CALCULATION SHEET
A. Input Data
CALCULATION SHEET
Checked: Date:
13-Feb-19
Reference
No trashrack
Checked: Date:
13-Feb-19
Kloss=kt+kg+ks+kv+Ko+Kf
v=(Ht x2g/kloss)^0.50
Qoutlet=a x v
Qtotal=No x Qoutlet
ATHMUQAM HYDROPOWER PROJECT (450 MW)
No. of Sheets Rev.:
CALCULATION SHEET
2 0
Contract : Athmuqam Hydropower Project (450 MW) By: Date:
Haroon Abid 13-Feb-19
Component : Design of Orifice Spillway
Checked: Date:
Feature : Hydraulic Design Capacity of Orifice Spillway 13-Feb-19
Description Symbol SI (Metric) Reference