MATERIAL TAKE-OFF LIST

Saudi Aramco 6228-ENG (11/2010)


REV. SAMS PER DWG.
DESCRIPTION STOCK SAP # QTY I/U STATUS REMARKS
CODE REQ. CODE
NUMBER
ARUBA 3810M SWITCH
00 ARUBA 3810M 48G POE+ 1-SLOT SWITCH; CS 1 EA T
PN: JL074A, COMPLETE WITH ALL THE
REQUIRED MODULES & ACCESSORIES
ARUBA 3810M 4SFP+ MODULE; PN: JL083A CS 1 EA T
ARUBA X372 54VDC 1050W 100-240VAC CS 2 EA T
POWER SUPPLY; PN: JL087A

FIBER OPTIC TRANSCEIVER


00 HPE X121 1G SFP LC LX TRANSCEIVER; CS 1 EA T
PN: J4859C
00 JUNIPER, SFP 1000BASE-LX GIGABIT ETHERNET CS 1 EA T
OPTIC MODULE; PN: SFP-1GE-LX

FIBER OPTIC PATCH CORD


00 FIBER OPTIC PATCH CORD, SM CS 1 EA T
LC-SC, DUPLEX, 2M

00 FIBER OPTIC PATCH CORD, SM CS 1 EA T


LC-SC, DUPLEX, 10M

UNINTERRUPTIBLE POWER SUPPLY (UPS)


00 APC SMART-UPS SRT 2200VA RM 230V; CS 1 EA T
PN: SRT2200RMXLI
00 APC SMART-UPS SRT 72V 2.2KVA RM BATTERY CS 1 EA T
PACK; PN: SRT72RMBP

00 HORIZONTAL RING MANAGER ORGANIZER CS 3 EA T


PANEL, 2U BLACK, COMMSCOPE

ISSUED FOR CONSTRUCTION


UTP PATCH PANEL CS 2 EA T
00 360-IPR-1100-E-GS3-2U-48 MODULAR PATCH
PANEL, COMMSCOPE, P/N 760152579

FIBER PATCH PANEL CS 2 EA T


00 FPP: 360G2 MODULAR 1U, SLIDING SHELF
PN: 360G2-1U-MOD-SD, MAT ID 760103085
SYSTIMAX 360 SOLUTION

00 INSTAPATCH 360 MODULES, 12SC-SM, FOR CS 4 EA T


SINGLE MODE FIBER, PN: 360DM-12SC-SM
MAT ID 760109975, SYSTIMAX 360 SOLUTION

00 TELECOM CABINET CS 1 EA T
MEGAFRAME CABINET 38RU
CHATSWORTH PRODUCT, P/N. M1223-111

00 CPI, HORIZONTAL BUSBAR, PN10610-019 CS 1 EA T

00 FIBER OPTIC CABLE CS 400 M T


FOC, SINGLEMODE, 24 CORE
LOOSE TUBE BUFFER CABLE
GEL- FILLED BUFFER, G.652D,
MANUFACTURER: MEFC OR RIYADH CABLE

PEDESTAL CS 1 EA T
00 BURIED CLOSURE: PEDESTAL TYPE UPC-1000,
EMERSON, WITH MOUNTING STAKE AND
ANCILLARIES

NOTES:
IU = ISSUE UNIT, EA = EACH, CS = CONTRACTOR SUPPLY, M = METER
1. ALL ITEMS ARE ASSUMED TO BE PROVIDED BY THE CONTRACTOR.
2. CONSTRUCTION CONTRACTOR SHALL VERIFY ALL REQUIRED QUANTITIES/MATERIALS TO PERFORM THE WORK AS SHOWN IN THE DESIGN DRAWINGS.
3. ALL OTHER MATERIALS NOT SHOWN IN THE DRAWINGS BUT ARE REQUIRED FOR THE SYSTEM FULL FUNCTIONALITY SHALL BE PROVIDED BY THE CONTRACTOR.

APPROVAL
COMPILED BY REV. REFERENCE DRAWING
CHECKED DATE PROJECT ENGR DATE
AMA 00 EML 04/15/18 MTM 04/15/18 CO-A00114.001
HA-176612.001
B.I. JO / E.W.O PHASE ENG. ITEM AREA START-UP DATE PRELIMINARY REV
28-00014 - 780 COMMS RT 03/08/2018 FINAL x REV 00
INDEX Materials for SHEET 1 OF 1
T DATA NETWORK CONNECTIVITY
PLANT TEMPORARY CONSTRUCTION FACILITY MTO-CO002
056 RAS TANURA SAUDI ARABIA