PERHITUNGAN

STRUKTUR
RUMAH KACA (1) – JALAN TITIAN

SAMPIT
2018
•••

DAFTAR ISI

PERATURAN DAN STANDAR PERENCANAAN .................................................................. 2


STRUKTUR BANGUNAN ...................................................................................................... 3
1. DESKRIPSI BANGUNAN ......................................................................................... 3
2. DATA TEKNIS .......................................................................................................... 3
3. DATA BEBAN ........................................................................................................... 3
4. PERMODELAN ........................................................................................................ 4
2. PEMBEBANAN ........................................................................................................ 5
HASIL ANALISA .................................................................................................................... 7
1. GAYA-GAYA DALAM ............................................................................................... 7
2. DISPLACEMENT...................................................................................................... 8
3. REAKSI PERLETAKAN............................................................................................ 9
DESAIN PROFIL BAJA ....................................................................................................... 10
1. DESAIN BALOK ..................................................................................................... 10
2. DESAIN KOLOM .................................................................................................... 13
DESAIN BASE PLATE ........................................................................................................ 15
DESAIN SAMBUNGAN ....................................................................................................... 21
DESAIN PLAT LANTAI ........................................................................................................ 25
DESAIN PONDASI .............................................................................................................. 31
1. PERHITUNGAN PONDASI F1 ............................................................................... 31
2. PERHITUNGAN PONDASI F2 ............................................................................... 36

1
•••

PERATURAN DAN STANDAR PERENCANAAN

1. SNI 03-1727-1989/SKBI-1.3.53.1987, Tata Cara Perencanaan Pembebanan Untuk


Rumah dan Gedung, Badan Standardisasi Nasional

2. SNI 03 - 1729 – 2002, Tata Cara Perencanaan Struktur Baja untuk Bangunan
Gedung, Dep. Pekerjaan Umum RI

3. SK SNI 03 - xxxx – 2002, Tata Cara Perhitungan Struktur Beton untuk Bangunan
Gedung , Badan Standardisasi Nasional

4. SNI 03-1726-2002, Tata Cara Perencanaan Ketahanan Gempa untuk Bangunan


Gedung, Badan Standardisasi Nasional

5. SNI 07-2052-2002 , Baja Tulangan Beton, Badan Standardisasi Nasional

6. Laporan Penyelidikan Tanah (Sondir) Pekerjaan Pembuatan DED Kebun Raya


Tahap I, 2018, CV. Borneo Geotec Engineering, Palangka Raya.

2
•••

STRUKTUR BANGUNAN

1. DESKRIPSI BANGUNAN
Terlampir

2. DATA TEKNIS
Mutu baja profil BJ37 fy = 240 Mpa
Mutu beton K-225 fc’ = 19.3 Mpa
Mutu tulangan baja polos (SR 24) fy = 235 Mpa
Mutu tulangan baja deform (SD40) fy = 395 Mpa
Bahan struktur sekunder ;
- Jenis penutup lantai = keramik
- Konstruksi rangka = baja profil
- Konstruksi lantai = plat bondeks

3. DATA BEBAN
1. Beban Mati (D)
Berat beton bertulang = 2500 kg/m3
Berat baja = 7800 kg/m3
Berat instalasi pagar (asumsi) = 20 kg/m’

2. Beban Hidup (L)


Beban hidup lantai = 300 kg/m2

3. Kombinasi Pembebanan
Struktur dan komponen struktur direncanakan hingga semua penampang
mempunyai kuat rencana minimum sama dengan kuat perlu, yang dihitung
berdasarkan kombinasi beban dan gaya terfaktor sebagai berikut :

U = 1,2 D + 1,6 L .................................... COMB1

3
•••

4. PERMODELAN

Layout balok dan perletakan

4
•••

2. PEMBEBANAN
1. BEBAN MATI (DL )
- Berat sendiri plat lantai kN/m3 24 0.1 1 1 2.400 kN/m2
2 2
- Berat penutup lantai keramik kN/m 0.24 1 1 1 0.240 kN/m
- Berat spesi penutup lantai kN/m2 0.21 2 1 1 0.420 kN/m2
' '
- Berat instalasi pagar kN/m 0.200 1 1 #REF! 0.200 kN/m

2. BEBAN HIDUP (LL )


2
- Beban hidup lantai 300 kg/m
2
- Beban hidup lantai kN/m 3 1 #REF! 3.0 kN/m'

Layout beban mati DL (satuan : kN)

5
•••

Layout beban hidup LL (satuan : kN, m)

6
•••

HASIL ANALISA

1. GAYA-GAYA DALAM

Bidang Momen akibat beban ultimit (satuan : N, mm)

Bidang Geser akibat beban ultimit (satuan : N, mm)

7
•••

Bidang Axial akibat beban ultimit (satuan : N, mm)

2. DISPLACEMENT

Displacement akibat beban COMB1 , U3 max = 8.0608 mm

8
•••

3. REAKSI PERLETAKAN

Gaya reaksi akibat bebanultimit (satuan : kN,m)

9
•••

DESAIN PROFIL BAJA


1. DESAIN BALOK
A. DATA BAHAN
Tegangan leleh baja (yield stress ), fy = 240 MPa
Tegangan sisa (residual stress ), fr = 70 MPa
Modulus elastik baja (modulus of elasticity ), E= 200000 MPa
Angka Poisson (Poisson's ratio ), u= 0.3

B. DATA PROFIL BAJA


Profil : WF150.100
ht = 148 mm

tf bf = 100 mm
tw = 6 mm
tf = 9 mm
tw r=
h h2 ht 11 mm
2
A= 2684 mm
4
I x = 10200000 mm
4
I y = 1510000 mm
r
h1 rx = 6.17 mm
ry = 2.37 mm
bf 3
Sx = 1380000 mm
3
Sy = 301000 mm
Berat : w= 211 N/m

BEAM COLUMN (RAFTER) TANPA PENGAKU BADAN

10
•••

C. DATA BALOK
Panjang elemen thd.sb. x, Lx = 60000 mm
Panjang elemen thd.sb. y ( jarak dukungan lateral ), Ly = 20000 mm
Momen maksimum akibat beban terfaktor, Mu = 10886713.2 Nmm
Momen pada 1/4 bentang, MA = 2721678 Nmm
Momen di tengah bentang, MB = 4979911 Nmm
Momen pada 3/4 bentang, MC = 2721678 Nmm
Gaya aksial akibat beban terfaktor, Nu = 421 N
Gaya geser akibat beban terfaktor, Vu = 15789 N
Faktor reduksi kekuatan untuk aksial tekan, fn = 0.85
Faktor reduksi kekuatan untuk lentur, fb = 0.90
Faktor reduksi kekuatan untuk geser, ff = 0.75

D. SECTION PROPERTIES
G = E / [ 2 *( 1 + u ) ] = 76923 MPa
h1 = tf + r = 20.00 mm
h2 = ht - 2 * h1 = 108.00 mm
h = ht - tf = 139.00 mm
J = S [ b * t /3 ] = 2 * 1/3 * b f * tf + 1/3 * (ht - 2 * tf) * tw = 57960.0 mm
3 3 3 4

6
I w = I y * h2 / 4 = 7.294E+09 mm
X1 = p / Sx * √ [ E * G * J * A / 2 ] = 2490.3 MPa
2 2 2
X2 = 4 * [ Sx / (G * J) ] * I w / I y = 0.0018510 mm /N
3
Zx = tw * ht2 / 4 + ( bf - tw ) * ( ht - tf ) * tf = 150450.0 mm
3
Zy = tf * bf2 / 2 + ( ht - 2 * tf ) * tw2 / 4 = 46170.0 mm
G= modulus geser,
tf
J= Konstanta puntir torsi,
Iw = konstanta putir lengkung, tw
h h2 ht
X1 = koefisien momen tekuk torsi lateral - 1,
X2 = koefisien momen tekuk torsi lateral - 2,
r
Zx = modulus penampang plastis thd. sb. x, h1
Zy = modulus penampang plastis thd. sb. y, bf

11
•••

Rasio tegangan = 0.343 < 1 → AMAN

12
•••

2. DESAIN KOLOM
A. DATA BAHAN
Tegangan leleh baja (yield stress ), fy = 240 MPa
Tegangan sisa (residual stress ), fr = 70 MPa
Modulus elastik baja (modulus of elasticity ), E= 200000 MPa
Angka Poisson (Poisson's ratio ), u= 0.3

B. DATA PROFIL BAJA


Profil : WF150.100
ht = 148 mm

tf bf = 100 mm
tw = 6 mm
tf = 9 mm
tw r=
h h2 ht 11 mm
2
A= 2684 mm
4
I x = 10200000 mm
4
I y = 1510000 mm
r
h1 rx = 6.17 mm
ry = 2.37 mm
bf 3
Sx = 1380000 mm
3
Sy = 301000 mm
Berat : w= 211 N/m

BEAM COLUMN (RAFTER) TANPA PENGAKU BADAN

13
•••

Rasio tegangan = 0.301 < 1 → AMAN

14
•••

DESAIN BASE PLATE


1. DATA TUMPUAN

BEBAN KOLOM DATA BEBAN KOLOM


Gaya aksial akibat beban terfaktor, Pu = 70563 N
Momen akibat beban terfaktor, Mu = 0 Nmm
Gaya geser akibat beban terfaktor, Vu = 1080 N
PLAT TUMPUAN (BASE PLATE) DATA PLAT TUMPUAN
Tegangan leleh baja, fy = 240.00 MPa
Tegangan tarik putus plat, f up = 370.00 MPa
Lebar plat tumpuan, B= 200 mm
Panjang plat tumpuan, L= 300 mm
Tebal plat tumpuan, t= 16 mm
KOLOM BETON DATA KOLOM BETON
Kuat tekan beton, f c' = 19.3 MPa
Lebar penampang kolom, I= 300 mm
Panjang penampang kolom, J= 300 mm
DIMENSI KOLOM BAJA DATA KOLOM BAJA
Profil baja : WF150.100
Tinggi total, ht = 148 mm
Lebar sayap, bf = 100 mm
Tebal badan, tw = 6 mm
Tebal sayap, tf = 9 mm
ANGKUR BAUT DATA ANGKUR BAUT
Jenis angkur baut, Tipe : SR-24
Tegangan tarik putus angkur baut, f ub
= 380 MPa
Tegangan leleh angkur baut, fy = 235 MPa
Diameter angkur baut, d= 16 mm
Jumlah angkur baut pada sisi tarik, nt = 2 bh
Jumlah angkur baut pada sisi tekan, nc = 2 bh
Jarak baut terhadap pusat penampang kolom, f= 104 mm
Panjang angkur baut yang tertanam di beton, La = 300 mm

15
•••

2. EKSENTRISITAS BEBAN
Eksentrisitas beban,
e = Mu / Pu = 0.00 mm
L/6= 50.00 mm
e<L/6

h = ht - tf = 139 mm
et = f + h / 2 = 174 mm
ec = f - h / 2 = 34.5 mm

Jumlah angkur baut total,


n = nt + nc = 4 bh

3. TAHANAN TUMPU BETON

Gaya tarik pada angkur baut, Pt = Pu * e c / e t = 14031 N


Gaya tekan total pada plat tumpuan, Puc = Pu + Pt = 84594 N
Panjang bidang tegangan tekan beton, Y=3*(L-h)/2= 241.50 mm
Luas plat tumpuan baja, A1 = B * L = 60000 mm2
2
Luas penampang kolom pedestral, A2 = I * J = 90000 mm

Tegangan tumpu nominal, f cn = 0.85 * f c' * √ ( A2 / A1 ) = 20.092 MPa


f cn = 1.70 * f c' = 32.810 MPa
Tegangan tumpu nominal beton yg digunakan, f cn = 20.092 MPa
Faktor reduksi kekuatan tekan beton, f= 0.65
Tegangan tumpu beton yg diijinkan, f * f cn = 13.060 MPa
Tegangan tumpu maksimum yang terjadi pada beton,
f cu = 2 * Puc / ( Y * B ) = 3.503 MPa
Syarat yang harus dipenuhi :
f cu ≤ f * f cn
3.503 < 13.060 → AMAN (OK)

16
•••

4. KONTROL DIMENSI PLAT TUMPUAN


Lebar minimum plat tumpuan yang diperlukan,
Bp min = Puc / ( 0.5 * f * f cn * Y ) = 54 mm
Lebar plat yang digunakan, B= 200 mm
Syarat yang harus dipenuhi :
Bp min  B
54 < 200 → AMAN (OK)
Panjang bagian plat tumpuan jepit bebas,
a = ( L - 0.95 * ht ) / 2 = 79.7 mm
f cu1 = ( 1 - a / Y ) * f cu = 2.347 MPa
2 3
Modulus penampang plastis plat, Z = 1/4 * B * t = 12800 mm
Momen yang terjadi pada plat akibat beban terfaktor,
Mup = 1/2 * B * f cu1 * a2 + 1/3 * B * ( f cu - f cu1 ) * a2 = 1980278 Nmm
Faktor reduksi kekuatan lentur, fb = 0.90
Tahanan momen nominal plat, Mn = f y * Z = 3072000 Nmm
Tahanan momen plat, f b * Mn = 2764800 Nmm
Syarat yang harus dipenuhi :
Mup  f b * Mn
1980278 < 2764800 → AMAN (OK)

5. GAYA TARIK PADA ANGKUR BAUT

Gaya tarik pada angkur baut, Tu1 = Pt / nt = 7016 N


Tegangan tarik putus angkur baut, f ub = 380 MPa
Luas penampang angkur baut, Ab = p / 4 * d 2 = 201 mm2
Faktor reduksi kekuatan tarik, ft = 0.90
Tahanan tarik nominal angkur baut, Tn = 0.75 * Ab * f ub = 57303 N
Tahanan tarik angkur baut, f t * Tn = 51572 N
Syarat yang harus dipenuhi :
Tu1  f t * Tn
7016 < 51572 → AMAN (OK)

17
•••

6. GAYA GESER PADA ANGKUR BAUT

Gaya geser pada angkur baut, Vu1 = Vu / n = 270 N


Tegangan tarik putus baut, f ub = 380 MPa
Jumlah penampang geser, m= 1
Faktor pengaruh ulir pada bidang geser, r1 = 0.4
Luas penampang baut, Ab = p / 4 * d 2 = 201 mm2
Faktor reduksi kekuatan geser, ff = 0.75
Tahanan geser nominal, Vn = r1 * m * Ab * f ub = 30561 N
Tahanan geser angkur baut, f f * Vn = 22921 N
Syarat yang harus dipenuhi :
Vu1  f f * Vn
270 < 22921 → AMAN (OK)

7. GAYA TUMPU PADA ANGKUR BAUT

Gaya tumpu pada angkur baut, Ru1 = Vu1 = 270 N


Diameter baut, d= 16 mm
Tebal plat tumpu, t= 16 mm
p
Tegangan tarik putus plat, fu = 370 MPa
Tahanan tumpu nominal, Rn = 2.4 * d * t * f up = 227328 N
Tahanan tumpu, f f * Rn = 170496 N
Syarat yang harus dipenuhi :
Ru1  f f * Rn
270 < 170496 → AMAN (OK)

18
•••

8. KOMBINASI GESER DAN TARIK


Konstanta tegangan untuk baut mutu tinggi, f1 = 807 MPa
f2 = 621 MPa
Faktor pengaruh ulir pada bidang geser, r2 = 1.9
Tegangan geser akibat beban terfaktor, f uv = Vu / ( n * Ab ) = 1.34 MPa
Kuat geser angkur baut, f f * r1 * m * f ub = 114.00 MPa
Syarat yang harus dipenuhi :
f uv = Vu / ( n * Ab )  f f * r1 * m * f ub
1.34 < 114.00 → AMAN (OK)

Gaya tarik akibat beban terfaktor, Tu1 = 7016 N


Tahanan tarik angkur baut, f f * Tn = f f * f 1 * Ab = 121693 N
Syarat yang harus dipenuhi :
Tu1  f f * f 1 * Ab
7016 < 121693 → AMAN (OK)
Kuat tarik angkur baut, f t = 0.75 * f ub = 285.00 MPa
Batas tegangan kombinasi, f 1 - r2 * f uv = 804.45 MPa
f2 = 621.00 MPa
Syarat yang harus dipenuhi :
ft  f 1 - r2 * f uv
285.00 < 804.45 → AMAN (OK)
Syarat yang harus dipenuhi :
ft  f2
285.00 < 621.00 → AMAN (OK)

19
•••

9. KONTROL PANJANG ANGKUR BAUT


Panjang angkur tanam yang digunakan, La = 300 mm
Kuat tekan beton, f c' = 19
Tegangan leleh baja, fy = 235
Diameter angkur baut, d= 16
Panjang angkur tanam minimum yang diperlukan,
Lmin = f y / ( 4 *  f c' ) * d = 214 mm
Syarat yang harus dipenuhi :
Lmin  La
214 < 300 → AMAN (OK)

20
•••

DESAIN SAMBUNGAN
DATA SAMBUNGAN
Gaya geser akibat beban terfaktor, Vu = 15789 N
Momen akibat beban terfaktor, Mu = 10886713 Nmm

BAUT
Jenis baut yang digunakan, Tipe baut : A-325
Tegangan tarik putus baut, f ub = 825 MPa
Diameter baut d= 16 mm
Jarak antara baut, a= 30 mm
Jumlah baut dalam satu baris, nx = 2 bh
Jumlah baris baut, ny = 3 baris
Faktor reduksi kekuatan tarik baut, ft = 0.75
Faktor reduksi kekuatan geser baut, ff = 0.75

PLAT SAMBUNG
Tegangan leleh plat, fy = 245 MPa
Tegangan tarik putus plat, f up = 400 MPa
Lebar plat sambung, b= 150 mm
Tebal plat sambung, t= 12 mm

21
•••

LETAK GARIS NETRAL

Jumlah baut total, n = nx * ny = 6 bh


Tinggi plat sambung, h = ny * a = 90 mm
Lebar plat sambung ekivalen sebagai pengganti baut tarik,
d = nx * ( p / 4 * D2 ) / a = 13.4041 mm
Lebar efektif plat sambung bagian tekan, b' = 0.75 * b = 112.5 mm
Misal garis netral terletak pada jarak x dari sisi atas plat sambung.
Momen statis luasan terhadap garis netral,
Ax = (b' - d)/2 = 50
Bx = - b' * h = -10125
Cx = 1/2 * b' * h2 = 455625
Dx = B x 2 - 4 * A x * Cx = 12214512
→ x = [ - B x -  Dx ] / ( 2 * A x ) = 66.91 mm
TEGANGAN YANG TERJADI PADA BAUT
Tegangan pada masing-masing baris baut dihitung sebagai berikut :
Tegangan tarik pada sisi atas plat sambung,
Dari pers. (3) : s1 = 3 * Mu / [ ( h - x )3 / x * b' + x2 * d ] = 404.64 MPa
Tegangan tekan pada sisi bawah plat sambung,
Dari pers. (1) : s3 = ( h - x ) / x * s1 = 139.67 MPa
Tegangan tarik pada baut baris teratas,
Dari pers. (2) : s2 = ( x - a / 2 ) / x * s1 = 313.93 MPa

GAYA TARIK PADA BAUT


Gaya tarik yang terjadi pada baut baris teratas, Tu = s2 * a * d = 126237 N
Gaya tarik yang ditahan satu baut, Tu1 = Tu / nx = 63118 N
Luas penampang baut, Ab = p / 4 * d 2 = 201 mm2
Tahanan tarik nominal satu baut, Tn = 0.75 * Ab * f ub = 124407 N
Tahanan tarik satu baut, f t * Tn = 93305 N
Syarat yang harus dipenuhi : Tu1  f t * Tn
63118 < 93305 → AMAN (OK)

22
•••

GAYA GESER PADA BAUT


Gaya geser yang ditahan oleh satu baut, Vs1 = Vu / n = 2631 N
Kondisi sambungan baut geser tunggal, maka nilai m= 1
Faktor pengaruh ulir pada bidang geser, r1 = 0.4
Ab = p / 4 * d 2 =
2
Luas penampang baut, 201 mm
Tahanan geser nominal baut, Vn = r1 * m * Ab * f ub = 66350 N
Tahanan geser baut, f f * Vn = 49763 N
Syarat yang harus dipenuhi : Vs1  f f * Vn
2631 < 49763 → AMAN (OK)

GAYA TUMPU PADA BAUT


Gaya tumpu yang ditahan satu baut, Rs1 = Vs1 = 2631 N
Diameter baut, d= 16 mm
Tebal plat sambung, t= 12 mm
p
Tegangan tarik putus plat, fu = 400 MPa
Tahanan tumpu nominal, Rn = 2.4 * d * t * f up = 184320 N
Tahanan tumpu, f f * Rn = 138240 N
Syarat yang harus dipenuhi : Rs1  f f * Rn
2631 < 138240 → AMAN (OK)

KOMBINASI GESER DAN TARIK


Konstanta tegangan (f1) untuk baut mutu tinggi, f1 = 807 MPa
Konstanta tegangan (f2) untuk baut mutu tinggi, f2 = 621 MPa
Faktor pengaruh ulir pada bidang geser, r2 = 1.9
Tegangan geser yang terjadi, f uv = Vu / ( n * Ab ) = 13.09 MPa
Tahanan geser baut, f f * r1 * m * f ub = 247.50 MPa
Syarat yang harus dipenuhi :
f uv = Vu / ( n * Ab )  f f * r1 * m * f ub
13.09 < 247.50 → AMAN (OK)

23
•••

Gaya tarik yang tejadi, Tu1 = 63118 N


Tahanan tarik baut, f f * Tn = f f * f 1 * Ab = 121693 N
Syarat yang harus dipenuhi : Tu1  f f * Tn
63118 < 121693 → AMAN (OK)

Tegangan tarik, f t = 0.75 * f ub = 618.75 MPa


Nilai tegangan kombinasi, f 1 - r2 * f uv = 782.13 MPa
Syarat yang harus dipenuhi : ft  f 1 - r2 * f uv
618.75 < 782.13 → AMAN (OK)

Syarat yang harus dipenuhi : ft  f2


618.75 < 621.00 → AMAN (OK)

CATATAN :
- sambungan balok - kolom identik jumlah baut dan tebal plat sambungan

24
•••

DESAIN PLAT LANTAI

A. DATA PLAT LANTAI KODE : PL


BAHAN STRUKTUR
Mutu beton, fc ' = 19.3 MPa
Tegangan leleh baja polos untuk tulangan lentur, fy = 235 MPa
Tegangan leleh baja polos untuk tulangan susut, fy = 235 MPa
DIMENSI PLAT
Panjang bentang plat arah x Lx = 3.00 m
Panjang bentang plat arah y Ly = 6.00 m
Tebal plat h= 100 mm
Diameter tulangan lentur, Ø= 10 mm
Diameter tulangan susut, Ø= 10 mm
Tebal bersih selimut beton, ts = 20 mm
KONSTANTA
Faktor distribusi tegangan beton, fc ' ≤ 30 Mpa b1 = 0.85
Faktor reduksi kekuatan lentur, f= 0.80
Faktor reduksi kekuatan geser, f= 0.60
Rasio tulangan pada kondisi balance , rb = 0.04264
rb = b 1* 0.85 * fc ’/ fy * 600 / ( 600 + fy )
Faktor tahanan momen maksimum, Rmax = 5.79365
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc ’ ) ]
Rasio tulangan minimum, rmin = √ fc ' / ( 4 * fy ) = 0.00467
Kondisi tumpuan tepi plat : Ly / L x = 2.00

Koefisien momen plat ;


Clx = 62
Cly = 35
Ctx = 62
Cty = 35

25
•••

B. PEMBEBANAN PLAT LANTAI


1. BEBAN MATI (D)
Jenis Beban Mati Berat satuan Tebal qi (kN/m2)
3
- Berat sendiri plat lantai (kN/m ) 24 0.1 2.400
3
- Berat penutup lantai keramik (kN/m ) 0.24 1 0.240
2
- Berat spesi penutup lantai (kN/m ) 0.21 2 0.420
qD = 3.060
2. BEBAN HIDUP (L )
2
- Beban hidup pada lantai , = 300 kg/m
- Koefisien reduksi beban hidup, = 1.00
qL = 3.00 kN/m2
3. BEBAN RENCANA TERFAKTOR
Beban rencana terfaktor, qu = 1.2 *qD + 1.6 * qL = 8.472 kN/m2

4. MOMEN PLAT AKIBAT BEBAN TERFAKTOR


+ Mulx = C1 * 0.001 * qu * Lx =
2
- Momen lapangan arah x, 4.727 kNm/m
- Momen lapangan arah y, + Muly = C2 * 0.001 * qu * Lx 2 = 2.669 kNm/m
2
- Momen tumpuan arah x, - Mutx = C3 * 0.001 * qu * Lx = 4.727 kNm/m
2
- Momen tumpuan arah y, - Muty = C4 * 0.001 * qu * Lx = 2.669 kNm/m
Momen rencana maksimum plat, → Mu = 4.727 kNm/m

26
•••

C. PENULANGAN PLAT
Jarak tulangan terhadap sisi luar beton, ds = ts +  / 2 = 25.0 mm
Tebal efektif plat lantai, d = h - ds = 75.0 mm
Ditinjau plat lantai selebar 1 m, → b= 1000 mm
Momen nominal rencana, Mn = Mu / f = 5.909 kNm
-6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 1.05053

Syarat : Rn < Rmax → (OK)


Rasio tulangan yang diperlukan :
r = 0.85 * fc ' / fy * [ 1 -  [ 1 – 2 * Rn / ( 0.85 * fc ' ) ] = 0.00462
Rasio tulangan yang digunakan, → r= 0.00462
Luas tulangan yang diperlukan, As = r * b * d = 347 mm2
s = p / 4 *  * b / As =
2
Jarak tulangan yang diperlukan, 226 mm
Jarak tulangan maksimum, smax = 2 * h = 200 mm
Diambil jarak tulangan → s= 200 mm
Digunakan tulangan, Ø 10 - 200

Luas tulangan terpakai, As = p / 4 *  2 * b / s = 393 mm2


Kuat geser plat tanpa tulangan geser ; V u = qu * LX / 2 = 12.7080 KN
f Vn = f (1/6 * Sfc ' * b * d ) =
Kuat geser nominal plat, 32.95 KN

Syarat : f Vn > Vu → AMAN (OK)

2
Luas tulangan susut perlu, Ast = 0.0020 * b * h = 200 mm
Diameter tulangan yang digunakan, = 10 mm
Jarak tulangan susut yang diperlukan, s = p / 4 *  * b / Ast =
2
393 mm
Jarak tulangan maksimum, smax = 2 * h = 200 mm
Digunakan tulangan, Ø 10 - 200
Luas tulangan terpakai, As = 392.70 mm2

27
•••

D. KONTROL LENDUTAN PLAT


Modulus elastis beton, Ec = 4700*√ fc ' = 20648 MPa
Modulus elastis baja tulangan, Es = 2.00E+05 MPa
Beban merata (tak terfaktor) pada plat, q = q D + qL = 3.031 N/mm'
Panjang bentang plat, Lx = 3000 mm
Batas lendutan maksimum yang diijinkan, Lx / 240 = 6.250 mm
3
Momen inersia brutto penampang plat, Ig = 1/12 * b * h3 = 83333333 mm
Modulus keruntuhan lentur beton, fr = 0.7 * √ fc' = 3.0752236 MPa
Nilai perbandingan modulus elastis, n = Es / Ec = 9.69
Jarak garis netral terhadap sisi atas beton, c = n * As / b = 3.804 mm
Momen inersia penampang retak yang ditransformasikan ke beton dihitung sbb. :
3 2 4
Icr = 1/3 * b * c + n * As * ( d - c ) = 19299252 mm
yt = h / 2 = 50 mm
Momen retak : Mcr = fr * Ig / yt = 5125373 Nmm
Momen maksimum akibat beban (tanpa faktor beban) :
2
Ma = 1 / 8 * q * Lx = 3409425 Nmm
Inersia efektif untuk perhitungan lendutan,
4
Ie = ( Mcr / Ma )3 * Ig + [ 1 - ( Mcr / Ma )3 ] * Icr = 2.37E+08 mm

Lendutan elastis seketika akibat beban mati dan beban hidup :


d e = 5 / 384 * q * Lx / ( Ec * Ie ) =
4
0.041 mm
Rasio tulangan aktual slab lantai : r = As / ( b * d ) = 0.00524
Faktor ketergantungan waktu untuk beban mati (jangka waktu > 5 tahun), nilai :
z= 2.0
l = z / ( 1 + 50 * r ) = 1.5850
Lendutan jangka panjang akibat rangkak dan susut :
d g = l * 5 / 384 * q * Lx 4 / ( Ec * Ie ) = 0.065 mm
Lendutan total, d tot = d e + d g = 0.106 mm

Syarat : d tot < Lx / 240 → AMAN (OK)

28
•••

Ø10 - 400 Ø10 - 400

Ø10 - 200 Ø10 - 200

 



Ln = Lx - B/2

Ø10 - 400 Ø10 - 400


Ø10 - 400

Ø10 - 400
Ø10 - 400

Ø10 - 400

Ø10 - 400 Ø10 - 400

Ø10 - 400

Ø10 - 400

Ln / 4 Ln / 4
Ln / 2

Ln = 2.7 m

29
•••

30
•••

DESAIN PONDASI

1. PERHITUNGAN PONDASI F1

Posisi pondasi type F1

31
•••

Mx Mx

VY VY

Y Y

A. DATA PONDASI PLAT GABUNGAN TYPE F-1


DATA TANAH
Kedalaman fondasi, Df = 1.50 m
Berat volume tanah urugan g= 1.81 kN/m3
Daya dukung tanah qc = 2.00 kg/cm2

GAYA-GAYA DALAM YG TERJADI exterior interior


Gaya aksial akibat beban terfaktor, P= 33 33 kNm
Momen arah x akibat beban terfaktor, Mx = 0.75 0.75 kNm
Momen arah y akibat beban terfaktor, My = 0.27 0.27 kNm
DIMENSI FONDASI
Lebar fondasi arah x (lebar exterior = lebar interior) Bx = 1.00 m
jarak tepi kolom exterior le = 0.40 m
jarak antar kolom exterior dan interior l = 1.30 m
Lebar kolom arah x, bx = 0.30 m
Lebar kolom arah y, by = 0.30 m
Letak titik Resultante Gaya terhadap tepi exterior xcf = 1.03 m
Lebar fondasi arah y , By = 2 . xcf = 2.05 m
jarak tepi kolom interior li = By - l - le = 0.35 m
Tebal fondasi, h= 0.30 m
Tinggi kolom pondasi, hp = 1.20 m
3 3
Tebal lantai kerja (cor beton = 22 kN/m ) 22 kN/m ) t= 0.000 m
BAHAN KONSTRUKSI
Kuat tekan beton, f c' = 19.3 MPa
Kuat leleh baja tulangan, fy = 235 MPa
Berat beton bertulang, gc = 24 kN/m3
BEBAN RENCANA FONDASI
Resultante Gaya aksial akibat beban terfaktor, SPu = 66.77 kN
Gaya dukung cerucuk 0 X 16.27 Pc = 0.00 kN
Gaya aksial rencana, Pu = 69.36 kN
Momen arah x akibat beban terfaktor, Mux = 1.506 kNm
Momen arah y akibat beban terfaktor, Muy = 0.531 kNm

B. KAPASITAS DUKUNG TANAH


Kapasitas dukung ijin tanah, qao = 66.67 kN/m2

32
•••

C. KONTROL TEGANGAN TANAH

2
Luas dasar foot plat, A = Bx * By = 2.0549 m
3
Tahanan momen arah x, W x = 1/6 * By * Bx2 = 0.3425 m
3
Tahanan momen arah y, W y = 1/6 * Bx * By2 = 0.7038 m
Tinggi tanah di atas foot plat, z = Df - h = 1.20 m
q = h * gc + z * g =
2
Tekanan akibat berat foot plat dan tanah, 9.372 kN/m
Eksentrisitas pada fondasi :
ex = Mux / Pu = 0.0226 m < Bx / 6 = 0.1667 m (OK)
ey = Muy / Pu = 0.0080 m < By / 6 = 0.3425 m (OK)
Tegangan tanah maksimum yang terjadi pada dasar fondasi :
q1,max = Pu / A + Mux / W x + q = 47.525 kN/m2
q2,max = Pu / A + Muy / W y + q = 43.882 kN/m2
qmax < qa → AMAN (OK)
Tegangan tanah minimum yang terjadi pada dasar fondasi :
q1,min = Pu / A - Mux / W x + q = 38.730 kN/m2
q2,min = Pu / A - Muy / W y + q = 42.373 kN/m2
qmin > 0 → tak terjadi teg.tarik (OK)

33
•••

E. PEMBESIAN FOOTPLAT
1. TULANGAN LENTUR ARAH X

Jarak tepi kolom terhadap sisi luar foot plat, ax = ( Bx - bx ) / 2 = 0.350 m


Tegangan tanah pada tepi kolom,
2
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 44.447 kN/m

Momen yang terjadi pada plat fondasi akibat tegangan tanah,


Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 4.673 kNm
Lebar plat fondasi yang ditinjau, b = By = 2055 mm
Tebal plat fondasi, h= 300 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 70 mm
Tebal efektif plat, d = h - d' = 230 mm
Rmax = 0.75 * rb * f y * [1-½*0.75* rb * f y / ( 0.85 * f c’ ) ] = 5.794
Mn = Mux / f = 5.841 kNm
Rn = Mn * 106 / ( b * d2 ) = 0.05373
Rn < Rmax → (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * f c’ / f y * [ 1 -  {1 – 2 * Rn / ( 0.85 * f c’ ) } ] = 0.0002
Rasio tulangan minimum, rmin = 0.0025
Rasio tulangan yang digunakan, → r = 0.0025
Luas tulangan yang diperlukan, As = r * b * d = 1181.56 mm2
Diameter tulangan yang digunakan,  16 mm
Jarak tulangan yang diperlukan, s = p / 4 * D * b / As =
2
350 mm
Jarak tulangan yang digunakan, → s= 200 mm
Luas tulangan terpakai, As = p / 4 * D * b / s =
2
2065.80 mm2
Digunakan tulangan,  16 - 200

34
•••

2. TULANGAN LENTUR ARAH Y

Jarak tepi kolom terhadap sisi luar foot plat, ay = ( By - by ) / 2 = 0.877 m


Tegangan tanah pada tepi kolom,
qy = qmin + (By - ay) / By * (qmax - qmin) = 43.238 kN/m2
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 13.202 kNm
Lebar plat fondasi yang ditinjau, b = Bx = 1000 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 85 mm
Tebal efektif plat, d = h - d' = 215 mm
Rmax = 0.75 * rb * f y * [1-½*0.75* rb * f y / ( 0.85 * f c’ ) ] = 5.794
Mn = Muy / f = 16.503 kNm
Rn = Mn * 106 / ( b * d2 ) = 0.35701
Rn < Rmax → (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * f c’ / f y * [ 1 -  {1 – 2 * Rn / ( 0.85 * f c’ ) } ] = 0.0015
Rasio tulangan minimum, rmin = 0.0025
Rasio tulangan yang digunakan, → r = 0.0025
As = r * b * d =
2
Luas tulangan yang diperlukan, 537.50 mm
Diameter tulangan yang digunakan,  16 mm
Jarak tulangan yang diperlukan, s = p / 4 * D * b / As =
2
374 mm
Jarak tulangan yang digunakan, → s= 200 mm
Luas tulangan terpakai, As = p / 4 * D2 * b / s = 1005.31 mm2
Digunakan tulangan,  16 - 200

35
•••

2. PERHITUNGAN PONDASI F2

Posisi pondasi type F1

36
•••

A. DATA PONDASI
DATA TANAH
Kedalaman fondasi, Df = 1.50 m
Berat volume tanah urugan g= 18.00 kN/m3
2
Daya dukung tanah lunak qc = 3.00 kg/cm
DIMENSI FONDASI
Lebar fondasi arah x, Bx = 1.20 m
Lebar fondasi arah y, By = 1.20 m
Tebal fondasi, h= 0.30 m
Lebar kolom arah x, bx = 0.30 m
Lebar kolom arah y, by = 0.30 m
Tinggi kolom pondasi, hp = 1.20 m
3
Tebal lantai kerja (cor beton = 22 kN/m ) t= 0.000 m
BAHAN KONSTRUKSI
Kuat tekan beton, K-225 f c' = 19.3 MPa
Kuat leleh baja tulangan, fy = 235 MPa
Berat beton bertulang, gc = 25 kN/m3
BEBAN RENCANA FONDASI
Resultante Gaya aksial akibat beban mati, SPD = 0.00 kN
Resultante Gaya Lateral, SH = 0.64 kN
Berat kolom pondasi Pk = 2.12 kN
Gaya aksial rencana, Pu = 73.11 kN
Momen arah x akibat beban terfaktor, Mux = 0.764 kNm
Momen arah y akibat beban terfaktor, Muy = 0.240 kNm

B. KAPASITAS DUKUNG TANAH


2
Kapasitas dukung ijin tanah, qa = 100.00 kN/m

37
•••

C. KONTROL TEGANGAN TANAH

Luas dasar foot plat, A = Bx * By = 1.4400 m2

Tahanan momen arah x, W x = 1/6 * By * Bx2 = 0.2880 m3


3
Tahanan momen arah y, W y = 1/6 * Bx * By2 = 0.2880 m
Tinggi tanah di atas foot plat, z = Df - h = 1.20 m
Tekanan akibat berat foot plat dan tanah, q = h * gc + z * g = 29.100 kN/m2
Eksentrisitas pada fondasi :
ex = Mux / Pu = 0.01046 m < Bx / 6 = 0.2000 m (OK)
ey = Muy / Pu = 0.00328 m < By / 6 = 0.2000 m (OK)
Tegangan tanah maksimum yang terjadi pada dasar fondasi :
q1,max = Pu / A + Mux / W x + q = 82.523 kN/m2
q2,max = Pu / A + Muy / W y + q = 80.703 kN/m2
qmax < qa → AMAN (OK)

Tegangan tanah minimum yang terjadi pada dasar fondasi :


q1,min = Pu / A - Mux / W x + q = 77.215 kN/m2
q2,min = Pu / A - Muy / W y + q = 79.036 kN/m2
qmin > 0 → tak terjadi teg.tarik (OK)

38
•••

E. PEMBESIAN FOOTPLAT

1. TULANGAN LENTUR ARAH X DAN Y

Jarak tepi kolom terhadap sisi luar foot plat, ax = ( Bx - bx ) / 2 = 0.450 m


Tegangan tanah pada tepi kolom,
2
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 80.533 kN/m
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 6.410 kNm
Lebar plat fondasi yang ditinjau, b = By = 1200 mm
Tebal plat fondasi, h= 300 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 40 mm
Tebal efektif plat, d = h - d' = 260 mm
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * f c’/ f y * 600 / ( 600 + f y ) = 0.042638
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * f y * [1-½*0.75* rb * f y / ( 0.85 * f c’ ) ] = 5.794
Mn = Mux / f = 8.013 kNm
Rn = Mn * 106 / ( b * d2 ) = 0.09878
Rn < Rmax → (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * f c’ / f y * [ 1 -  {1 – 2 * Rn / ( 0.85 * f c’ ) } ] = 0.0004
Rasio tulangan minimum, rmin = 0.0025
Rasio tulangan yang digunakan, → r= 0.0025
Luas tulangan yang diperlukan, As = r * b * d = 780.00 mm2
Diameter tulangan yang digunakan, Ø 16 mm
Jarak tulangan yang diperlukan, s = p / 4 * Ø * b / As =
2
309 mm
Jarak tulangan maksimum, smax = 200 mm
Digunakan tulangan, Ø 16 - 200
As = p / 4 * Ø2 * b / s = 1206.37 mm
2
Luas tulangan terpakai,

39
•••

2. TULANGAN LENTUR ARAH Y

Jarak tepi kolom terhadap sisi luar foot plat, ay = ( By - by ) / 2 = 0.450 m


Tegangan tanah pada tepi kolom,
qy = qmin + (By - ay) / By * (qmax - qmin) = 80.078 kN/m2
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 6.244 kNm
Lebar plat fondasi yang ditinjau, b = Bx = 1200 mm
Tebal plat fondasi, h= 300 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 60 mm
Tebal efektif plat, d = h - d' = 240 mm
Kuat tekan beton, f c' = 19 MPa
Kuat leleh baja tulangan, fy = 235 MPa
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * f c’/ f y * 600 / ( 600 + f y ) = 0.042638
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * f y * [1-½*0.75* rb * f y / ( 0.85 * f c’ ) ] = 5.794
Mn = Muy / f = 7.805 kNm
Rn = Mn * 106 / ( b * d2 ) = 0.11293
Rn < Rmax → (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * f c’ / f y * [ 1 -  {1 – 2 * Rn / ( 0.85 * f c’ ) } ] = 0.0005
Rasio tulangan minimum, rmin = 0.0025
Rasio tulangan yang digunakan, → r= 0.0025
As = r * b * d = 720.00
2
Luas tulangan yang diperlukan, mm
Diameter tulangan yang digunakan, Ø 16 mm
Jarak tulangan yang diperlukan, s = p / 4 * Ø * b / As =
2
335 mm
Jarak tulangan yang digunakan, → s= 200 mm
As = p / 4 * Ø * b / s = 1206.37 mm
2 2
Luas tulangan terpakai,
Digunakan tulangan, Ø 16 - 200

40