Anda di halaman 1dari 16

Date Updated

Check Request Status DHA Phase 8 Site 26-Oct-17


Sr. No CR No Description CR Date CR Status Remarks Folder Status Final Status
1 1 General Layout of 132/11.5KV GS as per Drawing No DEL-E71-10051 Dated 30-3-2017 4/8/2017 Refer to Lab Approved Present Test Pass
2 2 Provision of maximum dry density request for field compaction and range of water content OMC for special compaction for pr 4/10/2017 Refer to Lab Approved Present Test Pass
3 2(a) Review of ready mix plant(D-Mix) and material(crush,sand,Cement and aggregate) 4/19/2017 Refer to Lab Not Approved Not Present Test Fail
4 2(b) Inspection of field density by sand replacement method 4/21/2017 Refer to Lab Not Approved Not Present Test Fail
5 3 Determination of max dry density and OMC using proctor test 4/28/2017 Refer to Lab Approved Present Test Pass
6 4 Inspection of field density by sand replacement method 5/2/2017 Refer to Lab Not Approved Present Test Fail
7 5 Tensile strength and bending test of steel of 10mm Dia(Total Weight = 200Kg) 5/2/2017 Refer to Lab Approved Present Test Pass
8 6 Tensile strength and bending test of steel of 13mm Dia(Total Weight = 4890Kg) 5/2/2017 Refer to Lab Approved Present Test Pass
9 7 Tensile strength and bending test of steel of 16mm Dia(Total Weight=5210Kg) 5/2/2017 Refer to Lab Approved Present Test Pass
10 8 Tensile strenght and bending test of steel of 20mm Dia(Total Weight= 7009Kg) 5/2/2017 Refer to Lab Approved Present Test Pass
11 9 Tensile strength and bending test of steel of 25mm Dia(Total Weight = 1100Kg) 5/2/2017 Refer to Lab Approved Present Test Pass
12 10 Determination of field density test by sand replacement method(CB,SA,CT) Foundations 5/3/2017 Refer to Lab Not Approved Present Test Fail
13 11 Determination of field density test by sand replacement method of all switch yard Foundations 5/8/2017 Refer to Lab Approved Present Test Pass
14 12 Review of ready mix plant(D-Mix) and Akhtar and Brother Plant for material and Sieve Analysis 5/9/2017 Refer to Lab Approved Present Test Pass
15 13 Excavation level and Layout of switchyard foundation for Lean pouring 5/9/2017 Refer to Lab Not Approved Present Test Fail
16 14 Determination of field density by sand replacement method 5/10/2017 Refer to Lab Approved Present Test Pass
17 15 Checking of Layout work and excavation level 5/11/2017 Consultant Approved Present Test Pass
18 16 Check Request for Top level of following equipment 2PT, 4CT, 4CB, 1SA, 7DS, 4GA 5/12/2017 Consultant Approved Present Test Pass
19 17 Testing of concrete cylinders of ratio 1:4:8 for lean pouring of equipment 5/12/2017 Refer to Lab Approved Present Test Pass
20 18(a) Collection of steel sample 20mm Dia for test, Mark 5H5 (Total Weight = 7009Kg) 5/18/2017 Refer to Lab Approved Present Test Pass
21 18 Collection of steel sample 13mm Dia (Total Weight = 8296Kg) and 20mm Dia (total weight = 8720Kg) and 10mm Dia( Total Weig 5/22/2017 Refer to Lab Not Approved Present Test Fail
22 19 Collection of Brick Testing Mark 110 quantity 10,000 5/22/2017 Refer to Lab Approved Present Test Pass
23 20 Collection of Sample crushed and sand 5/22/2017 Refer to Lab Not Approved Present Test Fail
24 21 Collection of Sample crushed and sand 5/23/2017 Refer to Lab Approved Present Test Pass
25 22 Pouring of Lean Concrete for C.H.B 5/23/2017 Consultant Approved Present Test Pass
26 23 Excavation of following equipment foundation of 2 Gantries 5/25/2017 Consultant Approved Present Test Pass
27 24 Check for Lean Top level for equipment foundations 5/25/2017 Consultant Approved Present Test Pass
28 25 Check for excavation level of C.H.B foundation 5/25/2017 Consultant Approved Present Test Pass
29 26 Check for lean top level for C.H.B 5/25/2017 Consultant Approved Present Test Pass
30 27 Check shuttering and RCC for top level PAD foundations 29-05-17
Consultant Approved Present Waiting
31 28 Collect the sample Crush and Sand 5/29/2017 Refer to Lab Approved Present Test Pass
32 29 Collect sample for steel test 16mm dia (Quantity=9675kg) and 25mm dia (Quantity= 850kg) 5/29/2017 Refer to Lab Not Approved Present Test Fail
33 30 Submission of Concrete cylinder of ratio 1:2:4 for Equipment Foundations. 5/30/2017 Refer to Lab Approved Present Test Pass
34 31 Check Pad Concrete and steel pedestal. 5/30/2017 Consultant Approved Present Test Pass
35 32 Collect the sample foe concrete, sand and crush 6/5/2017 Refer to Lab Approved Present Test Pass
36 33 Submission of concrete cylinders of ratio 1:2:4 6/5/2017 Refer to Lab Approved Present Test Pass
37 34 Check Pad, concrete and steel for pedestal. 6/7/2017 Consultant Approved Present Test Pass
38 35 Check CHB layout, shuttering and gantry foundations. 6/12/2017 Consultant Approved Present Test Pass
39 36 Collect the sample of ratio 1:2:4 for sand and crush. 6/12/2017 Refer to Lab Approved Present Test Pass
40 37 Collect the sample of ratio 1:2:4 for gradation. 6/15/2017 Refer to Lab Approved Present Test Pass
41 38 Collect the sample of ratio 1:2:4 for gradation. 6/19/2017 Refer to Lab Approved Present Test Pass
42 39 Collect the sample of ratio 1:2:4 for gradation. 20-16-17
Refer to Lab Need Approval Present Test Pass
43 40 Collect the sample of ratio 1:2:4 for gradation. 6/20/2017 Refer to Lab Approved Present Test Pass
44 41 Collect the sample of ratio 1:2:4 for gradation. 6/21/2017 Refer to Lab Approved Present Test Pass
45 42 Collect the sample of ratio 1:2:4 for gradation. 6/21/2017 Refer to Lab Approved Present Test Pass
46 43 Collect the sample of ratio 1:2:4 for gradation. 6/21/2017 Consultant Discarded Present Test Fail
47 44 Collect the sample of ratio 1:2:4 for gradation. 6/22/2017 Refer to Lab Approved Present Test Pass
48 45 Collect the sample of ratio 1:2:4 for gradation. 6/22/2017 Refer to Lab Approved Present Test Pass
49 46 Testing for concrete cylinder ratio 1:2:4 for CHB and Gantries. 7/4/2017 Refer to Lab Approved Present Test Pass
50 47 Collect the sample of ratio 1:2:4 for gradation (Concrete of C.H.B and GA(2) pad foundation) 7/4/2017 Refer to Lab Approved Present Test Pass
51 48 Testing of concrete cylinder ratio 1:2:4 for Power Transformer and Gantries 7/5/2017 Refer to Lab Discarded Present Test Fail
52 49 Collect the sample of ratio 1:2:4 for gradation (Concrete of T/F (2) and GA(1) pad foundation) 7/11/2017 Refer to Lab Approved Present Test Pass
53 50 Check steel fixing and Shuttering for Transformer and gantry. 7/11/2017 Consultant Approved Present Test Pass
54 51 Collect cylinder for testing of Power transformer and Gantry. 7/12/2017 Refer to Lab Approved Present Test Pass
55 52 Collect the sample for Gradation (Concrete of GA(3) and GA(4) pad foundation) 7/14/2017 Refer to Lab Approved Present Test Pass
56 53 Check the layout, Steel, Shuttering for Gantries. 7/14/2017 Consultant Approved Present Test Pass
57 54 Collection of cylinder for testing of concrete ratio 1:2:4 2no. Gantries Pad. 7/15/2017 Refer to Lab Not Approved Not Present Misplaced Refernce 101 Schmidt hammer test
58 55 Using of SBR Chemical for Construction Joint 7/17/2017 Consultant Discarded Present Test Fail
59 56 Collect the sample of ratio 1:2:4 for gradation (Concrete of GA (5) and EM Pad foundation + GA (2) Pedestal) 7/20/2017 Refer to Lab Approved Present Test Pass
60 57 Check the foundations level of CHB. 7/20/2017 Consultant Approved Present Test Pass
61 58 Check the Equipment foundations pad concrete and pedestal steel. 7/20/2017 Consultant Approved Present Test Pass
62 59 Collection of cylinder for testing of concrete ratio 1:2:4 for Gantries and earth Mast 7/20/2017 Refer to Lab Approved Present Test Pass
63 60 Check the layout, Steel, Shuttering for Gantries and eath mast. 7/20/2017 Consultant Approved Present Test Pass
64 61 Please collect the sand sample for testing , used in bricks measonary of C.H.B walls 7/21/2017 Refer to Lab Approved Present Test Pass
65 62 Collection of Cylinder for testing of ratio 1:2:4 for Transformer and Gantry 7/21/2017 Refer to Lab Approved Present Test Pass
66 63 Collection of material sample for Gradation of Ratio 1:2:4. 7/25/2017 Refer to Lab Approved Present Test Pass
67 64 Using of Chemical for Construction Joint of Transformer. 7/26/2017 Refer to Lab Need Approval Present Test Pass
68 65 Collection of sample for Gradation of Ratio 1:2:4 7/27/2017 Refer to Lab Approved Present Test Pass
69 66 Collection of sample for Gradation of Ratio 1:2:4 (Concrete of GA (1) + GA (3) + Switch Yard 7/29/2017 Refer to Lab Discarded Present Test Fail
70 67 Collection of cylinder for test of ratio 1:2:4. 7/29/2017 Refer to Lab Approved Present Test Pass
71 68 Collect the brick sample for testing. 7/31/2017 Refer to Lab Approved Present Test Pass
72 69 Collection of sample for Gradation of Ratio 1:2:4 7/31/2017 Refer to Lab Approved Present Test Pass
73 70 Collection of sample for Buitemn. 7/31/2017 Refer to Lab Not Approved Present Test Fail
74 71 Check the Shuttering and Steel fixing of 2 GA, 6DS, 4CT and 2 CB pedestals 8/1/2017 Consultant Need Approved Present Test Pass
75 72 Collection of cylinder for test of ratio 1:2:4. 8/2/2017 Refer to Lab Approved Present Test Pass
76 73 Collection of cylinder for test of ratio 1:2:4. 8/3/2017 Refer to Lab Approved Present Test Pass
77 74 Collection of sample for Gradation of Ratio 1:2:4 8/3/2017 Refer to Lab Approved Present Test Pass
78 75 Check the Shuttering and Steel fixing for equipment Foundations. 8/4/2017 Consultant Approved Present Test Pass
79 76 Resmpling of Bricks for Test. 8/7/2017 Refer to Lab Approved Present Test Pass
80 77 Collection of sample for Gradation of Ratio 1:2:4 8/8/2017 Refer to Lab Approved Present Test Pass
81 78 Check the Shuttering and Steel fixing for equipment Foundations. 8/8/2017 Consultant Approved Present Test Pass
82 79 Collection of cylinder for test of ratio 1:2:4. 8/9/2017 Refer to Lab Approved Present Test Pass
83 80 Collection of sample for Buitemn PB 4 for pad and pedestal Coating. 8/11/2017 Refer to Lab Not Approved Not Present Test Fail
84 81 Collection of sample for Buitemn PB 4 for pad and pedestal Coating. Aug-17 Refer to Lab Approved Present Test Pass
85 82 Collection of sample for Gradation of Ratio 1:2:4 8/17/2017 Refer to Lab Approved Present Test Pass
86 83 Check the Steel fixing, Shuttering of Equipment foundauions for concrete. 8/24/2017 Consultant Approved Present Test Pass
87 84 Collection of Cylinder for testing of Pedestal Concrete Ratio 1:2:4 8/25/2017 Refer to Lab Need Approval Present Test Pass
88 85 Collect the C/R for sample of Bricks for CHB work TF, Quantity 25,000 8/29/2017 Refer to Lab Not Approved Present
89 86 C/R for layout, shuttering, steel fixing of 1no trafo, 1no. SA and 1no. VT 8/29/2017 Consultant Approved Present Test Pass
90 87 C/R for material gradation test for concreting 0f 1Trafo, SA and VT for concreting 8/29/2017 Refer to Lab Approved Present Test Pass
91 88 C/R for resample of rebar Dia ( weight 8296) Mark 5H5 8/29/2017 Refer to Lab Discarded Not Present
92 89 C/R for resample of Bricks for CHB work (Quantity=25000) mark TF 8/31/2017 Refer to Lab Approved Present Test Pass
93 90 C/R for resample of Bricks for CHB work (Quantity=24000) Mark TF 8/31/2017 Refer to Lab Approved Present Test Pass
94 91 C/R for Coal Tar layer for pads and pedestals 9/20/2017 Consultant Approved Present Test Pass
95 92 C/R for collection of sand for CHB masonary works 9/9/2017 Refer to Lab Approved Present Test Pass
96 93 C/R for collection of Bricks for CHB Quantity = 24000 9/11/2017 Refer to Lab Approved Present Test Pass
97 94 C/R for sample of concrete (1:2:4) for gradation of 1No. Trafo 1No. SA and 1 No. VT 9/11/2017 Refer to Lab Approved Present Test Pass
98 95 Please collect the sample of gradation for Concrete(1:2:4) of D-Mix plant for PT, Vt and SA 9/11/2017 Refer to Lab Approved Present Test Pass
99 96 Please collect the concrete cylinder of ratio (1:2:4) for test, 3000psi of 1PT, 1SA and 1VT 9/11/2017 Refer to Lab Not Approved Present Test Fail
100 97 Please collect the soil sample for proctor density test of soil 9/12/2017 Refer to Lab Approved Present Test Pass
101 98 please collect the sand sample for C.H.B brick work 9/13/2017 Refer to Lab Approved Present Test Pass
102 99 Determination ofC.H.B back filling. Please check it 9/15/2017 Consultant Approved Present Test Pass
103 100 We want to start C.H.B DPC. Please check the level and give a go ahead 9/15/2017 Consultant Approved Present Test Pass
104 101 Please give us permission for Schimidth hammer test to check the Concrete Strength of 2 Gantries 9/15/2017 Refer to Lab Not Approved Present Test Fail
105 102 Please check the general layout and excavation of fence wall 9/19/2017 Consultant Approved Present Test Pass
106 103 Please collect the sample of bricks for C.H.B brick work ( Total Quantity = 12,500) of Mark M.R 9/20/2017 Refer to Lab Approved Present Test Pass
107 104 Please collect the sample of concrete of ratio (1:4:8) for the gradtion from D-Mix and Pak-Mix for fence wall lean 9/21/2017 Refer to Lab Approved Present Test Pass
108 105 Collect the steel sample of Dia 13mm(Total Weight = 8296Kg) and 25mm ( Total Weight = 850 Kg) for resampling 9/21/2017 Refer to Lab Discarded In file
109 106 Insepection of anchor and Bolts and stubs for equipment foundation and structure foundation 9/21/2017 Refer to Lab Approved Present Test Pass
110 107 Determination of fence wall final layout shuttering and leveling insepection 9/21/2017 Consultant Approved Present Test Pass
111 108 Pouring of concrete of ration 1:4:8 of fence wall 9/21/2017 Refer to Lab Approved Present Test Pass
112 109 Request of FDT on C.H.B 9/22/2017 Refer to Lab Not Approved Present Test Fail
113 110 Intimation of start of brick work of fence wall 9/22/2017 Consultant Need Approval In folder Test Pass
114 111 Please collect the brick sample for C.H.B and fence wall Mark OK QTY ( 8500) 9/25/2017 Refer to Lab Not Approved Present Test fail
115 112 Requesr for FDT of C.H.B 9/25/2017 Refer to Lab Not Approved Present Test Fail
116 113 Please collect the brick sample of Mark RB, quantity (10000) for fence wall 9/26/2017 Refer to Lab Not Approved Present Test Fail
117 114 Request for FDT of C.H.B 9/25/2017 Refer to Lab Not Approved Present Test Fail
118 115 Please collect the sample of sand for bricks measonary of C.H.B and fence wall 7/26/2017 Refer to Lab Approved Present Test Pass
119 116 Please collect the brick sample of Mark RB , Qty (10,000) for fence wall and C.H.B brick work 9/27/2017 Refer to Lab Not Approved Present Test Fail
120 117 Request for FDT for 2nd layer of C.H.B 9/27/2017 Refer to Lab Approved Present Test Pass
121 118 Request for FDT of C.H.B 9/26/2017 Refer to Lab Approved Present Test Pass
122 119 Please check the steel inspection and shuttering work of 3 Nos SA, 6 Nos DS, 2 CB and 3 CT 9/26/2017 Consultant Need Approval Discarded Waiting
123 120 Determination of poring concrete(1:2:4) of 3 Nos SA, 6Nos DS, 2 Nos CB and 3 Nos CT 10/14/2017 Consultant Need Approval Present Waiting
124 121 Gradation of Crush and sand sample. Please collect from D-Mix 10/14/2017 Refer to Lab Need Approval In Folder Waiting
125 122 Please check the DPC level of fence wall 12/30/2017 Consultant Need Approval Present Waiting
126 123 Please collect the sample of bricks Quantity( 20,000) Mark RB and Quantity(8500) mark OK for resampling 9/29/2017 Refer to Lab Approved Present RB pass OK fail
127 124 Please collect the brick sample of Mark MR Quantity(12,000) for fence wall and C.H.B brick work 9/29/2017 Refer to Lab Not Approved Present Test Fail
128 125 Request for FDT of CHB 3rd layer 10/2/2017 Refer to Lab Approved Present Test Pass
129 126 Request for FDT in CHB 4th layer 10/4/2017 Refer to Lab Approved Present Test Pass
130 127 Request for FDT in CHB 4th layer 10/5/2017 Refer to Lab Approved Present Test Pass
131 128 Please collect the sample of bricks of Mark M.R Quantity (20,000) for CHB and Fence wall Brick work 10/5/2017 Refer to Lab Approved Present Test Pass
132 129 Please collect the brick sample of Mark M.R Quantity (12,000) to be used in CHB for resampling 10/5/2017 Refer to Lab Approved Present Test Pass
133 130 Request to check the Top level of Lean concrete of fence wall 1/29/1900 Consultant Need Approval In pad Waiting
134 131 Request for pouring concrete for lean ratio (1:4:8) of fence wall 10/7/2017 Refer to Lab Need Approval Present Test Pass
135 132 Request for FDT 5th layer of control house building 10/7/2017 Refer to Lab Not Approved Present Test Fail
136 133 Request for FDT of Control house building 5th layer 10/9/2017 Refer to Lab Approved Present Test Pass
137 134 Please collect the sample of bricks of Mark M.R Quantity (25,000) for CHB and Fence wall Brick work 10/9/2017 Refer to Lab Approved Present Test Pass
138 135 Please collect the sample of bricks of Mark OK, Quantity (8,500) for CHB and fence wall brick work 10/9/2017 Refer to Lab Not Approved Present Test Fail
139 136 Request for FDT of CHB 6th layer 10/9/2017 Refer to Lab Approved Present Test Pass
140 137 Please collect the sample of ration 1:2:4 for gradation from D-MIX and Tetra-Mix 9/11/2017 Refer to Lab Approved Present Test Pass
141 138 Please collect the sample of bricks of mark MR, Quantity 6,000 for fence wall and CHB brick Work 10/11/2017 Refer to Lab Not Approved Not Present Test Fail
142 139 Please collect the sample of bricks of mark MR, Quantity 12,000 for fence wall and CHB brick work 10/11/2017 Refer to Lab Not Approved Discarded DESCON BRICKS, Removed from Site
143 140 Please collect the sample of brick of Mark MR, Quantity 25,000 to be used in CHB and fence wall brick work 10/12/2017 Refer to Lab Not Approved Present Test Fail
144 141 Request for FDT 5th layer of control house building 10/9/2017 Refer to Lab Not Approved Present Test Fail
145 142 Request for gradation of ration 1:2:4 from D-MIX and Tetra-Mix 10/13/2017 Refer to Lab Approved Present Test Pass
146 143 Request for FDT 7th layer of CHB 10/13/2017 Refer to Lab Not Approved Present Test Fail
147 144 Request for FDT 7th layer of CHB 10/14/2017 Refer to Lab Not Approved Present Test Fail
148 145 Request for FDT 5th layer of control house building 10/14/2017 Refer to Lab Not Approved Present Test Fail
149 146 Request for FDT of CHB 7th layer 10/14/2017 Refer to Lab Not Approved Discarded Test not conducted
150 147 Request for FDT of CHB 5th layer 10/14/2017 Refer to Lab Not Approved Present Test Fail
151 148 With refrence of check request #106 please give approval of L-Type anchor Bolts for equipment foundations 10/14/2017 Consultant Approved Present Test Pass
152 149 Request for the gradation of ratio (1:2:4) from D-Mix and Tetra-Mix 10/16/2017 Refer to Lab Approved Present Test Pass
153 150 Request for concrete pouring in 1No of PT and 1No of GA 10/16/2017 Refer to Lab Approved Present Test Pass
154 151 Please collect the sample of Y-type anchor bolts (36x600)from the lot at the site for resampling 10/16/2017 Refer to Lab Approved Present Test Pass
155 152 Please inspect the shuttering of 1No of PT and 1 No of Gantry 10/16/2017 Consultant Approved Present Test Pass
156 153 Please check the transmission line survey completed for 132KV Grid station 10/16/2017 Consultant Approved Present Test Pass
157 154 Request for Schmidth hammer test on 2No of Gantries(3,5) pad foundation, 1 No of PT wall, 1SA and 1VT pedestal 10/17/2017 Refer to Lab Not Approved Mehroze Sir Test Fail
158 155 Please collect the brick sample of mark F-16 Quantity (7,000) to be used in fence wall brick wall 10/17/2017 Refer to Lab Not Approved Present Test Fail
159 156 Request for FDT 8th Layer 10/17/2017 Refer to Lab Approved Present Test Pass
160 157 please collect the brick sample of MR, Quantity (25,000) for fence wall and CHB brick work 10/18/2017 Refer to Lab Approved Present Test Pass
161 158 Please collect the brick sample of Mark B-2, Quantity (8,000) for fence wall and CHB brick work 10/18/2017 Refer to Lab Approved Present Test Pass
162 159 Request for gradation of ratio 1:2:4 from D-Mix and Tetra-Mix 10/18/2017 Refer to Lab Approved Present Test Pass
163 160 Request for FDT of CHB , 5th layer 10/18/2017 Refer to Lab Approved Present Test Pass
164 161 Request for FDT of CHB 8th layer 10/18/2017 Refer to Lab Approved Present Test Pass
165 162 Please check the shuttering of 14 No of switch yard equipment pedestal (6DS, 6CT, 2CB) 10/19/2017 Consultant Approved Present Test Pass
166 163 Request for pouring concrete in 14 No of switch yard equipment Pedestal (6DS, 6CT, 2CB) 10/19/2017 Refer to Lab Need Approal Present Test Pass
167 164 Pleae collect the sample of bricks of Mark MR, Quantity(6,000) for fence wall and CHB brick work 10/19/2017 Refer to Lab Need Approval
168 165 Please collect the sample of bricks of Mark B-2, Quantity (12000) for fence wall and CHB brick work 10/20/2017 Refer to Lab Approved Present Test Pass
169 166 Request for gradation of ratio (1:2:4) from D-MIX and Tetra-Mix plant 10/21/2017 Refer to Lab Approved Present Test Pass
170 167 Please collect the brick sample of Mark (MB), Quantity (4000) for fence wall and CHB brick work 10/22/2017 Refer to Lab Not Approved Discarded Not forwarded
171 168 Please collect the brick sample for C.H.B and fence wall of Mark (B-2), Quantity(8000) 10/31/2017 Refer to Lab Not Approved Discarded Not forwarded
172 169 Please check the steel fixing and shuttering of work of 6DS,3VT, 3SA and 2 CB 10/23/2017 Consultant Approved Present Test Pass
173 170 Request for FDT, Retest 7th layer in CHB 10/20/2017 Refer to Lab Approved Present Test Pass
174 171 Intimation of start of brick work of fence wall, please give go ahead 10/23/2017 Refer to Lab Approved Present Test Pass
175 172 Please brick sample of Mark MB, Quantity(4,000) to be used in CHB brick work 10/23/2017 Refer to Lab Approved Present Test Pass
176 173 Request for pouring concrete (1:2:4),6DS, 3SA, 2CB grid station site 132KV 10/23/2017 Refer to Lab Approved Present Test Pass
177 174 Request for rail of Power Transformer, inspection 10/23/2017 Consultant Need Approval Consultant
178 175 Please collect the brick sample of Mark MR , Quantity (14,000 + 6,000) for CHB Brick Work 10/24/2017 Refer to Lab Approved Present Test Pass
179 176 Please collect the brick sample of Mark B-2, Quantity (12,000) for fence wall and CHB brick work 10/24/2017 Refer to Lab Approved Present Test Pass
180 177 Request for resampling of bricks of mark F-16,Quantity (7,000) to be used for CHB brick work 10/25/2017 Refer to Lab Not Approved Present Test Fail
181 178 Request for gradation of ratio (1:2:4) from D-MIX and Tetra-Mix plant 10/25/2017 Refer to Lab Approved Present Test Pass
182 179 Request for 1st DPC of CHB 10/25/2017 Consultant Approved Present Test Pass
183 180 Insepection of steel and shuttering work of 10 No of switch yard pedestals 10/26/2017 Consultant Approved Present Test Pass
184 181 Request for pouring of conrete of ratio (1:2:4) in 10 No of switch yard equipment pedestals 10/26/2017 Consultant Approved Present Test Pass
185 182 Please check the bitumen coating on switch yard equipment pedestals 10/26/2017 Consultant Approved Present Test Pass
186 183 Collect the brick sample of mark MR, Quantity 13,000 to be used for CHB brick work 10/26/2017 Refer to Lab Approved Present Test Pass
187 184 Collect the brick sample of mark B-2, Quantity 8,000 to be used in CHB brick work 10/26/2017 Refer to Lab Approved Present Test Pass
188 185 Request for concreting of Beam for trench opening in CHB 10/26/2017 Refer to Lab Approved present Test Pass
189 186(a) Request for brick work from 1st DPC to 2nd DPC 10/26/2017 Consultant Not Approved Present Request not recommended
190 186 Request for 2nd DPC of CHB 10/28/2017 Consultant Need Approval Present Test Pass
191 187 Request for CHB brick work from 1st DPC to 2nd DPC 10/26/2017 Consultant Need Approval Present Request not recommended
192 188 Request for gradation of ratio (1:2:4) from D-MIX and Tetra-Mix plant 10/31/2017 Refer to Lab Need Approval Present Test Pass
193 189 Request for gradation of ration 1:2:4 from D-MIX and Tetra-Mix 11/2/2017 Refer to Lab Need Approval Present Test Pass
194 190 Request for pouring of concrete of 1 No of GA pedestal and 6 No of CHB lintel 11/2/2017 Refer to Lab Approved Present Test Pass
195 191 Please inspect the shuttering of 1 No of GA pedestal and 6 No of CHB Lintel 11/2/2017 Consultant Approved Present Test Pass
196 192 Please collect the brick sample from grid station site for Control house building Brick work, Mark BA-2 Quantity 8,000 11/3/2017 Refer to Lab Approved Present Test Pass
197 193 Please collect the sample of bricks for CHB brick work, Mark B-2 Quantity 12,000 11/3/2017 Refer to Lab Approved Present Test Pass
198 194 Please collect steel sample of 13mm Mark Kohinoor(weight 4600kg) 25mm Mark PSC (weight 2500 Kg) and 100 Mark PSC (weigh 11/7/2017 Refer to Lab Approved Present Test Pass
199 195 Request for bed plate concrete of Control house building 11/18/2017 Consultant Approved present Test Pass
200 196 Request to check the roof slab level and brick work from 2nd DPC upto roof level 3600mm of common wall control room and 11/9/2017 Consultant Discarded Present Not forwarded
201 197 Request to check the DPC level of fence wall and brick work upoto DPC of fence wall 12/11/2017 Consultant Approved present Test Pass
202 198 Please collect the brick sample of mark B-2 , Quantity 20,000 for CHB brick work 11/10/2017 Refer to Lab Approved Present Test Pass
203 199 Please check the shuttering of 18 no of CHB lintel completed for concrete pouring 11/11/2017 Consultant Approved DHA Office Test Pass
204 200 Request for gradation of ratio 1:2:4 from D-Mix and Tetra-Mix 11/15/2017 Refer to Lab Approved Present Test Pass
205 201 Request for Schmidth hammer test on 2No of Gantries(3,5) pad foundation, 1 No of PT wall, 1SA and 1VT pedestal 11/13/2017 Refer to Lab Approved Present Test Pass
206 202 Request for fence wall excavation 11/13/2017 Consultant Approved Present Test Pass
207 203 Please check the shuttering of 1 no of Gantry pedestal and PT wall 11/20/2017 Consultant Approved DHA Office Test Pass
208 204 Request for5 concrete Pouring of 1 no of GA pedestal and PT wall and 18 no of lintel and 3 SA pedestal 11/20/2017 Refer to Lab Approved IN LAB Test Pass
209 205 Request for gradation of ratio 1:2:4 and 1:4:8 from D-Mix and Tetra-Mix 11/16/2017 Refer to Lab Approved Present Test Pass
210 206 Request for concrete pouring of ratio 1:4:8 into fence wall 11/16/2017 Refer to Lab Approved IN LAB Test Pass
211 207 Request for FDT deep test 2nd layer control house building 11/16/2017 Refer to Lab Approved Present Test Pass
212 208 Request for FDT deep test 6th layer in CHB 11/16/2017 Refer to Lab Not Approved Present Test Fail
213 209 Please check the brick work of CHB (height 4135mm) from FFL 11/23/2017 Consultant Approved Present Test Pass
214 210 Request for brick sample of mark B-2 Quantity 18,000 please collect from grid station site 11/16/2017 Refer to Lab Approved Present Test Pass
215 211 Request for sand sampling for brick work 11/16/2017 Refer to Lab Sample to be colPresent Not forwarded
216 212 Request for gradation of ratio 1:2:4 for gantry 11/20/2017 Refer to Lab Not Approved Present Test Fail
217 213 request for resampling of steel 10mm #3 weight (5000Kg) of Mark PSC 11/21/2017 Refer to Lab Approved Present Test Pass
218 214 Request for FDT deep test 6th layer in CHB 11/22/2017 Refer to Lab Approved Present Test Pass
219 215 Intimation of start of form work CHB and confirm the dimension of projection wall from drawing 11/23/2017 Consultant Approved DHA Office Test Pass
220 216 Request for gradation of ratio 1:2:4 from D-Mix and Tetra-Mix 11/23/2017 Refer to Lab Discarded Present Not forwarded
221 217 Request for resampling of steel 10mm #3 of Mark PSC 11/27/2017 Refer to Lab Approved Present Test Pass
222 218 Request for resampling of steel 13mm #4 of Mark Kohinorr 11/27/2017 Refer to Lab Not Approved Present Test Fail
223 219 Request for FDTdeep test 3rd layer in CHB 11/27/2017 Refer to Lab Approved Present Test Pass
224 220 Request for gradation of ratoio 1:2:4 from D-Mix and tetra Mix 11/30/2017 Refer to Lab Approved Present Test Pass
225 221 Please collect the brick sample of Mark B-2 Quantity *(15,000) Refer to Lab Need Approval DHA Office Test Pass
226 222 Request for co0nctrete pouring of 2 no of Gantry pedestal 12/2/2017 Refer to Lab Approved present Test Pass
227 223 As per refrence CR#94 and letter DEL/PC-E &I /DHA Ph-8 dated November 30,2017 please allow extra bars have been used to acco12/4/2017 Consultant Approved Present Test Pass
228 224 Please collect thesteel sample of 10mm #3 of Mark PSC weight (8000Kg) 12/5/2017 Refer to Lab Discarded Present Not forwarded
229 225 Please collect steel sample of 10mm #3 of Mark PSC weight (3850KG) 12/5/2017 Refer to Lab Approved Present Test Pass
230 226 Please inspect the CHB roof slab shuttering and steel fixing completed for concrete pouring 12/10/2017 Consultant Approved Present Test Pass
231 227 Request for gradation of ratoio 1:2:4 from D-Mix and tetra Mix 12/10/2017 Refer to Lab Approved Present Test Pass
232 228 Request for shuttering inspection of 1 no of gantry and 1 Earth Mast pedestal 12/7/2017 Consultant Approved Present Test Pass
233 229 Request for concrete pouring of ratio 1:2:4 in 1 no of Gantry and 1 No of Earth mast pedestal 12/7/2017 Refer to Lab Approved Present Test Pass
234 230 Copper condutor 95mm2 and Hawthorn (Aluminium) 600mm2 12/13/2017 Refer to Lab Approved Present Test Pass
235 231 Request for brick sample of mark BA-2 Quantity 10,000 and Mark B-2 Quantity 5,000 for brick work 12/14/2017 Refer to Lab Approved Present Test Pass
236 232 Request for gradation of ratio 1:2:4 from D-Mix and Tetra-Mix Refer to Lab Approved Present Test Pass
237 233 Request for concrete pouring of ratio 1:2:4 control house building roof slab 12/19/2017 Refer to Lab Rejected by consPresent Test fail
238 234 Please allow ultra powder -2000 as water proofing admixture for concrete/ vertical DPC 12/19/2017 Consultant Need approval Present To be handed over to DHA office
239 235 please check the electrification of chb completed for roof slab concreting 12/21/2017 Rejected
240 236 please collect the brick sample of mark b-2 12/23/2017 Refer to lab Approved present Test Pass
241 237 Request for CHB vertical DPC 12/26/2017 Vertical Dpc Allowed Approved present Test Pass
242 238 request for chb roof slab concrete pouring along with para-pit and pardi 12/28/2017 Refer to lab Approved present Test Pass
243 239 Request for FDT in CHB 9th layer 1/15/2017 Refer to lab Approved present Test Pass
244 240 request for FDT 10th layer in chb 1/20/2018 Refer to lab Approved present Test Pass
245 241 please give permission of switchyard erection 1/18/2018 Permission to start the Erec Approved present Test Pass
246 242 please give permission of power transformer erection 1/18/2018 Permission to start the Erec Approved present Test Pass
247 243 please check the fence wall brick work upto the dpc 11/5/2017 Check and Found Approved present Test Pass
248 244 please check the layout of cable trench and give go ahead for excavation 1/29/2018 Lay out Checked Approved present Test Pass
249 245 intimation to start the trenches brick work please go ahead 2/14/2018 Lay out Checked Approved present Test Pass
250 246 request for FDT 11th layer in CHB 11kv pass ,rest fail 2/2/2018 Refer to lab Approved present Test Pass
251 247 request for FDT 11th layer in CHB control pass,veranda fail 2/3/2018 Refer to lab Approved present Test Pass
252 248 request for FDT 11th layer in CHB 2/6/2018 Refer to lab Approved present Test Pass
253 249 please collect brick sample of mark(DG),Qty 15,500 from site (b-2)(4500) 2/7/2018 Refer to lab Approved present Test Fail
254 250 request for FDT 12th layer in CHB 2/7/2018 Refer to lab Approved present Test Pass
255 251 Intimation of start of fence wall brick work please give go ahead 2/7/2018 Allow to start Approved present Test Pass
256 252 request for FDT 13th layer in CHB 2/9/2018 Refer to lab Approved present Test Pass
257 253 please collect sand sample from site to be used for bricks work 2/9/2018 Refer to lab Not Forwarded in white Folder
258 254 Request for gradation of ratio (1:4:8) from D-MIX and aktar brother plant 2/12/2018 Refer to lab Approved present Test Pass
259 254 a please collect the brick sample of mark DG,Qty 16000 for resampling 2/13/2018 Refer to lab Not Approved present Test Fail
260 255 request for concrete pouring (1:4:8) of fence wall gate and CHB cabled trenches 2/12/2018 Refer to lab Approved present Test Pass
261 256 please collect sample of RCC pipe and 225mm dia Qty 130 nos from progressive pipe factory Ph-9 2/14/2018 Refer to lab in lab
262 257 intimation of start of CHB plaster work give a go ahead 2/14/2018 Discarded
263 258 request for CHB plaster work. Please give a go ahead 2/14/2018 you can start Approved present Test Pass
264 259 request for RCC pipe lying in CHB 2/15/2018 you can start Approved present Test Pass
265 260 request for completion of CHB trenches brick work please confirm 2/17/2018 you can start Approved present Test Pass
266 261 please check the switchyard trenches layout and give a go ahead for excavation 2/19/2018 you can start Approved present Test Pass
267 262 please collect brick sample of mark b-2 Qty 12000 from grid station site 2/21/2018 Refer to lab Approved present Test Pass
268 263 with refrence to Letter no please check the excavation lavel and layout for lean concrete of switchyard trenches 2/22/2018 you can start Not Approved present Test Fail
269 264 Request for gradation of ratio (1:4:8) from D-MIX 2/23/2018 Refer to lab Approved present Test Pass
270 265 please confirm the pipe RCC 225mm dia laid in CHB 2/23/2018 Refer to lab Discarded
271 266 request for FDT 14th layer in CHB 2/24/2018 Refer to lab Not Approved present Test Fail
272 267 request for FDT 10 th layer (Deep Test) in Telecom, battery,store room,and veranda area 2/24/2018 Refer to lab Need Approval in lab
273 268 request for concrete pouring ratio (1:4:8) switchyard trenches lean 2/24/2018 Refer to lab Approved present Test Pass
274 269 request for FDT 14th layer in CHB 2/26/2018 Refer to lab Approved present Test Pass
275 270 please collect brick sample of mark b-2 Qty 12000 from grid station site 2/26/2018 Refer to lab Approved present Test Pass
276 271 request for FDT Deep test 10th layer in CHB telecom and veranda area 2/26/2018 Refer to lab Approved present Test Pass
277 272 request for gradation of ratio (1:4:8) from D-mix plant. Please collect the sample from site 2/27/2018 Refer to lab Approved present Test Pass
278 273 please collect the sample of RCC pipe 225mm dia Qty 100 nos from progressive pipe factory 2/27/2018 Refer to lab Approved present Test Pass
279 274 request for FDT 14th layer in CHB 2/27/2018 Refer to lab Approved present Test Pass
280 275 please collect brick sample of mark b-2 Qty 6,000 from grid station site 2/27/2018 Refer to lab Approved present Test Pass
281 276 request for concrete pouring of CHB floor ratio 1:4:8 lean concrete 2/28/2018 you can start Approved present Test Pass
282 277 request for brick sampling of DG mark Qty 12000 2/28/2018 Refer to lab Not Approved present Test Fail
283 237 a request to check vertical DPC of CHB 12/28/2017 Discarded
284 278 request to check the vertical DPC of CHB 2/24/2018 Refer to lab Approved present Test Pass
285 279 intimation to start the excavation for laying of 225mm RCC pipe in switchyard 3/2/2018 you can start Approved present Test Pass
286 280 intimation to start p/f strips for dividing and flooring CHB into panels 3/1/2018 you can start Approved present Test Pass
287 281 request to check the excavated level for laying 225mm dia RCC pipe in switchyard 3/3/2018 you can start Approved present Test Pass
288 282 request to check the level of laid 225mm dia RCC pipe in switchyard 3/3/2018 you can start Approved present Test Pass
289 283 request to check the steel fixing for switchyard trenches 3/3/2018 you can start Approved present Test Pass
290 284 request for gradation of ratio (1:2:4) and (1:4:8) from D-mix plant please collect sample from plant 3/3/2018 Refer to lab Approved present Test Pass
291 285 request for control room cable trench channel checking 3/5/2018 you can start Approved present Test Pass
292 286 request for concrete pouring of switchyard trenches and CHB flooring (1:2:4) 3/6/2018 Refer to lab Approved present Test Pass
293 287 please collect brick sample of mark b-2 Qty=8000 from site 3/7/2018 Refer to lab Approved present Test Pass
294 288 Request for gradation of ratio (1:2:4) from D-MIX 3/8/2018 Refer to lab Approved present Test Pass
295 289 please collect the sand sample from site 3/7/2018 Refer to lab Approved present Test Pass
296 290 request to check the layout of transformer way 11kv structure and pmt please permission for excavation 3/8/2018 Checked ok Approved present Test Pass
297 291 request to check the excavation of transformer 11kv structure and pmt 3/8/2018 Discarded
298 292 request for concrete pouring of swithchyard trenches pad, control room and 11kv switchgear floor concrete 1:2:4 3/8/2018 Refer to lab Approved present Test Pass
299 293 request to check the excavation of transformer 11kv structure and pmt 3/8/2018 Check and Found Discarded
300 294 request for gradation of ratio 1:4:8 from D-mix plant please collect the sample 3/9/2018 Refer to lab Approved present Test Pass
301 295 request for concrete pouring of ratio 1:4:8 of transformer way,11kv structure and pmt 3/9/2018 Refer to lab Approved present Test Pass
302 296 as per ref of CR-235, please check the electrification of CHB completed for roof slab concreting 3/9/2018 Checked ok Approved present Test Pass
303 297 please collect steel sample of mark SJ steel (Qty 3=2000kg),(4=500kg),(6=700kg),(9=7600kg)(G 60) 3/10/2018 Refer to lab Approved present Test Pass
304 298 intimation of start of transformer way brick work.please give go ahead and fence wall gate too 3/10/2018 you can start Approved present Test Pass
305 299 please check TR available at site and give go ahead for fixing in 11kv switchgear room 3/12/2018 you can start Approved present Test Pass
306 300 please give a go ahead for stuck pointing CHB 3/12/2018 you can start Approved present Test Pass
307 301 request for gradation of ratio 1:4:8 from D-mix plant please collect the sample 3/12/2018 Refer to lab Approved present Test Pass
308 302 intimation of start of earthing pipe to be laid at site 3/12/2018 you can start Approved present Test Pass
309 303 request for resampling of steel mark (SJ),(#3) 3/14/2018 Refer to lab Discarded
310 304 please check layout and give go ahead of capacitor bank excavation 3/13/2018 Checked ok Approved present Test Pass
311 304 a request for concrete pouring (1:4:8) of transformer way ,PMT and 2 capacitor bank 3/13/2018 Refer to lab Approved present Test Pass
312 305 please check excavation of capacitor bank.check its level and give go ahead for concrete pouring 3/13/2018 Checked ok Discarded
313 306 intimation to start of excavation of tx line poles and tower and check the layout 3/15/2018 you can start Approved present Test Pass
314 307 request to collect steel samples of mark SJ steel Qty #3=2000kg, #6=700kg, Gd #60 3/15/2018 Refer to lab Not Approved present Test Fail
315 308 intimation to start the mosaic flooring and struck pointing of CHB 3/15/2018 you can start Approved present Test Pass
316 309 request to check the strips of CHB flooring channels for control room and TR for 11 kv switchgear room 3/15/2018 checked and found Approved present Test Pass
317 310 request to check the transformer way brick work 3/15/2018 checked Approved present Test Pass
318 311 request to check the PMT brick work 3/15/2018 checked Approved present Test Pass
319 312 request for gradation of ratio (1:2:4) from d-mix plant please collect the sample from plant 3/16/2018 Refer to lab Approved present Test Pass
320 313 request for concrete pouring of ratio (1:2:4) of transformer way,Capacitor bank and 11kv structure 3/16/2018 you can proceed Approved present Test Pass
321 314 request for gradation of ratio (1:2:4) from D-mix plant please collect the sample from plant 3/19/2018 Refer to lab Approved present Test Pass
322 315 intimation of start of Dowel bars placement and thermopole sheet for transformer way 3/19/2018 go ahead Approved present Test Pass
323 316 request for concrete pouring of ratio (1:2:4) of transformer way,Capacitor bank. 3/17/2018 Refer to lab Approved present Test Pass
324 317 request for concrete pouring of (1:2:4) of transformer way panels and capacitor bank pad 3/20/2018 Refer to lab Approved present Test Pass
325 318 request to check the sample of 11kv cables trenches platform in CHB and give permission to start placing them 3/20/2018 checked ok Approved present Test Pass
326 319 request for gradation from D-mix plant please collect the sample from plant. 3/20/2018 Refer to lab Approved present Test Pass
327 320 request for concrete pouring (1:4:8) lean of transformer way wall,PMT,veranda steps and CHB Washroom 3/20/2018 Refer to lab Approved present Test Pass
328 321 Please collect the brick sample of Mark B-2 Quantity -16000 3/22/2018 Refer to lab Approved present Test Pass
329 322 request to collect steel mark(P.S.C) Quantity 25mm (2000kg) 3/21/2018 Refer to lab Approved present Test Pass
330 323 request for concrete pouring (1:2:4) of transformer way panel 3/21/2018 you can proceed Approved present Test Pass
331 324 request for concrete pouring (1:2:4) of transformer way panel and PMT pad 3/22/2018 checked and found Approved present Test Pass
332 325 intimation of start of bricks work for CHB veranda steps 3/22/2018 you can proceed Approved present Test Pass
333 326 request to check the stuck pointing of CHB 3/22/2018 checked and found Not Approved present Test Fail
334 327 intimation of start of skirting in CHB 3/22/2018 go ahead Approved present Test Pass
335 328 request to check the fixed white glazed earthwire water closet squatting orissa pattern type. 3/22/2018 checked and found Approved present Test Pass
336 329 request for gradation from D-mix and Royal plant please collect the sample from plant. 3/26/2018 Refer to lab Approved present Test Pass
337 330 request for concrete pouring of (1:4:8) lean concrete for transformer way and culvert under transformer way. 3/26/2018 you can proceed Approved present Test Pass
338 331 request to check the excavation and layout for culvert under transformer way. 3/26/2018 checked and found Approved present Test Pass
339 332 request to collect the samples of bricks of mark B-2 Quantity (20,000) 3/26/2018 Refer to lab Approved present Test Pass
340 333 request to collect the samples of steel mark (SJ) of #3 Qty 2000kg ,#6 Qty700kg & #9 Qty 5000kg Grade 60 3/26/2018 Refer to lab Approved present Test Pass
341 334 request to check the plaster of CHB. 3/26/2018 checked and found Approved present Test Pass
342 335 request to check the skirting of CHB & veranda steps bricks work. 3/27/2018 checked and found Not Approved present Test Fail
343 336 request for concrete pouring of (1:2:4) of transformer way panels and 11kv structure. 3/27/2018 Refer to lab Approved present Test Pass
344 337 request for concrete pouring of (1:4:8) lean concrete for culvert under transformer way. 3/27/2018 Refer to lab Approved present Test Pass
345 338 request to check the laid earthing pipe at site 3/29/2018 checked and found Approved present Test Pass
346 339 request for gradation (1:2:4) from Royal plant. 3/30/2018 Refer to lab Approved present Test Pass
347 340 request for Concrete pouring (1:2:4) for culvert under transformer way 11kv padestal 3/31/2018 you can proceed Approved present Test Pass
348 341 request to check the shattering and steel fixing of culvert under transformer way. 3/31/2018 checked ok Approved present Test Pass
349 342 intimation to start the bricks work of culvert under transformer way. 3/31/2018 you can start Approved present Test Pass
350 343 Intimation to start the erection of PMT 4/2/2018 Checked ok Approved present Test Pass
351 344 Request to approve the tile sample of "Master" make for CHB toilet. 4/3/2018 Sample approved Not Approved present Test Fail
352 345 Request of concrete pouring (1:2:4) for culvert under transformer way slab, control room steps and 11 kv plat form lean. 4/4/2018 refer to lab Approved present Test Pass
353 346 request for gradation (1:2:4) from Royal plant and ratio (1:4:8) 4/3/2018 refer to lab Approved present Test Pass
354 347 Inspection of shattering and steel fixing of culvert under transformer way slab. 4/4/2018 checked and found Approved present Test Pass
355 348 Request to check the fence wall brick work. 4/5/2018 checked and found Approved present Test Pass
356 349 Request to check the Dowel Bars in transmission way (pad & slab) 4/5/2018 Checked ok Approved present Test Pass
357 350 Request to check the polyting sheet on DPC (1st and 2nd) of CHB. 4/5/2018 Checked ok Approved present Test Pass
358 351 Request to check the moosak flooring in CHB. 4/5/2018 found satisfactory Not Approved present Test Fail
359 352 Request to check the fan bar huk in CHB. 4/5/2018 Found ok Approved present Test Pass
360 353 Request to check the Brick work of Culvert under transformer way. 4/5/2018 checked and found Approved present Test Pass
361 354 please confirm the pipe RCC 225mm dia laid in CHB. 4/5/2018 checked ok Approved present Test Pass
362 355 Intimation to start the excavation and layout for plat form for 11 kv room. 4/5/2018 checked and found Approved present Test Pass
363 356 Request to check the Excavation of plat form for 11kv room. 4/5/2018 checked and found Discarded
364 357 Intimation to start the brick work of plat form for 11kv room and control room steps brick work. 4/6/2018 found satisfactory Approved present Test Pass
365 358 request to check the stuck pointing of CHB. 4/6/2018 Checked ok Approved present Test Pass
366 359 Inspection of steel fixing of transmission line. 4/6/2018 Checked ok Discarded
367 360 Intimation to start the erection of DS. 4/6/2018 Discarded
368 361 please collect the sample of Bitumen PB-4 4/9/2018 refer to lab Approved present Test Pass
369 362 Request to approve the tile sample of "Master" make for CHB toilet. 4/10/2018 Checked ok Approved present Test Pass
370 363 Request for Gradation (1:2:4) and (1:4:8) from Royal plant. 4/11/2018 refer to lab Discarded
371 364 Request to check the Excavation & Layout of transmission line (Tower & Poles). 4/11/2018 pole-1 ok and pole 2 more eApproved present Test Pass
372 365 Request for Gradation of (1:4:8) concrete.please collect the sample from Royal Plant. 4/11/2018 refer to lab Approved present Test Pass
373 366 Request for Gradation of 4000 psi concrete from Royal Plant. 4/11/2018 refer to lab Approved present Test Pass
374 367 Request for Concrete pouring of Transmission line poles of 4000 psi. 4/11/2018 you can proceed Approved present Test Pass
375 368 Please check the layout of ZM-30 tower and go ahead for lean concrete pouring (1:4:8). 4/11/2018 Lay out Checked FDT required In Folder
376 369 Request to check the sample of Fence wall panel and approve it. 4/12/2018 IN PAD
377 370 Request for concrete pouring of ratio (1:4:8) for Transformer way, Trenches and 11kv plat form. 4/12/2018 refer to lab Approved present Test Pass
378 371 Request for Gradation of 4000 psi concrete from Royal Plant. 4/13/2018 refer to lab Approved present Test Pass
379 372 Request for Gradation of ratio(1:2:4).please collect the sample from ROYAL Plant. 4/16/2018 refer to lab Approved present Test Pass
380 373 Request for Concrete pouring of R.C.C for ZM-30 Transmission Line Tower 4/16/2018 refer to lab Approved present Test Pass
381 374 Request of concrete pouring of ratio (1:2:4) for transformer way and Trenches. 4/16/2018 steel should be clean from rusting IN PAD
382 375 Inspection of steel fixing of ZM-30 Tower. 4/16/2018 checked and found Approved present Test Pass
383 376 Request for concrete pouring of TX-Line poles of 4000 psi 4/17/2018 refer to lab need Approval in lab
384 377 Request for Gradation of 3000 psi and 4000 psi please collect the sample from Royal Plant. 4/17/2018 refer to lab Approved present Test Pass
385 378 please check the Sample of brunt clay tiles. 4/17/2018 found and satisfactory Approved present Test Pass
386 379 Request to check the floor trap for washroom CHB. 4/18/2018 Sample approved Approved present Test Pass
387 380 Request for 4000 psi concrete pouring of TX-Line Pole. 4/18/2018 refer to lab Approved present Test Pass
388 381 Request to check the RCC pipes under trench. 4/18/2018 checked ok approved present Test Pass
389 382 Request for start the fence wall panel fixing and angle. 4/19/2018 you can start Approved present Test Pass
390 383 Request for start the fence wall gate fixing and 11kv Door D1 4/19/2018 you can start Approved present Test Pass
391 384 Request for Gradation of 3000 psi and 4000 psi please collect the sample from Royal Plant. 4/19/2018 refer to lab Approved present Test Pass
392 385 Request for concrete pouring of ratio (1:2:4) 3000 psi of H-type Trench wall and Transformer way panel. 4/20/2018 refer to lab Approved present Test Pass
393 386 Request for Gradation of 4000 psi concrete from Royal Plant. 4/21/2018 refer to lab Approved present Test Pass
394 387 Request for concrete pouring of ratio 4000psi for TX-Line pole. 4/21/2018 checked and verified Approved Present Test Pass
395 388 Request for Gradation of ratio (1:2:4).please collect the sample from Royal plant. 4/23/2018 refer to lab Approved present Test Pass
396 389 Request for concrete pouring of ratio (1:2:4) for Trenches, Transformer way panel. 4/23/2018 refer to lab Approved present Test Pass
397 390 Request for start the paint work of CHB. 4/24/2018 you can proceed Approved present Test Pass
398 391 Request for Gradation of ratio (1:2:4).please collect the sample from Akhter Brothers plant. 4/24/2018 refer to lab Discarded
399 392 Request for start the erection of panels in CHB. 4/24/2018 Checked ok Approved present Test Pass
400 393 Request for Gradation of ratio (1:2:4).please collect the sample from Akhter Brothers plant. 4/23/2018 refer to lab Approved present Test Pass
401 394 request for gradation of ratio (1:2:4) and (1:4:8) please collect sample from Royal plant. 4/25/2018 refer to lab Approved present Test Pass
402 395 Request for two samples of Aluminium for windows and Door and sample of glass. 4/25/2018 Sample approved Approved present Test Pass
403 396 Request for concrete pouring of ratio (1:2:4) 3000 psi of H-type Trench wall, Transformer way panel and fence wall top coping. 4/26/2018 refer to lab Approved present Test Pass
404 397 Request for Gradation of ratio (1:4:8) please collect the sample from Royal plant. 4/27/2018 refer to lab Approved present Test Pass
405 398 Request for concrete pouring of ratio (1:4:8) for Cable Trench k-Type 4/27/2018 Refer to lab Approved present Test Pass
406 399 Request for start the Excavation of earth mesh in switchyard. 4/27/2018 will be re verified Discarded
407 400 Request for Gradation of ratio (1:2:4) please collect the sample from Royal plant. 4/30/2018 refer to lab Approved present Test Pass
408 401 Request for concrete pouring of ratio (1:2:4) for H-type Trenches, Transformer way Panel and Fence wall top coping. 4/30/2018 refer to lab Approved present Test Pass
409 402 Request to collect the brick sample of mark b-2, Qty 10,000 4/30/2018 ok you can Approved present Test pass
410 403 inspection of steel fixing of Transmission line pole 1 4/6/2018 steel fixing checked Approved present Test pass
411 404 inspection of steel fixing of Transmission line pole 2 4/6/2018 Checked ok Approved present Test pass
412 405 Request for start the fence wall plaster work. 5/2/2018 you can proceed Approved present Test pass
413 406 Request for Gradation of ratio (1:2:4). Please collect the sample from royal plant. 5/2/2018 refer to lab Approved present Test pass
414 407 Request for concrete pouring of ratio (1:2:4) for H-type Trenches wall. 5/2/2018 refer to lab Approved present Test pass
415 408 Request to check & approve the sample for cable Hangers for Trenches in switchyard. 5/3/2018 in 4 no pad
416 409 inspection of H-type Trench steel#4 fixing and shattering. 5/3/2018 found satisfactory Approved Present Test pass
417 410 Request for Gradation of ratio (1:2:4) please collect the sample from Royal plant. 5/4/2018 refer to lab Approved Present Test pass
418 411 Request for concrete pouring of ratio(1:2:4) for k-type Trench Pad, Transformer way panel. 5/5/2018 refer to lab Approved Present Test pass
419 412 request to check the skirting of CHB & veranda steps bricks work. 5/4/2018 found satisfactory Approved present Test pass
420 413 Request to check the moosak flooring in CHB. 5/4/2018 you can proceed Approved present Test pass
421 414 request to check the earthing layout for grid earth mesh. 5/4/2018 found satisfactory Approved present Test pass
422 415 Request for Gradation of ratio (1:2:4) please collect the sample from Royal plant. 5/7/2018 refer to lab Approved Present Test Pass
423 416 Request for concrete pouring of ratio (1:2:4) for H-type Trenches wall, Transformer way panel. 5/7/2018 refer to lab Discarded
424 417 Request for Gradation of ratio (1:2:4) & (1:4:8) please collect the sample from Royal plant. 5/11/2018 refer to lab Approved Present Test Pass
425 418 Request for concrete pouring of ratio (1:2:4) for k-type Trenches wall, Parking area. 5/11/2018 refer to lab Approved Present Test Pass
426 419 inspection of k-type Trench steel#4 fixing and shattering. 5/11/2018 checked and found Approved Present Test Pass
427 420 Request to check the layout for power cable laying of power Transformer, Capacitor Bank and PMT 5/12/2018 found satisfactory Approved Present Test Pass
428 421 Request to check the Grounding set for ZM-30 Tower. 5/16/2018 you can proceed Approved Present Test Pass
429 422 Request to start the Aluminium work for Door and Windows in CHB. 5/12/2018 you can proceed Approved Present Test Pass
430 423 Request for Gradation of ratio (1:2:4) please collect the sample from Royal plant. 5/14/2018 refer to lab Approved Present Test Pass
431 424 Request to check the Marble strips 75mm dia for Parking Area. 5/14/2018 found satisfactory Not Approved Present Test Fail
432 425 Intimation to start the P/F of Washroom Accessories from item no H, 9 to 25- 5/14/2018 as per BOQ OK Approved Present Test Pass
433 426 Request for concrete pouring of ratio (1:2:4) for H-type Trenches, Parking Area, Draw pit PAD. 5/14/2018 refer to lab Approved Present Test Pass
434 427 Request for Gradation of ratio (1:2:4) please collect the sample from Royal plant. 5/18/2018 refer to lab Approved Present Test Pass
435 428 Request for concrete pouring of ratio (1:2:4) for k-type, H-type Trenches, Parking area. 5/18/2018 refer to lab Discarded
436 429 Intimation to start the Earthing of Switchyard i.e Conductor laying, Cat welding Joints & Earthing Rod Emplacement. 5/18/2018 only conductor lying Approved present Test pass
437 430 Inspection of steel fixing & shattering for Draw pit 5/18/2018 checked and found Approved present Test pass
438 431 Request to check the layout for Draw pit. 5/18/2018 checked and found Approved present Test pass
439 432 intimation to start the switchyard gate pillor. 5/21/2018 found satisfactory Approved present Test pass
440 433 Intimation to start the Brickwork for Transformer way. 5/21/2018 you can proceed Approved present Test pass
441 434 Intimation to start the bitumen coating P/L polything sheet S/F Jumbolon and brunt clay tile for CHB roof. 5/22/2018 you can proceed Approved present Test pass
442 435 intimation to start the Bitumen work for H-type , K-Type Trenches and Draw pit. 5/22/2018 you can proceed Approved present Test pass
443 436 Request to check the sample of Jumbolon Board. 5/24/2018 as per BOQ OK Approved present Test pass
444 437 Request for Gradation of ratio (1:4:8) please collect the sample from Royal plant. 5/25/2018 refer to lab Approved present Test pass
445 438 Intimation to start the Earthing of Switchyard i.e Conductor laying, Cat welding Joints & Earthing Rod Emplacement. 5/25/2018 you can proceed Approved present Test pass
446 439 Request for concrete pouring of ratio (1:4:8) for Transformer way, Draw pit 5/26/2018 found satisfactory Discarded
447 440 Request for Gradation of ratio (1:4:8) please collect the sample from Royal plant. 5/28/2018 refer to lab Approved present Test pass
448 441 Request to Check the Bitumen coating, polything sheet, Jumbolon Board and earth laid on C.H.B roof. 5/28/2018 checked and found Approved present Test pass
449 442 Request for concrete pouring of ratio (1:4:8) for Transformer way, Draw pit and septic tank. 5/29/2018 refer to lab Approved present Test pass
450 443 Request to check the Fence gate in switchyard. 5/29/2018 checked and found Approved present Test pass
451 444 Request to approve the Manufacture by (pak fan) Ceiling fan Exhaust Fan. 5/29/2018 as per BOQ OK Approved present Test pass
452 445 Request to check the Excavation for Earth mesh in Switchyard. 5/30/2018 checked and found Approved present Test pass
453 446 Request to check the conductor Length (599.5)m laid for Earthing in switchyard. 5/29/2018 checked and found Approved present Test pass
454 447 Request to check the conductor Length (596)m laid for Earthing in switchyard. 5/30/2018 checked and found Approved present Test pass
455 448 Request for Gradation of ratio (1:2:4) & (1:4:8) please collect the sample from Royal plant. 6/4/2018 Refer to lab Approved present Test pass
456 449 Request for concrete pouring of ratio (1:2:4) for Transformer way. 6/5/2018 refer to lab Discarded
457 450 Request to check the conductor Length (387.4)m laid for Earthing in switchyard. 5/31/2018 checked and found Approved present Test pass
458 451 intimation to start the Excavation for Septic tank. 6/2/2018 ok you can not approved present Test Fail
459 452 intimation to start the paint work for 11 kv switchgear room Trenches. 6/2/2018 ok you can Approved present Test pass
460 453 Request of erection for spg pole 6/4/2018 Discarded
461 454 Request of erection for ZM-30 Tower and SPG pole. 6/4/2018 ok you can Approved present Test pass
462 455 Request for Stringing of Transmission Line. 6/4/2018 Allowed need approval DHA Office
463 456 Request to check the measurements of Switchyard Trenches as per Design 6/4/2018 found satisfactory Approved present Test pass
464 457 Request to check the fence wall plaster work. 6/4/2018 checked and found Approved present Test pass
465 458 Request to check the fence wall panel & Angle. 6/4/2018 checked and found Approved present Test pass
466 459 Request to check the Tightness for Gentary, Beam, Earth Mast, 11kv Structure. 6/4/2018 checked and found Approved present Test pass
467 460 Request for concrete pouring of ratio (1:2:4) for Transformer way panel, Septic tank. 6/5/2018 refer to lab Discarded
468 461 Request to check the steel fixing and shattering for Septic tank. 6/5/2018 checked and found not approved present Test Fail
469 462 Request for Earthing of Switchyard i.e Conductor laying, Cat welding Joints & Earthing Rod Emplacement. 6/6/2018 Allowed Approved present Test pass
470 463 Request to check the Erection of PMT 6/6/2018 Anchor bolt are missing in pad
471 464 Request to check the Erection of Power Transformer. 6/6/2018 found satisfactory not approved present Test Fail
472 465 Request to check the Erection of Gentaries and Beam. 6/6/2018 found satisfactory Approved present Test pass
473 466 Request to check the Erection of Circuit Breaker. 6/6/2018 found satisfactory Approved present Test pass
474 467 Request to check the Erection of Disconnector switch. 6/6/2018 channel is not change not approved present Test Fail
475 468 Request to check the Excavation for Draw pit. 5/26/2018 found satisfactory Approved present Test pass
476 469 Request for Gradation of ratio (1:2:4) please collect the sample from Royal plant. 6/8/2018 refer to lab Approved present Test pass
477 470 Request for concrete pouring of ratio (1:2:4) for Transformer way, Septic tank. 6/9/2018 refer to lab Approved present Test pass
478 471 Request to start the Castiron pipe fixing for rain water. 6/8/2018 as per BOQ OK not approved present Test Fail
479 472 Request to check the excavation for septic tank 6/4/2018 found satisfactory not approved present Test Fail
480 473 Request to check the brick work and plaster work for fence wall gate pillor 6/11/2018 found satisfactory not approved present Test Fail
481 474 Request to check the bitumen coating for switchyard Trenches, 11kv structure, capacitor bank,PMT, Draw pit. 6/11/2018 found satisfactory approved present Test Pass
482 475 Request for 3-way cables hanger fixing in switchyard Trenches 6/11/2018 in pad
483 476 Request for GI earth strip fixing fence wall pillor 6/11/2018 you can proceed Approved present Test pass
484 477 Request for bar bid wire in fence wall 6/11/2018 you can proceed Approved present Test pass
485 478 Request to check the roof treatment and khuras. 6/11/2018 as per BOQ found ok not approved present Test Fail
486 479 Request to check the Aluminium work of CHB 6/11/2018 found satisfactory not approved present Test Fail

487 480 Request for Marble strips 75mm dia for parking area found satisfactory Discarded due to
date issue by DHA
5/14/2018
488 481 Request to check the cast iron pipe fixing shoes and bend. 6/11/2018 found satisfactory not approved present Test Fail
489 482 Request to check the Master tiles in CHB toilet and its Accessories for washroom. 6/11/2018 found satisfactory not approved present Test Fail
490 483 Request for check the platform and T iron in CHB 6/11/2018 checked and found Approved present Test pass
491 484 Request to check the Cat welding,lying conductor,joints earthing rod Emplacement and Riser. 6/11/2018 checked and found not approved present Test Fail
492 485 Request to check the Earthing Rod Quantity:68 Emplacement 6/11/2018 checked and found not approved present Test Fail
493 486 Request to check the erection of Outgoing,incoming,CP,RP,Bus Couplor,AC/DC panel and Battery Charger 6/11/2018 checked and found Approved Present Test pass
494 487 Request to check the Aluminium work of CHB 6/11/2018 silicon replace the plastic of not approved present Test Fail
495 488 Request to check the Master tiles in CHB toilet and its Accessories for washroom. 6/11/2018 as per BOQ OK Approved Present Test pass
496 489 Request to check the roof treatment and khuras. 6/11/2018 found satisfactory Approved present Test pass
497 490 Request to start the Castiron pipe fixing for rain water. 6/8/2018 found satisfactory Approved present Test pass
498 491 Request to check the brick work and plaster work for fence wall gate pillor 6/11/2018 Discarded
499 492 Request to check the cast iron pipe fixing shoes and bend. 6/11/2018 found satisfactory Approved present Test pass
500 493 Request for lying the Power Cables for Power Transformer,PMT and Capacitor Bank and sand bed for laid the cable 6/21/2018 Discarded
501 494 Request for lying the Power Cables for Power Transformer,PMT and Capacitor Bank as per Drawing. 6/21/2018 you can proceed Approved Present Test pass
502 495 Request to check the sample of socket board. 6/21/2018 ok in pad
503 496 Request to check the Brick work of switchyard gate pillor. 6/11/2018 found satisfactory Approved present Test pass
504 497 Request to check the sample of tube light manufacture by phillips. 6/25/2018 checked and found need approval in D/O
505 498 Request to check the laid of Power cables 1000MCM total length 10*90 and 5*88=1340 m for power T/F. 6/25/2018 checked and found Discarded
506 499 Request to check the the ACC 600 mm Total Length 20m for Connecting the jumpers DS to CB. 6/25/2018 checked and found Approved present Test pass
507 500 Request for Checked and Verified the Electrification Cables for CHB. 6/26/2018 checked and found Approved Present Test pass
508 501 Request to Check the Excavation of Power Cables lying for Power Transformer. 6/18/2018 checked and found Not Approved Present Test Fail
509 502 Request to check the laid of Power cables 1000MCM total length 15*89.5= 1342.5 m for power T/F 02. 6/25/2018 checked and found Not Approved Present Test Fail
510 503 Request to check the laid of Power cables 1000MCM total length 15*75=1125 m for power T/F 02 6/27/2018 Discarded
511 504 Request to check the excavation for septic tank. 6/2/2018 checked and found Not Approved Present Test Fail
512 505 Request to check the steel fixing and shattering for Septic tank. 6/5/2018 checked and found Not Approved Present Test Fail
513 506 Request to Check the Vinyle sample for Battery room in CHB. 6/29/2018 Discarded
514 507 Requst to check the AAC 600mm 6 Lengths of 46m 6*46=276m for 132kv bus bar. 6/30/2018 Discarded
515 508 Request to check the sample of Vinyl tile for battery room in CHB. 6/29/2018 found satisfactory Approved present Test pass
516 509 Request to check the sample of Bar bid wire . 7/2/2018 found satisfactory Approved Present Test pass
517 510 Request for start the lying of control cables 2.5mm, 6mm, 4 core, 8 core, 16 core. 6/28/2018 you can proceed Approved Present Test pass
518 511 Request to Check the AAC 600mm 6 Lengths of 7.33m 6*7.33=44m for Dropper 132kv line to DS (bay1&2) 7/1/2018 checked and found Approved Present Test pass
519 512 Request to check the 4*2.5mm Control cables Length 584m. 6/28/2018 Discarded
520 513 Request to check the laid of Power cables 1000MCM total length 15*75.6=1134 m for power T/F 01. 6/27/2018 checked and found Not Approved Present Test Fail
521 514 Request to check the 8*2.5 mm control cables length 560m. 6/29/2018 Approved Present Test pass
522 515 Request to check the 8*2.5 mm control cables length 461m. 6/30/2018 Approved Present Test pass
523 516 Request to check the 16*2.5mm control cables Length 439m. 7/1/2018 Discarded
524 517 Request for start the Shield wire in sy Gentry,Earthmast,and SPG pole. 7/2/2018 you can proceed Approved Present Test pass
525 518 Request to check the 4*2.5mm Control cables Length 354m. 7/2/2018 Discarded
526 519 Request to check the shield wire 4 Length Total Quantity 175m. 7/2/2018 Discarded
527 520 Request to start the Erection of CT And VT. 7/4/2018 you can start Approved Present Test pass
528 521 Request to check the shield wire 4 Length Total Quantity 171m. 7/2/2018 checked and found Discarded
529 522 Request to check the Cat welding,lying conductor,joints earthing rod Emplacement and Riser. 6/11/2018 Discarded
530 523 Request to check the Bar bid wire in sy. 7/7/2018 checked and found Not Approved Present Test Fail
531 524 Request to check the GI Earth strip fixing fence wall pilor. 7/7/2018 checked and found Approved Present Test Pass
532 525 Request to check the erection of ceiling fan (6 nos) 7/7/2018 checked and found Approved Present Test Pass
533 526 Request to check the erection of Exhaust fan and Butterfly Shutter. 7/7/2018 checked and found Approved Present Test Pass
534 527 Request for check the fixing of Flourescent tube Light 40 watt as per BOQ Specification. 7/7/2018 checked and found Approved Present Test Pass

535 528 Request for start the Erection of 132kv Bus Bar. Discarded due to
7/7/2018 date issue by DHA
536 529 Request to check the ACSR Rail Conductor 400mm Length 6*50=300m for SPG pole to Gentry. 6/5/2018 checked and found Approved present Test pass
537 530 Request for check the Excavation of Boundary wall. 7/11/2018 Discarded
538 531 Request for Dismantle the boundry wall length. 7/11/2018 Not Approved present Test Fail
539 532 Request for check the sand bed and bricks bed on power cables. Discarded due to
7/11/2018 date issue by DHA

540 533 Request for check the Sag of 132 KV Bus bar. Discarded due to
7/11/2018 date issue by DHA
541 534 Intimation to Start the installation of vinyl floor tile, MF20010 in battery room. 7/12/2018 Not Approved Present Test Fail
542 535 Request to check the power cables 1000MCM 6No's length = 606m for capacitor bank (1 & 2). 7/12/2018 Not Approved Present Test Fail
Request to check the control cables 4x6 sqmm length = 402m and control cables 4x2.5 sqmm
543 536 length 621m - NET length = 1023m. 7/6/2018 Approved Present Test pass
544 537 Request to check the control cables 4x6 sqmm length 279m.
545 538 Request to check the control cables 4x6 sqmm length 701m.
546 539 Request to check the control cables 4x2.5 sqmm length 388m.
547 540 Request to check the control cables 16x2.5 sqmm length 426m.
548 541 Request to check the control cables 4x2.5 sqmm length 272m.
549 542 Request to check the ACC 600 sqmm (Hawthorn) 6 No's length 6x43 =258m for 132 Kv bus bar.
550 543 Two vinyl tiles are not available, so we want to use on vinyl tile MF20010 for battery room.
551 544 Intimation to start the main hole.
552 545 Request for main hole brick work and plaster work.
553 546 intimation to start the erection of 11kv bus bar from T/F (1 & 2).
554 547 Intimation to start the erection of surge arrester.
Request for check the sample of 3 - way cables hangers (Measurment, Galvanization, tensile strength %
555 548 alongation total 130 quantity.
556 549 Request for check the shield wire 9 sqmm length no's = 197m.
557 550 Request for check the barbid wire in switchyard 4 rows (241).
558 551 Request to check the Grounding set for ZM-30 Tower.
559 552 Intimation to start the outdoor termination of power cables for transformer 01.
560 553 Request to check the erection of 11 kv Bus Bar for Transformer (1 & 2).
561 554 Request for check the termination of power cables for transformer (1&2) Ref # 552 Cr.
562 555 intimation to start the erection of capacitor bank.
563 556 Intimation to start the installation of batteries in battery room
564 557 Request to check the control cables 4x6 sqmm length = 517m.
565 558 Request to check the control cables 4x6 sqmm length =701m.
566 559 Request to check the control cables 16x2.5 sqmm length 661m.
567 560 Request to check the control cables 4x2.5 sqmm length = 774m.
568 561 Request to check the control cables 4x2.5 sqmm length = 283m.
569 562 Request to check the erection of current transformer and voltage transformer.
570 563 Request to check the Erection of Power Transformer.
571 564 Request to check the Erection of Disconnector switch.
572 565 Request for check the pipes of CHB washroom under floor pipe (100mm), water supply (20mm).
573 566 Request for check the AAC 600 sqmm total length = 115.3m for 132kv Busbar to DS Dropper.
Request for check the AAC (Hawthorn) 600 sqmm total length 40.8m for line bay jumpers DS to VT,
574 567
CB to CT, CT to DS
Request for check the AAC (Hawthorn) 600 sqmm conductor total length 33.6m for T/F Bay jumpers
575 568 Ds to CT, CT to CB.
576 569 Request to check the earthing rod = 68 qty emplacement.
577 570 Intimation to start the termination of LT and power Cables for PMT.
578 571 Request to check the copper conductor 95 sqmm for riser total length = 87.2m
579 572 Request to check the copper conductor 95 sqmm for riser total length = 118.2m
580 573 Request to check the copper conductor 95 sqmm for riser total length =67m.
581 574 Request to check the copper conductor 95 sqmm for riser total length =67m.
582 575 Request to check the copper conductor 95 sqmm for riser total length =67.3m.
583 576 Request to check the copper conductor 95 sqmm for riser total length =70.1m.
584 577 Request to check the IR power Cables Test with 5 KV MEEGER for transformer 01.
585 578 Request to check the IR power Cables Test with 5 KV MEEGER for transformer 02.
586 579 Request to check the erection of surge arrester
Request to check the earthing material ( earthing platform, cartridges, moulds with holding clamps,
587 580 grounding connecter) for 132 KV SY and CHB.
588 581 Request to check the 3 core 4/0 AWG Aluminium conductor total length = 89m for PMT.
589 582 Request to check the Termination of control cables for power transformer (1&2).
590 583 Request for check the termination of control cables in CP30, CP50, RTCC, RP-3, RP-4.
591 584 Request to check the termination of control cables for T/F bay, DS and CB.
592 585 Request to check the excavation of power cables for capacitor bank.
593 586 Request to check the excavation for Saptic tank.
594 587 Request to check the steel fixing and shattering for Septic tank.
595 588 Request to check the 3 core 4/0 AWG Aluminium conductor total length = 89m for PMT.
596 589 Intimation to start the termination of power cables for capacitor bank.
intimation to start the terminationof power cables for incoming panels capacitor control panels in
597 590 11kv Switchgear room.
598 591 Request to check the terminatiobn of control cables for line bay DS and CB.
599 592 Request to check the 5kv MEGGAR test of power cables for capacitor control panel.
600 593 Reuest for check the Erection of 132 KV bus bar.
601 594 Request for check the aluminium work of C.H.B
602 595 Request to check the excavation of power cables for power T/F.
603 596 Request for check the pipe of C.H.B.
604 597 Request for check the erection of power transformer (1&2)
605 598 Request for main hole brick work and plaster work of C.H.B.
606 599 Request to check the power cables 1000MCM 6No's length = 606m for capacitor bank (1 & 2).
607 600 Request to check the laid of power cables 1000MCM total lengths 15x75.6 = 1134m for power T/F 01.
608 601 Request to check the laid of power cables 1000 MCM total lengths 15x89.5 = 1342.5m for power T/F 02.
609 602 Request to check the paint work of C.H.B.
610 603 Request for check the termination of power cables for transformer (1&2).
611 604 Request to check the IR power cables test with 5kv MEGGER for power transformer 02.
612 605 Request to check the IR power cables test with 5kv MEGGER for power transformer 01.
613 606 intimation to start the termination of power cables for incoming panels, capacitor control panels in 11kv room.
614 607 Request for check the sand bed and bricks bed on power cables.
615 608 Request to check the excavation for septic tank.
616 609 Request to check the steel fixing or shattering for septic tank.
617 610 Request for check the termination of control cables in CP30, CP50, RTCC, RP-3, RP-4 and incoming panel.
618 611 Request to check the excavation of power cables for power transformer.
619 612 Request to check the Termination of control cables for power transformer (1&2).
620 613 Request to check the 5kv MEGGAR test of power cables for capacitor control panel.
621 614 Request for start the erection of 132 KV Bus Bar.
622 615 Request for layout and excavation of main Gate (intimation)
623 616 Request for check the 3 core 4 / AWG Aluminium cable total length = 89m of PMT.
624 617 Request to check the laid power cables 1000 MCM total length 15x75.6 = 1134 m for power transformer 01.
625 618 Request to check the laid power cables 1000 MCM total length 15x75.6 = 1142.5m for power transformer 02.
626 619 Request to check the erection of 132KV busbar.
627 620 Request for check the paints work of C.H.B.
628 621 Request for Marble strips 75mm dia for parking area.
629 622 Intimation to start the excavation for outdoor power cable at the back side of C.H.B.
630 623 Request for check the transmission of power cables for transformer (1&2) (outdoor termination)
631 624 Request to check the termination of power cables for incoming panels and capaciter control panels in 11kv switchgear.
632 625 Request to check the outdoor termination of 3 core 4/0 AWG cables for PMT.
633 626 Request to check the indoor termination of 3 core 4/0 AWG cables for bus coupler panel.
634 627 Request for check the wiring light or fan point with 1/1.3 (3/0.029) and wiring of 3/5 pin 5 amp wall socket point
with 1/1.3 (3/0.029) isulator copper wire.
635 628 Request for check the flush type 3 pin 15 amp S/Phase plus Socket switch.
Request for check the distribution board 14 SWG, S sheet powder coated 100Amp 400V with 01 No I/C CB 100Amps
636 629 and O/G CB- 6-30 Amps.
637 630 Request for check the B.C babelites button lamp holder with 200mm white glass globe and gallery etc.
638 631 Request for check the emergency fitting (D.C) light 1x100 watts.
639 632 Request for check the 3 - phase 4 pin water proof socket imported 415 volts Amp.
640 633 Request for check the aluminium work of C.H.B
641 634 Request for check the installation of batteries in battery room.
642 635 Request to check the eathing materials (earthing platform, cartridges, moulds with holding clamps, grounding
connectors for 132 KV SY and CHB.
643 636 Request for check the cable trays, racks, supports, cable conduits etc.
644 637 Request for check the paints work of C.H.B.
645 638 Request for check the D-1 Door S.E paint in 11kv switchgear room.
646 639 Request for check the main hole bricks work and plaster work.
647 640 Request for check the layout and excavation of main Gate and Boundry wall.
648 641 Request for check the pipes of CHB washroom under floor pipe (100mm), water supply (20mm).
649 642 Request for check the Bitumen coating of septic tank.
650 643 Request for check the erection of Surge arrester.
651 644 Request for concrete pouring of ratio (1:4:8) for Boundry wall and main gate piller and main hole.
652 645 Request for check the S.E paint D-1 Door of CHB
653 646 Intimation to start the bricks work for main gate pillor, Boundary wall.
654 647 Request for check the steel fixing of main gate piller.
655 648 Request to check the control cables 4x6 sqmm total length =323m.
656 649 Request to check one Vinyl tile MF20010 for Battery Room.
657 650 Request to check the paint work of C.H.B.
658 651 Intimation to start the Pre- commissioning and testing of all equipment (GS).
659 652 Request for check water sprinkling at site and unmetalled road.
660 653 Request for disposal of swerage and soil waste during enite project.
661 654 Request for Safetly material i-e First Aid Box, Safety gloves, helmets, eye shield etc and placement of sign board.
662 655 Request for storage of lubricants, fuels and other hydrocarbons.
663 656 Request for Analysis/ monitoring of air quality.
664 657 Request for check arranged workshop/ training sessions.
665 658 Intimation to start the dehydration of power transformer (1 and 2).
666 659 intimation to start the pre comissioning and testing of all equipment (GS)
667 660 Request for check the flush type 3 pin 15 amp S/Phase plus Socket switch.
668 661 Request to check the dehyderation of t/f (1 & 2)
669 662 Request to check Brick work and plaster of boundry wall.
670 663 Request for check the testing results of line bay 1
671 664 request for check the testing results of line bay 2
672 665 Request for check the testing results of PMT
673 666 Request for check the sample of gravel as per BOQ specifications
674 667 Request for check the testing results of transformer bay 1
675 668 request for check the testing results of transformer bay 2
676 669 request for check the testing results of earthing of S.Y equipment control room and 11kV Switchgear room
677 670 Request for check the testing results of PT Bay in S.Y.
678 671 Request for check the testing result of 11kV incoming, out going bus coupler
679 672 Request for check the erection of transmission line pole (SPG) (1No) with ASCR rail stringing with allied accessories.
680 673 Request for check the cable trays, racks, supports, cable conduits etc.
681 674 Request for check the fire protection as drawing / site requirments (1no)
682 675 request for check the erection of capacitor bank (T1 and T2)
683 676 Request for check the fire fighting systems as per BOQ
684 677 Request for check control cables lengths (4x6 sqmm =245m, 4x6sqmm =140m) (4x2.5sqmm =57m, 4x2.5 sqmm =112m)
(16x2.5sqmm =138)
685 678 Request for check the AAC 600 sqmm length = 54m, ACSR rail 400 sqmm length=150m, Riser 95 sqmm length 187m.
686 679 Request for check the erection of 12kV Surge Arrester of transformer T1 and T2
687 680 Request for check the erection of ZM-30 (1No), SPG Pole (1No) with stringing, hardware and allied accessories.
688 681 Request for check the testing results of capacitor bank (T1 and T2)
689 682 Please collect Brick sample of Mark B-2 Quantity 20,000/-
690 683 Request to check the length of 8x2.5 sqmm control cable (length =103m)
691 684 Request to check the excavation of outgoing feeder cables and also check the length of outgoing feeder cables
692 685 request to check the installation of Acs in CHB 1.5 ton x 1, 2 ton x 2.
693 686 DISCARDED
694 687 intimation to start graveling in switchyard and also check and confirm the backfilling level and compaction of site
695 688 request to check the excavation of sewerage line and main hole
696 689 request to check excavation of boundry wall
697 690 intimation to start of CHB Plinth
698 691 Intimation to start the trench cover casting of SwitchYard as per drawing at site
699 692 intimation to start the RCC pipe (dia=225mm) for sewerage line and main hole
700 693 Request to check and confirm your compaction and give go-head for graveli spreading
701 694 Request is in lab
702 695 please collect crush and sand sample quantity crush =350cft and sand 280Cft
703 696 request to check the brick work of CHB Plinth Protection
704 697 Request to check the glass strip in CHb plinth protection
705 698 Request for gradation of ratio 1:2:4 please collect the sample from royal plant
706 699 Request for Concrete poring of CHB plinth
707 700 Please Collect sample of crush 3/4 mix mazalla (QTY=500Cft)
708 701 request to check plain stee,l trench cover (Dia =6mm) as per drawing
709 702 Please collect the sample of RCC Pipe 225mm dia Qty 100 Nos from Alpha pipe factory barki road Lahore
710 703 Request to check the Switch yard trench cover as per drawing casting
711 704 Concrete poring for Switch yard trench covers
712 705 Concrete poring for Switch yard covers
713 706 Concrete pouring of switch yard trench covers
714 707 Request to check the trench covers in control room
715 708 Request to check the CHB lightening protection System S.Y lighting
716 709 please collect the brick sample mark (B2) QTY=1500
717 710 please collect the brick sample mark (B2) QTY=1500
718 711 Request to check the Relay settings test, result of MV Switchgear room of all outgoing panel of T1
719 712 Request to check the relay setting test result of all outgoing panels of T2
720 713 Request to check the Relay setting test result of MV Switchgear room of incoming panels T1 and T2
721 714 Request to check the relay setting test result of MV Switchgear room for capacitor panel of T1 and T2
722 715 Request to check the relay setting test result of RP4 panel of T1 and T2 (Transformer differential relay test )
723 716 Request to check the relay test setting result of RP4 panel of T1 and T2 (overcurrent and earth fault relay)
724 717 Request to check the relay setting test results of RP3 of (L1 and L2) (Distance Protection relay)
725 718 Request to check the relay test setting result of RP3 of (L1 and L2) (overcurrent and earth fault relay)
726 719 Request to check the excavation of existing feeder cables
727 720 Request to check the Backfilling of existing feeder cables
728 721 Request to check the removal / pulling out of HT cables
729 722 Request to check the relaying of HT cable
730 723 Request to check the supply and laying of sand fine ravi in cable trenches
731 724 Request to check the laying of bricks 1500 PSI protection Cover with 3" thick
732 725 request to check the switch yard gravel leveling as per drawing
733 726 request to check the laying of RCC pipe in Sewerage line (length verified as per site )
734 727 Request to check the brick work of main hole
735 728 request to check the plaster work mainhole.
736 729 request to check the excavation of sewerage line and main hole
737 730 Request to check the Backfilling of sewerage line main hole.
738 731 Request to check the steel fixing of mainhole slabs
739 732 Request to check the steel fixing of draw pit
740 733 Request to check the Switchyard trench covers
741 734 Request to check the erection of PMT
742 735 Request to check the termination of LT 4-core 19/0.083 PVC/PVC/Cu cable length =100m and 3 core 4/0 AWG
aluminium conductor 120 sqmm length = 89m of PMT.
743 736 Request to check the length of 95 sqmm Copper conductor total length = 190m
744 737 Request to check 132kV line and tranfs CT junction boxes (outdoor type) QTY = 4/- ,132 kV VT junction Box
(outdoor type) QTY = 1/-
745 738
746 739
747 740
748 741 Request to check the excavation of boundry wall
749 742 Request to check the excavation of capacitor bank Power cables
750 743 Request to check the excavation for capacitor bank control
751 744 Request to check the excavation around CHB for earthing
752 745 Request to check the steel fixing of switchyard trench covers
753 746
754 747
755 748
756 749
757 750
758 751
759 752
760 753
761 754
762 755
763 756
764 757
765 758
766

Anda mungkin juga menyukai