Name of the Firm CENTRAL ENGINEERING CONSULTANCY BUREAU CECB

Name and Address of Client: Bank of Ceylon


Colombo 1

Assignment Name: Refurbishment of BOC Head Office Building

Approx. value of the contract: LKR 65.0.Mn Duration of assignment 22 Months


(months):

Location: Colombo Total No: of staff-months of the XXX


assignment:

No: of professional staff-months XXX Approx. value of the services LKR 5.20Mn
provided by you: provided by firm:

Start date (month/year): 10/08/18 Completion date (month/year): 08/06/20

Name of associated Consultants, if No of Months of Professional


any: Staff Provided by Associated
Consultant:
Name of senior professional staff Draughtsman-B.H Kumari
of your firm involved and Mechanical Engineer-B.A.A.I Karunasena
functions performed. AGM(E&M)-Eng. G.A.D.L.J Seneviratne
DGM(Mechanical-2))-Eng. M.S Fernando

Narrative description of Project:

Replacement of the existing conventional fire detection and alarm system with an addressable system

Description of actual services provided by your staff within the assignment:

Design, Preparation of Bidding Documents, Contract Administration

AGM Division – Electro Mechanical (C1426) DGM Division – DGM-Mechanical 2