CALCULATING OEE WORKSHEET

Overall Equipment Effectiveness


Line / Cell :
Process : OEE
Machine :
Date :
79.1%
OEE DATA
Shift Length (Minutes) : 1080
Number of Shift(s) : 3
Short Breaks per Shift (Minutes) : Each (Minutes) : Nb : Total : 0
Meal Break per Shift (Minutes) : Each (Minutes) : 30 Nb : 3 Total : 90
Down Time (Minutes) :
Ideal Rate : (Pieces/Hour) : 17 (Pieces/Minute) : 0.28
Total Pieces Produced per Shift : 230
Rejected Pieces per Shift : 8

OEE VARIABLES CALCULATION


Planned Production Time (Minutes) : 2970
Operating Time (Minutes) : 2970
Good Pieces per Shift : 222

OEE FACTORS CALCULATION


Availability 100.0% 90.0%
Performance 82.0% 95.0%
Quality 96.5% 99.9%
Overall OEE 79.1% 85.4%

120.0%
Calculated Factor World Class
100.0%

80.0%

60.0%

40.0%

20.0%

0.0%
Availability Performance Quality Overall OEE
Rate

File : 408579711.xls
Form Release : 1.10 US
Copyright © 2004-2008 - Philippe Magnier
0.0%
Availability Performance Quality Overall OEE
Rate

File : 408579711.xls
Form Release : 1.10 US
Copyright © 2004-2008 - Philippe Magnier
165
82.5

Anda mungkin juga menyukai