ANALISA BIAYA KONSTRUKSI

I. PEKERJAAN RANGKA ATAP


1 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS II
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN
(Rp.)

A. TENAGA
Pekerja OH 4.0000 80,000.00
Tukang kayu OH 12.0000 110,000.00
Kepala Tukang OH 1.2000 115,000.00
Mandor OH 0.2000 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Balok Kayu Kamper m3 1.1000 9,100,000.00
Besi Strip Tebal 5 cm Kg 15.0000 11,960.00
Paku 12 Cm Kg 5.6000 17,297.78
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

2 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN
(Rp.)

A. TENAGA
Pekerja OH 2.4000 80,000.00
Tukang kayu OH 7.2000 110,000.00
Kepala Tukang OH 0.7200 115,000.00
Mandor OH 0.1200 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Balok Kayu Jati m3 1.1000 9,100,000.00
Besi Strip Tebal 5 cm Kg 15.0000 11,960.00
Paku 12 Cm Kg 3.0000 17,297.78
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

3 MEMASANG 1 M2 USUK EXPOSE KAYU KLS I KAMPER


NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00
Tukang kayu OH 0.1000 110,000.00
Kepala Tukang OH 0.0100 115,000.00
Mandor OH 0.0050 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Usuk ( 5 x 7 ) Cm m3 0.0105 8,100,000.00
Paku 5 Cm dan 10 Cm Kg 0.2500 17,297.78
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

4 MEMASANG 1 M2 RENG KAYU KLS I KAMPER


NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00
Tukang kayu OH 0.1000 110,000.00
Kepala Tukang OH 0.0100 115,000.00
Mandor OH 0.0050 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Reng ( 2 x 3 ) Cm m3 0.0036 8,100,000.00
Paku 5 Cm dan 10 Cm Kg 0.2500 17,297.78
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)
5 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS II
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.1000 80,000.00
Tukang kayu OH 0.2000 110,000.00
Kepala Tukang OH 0.0200 115,000.00
Mandor OH 0.0050 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan Kayu Kamper m3 0.0108 10,100,000.00
Paku 7 Cm dan 10 Cm Kg 0.1000 17,297.78
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS (GEWEL)


NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN
(Rp.)

A. TENAGA
Pekerja OH 0.3000 80,000.00
Tukang Batu OH 0.1000 100,000.00
Kepala Tukang OH 0.0100 115,000.00
Mandor OH 0.0150 130,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.0000 1,500.00
Semen Portland kg 14.3700 1,450.00
Pasir Pasang m3 0.0400 400,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C)
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA
(Rp.)

320,000.00
1,320,000.00
138,000.00
26,000.00
1,804,000.00

10,010,000.00
179,400.00
96,867.56
10,286,267.56

12,090,267.56
-
12,090,267.56

JUMLAH HARGA
(Rp.)

192,000.00
792,000.00
82,800.00
15,600.00
1,082,400.00

10,010,000.00
179,400.00
51,893.33
10,241,293.33

11,323,693.33
-
11,323,693.33

JUMLAH HARGA
(Rp.)

8,000.00
11,000.00
1,150.00
650.00
20,800.00

85,050.00
4,324.44
89,374.44

110,174.44
-
110,174.44

JUMLAH HARGA
(Rp.)

8,000.00
11,000.00
1,150.00
650.00
20,800.00

29,160.00
4,324.44
33,484.44

54,284.44
-
54,284.44
JUMLAH HARGA
(Rp.)

8,000.00
22,000.00
2,300.00
650.00
32,950.00

109,080.00
1,729.78
110,809.78

143,759.78
-
143,759.78

JUMLAH HARGA
(Rp.)

24,000.00
10,000.00
1,150.00
1,950.00
37,100.00

105,000.00
20,836.50
16,000.00
141,836.50

178,936.50
-
178,936.50
RENCANA ANGGARAN BIAYA

No Uraian pekerjaan VOLUME/LUAS

1 Memasang 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas II 1.45


2 Memasang 1 M3 Konstruksi Gordeng, Kayu Kelas II 0.36
3 Memasang 1 M Listplank Ukuran (3 x 20) CM, Kayu Kelas II 48
4 Memasang 1 M2 Usuk Expose Kayu Kelas I Kamper 157.75
5 Memasang 1 M2 Reng Kayu Kelas I Kamper 157.75
6 Memasang 1 M2 Pasangan Bata Merah Tebal 1/2 Bata Camp. 1 PC : 3 PS (Gewel) 2.6
TOTAL
YA

SATUAN HARGA (Rp) JUMLAH HARGA (RP)

M3 Rp 12,090,267.56 Rp 17,530,887.96
M3 Rp 11,323,693.33 Rp 4,076,529.60
M Rp 143,759.78 Rp 6,900,469.33
M2 Rp 110,174.44 Rp 17,380,018.61
M2 Rp 54,284.44 Rp 8,563,371.11
M2 Rp 178,936.50 Rp 465,234.90
Rp 54,916,511.51