC/TRY/HD/F.230 KV Pdkt-110 SIPCOT link
line /D.407/15
Dated 29.6.15.
#######

I submit herewith the reply for the memo cited above ,

1) KCR tower has been provided at location 2.

2) The angle of deviation @ loc 2 is 106*57’ Rt of span 2to 3 the


necessary sketch is enclosed for reference

Encl :-Sketch-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.97/15 Dated 25.7.15.
Sir,
SUB :- Works- CC & Final bill- Sub of –Reg.
Ref:- 1 K2 Agt. No.212 SE/14-15
#######
I herewith submit CC I & Final bill for the construction of retaining
wall with fencing around the boundaries of Pudukkottai urban 110/22 KV
SS along with M Books and statement in triplicate
This is for favor of further action please.

Encl;- Mbooks 9553-1No }


Bill coy and statement in triplicate } 1 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.128/15 Dated 24.8.15.
Sir,
SUB :- Works- CC I st & Part bill- Sub of –Reg.
Ref:- K2 Agt. No.069 SE/14-15
#######
I herewith submit CC I & part bill for the construction of Control
room building with electrical arrangements in 33/11 KV SS @
Gandharvakkottai , along with M Books and statement in triplicate
This is for favor of further action please.

Encl;- Mbooks 8291 &10037-2Nos }


Bill coy and statement in triplicate } 1 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.128/15 Dated 24.8.15.
Sir,
SUB :- Works- CC I st & Part bill- Sub of –Reg.
Ref:- K2 Agt. No.069 SE/14-15
#######
I herewith submit CC I & part bill for the construction of Control
room building with electrical arrangements in 33/11 KV SS @
Gandharvakkottai , along with M Books and statement in triplicate
This is for favor of further action please.

Encl;- Mbooks 8291 &10037-2Nos }


Bill coy and statement in triplicate } 1 set

. Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.166/15 Dated 05.11.15.
Sir,

Sub:- Works- Progress report as on 31.10.15-Sub of –Reg.


########
I here with submit the Progress report as on 31.10.15.in respect of
AEE/TLC/Pudukkottai for favour of further action please.

Encl:-progress report-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Executive Engineer/TLC/Trichy for kind information


please

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.166/15 Dated 05.11.15.
Sir,

Sub:- Works- Progress report as on 31.10.15-Sub of –Reg.


########
I here with submit the Progress report as on 31.10.15.in respect of
AEE/TLC/Pudukkottai for favour of further action please.

Encl:-progress report-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Executive Engineer/TLC/Trichy for kind information


please
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.167/15 Dated 05.11.15.
Sir,

Sub:- TANGEDCO-Effective management of court cases to safeguard


the interest of
TANGEDCO and Government-Instructions –Issued-Status Report
called for-return
-Sub of –Reg.
Ref:- Circular Memo No.54208/C4/C42/2015-1 dated 23.09.15.
########
I here with submit the Court case return for the month of October 15
as on I st November 15 in respect of AEE/TLC/Pudukkottai for favour of
further action please.

Encl:-Court case return-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Executive Engineer/TLC/Trichy for kind information


please

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.167/15 Dated 05.11.15.
Sir,

Sub:- TANGEDCO-Effective management of court cases to safeguard


the interest of
TANGEDCO and Government-Instructions –Issued-Status Report
called for-return
-Sub of –Reg.
Ref:- Circular Memo No.54208/C4/C42/2015-1 dated 23.09.15.
########
I here with submit the Court case return for the month of October 15
as on I st November 15 in respect of AEE/TLC/Pudukkottai for favour of
further action please.

Encl:-Court case return-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Executive Engineer/TLC/Trichy for kind information


please

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC /Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.132/15 Dated 01.9.15.
Sir,

Sub:- Works- Progress report as on 31.8.15-Sub of –Reg.


########
I here with submit the Progress report ,Requirement of
materials,court case return,and work order pending as on 31.8.15.in
respect of AEE/TLC/Pudukkottai for favour of further action please.

Encl:-progress report-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Executive Engineer/TLC/Trichy for kind information


please

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.RWE –TA Bills/D.135/15 Dated 02.9.15.
Sir,.
Sub:- Establishment-RWE staffs-TA bills- Sub of –Reg.
#########
I here with submit the TA bills for the month of Auguest 2015,staff of
this sub Division ,for favor of further action please.

Encl:- TA Bill-2 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.RWE –TA Bills/D.135/15 Dated 02.9.15.
Sir,.
Sub:- Establishment-RWE staffs-TA bills- Sub of –Reg.
#########
I here with submit the TA bills for the month of Auguest 2015,staff of
this sub Division ,for favor of further action please.

Encl:- TA Bill-2 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er. P..Xavier, B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
TLC/Pudukkottai.
O&M/TANGEDCO/Gandharvakkottai.
Pudukkottai Dist.
Lr.No.AEE/O&M/GKT/F.400 KV Land Handing Over/D. /15 Dated
15..7.15.
Sir,
Sub :- 400 KV sub Station- Land
S.F.No.163/2,Vellalaveduthi,Gandharvakkottai
Taluk,Pudukkottai Dist.- Handing Over the land Report -Reg

Ref:- G.O.MS No. 137 Dated 16.09.2014.

#####
I enclosed here with land survey map bearing survey No.163/2 in the
Vellalaveduthy revenue Village at an extent of 50(Fifty) Accrs. With the
Size of 404.80mX500.00 m allotted to Electricity Board for establishment
of 400 KV Sub station as per the GO cited above.

Necessary arrangement will be made at our end for getting the


land Transfer certificate for the above land form the consent Department
it will be sent seperatly.

Hence ,I request that the above land may please be taken over for
the Establishment of 400 KV SS at your end.and also communicate the
taken over report to this Office as early please.

Encl:- FMB Drawing- 1 No.


Handing over Report-1No.
Assistant
Executive Engineer,
O&M
/gandharvakkottai.

Copy submitted to the Superintending Engineer/PEDC/Pudukkottai. }


**
Copy submitted to the Superintending Engineer/GCC/Trichy }
Copy submitted to the Executive Engineer/O&M/Pudukkottai. }
Copy submitted to the Executive Engineer/TLC/Trichy. }
** (w.e) for kind information please.

HANDING OVER REPORT

1) Name of the Village :- Vellalavedudhy

2) Name of Taluk :- Gandarvakkottai

3) Name of the District :- Pudukkottai

4) S.F.No :- 163/2

5) Extent Area :- 50 Accrs

6) Size of the land :- 404.80m X 500.00m

7) Remarks :- Establishment of 400 KV Sub Station

Taken Over Handed Over

Assistant Executive Engineer Assistant


Executive Engineer,
TLC/Pudukkottai.
O&M/Gandharvakkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.work/D.76/15 Dated 29.6.15.
Sir,

SUB :- Works- CC & Final bill- Sub of –Reg.


Ref:- 1 K2 Agt. No.054 SE/15-16
2 K2 Agt No038 SE/15-16

#######
I herewith submit 3 Nos of CC I & Final bills along with M Books and
statement in triplicate for the following works
1) EWE,SS,concreteing,erection of towers from loc 16-18 and stringing of panther
conductor and earth wire from loc 15-19 for LILO of Thirumayam-Sipcot
Pudukkottai feeder to Proposed Urban 110/22 KV SS @ Pudukkottai
2) EWE,SS,concreteing,erection of towers from loc 9-15 and stringing of panther
conductor and earth wire from loc 8-15 for LILO of Thirumayam-Sipcot
Pudukkottai feeder to Proposed Urban 110/22 KV SS @ Pudukkottai
This is for favor of further action please.

Encl;- Mbooks 8958,8824-2Nos }


Bill coy and statement in triplicate } 2 sets.
.
Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. works bill/D.65/15 Dated 26.6.15.
Sir,
SUB :- Works- CC & Final bill- Sub of –Reg.
Ref:- 1 K2 Agt. No.158 SE/2012-1
#######
I herewith submit 2 Nos of final bills along with M Books and
statement in triplicate for the following works
1) Providing concrete for structures and equipment plinth @
Keeramangalam 110/33-11 KV SS CC II & Final bill
This is for favor of further action please.

Encl;- Mbooks 9551,9023 ,8494-3 Nos }


Bill coy and statement in triplicate } 1 No
.

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. works bill/D.134/15 Dated 02.9.15
.
Sir,
SUB :- Vehicle – TN 55 V.2603 hired vehicle-CCVIII th & part bill- Sub
of –Reg.
Ref:- 1 K2 Agt. No.GCC/57 SE/2014-15
######
I here with submit the CC IX th & part bill for the hired vehicle
bearing Reg No. TN 55 V 2603, for the month of Auguest 2015 along with
MBooks 9408 with bill copy and statement in triplicate for favour of further
action please.

Encl:-9408 -1 No.
Bill copy and statement in triplicate—1 set
Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. works bill/D.134/15 Dated 02.9.15
.
Sir,
SUB :- Vehicle – TN 55 V.2603 hired vehicle-CCVIII th & part bill- Sub
of –Reg.
Ref:- 1 K2 Agt. No.GCC/57 SE/2014-15
######
I here with submit the CC IX th & part bill for the hired vehicle
bearing Reg No. TN 55 V 2603, for the month of Auguest 2015 along with
MBooks 9408 with bill copy and statement in triplicate for favour of further
action please.

Encl:-9408 -1 No.
Bill copy and statement in triplicate—1 set

Assistant
Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. works bill/D.106/15 Dated 12.8.15
.
Sir,
SUB :- Vehicle – TN 55 V.2603 hired vehicle-CCVIII th & part bill- Sub
of –Reg.
Ref:- 1 K2 Agt. No.GCC/57 SE/2014-15
######
I here with submit the CC VIII th & part bill for the hired vehicle
bearing Reg No. TN 55 V 2603, for the month of July 2015 along with
MBooks 9555 with bill copy and statement in triplicate for favour of further
action please.

Encl:-9555 -1 No.
Bill copy and statement in triplicate—1 set

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. works bill/D.65/15 Dated 26.6.15.
Sir,
SUB :- Vehicle – TN 55 V.2603 hired vehicle-CCVII th & part bill- Sub
of –Reg.
Ref:- 1 K2 Agt. No.GCC/57 SE/2014-15
######
I here with submit the CC VII th & part bill for the hired vehicle
bearing Reg No. TN 55 V 2603, for the month of June 2015 along with
MBooks (2 Nos) with bill copy and statement in triplicate for favour of
further action please.

Encl:-8961 &9173 -2 Nos


Bill copy and statement in triplicate—1 set

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. works bill/D.65/15 Dated 26.6.15.
Sir,
SUB :- Vehicle – TN 55 V.2603 hired vehicle-CCVII th & part bill- Sub
of –Reg.
Ref:- 1 K2 Agt. No.GCC/57 SE/2014-15
######
I here with submit the CC VII th & part bill for the hired vehicle
bearing Reg No. TN 55 V 2603, for the month of June 2015 along with
MBooks (2 Nos) with bill copy and statement in triplicate for favour of
further action please.

Encl:-8961 &9173 -2 Nos


Bill copy and statement in triplicate—1 set

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., Thiru
S.Ranganathan, Assistant Executive Engineer,
Prop M/s,India Electro power controls,
TLC/Pudukkottai. 39A,Ganesh complex,
Trichy-8 .
Lr.No.AEE/TLC/PDKT/F. Filling works /D.89/15 Dated 29.7.15..
Sir,
SUB :- Works- construction of retaining wall with fencing around the
boundary for the
proposed Pudukkottai urban 110/22 KV SS-CC I & Final bill
ready-Intimation –
reg.
Ref:- K2 Agt No.212 SE/2014-20015.
#######
The above cited work was award d on 02.6.15and site handed over on
03.6.15.period of completion 1 month (02.7.15) and work portion of 110
KV & 22 KV yard filling with gravel was completed as on 16.6.2015 for
carryout the further works in the yard ie Wet macadam with 40 mm metal
and filling 20 mm metal above the gravel filled area under the different
Agreements.
The Executive Engineer/Transmission Line Construction /Trichy
inspection of 110 KV pudukkottai urban SS on 06.7.2015. it is found that
between 110 KV eastern side yard kerb wall and fencing wall area .It is
found that uneven surface its is looks very shabby. He is instructed to
make even surface with the help of gravel.

The Executive Engineer/TLC/Trichy instructed to me to inform the


contractor to take necessary step to fill the portion with gravel and to
maintain the surface level has already filled rear side of control room
building.
You are requested to make necessary arrangement to the area as
per the instruction by the Executive Engineer/TLC/Trichy as early please.

Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy submitted to The Superintending Engineer/GCC/Trichy. For kind
information please.
Copy submitted to The Executive Engineer/TLC/trichy For kind
information

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Lines/Pudukkottai.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. LC/D.87/15 Dated 03.7.15.
Sir,
Sub:-Works-Thirumayam-Sipcot Pudukkottai 110 KV SC line –Line
clear
Requested –reg.
#######
I request that the Line clear may please be issue @ 07.00 Hrs on 06.7.2015
to 15.00Hrs on 08.7.2015 continuously for carry out the following works

3) Realsing jumpers @ loc 155 of Thirumayam-spudukkottai sipcot feeder


For feeding arrangemrnts to Pudukkottai 110 KV ss on 06.7.15 and résumé
the supply in between Sipcot SS to Loc 155 .(Toward sipcot side) @ 9.00 Hrs
in the same day and the remain portion ie loc 1 to 155 towards Thirumayam
side under LC condition.

4) Releasing and lowering of existing conductor and Earth wire between Exg loc
150 &151of the Thirumayam- Pudukkottai sipcot feeder
5) Realsing jumpers @ loc 155 of Thirumayam-spudukkottai sipcot feeder
For feeding arrangemrnts to Pudukkottai 110 KV ss on 05.7.15
6) Erection of new tower @ Loc 1 in the proposed LILO arrangements to
proposed Pudukkottai Urban 110/22 KV SS.

7) Stringing of 6 Nos panther conductor and 1 No. Earth wire between Loc 1
&2
And providing loop jumper arrangement for supply normalized between
Sipcot 110KV SS & Thirumayam 110 KV SS.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy


Copy submitted to the Superintending Engineer/operation /Trichy
Copy submitted to the Superintending Engineer/PEDC/Pudukkottai
Copy submitted to the Executive Engineer/TLC/Trichy
Copy submitted to the Executive Engineer/Operation/Pudukkottai
Copy submitted to the Executive Engineer/O &M/Pudukkottai &
Thirumayam

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Lines/Pudukkottai.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. LC/D.87-1/15 Dated 03.7.15.
Sir,
Sub:-Works-Thirumayam-Sipcot Pudukkottai 110 KV SC line –Line
clear
Requested –reg.
#######
I request that the Line clear may please be issue @ 8.00 Hrsto 10.00 Hrs on
08.7.2015 for carry out the following works
1) Providing rejumpering @ loc 155 for normalised Pudukkottai-Thirumayam
feeder.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy


Copy submitted to the Superintending Engineer/operation /Trichy
Copy submitted to the Superintending Engineer/PEDC/Pudukkottai
Copy submitted to the Executive Engineer/TLC/Trichy
Copy submitted to the Executive Engineer/Operation/Pudukkottai
Copy submitted to the Executive Engineer/O &M/Pudukkottai &
Thirumayam
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Funds/D.154/15 Dated 01.10.15.
Sir,
Sub:- Apprentice-Engineering Diploma apprentice-Trainee
Thiru S.Raja prabhakaran-progress report of auguest 2015.-sub of-Reg.

######
I here with submit the progress report received from
Thiru S. Rajaprabhakaran,Engineering Diploma Apprentice for the month of
September 2015 for favour of further action please.

Encl:-Progress Report 4 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Funds/D.167/15 Dated 02.11.15.
Sir,
Sub:- Apprentice-Engineering Diploma apprentice-Trainee
Thiru S.Raja prabhakaran-progress report of October 2015.-sub of-Reg.

######
I here with submit the progress report received from
Thiru S. Rajaprabhakaran,Engineering Diploma Apprentice for the month of October
2015 for favour of further action please.

Encl:-Progress Report 4 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Funds/D.167/15 Dated 02.11.15.
Sir,
Sub:- Apprentice-Engineering Diploma apprentice-Trainee
Thiru S.Raja prabhakaran-progress report of October 2015.-sub of-Reg.

######
I here with submit the progress report received from
Thiru S. Rajaprabhakaran,Engineering Diploma Apprentice for the month of October
2015 for favour of further action please.

Encl:-Progress Report 4 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. EOT-l/D. 116 /15 Dated 18.2.15.
Sir,
Sub:-Works-Providing concrete for structures and equipment plinth
at
Pudukkottai urban 110/22 KV SS-–EOT proposal-sub of-reg.
Ref:-1.). K2 Agt.No.189 /SE/2014-15..
2). Contractor’s Lr.dated.17.2.15.
######
I submit here with the EOT proposal for the above work,with
specific remarks as follows.
a) Name of the contractor :-Thiru
S.Ranganathan,
Prop M/S India
eletro Power Control
Trichy
b) Date of handing over of the site :-20.10.14.
c) Date fixed for complection :-19.2.15( 4
Months)
d) Date of EOT required :-10 Days after
completion of
filling the yard
works
e) Value of work completed within the period :-Rs.
36,27,200( 95%)
f) Value of work to be completed in the EOT period :-Rs.1,91,150/-
(5%)

The contractor submit the EOT letter dated 17..2.15..stated that


the work were carry and completed 95 % in the Agreement period ie
19.2.15 .The balance 5% could not be completed in the Agreement
period . In this Agreement the yard filling with wet mixed macadam
after raising the yard level by using gravel .The rising the sub
station level by using gravel as requested by the TANGEDCO
/Pudukkottai based on that the estimate prepared and submitted for
approval After complection of filling works the balance works are
carry out and completed within 10 days

The reason stated by the contractor is genuine, The contractor has


requested EOT for the above work 10 Days from the date of
completion of filling gravel works in the separate agreement
Hence ,I kindly be submit the Prior EOT proposal for kind
information please

ASSISTANT EXECUTIVE
ENGINEER
Encl:-EOT proposal in duplicate
TLC/PUDUKKOTTAI.
With contractor’s Letter

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. EOT-l/D. 06 /15 Dated 2.5.15.
Sir,
Sub:-Works-Construction of cable Duct and allied works at
Pudukkottai urban 110/22 KV SS-–EOT proposal-sub of-reg.
Ref:-1.). K2 Agt.No.190 /SE/2014-15..
2). Contractor’s Lr.dated.12.6.2015.
######
I submit here with the EOT proposal for the above work,with
specific remarks as follows.
a) Name of the contractor :-Thiru
S.Ranganathan,
Prop M/S India
eletro Power Control
Trichy
b) Date of handing over of the site :-06.1.2015
c) Date fixed for complection :-05.5.15( 4
Months)
d) Date of EOT required :-25.6.15.
e) Value of work completed within the period :-Rs. 36,67,295/-
( 84%)
f) Value of work to be completed in the EOT period :-Rs.7,02,432/-
(16%)

The contractor submit the EOT letter dated 12.6.15..stated that


the work were carry and completed 84 % in the Agreement period ie
05.5.15. The balance 5% could not be completed in the Agreement
period . IN this Agreement the yard filling with HBS 20 mm
metal,coping for structures and colour washing after raising the
yard level by using gravel .The rising the sub station level by using
gravel as requested by the TANGEDCO /Pudukkottai based on that
the estimate prepared and submitted for approval After complection
of filling works the balance works are carry out and completed
within 10 days

The reason stated by the contractor is genuine, The contractor has


requested EOT for the above work 10 Days from the date of
completion of filling gravel works in the separate agreement
Hence ,I kindly be submit the Prior EOT proposal is for kind
information please

ASSISTANT EXECUTIVE
ENGINEER
Encl:-EOT proposal in duplicate
TLC/PUDUKKOTTAI.
With contractor’s Letter

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. EOT-l/D. 78 /15 Dated 22.6.15.
Sir,
Sub:-Works-Providing concrete for structures and equipment plinth
at
Pudukkottai urban 110/22 KV SS-–EOT proposal-sub of-reg.
Ref:-1.). K2 Agt.No.189 /SE/2014-15..
2). Contractor’s Lr.dated.12.6.2015.
######
I submit here with the EOT proposal for the above work,with
specific remarks as follows.
a) Name of the contractor :-Thiru
S.Ranganathan,
Prop M/S India
eletro Power Control
Trichy
b) Date of handing over of the site :-20.10.14.
c) Date fixed for complection :-19.2.15( 4
Months)
d) Date of EOT required :-23.6.15.
e) Value of work completed within the period :-Rs.
36,27,200( 95%)
f) Value of work to be completed in the EOT period :-Rs.1,91,150/-
(5%)

The contractor submit the EOT letter dated 12.6.15..stated that


the work were carry and completed 95 % in the Agreement period ie
19.2.15 .The balance 5% could not be completed in the Agreement
period . The yard filling with wet mixed macadam after raising the
yard level by using supply and filling of gravel .The rising the sub
station level by using gravel as requested by the TANGEDCO
/Pudukkottai based on the The gravel filling works carry out the
other Agreement the filling the work was awarded on 02.6.2015
and the site handed over on 03.6.15 and the same is completed
on 16.6.15
After the filling works completed the contractor carry out the
balance work of supply and filling with wet mixed macadam in the
yard and completed the work on 23.6.15
The reason stated by the contractor is genuine, The contractor has
requested EOT for the above work up to 25.6.15.with out penalty
,He will not claim any extra rates for carry out the works beyond the
Agreement period. But the contractor has complete the work on
23.6.15 in all respects.
Hence ,I request that the EOT proposal may please be arranged
to be granted
up to 23.6.2015... Without penalty.

ASSISTANT EXECUTIVE
ENGINEER
Encl:-EOT proposal in duplicate
TLC/PUDUKKOTTAI.
With contractor’s Letter

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. EOT-l/D.79/15 Dated 22.6.15.
Sir,
Sub:-Works-Construction of cable Duct and allied works at
Pudukkottai urban 110/22 KV SS-–EOT proposal-sub of-reg.
Ref:-1.). K2 Agt.No.190 /SE/2014-15..
2). Contractor’s Lr.dated.12.6.2015.
######
I submit here with the EOT proposal for the above work,with
specific remarks as follows.
a) Name of the contractor :-Thiru
S.Ranganathan,
Prop M/S India
eletro Power Control
Trichy
b) Date of handing over of the site :-06.1.2015
c) Date fixed for complection :-05.5.15( 4
Months)
d) Date of EOT required :-25.6.15.
e) Value of work completed within the period :-Rs. 36,67,295/-
( 84%)
f) Value of work to be completed in the EOT period :-Rs.7,02,432/-
(16%)

The contractor submit the EOT letter dated 12.6.15..stated that


the work were carry and completed 84 % in the Agreement period ie
05.5.15.The balance 16% could not be completed in the Agreement
period . The yard filling with HBS 20 mm metal in the yard portion
copping of structures and colour washing after raising the yard level
by using supply and filling of gravel .The rising the sub station level
by using gravel as requested by the TANGEDCO /Pudukkottai based
on the The gravel filling works carry out the other Agreement the
the work was awarded on 02.6.2015 and the site handed over on
03.6.15 and the same is completed on 16.6.15
After the filling works completed the contractor carry out the
balance work of supply and filling with 20mm HBS metal,in the yard
portion ,Coping of structures and colour washing and completed the
work on 25.6.15
The reason stated by the contractor is genuine, The contractor has
requested EOT for the above work up to 25.6.15.with out penalty
,He will not claim any extra rates for carry out the works beyond the
Agreement period.

Hence ,I request that the EOT proposal may please be arranged


to be granted
up to 23.6.2015... Without penalty.

ASSISTANT EXECUTIVE
ENGINEER
Encl:-EOT proposal in duplicate
TLC/PUDUKKOTTAI.
With contractor’s Letter

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Lines/Pudukkottai.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. LC/D.87/15 Dated 02.7.15.
Sir,
Sub:-Works-Thirumayam-Sipcot Pudukkottai 110 KV SC line –Line
clear
Requested –reg.
#######
I request that the Line clear may please be issue @ 9.00 Hrs on 05.7.2015 to
15.00Hrs on 07.7.2015 continuously for carry out the following works
8) Realsing jumpers @ loc 155 of Thirumayam-spudukkottai sipcot feeder
For feeding arrangemrnts to Pudukkottai 110 KV ss on 05.7.15 and résumé
the supply in between Sipcot SS to Loc 155 .
9) Releasing and lowering of existing conductor and Earth wire between Exg loc
150 &151of the Thirumayam- Pudukkottai sipcot feeder

10) Realsing jumpers @ loc 155 of Thirumayam-spudukkottai sipcot feeder


For feeding arrangemrnts to Pudukkottai 110 KV ss on 05.7.15
11)Erection of new tower @ Loc 1 in the proposed LILO arrangements to
proposed Pudukkottai Urban 110/22 KV SS.
12) Stringing of 6 Nos panther conductor and 1 No. Earth wire between Loc 1
&2

13) Realsing jumpers @ loc 155 of Thirumayam-spudukkottai sipcot feeder


For feeding arrangemrnts to Pudukkottai 110 KV ss on 05.7.15

Encl :- Estimate in duplicate-9 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Estimates/D.60/15 Dated 15.6.15.
Sir,
Sub:-Works-Estimates-providing 110 KV LILO line from
Aadhanakottai-
Karambakudy SC line to proposed Gandharvakottai 110/33 KV
SS-Estimates
-sub of-reg.
Ref:- (per) FB TANTRANSCO proceeding No.115 Dated 18.07.2014..
#######
I here with submit the 9 Nos estimates for the above said line including main
materials estimate in duplicate for favour of further action please.

Encl :- Estimate in duplicate-9 Nos.


Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Funds/D.87/15 Dated 02.7.15.
Sir,
Sub:- Apprentice-Engineering Diploma apprentice-Trainee
Thiru S.Raja prabhakaran-progress report of june 2015.-sub of-Reg.

######
I here with submit the progress report received from
Thiru S. Rajaprabhakaran,Engineering Diploma Apprentice for the month of June
2015 for favour of further action please.

Encl:-Progress Report 4 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Rural/Pudukkottai
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. 22 KV - LC/D.61-1/15 Dated 19.6.15.
Sir,
Sub:-Works-22 KV LC –Requested-Reg..

#######
I request that the Line clear may please be issued on 27.6.15. between 09.00
Hrs & 17.00 Hrs in the 22 KVAmmaiarpatty for carryout the following works.

1 Stringing of 6 Nos panther conductor and 1 No. GI earth wire between loc 13-14.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/PEDC/Pudukkottai


Copy submitted to the Superintending Engineer/GCC/Trichy
Copy submitted to the Executive Engineer/TLC/Trichy.
Copy submitted to the Executive Engineer/O & M/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Town/Pudukkottai
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. 22 KV - LC/D.61-1/15 Dated 19.6.15.
Sir,
Sub:-Works-22 KV LC –Requested-Reg..

#######
I request that the Line clear may please be issued on 27.6.15. between 09.00
Hrs & 17.00 Hrs in the 22 KV town feeder for carryout the following works.

1 Stringing of 6 Nos panther conductor and 1 No. GI earth wire between loc 16-18.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/PEDC/Pudukkottai


Copy submitted to the Superintending Engineer/GCC/Trichy
Copy submitted to the Executive Engineer/TLC/Trichy.
Copy submitted to the Executive Engineer/O & M/Pudukkotta

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Rural/Pudukkottai
TLC/Pudukkottai.

The Assistant
Executive Engineer,
O & M/
Thirumayam
Lr.No.AEE/TLC/PDKT/F. 22 KV - LC/D.61-2/15 Dated 19.6.15.
Sir,
Sub:-Works-22 KV LC –Requested-Reg..

#######
I request that the Line clear may please be issued on 24.6.15. between 09.00
Hrs & 17.00 Hrs in the Milk 22 KV feeder for carryout the following works.

1 Stringing of 6 Nos panther conductor and 1 No. GI earth wire between loc 10-14.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/PEDC/Pudukkottai


Copy submitted to the Superintending Engineer/GCC/Trichy
Copy submitted to the Executive Engineer/TLC/Trichy.
Copy submitted to the Executive Engineer/O & M/Pudukkottai. &
Thirumayam
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Rural/Pudukkottai
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. 22 KV -LC/D.61/15 Dated 15.6.2015.
Sir,
Sub:-Works-22 KV LC –Requested-Reg..

#######
I request that the Line clear may please be issued on 24.6.15 between 09.00
Hrs & 10 .00 Hrs in the Ammaiarpatty 22 KV feeder for carryout the following works.

1. Dismantling the conductor and Earth wire from the Existing 66 line .
(Near Thiruvappur 110 KV SS)

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Executive Engineer/TLC/Trichy.


Copy submitted to the Executive Engineer/O & M/Pudukkottai
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, (APS)
GCC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Tyres/D.62/15 Dated 16.6.15.
Sir,
Sub:-Enq.No.81/14-15-dt 28.3.15 Supply of 900X 20 New tyre ,Tube
and flap
Inspection Report -sub of-reg.
Ref:- LPO No.07/15-16.
#######
I here with submit the Inspection report for the 7 Nos. 900x 20 size New tyre
@ M/s MRF Limited,SF No.108/1A ,New No.2,Sangiliyandapuram,Trichy-1.Bearing
tyre Nos as follows.
1 ) Tyre No. 10357921115
2) Tyre No 10357871115
3) Tyre No 10380441115
4) Tyre No. 10137140615
5) Tyre No. 10122780615
6) Tyre No. 10113800615
7) Tyre No 10122880615

It is fit for run ,This is for favour of further action please.

Encl:-Bill invoice No.P.l.No.118/2015 Dt.10.6.15.

Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy to the Assistant Executive Engineer/MM/GCC/CO/Trichy.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. WOA/D.66/15 Dated 19.62015.
Sir,
Sub:-Works-Work order application sub of –Reg.
########
I here with submit the work order application bearing No.095023
dated 19.6.15. for the work of filling the yard with gravel and other civil
works for the proposed Pudukkottai Urban 110 KV SS. For favor of further
action please.

Encl :- WOA with copy of sanction estimate


Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. WOA/D.66/15 Dated 19.6.2015.
Sir,
Sub:-Works-Work order application sub of –Reg.
########
I here with submit the work order application bearing No.095023
dated 19.6.15. for the work of filling the yard with gravel and other civil
works for the proposed Pudukkottai Urban 110 KV SS. For favor of further
action please.

Encl :- WOA with copy of sanction estimate


Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. vehicle/D.69/15 Dated 20.5.15.
Sir,
Sub:-Vehicle-hired vehicle-TN 55 V 2603-CC VI th & part bill –sub of –
Reg.

I here with submit the CC VI th & part bill for the hired vehicle for the month
of May 2015 along with Mbook and trip sheet and bill coy in triplicate for favour of
further action please.

Encl :-Mbook 9251 with bill copy and trip sheet.


Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. vehicle/D.69/15 Dated 20.5.15.
Sir,
Sub:-Vehicle-hired vehicle-TN 55 V 2603-CC VI th & part bill –sub of –
Reg.

I here with submit the CC VI th & part bill for the hired vehicle for the month
of May 2015 along with Mbook and trip sheet and bill coy in triplicate for favour of
further action please.

Encl :-Mbook 9251 with bill copy and trip sheet.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Estt/D.45/15 Dated 18.5.2015.
Sir,
Sub :- Estt-RWE-staff TA bill-Sub of – Reg.
######
I here with submit the TA bills for the moth of April 2015
inrespect RWE staffs of this Sub Division , This is for favour of further
action Please
Encl:- TA bills 4 Nos -1 set.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Estt/D.45/15 Dated 18.5.2015.
Sir,
Sub :- Estt-RWE-staff TA bill-Sub of – Reg.
######
I here with submit the TA bills for the moth of April 2015
inrespect RWE staffs of this Sub Division , This is for favour of further
action Please
Encl:- TA bills 4 Nos -1 set.

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Estt/D.43/15 Dated 14.5.2015.
Sir,
Sub :- Estt-RWE-GPF part final bill-Sub of – Reg.
Ref :- Application dated 14.5.15.
######
Received GPF part final application from Thiru, A. Nagarajan,
Spl. Gr. Driver of this Sub Division is enclosed here with for favor of
further action please.

Encl:- GPF part final appln -1 set.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. WO closing /D.44/15 Dated 14.5.2015.
Sir,
Sub:- Work order- closed work orders –sub of – Reg.
#######
I here with submit 5 Nos. closed work orders in duplicate for
the following works

1) Drawal of main for increasing vertical clearance between of loc 154


&155 of Thirumayam-Sipcot 110 KV feeder for Trichy- Rameswaram
express wayat NH210 under DCW( W.O. No.69.6/S.346/02/14-15 dt
3.5.14.)
2) Drawal of main for increasing vertical clearance of loc 306 &308 of 66
KV Karaikudy-Pudukkottai Sc line @ high way KM 49/855 NH under
DCW
( W.O. No.69.6/S.345/02/14-15 dt 3.5.14.)

3) Drawal of main for increasing vertical clearance of loc 154 &155 of


Thiruverambur-T.Nallur line for newly constructed Trichy bye pass road
@ NH 67 at NH Ch 12/150 under DCW( W.O. No.69.6/S.344/02/14-15
dt 3.5.14.)

4) Estimate for stringing of panther conductor and earth wire from loc 95-
104 of Thirumayam-Aliyanilai 110 KV SC line (W.O. No.
43.6/S.267/011/14-15 Dt.03.7.14)

5) Estimate forcheck survey pit marking stu setting concreting for loc
28,29,30,31,33 &38 stringing of panther conductor and earth wire
from loc 27-504 of Thirumayam-Aliyanilai 110 KV SC line (W.O. No.
43.6/S.564/07/14-15 Dt.03.7.14)

For favor of further action please.

Encl:-5 Nos. Closed Work orders in duplicate-1 set.

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., Thiru,V.Kumaravel,
Assistant Exeecutive Engineer 1/365
Thiruvaluvar Nagar,
TLC/Pudukkottai. Gundur,
Trichy-7.
Lr.No.AEE/TLC/PDKT/F. Audit recovery /D.26/14 Dt. 28.4.15.
Sir,

Sub:-Audit- providing 150 mm dia bore well and construction of 7200


lit cap OHT
formation of WBM road and costruction of box type
culvert at Annapannai
33/11 KV SS in Pudukkottai Dist.- -remit the pending
amount-Reg.

Ref:- 1) K2 Agt .No.117SE/2003-04.


2) Audit slip No.27 dated 05.9.05..
######
The above work was taken by you to the carryout and complete the
work on 05.7.2004, ie beyond the Agreement period (18.5.2004) .
The EO T period from 19.5.04 to 05.7.04 delay of execution of
above work is 48 days and levied for Rs.600/ (six hundred only ) at the
time of EOT sanctioned ,But the Audit wing suggestated that the work
could not be beneficially used by the Board .
Hence the calculated the penalty of the above work and proposed
for Rs. 146001/- (Rupees forteen thousand and one only) and already
recovered for Rs.600/- and the balance of Rs.14001/-( Rupees forteen
thousand and one only).

You are requested to remit the balance amount of RS.14001/- may


please be remit the amount to in the office of the Superintending
Engineer/GCC/Trichy .as early please.

Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy submitted to the Superintending Engineer/GCC/Trichy }
Copy submitted to the Executive Engineer/TLC/Trichy } For kind
information please

TANTRANSCO
FROM, TO,
Er. K.Srinivasan,B.E., The Assistant
Executive Engineer,
` Assistant Executive Engineer, TLC III/Trichy
Transmission Line Construction .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F 110 KVAmmachtirami SS Handing over/D.No:-
37/2015
Dat
08.5.2015
Sir,
Sub:-TLC Division –Trichy-Establishment of 110/22 /11 KV SS and
Allied 110 KV lines- Files Handed Over to AEE /TLC III/Trichy-
Reg.
Ref:- EE/TLC/Try’s Memo No. EE/TLC/TRY/HD/F.Ammachtiram 110 KV
SS/D.271/15
Dated 30.4.2015.
###########
As per the orders issued by the Executive Engineer/TLC/Trichy under
cited above
reference I handed over the relavent files regarding Ammachtiram 110/22-11 KV SS &
110 KV lines

I request that the above files are may please be taken over and the
taken over and
copy sent to this office as early please.

Encl:- List of Handing over along with files.

Assistant Executive
Engineer,

TLC/Pudukkottai.
Copy submitted to The Superintending Engineer/GCC/Trichy } *
Copy submitted to The Executive Engineer/TLC/Trichy. }*

*For kind information please.

LIST OF FILES HANDED OVER REGARDING AMMACHTIRAM 110/22-11 KV SS &


110 KV LINES.

1) (Per) FB.TANTRANSCO proceeding No.92 dated 04.10.14.


2) Land Transfer certificate file.
3) Electrical layout.
SUB STATION
4) Estimate for Removal of elevated rock and transport the same away from the site
for the proposed
110/22-11 KV SS Ammachtiram.
5) Construction of control room building at the proposed Ammachtiram 110/22-11 K
SS
6) Providing bore well and electrification construction of septic tank sewer line
arrangements for the control room building at the proposed Ammachtiram 110/22
11 KV SS in Pudukkottai Dist.
7) Construction of cable duct for the proposed Ammachtiram 110/22-11 KV SS
8) Providing foundation concrete for structures and equipment plinths at
Ammachtiram 110/22-11
KV SS (110/11 KV bay)
9) Providing foundation concrete for structures and equipment plinths at
Ammachtiram 110/22-11
KV SS (110/22 KV bay)

Sl. No. 4 to 9 the sanction estimate available at SE /GCC/Trichy Office

LINES
1) Conducting Detailed survey and plotting profile for the erection of 110 KV SC lin
on DC towers from vadugapatty 110 KV SS to the proposed Ammachtiram 110/22-11 K
SS.
a) Profile and route map submitted to Head quarters for approval (Enclosed files)
b) Face value proposal submitted for approval

2) ) Conducting Detailed survey and plotting profile for the erection ofLILO of 110
KV line
From Pudukkottai 230-T. Nallur 110 KV SC line to proposed Ammachtiram 110/22-11
SS
a) a) Profile and route map , Railway crossing drawings submitted to Head
quarters
for approval(Enclosed files)
b) CC I st & Final bill prepared and submitted to EE/TLC/Trichy.

Taken over Handed over


TANTRANSCO
FROM, TO,
Er. K.Srinivasan,B.E., The Assistant
Executive Engineer,
` Assistant Executive Engineer, O&M,/Gandarvakkottai,
Transmission Line Construction Pudukkottai Dist .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F 110 KV G.Koottai SS Temp.supply/D.No:-32/2015 Date
06.5.2015

Sir,

Sub:- Estt-Proposed upgradation of 33/ 11 KV SS into 110/33 -11 KV SS


At gandarvakkottai -Temp. Supply –Requested-Reg.

Ref:- (Per).CH .TANTRANSCO Proceeding No115


Dated.14.7.14.
#######
It is proposed 110/33 KV SS @ Gandarvakkottai ,
Construction works are will be commenced and work under progress
.Hence I request that 10 KW temporary supply for construction of
control room, plinths, Fabrication of structures etc.,using following
machineries as follows.
1. Water supply for New bore well :-7.5 KW
2. Lighting load :-2.5 KW
-------------
TOTAL :- 10.0 KW
-------------

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy submitted to The Executive Engineer/TLC/Trichy.


Copy submitted to The Executive Engineer/O&M/Pudukkottai.
Copy to Assistant Engineer/O&M/Gandarvakkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Executive Engineer,
Assistant Executive Engineer,
TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. EOT-l/D.12/15 Dated 17.4.2015.
Sir,
Sub:-Works-Providing concrete for structures and equipment plinth
at
Pudukkottai urban 110/22 KV SS-–EOT proposal-sub of-reg.
Ref:-1.). K2 Agt.No.189 /SE/2014-15..
2). Contractor’s Lr.dated.12.6.2015.
######
I submit here with the EOT proposal for the above work,with
specific remarks as follows.
g) Name of the contractor :-Thiru
S.Ranganathan,
Prop M/S India
eletro Power Control
Trichy
h) Date of handing over of the site :-20.10.14.
i) Date fixed for complection :-19.2.15( 4
Months)
j) Date of EOT required :-23.6.15.
k) Value of work completed within the period :-Rs.
36,27,200( 95%)
l) Value of work to be completed in the EOT period :-Rs.1,91,150/-
(5%)

The contractor submit the EOT letter dated 12.6.15..stated that


the work were carry and completed 95 % in the Agreement period ie
19.2.15 .The balance 5% could not be completed in the Agreement
period . The yard filling with wet mixed macadam after raising the
yard level by using supply and filling of gravel .The rising the sub
station level by using gravel as requested by the TANGEDCO
/Pudukkottai based on the The gravel filling works carry out the
other Agreement the filling the work was awarded on 02.6.2015
and the site handed over on 03.6.15 and the same is completed
on 16.6.15
After the filling works completed the contractor carry out the
balance work of supply and filling with wet mixed macadam in the
yard and completed the work on 23.6.15
The reason stated by the contractor is genuine, The contractor has
requested EOT for the above work up to 23.6.15.with out penalty
,He will not claim any extra rates for carry out the works beyond the
Agreement period.

Hence ,I request that the EOT proposal may please be arranged


to be granted
up to 23.6.2015... Without penalty.

ASSISTANT EXECUTIVE
ENGINEER
Encl:-EOT proposal in duplicate
TLC/PUDUKKOTTAI.
With contractor’s Letter

TRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC/Trichy-
20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Estt/D.28/15 Dated 25..4.2015.
Sir,
Sub:- Apprenticeship Traininng-Under the apprentices(Amendment)
Act 1973 and 1986
Engagement of Engineering Diploma Apprentice in TANGEDCO
for the year
2014-2015-Joining Report -Submission of-Reg
Ref :- Office Order No.2278/139/Adm-I/A4/F.Apprentice/2015.
Dt.20.4.2015.
################
Thiru,S.Rajaprabhakaran, is joint as Apprentice trainee in this Sub
Division on 25.4.2015 F.N.as per orders under cited reference.
I verify the original documents of Diploma Certificate, consolidated
mark sheets ,Transfer certificate and community certificate the copy of
the same and Apprenticeship contract Registration card in Quateraplicate.
is enclosed here with for favor of further action please.

Encl:-copy of Diploma certificate, ;


Community certificate,consolidated mark sheet ; 1 set.
And Registration card in Quateraplicate ;

ASSISTANT EXECUTIVE
ENGINEER

TLC/PUDUKKOTTAI

Copy submitted to the Executive Engineer/TLC/Trichy for kind information


please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.works bill/D.28 /15 Dated 24.4.15.
Sir,
Sub:- Works bills- CCI st & Final bills –sub of- Reg.
Ref :- K2 Agt. No. 031 SE/2015-16.
2) K2 Agt. No.001/2015-15 of EE/TLC/trichy.
################
I here with submit the CC I st & final bills along with MBooks
9091 &9552 and bill, statement in triplicate for the following works
1) Providing circular type well foundation at loc 38 of LILO of Nagudy-
Peravurani 110 KV SC line @ proposed Keeramangalam 110 KV SS.
Rs.1,81,468/-
2) Conducting detailed survey by theodolite instrument and plotting
the profile for the erection of 110 KV SC line on DC towers from
Pudukkottai 230 KV SS to Alangudy 110 KV SS in pudukkottai Dist.
Rs.3,57,310/-
.This for favor of further action please.

Encl:-Mbooks 9091 & 9552 and bill copy ;


with statement in triplicate.:-2 Sets.

ASSISTANT EXECUTIVE
ENGINEER

TLC/PUDUKKOTTAI

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.vehicle bill/D.35/15 Dated 08.5.15.
Sir,
Sub:- Vehicle TN 55 V 2603-CC V th & part bill –Sub of –Reg.
Ref :- K2 Agt.No.GCC/SE/57/2014-2015.
################
I here with submit the CC V th & part bill for the hired vehicle
bearing Reg. No.TN 55 V 2603 for the month of April 2015 along with
MBook 9174 and bill, statement in triplicate .This for favor of further
action please.

Encl:-Mbook 9174 and bill copy with statement in triplicate.

ASSISTANT EXECUTIVE
ENGINEER

TLC/PUDUKKOTTAI
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. W.O.A/D.24/15 Dated 27..4.2015.
Sir,
Sub:- Work order Applications –Submission of-Reg
################
I here with submit the 10 Nos (TEN ) work order application along
with the copy of sanction estimate for the following works
1. Earth work execavation, stub setting, concreting, Supply and
erection of towers
From loc 1 to 6 and stringing of panther conductor and earth wire
from loc 1-6
Of 110 KV DC line on Dc towers LILO from Pudukkottai-Thirumayam
feeder to
Proposed Pudukkottai urban 110 KV SS (WOA 095013/dt.27.4.15)

2. . Earth work execavation, stub setting, concreting, Supply and


erection of towers
From loc 9 to15 and stringing of panther conductor and earth wire
from loc 8-15
Of 110 KV DC line on Dc towers LILO from Pudukkottai-Thirumayam
feeder to
Proposed Pudukkottai urban 110 KV SS(WOA 095018/dt.27.4.15)

3. Earth work execavation, stub setting, concreting, Supply and


erection of towers
From loc 16-18 and stringing of panther conductor and earth wire
from loc 15-18
Of 110 KV DC line on Dc towers LILO from Pudukkottai-Thirumayam
feeder to
Proposed Pudukkottai urban 110 KV SS(WOA 095016/dt.27.4.15)

4. Earth work execavation, stub setting, concreting, Supply and


erection of towers
From loc 19 to20 and stringing of panther conductor and earth wire
from loc 19-21
Of 110 KV DC line on Dc towers LILO from Pudukkottai-Thirumayam
feeder to
Proposed Pudukkottai urban 110 KV SS(WOA 095017/dt.27.4.15)

5. Earth work execavation, stub setting, concreting, Supply and


erection of towers
From loc 21-22 and stringing of panther conductor and earth wire
from loc 21-22
Of 110 KV DC line on Dc towers LILO from Pudukkottai-Thirumayam
feeder to
Proposed Pudukkottai urban 110 KV SS(WOA 095014/dt.27.4.15)

6. Earth work execavation, stub setting, concreting, Supply and


erection of towers
From loc 23-26 and stringing of panther conductor and earth wire
from loc 22-26
Of 110 KV DC line on Dc towers LILO from Pudukkottai-Thirumayam
feeder to
Proposed Pudukkottai urban 110 KV SS. (WOA 095015/dt.27.4.15)

7. Earth work execavation, stub setting, concreting, Supply and


erection of towers
From loc 1-4 and stringing of panther conductor and earth wire
fromTake off and loc 1-4Of 110 KV DC line on Dc towers from
Pudukkottai 230 KV SS to Pudukkottai sipcot 110 KV SS. (WOA
095021/dt.27.4.15)

8. Earth work execavation, stub setting, concreting, Supply and


erection of towers
From loc 5-8 and stringing of panther conductor and earth wire
fromTake loc 4-8of 110 KV DC line on Dc towers from Pudukkottai
230 KV SS to Pudukkottai sipcot 110 KV SS. (WOA
095019/dt.27.4.15)

9. Earth work execavation, stub setting, concreting, Supply and


erection of towers
From loc 9-11 and stringing of panther conductor and earth wire
from loc 11-12 of 110 KV DC line on Dc towers from Pudukkottai
230 KV SS to Pudukkottai sipcot 110 KV SS. (WOA
095020/dt.27.4.15)

10. Earth work execavation, stub setting, concreting, Supply and


erection of towers
loc12 and stringing of panther conductor and earth wire from loc
11-12 and take off of 110 KV DC line on Dc towers from Pudukkottai
230 KV SS to Pudukkottai sipcot 110 KV SS. (WOA
095022/dt.27.4.15)

This for favour of further action please.

Encl:-Work order applications :-10 Nos.


(WOA 095013-22)
ASSISTANT EXECUTIVE
ENGINEER

TLC/PUDUKKOTTAI

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Bills/D.23/15 Dated 24..4.2015.
Sir,
Sub:- Works bills –submission of –Reg.

#########
I here with submit the CC I & Final bills along with M Books and
statement in triplicate for the following works.
1. Modification of control room building with allied works for bay
Extension @ T.Nallur SS.
2. Formation of new WBM road and water supply arrangements@
T.Nallur SS

3. Conducting detailed survey by Theodolite instrument and ploting


profile for the erection of 110 KV DC line on DC towers from
Pudukkottai-T.Nallur feeder for the proposed Ammachtiram 110/22-
11 KV SS

4. Conducting detailed survey by Theodolite instrument and ploting


profile for the erection of 110 KV DC line on DC towers LILO from
Pudukkottai-Aadhanakootai-karambakudi 110 KV SC line @ proposed
upgradation of Gandarvakkottai 33/11 KV SS into 110/33-11 KV SS.
5. Construction of control room building and allied works @Pudukkottai
urban 110/22 KV SS.

Encl :- Mbooks,Bill copies,statement in triplicate -5 Sets.

ASSISTANT EXECUTIVE
ENGINEER

TLC/PUDUKKOTTAI
REPLY TO THE AUDIT SLIP NO 27/03-04 OF BOAB

NAME OF THE WORK:-Providing 150 mm dia bore well with OHT


and pipe line
arrangements @ Annapannai 33/11 KV
SS.
Name of the contractor:-Thiru,V.Kumaravel,Trichy.

K2 Agt No. 117/2003-04 & Specn. 148/03-04

The site has been handed over to the


contractor for the subject work was on and due date of complection was
as per the agreement condition. But the actual date of complection is
.
Due to delay from the department ,the
complection period did not be able to assessed by the contractor himself.
Moreover the contractor has ready to short close the agreement at the
time.As per the request,the subject work has been completed on
28.02.2001 without giving any additional rates. Without knowing the date
supply of line materials from the department,the contractor has not in a
position to submit the EOT letter within the contract period. In this
circumstances the EOT has been approved upto 28.02.2001.without
penalty. In future it will be avoided.
Moreover the contractor has not been taken
any works from this circle for the past five years.

Hence the audit slip may kindly be dropped


please.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.PDKT-Alangudy110KV line /D.014/15 Dt.
17.4.15.
Sir,
Sub :- Erection of 110 KV link line from Pudukkottai 230 KV SS to
Alangudy
i- Profile and route map Proposal –submitted- Requested-
Regarding.

Ref :- (Per) FB.TANTRANSCO Proceeding No.91 Dated 4.10.2014.


########
I herewith submit the Route map, Profile in duplicate ,EPR
value, single line digram ,Diagonal distance of Earth mate and EPR value
of Alangudy,Pudukkottai & Aliyanilai 110 KV SS ,Tower schedule for the
proposed 110 KV line from Pudukkottai
230 KV SS-Alangudy 110 KV SS.
This is for favor of further action , please

Encl:- Route Map ,Tower schedule, }


EPR value for SS & line }
Diagonal distance of earth mat } --4 Sets.
Of Exg.110 KV SS }

Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy submitted to The Superintending Engineer/GCC/Trichy for kind
information please.

REPLY TO THE AUDIT SLIP NO 35 DT.10.01.2001 OF BOAB

NAME OF THE WORK:-Earth work execavation,stub


setting,concreting,refilling
Transport and erction of towers and
full welding for
loc 131 to 139 of Alundur-Pudukkottai
230 KV SC line .

Name of the contractor:-Thiru,R.Raghavan,Trichy.

K2 Agt. No.:--46 SE/2000-2001.

The site has been handed over to the


contractor for the subject work Was on 06.8.2000 and due date of
complection was 05.11.2000 as per the agreement condition. But the
actual date of complection is 28.02.2001.Due to the non availability of
department materials at GCC stores in Trichy circle (zebra conductor,
allied suspension and tension fittings etc.,) the work did not completed in
time. The delay is not on the part of the civil contractor.

Due to delay from from the department,the


complection period did not be able to assessed by the contractor himself.
Moreover the contractor has ready to short close the agreement at the
time.As per the request,the subject work has been completed on
28.02.2001 without giving any additional rates. Without knowing the date
supply of line materials from the department,the contractor has not in a
position to submit the EOT letter within the contract period. In this
circumstances the EOT has been approved upto 28.02.2001.without
penalty. In future it will be avoided.
Moreover the contractor has not been taken
any works from this circle for the past five years.

Hence the audit slip may kindly be dropped


please.

REPLY TO THE AUDIT SLIP NO 36 DT.10.01.2001 OF BOAB

NAME OF THE WORK:-Earth work execavation,stub


setting,concreting,refilling
Transport and erction of towers and
full welding for
loc 123 to 130 of Alundur-Pudukkottai
230 KV SC line .

Name of the contractor:-Thiru,R.Raghavan,Trichy.

K2 Agt. No.:--47 SE/2000-2001.

The site has been handed over to the


contractor for the subject work Was on 06.8.2000 and due date of
complection was 05.11.2000 as per the agreement condition. But the
actual date of complection is 28.02.2001.Due to the non availability of
department materials at GCC stores in Trichy circle (zebra conductor,
allied suspension and tension fittings etc.,) the work did not completed in
time.The delay is not on the part of the civil contractor.

Due to delay from from the department,the


complection period did not be able to assessed by the contractor himself.
Moreover the contractor has ready to short close the agreement at the
time.As per the request,the subject work has been completed on
28.02.2001 without giving any additional rates. Without knowing the date
supply of line materials from the department,the contractor has not in a
position to submit the EOT letter within the contract period. In this
circumstances the EOT has been approved upto 28.02.2001.without
penalty. In future it will be avoided.
Moreover the contractor has not been taken
any works from this circle for the past five years.

Hence the audit slip may kindly be dropped


please.

REPLY TO THE AUDIT SLIP NO 39 DT.10.01.2001 OF BOAB


NAME OF THE WORK:-Earth work execavation,stub
setting,concreting,refilling
Transport and erction of 1 No KC Type
tower for
Pudukkottai 230 KV SS to T.Nallur –
Alangudy
110 KV DC link line.

Name of the contractor:-M/s Kumaran Enterprises,Trichy.

K2 Agt. No.:--49 SE/2000-2001.

The site has been handed over to the


contractor for the subject work Was on 24.3.2000 and due date of
complection was 23.6.2000 as per the agreement condition. But the
actual date of complection is 15.8.2000 .Due to the non availability of
department materials at GCC stores in Trichy circle (Panther conductor
,allied suspension and tension fittings etc.,) the work did not completed in
time.The delay is not on the part of the civil contractor.

Due to delay from from the department, the


complection period
did not be able to assessed by the contractor himself. Moreover the
contractor has ready to
short close the agreement at the time.As per the request,the subject work
has been completed
on 15.8.2000 without giving any additional rates. Without knowing the
date supply of line materials from the department, the contractor has not
in a position to submit the EOT letter within the contract period. In this
circumstances the EOT has been approved upto 15.8.2000. without
penalty. In future it will be avoided.
Moreover the contractor has not been taken
any works from this circle for the past five years.

Hence the audit slip may kindly be dropped


please.
REPLY TO THE AUDIT SLIP NO 15 DT.22.11.2001 OF BOAB

NAME OF THE WORK:-Check survey, pit marking,,stub


setting,concreting,
erction of towers from loc 23-42 and
stringing of power
conductor and earth wire from loc 22-
42 Reach-II for
erection of Nagudy- Peravurani 110
KV SC line on DC
towers.

Name of the contractor:-Thiru,K.Petchimuthu,Madurai.

K2 Agt. No.:--93 SE/2009-2010.

The site has been handed over to the


contractor for the subject work Was on 17.8.2009 and due date of
complection was 16.12.2009 as per the agreement condition. But the
actual date of complection is 16.06.2012.Due to the non availability of
department materials at GCC stores in Trichy circle (Tower parts supplied
by departmently form the month 07/2010 onwards and stringing
materials such as ACSR Panther conductor,Earth wire, Suspension fittings,
Tension fittings and allied fittings etc.,supplied by Departmentally from
the month of 04/2012 onwards (Reconsilation of materials statement
enclosed)after the receiving the materials carryout and complete the
work . the work did not completed in time. The delay is not on the part of
the civil contractor.

Due to delay supply of materials from the


department, the complection period did not be able to assessed by the
contractor himself. Moreover the contractor has ready to short close the
agreement at the time. As per the request, the subject work has been
completed on 16.06.2012. without giving any additional rates, Based on
that the Extension of time applied by the contractor on
11.06.12..Moreover without knowing the date supply of line materials from
the department,the contractor has not in a position to submit the EOT
letter within the contract period. In this circumstances the EOT has been
approved upto 16.06.2012 from 17.12.2009.without penalty .
(ViideLr.No.SE/GCC/TRY/AEE/GL/DB/D.2/F.Nagudy- Peravurani.line/
D.712/12 Dt.13.07.2012.)(copy enclosed)
Based on the EOT the CC III rd & Final bill prepared and
submitted for an amount of Rs.14,57,322/Gross &nett Rs.5,39,892/-passed
& paid vide C.B.Vr.24/11/2012 & APS II Jl Vr. No.11/11/2012.
Hence the audit slip may kindly be dropped
please.

REPLY TO THE AUDIT SLIP NO 46 DT.22.11.2001 OF BOAB

NAME OF THE WORK:- Thirumayam—Aliyanilai 110 KV line (Loc 16-


18)

Name of the contractor:- M/s.Ayyappan & co, Kovilpatty.

Remarks :-Penalty for non utilizing of Technical Assistant for supervising


the works
Reply:-
Recovered amount for RS. 4194/- (vide page no.38 of M.Book
8824 in the CCII & finalFinal bill)

Hence the audit slip may kindly be dropped please.


REPLY TO THE AUDIT SLIP NO 53 DT.22.11.2001 OF BOAB

NAME OF THE WORK:- Thirumayam—Aliyanilai 110 KV line (Loc 16-


18)

Name of the contractor:- M/s.Ayyappan & co, Kovilpatty.

Short levy of WCT from the works bill

Reply,

Recovered amount for RS.33,036/- (vide page no.43 of


M.Book 8958 in the CC II &Final bill)

Hence the audit slip may kindly be dropped please .


REPLY TO THE AUDIT SLIP NO 56 / 2011-2012. OF BOAB

NAME OF THE WORK:-Trunkey contract -110 KV line for various


sugar Mills Ltd.

Name of the contractor:-M/s. ECCI / Chennai.

Non levy of 0.5% of discount for beyond the Agt. Period.

Reply:-

Recovered amount for RS. 22506/- (vide page no.76 of


M.Book 8960)(CC V th & Part bill)( Rs.22506+82050).

Hence the audit slip may kindly be dropped


please.
REPLY TO THE AUDIT SLIP NO 52 / 2001-2002. OF BOAB

NAME OF THE WORK:- Hoisting of insulators and srining of power


conductor for
(3 Nos) Zebra conductor and Earth
wire of size7/3.15mm
From loc 62-90of Alundur (Trichy)-
Pudukkottai 230 KV
Sc line

Name of the contractor:-Thiru S.M.Yusuff,Trichy

Short recovery of loading charges


Reply:-

The contractor is No more , Recover the amount of


Rs.3747/-will be recovered from the pending payments
from this circle.
Hence the audit slip may kindly be dropped
please
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Audit reply /D.202/14 Dt. 12.3.15.
Sir,
Sub :- Audit –Audit slip 2011-2012-Recovery details-Sub
of-
Requested –Reg.
Ref:- Audit slip No.35,36 &39/2000-01,52/01-02,15/09-10
&46,53
&56/2011-2012

######
I herewith submit the Reply for the audit slips under
cited above reference,for favour of further action please.
Encl :-8 Nos.
Assistant
Executive Engineer,

TLC/Pudukkottai. .

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. old G. Kottai Estimate /D.009/15 Dt.
15.4.15.
Sir,
Sub :- Estimate-Construction of control room
building,Electrification
Bore well and water supply arrangements for the
Establishment of
33/11 KV SS @ Old Gandarvakkottai-Submission of
–Reg.
Ref:- (Per) CMD TANGEDCO Proceedings No. 130 Dated 23.03.2015.
#########
I herewith submit an estimate for the above work in duplicate for an
amount of Rs.48,01,000/- for favor of further action please.

Encl:-Estimate in duplicate-1 Set.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. old G. Kottai Estimate /D.009/15 Dt.
15.4.15.
Sir,
Sub :- Estimate-Construction of control room
building,Electrification
Bore well and water supply arrangements for the
Establishment of
33/11 KV SS @ Old Gandarvakkottai-Submission of
–Reg.
Ref:- (Per) CMD TANGEDCO Proceedings No. 130 Dated 23.03.2015.
#########
I herewith submit an estimate for the above work in duplicate for an
amount of Rs.48,01,000/- for favor of further action please.

Encl:-Estimate in duplicate-1 Set.

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Bill /D.24/15 Dt. 24.4.15.
Sir,
Sub :- Works-Bills for the construction of cable duct @
Pudukkottai
Urban 110/22 KV SS-CC I st &part bill-Sub of-reg.

Ref:- K2 Agt.No.190 SE/2014-2015.


######
I herewith submit the CC I st & part bill for the above
work along with Mbooks 9425,9556 with copy of bills and
statements in triplicate,for favour of further action please.

Encl:-Mbooks 9425 &9556


Bill copy and statement
In triplicate. 1 set.
Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Bill /D.207/14 Dt. 24.3.15.
Sir,
Sub :- Works-Bills for the construction of cable duct @
Pudukkottai
Urban 110/22 KV SS-CC I st &part bill-Sub of-reg.

Ref:- K2 Agt.No.190 SE/2014-2015.


######
I herewith submit the CC I st & part bill for the above
work along with Mbooks 9425,9556 with copy of bills and
statements in triplicate,for favour of further action please.

Encl:-Mbooks 9425 &9556


Bill copy and statement
In triplicate. 1 set.
Assistant
Executive Engineer,

TLC/Pudukkottai.

BY RPAD
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., M/s Lakshmi
Engineering Works
Assistant Exeecutive Engineer Plot No.260 A,
TLC/Pudukkottai. Housing
Unit,Rajagopalapuram,
Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Audit recovery /D.210/14 Dt. 27.3.15.
Sir,

Sub:-Audit-Providing foundation for structures and equipments


plinths in 110 KV
And 11 KV side @ Nagudi 110 KV SS-Recovery of pending
amount-Reg.

Ref:- 1) K2 Agt .No.27 SE/2004-05.


2) Audit slip No.9 dated 06.3.2008.
######
The above work was taken by your firm on 03.12.2004 and complete
the work on 02.4.2005 , (period 4 Months) but you are not complete the
work in time and completed on 30.10.2005. which is beyond the
agreement period (Ie 03.4.2005 to 31.10.2005) delayed completion of the
work is 211 days.

The Extension of time for this work from 3.4.05 to 30.10.05 was
granted without penalty by SE/GCC/Trichy vide
Lr.No.SE/GCC/TRY/DB/D2/F.K2Agt.No,27/SE/04-05/D.No.872/05/dt 16.8.05.
The Audit wing in our Department proposed the penalty of
Rs.8,894/ -due to the delay the completion of works beyond the
agreement period.which is loss to the board ,Hence the penalty is
proposed.

You are requested to remit the amount of Rs.8,894/-(Rupees Eight


thousand eight hundred and ninty four only) in the office of the
Superintending Engineer/GCC/Trichy .as early please.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy }


Copy submitted to the Executive Engineer/TLC/Trichy } For kind
information please.

BY RPAD

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E.,
Thiru,R.Shanmugasundaram,
Assistant Exeecutive Engineer Contractor,
TLC/Pudukkottai.
Pachikkottai,Alankudi Post,
Pudukkottai
Dist.
Lr.No.AEE/TLC/PDKT/F. Audit recovery /D.211/14 Dt. 27.3.15.
Sir,

Sub:-Audit-Providing Bore well with over Head Tank arrengements-


Recovery of
pending amount-Reg.

Ref:- 1) K2 Agt .No.74 SE/2003-04.


2) Audit slip No.22 dated 02.9.2005.
######
The above work was taken by you, Date fixed 13.3.04., but you are
complete the work 02.7.04. which is beyond the agreement period (ie
14.3.04 to 02.7.04) delayed completion of the work is 111 days.

The Extension of time for this work from 14.3.04 to 02.7.04 was
granted with penalty of Rs 1876/ - balance (based on the works done in
the EOT period) by SE/GCC/Trichy.

The Audit wing in our Department proposed the short penalty of


Rs.16,463/ -due to the delay the completion of works beyond the
agreement period .which is loss to the board Hence the penalty is
proposed the agt value of Rs.2,44,517/-.

You are requested to remit the amount of Rs.16,463/-(Rupees


Sixteen thousand four hundred andsixty three only) in the office of the
Superintending Engineer/GCC/Trichy .as early please.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy }


Copy submitted to the Executive Engineer/TLC/Trichy } For kind
information please.

BY RPAD

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., Thiru M.Sakthivel,
Assistant Exeecutive Engineer 5,NMK, Colony,
TLC/Pudukkottai. No.5,Tolgate,
Trichy-20.
Lr.No.AEE/TLC/PDKT/F. Audit recovery /D.212/14 Dt. 27.3.15.
Sir,
Sub:-Audit- Construction of control room building,septic tank and
dispersion
trench,pump room and allied works @ vadugapatty 110/11 KV
SS in
Pudukkottai Dist.- -remit the pending amount-Reg.

Ref:- 1) K2 Agt .No.63 SE/2007-08.


2) Audit slip No.39 dated 05.8.09.
######
The above work was taken by your firm on 26.2..2007 and complete
the work on 25.6.2007 , (period 4 Months) but you are not complete the
work in time and completed on 08.2.2008.. which is beyond the
agreement period (Ie .26.2.07 to 08.2.08) delayed completion of the work
is 228 days.

The Extension of time for this work from 26.2.07 to 08.2.08 was
granted without penalty by SE/GCC/Trichy

The Audit wing in our Department proposed the penalty of


Rs.1,03,916/ -due to the delay the completion of works beyond the
agreement period.which is loss to the board ,Hence the penalty is
proposed for the Agt value of Rs.10,39,155/

You are requested to remit the amount of Rs.1,03,916/-(Rupees


One lakhs three thousand nine hundred and sixteen only) in the office of
the Superintending Engineer/GCC/Trichy .as early please.

Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy submitted to the Superintending Engineer/GCC/Trichy }
Copy submitted to the Executive Engineer/TLC/Trichy } For kind
information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Asst.Executive
Engineer, Assistant Executive Engineer
O&M/ Mathur.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. 110/33 KV –T.Nallur /D.196/14 Dt.
10.03.15.
Sir,
Sub :- Works- Clearing of trees –Bay Extension @ T.Nallur 110/33 KV
SS-
amount paid for clearing the trees –particulars -Reg.
Ref:- PR No.32629 Dated 23.01.2015.
########
It is proposed that the bay extension work for 110/33 KV at T.Nallur
110/11 KV SS premises in that area some trees are available in the bay
extension area .The trees are removed and cleared from the site as per
the instruction of SE/PED/Pudukkottai. Based on that we are conducting
open auction and awared letter issued to Thiru S.Murugan,Madurai
to remit the amount of Rs. 1200/ (Rupees one thousand and two hundred
only).

Thiru S.Murugan,Madurai has remit the amount of Rs. 1200/ Vide


PR No.32629 Dt.23.01.2015.towards cutting of trees and same is cleared
from the site for carryingout the bay extension works @ T.Nallur 110/33
KV SS. For taking necessary action at your end.

Encl:- Copy of PR No.32629 Dt.23.01.2015.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to,


The Superintending Engineer/GCC/Trichy *
The Superintending Engineer/PEDC/Pudukkottai.*
The Executive Engineer/TLC/Trichy*
The Executive Engineer/O&M/Keeranur*
Copy to The Assistant Executive Engineer/Civil /Pudukkottai.*
Copy to the Assistant Engineer/Sub station/T.Nallur.*
* (with enclosure)

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. GL/D.205/14 Dt. 24.3.15.
Sir,
Sub :-Estt-RWE Staffs-Conveyance Advance –Hypothecation Deed
and other
Particulars- Submission of-Reg.

Ref :-SE/GCC/Try’s MEMO NO..1872/242/ADM I/A 3/F.Conveyance


ADV/2015
Dated 27.11.2014..
########
I herewith submit the Hypothecation Deed and other
particulars regarding purchase of TVS XL HEAVY DUTY vehicle in duplicate
inrespt of Thiru K.Alagar,& K.Subramani,Fitter II GR of this sub Division.
This is for favour of further action , please

Encl:- Hypothecation deed&


Other particulars ---2 Sets.

Assistant
Executive Engineer,

TLC/Pudukkottai.

.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. TN 55 V 2603 bill /D.007/15 Dt. 15.4.15.


Sir,
Sub:- Works bill- Vehicle TN 55-V 2603-CC IV & part bill –subof –reg.
Ref:- K2 Agt .No 57 SE/2014-2015..
############
I here with submit the CC IV th & part bill in triplivate and statement
along with MBook 9 for the Hired vehicle TN 55 V 2603 for the month of
March.2015.Official usage of this sub Division , for favor of further action
please.

Encl:- bill copy in triplicate &MBK 9174..

Assistant
Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. TN 55 V 2603 bill /D.007/15 Dt. 15.4.15.


Sir,
Sub:- Works bill- Vehicle TN 55-V 2603-CC IV & part bill –subof –reg.
Ref:- K2 Agt .No 57 SE/2014-2015..
############
I here with submit the CC IV th & part bill in triplivate and statement
along with MBook 9 for the Hired vehicle TN 55 V 2603 for the month of
March.2015.Official usage of this sub Division , for favor of further action
please.

Encl:- bill copy in triplicate &MBK 9174..

Assistant
Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. TN 55 V 2603 bill /D.207/14 Dt. 20..3.15.


Sir,
Sub:- Works bill- Vehicle TN 55-V 2603-CC III & part bill –subof –reg.
Ref:- K2 Agt .No 57 SE/2014-2015..
############
I here with submit the CC III rd part bill in triplivate and statement
along with MBook 9170 for the Hired vehicle TN 55 V 2603 for the month
of Feb.2015.Official usage of this sub Division , for favor of further action
please.
Encl:- bill copy in triplicate &MBK 9170.

Assistant
Executive Engineer,

TLC/Pudukkottai

Page No.95 of M Book 8309

CERTIFICATES.
1. Certified that the HR has not been claimed and paid before
2. Certified that no recovery from the contractor
3. Certified the the final bill passed and paid.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. RWE –TA bills /D.200/14 Dt. 10.3.15.
Sir,
Sub:- Estt- RWE Staff-SLS bill -Sub of –Reg.
############
I here with submit the RWE staffs SLS in respect of Thiru
K.Alagar,Fitter II Gr,& Thiru K.Subramani,Fitter II Gr in respect of this sub
Division for favor of further action please.

Encl:- SLS Bill with sanction copy..

Assistant
Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. RWE –TA bills /D.199/14 Dt. 10.3.15.
Sir,
Sub:- Estt- RWE Staff-T A bill for the month of Feb-2015-Sub of –Reg.
############
I here with submit the RWE staffs TA bill for the month of February
2015 in respect of this sub Division for favor of further action please.

Encl:- TA bills -3 Nos.


Assistant
Executive Engineer,

TLC/Pudukkottai
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. RWE –TA bills /D.200/14 Dt. 10.3.15.
Sir,
Sub:- Estt- RWE Staff-SLS bill -Sub of –Reg.
############
I here with submit the RWE staffs SLS in respect of Thiru
K.Alagar,Fitter II Gr,& Thiru K.Subramani,Fitter II Gr in respect of this sub
Division for favor of further action please.

Encl:- SLS Bill with sanction copy..

Assistant
Executive Engineer,

TLC/Pudukkottai
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engineer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Audit reply /D.198/14 Dt. 10.3.15.
Sir,

Sub :- Audit –Audit slip 2009-2010-Audit Reply -Sub of-


Requested –Reg.
Ref:- Audit slip No.15/ dated 22.11.10.

###########
I here with submit the replay for the audit slip No. 15
Dt.22.11.10.along with relavent available records .the copy of the same is
enclosed here with for favor of further action please.

Encl:-Copy of EOT sanction & }


Reconsilation of materials} 1 set.

Assistant Executive
Engineer,

TLC/Pudukkottai.

```
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Commissinor,
Assistant Executive Engneer Pudukkottai
Municipality,
TLC/Pudukkottai. Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. PDKT urban 110/22 KV SS/D.182-1/14 Dt.
25.5.15.
Sir,
Sub:- Elecy- Proposed 110/22 KV SSat Pudukkottai-
Clearing of tree-
Requested- -Reg.
Ref:- 1) Lr.No.AEE/TLC/PDKT/F. PDKT urban 110/22 KV
SS/D.182/14 Dt. 20.02.15

######
It is proposed that 110/22 KV SS @ pudukkottai
urban area ,It is located at side of Pudukkottai- Trichy road and
western side collectorate compound (Old Arranmanai).as
already requested vide the above reference cited (1).
In this connection the proposed 110 KV EHT line
from Thirumayam- Pudukkottai existing line to the proposed
Sub Station ,the line passes through parallel to the
pudukkottai-Trichy road, near the Sub station end One Number
neem tree and one number chavku tree are there on road side
,which is belong to the Municipalty control ,The proposed EHT
line pass over the trees. between loc 25-26 of tower line

Hence ,I request that the above trees are may


kindly be removed for avoiding Electrical accident.

Necessary orders may please be issued to remove


the trees and make electrical clearance as early please.
(Position tree drawing is enclosed for kind perusal)
Encl:-Drawing – 1 No.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy for kind


information please

Copy submitted to the Executive Engineer/TLC/Trichy-20 for kind


information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engneer
O&M/Pudukkottai.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Estimates/D.183/14 Dt. 20..02.15.
Sir,
Sub :- Elecy—Proposed LILO of 110 KV Line from
Thirumayam-
Pudukkottai 110 KV SC line @ proposed 110/22
KV SS
Pudukkottai-Clearing the trees - Requested –Reg.

######

It is proposed that the 110 KV LILO line from


Thirumayam-Pudukkottai Sipcot 110 KV SC line at proposed
Pudukkottai Urban 110/22 KV SS via Thiruvappur 110 KV SS,It
is proposed that LILO arrangements to be made at
Thiruvappur SS.
The proposed line pass over the Thiruvappur SS
premises ,about 20 (Twenty) trees to be removed which is
under the proposed 110 KV line and marked the trees.

Hence ,I request that the necessary arrangements


made at our end to remove the trees in the Thiruvappur Sub
Station premises as early please.

Assistant
Executive Engineer

TLC/Pudukkottai.

Copy submitted to the Superintending Engineer/GCC/Trichy for kind


information please

Copy submitted to the Superintending Engineer/ PEDC/Pudukkottai. for


kind information

- please .
Copy submitted to the Executive Engineer/TLC/Trichy-20 for kind
information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engneer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. RWE /D.181/14 Dt. 19.2.15.
Sir,
Sub :- Vehicle-Lorry TN 45 F 8341–Tyre condemnation
proposal-
Sub of- Requested –Reg.

######
I herewith submit the 7 Nos tyres were condemned
due to normal wear & tears based on that the condemnation
proposal for the department Lorry TN 45 F 8341 the tyres
were I st (First) retread and served more than norms after
retreads .
Hence, the condemnation proposal prepared and
submitted for the 7 Nos
tyres ,I request that the above tyres may please be condemned
and approval for New tyres , tubes & flaps (7 Sets) for favor of
further action please.

Encl-Tyre register with }


Condamation proposal } -1 set
In duplicate }

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engneer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Estimates/D.180/14 Dt. 18.2.15.
Sir,
Sub :- Estt-RWE-Surrender leave Applications –Sub of-
Requested –Reg.
######
I herewith submit the surrender leave applications in
respect of Thiru K.Subramani & Thiru K.Alagar, fitter II Gr of this
Sub Division for favor of further action please.

Encl-SLS application –2 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engneer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Estimates/D.180/14 Dt. 18.2.15.
Sir,
Sub :- Estt-RWE-Surrender leave Applications –Sub of-
Requested –Reg.
######
I herewith submit the surrender leave applications in
respect of Thiru K.Subramani & Thiru K.Alagar, fitter II Gr of this
Sub Division for favor of further action please.

Encl-SLS application –2 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engneer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Estimates/D.166/14 Dt. 28.1.15.
Sir,
Sub :- Works – Refund of EM D, SD & RA –Hand Receipt
-Sub of-
Requested –Reg.
Ref:- K2 Agt. No.72/SE/2012-2013

######
I herewith submit the hand receipt of refund of EMD,SD
& RA for the work of construction of retaining wall around the
tower location of Thirumayam-Aliyanilai 110 KV SC line on DC
towers along with M Book 9423 and HR for favor of further
action please.

Encl – M Book 9423with HR1 Set.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer, Assistant Executive Engneer
TLC/Trichy
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Estimates/D.166/14 Dt. 28.1.15.
Sir,
Sub :- Works – Refund of EM D, SD & RA –Hand Receipt
-Sub of-
Requested –Reg.
Ref:- K2 Agt. No.72/SE/2012-2013
######
I herewith submit the hand receipt of refund of EMD,SD
& RA for the work of construction of retaining wall around the
tower location of Thirumayam-Aliyanilai 110 KV SC line on DC
towers along with M Book 9423 and HR for favor of further
action please.

Encl – M Book 9423with HR1 Set.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCc/Trichy-
20. (CASH)
TLC/Pudukkottai.`
Lr.No.AEE/TLC/PDKT/F. Mazhaiyur 110 KV line Tree/Crop compl/D.158/14
Dated 21.1.15.
Sir,.
Sub:- Tree/Crop Compensation –Payment Hand Receipts –
Submission of –Requested-
Reg.
Ref :- Payment cheque Dated 11.12.14..
######
I herewith submit the 13 Nos.stamped hand receipts for Tree
/crop ompensation
for LILO of 110 line from Alangudy-Karambakudy @ proposed Mazhaiyur
110/22 KV SS

This is for favour of further action please.

Encl:-H.R. 13 Nos.

Assistant
Executive Engineer,

TLC/Pudukkottai.
Hand Receipt

Recived for Rs. 33,900/- (Rupees Thirty three thousand and nine
hundred only)Vide
cheque No. 968959 Dated 11.12.2014.In favor of THIRU T.KARUPPAIYA
s/o THANGAIYA , Mazaiyur,,PUDUKKOTTAI DIST. towards compensation of
Tree/Crop of 110 KV Dc line from Alangudy-Karambakudi 110 KV SC line to
Mazhaiyur 110/22 KV SS.

Witness:-

Hand Receipt

Recived for Rs. 33,900/- (Rupees Thirty three thousand and nine
hundred only)Vide
cheque No. 968959 Dated 11.12.2014.In favor of THIRU T.KARUPPAIYA
s/o THANGAIYA , Mazaiyur,,PUDUKKOTTAI DIST. towards compensation of
Tree/Crop of 110 KV Dc line from Alangudy-Karambakudi 110 KV SC line to
Mazhaiyur 110/22 KV SS.

Witness:-
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,
Tangedco/Pudukkottai.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Works l/D.145/14 Dated 15.12.14.
Sir,
Sub:- Establishment of 110/22 KV SS @Pudukkottai
Urban- Clearing of
Trees at Thiruvappur 110 Kv ss premises-
requested-Reg.

Ref:- Per).FB.TANTRANSCO Proceeding No.09 ated10.01.2014

##########
It is proposed that the above Sub station tentatively
programmed to be commissioned on FEB-2015. In this
connection the proposed 110 KV DC line from Thirumayam –
Pudukkottai Sipcot 110 KV Sc line to Pudukkottai urban ss(Via)
Thiruvappur .
Now 110 KV Bay extension at Thiruvappur and urban
110 KV Ss works are under progress .
The line cross over Thiruvappur SS Quarters area It is
found that trees are there , I have mark 15 Nos of the various
type of trees ,the same to be removed .

Hence ,I request that the 15 Nos trees may kindly be


cut and removed from the site as early please

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to :-
The Superintending Engineer/GCC/Trichy.
The Superintending Engineer/PEDC/TANGEDCO/Pudukkottai.
The Executive Engineer/TLC/Trichy
The Executive Engineer/O&M/Pudukkottai.
Copy to The Assistant Executive Engineer/O&M/Rural/Pudukkottai.
Copy to The Assistant Engineer/110 KV SS/Thiruvappur.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Work orders/D.147/14 Dated 19.12.14.
Sir,
Sub:- Work orders-Details of Work order –Particulars-sub
of-Requested
-Reg
##########
I herewith submit the details of work order pending as
on 18.12.14. regarding this Sub Division , for favor of further
action please.

Encl:-Work order statement:- 2 sets.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Work orders/D.147/14 Dated 19.12.14.
Sir,
Sub:- Work orders-Details of Work order –Particulars-sub
of-Requested
-Reg
##########
I herewith submit the details of work order pending as
on 18.12.14. regarding this Sub Division , for favor of further
action please.

Encl:-Work order statement:- 2 sets.

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
superintending Engineer,
Assistant Executive Engineer, GCC/Trichy-
20.
TLC/Pudukkottai.
Through Executive Engineer/TLC/Trichy

Lr.No.AEE/TLC/PDKT/F. Income Tax/D.146/14 Dated 19.12.14.


Sir,
Sub:- Income Tax for the year 2014-15-Sub of-Reg.

##########
I herewith submit the Income Tax return for the year
2014-15 of My self , This for favor of further action please.

Encl:- Income Tax Return :-1 Set.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
superintending Engineer,
Assistant Executive Engineer, GCC/Trichy-
20.
TLC/Pudukkottai.
Through Executive Engineer/TLC/Trichy

Lr.No.AEE/TLC/PDKT/F.Income Tax/D.146/14 Dated 19.12.14.


Sir,
Sub:- Income Tax for the year 2014-15-Sub of-Reg.

##########
I herewith submit the Income Tax return for the year
2014-15 of My self , This for favor of further action please.

Encl:- Income Tax Return :-1 Set.


Assistant
Executive Engineer,

TLC/Pudukkottai.

Er. K.Srinivasan,B.E., The Assistant


Executive Engineer,
` Assistant Executive Engineer, O&M,/Gandarvakkottai,
Transmission Line Construction Pudukkottai Dist .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F 110 KV T.Nallur SS Temp.supply/D.No:-141/2014 Date:-
8.12.2014.
Sir,

Sub:- Bay Extension work @ T.Nallur 110/22KV SS-Temp. Supply –


Requested-Reg.

Ref:- (Per).CH .TANTRANSCO Proceeding No115


Dated09.5.14.

#######
It is proposed 110/33 KV Bay Extension @ T.Nallur 110/22
KV SS, Construction works are will be commenced and work under
progress .Hence I request that 10 KW temporary supply for
construction of control room,plinths,Fabrication of structures
etc.,using following machineries as follows.
3. Water supply for New bore well :-7.5 KW
4. Lighting load :-2.5 KW
-------------
TOTAL :- 10.0 KW
-------------

Assistant Executive
Engineer,
TLC/Pudukkottai.
Copy submitted to The Executive Engineer/O&M/Keeranur.
Copy to Assistant Engineer/O&M/T. Nallur.

TANTRANSCO
From To,
Er.M.PANDIARAJAN,B.E., The Executive
Engineer
Executive Engineer Montiory
TLC/Trichy 6 th floor
western wing,
o/o Chief
Engineer/Transmission,
Chennai.
Lr.No.EE/TLC/Try/F.Pudukkottai route map/D. /14 dated 02.12.2014.
Sir ,
Sub:- Pudukkottai 110/22 Kv Urban SS-Route map approval-
Requested-Reg.
Ref:- (Per) FB TANTRANSCO Proceedings No.09 dated.10.01.2014.
#####
As per the Proceedings cited in the above reference, The
proceeding stated that the 110 KV DC line on DC towers from Pudukkottai
230 KV SS to Pudukkottai Sipcot 110 KV SS.
Adharance the proceeding condition,Hence the above line read as
110 KV DC line on DC tower between two specified Sub stations
One more proceeding received from Head Quarters vide (Per)
FB.TANTRANSCO Proceedins No.091 dated 04.10.2014. Stated that one
line line from Pudukkottai 230 KV Ss
To Alangudy110 KV SS by Sc line on Dc towers.
In this connection we have suggest that the Existing 110 KV line
from Pudukkottai 230 Kv SS to Pudukkottai sipcot 110 KV SS need not be
dismantled for the following reasons.
1. The Existing line from Pudukkottai 230 KV SS on DC towers upto
Railway crossing one feeder goes to Alangudy and another to sipcot
SS at pudukkottai.After Railway crossing the feeder are sepreated
and connected with SC line on SC towers.The line can be used for
line line from Pudukkottai 230 KV SS to Raiway crossing
2. To avoid the Rail way crossing approval and time delay, the Existing
corridor can be used benificially.and also avoid the ROW problems
because the around areas are developed in Residential areas..
I enclosed here with the line sketch, for the proposed 110
KV lines, Hence , I request that the above route map and profile may
kindly be approved and communicated as early please.
Encl:- sketch -1 No.

Executive Engineer,

TLC/Trichy

FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer,(Deputation) Lines /230 KV
SS,
400 KV Line,Ambur(camp).
Vennamangalam.
9442502244,94454.9687
Lr.No. AEE/TLC/DPI/F.400 KV line Inspn./D. camp /14 Dated 29.11.2014.
Sir,
Sub :- 400 KV Line-Inspection –Requested-Regarding.
#####

The 400 KV line from Mettur Thermal Power Station (MTPS) to


Thiruvalam 400 KV SS. from Angle point @ Km 247 to Km269 almost
works are completed (such as stub setting, tower erection , stringing of
mouse conductor (Quitrent) and earth wire .etc.,) .The tower schedule is
enclosed here with.

Hence , I request that the above line may kindly inspected and give
the report for of the above said line as early please.

If any defects find out during the inspection may please be


intimate to this office for taking necessary action to rectify the defects
at our end.

Encl:-Tower schedule |
(AP 247-AP269) | 1 Set.

Assistant
Executive Engineer,

TLC/Dharmapuri
(Camp at
Ambur)
Copy submitted to,
The Chief Engineer/Project II/TANTRANSCO/Trichy
The Superintending Engineer/GCC/Salem
The Superintending Engineer/Operation/Thiruvalam.
The Executive Engineer/TLC/Dharmapuri. (w.e)
The Executive Engineer/operation/venamangalam (w.e)
Copt to The Junior Engineer/Lines/Vennamangalam (w.e)

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer, Lines/230 KV
SS,
TLC/Pudukkottai. Thanjavur

Lr.No. AEE/TLC/PDKT/F. 110 KV LC./D.132 /14 Dated 11..11.2014.


Sir,
Sub :- 110 KV line-Arignar Anna sugar mill Krunkulam-Punalkulam
110 KV SC line on DC towers @punalkulam-Line clear-Requested-Reg.
#####
Line clear may please be issused on 18.11.2014,@9.00 Hrs
to15.00 Hrs for 110 KV line from Arigar Anna Sugar mill Krunkulam-
Punnalkulam 110 KV SC line on Dc towersur to carryout the following
works regarding

1. Stringing of 3 Nos panther conductor between Loc 01 and Take off


structures (Sugar Mill end)
2. Providing jumbers @ loc 01.(Company end)

Encl:-Copy of sanction BP.No.(CH).No.371/Dt.2.08.2010

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to,


The Superintending Engineer/GCC/Trichy.
The Superintending Engineer/Operation/Trichy.
The Superintending Engineer/TEDC/Thanjavur.
The Superintending Engineer/PEDC/Pudukkottai.
The Executive Engineer/TLC/Trichy.
The Executive Engineer/operation/Thanjavur.
The Executive Engineer/O&M/Pudukkottai.
Copy to Assistant Executive Engineer/SS/Punakulam.
TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Assistant Executive
Engineer
Assistant Executive Engineer, Lines,
Transmission Line Construction Pudukkottai. .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F Tmym-sipcot line LC/D.No:-77/2014 Date:- 11..8.201
Sir,
Sub:- 110 KV line –Pudukkottai Sipcot –Thirumayam 110Kv line-
LC-Requested-Reg.
#####
The line clear may please be issued on 20.8.14 from 09.00
Hrs to 12.00 Hrs
to carry out the following work.
Releasing jumpers @ loc 155 of Thirumayam –Pudukkottai
Sipcot 110 KV
line.
The same day ,Line charged section between Pudukottai
Sipcot SS and
Thiruvappur SS upto Loc 155(Thiruvappur side)
One more line clear may please be issued on 20.8.14. from
12.00 Hrs to
17.00 Hrs to 09.8.14. Continuously in the same line, section
between loc 155
and Thirumayam 110 KVSS to carry out the following works.

a) To releasing the 3 Nos. existing panther conductor and one No.


GI earthwire
between loc 154&155
b) Erection of 1 No New tower between loc 154&155.
c) Stringing of 3 Nos.panther conductor & 1 No. Earthwire between
loc 154-Newly erected tower(154A) , Newly erected tower ( 154
A)to loc 154B(Recently erected tower )
Incontinuation, Another LC may please be issued on 22.8.14 @
15.00Hrs to 17.00 Hrs from Pudukkottai Sipcot 110 KV SS to
Thirumayam 110 KV SS for carry out the following works.
1.) To provide jumpers @ location 155 of Thirumayam-Pudukkottai
sipcot
110 KV line. To make a normal position of the above said line.

Assistant Executive
Engineer,
TLC/Pudukkottai.
Copy submitted to,
The Superintending Engineer/GCC/Trichy.
The Superintending Engineer/ / Operation/Trichy.
The Superintending Engineer/PEDC/Pudukkottai
The Executive Engineer/TLC/Trichy.
The Executive Engineer/Operation/230 KV SS/Pudukkottai
The Executive Engineer/O&M/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.400 KV line Survey Estimates/D.126/14 Dated


03.11.14.
Sir,
Sub:-Survey Estimates for the Establishment of 400/230
KV SS
@ Vellanveduthi in Pudukkottai Dist -sub of-Reg.

Ref:- Agricultural Department Lr.No. C1/ 8598/2013


Dated 09.10.2014.
##########
I here with submit the survey estimate for the
following works for favor of further action please.

1) Conducting detailed survey and profile plotting for providing tentative route
alignment in GTS Map and route alignment Map using Remote sensing method of the
transmission scheme 400 KV LILO from Karaikudi-Pugalur400 KV line Feeder-I to
the proposed 400/230 KV SS @ Vellanveduthi in Pudukkottai Dist.(wind zone 4,TC-1
) with Quard moose conductor (Rs.32,97,000/=)

2) Conducting detailed survey and profile plotting for providing tentative route
alignment in GTS Map and route alignment Map using Remote sensing method of the
transmission scheme for the proposed 400 KV LILO line from Karaikudi-Pugalur 400
KV Line Feeder-II to Vellanveduthi (wind zone 4,TC-1 ) with Quard moose
conductorfor the proposed Vellalaveduthi(Pudukkottai)400/230 KV SS
(Rs.37,63,600/=)
3) Conducting detailed survey and profile plotting for providing tentative route
alignment in GTS Map and route alignment Map using Remote sensing method of the
transmission scheme for the proposed 230 KV SC line on DC towers (wind zone
4,TC-1 ) with Zebra conductor to the proposed Vellalaveduthi(Pudukkottai)400/230
KV SS to Thuvakudy 230/110 KV SS. (Rs.19,43,500/=)

4) Conducting detailed survey and profile plotting for providing tentative route
alignment in GTS Map and route alignment Map using Remote sensing method of the
transmission scheme for the proposed 230 KV SC line on DC towers (wind zone
4,TC-1 ) with Zebra conductor from the proposed
Vellalaveduthi(Pudukkottai)400/230 KV SS to Karambiyam 230/110 KV SS
(Rs.12,65,100/=)

5) Conducting detailed survey and profile plotting for providing tentative route
alignment in GTS Map and route alignment Map using Remote sensing method of the
transmission scheme for the proposed 230 KV DC line on DC towers (wind zone
4,TC-1 ) with Zebra conductor from the proposed
Vellalaveduthi(Pudukkottai)400/230 KV SS to Pudukkottai 230/110 KVSS
(Rs.16,32,100/=)

6) Conducting Topographical/contour survey using GPS and Total station


for establishment of 400/230 KV SS at Vellanveduthi inPudukkottai
District. (Rs.7,55,800/=)

Encl :-Estimate in duplicate :-6 Nos..

Assistant
Executive Engineer,

TLC/Pudukkottai.

`
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer, Civil /PEDC
TLC/Pudukkottai. Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.T.nallur 110 KV SS/D.135/14 Dated 17.11.2014.


Sir,
Sub:-Estt-110/33 KV Bay extension at T.Nallur-Removal of shed
-Requested-Reg.
Ref:- Per(CH) TANTRANSCO Proceeding No.75 Dated 09.5.2014.
########

As per the BP ,It is proposed that the Bay Extension works ,It will
be proposed commenced within a week by GCC/Trichy wing , it is found
that 1 No shed which is fouling in the bay extension area .
Hence ,I request that may please be remove the shed and re
erected suitable please away from the bay extension area as early
please .and the fact may please be intimated to this office it is need to
carryout the bay extension work at our end.

Assistant
Executive Engineer,
TLC/Pudukkottai.

Copy submitted to,


The Superintending Engineer/GCC/Trichy.
The Superintending Engineer/PEDC/Pudukkottai (EE/GL)
The Executive Engineer/TLC/Trichy./SSE/Trichy.
The Executive Engineer/O&M/Keeranur
Copy to The Assistant Executive Engineer/SSE/Trichy.
Copy to The assistant Executive Engineer/O&M/Mathur

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Works Riy.Xing/D.125/14 Dated 01..11.14.


Sir,
Sub:- Estt-Proposed Pudukkottai110/22 KV SS –110 KV
Line-Railway-
Crossing Drawing---sub of
-Reg.

Ref:- ( Per) .FB. TANTRANSCO Proceeding NO.09


Dated.10.01.2014.

##########
I herewith submit the four copies of110 Kv line Railway
crossing drawing along with performa , for favor of further
action please.

Encl:-Railway crossing drawing|


Along with performa | -4 Copies

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E ., The Executive
Engineer,(AgrEngg)
Assistant Executive Engineer. Divisional Office,
TLC/Pudukottai. Agreclutural
Engineering,
Trichy-1
Lr.No.AEE/TLC/PDKT/F.Proposed 110 KV SS/D.48/15 Dated 25.5.15.
Sir,
Sub:- Works- Proposed 110 33KV SS @ Gandharvakkottai in
Pudukkottai Dist. –
Water divining for bore well Point-location -Requested --Reg.
.
##########
It is proposed that the 110/33 KV SS @ Gandharvakkottai in
Pudukkottai Dist
I request that may please arrange for divine for 1 no bore well point in
this area for construction & drinking water purpose .
The above sub station will be commissioned on or before
September 2015. Hence I request that to make necessary arrangement to
divine bore well point in the above site as early please.

Encl :-FMB Sketch :-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy Submitted to the Executive Engineer/TLC/Trichy

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Works bills/D.123/14 Dated 27..10.14.
Sir,
Sub:-Estimates-Survey Estimates -sub of-Reg.

Ref:- ( Per) .FB. TANTRANSCO Proceeding NO.92


Dated.04.10.2014.

##########
I here with submit the survey estimate for the
following works for favor of further action please.
7) Preliminary and detailed survey for the LILO of the existing 110
KV Pudukkottai to T.Nallur at the proposed Ammachatiram 110 /
22-11 KV SS. in Pudukkottai Dist.(Rs.1,46,300/-)

8) Preliminary and detailed survey for 110 KV LILO of existing 110


KV Alundur-Vadukkapatty @ proposed Ammachatiram 110/22-11
KV SS in Pudukkottai Dist.(Rs.3,88,200)

Encl :-Estimate in duplicate :-2 Nos..

Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Works bills/D.104/14 Dated 30.9.14.
Sir,
SUB:- Works-Refund of EMD,SD & RA-Proposal – Sub of –Reg.
###########
I here with submit the proposal for refund of EMD,SD & RA
for the following works along with MBK sfor favor of further action please.
1 Construction of battery room ,providing concrete for structure and
equipment plinths,road,fencing and other allied works @
Ammaradakki 33/11 KV SS(UM)
2 EWE,SS,Conc,supply&erection of towers and stringing of
conductor,and earth wire of LILO 110 KV line from Alangudy-
Karambakudi @ proposed Mazhjyur 110 KV SS (Reach-I)
3 ----DO---- (Reach-II)
4 -----DO---- (Reach-III)
5 ----DO---- (Reach –IV)
6 Construction of Cable duct ,retaining wall,and yard levelling @
Mazhaiyur.
7 Providing concrete for structuresand equipment plinths @
Mazhaiyur 110 KV SS.
8 Construction of Retaining wall around tower location 67-87 of
Nagudy-Kodikulam 110 KV SC line on DC tower.
9 -------Do----- Loc 52-56.
10 -------DO----- Loc 1-51.

Encl:- HR -10 Nos


Mbks 8960 &8961 -2 Nos.

Assistant
Executive Engineer,
TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Project Director,
Assistant Executive Engineer, NHAI,
Transmission Line Construction Karaikudi.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F KM 49/855/D.No:-91/2014 Date:- 30.8.2014.
Sir,
Sub:- Trichy-Rameswaram KM 49/855-Providing towers for vertical
clearance
Of 66 KV line @ loc 306 &308-ROW problem-sloving-Requested-
Reg.

Ref:- Your Letter NHAI/PIU/Karaikudi/11032/08/2014/599 Dated June 07,201

#######

With reference to the above, you are solve the ROW problem and ident
the alternate land
for provide tower @ loc 306. 1 No. Tower leg which is foul near the road (road
portion) , it is very
dangerous to traffic, it is not feasibility at our side. The location sketch is
enclosed herewith.

We are suggested that to select another suitable land for laying tower
away from the Road
side or otherwise you are requested to given approval for laying tower has
already identify land
by you.(Approval requested for the enclosed Drawing ).
I request that may kindly be favorable reply as early please.

Encl:- Sketch—1 No.

Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy submitted to,
The Superintending Engineer/GCC/Trichy.
The Executive Engineer/TLC/Trichy

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-90/2014 Date:- 30.8.2014.
Sir,
Sub :- Lorry TN 45 F.8341-FC Works- Proposal- Submission –Reg.

#########
I herewith submitted the proposal for an amount of Rs.4700/-(Rupees
four thousand and seven hundred only) for FC works regarding Department lorry
TN45 F 8341 .The FC expiring on 26.8.14. The repair work is essentially required
to be carried out for road in order to get the FC from the consent department
and make the vehicle road worthy
Necessary quotations obtained from three different firms,and compare
the rates M/s sri porpannaiyan Automobiles,Pudukkottai has
quoted the lowest rate comparative statement is enclosed herewith along with
Quotations.
Under the circumstances it is requested that the approval may please
be accorded to carry out the FC works through M/s sri porpannaiyan
Automobiles,Pudukkottai
Encl :-Quotation 3 Nos |
with comparative statement| 1 Set

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-88/2014 Date:- 28.8.2014.
Sir,
Sub :- Lorry TN 45 F.8341-FC Works- Proposal- Submission –Reg.

#########
I herewith submitted the proposal for an amount of Rs.4500/-(Rupees
four thousand and five hundred only) for FC works regarding Department lorry
TN45 F 8341 .The FC expiring on 26.8.14. The repair work is essentially required
to be carried out for road in order to get the FC from the consent department
and make the vehicle road worthy
Necessary quotations obtained from three different firms,and compare
the rates M/s sri porpannaiyan Automobiles,Pudukkottai has
quoted the lowest rate comparative statement is enclosed herewith along with
Quotations.
Under the circumstances it is requested that the approval may please
be accorded to carry out the FC works through M/s sri porpannaiyan
Automobiles,Pudukkottai
Encl :-Quotation 3 Nos |
with comparative statement| 1 Set

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-94/2014 Date:- 03.9.2014.
Sir,
Sub :- -Earn leave application - Submission –Reg.
.
#########
I herewith submitted the Earn leave application received from
Thiru,T.Rajendran,Civil Masitry of this sub Division period from 08.9.14 to
12.9.14 and permission on 13.9.14 &14.9.14.is enclosed, for favor of further
action please.

Encl:-EL appln.:-1 No
Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-94/2014 Date:- 03.9.2014.
Sir,
Sub :- RWE-Earn leave application - Submission –Reg.
.
#########
I herewith submitted the Earn leave application received from
Thiru,T.Rajendran,Civil Masitry of this sub Division period from 08.9.14 to
12.9.14 and permission on 13.9.14 &14.9.14.is enclosed, for favor of further
action please.

Encl:-EL appln.:-1 No

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-95/2014 Date:- 03.9.2014.
Sir,
Sub :- Estt-Class III-RWEStaff-Conveyance Advance -Application -
Submission –Reg.
#########
I herewith submitted the Conveyance advance applications as
received from hiru,K.Alagar,Helper, & Thiru K.Subramani,Helper,of this sub
Division for purchase of TVS XL HEAVY DUTY in duplicate is enclosed, for favor of
further action please.

Encl:-Apllication in duplicate-2 sets.

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F RWE /D.No:-96/2014 Date:- 03.9.2014.
Sir,
Sub :- Works:-Works bills –Submission of –Reg.
Ref:- 1) K2 Agt.No.196 SE/2013-14.
MEMO.NO.208/ADM-I/A4/F.Fitters/2014/dt.26.8.14.

#########
With reference to the above ,I herewith submitted the suitability report
for the following RWE Staffs .
1. Thiru K.Subramani, Helper :- Suitable for promotion.
2. Thiru K. Alagar, Helper, :- Suitable for promotion.

This for favor of further action please.

Assistant Executive
Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E ., The Executive
Engineer,(AgrEngg)
Assistant Executive Engineer. Divisional Office,
TLC/Pudukottai. Agreclutural
Engineering,
Trichy-1
Lr.No.AEE/TLC/PDKT/F.Proposed 110 KV SS/D.81/14 Dated 22.08..2014.
Sir,
Sub:- Works- Proposed 110 KV SS Urban Pudukkottai –Water divining
for bore well
Point-location -Requested --Reg.
.
##########
It is proposed that the 110/22 KV SS @ Pudukkottai Urban
area. I request that may please arrange for divine for 1 no bore well point
in this area for construction & dringing water purpose .

Encl :-FMB Sketch :-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E ., The Executive
Engineer,(AgrEngg)
Assistant Executive Engineer. o/o The Deputy
Director,
TLC/Pudukottai. Agreclutural
Engineering,
Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Proposed 110 KV SS/D.81/14 Dated 22.08..2014.
Sir,
Sub:- Works- Proposed 110 KV SS Urban Pudukkottai –Water divining
for bore well
Point-location -Requested --Reg.
.
##########
It is proposed that the 110/22 KV SS @ Pudukkottai Urban
area. I request that may please arrange for divine for 1 no bore well point
in this area for construction & dringing water purpose .

Encl :-FMB Sketch :-1 No.


Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Esimate/D.108/14 Dated 29.9.14.
Sir,
Sub:- Works-Works bills -sub of-Reg.
Ref:- 1) K2 Agt.No.196 SE/2013-14.
2) K2 Agt.No.197 SE/2013-14.

##########
I here with submitted the CC I st & final bill for the
following works along with M Books(9554 &9571) with bill copy and
statement in triplicate for the following works for favor of further action
please.

1) Construction of cable dduct works in Bay extension @ Thiruvapur


110/22 KV SS.
Rs.30,58,600/-

Encl Estimates in duplicate:-2 Nos..

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Esimate/D.78/14 Dated 18.08..2014.
Sir,
Sub:- Works-Estimates-sub of-Reg.
##########
I here with submitted the Estimates for the following works
in duplicate for favor of further action please.
1. Providing for concrete plinth for various structures and equipment
plinth for Bay
extension @ Thiruvapur 110/22 KV SS. RS.31,73,900/-

2 Construction of cable dduct works in Bay extension @ Thiruvapur


110/22 KV SS.
Rs.30,58,600/-

Encl Estimates in duplicate:-2 Nos..

Assistant
Executive Engineer,
TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Work orders l/D.54/14 Dated 08.07..2014.
Sir,
Sub:-Work order-closing proposal-Sub of –Reg.
##########
I herewith submit the work order closing proposal for
the.following works for favor of further action please.
1). Earth work execavation,stub setting,concreting,supply , erection of
towerfrom loc 1-5
And srtinging of panther conductor and earth wire of 110 KV LILO line
from
Alunkudy-Karambakudy 110 KV SC line @ Mazhaiyur 110/22 KV SS.
(W.O.No.14.53.4/S.114/08/13-14)
2). Earth work execavation,stub setting,concreting,supply , erection of
towerfrom
loc 06-10 and srtinging of panther conductor and earth wire loc 06-12
of 110 KV LILO line from Alunkudy-Karambakudy 110 KV SC line @
Mazhaiyur 110/22 KV SS.
(W.O.No.14.53.4/S.115/07/13-14)
3). Earth work execavation,stub setting,concreting,supply , erection of
towerfrom
loc 10- 15and srtinging of panther conductor and earth wire loc12-15
of 110 KV LILO
line from Alunkudy-Karambakudy 110 KV SC line @ Mazhaiyur 110/22
KV SS.
(W.O.No.14.53.4/S.116/06/13-14)
4). Earth work execavation,stub setting,concreting,supply , erection of
towerfrom
loc 16- 18 and srtinging of panther conductor and earth wire loc 15
to Takeoff of
110 KV LILO line from Alunkudy-Karambakudy 110 KV SC line @
Mazhaiyur
110/22 KV SS. (W.O.No.14.53.4/S.117/05/13-14)
5). Construction of Control room building with electrification
arrangements for
Mazhiyur 110/22 KV SS (W.O.No.14.53.4/S.38-1/03/13-14)

Encl:- Closed work order :- 5Nos.

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy Submitted to The Superintending Engineer/GCC/Trichy.

Copy to The Assistant Engineer/SS/Pudukkottai


TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Assistant Executive
Engineer
Assistant Executive Engineer, O&M,Town.
Transmission Line Construction Pudukkottai . .
Pudukkottai.(9442502244).
Lr.No:- AEE/TLC /PDKT/F 110 KV Urban SS Temp.supply/D.No:-83/2014 Date:-
22..8.2014.
Sir,

Sub:- Pudukkottai 110/22KV Urban SS-Temp. Supply –Requested-Reg.

Ref:- (per).FB.TR.No.09 Dated 10.01.2014.


#######
It is proposed 110/22 KV Urban SS at Pudukkottai,
Construction works are will be commenced within a week .Hence I
request that 10 KW temporary supply for construction of control
room,plinths,Fabrication of structures etc.,using following
machineries as follows.
5. Welding machine :-7.5 KW
6. Drilling Machine :-1.5 KW
7. Lighting load :-1.0 KW
-------------
TOTAL :- 10.0 KW
-------------

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy to Assistant Engineer/O&M/Thiruvapur


TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Esimate/D.71/14 Dated 02.08..2014.
Sir,
Sub:- DCW-Providing earth work execavation,stub
setting,concreting,earthing and
Refilling for 1 No.Addl loc @308 of 66 KV pole line for vertical
clearance for
NHAI Pudukkottai-Karaikudi Bye pass road @ Pudukkottai-
Estimte-
Sub of-Reg.
##########
I herewith submit an estimate in duplicate for the above for
an amount of
Rs.3,58,100/-(Rupees Three lakhs fifty eight thousand one hundred
only) for favor of further action please.
Encl:- 1 No.Estimate in duplicate.
Assistant Executive
Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Amaradakki 33/11 KV SSl/D.70/14 Dated
01.08..2014.

I herewith submit the report regarding water supply arrangement


of Amaradakki 33/11 KV SS as called for under cited reference as
follows.
1. Geological test contacted on 20.07.2012. by Agriculture
Department/Pudukkottai as per our request,and given report for
providing bore well at Amaradakki SS.It is stated that the available
water is basic content (Uvar neer)and recommendation it is not
suitable bore well
The copy of report is enclosed herewith for favor further
action please.

Encl:- Copy of Report:-1 Set.

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy Submitted to The Chief Engineer/Distn/Trichy. |


Copy Submitted to The Superintending Engineer/GCC/Trichy. | **
Copy Submitted to The Executive Engineer/TLC/Trichy. |

** For kind information please.(w.e)


TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, Pudukkottai
Elecy.Distn.Circle,
TLC/Pudukkottai. Pudukkottai.

Lr.No.AEE/TLC/PDKT/F. Amaradakki 33 /11 KV SSl/D.70/14 Dated


01.8..2014.
Sir,
Sub:-Trichy Region-PEDC/Pudukkottai-Amaradakki SS-Provision
of
bore well arrangements for earth pits and SS usage-
Report sub of-
–Reg.
Ref:-Lr.No SE/PEDC/PDKT/AEE/CIVIL/F.DOC/D.243/14. Dated
18.07.2014.
##########
I herewith submit the report regarding water supply
arrangement of Amaradakki 33/11 KV SS as below.
2. Geologigal test contacted on 20.07.2012. by Agriculture
Department/Pudukkottai as per our request,and given report .It is
stated that the available water is basic content (Uvar neer)and
recommendation it is not suitable bore well
The copy of report is enclosed herewith for favor further
action please.

Encl:- Copy of Report:-1 Set.

Assistant Executive
Engineer,
TLC/Pudukkottai.

Copy Submitted to The Superintending Engineer/GCC/Trichy.


Copy Submitted to The Executive Engineer/TLC/Trichy.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Work orders l/D.52/14 Dated 05.07..2014.
Sir,
Sub:- AEE/TLC/PDKT-Rate Approval –Supply and fixing of granite
plaques for
Inaugration of 3 Nos. of sub stations in this sub division –
work carried out
In anticipation of approval-Ratification requesting of-
Regarding’

Ref:- Memo No. CE/TR/SE/TR-1/EW/A1/F.CM Unaug/D.011/14


Dt.09.01.14.
######

In this Sub-Division Aranthangi 33/11 KV SS,Vadakatupatty


33/11 KV SS and Kodikulam 110/33-11 KV SS in the list of 50 Nos.Sub-
Stations Inaugurated by the Hon’ble Chief Minister of Tamil Nadu
30.12.2013.which was executed by TLC Sub-Division Pudukkottai.
As per the instruction of the Chief Engineer/Transmission/
Chennai vide the reference cited,quotations were called from various
agencies for supply and fixing of granite plaques as per the approved
samples plaques with 5 sets of soft and hard copies on 28.02.14.
Quotations were received from three Nos of agencies, Out of
the three agencies Thiru S.Ranganathan,contractor,Trichy had quted the
lowest rate of RS.24,000/-(Rupees Twenty four thousand only)for carrying
out the work for the above three sub-statios at Rs.8000/-(Rupees Eight
thousand only) per each which is reasonable.
In view of urgent nature, the work was carried out
Thiru,M.S.Gannam, contractor, Thanjavur,who quoted the lowest rate.
Hence , I request that an approval may kindly be accorded
the action taken in anticipation of approval and ratification from the
competitive authority please.

Encl:- 3 Nos. Quotations.


With comparative statement.

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Work orders l/D.52/14 Dated 05.07..2014.
Sir,
Sub:- AEE/TLC/PDKT-Rate Approval –Supply and fixing of granite
plaques for
Inaugration of 3 Nos. of sub stations in this sub division –
work carried out
In anticipation of approval-Ratification requesting of-
Regarding’

Ref:- Memo No. CE/TR/SE/TR-1/EW/A1/F.CM Unaug/D.011/14


Dt.09.01.14.
######

In this Sub-Division Ammaradaki 33/11 KV SS,Mazhaiyur


110/22 KV SS and Keeramangalam 110/33-11 KV SS in the list of 51
Nos.Sub-Stations Inaugurated by the Hon’ble Chief Minister of Tamil Nadu
12.06.14.which was executed by TLC Sub-Division Pudukkottai.

As per the instruction of the Chief Engineer/Transmission/


Chennai vide the reference cited,quotations were called from various
agencies for supply and fixing of granite plaques as per the approved
samples plaques with 5 sets of soft and hard copies on .07.14.

Quotations were received from three Nos of agencies, Out of


the three agencies Thiru S.Ranganathan,contractor,Trichy had quted the
lowest rate of RS.24,000/-(Rupees Twenty four thousand only)for carrying
out the work for the above three sub-statios at Rs.8000/-(Rupees Eight
thousand only) per each which is reasonable.
In view of urgent nature, the work was carried out
Thiru,M.S.Gannam, contractor, Thanjavur,who quoted the lowest rate. who
quoted the lowest rate.

Hence , I request that an approval may kindly be accorded


the action taken in anticipation of approval and ratification from the
competitive authority please.

Encl:- 3 Nos. Quotations.


With comparative statement.

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Work orders l/D.54/14 Dated 08.07..2014.
Sir,
Sub:-Work order-closing proposal-Sub of –Reg.
##########
I herewith submit the work order closing proposal for
the.following works for favor of further action please.
1). Earth work execavation,stub setting,concreting,supply , erection of
towerfrom loc 1-5
And srtinging of panther conductor and earth wire of 110 KV LILO line
from
Alunkudy-Karambakudy 110 KV SC line @ Mazhaiyur 110/22 KV SS.
(W.O.No.14.53.4/S.114/08/13-14)
2). Earth work execavation,stub setting,concreting,supply , erection of
towerfrom
loc 06-10 and srtinging of panther conductor and earth wire loc 06-12
of 110 KV LILO line from Alunkudy-Karambakudy 110 KV SC line @
Mazhaiyur 110/22 KV SS.
(W.O.No.14.53.4/S.115/07/13-14)
3). Earth work execavation,stub setting,concreting,supply , erection of
towerfrom
loc 10- 15and srtinging of panther conductor and earth wire loc12-15
of 110 KV LILO
line from Alunkudy-Karambakudy 110 KV SC line @ Mazhaiyur 110/22
KV SS.
(W.O.No.14.53.4/S.116/06/13-14)
4). Earth work execavation,stub setting,concreting,supply , erection of
towerfrom
loc 16- 18 and srtinging of panther conductor and earth wire loc 15
to Takeoff of
110 KV LILO line from Alunkudy-Karambakudy 110 KV SC line @
Mazhaiyur
110/22 KV SS. (W.O.No.14.53.5/S.202/08/13-14)
5). Construction of Control room building with electrification
arrangements for
Mazhiyur 110/22 KV SS (W.O.No.14.53.4/S.38-1/03/13-14)

Encl:- Closed work order :- 5Nos.

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy Submitted to The Superintending Engineer/GCC/Trichy

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. Work orders l/D.54/14 Dated 08.07..2014.
Sir,
Sub:-Work order-closing proposal-Sub of –Reg.
##########
I herewith submit the work order closing proposal for
the.work of Drawal of main materials for LILO of Alangudy-Karambakudi
110 KV line at Mazhaiyur 110 KV SS
(W.O.No.14.53.5/S.122/09/2013-14.) for favor of further action
please

Encl:- Closed work order :- 1 No.


Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy Submitted to The Superintending Engineer/GCC/Trichy.


TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. WOA/D.55/14 Dated 08.7.2014.
Sir,
Sub:- Work order –Work order application -sub of-reg.

I herewith submit the work order application along with the


copy of sanction estimate for the following works, for favor of further
action please
1. Construction of retainging wall for newly formed approach road
@mazhiyur
110/22 KV SS. (WOA 095116/08.7.2014.)
2. Construction of retainging wall at northernside boundary @
Mazhaiyur
(WOA 095117/08.7.2014.)
Encl:- Work order application:- 2 Nos.
(2 Sets)
Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy Submitted to The Superintending Engineer/GCC/Trichy.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. WOA/D.55/14 Dated 08.7.2014.
Sir,
Sub:- Work order –Work order application -sub of-reg.

I herewith submit the work order application along with the


copy of sanction estimate for the following works, for favor of further
action please
1. Construction of retainging wall for newly formed approach road
@mazhiyur
110/22 KV SS. (WOA 095116/Dt.08.7.2014.)
2. Construction of retainging wall at northernside boundary @
Mazhaiyur
(WOA 095117/Dt.08.7.2014.)
Encl:- Work order application:- 2 Nos.
(2 Sets)
Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy Submitted to The Superintending Engineer/GCC/Trichy


TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Hired vehicle/D.50 /14 Dated 05.07.2014.


Sir,
Sub:- TLC/Trichy-Hiring of vehicle-Agreement period ending on
15.8.2014.
New Tender to be floated –Requested-reg.

Ref:- K2 Agreement No. 24/2013-14/SE/GCC/Try’


#########

The agreement period of K2 Agreement No.SE/GCC/Try

24/2013-14 for the work of providing one No. diesel driven TATA SUMO on

hire basis for the official use of Assistant Executive

Engineer/TLC/Pudukkottai is ending on 15.8.2014.

Hence I request that necessary tender may please be

arranged to floated to fix the New Agency for the above work with effect

from 16.8.2014. as the vehicle is essentially required for attending the

ongoing T&D works for favor of further action please

Assistant
Executive Engineer,

TLC/Pudukkottai

Copy Submitted to The Superintending Engineer/GCC/Trichy.


TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F K2 Agt 071SE/12-13 /D.97/14 Dated 03.09.2014.
Sir,
Sub:- Works- Releasing EMD,SD & RA-Providing concrete
structures and
equipment plinth @ Aranthangi 33/11 KV SS --sub of-reg.
Ref:- K2 Agt.No. 071 SE/12-13.

I herewith submit the proposal for the refund of EMD<SD&RA


for the above work along with MBook 9192 and HR ,for favor of further
action please

Encl:-HR with MBK 9192 :-1 No..

Assistant
Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F K2 Agt 071SE/12-13 /D.97/14 Dated 03.09.2014.
Sir,
Sub:- Works- Releasing EMD,SD & RA-Providing concrete
structures and
equipment plinth @ Aranthangi 33/11 KV SS --sub of-reg.
Ref:- K2 Agt.No. 071 SE/12-13.

I herewith submit the proposal for the refund of EMD<SD&RA


for the above work along with MBook 9192 and HR ,for favor of further
action please

Encl:-HR with MBK 9192 :-1 No..

Assistant
Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. RWE –TA Bill/D.58/14 Dated 084.07.2014.
Sir,
Sub:- Estt-RWE Staff-Thiru T.Rajendran,Civil mastery Surrender
leave application’
--sub of-reg.
#####

I herewith submit the surrender leave application for 15


days,as received from Thiru T.Rajendran, Civil mastery of this sub division
due date on 18.7.2014. for favor of further action please

Encl:- Surrender leave appln:-1 No.

Assistant
Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. RWE –TA Bill/D.58/14 Dated 084.07.2014.
Sir,
Sub:- Estt-RWE Staff-Thiru T.Rajendran,Civil mastery Surrender
leave application’
--sub of-reg.
#####

I herewith submit the surrender leave application for 15


days,as received from Thiru T.Rajendran, Civil mastery of this sub division
due date on 18.7.2014. for favor of further action please

Encl:- Surrender leave appln:-1 No.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Assistant
Executive Engineer,
Assistant Executive Engineer, Lines/230 KV
SS,
TLC/Pudukkottai. Pudukkottai.

Lr.No. AEE/TLC/PDKT/F.Try-Tvmbr line L.C./D.46-2 /14 Dated 04.07..2014.


Sir,
Sub :- 110 KV line-T.Nallur-Thiruverambur 110 kv line-Line clear-
Requested-Reg.

Ref:- Lr.No. AEE/TLC/PDKT/F.Try-Tvmbr line L.C./D.46-1 /14 Dated


30..6.2014.

#####
The Line clear has already been applied vide under cited above
reference ,This may please be Cancelled for the above said line ,due to
non availability of labour force .

The line clear will be applied latter date after conforming


labour force at our end.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Copy submitted to,


The Superintending Engineer/GCC/Trichy.
The Superintending Engineer/Operation/Trichy.
The Superintending Engineer/Metro/Trichy.
The Superintending Engineer/PEDC/Pudukkottai.
The Executive Engineer/TLC/Trichy.
The Executive Engineer/operation/Pudukkottai.
.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC/Trrichy,
Transmission Line Construction,
Pudukkottai.(9442502244)
Lr.No:- AEE/TLC /PDKT/F RTI/D.No:-43/2014 Date:- 26.6.2014.
Sir,
Sub:- Elecy—Particulars requested by Thiru K.Sivakumar,Dharapuram
under
RTI Act-Report –Submission of-Reg.

Ref :- Endt.No.EE/TLC/TRY/DB/HD/F.RTI/PR.No.198/14 Dated.23.05.14.


######

I herewith submit the particulars regarding construction of


retaining wall around
the tower locations the details as follows.
I. YEAR 2012-2013.

1. Construction of retainging wall around tower loc23 &58


Of 110 kv line from Nagudi-Peravurani line
Rs.6,57,800/-

2. Construction of retainging wall around tower loc 25 &26


Of Alundur –vadugapatty 110 KV line
Rs.2,89,700/-

3. Construction of retainging wall around tower loc 81-116


(9 Nos) of Thirumayam-Aliyanilai 110 KV line
Rs.26,11,800/-

II. YEAR 2013-2014

1. Construction of retainging wall around tower loc 51-56


(3 Loc) of Nagudy-Kodikulam 110 KV line
Rs.12,87,000/-

2. Construction of retainging wall around tower loc 56-80


(4 Loc) of Nagudy-Kodikulam 110 KV line
Rs.13,36,900/-

3. Construction of retainging wall around tower loc 1-50


(83 Loc) of Nagudy-Kodikulam 110 KV line
Rs.37,14,000/-

This is favor of further action please.

Assistant Executive
Engineer,

TLC/Pudukkot
1

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. EOT-l/D.39/14 Dated 09.6.2014.
Sir,
Sub:-Works-Check suervey,stub setting,concreting,erection of
towers from loc28-33
&38,stringing of panther conductor from 27- 50 of
Thirumayam-Aliyanilai
110 KV line(Reach—I) –EOT proposal-subof-reg.
Ref:-1.). K2 Agt.No.105 /SE/2010-2011..
2). Contractor’s Lr.dated.07.6.2014.
######
I submit here with the EOT proposal for the above work,with
specific remarks as follows.
m) Name of the contractor :-M/S Ayyapp
an &Co,Kovilpatty.
n) Date of handing over of the site :-17.6.2011.
o) Date fixed for complection :-16.8.2011.
p) Date of EOT required :-24.11.2011.
q) Value of work completed within the period :-Rs.5,54,076/-
(45%)
r) Value of work to be completed in the EOT period :-Rs.5,77,724/-
(55%)

The reason stated by the contractor is genuine, the problems


raises by the land owners
at the time of execution of work. and stop the work .The Department
Officials approach several times at frequent intervals the land
owners to make convince in the interest of Board. This process
continuously till end of the work. Some Land owners convinced by
the Revenue Officials.

The stringing materials such as panther conductor,GI Earth wire


and hardware fittings,supllied by the department during Auguest
2011to October 2011.

The contractor wants to short closer this Agreement, due to non


complection of coping works loc 31,32 &34 which is located inside
the tank(kulam),at the time water stored the tank ,Hence the coping
works was not completed in time .The short closer proposal has
already submitted vide Lr.No.EE/TLC/TRY/DB/DM/F.Thirmayam-
Aliyanilai/D.No.91/11-12 dt.23.02.2012.(copy enclosed),Now it is
constructed revertment along with coping.in the other agreement.

At last the line charged on 24.12.2011.succesfully.There is no


loss to the Board .The EOT proposal received from the contractor
up to 24.11.2011 without penalty. .

Hence ,I request that the EOT proposal may please be arranged


to be granted upto 24.11.2011. Without penalty.

ASSISTANT
EXECUTIVE ENGINEER
Encl:-EOT proposal in duplicate
TLC/PUDUKKOTTAI.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. EOT-l/D.40/14 Dated 09.6.2014.
Sir,
Sub:-Works-Check suervey,stub setting,concreting,erection of
towers from loc28-33
&38,stringing of panther conductor from 13-26 of
Thirumayam-Aliyanilai
110 KV line(Reach—I) –EOT proposal-subof-reg.
Ref:-1.). K2 Agt.No.123 /SE/2010-2011..
2). Contractor’s Lr.dated.07.6.2014.
######
I submit here with the EOT proposal for the above work,with
specific remarks as follows.
a) Name of the contractor :-M/S Ayyappan
&Co,Kovilpatty
b) Date of handing over of the site :-05.3.2010.
c) Date fixed for complection :-04.7.2010.
(4Months)
d) Date of EOT required :-21.12.2011.
e) Value of work completed within the period :-Rs.5,38,302/-
(61%)
f) Value of work to be completed in the EOT period :-Rs.3,43,731/-
(39%)
The reason stated by the contractor is genuine, the problems
raises by the land owners
at the time of execution of work. and stop the work .The Department
Officials approach several times at frequent intervals the land
owners to make convince in the interest of Board. This process
continuously till end of the work. Some Land owners convinced by
the Revenue Officials.

The stringing materials such as panther conductor,GI Earth wire


and hardware fittings,supllied by the department during Auguest
2011to October 2011.

The contractor wants to short closer this Agreement due to non


complection of coping works loc 14,15,22 &25 which is located
inside the tank(kulam),at the time water stored the tank ,Hence the
coping works was not completed in time . .The short closer proposal
has already submitted vide Lr.No.EE/TLC/TRY/DB/DM/F.Thirmayam-
Aliyanilai/D.No.90/11-12 dt.23.02.2012.(copy enclosed),Now it is
constructed revertment along with coping.in the other agreement.
Now it is constructed revertment along with coping.in the other
agreement.

At last the line charged on 24.12.2011.succesfully.There is no


loss to the Board .The EOT proposal received from the contractor
up to 24.11.2011 without penalty.

Hence ,I request that the EOT proposal may please be arranged


to be granted upto 21.12..2011. Without penalty.

ASSISTANT
EXECUTIVE ENGINEER
Encl:-EOT proposal in duplicate
TLC/PUDUKKOTTAI.
TAMILNADU TRANSMISSION CORPORATION

From To,
Er.R.Kalaiselvan,B.E., The Branch
Manager,
Superintending Engineer, TIIC,Anna Nagar,
General Construction Circle, Madurai.
Trichy-20.

Lr.No.SE/GCC/TRY/AAO/F.Bill/D. /14 Dated. .6.2014.


Sir,

Sub :-Construction of retaining wall around tower locations at


Thirumayam-
Aliyanilai 110 KV SC line on DC towers location 1-80.-CC Ist &Final
bill.
Ref :-K2 Agt.No.072 Se/2012-2013.
Contractor’s letter No bill Dt.

As per the above reference CC Ist & Final bill for Rs. 40,80,620/- /
(Rupees Forty
Lakhs eighty thousand six hundred and twenty only) received in
favor of
M/S ISHWARAYA CONSTRUCTIONS,Dindugal.
For the above said work the bill amount details.

Gross Amount ;-Rs. 40,80,620/-


Nett Amount :-Rs. 36,72,559/-

The Nett amount of Rs. 36,72,559/-is eligible for payment to the


contractor.

SUPERINTENDING
ENGINEER,

GCC/TRICHY-20.

Copy to APS-II
Copy to M/S,Ishwaraya constructions,Dindugul.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F .Lorry TN 45 F.8341 QT/D.No:-47/2014 Date:-
04.7.2014.
Sir,
Sub :-Vehicle-Lorry TN 45 F-8341-Quarterly tax-Proposal-Sub of-Reg.
#########
I herewith submit the Hand Receipt in favor of The reginal Transport
Officer/Trichy towards the Quarterly Tax proposal for the vehicle TN 45 F.8341
for the period of 01.7.2014 to 30.09.2014. for an amount of RS.2800/-(Rupees
two thousand eight hundred only) along with LLB Vol C, for favor of further
action please.

Encl:-1 No Hand Receiptl,


Along with LLB Vol C..

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F .Lorry TN 45 F.8341 QT/D.No:-47/2014 Date:-
04.7.2014.
Sir,
Sub :-Vehicle-Lorry TN 45 F-8341-Quarterly tax-Proposal-Sub of-Reg.
#########
I herewith submit the Hand Receipt in favor of The reginal Transport
Officer/Trichy towards the Quarterly Tax proposal for the vehicle TN 45 F.8341
for the period of 01.7.2014 to 30.09.2014. for an amount of RS.2800/-(Rupees
two thousand eight hundred only) along with LLB Vol C, for favor of further
action please.

Encl:-1 No Hand Receiptl,


Along with LLB Vol C..

Assistant Executive
Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC/Trichy-
20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.PTCC. /D.38/14 Dated 09.06.2014.
Sir,
Sub:-GCC/Trichy-Work order application –Sub of –Reg.

Ref:-1.MEMO NO.SE/GCC/TRY/AEE/GL/DB/D4/F.Keeramangalam 110


KV SS /
D.40/13 Dt.02.4.2014.
#####
I submit here with the work order application bearing no. 095112
dated 04.07.14for the work of providing circular type well foundation at
loc 38 of 110 KV LILO of Nagudy-Peravurani 110 KV SC line on DC towers
at proposed Keeramangalam 110 KV SS.along with copy of sanction
estimate for favor of futhur action please.

Encl:- WOA 095112/dt04.7.14


With copy of sanction estimate.
Assistant
Executive Engineer,
TLC/Pudukkottai.
Copy submitted to the Executive Engineer/TLC/Trichy.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC/Trichy-
20.
TLC/Pudukkottai.
z
Sir,
Sub:-GCC/Trichy-Work order application –Sub of –Reg.
Ref:-1.MEMO NO.SE/GCC/TRY/AEE/GL/DB/D4/F.Keeramangalam 110
KV SS /
D.40/13 Dt.02.4.2014.
#####
I submit here with the work order application bearing no. 095112
dated 04.07.14for the work of providing circular type well foundation at
loc 38 of 110 KV LILO of Nagudy-Peravurani 110 KV SC line on DC towers
at proposed Keeramangalam 110 KV SS.along with copy of sanction
estimate for favor of futhur action please.

Encl:- WOA 095112/dt04.7.14


With copy of sanction estimate.
Assistant
Executive Engineer,
TLC/Pudukkottai.

Copy submitted to the Executive Engineer/TLC/Trichy.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC/Trichy-
20.(MM)
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.PTCC. /D.38/14 Dated 09.06.2014.


Sir,
Sub:-GCC/Trichy-Surprise Inspection of Stores-Conducted the
Assistant Executive Engineer’s –Report –Submission of-Reg.

Ref:-MEMO NO.SE/GCC/TRY/SS/SPS/A1/F.Surprise
Inspection/D.12/2014 Dt.03.5.14.
#####
I submit here with the Surprise Inspection report regarding
Stationary stroe at Trichy,
On 28.5.2014.along with report folio no.009920 & 009921/dt.28.5.2014.
for favor of futhur action please.
Encl:- 2 sheets.(009920&009921)
Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-47/2014 Date:- 28.6.2014.
Sir,
Sub :- Works:- work bills- Submission –Reg.
#########
I herewith submitted the CC I st & Final bill for the construction of
retaining wall around tower locations at Thirumayam-Aliyanilai 110 KV SC line
on DC towers loc 1-80,along with MBooks 8961,9023 ,bill copies and statement
in triplicate, for favor of further action please.

Encl:-1 No works bill,


Along with MBK,9424,9023-2 Nos.
Bill copy,statement
In triplicate
Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-88/2014 Date:- 28.8.2014.
Sir,
Sub :- Works:- work bills- Submission –Reg.
Ref:- K2 Agt.No.30 SE/2014-2015.
#########
I herewith submitted the CC I st & Final bill for the construction of
retaining wall for newly formed approach road at Mazhajyur 110/22 KV SS for an
amount of Rs.32,58,397,along with MBooks 9556 &9578,bill copies and
statement in triplicate, for favor of further action please.

Encl:-1 No works bill,


Along with MBK,9556,9578-2 Nos.
Bill copy,statement
In triplicate
Assistant Executive
Engineer,

TLC/Pudukkottai.
TANTRANSCO

From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-47/2014 Date:- 28..6.2014.
Sir,
Sub :- Works:- Balance work orders-Application –Submission of-Reg.

########
I submit herewith the 10 Nos.(Ten)balance work order
applications along with list of works and expenditure statement in
duplicate,for favor of further action please.

Encl:-10 Nos WOA,statement in duplicate.


(WOA no.095102 to095111)

Assistant Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO

From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-35/2014 Date:- 03.6.2014.
Sir,
Sub :- Works:- Balance work orders-Application –Submission of-Reg.

########
I submit herewith the 10 Nos.(Ten)balance work order
applications along with list of works and expenditure statement in
duplicate,for favor of further action please.

Encl:-10 Nos WOA,statement in duplicate.


(WOA no.095102 to095111)
Assistant Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC,
Transmission Line Construction Trichy.20.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Work bills/D.No:-32/2014 Date:- 26.5.2014.
Sir,
Sub :- Works:- check survey,pit marking,earth work
execavation,concreting,transport and
erection of towersfor the balance portion from loc 51-68 and
strining of conductor
and earth wire from loc 50-68 of Thirumayam-Aliyanilai 110 KV
SC line on
DC towers-EOT-requested-proposal -submission –Reg.
Ref:-K2 AGT.No.130 SE/2009-2010.
########
I submit herewith the EOT proposal for the above
work,along with the contractor’s letter dated16.05.2014.in duplicate,for
favor of further action please.
Encl:-EOT proposal with contractor’s letter in duplicate.
Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.EMD&RA -Relesing/D.33/14 Dated 28.5.2014.
Sir,
Sub:-Works:- Construction of control room building with
Electrification arrangements
And other works at Kodikulam 110/33-11 KV SS- Refund of
EMD,RA-refund
proposal –submission of -Reg.
. Ref:- 1).K2 Agt.No.96SE/2012-2013.
######
I here with submitted the EMD,RA Refund proposal for the
above reference cited works. along with Hand Receipt, Indemnity bond
and M Book9425,this is for favor of further action please.

Encl:- MBook 9425& H.R ,Indemnity bond:-1Set.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.EMD&RA -Relesing/D.33/14 Dated 28.5.2014.
Sir,
Sub:-Works:- Construction of control room building with
Electrification arrangements
And other works at Kodikulam 110/33-11 KV SS- Refund of
EMD,RA-refund
proposal –submission of -Reg.
. Ref:- 1).K2 Agt.No.96SE/2012-2013.
######
I here with submitted the EMD,RA Refund proposal for the
above reference cited works. along with Hand Receipt, Indemnity bond
and M Book9425,this is for favor of further action please.

Encl:- MBook 9425& H.R ,Indemnity bond:-1Set.

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.EMD&RA -Relesing/D.25/14 Dated 13.05.2014.


Sir,
Sub:-Works:- Refund of EMD,RA-refund proposal –submission of
-Reg.
. Ref:- 1).K2 Agt.No.81SE/2013-2014.
2) K2 Agt No.82 SE/2013-2014.
3)K2 Agt No.83SE/2013-2014.
4) K2 Agt No.84 SE/2013-2014..

######
I here with submitted the 04 Nos (Four) Nos EMD,RA
Refund proposal for the above reference cited works. along with Hand
Receipt sand M Book 9170,this is for favor of further action please.

Encl:- MBook 9170& H.R 4 Nos.:-1Set.


Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Lorry TN 45 F.8341/D.29/14 Dated 16.5.2014.


Sir,
Sub:-Lorry TN 45 J 8341-Diesel bills -Submission of-Reg.

######
I here with submitted the diesel bills from various
Dealers, along with the statement for the month of April 2014.for
favor of further action please.

Encl:-Diesel bills with statement :-1 Set

Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Lorry TN 45 F.8341/D.29/14 Dated 16.5.2014.


Sir,
Sub:-Lorry TN 45 J 8341-Diesel bills -Submission of-Reg.

######
I here with submitted the diesel bills from various
Dealers, along with the statement for the month of April 2014.for
favor of further action please.

Encl:-Diesel bills with statement :-1 Set


Assistant
Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Tree/Crop-Mazaiyur/D.24/14 Dated 12.5.2014.


Sir,
Sub:-Temporary Advance-Closed vouchers-Submission of-Reg.

For ######
I here with submitted the closed vouchers (2
Nos.)regarding labour charges
for loading 8 Nos. of Gi earth wire from GCC store,Ambathur ,Chennai ,to
lorry TN 45 F.8341
along with PCB folio No,218666/Dt.12.05.14. for favor of further action
please.

Encl:- PCB folio 218666/Dt.12.05.14.


Vouchers 2 Nos.
Assistant
Executive Engineer,
TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC/Trichy-
20.(MM)
TLC/Pudukkottai.
Through proper channel

Lr.No.AEE/TLC/PDKT/F.PTCC. /D.28/14 Dated 16.5.2014.


Sir,
Sub:-GCC/Trichy-PTCC clearance of EHT lines-SR data and EPR
details –
Furnished -Reg.
Ref:-1)Memo No.
SE/GCC/TRY/AEE/GL/DB/AEC/F.PTCC/D.09/Dt.02.04.14.
. 2) Endt.No.EE/TLC/TRY/F.PTCC/PR.No.153/14 Dt.04.04.2014.
######
I here with submit the SR Data ,EPR details and Single line
digram regarding Alangudy ,Karambakudi &Maliyur 110 KV SS and line the
particulars enclosed herewith for favor of further action please.

Encl:- Statement:-1 set in duplicate.

Assistant
Executive Engineer,

TLC/Pudukkottai.

Endt. No.EE/TLC/TRY/F.PTCC/C.No. /14 Dated .5.2014.

Submitted to the Superintending Engineer/GCC/Trichy for favor of


further action please.

Encl:-As received

Executive Engineer,

TLC/Trichy-20.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer, GCC/Trichy-
20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Work order Appln. /D.24/14 Dated 08.5.2014.


Sir,
Sub:-Works:- Work order application –Construction of Retaining wall
around tower
locations @ Thirumayam-Aliyanilai 110 KV SC line on DC
towers loc01 to 80
–submission of -Reg.
Ref:-Memo No. SE/GCC/TRY/AEE/GL/DB/D2/F.Tmy-
Aliyanilai/D.232/Dt.25.02.12.
.
######
I here with submit the work order application for the above
work along with
work order application No.00597/Dated 08.5.2014.and copy of sanction
estimate, This is for
favor of further action please.

Encl:- WOA-00597/Dt.08.5.2014,
Copy of sanction estimate.—1 Set.
Assistant
Executive Engineer,

TLC/Pudukkottai.

REPLY TO THE AUDIT SLIP NO 35 DT.10.01.2001 OF BOAB

NAME OF THE WORK:-Earth work execavation,stub


setting,concreting,refilling
Transport and erction of towers and
full welding for
loc 131 to 139 of Alundur-Pudukkottai
230 KV SC line .

Name of the contractor:-Thiru,R.Raghavan,Trichy.


K2 Agt. No.:--46 SE/2000-2001.

The site has been handed over to the


contractor for the subject work Was on 06.8.2000 and due date of
complection was 05.11.2000 as per the agreement condition. But the
actual date of complection is 28.02.2001.Due to the non availability of
department materials at GCC stores in Trichy circle (zebra conductor,
allied suspension and tension fittings etc.,) the work did not completed in
time.The delay is not on the part of the civil contractor.

Due to delay from from the department,the


complection period did not be able to assessed by the contractor himself.
Moreover the contractor has ready to short close the agreement at the
time.As per the request,the subject work has been completed on
28.02.2001 without giving any additional rates. Without knowing the date
supply of line materials from the department,the contractor has not in a
position to submit the EOT letter within the contract period. In this
circumstances the EOT has been approved upto 28.02.2001.without
penalty. In future it will be avoided.

Hence the audit slip may kindly be dropped


please.

REPLY TO THE AUDIT SLIP NO 36 DT.10.01.2001 OF BOAB


NAME OF THE WORK:-Earth work execavation,stub
setting,concreting,refilling
Transport and erction of towers and
full welding for
loc 123 to 130 of Alundur-Pudukkottai
230 KV SC line .

Name of the contractor:-Thiru,R.Raghavan,Trichy.

K2 Agt. No.:--47 SE/2000-2001.

The site has been handed over to the


contractor for the subject work Was on 06.8.2000 and due date of
complection was 05.11.2000 as per the agreement condition. But the
actual date of complection is 28.02.2001.Due to the non availability of
department materials at GCC stores in Trichy circle (zebra conductor,
allied suspension and tension fittings etc.,) the work did not completed in
time.The delay is not on the part of the civil contractor.

Due to delay from from the department,the


complection period did not be able to assessed by the contractor himself.
Moreover the contractor has ready to short close the agreement at the
time.As per the request,the subject work has been completed on
28.02.2001 without giving any additional rates. Without knowing the date
supply of line materials from the department,the contractor has not in a
position to submit the EOT letter within the contract period. In this
circumstances the EOT has been approved upto 28.02.2001.without
penalty. In future it will be avoided.

Hence the audit slip may kindly be dropped


please.
REPLY TO THE AUDIT SLIP NO 39 DT.10.01.2001 OF BOAB

NAME OF THE WORK:-Earth work execavation,stub


setting,concreting,refilling
Transport and erction of 1 No KC Type
tower for Pudukkottai
230 KV SS to T.Nallur – Alangudy 110
KV DC link line.

Name of the contractor:-M/s Kumaran Enterprises,Trichy.

K2 Agt. No.:--49 SE/2000-2001.

The site has been handed over to the


contractor for the subject work Was on 24.3.2000 and due date of
complection was 23.6.2000 as per the agreement condition. But the
actual date of complection is 15.8.2000 .Due to the non availability of
department materials at GCC stores in Trichy circle (Panther conductor
,allied suspension and tension fittings etc.,) the work did not completed in
time.The delay is not on the part of the civil contractor.

Due to delay from from the department, the


complection period
did not be able to assessed by the contractor himself. Moreover the
contractor has ready to
short close the agreement at the time.As per the request,the subject work
has been completed
on 15.8.2000 without giving any additional rates. Without knowing the
date supply of line materials from the department, the contractor has not
in a position to submit the EOT letter within the contract period. In this
circumstances the EOT has been approved upto 15.8.2000. without
penalty. In future it will be avoided.

Hence the audit slip may kindly be dropped


please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.BOAB Audit/D.16/14 Dated 19.4.2014.


Sir,

Sub:-Pending Audit slip for the period from 2000-2001 to


2009-2010
Reply called for-Reply submission of – Reg.

Ref:--1) SE/GCC/Try’sMemo No. SE/GCC/TRY/AO/AAO/AS/A3/


F.BOAB AUDIT/D.229/2014 DT.10.4.2014.

2) Endt.No.EE/TLC/Trichy/A1/F.Audit
slip/B.R.No:345/14 4
Dated.15.4.2014.

##########
I herewith submit the reply for the audit slip as called for
in the reference

Cited above,This is for favor of further action please.

Assistant Executive Engineer,

TLC/Pudukkottai.
Encl:- Reply of audit slip in duplicate

Copy Submitted to The Superintending Engineer/GCC/Tricy. ;(w.e)


For kind information please.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer
(AO/Accounts)
TLC/Pudukkottai. GCC/Trichy-
20.

Lr.No.AEE/TLC/PDKT/F.Imprest/D.219/14 Dfated 30.3.15.


Sir,

Sub:- Imprest—JE/TLC/Pudukkottai-closing of imprest advance-


Requested-Reg.

Ref:-1) CEP/Chennai’s Memo No.000792/795/G15/G151/2013-1


Dt.06.9.2013.
########

Thiru,P.Sekar,Junior Engineer/TLC/Pudukkottai is
transfered and posted as Junior Engineer/TLC/Karaikudi,in GCC/Madurai.as
per the order cited in above reference.
He was realived from his duty on 01.3.2014 He is
handed over imprest cash for an amount of Rs.2000/-(Rupees Two
thousand only) to Assistant Executive Engineer/TLC/ Pudukkottai.
Sofor no expenditure incurred by the imprest ,Hence
I request that the imprest may kindly be permit to close and remit the
amount with Account head.

The fresh imprest will be opened at the time of


joining of Section Officers in this Sub –Division.

Once again, I may kindly be requested that the


impest closed in favor of Junior Engineer/TLC/Pudukkottai, as early please.

Assistant Executive Engineer,

TLC/Pudukkottai.

Copy submitted to the Executive Engineer/TLC/Trichy.


(for kind information please)

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer (PRS)
TLC/Pudukkottai. GCC/Trichy-
20.
Lr.No.AEE/TLC/PDKT/F.Health Insu/D.61/14 Dated 17.07.2014.
Sir,
Sub:- Estt-Class II Service-Thiru
K.Srinivasan,AEE/TLC/Pudukkottai-
Health Insurance scheme 2012-particulars-Sub of –Reg
#####
I herewith submit the particulars regarding New Health
Insurance scheme 2012 in respect of Thiru K.Srinivasan ,Assistant
Executive Engineer/TLC/Pudukkottai in the prescribed format for favor of
further action Please.

Encl:-Format:- 1 No.

Assistant Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer (PRS)
TLC/Pudukkottai. GCC/Trichy-
20.
Lr.No.AEE/TLC/PDKT/F.Health Insu/D.61/14 Dated 17.07.2014.
Sir,
Sub:- Estt-Class II Service-Thiru
K.Srinivasan,AEE/TLC/Pudukkottai-
Health Insurance scheme 2012-particulars-Sub of –Reg
#####
I herewith submit the particulars regarding New Health
Insurance scheme 2012 in respect of Thiru K.Srinivasan ,Assistant
Executive Engineer/TLC/Pudukkottai in the prescribed format for favor of
further action Please.

Encl:-Format:- 1 No.

Assistant Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The
Superintending Engineer,
Assistant Executive Engineer
(AO/Accounts)
TLC/Pudukkottai. GCC/Trichy-
20.

Lr.No.AEE/TLC/PDKT/F.Imprest/D.06/14 Dated 07.04.2014.


Sir,

Sub:- Certificate of Imprest and Temporary Advance as on


31.3.2014 –
Particulars-Sub of –Reg.
Ref:- MEMO NO.SE/GCC/TRY/AAO/A.1/B&BS/F.IMP
&TEM.ADV/D.196/2014.DT.27.3.14.
#####

I herewith submit the certificate of imprest & Temporary


Advance as on 31.3.2014.Inrespect of this sub-division as called for in the
above cited reference,fo favor of further action
Please.
Encl:-certificates:-2 Nos.

Assistant Executive Engineer,

TLC/Pudukkottai.
Copy submitted to the Executive Engineer/TLC/Trichy.
REPORT TO ACCOMPANY THE ESTIMATE

Name of Work:-Conducting preliminary and detailed survey,profile


plotting for
Theodolite Survey for 110 KV DC line on DC
towers, for various
110 KV line for the Proposed Pudukkottai
URBAN 110/22 KV SS.
(Three Lines).

Estimate
Amount for Rs.2,36,100/-

This estimate envisages for the work of conducting


preliminary and detailed
Survey,profile plotting for theodolite survey for 1)110 KV DC tower with
panther conductor
to LILO the existing 110 KV PudukkottaiSIPCOT-Thirumayam feeder at
Puddukkottai 110 KV SS ,2)110 KV DC line on DC tower with panther
conductor from Pudukkottai 230 KV SS to Pudukkottai SIPCOT 110 KV SS
to bifurcate 110 KV Pudukkottai –Thirumayam Feeder (One line to feed
Pudukkottai SIPCOT and the other to Pudukkottai 110-Thirumayam) 3).110
KV DC line on DC tower with panther conductor to LILO of the existing 110
KV Pudukkottai-Thoirumayam feeder at the proposed Pudukkottai Urban
110 KV SS. In Pudukkottai District.
Necessary administrative approval has been accorded vide
(Per).FB.TANTRANSCO proceedings No.09. Dated .10.01.14.
The following provisions are made in this estimate
1.Reconnaissance survey
2. Detailed survey using theodolite
3 Supply of Route map,
4. Preparation of crossing drawings,
5. Supply and fixing of demarcation stone,
6. Clearing of all kinds of jungles,
7. Cutting of small trees.

The rates adopted in this estimate are based on the


schedule of rates for the
Year 2013-2014.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F. EOT-l/D.35/14 Dated 03.6.2014.
Sir,
Sub:-Works-Check suervey,stub setting,concreting,erection of
towers from loc28-33
&38,stringing of panther conductor from 27- 50 of
Thirumayam-Aliyanilai
110 KV line(Reach—I) –EOT proposal-subof-reg.
Ref:-1.). K2 Agt.No.105 /SE/2010-2011..
2). Contractor’s Lr.dated.03.6.2014.
######
I submit here with the EOT proposal for the above work,with
specific remarks as follows.
g) Date of handing over of the site :-17.6.2011.
h) Date fixed for complection :-16.8.2011.
i) Date of EOT required :-24.11.2011.
j) Value of work completed within the period :-Rs.5,54,076/-
(45%)
k) Value of work to be completed in the EOT period :-Rs.5,77,724/-
(55%)
The reason stated by the contractor is genuine, the problems
raises by the land owners
at the time of execution of work. and stop the work .The Department
Officials approach several times at frequent intervals the land
owners to make convince in the interest of Board. This process
continuously till end of the work. Some Land owners approach
court(By Law).
The stringing materials such as panther conductor,GI Earth wire
and hardware fittings,supllied by the department during Auguest
2011to October 2011.

The contractor was completed works excepted coping for


loc31,33,&35 to38 which is located inside tank,It is constructed
revertment along with coping.in the other agreement.

At last the line charged on 24.12.2011.succesfully.The EOT


proposal received from the contractor up to 24.11.2011 without
penalty.

Hence ,I request that the EOT proposal may please be arranged


to be granted upto 24.11.2011. Without penalty.

ASSISTANT
EXECUTIVE ENGINEER,
Encl:-EOT proposal in duplicate
TLC/PUDUKKOTTAI.

Hand Receipt

Recived for Rs. 36,100/- Vide cheque No. 972808 Dated


18.08.2014.
In favor of Thiru R.AMBALATHARASU,KEERAMANGALAM,Aranthangi
Taluk,Pudukkottai Dist,towards compensation of Tree/Crop of 110 KV LIlo
line from Nagudy-Peravurani @ proposed Keeramangalam 110/11 KV SS.
Witness:-

Hand Receipt

Recived for Rs. 36,100/- Vide cheque No. 972808 Dated


18.08.2014.
In favor of Thiru R.AMBALATHARASU,KEERAMANGALAM,Aranthangi
Taluk,Pudukkottai Dist,towards compensation of Tree/Crop of 110 KV LIlo
line from Nagudy-Peravurani @ proposed Keeramangalam 110/11 KV SS.

Witness:-

Hand Receipt
Recived for Rs. 25,440/- Vide cheque No. 972235 Dated
21.03.2014.
In favor of Thiru C.CHELLADURAI,THOLAGIRIPATTY,towards compensation
of
Tree/Crop of 110 KV line Punakulam to Anna sugar mill at Kurunkulam.

Hand Receipt

Recived for Rs.36,000/- Vide cheque No. 972237 Dated


21.03.2014.
In favor of Thiru R .KARUPPASAMY,THOLAGIRIPATTY,towards compensation
of
Tree/Crop of 110 KV line Punakulam to Anna sugar mill at Kurunkulam.

Hand Receipt

Recived for Rs.36,000/- Vide cheque No. 972237 Dated


21.03.2014.
In favor of Thiru R .KARUPPASAMY,THOLAGIRIPATTY,towards compensation
of
Tree/Crop of 110 KV line Punakulam to Anna sugar mill at Kurunkulam.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Work bill/D.23/14 Dated 08.5.2014.


Sir,
Sub:-Works:- Tree/crop Compensation Proposal –submission of -Reg.
.
######
I here with submitted the 15 Nos (Fifteen) Nos Tree/crop
compensation proposal
for Erection of 110 KV DC line @ Mazhaiur 110/22 KV SS. Along with MED
forms and statement ,this is for favor of further action please.

Encl:- MED forms&


Statement in duplicate.
Assistant
Executive Engineer,

TLC/Pudukkottai.
TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Work bill/D.12/14 Dated 07.04.2014.


Sir,
Sub:-Works:- Tree/crop Compensation Proposal –submission of -Reg.
.
######
I here with submitted the 15 Nos (Fifteen) Nos Tree/crop
compensation proposal
for Erection of 110 KV DC line @ Mazhaiur 110/22 KV SS. Along with MED
forms and statement ,this is for favor of further action please.

Encl:- MED forms&


Statement in duplicate.

Assistant Executive Engineer,

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Worksl/D.10/14 Dated 15.04.2014.


Sir,
Sub:-110 KV LILO line from Nagudy-Peravurani 110 KV SC line to
Proposed Keeramangalam 110 /11 KV SS-Complection
certificate-
Requested-Reg.

Ref:-1) K2 Agt.No. 81,82,83 &84 SE/2013-2014.


2) M/S Teems India Tower lines Pvt, Ltd. Chennai’s
Lr.Dated April 2014.
##########
I herewith submit the work complection certificate performa for
the above work
under cited reference ,This for favor of further action please.
Encl:-Work complection certificate performa,
Ref 2 Letter

Assistant Executive Engineer,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.
Lr.No.AEE/TLC/PDKT/F.Works/D.10/14 Dated 15.04.2014.
Sir,
Sub:-110 KV LILO line from Nagudy-Peravurani 110 KV SC line to
Proposed Keeramangalam 110 /11 KV SS-Complection
certificate-
Requested-Reg.
Ref:-1) K2 Agt.No. 81,82,83 &84 SE/2013-2014.
2) M/S Teems India Tower lines Pvt, Ltd. Chennai’s
Lr.Dated April 2014.
##########
I herewith submit the work complection certificate performa for
the above work
under cited reference ,This for favor of further action please.

Encl:-Work complection certificate performa,


Ref 2 Letter

Assistant Executive Engineer,

TLC/Pudukkottai

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Bills//D.21/14 Dated 05.05.2014.


Sir,
Sub:- Vehicle-TN 55 AB 1390-CC IX th&part bill(04/14)-Sub of-
Reg.
Ref:- K2 Agt.No.24 SE/13-14.
#####

I here with submit the CC IX & Part for the above work for an
amount of Rs.28,491/-
along with M Book 9423,copy of bill and statement in triplicate for the
month of 04/14 for favor of further action please.

Encl:-M book 9423,bill copy &


Statement in triplicate :-1 Set.
Assistant
Executive Engineer ,

TLC/Pudukkottai.

TANTRANSCO
FROM, TO,
Er.K.Srinivasan,B.E., The Executive
Engineer,
Assistant Executive Engineer, TLC/Trichy-20.
TLC/Pudukkottai.

Lr.No.AEE/TLC/PDKT/F.Bills/14/D.21/14 Dated 05.05.2014.


Sir,
Sub:- Vehicle-TN 55 AB 1390-CC IX th&part bill (04/14)-Sub of-
Reg.
Ref:- K2 Agt.No.24 SE/13-14.
#####

I here with submit the CC IX & Part for the above work for an
amount of Rs.28,491/-
along with M Book 9423,copy of bill and statement in triplicate for the
month of 04/14 for favor of further action please.
Encl:-M book 9423,bill copy &
Statement in triplicate :-1 Set.
Assistant
Executive Engineer ,

TLC/Pudukkottai.

CERTIFICATES:-
1. Certified that this HR has not been claimed and paid before.
2. Certified that the work was commenced on and
completed on.
3. Certified that the final bill passed and paid.
4. Certified that the SD amount for this work towards Bank Guarantee
by the contractor.

Assistant Executive Engineer

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Superintending Engineer
Assistant Executive Engineer, GCC/,
Transmission Line Construction ,Mannarpuram,
Pudukkottai. Trichy – 620 020.

Lr.No:- AEE/TLC /PDKT/F.Work order closing//D.No:- 249 /2014 Date:-


18.03.2014.
Sir,
Sub:-Work order closing --submission of –Reg.

Ref:- 1.W.O.No.14.642/S10(06-07)/01 of 2012-13


2.W.O.No.43.6/S.70/07/12-13.
--------
I submit here with the closed work order for the following
works for favour of further
action please.

1. Extension of control room building and construction of AE room and stor


room for introduction
of 110/11 KV SS @ Aliyanilai.
(W.O.No.14.642/S10(06-07)/01 of 2012-13)

2. Nagudi-Peravoorani 110 KV sc line on DC towers stringing of panther


conductor and earthwire
Hoisting of insulator and providing special earthing arrangement for railwa
tower in between
Loc52 & 53 for Railway track between Peravoorani & Aayankudy Junction @
Km 140/700-800.

(W.O.No.43.6/S.70/07/12-13.)

Encl:-_Closed Work order:-2 Nos.

ASSISTANT EXECUTIVE ENGINEER,


TLC /PUDUKKOTTAI.

.
Copy Submitted to the Executive ngineer/TLC/Trichy. .
TANTRANSCO

From To
Er.K.SRINIVASAN,B.E., The Assistant Executive Engineer
Assistant Executive Engineer, Civil/PEDC,
Transmission Line Construction Pudukkottai
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F.Mazhaiyur 110/22 KV SS/D.No:- 251 /2014 Date:-
20.3.2014.
Sir,
Sub:-Establish-Mazhaiyur 110 /22 KV SS-Demarcation of boundaries-
Requested-–Reg.

Ref:- BP No.(Per)FB.TANTRANSCO Proceedings No.29 Dated


28.06.2012.

#####
The Mazhaiyur 110/22 KV SS was commissioned on 15.03.2014
(Test charge)
At the time fencing works are not completed in full shape, due to the non availability of
boundary stone
at Eastern side and North Eastern side (missing).

Hence I request that,may kindly be make necessary arrangeme


to provide
Boundary stones in all sides of boundaries ,to make fencing along the boundry, as early
please.

ASSISTANT EXECUTIVE ENGINEER,


TLC /PUDUKKOTTAI.

Encl:-Mazhaiyur Land Drawing(S.F.No.68-1,&70-7) :-1 No.


TANTRANSCO

From To
Er.K.SRINIVASAN,B.E., The Superientending Engineer
Assistant Executive Engineer, GCC(AEE/MM)
Transmission Line Construction Trichy.20.
Pudukkottai.
Through proper channel

Lr.No:- AEE/TLC /PDKT/F Furniture Estimates /D.No46 /15 Date:- 18.5.15.


Sir,

Sub:- T&P:-Estimates-Submission of –Reg.

. Ref:- 1.BP(Per) FB TANTRANSCO Proceedings No.29 dated28.6.12.


2 (Per) CH TANTRANSCO Proceedings No.76 dated20.5.2013
3 (Per) CH TANTRANSCO Proceedings No.92 dated04.10.14.

#######

I submit here with the Furniture estimate in triplicate for the


following 110 KV SS.
This is for favour of further action please.
1. Providing furniture arrangements for 110/11 KV SS @ Keeramangalam.
2. Providing furniture arrangements for 110/22 KV SS @ Mazhaiyur
3. Providing furniture arrangements for 110/22 KV SS @ Pudukootai Urban.

Assistant Exeutive
Engineer,
TLC/Pudukkottai.
Encl:- Estimate in triplicate:-3 Sets.
Copy submitted to the Executive Engineer/TLC/Trichy for kind information please.

TANTRANSCO

From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC/Trichy-2,
Transmission Line Construction
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Kurunkulam tree/crop comp/D.No:-12/2014 Date:-
16.4.2014.
Sir,
Sub:- Tree/Crop Compensation –Erection of 110 KV line Punakulam to
Anna sugar miil at Kurunkulam-Paid Hand receipt- Sub of –Reg
#######

I submit here with the 3 Nos.(Three) paid hand receipt ,towar


the tree/crop
compensation for the above said line. This is for favour of further action
please.

Assistant Exeutive
Engineer,
TLC/Pudukkottai.
Encl:- 3 Nos(Three).Paid H.R.
TANTRANSCO

From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC/Trichy-20,
Transmission Line Construction
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Kurunkulam tree/crop comp/D.No:-12/2014 Date:-
16.4.2014.
Sir,
Sub:- Tree/Crop Compensation –Erection of 110 KV line Punakulam to
Anna sugar miil at Kurunkulam-Paid Hand receipt- Sub of –Reg
#######

I submit here with the 3 Nos.(Three) paid hand receipt ,towar


the tree/crop
compensation for the above said line. This is for favour of further action
please.

Assistant Exeutive
Engineer,
TLC/Pudukkottai.
Encl:- 3 Nos(Three).Paid H.R.

REPORT ACCOMPANY THE ESTIMATE

Name of Work:-Providing furniture for the usage of New 110/11 KV Sub


Station @
Keeramangalam 110/ 11KV SS.

This estimate provides for providing furniture’s for the


usages of new
110/11 KV SS at Keeramangalam. Necessary approval has been accorded
vide BP
(Per) FB TANTRANSCO Proceedings No.29 dated28.6.12.Since the Sub
Station was
Commissioned on 23.1.2014.It is essentially required to the usage of
substation.
Hence this estimate has been preparedand submitted.

The rates adopted in this estimate are previous


sanctioned estimate,and
also prevailing local market rates.

Name of Work:-Providing furniture for the usage of New 110/11


KV Sub Station @
Keeramangalam 110/11 KV SS.

Supply of furnitures manufacture by


'TANSI' or any other ISI mark
1. Qty Per including cost of all materials, labour, Rate Per Amount
lead and lift etc., complete.

a 2.00 Nos Steel side rack open type 1100x400x1200 1730.00 Each 3460.00

b 2.00 Nos Steel half bench 1200x400x600mm 975.00 Each 1950.00


c 3.00 Nos Nylon seated S type chair 1500.00 Each 4500.00
d 3.00 Nos steel stool 350.00 Each 1050.00
e 2.00 Nos SC table 540.00 Each 1080.00
Sub total 12040.00
Service tax @ 5% 602.00
Transport charges@10% 1204.00
Contingencies and unforseen items
602.00
5%
TOTAL 14448.00
Or say 14500.00

(Rupees Forteen thousands and five hundred only)

Assistant
Executive Engineer,

TLC/Pudukkottai.

REPORT ACCOMPANY THE ESTIMATE

Name of Work:-Providing furniture for the usage of New 110/11 KV Sub


Station @
Mazhaiyur 110/22 KV SS.

This estimate provides for providing furniture’s for the


usages of new
110/22 KV SS at Mazhaiyur. Necessary approval has been accorded vide
(Per) CH TANTRANSCO Proceedings No.76 dated20.5.2013.Since the Sub
Station was
Commissioned on 23.1.2014.It is essentially required to the usage of
substation.
Hence this estimate has been preparedand submitted.

The rates adopted in this estimate are previous


sanctioned estimate,and
also prevailing local market rates.

Name of Work:-Providing furniture for the usage of New 110/11


KV Sub Station @
Mazhaiyur 110/22 KV SS.

Supply of furnitures manufacture by


'TANSI' or any other ISI mark
*1. Qty Per including cost of all materials, labour, Rate Per Amount
lead and lift etc., complete.

a 2.00 Nos Steel side rack open type 1100x400x1200 1730.00 Each 3460.00

b 2.00 Nos Steel half bench 1200x400x600mm 975.00 Each 1950.00


c 3.00 Nos Nylon seated S type chair 1500.00 Each 4500.00
d 3.00 Nos steel stool 350.00 Each 1050.00
e 2.00 Nos SC table 540.00 Each 1080.00
Sub total 12040.00
Service tax @ 5% 602.00
Transport charges@10% 1204.00
Contingencies and unforseen items
602.00
5%
TOTAL 14448.00
Or say 14500.00

(Rupees Forteen thousands and five hundred only)

Assistant
Executive Engineer,

TLC/Pudukkottai.

REPORT ACCOMPANY THE ESTIMATE

Name of Work:-Providing furniture for the usage of New 110/11 KV Sub


Station @
Mazhaiyur 110/22 KV SS.

This estimate provides for providing furniture’s for the


usages of new
110/22 KV SS at Mazhaiyur. Necessary approval has been accorded vide
(Per) CH TANTRANSCO Proceedings No.92dated04.10.14.Since the Sub
Station was
Commissioned on 30.3.15..It is essentially required to the usage of
substation.
Hence this estimate has been preparedand submitted.

The rates adopted in this estimate are previous


sanctioned estimate,and
also prevailing local market rates.

Name of Work:-Providing furniture for the usage of New 110/11


KV Sub Station @
Pudukkottai 110/22 KV Urban SS.

Supply of furnitures manufacture by


'TANSI' or any other ISI mark
*1. Qty Per including cost of all materials, labour, Rate Per Amount
lead and lift etc., complete.

a 2.00 Nos Steel side rack open type 1100x400x1200 1730.00 Each 3460.00

b 2.00 Nos Steel half bench 1200x400x600mm 975.00 Each 1950.00


c 3.00 Nos Nylon seated S type chair 1500.00 Each 4500.00
d 3.00 Nos steel stool 350.00 Each 1050.00
e 2.00 Nos SC table 540.00 Each 1080.00
Sub total 12040.00
Service tax @ 5% 602.00
Transport charges@10% 1204.00
Contingencies and unforseen items
602.00
5%
TOTAL 14448.00
Or say 14500.00

(Rupees Forteen thousands and five hundred only)

Assistant
Executive Engineer,
TLC/Pudukkottai.

TANTRANSCO
From To,
Er.M. Soundharrajan, B.E., The Branch Manager,
Superintending Engineer, Cannara Bank,
General Construction Circle, Railway Junction Branch
Trichy-20. Trichy-1

Lr.No.SE/GCC/TRY/AAO/F.Bill/D. /15 Dated. .11.2015.


Sir,

Sub :-Earth work excavation, stub setting, concreting, and supply and erection of tower
Loc 1-4 and stringing of conductor and earthwire from take off and loc 1 -4 LILO of
110 KV DC line on DC towers from existing 230 KV Pudukkottai to Sipcot
Pudukkottai
110 KV SS (Reach-I)
.

Ref :-K2 Agt.No.048 SE/2015-2016.


Contractor’s letter No bill Dt.

As per the above reference CC Ist & Part bill for Rs.33,13,668/- /(Rupees Thirty
three laksh
Thirteen thousand six hundred and sixty eight only) received in favor of Thiru M.S.
Gannam,Thanjavurl.

For the above said work the bill amount details.

Gross Amount ;-Rs. 33,13,668/-


Nett Amount :-Rs. 30,72,515/-

The Nett amount of Rs. 30,72,515 /-is eligible for payment to the contractor.
SUPERINTENDING ENGINEER,
GCC/TRICHY-20.

Copy to APS-II
Copy to Thiru , M.S. Gannam, contractor, Thanjavur.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Assistant Executive Engineer
Assistant Executive Engineer, Telecom Department,
Transmission Line Construction Aranthangi.
Pudukkottai.(9442502244)
Lr.No:- AEE/TLC /PDKT/F Inspection/D.No:-40/2014 Date:- 10.6.2014.
Sir,
Sub:- 110 KV line –110 LILO ofNagudi- Peravurani 110 KV SC line to
Proposed Keeramangalam 110/11KV SS-Join inspection –
Requested-Reg.

The 110 KV LILO line from Nagudi-Peravurani 110 KV SC line to


Proposed
Keeramangalam 110 /11 KV Sub Station . The line works were completed
in all respects.

You are requested to intimate your convenient date for joint


inspection for the
above line,for getting energisation approval from your department.

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy submitted to,


The Superintending Engineer/GCC/Trichy.
The Executive Engineer/TLC/Trichy.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Assistant Executive Engineer
Assistant Executive Engineer, Telecom Department,
Transmission Line Construction Pudukkottai. .
Pudukkottai.(9442502244).

Lr.No:- AEE/TLC /PDKT/F Inspection/D.No:-41/2014 Date:- 10.6.2014.


Sir,
Sub:- 110 KV line –110 LILO of Alangudi- Karambakudi 110 KV SC line to
Proposed Malaiyur 110/22 KV SS-Join inspection –Requested-Reg.

The 110 KV LILO line from Alangudi- Karambakudi 110 KV SC


line to Proposed
Maliyur 110 /11 KV Sub Station . The line works were completed in all
respects.

You are requested to intimate your convenient date for joint


inspection for the above
line,for getting energisation approval from your department.

Assistant Executive
Engineer,

TLC/Pudukkottai.

Copy submitted to,


The Superintending Engineer/GCC/Trichy.
The Executive Engineer/TLC/Trichy.
HAND RECEIPT

Infavour of Thiru,T.Karuppaiya,
S/O,Thangaiya,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.33,900/-
(Rupees Thirty three thousand nine hundred only) towards the payment made for
damages of Tree/Crop compensation of Cholam-630 sqm.Coconut trees-6 Nos,for the
erection of 110 KV LILO line from alungudy-Karambakudi 110 KV SC line @ Mazhaiyur
110/22 KV SS.
(Loc;-1-2,S.F.No.:-160-1,2)

Signature of the
payee

Dated:-
Page No. :- 09 Of Mbook:-9552
Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,
TLC/Pudukkottai.

HAND RECEIPT

Infavour of Thiru,S.Selvanathan,
S/O,Sennathambi plugi,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.33,200/-
(Rupees Thirty three thousand two hundred only) towards the payment made for
damages of Tree/Crop compensation of Cholam-840 sqm.& Teak trees-4 Nos,for the
erection of 110 KV LILO line from alungudy-Karambakudi 110 KV SC line @ Mazhaiyur
110/22 KV SS.
( Loc 1-2 &S.F.No.:-98-2B)

Signature of the
payee

Dated:-
Page No. :- 10 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.

HAND RECEIPT

Infavour of Thiru,A.Mani,
S/O,Aadimulam,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.34,160/-
(Rupees Thirty four thousand one hundred and sixty only) towards the payment made
for damages of Tree/Crop compensation of Mango trees 8 Nos,Ucliptus 180 Nos & jack
fruit trees 4 Nos.,for the erection of 110 KV LILO line from alungudy-Karambakudi 110
KV SC line @ Mazhaiyur 110/22 KV SS.
(Loc2-3 & S.F.no.:-4-49/1B)

Signature of the
payee
Dated:-
Page No. :- 11 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.

HAND RECEIPT

Infavour of Thiru,P. Rengan,


S/O,Periyasamy
Kugaipliyan kollai,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.60,000/-
(Rupees Sixty thousand only) towards the payment made for Damages ofTree/Crop
compensation of Mango trees 4 Nos,Teak 4 Nos.Cholam-800 sqm.& Jack fruit 6 Nos
Nos ,for the erection of 110 KV LILO line from alungudy-Karambakudi 110 KV SC line @
Mazhaiyur 110/22 KV SS.
(Loc 3-4,& S.F.No.122-2A,127-2B)
Signature of the
payee

Dated:-
Page No. :- 12 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.

HAND RECEIPT

Infavour of Thiru,P.Ramasamy,,
S/O Periyasamy,
Kunaipliyan kollai,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.27,000/-
(Rupees Twenty seven thousand only) towards the payment made for damages of
Tree/Crop compensation of Teak 6 Nos &.Coconut trees-6 Nos,for the erection of 110
KV LILO line from alungudy-Karambakudi 110 KV SC line @ Mazhaiyur 110/22 KV SS.
( Loc 4-5 & S.F.No.6-1B4)

Signature of the
payee

Dated:-
Page No. :- 13 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.
HAND RECEIPT

Infavour of Thiru,R.Arumugam,
S/O, Raman Ambalam,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.30,500/-
(Rupees Thirty thousand five hundred only) towards the payment made for damages
of Tree/Crop compensation of Cholam-350 sqm.&Coconut trees-8 Nos,for the erection
of 110 KV LILO line from alungudy-Karambakudi 110 KV SC line @ Mazhaiyur 110/22
KV SS.
(Loc 5-6 & S.F.No.6- 1B5)

Signature of the
payee

Dated:-
Page No. :- 14 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.
HAND RECEIPT

Infavour of Thiru,V.Ramakonar,
S/O, Veeramuthu konar,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.30,920/-
(Rupees Thirty thousand nine hundred and twenty only) towards the payment made
for damages of Tree/Crop compensation of .Coconut trees-10 Nos, Ucliptus 160 Nos, &
Teak 2 Nos for the erection of 110 KV LILO line from a Alungudy-Karambakudi 110 KV
SC line @ Mazhaiyur 110/22 KV SS.
(Loc6-7 & S.F.No 75-1B)

Signature of the
payee

Dated:-
Page No. :- 15 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.
Assistant Executive
Engineer,

TLC/Pudukkottai.

HAND RECEIPT

Infavour of Thiru,S.Sivakumar,
S/O, Selvanathan,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.33,900/-
(Rupees Thirty three thousand nine hundred only) towards the payment made for
damages of Tree/Crop compensation of Cholam-630 sqm.Coconut trees-6 Nos,for the
erection of 110 KV LILO line from alungudy-Karambakudi 110 KV SC line @ Mazhaiyur
110/22 KV SS.
(Loc 7-8 & S.F.No.114/1A,2A,3A,4A&6A)

Signature of the
payee

Dated:-
Page No. :- 16 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.

HAND RECEIPT

Infavour of Tmty, K.Valliyammal ,


W/o,Karruppaiya,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.27,750/-
(Rupees Twenty seven thousand seven hundred and fifty only) towards the payment
made for damages of Tree/Crop compensation of Cholam-525 sqm.Mango trees-4
Nos,for the erection of 110 KV LILO line from Alungudy-Karambakudi 110 KV SC line @
Mazhaiyur 110/22 KV SS.
(Loc 8-9,& S.F.No.74-9)
Signature of the
payee

Dated:-
Page No. :- 17 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.

HAND RECEIPT

Infavour of Thiru,K.Kaliyamoorthy,
S/O,Kulanthian
Kelamazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.30,800/-
(Rupees Thirty thousand eight hundred only) towards the payment made for
damages of Tree/Crop compensation of Cholam-360 sqm.Coconut trees-8 Nos,for the
erection of 110 KV LILO line from Alungudy-Karambakudi 110 KV SC line @ Mazhaiyur
110/22 KV SS.
(Loc 9-10,S.F.No.72-4C)

Signature of the
payee

Dated:-
Page No. :- 18 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.

HAND RECEIPT

Infavour of Thiru,S.Selvaraj,
S/O, Sivagami plugi,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.30,500/-
(Rupees Thirty thousand five hundred only) towards the payment made fordamages
of Tree/Crop compensation of Cholam-600 sqm.Coconut trees-5 Nos,for the erection
of 110 KV LILO line from alungudy-Karambakudi 110 KV SC line @ Mazhaiyur 110/22
KV SS.
(Loc 10-11 & S.F.No.97/7)

Signature of the
payee

Dated:-
Page No. :- 19 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.
HAND RECEIPT

Infavour of Thiru,V.Venkadachalam,,
S/O,Velusamy,
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.29,400/-
(Rupees Twenty nine thousand four hundred only) towards the payment made for
damages of Tree/Crop compensation of Cholam-560 sqm. Neem trees-4 Nos,& Tamarid
tree 4 Nos,for the erection of 110 KV LILO line from alungudy-Karambakudi 110 KV SC
line @ Mazhaiyur 110/22 KV SS.
(loc 10-11 &S.F.No.5-1A4,1B)

Signature of the
payee

Dated:-
Page No. :- 20 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,
TLC/Pudukkottai.

HAND RECEIPT

Infavour of ThiruM.Balasubramanian,,
S/O,Muthiya,
kukaipulian kullai
Mazhaiyur,Pudukkottai Dt.

Received from The Superintending Engineer/GCC/Trichy the sum of


RS.28,000/-
(Rupees Twenty eight thousand only) towards the payment made for damages of
Tree/Crop compensation ofsugar cane 400 sqm.Coconut trees-8 Nos,for the erection of
110 KV LILO line from alungudy-Karambakudi 110 KV SC line @ Mazhaiyur 110/22 KV
SS.
(Loc 11-12 &S.F.No.139-1,2)

Signature of the
payee
Dated:-
Page No. :- 21 Of Mbook:-9552

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.

HAND RECEIPT

Infavour of Thiru P.Kumaresan,,


S/O, Palaniyandi
Paravan kollai
Mazhaiyur,Pudukkottai Dt.

Received from The Executive Engineer/TLC/Trichy the sum of


RS.23,260/-
(Rupees Twenty three thousand two hundred and sixty only) towards the payment
made for damages of Tree/Crop compensation of sugar cane 490 sqm,Coconut trees-5
Nos &Ucliptus 80 Nos,for the erection of 110 KV LILO line from Alungudy-Karambakudi
110 KV SC line @ Mazhaiyur 110/22 KV SS.
(Loc 9-10 & S.F.No73-14).
Signature of the
payee

Dated:-
Page No. :- 97 Of Mbook:-8311

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.

HAND RECEIPT

Infavour of ThiruC.Rengasamy,,
S/O, Chidambaram
Vagipliyan kollai
Mazhaiyur,Pudukkottai Dt.

Received from The Executive Engineer/TLC/Trichy the sum of


RS.23,650/-
(Rupees Twenty three thousand six hundred and fifty only) towards the payment
made for damages of Tree/Crop compensation of jack fruit tree 5 Nos.Cholam-455
sqm.for the erection of 110 KV LILO line from Alungudy-Karambakudi 110 KV SC line @
Mazhaiyur 110/22 KV SS.
(Loc11-12 & S.F.No.124/2,3,4 7127/1A,3B)

Signature of the
payee

Dated:-
Page No. :- 98 Of Mbook:-8311

Certificates:-
1). Certified that this H R has not been claimed and paid before,
2). Certified that the rates are reasonable and approved by SE/GCC/Trichy vide
Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV line Tree/Crop
Compensation/
D..601/14 Dt.02.8.14.
3). Certified that the amount chargeable in to W.O.No.14.53.4/S.117/05/13-14.

Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO
From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC/Trichy-20,
Transmission Line Construction
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Mazhaiyur tree/crop comp/D.No:-90/2014 Date:-
30.8.2014.
Sir,
Sub:- Tree/Crop Compensation –Erection of 110 KVLILO line from
Alungdy –
Karambakudi 110 KV SC line @ proposed Mazhiyur 110/22 KV S
- Hand receipt- Sub of –Reg
Ref:- Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV
line
Tree/Crop Compensation/ D..601/14 Dt.02.8.14.

#######
I herewith submit Hand Receipt 15 Nos (13+2)regarding tree/crop
compensation for the above said line alongwith MED, MBook entries (SECA
9251&9169) for favor of further action please.

Encl:-Mbooks9251,9169,with HR-15 Nos.


Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO

From To
Er.K.SRINIVASAN,B.E., The Executive Engineer
Assistant Executive Engineer, TLC/Trichy-20,
Transmission Line Construction
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F Mazhaiyur tree/crop comp/D.No:-90/2014 Date:-
30.8.2014.
Sir,
Sub:- Tree/Crop Compensation –Erection of 110 KVLILO line from
Alungdy –
Karambakudi 110 KV SC line @ proposed Mazhiyur 110/22 KV S
- Hand receipt- Sub of –Reg
Ref:- Memo No.SE/GCC/TRY/AEE/GL/DB/AE-C/F.Mazhaiyur 110 KV
line
Tree/Crop Compensation/ D..601/14 Dt.02.8.14.

#######
I herewith submit Hand Receipt 15 Nos (13+2)regarding tree/crop
compensation for the above said line alongwith MED, MBook entries (SECA
9552&8311) for favor of further action please.

Encl:-Mbooks9552,8311,with HR-15 Nos.


Assistant Executive
Engineer,

TLC/Pudukkottai.

TANTRANSCO

From To
Er.K.SRINIVASAN,B.E., The Project Director,
Assistant Executive Engineer, NHAI,
Transmission Line Construction Karaikudi.
Pudukkottai.
Lr.No:- AEE/TLC /PDKT/F KM 49/855/D.No:-91/2014 Date:- 30.8.2014.
Sir,
Sub:- Trichy-Rameswaram KM 49/855-Providing towers for vertical
clearance
Of 66 KV line @ loc 306 &308-ROW problem-sloving-Requested-
Reg.
Ref:-

#######

With reference to the above, you are solve the ROW problem and ident
the alternate land
for provide tower @ loc 306. 1 No. Tower leg which is foul near the road , it is
very dangerous
to traffic it is not satisfied at our side. The location sketch is enclosed herewit

We are suggested that to select another suitable land for laying towe
away from the Road
Side or otherwise you are requested to given approval for laying tower has
already identify land
by you.

I request that may kindly be favorable reply as early please.


Encl:- Sketch—1 No.

Assistant
Executive Engineer,

TLC/Pudukkottai.
Copy submitted to,
The Superintending Engineer/GCC/Trichy.
The Executive Engineer/TLC/Trichy

Anda mungkin juga menyukai