PERHITUNGAN VOLUM

PEKERJAAN GALIAN

Realisasi Perhitungan Lapangan

AS
PONDASI PANJANG
NO URAIAN PEKERJAAN
ATAS
(M)
1 2 3 4
1 GALIAN PONDASI FOOTPLAT
FP2 8-CB 10.15
FP1 7-D 5.00
FP1 7A 4.70
FP1 6A 5.10
FP2 6CB 7.00
FP1 6D 5.00

2 GALIAN PLAT MENERUS D(2-7)

JUMLAH
Diperiksa Oleh:
Tim Pengelola Teknis Proyek (PTP)

1. Jeane P. G. Hadjon, ST., MM. : ………………………….


NIP. 19680530 199703 2 005

2. Edwin Tse, ST. : ………………………….


NIP. 19690817 200212 1 012

3. Sonny K. Nenobesi, A.MDt. : ………………………….


NIP. 19811001 201212 1 001

4. Aloysius G. Lake, ST., MT. : ………………………….

5. Tedy Wonlele, ST., MT. : ………………………….


RHITUNGAN VOLUME

DIMENSI GALIAN
VOLUME
PANJANG LEBAR TINGGI
BAWAH RATA-RATA ATAS BAWAH RATA-RATA T.BIASA T.BIASA
(M) (M) (M) (M) (M) (M) (M3)
5 6=(4+5)/2 6 7 8=(6+7)/2 9

9.17 9.66 8.60 6.80 7.70 3.54 263.50


5.30 5.15 4.70 4.30 4.50 3.60 83.31
4.40 4.55 4.80 4.20 4.50 2.60 53.13
4.80 4.95 4.60 4.20 4.40 3.00 65.39
6.50 6.75 4.70 4.50 4.60 2.58 80.03
4.90 4.95 5.20 4.68 4.94 3.57 87.24

42.50 2.50 1.50 159.38


10.20 2.50 1.50 38.25
10.20 2.50 1.50 38.25

UMLAH 868.48
Diperiksa Oleh: Dibuat Oleh:
Konsultan Pengawas Kontraktor Pelaksan
PT. Siarplan Utama Konsultan PT. Gala Karya

Ir. Pilipus Jeraman, MT M. Khadiq Mukhlas,


Team Leader Project Manager

Hendry D. Zacharias, ST Dani Christian, ST


Penanggung Jawab Struktur
Dibuat Oleh:
Kontraktor Pelaksana
PT. Gala Karya

M. Khadiq Mukhlas, ST
Project Manager

Dani Christian, ST
Staf Teknik