COLUMNAS
4.95 C-1
C-1
3 C-1
3
Ø3/8"@.10m
Ø3/8"@.10m
H=0.60 H=0.60
DF=1.00 MIN DF=1.00 MIN
4Ø1/2"
Ø3/8"@.10m Ø3/8"@.10m Ø1/4, 1@0.05,20@0.15,RESTO@.25
EMPEZANDO POR AMBOS EXTREMOS
DETALLE DE CIMENTACION
ESCALA 1/50
DORMITORIO 2
NPT+0.10
3 3 1 1 0.15
4.31
4.33
0.25 0.05
0.10
0.10
0.05
1.10
0.95
0.85
0.75
0.50
CORTE 2-2
DORMITORIO 1
Ø3/8"@.10m Ø3/8"@.10m NPT+0.10 Ø3/8"@.10m
Ø3/8"@.10m
Ø3/8"@.10m
Ø3/8"@.10m
8.67
2 2
8.70
C-1 SS.HH. C-1
2 2 0.25 0.05
0.10
0.05
1.10
0.85 0.95
0.75
0.50
4.36
4.38
CORTE 1-1
COCINA 1
1 1 NPT+0.10 1
SALA
NPT+0.10
0.05
0.10
0.05
0.85
Ø3/8"@.10m
Ø3/8"@.10m
0.75
H=0.60 H=0.60 H=0.60
DF=1.00 MIN DF=1.00 MIN DF=1.00 MIN
CIMENTACION B C
A ESCALA 1/50
ESPECIFICACIONES TECNICAS
Cimientos 1:10+30% P.G PROPIETARIO:
TAFUR CURAY DE SANTOS SARA
Sobrecimientos 1:8+25% P.M
Concreto Zapatas F'c = 175kg/cm2
UBICACION: CENTRO POBLADO EL INDIO
MZ. E1 LTE. 12 ,DISTRITO: CASTILLA, PROV:PIURA, DEP:PIURA
SAC.
Concreto Columnas F'c = 175kg/cm2 ESCALA: PROYECTO:
PROGRAMA TECHO PROPIO LAMINA :
E-01
1/50
Esfuerzo del Terreno ?T = 1.0kg/cm2 ESPECIALIDAD: AREA TECHADA: