Location Type ID OD Flange Thk Min Hub Thk Material How attached
Num & Size
(a) ----- ---- ---- ---- ---- ---- ----- ------ -----
(b) ---- ---- ---- ---- ---- ---- ----- ----- -----
9. MAWP 3.5 kg/cm²g Full Vacuum at max. temp. 270 °C
(Internal) (External) (Internal)
Min. design metal temp. 0.2 ⁰C at 3.5 kg/cm²g . Hydro., pneu., or comb. test pressure
12. Remarks: Manufacturer’s Partial Data Reports properly identified and signed by Commissioned Inspectors have been furnished
items of the report : NONE
(Name of part, item number, Manufacturer’s name and identifying s
We certify that the statements made in this report are correct and that all details of design, material, construction, and workmans
conform to the ASME BOILER AND PRESSURE VESSEL CODE, Section VIII, Division 1. “U” Certificate of Authorization Numbe
expires JUNE 10, 2019 .
Vessel constructed by ALTECH INFRASTRUCTURE PVT. LTD at PLOT NO. E-535(A),INDUSTRIAL AREA CHOPANKI,BHIWAD
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and emplo
LLOYD'S REGISTER VERIFICATION LIMITED UK.
have inspected the component described in this Manufacturer's Data Report on 16/01/2017
to the best of my knowledge and belief, the Manufacturer has constructed this pressure vessel in accordance with AS
VESSEL CODE, Section VIII, Division 1. By signing this certificate neither the Inspector nor his/her employer makes an
implied, concerning the pressure vessel described in this Manufacturer's Data Report. Furthermore, neither the Inspecto
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or conne
URE VESSELS
bricated Vessels only)
Rules, Section VIII, Division 1
. LTD.
ASTHAN 301019, INDIA
Rev - 2 -- 2019
(National Board number) (Year built)
NA
numbers) [Special service per UG-120(d)]
2134 mm 3061 mm
ide diameter) [Length (overall)]
Bolting
Washer
Bolting Material Washer Material
(OD, ID, thk)
----- ----- -----
----- ----- -----
e1 Full 100 1
, sngl., lap, butt)] [R.T. (spot (Eff., %) (No. of
or full)] courses)
SA-516 GR. 70
(Spec. no., grade)
Bolting
Washer
Bolting Material Washer Material
(OD, ID, thk)
----- ---- -----
----- ----- -----
270 °C 270 °C
(Internal) (External)
d identifying stamp)
ALT - 323A
R.K.Sutradhar Date : 16/01/2019
Anil Nanda Date : 16/01/2019
R.K.Sutradhar
(Representative)
Data Report
Remarks
Item Number
(N2) STEAM INLET 1 DN 300 cl 150 flg SA 106 GR. B SA 105 10.31
(N3) VENT 1 DN 80 cl 150 flg SA 312 TP 304 SA 182 F304 5.49
(N4) VACUUM BREAKER 1 DN 80 cl 150 flg SA 106 GR. B SA 105 7.6
(N5) PSV 1 DN 100 cl 150 flg SA 106 GR. B SA 105 11.12
(N6) DOWNCOMER 1 DN 350 cl 150 flg SA - 516 Gr 70 SA 105 10
(N7) EQUALIZER 1 DN 250 cl 150 flg SA 106 GR. B SA 105 9.3
(N8) MANHOLE WITH DAVIT 1 DN 500 cl 150 flg SA - 516 Gr 70 SA 105 10
NOTES :-
1 Job No. : ALT-323A
2 Except Manhole, All Nozzle to flange as per fig. UW 21 (1).
3 Manhole to flange circumferential seam are butt welded using Type -1 joints are fully radiographed, joint efficiency
4 Impact testing is exempted as per UG 20 (f) for plates & pipes, as per fig.UCS-66 Note(c) for fasteners and as per UC
HAZ as per UCS 67 and as per UHA-51 for stainless steel pipes, flanges & fasteners.
5 Blind Flange on nozzle N8 attached with DN 500 BLRF flange with 20 Nos stud and two nuts each of
size 1&1/8" x Lg 170 mm of material SA 193 Gr B 7 for studs & SA 194 Gr 2H for nuts
6 Vessel Hydro tested in Vertical condition.
7 Pressure relief valve is not in scope of supply.
8 MSN of ALT-323A is mounted over Feed Water Storage Tank of MSN - ALT-323B and loading imposed by top vessel
9 Top vessel of MSN - ALT-323A & bottom Vessel of MSN-ALT-323B are connected and drain provided on bottom vess
Certificate of Authorization : Type U No. 53,968 Expires
Purchaser)
ress)
ALT - 323A
etc.) (Manufacturer’s serial number)
------ 2019
nal Board number) (Year built)
emarks
each of
Signed R.K.Sutradhar
(Representative)