ANTICIPATED PERFORMANCE DATA FOR BOILER

CETHAR VESSELS LIMITED


TRANSMITTAL NO : EIS 013

100% BMCR Perf. 100% TMCR Perf. All HP heater Out 60% BMCR Perf.
Description Unit
Coal Coal A Perf. Coal Coal

GAS TEMPERATURES

Platen superheater Outlet °C 1067 1061 1059 969

Final superheater Outlet °C 969 961 959 865

LTRH Inlet °C 799 791 790 697

Economiser Inlet LTRH side °C 478 472 475 433

Economiser Outlet LTRH side °C 347 342 288 315

LTSH upleg Inlet °C 764 755 754 648

Horizontal LTSH Inlet °C 733 724 724 611

Economiser Inlet LTSH side °C 470 464 466 397

Economiser Outlet LTSH side °C 348 343 292 286

Mixed Economiser outlet gas temperature °C 347 343 291 303

RAPH outlet temperature (Uncorr.) °C 138 132 115 114

RAPH outlet temperature (Corr.) °C 133 127 111 109

STEAM TEMPERATURES

Superheater system

Saturation steam temperature °C 361 360 357 354

Horizontal LTSH inlet °C 359 358 357 355

LTSH upleg Outlet °C 385 388 404 372

DESH - I Outlet °C 381 377 370 369

Platen superheater Inlet °C 381 377 370 369

Platen superheater Outlet °C 471 468 478 460

DESH - II Outlet °C 470 468 455 460

Final superheater Inlet °C 470 468 455 460

Final superheater Outlet °C 543 543 543 543

Reheater system

Horizontal LTRH Inlet °C 332.7 326.8 334.9 292.5

High temperature reheater Outlet °C 543 543 543 543

WATER TEMPERATURES

Economiser Inlet temperature °C 281.2 277.5 180.6 250.5

Economiser Outlet temperature °C 324.2 323.1 275 297

Project M/s. Meenakshi Energy Private Ltd., 2 X 300 MW Sheet 02 of 04

Contract No: M/B/J087 & 088


ANTICIPATED PERFORMANCE DATA FOR BOILER
CETHAR VESSELS LIMITED
TRANSMITTAL NO : EIS 013

100% BMCR Perf. 100% TMCR Perf. All HP heater Out 60% BMCR Perf.
Description Unit
Coal Coal A Perf. Coal Coal

STEAM FLOW

Superheater system

Superheater Outlet flow Kg/hr 1165000 1088860 946230 699000

Spray flow Kg/hr 18400 45400 120900 8300

Feed water flow Kg/hr 1146600 1043460 825330 690700

Reheater system

Horizontal LTRH Inlet Kg/hr 951420 902610 927660 570850

High temperature reheater Outlet Kg/hr 951420 902610 927660 570850

Boiler thermal efficiency


Boiler thermal efficiency considered
A % 87.0 85.5 - -
for design

Pressure

Superheater Outlet pressure Kg/cm2(a) 179.0

DESH-I Inlet pressure Kg/cm2(a) 186.7

DESH-I Outlet pressure Kg/cm2(a) 185.9

Drum Operating pressure Kg/cm2(a) 192.25

Economiser Inlet pressure Kg/cm2(a) 197.1

Coal Flow

Coal Flow Kg/hr 200120

Air flow

Total combustion air flow Kg/hr 1338110

Air Ingress to furnace Kg/hr 33460

Total mill air flow through PA fan Kg/hr 417000

Total secondary air flow through FD fan Kg/hr 887650

Tempering air quantity Kg/hr 66225

GAS FLOW

Final superheater Kg/hr 1483330 1430100 1443740 954200

HTRH Kg/hr 1483330 1430100 1443740 954200

LTRH side Kg/hr 577020 566320 565950 547720

LTSH side Kg/hr 906310 863780 877790 406480

Economiser Outlet Kg/hr 1483330 1430100 1443740 954200

RAPH Inlet Kg/hr 1483330 1430100 1443740 954200

RAPH Outlet Kg/hr 1565431 1513562 1524480 1029390

ID Fan Inlet / Outlet Kg/hr 1565431 1513562 1524480 1029390

Project M/s. Meenakshi Energy Private Ltd., 2 X 300 MW Sheet 03 of 04

Contract No: M/B/J087 & 088


ANTICIPATED PERFORMANCE DATA FOR BOILER
CETHAR VESSELS LIMITED
TRANSMITTAL NO : EIS 013

100% BMCR Perf. 100% TMCR Perf. All HP heater Out 60% BMCR Perf.
Description Unit
Coal Coal A Perf. Coal Coal

Ash distribution

Ash percentage in Coal % 26.92

Bottom ash 20% Kg/hr 10780

Fly ash 80% Kg/hr 43100

Air Temperature

Secondary air circuit

Air temperature @ Inlet of FD fan °C 35 35 35 35

Air temperature @ Outlet of FD fan °C 38 38 38 38

Air temperature @ Outlet of SCAPH °C 38 38 38 38

Air temperature @ Outlet of RAPH °C 309 302 256 273

Air temperature @ Inlet of Windbox °C 309 302 256 273

Primary air circuit

Air temperature @ Inlet of PA fan °C 35 35 35 35

Air temperature @ Outlet of PA fan °C 39 39 39 39

Air temperature @ Outlet of RAPH °C 298 292 245 266

Air temperature @ Inlet of Mill after


°C 259 282 245 266
tempering

Air temperature @ Outlet of Mill °C 77 77 70 77

Project M/s. Meenakshi Energy Private Ltd., 2 X 300 MW Sheet 04 of 04

Contract No: M/B/J087 & 088